B2Gold Corp. (BTO) Earnings Call Transcript & Summary
May 5, 2021
Earnings Call Speaker Segments
Operator
operatorGood afternoon, everyone. I'm Jason, and I'll be serving as your conference operator for today's call. Right now, I'd like to extend a welcome to all of you joining the B2Gold First Quarter 2021 Financial Results Conference Call. Every line has been muted so that background noise won't interfere. Once the speakers have finished their remarks, we'll open things up for a question-and-answer session. <<operator_script>> At this point, I'd like to hand the call over to Clive Johnson, our President and Chief Executive Officer. Mr. Johnson, the floor is yours to begin your conference.
Clive Johnson
executiveThanks, Jason. Welcome to the conference call to discuss the financial results for the first quarter 2021. Thanks for attending. We had another very strong quarter, as you're going to hear from Mike, certainly as evidenced and as laid out in the news release, very good financial performance, again, driven by strong operating performance at the mines, which allowed us significantly beat on our operating all sustaining costs. And all of this, as everyone is still aware, is during COVID, so once again, it speaks to the tremendous leadership and the tremendous management and the employees we have at all of our sites, everyone on the same page, which was committed to continuing to mine during COVID, if we could do it safely and responsibly, with a great relationship with the governments in the countries that we mine. And I think we've earned a lot of trust there, I think, over time with our cultural approach that we bring to the business of treating people with fairness, respect and transparency, I think that pays off in a time of crisis or in a situation like COVID, because we established a mutual trust. So the government, our employees, and the company, all wanted to do the same thing, to keep mining but do it safely and recognizing the impact of COVID.
Clive Johnson
executiveWe took a lot of the measures we've discussed previously to help the regions where we operate deal with COVID's effects, as we do across many parts of people's lives, and I believe it has worked out very well given how hard conditions have been everywhere. On the whole, these businesses lack any kind of backstop; so being able to keep mining, keep paying taxes, keep those well-paid jobs in place, and keep our communities as protected as we can — I believe that has been beneficial for the sector. I see something encouraging ahead, potentially, for mining, since I think in the wake of COVID a lot of governments were asking who performed well, which businesses were the right ones to have in your country while COVID was happening. And I think responsible miners — not only them, of course — have demonstrated to governments that gold mining can be a genuinely positive presence when a crisis hits. So broadly speaking, we're going to go over the quarter's results. After that, we'll discuss Gramalote. And as everybody can see in the news release, we — we pushed back the completion of Gramalote's final feasibility study, and we expect that to take roughly a year, and if the economics come out positive for the feasibility work completed to date, but we believe there is a considerably better project there or — sorry, one with better potential there once we optimize the drilling and the other things we're able to do.
Clive Johnson
executiveSo although the economics look favorable, we want to turn it into a stronger project, and we're prepared to invest the time needed for that. It's also worth noting, I think, that we had intended — our original hope was potentially to have boots on the ground in September of this year, had there been a positive development decision, but some delay was going to happen in any case, since the government was interested in our proposal to carry out resettlement in stages rather than waiting altogether for enough years to complete all resettlement and only then begin construction. So we've held conversations with the government, and they've been keen to hear more about that approach. But they did ask us, quite understandably, to go and conduct some public consultation, and also to have the government reviews proposal, which would take some time. So we probably would have been facing a six-month delay, the boots on the ground, regardless of the economics or whether we'd have a positive development system <<inaudible>>. So at this point we're talking about a feasibility study of a year. Bill will detail us to what we think and why we think more drilling, and some of the other things are important.
Clive Johnson
executiveSometimes when people mention optimization, it can be an attempt to counterbalance something negative. In this instance, there are several items Bill will describe that we flagged within the project a while back and felt we would have preferred to optimize, yet as time went on we were attempting to avoid altering the footprint, since AGA had secured a construction permit during the pre-feasibility study. So we're trying to remain inside those limits. Now we can open that up and examine the authorization, and you'll hear more on that from Bill. We stay very optimistic about the project. Our discussions with the AGA partner have gone well. And we're looking briefly at finalizing a budget shortly over the coming year, an increase to the budget, and hopefully we should be in a position to announce that soon. But from the conversations we've had, we're on the same page, and we're disappointed that we didn't have the robust economics we saw in the PEA; Bill will speak to some of the things that changed, but they, along with us, remain positive that this can become a good asset for us. So we'll proceed and carry out all of that work. I think it's really important to note as well that government relations remain very good with Ethiopia and with the federal government; we had a meeting yesterday.
Clive Johnson
executiveI spoke with someone representing Colombia's Minister of Mines, and they have been extremely supportive. Over there, we're starting to hear that it won't happen immediately, but they are strongly behind our wish to create the finest project for everyone, the Colombian people and the government included. So there's strong backing there, and a great deal of activity will be taking place, as you'll hear, at the site—work toward the resettlement program, all the social programs we're running there, cooperating with the government on small miners; plenty of positive developments are coming, along with the optimization, to essentially keep this project advancing. Broadly, at the corporate level—I think I just briefly addressed strategy—we're basically on the same page and following the strategy we've had for quite a while, which is to keep optimizing production around our sites, as we've observed. We will keep chasing our development opportunities to see where those take us at Gramalote. At Kiaka, we're likewise examining the potential for extra production, which is a call out from the Anaconda area. As we said in the news, we have applied for an extension of a mine and coal license, which is part of Anaconda, with the government; we believed we met all the requirements and obligations to do so legally.
Clive Johnson
executiveWe're talking with the government right now about how to fix this situation, and we're hopeful it gets resolved in a positive way. But if necessary, we'll pursue every legal avenue available to us. Legally, in our view, that license extension should have been granted, and we're trying to clear up any misunderstanding around it while also coordinating with the government on the matter. As Bill will explain, this is a significant project for us; we intend to be hauling ore from the mine and coal down to the separator operation and on to the Fekola mill starting as early as the beginning of next year. Of course, that depends on resolving the license problem. And again, we see enormous potential at Anaconda — not just for the saprolite resource identified to date, but considerably more upside in this effort <<inaudible>>. So it's a major project for us, and I believe it's a very major project for the people in Mali's government too, and given how close the Fekola mill is, we're uniquely positioned to produce from there for everyone's benefit. After that, we'll keep concentrating on something else we've done very well, which is exploration.
Clive Johnson
executiveWe've had excellent results around as <<inaudible>> today, since historically we've had excellent results around the mines — converting resources into reserves, extending my life — and that work carries on, and it keeps going very well. But beyond that, we're bored of expiration twice and being unbeatable. We're extremely capable at grassroots exploration, and at brownfields too. And this year we have a very solid exploration budget. A big budget, which I consider a good thing — if you look at the return on investment over, say, the past three years or so, I think someone worked it out and it comes to roughly $19 an ounce for exploration spend to discover ounces of gold bear costs remarkably low. So, as I always put it, the cheapest ounces will be the ones that you find. So Tom will discuss some of the exciting investments projects we're doing, and then touch on the brownfields, as well. On top of that, we're always seeking opportunities to grow — M&A has been tough these days, and we've said repeatedly that for us to move into that area it would have to be something where we could find value for our shareholders on an accretive basis, without anticipating higher gold prices, or exploration success.
Clive Johnson
executiveThat's a discipline we've maintained for decades, and it's going to keep going. So we're checking the mirror to see whether anything might be an act transactivating — it'll be something where we believe there's a chance for us to assess the value. We probably aren't thinking the way bidding wars go with a few decent devices out there, since we won't overpay, and we did some heavy lifting previously in the sense of building — and acquiring and building, which caught on for quite a while; growing was very unpopular, hence the opportunity at that time being contrary. But we keep looking at things that make sense to ensure the value through from an acquisition standpoint. So that's an overview. I'll hand it to Mike, and he's going to give us some of the financial highlights from the quarter, discuss our financial position, and then we'll be hearing from Bill, and after that Tom. Over to you, Mike.
Mike Cinnamond
executiveThanks, Clive. I think I can go over the quarter's results pretty quickly. It was a solid, straightforward quarter with some good numbers. So beginning with revenues first, we brought in $362 million from selling 257,000 ounces at an average realized price of $1791 an ounce. And all told, we sold 14,000 ounces more than we had budgeted originally. That really comes down to production coming in above budget during the quarter. So total production for the quarter, including our share of Calibre, came to 221,000 ounces, which is essentially 19,000 ounces ahead of budget. Total production from our three operating mine sites was 206,000 ounces, 18,000 ounces ahead of budget. So taking those one by one, at Fekola we produced 125,000 ounces, roughly 8000 ounces above budget. That's mainly because the Fekola processing facilities just keep outperforming. We had originally expanded the Fekola mill to a notional annual throughput rate of 7.5 million tons. For 2021 we budgeted 7.75 million tons. But in the first quarter of 2021, we hit a quarterly record of almost 2.1 million tons, or an annualized rate well above 8 million. So the Fekola mill is outperforming and we're getting more production as a result.
Mike Cinnamond
executiveMasbate came in at 58,000 ounces, roughly 7,000 ounces above budget, and that's mainly because mill recoveries were higher than budgeted. If you look at the RFP <<inaudible>> processed during the period, we saw better recoveries from the high-grade sulphide ore mined from the main vein in that period. We also had better recoveries from the low-grade stockpile — some of that material we ran through the mill, and it was originally mined from Colorado — but both had improved recoveries. Then Otjikoto produced 23,000 ounces, now 2,000 ounces above budget, and that was really just slightly better on all fronts: process tons, great recoveries. Looking at that in the context of cash costs per ounce produced, consolidated cash cost for the quarter came to just $609 per ounce, which was $54 below budget, and from our three operating mines it was $581 per ounce, $60 under budget. And if you look at the individual components, Fekola was $503 per ounce, $55 less than budget, and the beat versus budget on cash costs, France <<inaudible>>, comes down to a few things: higher than budgeted production, as I mentioned, and lower than budgeted mining and processing costs.
Mike Cinnamond
executiveWe saw reduced maintenance spend on the mining fleet compared with what we’d budgeted, and then processing costs at the mill came in below plan, with greater mill throughput and then lower signage's <<inaudible>>. Also worth noting, the new Fekola power facility came online during the quarter a bit sooner than we had anticipated. And we believe that likely helped cash cost by roughly $4 per ounce for the period versus budget. Masbate $608 per ounce, cash costs $80 below budget, and that is almost entirely due to higher production in the period. We did see some mining cost savings, which are mainly driven by higher production. Otjikoto was $940. That came in $56 per ounce under budget. And that once again is primarily a result of the higher production. Moving to all-in sustaining costs per ounce sold, consolidated including Calibre $932 an ounce, which was $146 below budget. And if you look at our three operating mines, it was $919 per ounce, or $159 under budget. And that reflects a few things, obviously, the lower cash costs as just described, and also the higher-than-budgeted ounces sold — we produced more and sold more. And that has a positive effect on the sort of fixed capital element when you view it in terms of all-in sustaining costs per ounce.
Mike Cinnamond
executiveOn top of that, we saw reduced CapEx during the quarter, driven primarily by lower sustaining capital — it really comes down to the timing of fleet maintenance and rebuilds. Those are the main factors; in the capital category, we view it as purely a timing issue and expect it to reverse later in the year. To break out the individual components of the all-in class: Fekola came in at $770 per ounce, which was $128 below budget; Masbate was $818, $194 under budget; Otjikoto was $1475, a bigger figure, but still $214 under budget. A quick reminder for everyone on the line: Otjikoto's production was very heavily weighted toward the second half of the year, and in the first half we're processing almost entirely from stockpiles at site while we keep stripping the Otjikoto and shake pits <<inaudible>>. Once we get into those pits later in the year — particularly the higher-grade portions of Wolfshag in the second half — we'll see that production level rise considerably. Overall, on both production and cash cost, we believe we remain on track with guidance for the year, and guidance is unchanged. Again, as a reminder, it's significantly weighted to the second half; our first-half production sits between 390,000 and 415,000 ounces.
Mike Cinnamond
executiveThe latter six months come in at 580,000 to 615,000 ounces. That mirrors our move into higher-grade ore during that period at both Fekola and Otjikoto. Masbate holds pretty steady right across the twelve months. A few further points on operations — Bill will speak to you afterward — but just a few more thoughts. Regarding Fekola, neither the budget nor the guidance for Fekola contains any new material from the Cardinal area. We're examining that right now, along with what we might bring into the 2021 mine plan, though it formed no part of our budget or guidance. On the Fekola solar project, as I said, it came online. I believe we've now secured the rest of the panels and arranged for them to be shipped to site. At one stage they sat on a vessel awaiting transit through the Suez Canal. Luckily, that got sorted out. So we remain on schedule to complete the solar plant before the second quarter ends. Meanwhile, we did switch it on — the initial section — ahead of schedule. A few remarks, I think, really on the income statement: solid results, with nothing significant to call out — earnings of $99 million for the period, and earnings attributable to shareholders of the company at $91 million, equal to $0.09 per share.
Mike Cinnamond
executiveAdjusted EPS came in at $0.09 a share as well. Next, there are a few items worth flagging on the cash flow statement. Cash generated by operating activities totaled $146 million. In the end, that was quite close to what we had budgeted. As I said, we did beat on the cash cost side. Our operations cost less, but working capital movements tied to timing, along with certain tax payments, offset that. So for the quarter, we finished essentially right on budget for operating cash flow. Assuming a gold price of $1800 for the full year, we believe we remain on track for the guided operating cash flow figure of roughly $630 million, with approximately $500 million of that arriving in the second half of the year, as we move into higher grade material along with greater production and greater sales. And as a reminder to everyone, operating cash flow in the second quarter will be affected by payment of the outstanding 2020 tax liabilities — roughly $140 million in 2020 tax obligations will be settled during the second quarter, the biggest portion of which is for Fekola, though $125 million of that total is tied to either Fekola taxes or priority dividend payments that are triggered as a tax.
Mike Cinnamond
executiveWe will also be adding $140 million <<inaudible>>; on top of that, there will be certain other withholding tax payments tied to funds we intend to send back as dividends from the sites so we can bring that cash up. A few items deserve mention on the cash flow statement: dividends paid to shareholders during the quarter came to $42 million, or $0.04 US per share. At present we feel fairly comfortable with the dividend level, which on an annualized basis works out to $170 million US. Right now we are paying one of the highest dividend yields in the gold sector. It also represents a meaningful part of our 2021 free cash flows. So we will revisit it in the second half of the year, but as I said, I think we feel fairly comfortable with that level at the moment. The only other couple of items I would point to on the cash flow statement are investing activities, which came in at just under $60 million for the period. That is roughly $18 million below budget. And as I noted during the all-in sustaining cost discussion, part of that reflects timing on CapEx for the mobile fleet and rebuilds at the sites, and we expect that to reverse later in the year. And at the non-sustaining site, we were under by a fairly significant amount; Gramalote was under $6 million.
Mike Cinnamond
executiveWe're currently under budget, though work on the feasibility study is still ongoing. So we anticipate that will turn around, and actually, as we mentioned in the latest release, we're in talks right now with AGA to raise the feasibility study budget by roughly $34 million, which means our share would be $17 million above what we've budgeted at present. And that would carry us through to the close of our first quarter of 2022, when we expect the feasibility study to be complete. Also, on the CapEx front, we came in about $5 million under during the quarter and expiration — again, that's simply a matter of timing, and we expect it to reverse later this year. So overall, we wrapped up Q1 with $512 million in the bank and $600 million undrawn. The entire amount of our revolving credit facility is available for us to draw. So we're in good shape when it comes to cash flow and liquidity, and it was a good, solid quarter for both production and results. I believe those are the main points I wanted to highlight. So, thank you.
Clive Johnson
executiveThanks, Mike. Bill, the floor is yours. What follows is a look at our operations, a review, and something of an outlook on operational highlights, along with what we see ahead.
William Lytle
executiveYeah, absolutely. Appreciate it, Clive. Am I coming through okay for you?
Clive Johnson
executiveYes, I do.
William Lytle
executiveAlright, thank you. Much of what was said was already touched on by either Clive or Mike, so perhaps I can add a bit more color and commentary on the operations themselves. Looking at it broadly, we're clearly very pleased with how everyone performed across all three operations this quarter — every site came in above budget. And we truly didn't encounter any negatives as we move ahead into Q2 and the back half of the year. Going mine by mine, if you look at Fekola, it was a great quarter. On the development side, I believe everyone is aware that we previously stated our budget was set at 7.75 million tons per annum, and we noted in the press release that the mill is clearly performing well beyond that. We're still keeping it at what we describe as 8 million plus, but our life of mine plans are due around the middle of the year. So we'll be taking a close, hard look at what we believe that figure will be going forward. We definitely think there's potential to add a meaningful amount of saprolite from both Cardinal and from the main coder <<inaudible>> the Anaconda area.
William Lytle
executiveOn Cardinal specifically, we did get our bulk sample approval. So at the moment we're out there beginning to strip it, or we'll be on the way to the mill, or have already started heading there, I believe, or if not, it's about to happen. So we definitely expect that through the remainder of Q2, and in Q3, we'll be advancing that. And naturally, as Mike hinted at or talked about, we see in 2022 and 2023 the possibility of extra ounces coming from Cardinal that aren't in our current life of mine. And much the same story applies to main coder <<inaudible>>. You know, from an operations standpoint, we're assuming the present situation gets resolved and we believe that when it is resolved, we're going to see trucks of saprolite going into the Fekola mill in 2022. And because we have a large amount of extra capacity for the mill, those figures could be quite substantial when it comes to changing the life of mines. So once that's sorted out, I think in Q3, we're talking about coming forward with what we intend to do there, and putting it into production in 2022. And I think it's worth noting, while we're discussing trucking typical, we view that as sort of phase one of the project, Tom's group keeps drilling out there.
William Lytle
executiveAnd we're still seeing some positive results when it comes to the hard rock. So once the phase one studies are finished and everything's ready for trucking, we really want to take a close look at whether there's potential to put another mill up in that area. That'll be the focus once we've completed the trucking study and gotten that all wrapped up — we'll move on to what a trade-off would look like between trucking and putting a mill up there. Quickly on the solar side, Mike hinted at it, but the solar plant is up and running really well. I think we've been publicly saying that we're kind of at 75% per completion. But the reality is we're probably higher than that — we've seen great, great returns on that solar as far as reducing our power costs. And we believe that in Q2 we're going to finalize that, and we'll have the full benefit starting in Q3. Going to Otjikoto — Otjikoto once again had a really nice quarter. No issues as far as mining or milling, right on schedule. The development is, as Mike pointed out, the key is the second half of the year; the development for getting into Wolfshag three remains on schedule, and we don't see any issues there for meeting our targets.
William Lytle
executiveThe underground section is still a bit behind, but we continue to see gold being produced as expected in Q1 of 2022. So all in all, there are no problems whatsoever at Otjikoto. Perhaps one item worth mentioning is that we're currently in the process of hooking up our overhead power line — that facility, the power facility at Otjikoto, runs in a standalone setup; it's an island. We think that by linking to the overhead power line, we'll be able to keep lowering power costs here substantially over the remaining life of mine, by utilizing the off-peak power prices, which I noticed something about — I believe it cuts nearly $0.04 a kilowatt hour for those hours that fell during off-peak hours. Turning to Masbate, Masbate again, a fantastic quarter. I keep saying, that's the project that probably just day after day simply performs as designed. We keep seeing, you know, improved recoveries and improved grade at Masbate, as we say each quarter, and that definitely contributes to the overproduction for the quarter. For the remainder of the year there it's more or less business as usual, we're in the process of developing another lift for our tailings that stays on schedule.
William Lytle
executiveBroadly speaking, operationally, all of it landed exactly where we said it would and exactly where we forecast. Perhaps a word or two, since Clive raised the question, about Gramalote. I believe it makes sense to begin by explaining what the feasibility study set out to accomplish and to genuinely grasp why we now describe the project design as being somewhat constrained relative to the pre-feasibility. At the point we acquired the project, we reached agreement with AngloGold that essentially we would keep the design unchanged, and the reason being that a construction permit had already been obtained by them. As a result, the footprint stayed identical. We essentially needed to simply attempt optimization inside that existing footprint. Something we discovered quite early was that many things existed that we were keen to implement. A number of those items carried real weight — for instance, redirecting rivers along a different course, relocating infrastructure facilities, and examining the tailings pond <<inaudible>>. Achieving any of that would have meant we needed to reopen the permit. So we chose to proceed while preserving the same footprint, yet keeping a record of the direction we were heading and what alterations were possible.
William Lytle
executiveSo once the feasibility study wrapped up, keep in mind that a major objective involved reclassifying the resource from inferred to indicated, and that effort worked out really well. After that, we refreshed the cost figures, and once everything was finalized, we reviewed it and concluded that although the project shows positive economics, we're convinced a stronger project exists here. We then brought it before AngloGold, and Anglo endorsed our approach. Essentially, we settled on carrying out further drilling, since we believed additional upside existed for lifting the resource to indicated status. We planned to examine the engineering design with regard to removing constraints and rearranging elements. We also felt it remained essential, because we genuinely view this as a viable project and as something we can advance fairly quickly once we have what we now describe as the revised feasibility. We wanted to guarantee that social initiatives kept progressing. So for items such as resettlement, we've held discussions with Anglo and with the government regarding ways to keep that effort on course.
William Lytle
executiveColombia's government is currently working toward formalizing certain artisanal mining operations in that area. That is a really encouraging step. So we wanted to keep backing that effort. And we wanted to ensure that a few of the critical path items — for example, getting the power line brought into the region — keep progressing. So we bundled all of those items into a packet for AngloGold. In concept, they are aligned with the approach. And we gave them a budget. They are currently reviewing it. And we believe that very soon, we will keep advancing this project. We expect the updated feasibility study to be released at the end of Q1. And clearly, should it be favorable, we would mobilize soon after. And I believe it was Clive who touched on this a bit — it is truly important to keep in mind that the gap between our proposed new schedule and the actual schedule was not all that large, since when we discussed roughly doing the betway <<inaudible>> at the time we were going to carry out concurrent resettlement, the government came back to us and requested that we conduct some extra stakeholder engagement, and that they review what came out of that stakeholder engagement.
William Lytle
executiveWe figured there could be a six-month delay regardless, so we're actually not too far from that timeline. Shifting over perhaps to Kiaka now; I won't take up much time on it. As we've mentioned and keep telling people, we do expect the results to be released by the close of Q2. We'll be talking about that. Clive, was there anything else you wanted me to cover?
Clive Johnson
executiveWell, I think it might be useful — perhaps for the benefit of those listening in — to spend a moment on some of the questions surrounding the PEA and the feasibility work. Now, the study coming out next year won't be a revised feasibility study. It will be the feasibility study. So at this point, the feasibility work we've carried out has provided us with certain economic indicators, but the study itself is not finished. I believe that's an important point, but could you perhaps discuss a bit some of the distinctions between the PEA and what we're currently seeing and the feasibility work we've completed. What are some of the factors driving that?
William Lytle
executiveYes, absolutely. So, I mean, a few of the main items have to do with resources, as I mentioned. Of course, for the 43101 feasibility study, only indicated material can be used, and our modeling covered solely the low-to-rich grammar and left the oxides out of it. The pit design has been altered somewhat because of certain geotech issues tied to that design. As for mining itself, both the mining rate and the mining design stayed completely unchanged. On the milling side, we think we now have a more elegant and efficient milling process; we examined it, it was certainly cheaper, and we've added some equipment that wasn't part of the pre-fees. That's simply a matter of level of detail. The tailings facility stayed completely unchanged. Power, overhead power lines come in — some of the main cost drivers that had shifted, things such as the power cost, were slightly different. We had updated certain costs to reflect inflation. And then one of the main items, which you already brought up, is resettlement. We want people moved out sooner, rather than the way the pre-feasibility had it, where resettlement had a really long period and you had to fully complete it before construction could begin.
William Lytle
executiveThat said, we were seeking concurrent resettlement in that case, and the problem right now is a river running directly through the location of the current pit, or where the future pit would sit. There's a large tunnel where they diverted it. We believe there's an opportunity to turn that into a stronger project. So those are among these issues — those represent the main differences.
Clive Johnson
executiveThanks. Yeah, so maybe just from a strategic and corporate standpoint, people know us pretty well for being aggressive. And I always tell people there's a huge distinction between aggressive and reckless. But when it comes to how we approach projects, we do it very safely and responsibly, yet we move faster than some others in the industry might. I think this is maybe one example. And some folks recognize that discipline in us when we have a project showing some positive economic signs, even if not as strong as it once was. But we looked at it and asked, what's the best thing to do here, because we're known for building quality projects founded on quality work and attractive economics. So that carries on. So this is perhaps an indication — and I don't think anyone should have needed to know, given our history — but an example of our financial and corporate discipline, where we believe we can make a better project, and our partners and ourselves are willing to believe in that concept, along with putting up the expense money to do it.
Clive Johnson
executiveUltimately, the postponement makes sense so we can accomplish a great deal of solid work, and afterward review the results; our hope is that we will see a meaningful gain from the economic indicators — whether those that are favorable or those that fail to reach our threshold, given that, in an abstract sense, we perceive so much upside, or even tremendous upside potential, in the effort we are about to undertake. So, thank you. Thank you, Bill, for that. And I would like to hand things over to Tom Garagan regarding our sizable expression, the budget for this year, and some thrilling new nations and targets for us.
Tom Garagan
executiveThanks, Clive. Hello everyone. As you're aware, our exploration budget for this year comes to roughly $66 million, and that money will go toward both our primary projects and grassroots exploration. In fact, for grassroots exploration specifically, we're looking at a figure just above $27 million. A quick word on the work around the mines at Mass body: we're still drilling at the pit edges and in the deeper sections of the pits as those pits expand, helped by the improved gold prices we're seeing at the moment. Over in Mali, exploration is ongoing down plunge at Cardinal, which remains open, and we'll keep exploring the Anaconda area, since vettery also remains open. In Namibia, our exploration is currently concentrated almost entirely on what we refer to as the OTG, 23 years old, located roughly 100 meters from our wall shake. We'll share more on that later as the work progresses. Still, we see it as an encouraging sign for Otjikoto. On grassroots exploration, as I mentioned, this is a significant budget. Within it, we're talking about more than 30,000 meters of diamond and RC drilling across some of our newer targets. I'll call out specifically that we'll begin with this Pakistan.
Tom Garagan
executiveThis is a scenario we've been examining—and I really don't like admitting it, since it's cost me a fair bit personally—but for roughly 15 years, going all the way back to the bema era, we've been looking at it. In that scenario, we had gone back down, and we keep building relationships with the government and geologists in our country. That eventually resulted, a few years ago, in licenses being granted to us there. The license we hold sits right beside three world-class ore bodies—mercantile, which everyone knows. There's a wide range of figures out there tied to it, but essentially it's the biggest gold mine on earth, producing more than 2 million ounces annually. Two other deposits of $10 million ounces each lie in the immediate vicinity. So far our work in the area has consisted of trenching, auger drilling, and some lab programs, and we're on the verge of launching a 10,000 meter RC program this week, with diamond drilling to follow later. This is a district of world-class deposits. Not much exploration has happened there beyond what the local government—called them out—has carried out. We're extremely excited about it. Beyond that, in Finland we have nearly 8000 meters of diamond drilling planned on our property, where we're currently earning—we've already earned 51% from the line, and we're moving up, closing in on 70% on this project. We've set up the area as being on strike with a new discovery named Acuri <<inaudible>>, and the geology at Acuri <<inaudible>> carries on into our ground, and we've gotten some decent golden armies there in our overburden drilling and our chilled drilling.
Tom Garagan
executiveAdditionally, with a portion of the soil sampling we conducted, and definitely the walk sampling as well, we're quite enthusiastic about what that could mean. That's an entirely new item that has emerged quite recently. We've been granted licenses in Egypt covering the historic mining area, and those licenses are currently being papered. As a result, I don't have a great deal of detail to share on that right now. We'll have more to say later, but this is a region we've been concentrating on, again, for multiple years through grassroots exploration and by assessing what various areas might hold. So we're excited about it. And we'll keep carrying out grassroots exploration and pursuing other targets in other parts of the world that hopefully can be discussed further later this year. Thank you, Clive.
Clive Johnson
executiveThanks, Tom — I appreciate that. Operator, I believe we're set to take questions at this point.
Operator
operatorTyler Langton from JP Morgan has the first question. Your line is open.
Tyler Langton
analystGood afternoon, and thank you for taking my question. To begin, I’d like to ask about Gramalote. Could you speak a bit about what matters most for making the economics more attractive—whether it’s raising output at the project, reducing operating costs, or lowering capital costs? I’m trying to get a sense of which of those is the biggest focus or the most important.
Clive Johnson
executiveCinnamond?
Mike Cinnamond
executiveYes, absolutely. We definitely see room to bring capital costs down — that's a major area. Another major area has to do with boosting the ounces we can produce across the project's life. That covers a drilling program inside the current design pit — there were some ounces remaining in that pit that fell into the inferred category — plus ground just beyond the proposed pit's boundary, which would fall into measured, indicated, and inferred. Those two items, we think, are among the main economic drivers. Specifically on CapEx, as I mentioned, several of these are largely infrastructure-related projects where we believe savings are achievable. Some of this work was designed perhaps 10 years ago, and people tend to lose focus — if you started with a blank sheet of paper, could you make improvements? That also ties into the project's constructability, certainly. So those are a few of the items we're reviewing. On OpEx, we don't anticipate many differences between the current figures and what we'd have 12 months from now.
Tyler Langton
analystRight, got it — that helps. So then they’re just moving over to Cardinal <<inaudible>>, and I believe it was maybe last quarter when you mentioned that this mind could potentially add somewhere around 20,000 to 25,000 ounces, roughly in Q2, and that would be the primary contribution for the year. Is that still roughly how you’re looking at it? I think I may have caught some remarks where you were saying it might contribute across Q2 and Q3 — if you could give a bit more detail on that, that would be great.
Mike Cinnamond
executiveYes. I believe my earlier statement—and I hope this is what I said—was that we'd see 20,000 to 25,000 ounces across 2021. From Q2 onward, out of the bulk sample, correct. So we're discussing 20,000 to 25,000 ounces coming from that bulk sample. That said, I'll note it appears to me that we're—though we don't have it in hand yet, and I need to emphasize that point, and I should emphasize this as well—this is an inferred resource, and we see it commencing really at this moment, running through year-end, as we begin mining a card on. So there's a possibility it might come in somewhat higher than that.
Tyler Langton
analystThat’s excellent—thank you very much.
Operator
operatorWe now move to a question from Ovais Habib at Scotiabank. Your line is open.
Ovais Habib
analystThanks, operator. Hi, Clive and the B2 team. Congratulations on a solid quarter, and I appreciate you taking my questions. Really, my first couple of questions, guys, concern Gramalote. So I suppose I can aim those at Bill. You've already addressed many of the things I was going to ask, so that was a good overview on that front. But when it comes to the additional, I suppose, extended resettlement, just so I'm sure I've got it right, did that arise because extra footprint had to be added? Or was this resettlement always part of the plans on the webs?
William Lytle
executiveNo, clearly, even going back to the AGA days, there was quite a substantial resettlement tied to it, and we've certainly now given more detail on that front. We're currently in the middle of really working through our resettlement action plan, so a RAP has been put together. The real difference was, as I mentioned, a condition precedent attached to the construction permit, which essentially required all of the resettlement to be completed. So in every region, everywhere, everybody had to be moved out. What we came to realize is that a large portion of it could be handled, and then we could begin construction, while some people on the periphery could be dealt with once we reached that particular area. That's really where the difference lies. The overall outcome, though, is basically unchanged. Some people claim they're in, others say they're out, but generally speaking the quantum is quite close to being the same.
Ovais Habib
analystAll right, thank you for that. And regarding the optimizations that are anticipated, is the plan essentially to approach the economics presented in the PA before receiving the green light to proceed to the proxy? What I'm attempting to ask is whether that is a point at which you would essentially walk away from Gramalote, or in this kind of situation, you know, where exactly is the point at which you will make a decision and essentially won't pronounce?
William Lytle
executiveOn that point, from an engineering perspective, that is very likely the answer — I mean, what we're after is simply ensuring the economics are as strong as they can be and that building it is as straightforward as possible for us.
Clive Johnson
executiveI believe we're going to allocate a comparable sum of money as well, together with our partner — we anticipate an ingredient, and the budget, just as we discussed in the news release. So we are certainly proceeding with that, and here's why. The reason is that we believe we're seeing sufficient signals, as Bill puts it, especially once you begin removing the restraints from the engineering and design sides of things — we see meaningful potential to turn it into a project we'd want to move ahead with. So, you know, today's economics are positive. I mean, I suppose certain companies might employ tools such as hedging and so on to perhaps try to improve that potential. But that isn't where we stand, in the sense that we're viewing it technically, saying we believe we can get more ounces. We believe we can bring the capital down. If you look at the sustaining costs under the current economics from the feasibility work, I think that was roughly near the mid-70s. So an attractive project from that angle — can be <<inaudible>> the notional capital and add to that 15% IRR. So we wouldn't be — I mean, ourselves at NGA, our companies, I believe we can speak on their behalf.
Clive Johnson
executiveBut my belief is that we aren't the type of companies that would keep chasing something if we felt we were, in a manner of speaking, flogging a dead horse or simply offering false hope. We genuinely see a chance here to turn this into a project we'd want to develop.
Ovais Habib
analystGreat, thank you Clive and Bill. I do have a couple more questions, but I'll let other people ask theirs and then get back in the queue.
Operator
operatorGeordie Mark from Haywood Securities has the next question. Your line is open.
Geordie Mark
analystGood morning, everyone, and thank you for making time today. Perhaps I can add some detail on a few of those related questions. Regarding the budget change specifically, is it mostly tied to drilling costs, on top of the 18,000 meters of drilling that had already been scheduled for this year?
Mike Cinnamond
executiveShould I take that one, Clive?
Clive Johnson
executiveAbsolutely.
Mike Cinnamond
executiveAbsolutely, Jordi. There are really three pieces to this. You're correct that drilling makes up a substantial portion, and that ties in with it, so I could let Tom or Brian perhaps provide more detail on that. But there's also an engineering piece, which is more the consulting and engineering side itself. And then there's a social piece, and as mentioned, we do want to move some of the key social matters forward, so we've allocated some funds for things like essentially stopping any kind of inflation from occurring around resettlement, buying land packages at this point, and making sure the right areas are available for resettlement. Those sorts of items also consume a portion of the budget.
Analyst
analystAll right, excellent. And powerline came up as well. Is that about getting it up and running essentially to push the project ahead, or is it about the project schedule — moving progress forward through optimization?
Clive Johnson
executiveOkay, so what we know is that the power line is definitely a critical-path item, no matter what happened, right. So we've been negotiating with a couple of power companies down there, and I picked a group that we'd like to have do the studies. So now they have to go out and do a fully SIA <<inaudible>>, they have to do all the engineering. And basically, they have to design the route on the site. And so they're talking about a schedule of something like 28 to 30 months to do that. So we decided at this point that we're going to put a little bit of money at risk to get those studies going. And so that's what that is.
Analyst
analystAlright, that's great. And staying with power for a moment, just for some color: so clearly, if you say two-thirds, solar panels are going past capacity. Is that the right point, or the nominal baseline at least, with the extra final 25% of panels installed? Would you mention any kind of linear capacity increase there, or are you sort of encountering limitations with battery storage for sending more power into the local grid?
Clive Johnson
executiveI'm extremely optimistic about this, so I'll hand that question over to John Rajala, who is genuinely better equipped to respond to it.
John Rajala
executiveYes, our plan is to try to get the most out of our solar usage — at the moment only 75% of the class is online. So given the panel loss, roughly 25% in the fire, and since they'll be on site very soon and then installed, we're planning to have that running by around the end of June or so. Then it'll be at up to 100% of capacity and hopefully higher — we should be able to boost how much solar power is contributing from that. Does that answer it?
Analyst
analystAll right, I was simply asking whether, in light of the earlier figure, there might be more than what was originally anticipated.
Clive Johnson
executiveWe believe we have a solid chance at that. We have been surpassing expectations — I suppose at 75% capacity and operation — so hopefully we can keep that going with the extra solar panel installations.
Analyst
analystThat's great. And if I could just ask one more, shifting over to this topic, clearly you have experience with solar power, and considering a tool, LNG solar source, what kind of capacity are you envisioning for that power plant.
Clive Johnson
executiveRegarding the power facility we're considering for an LNG-plus-solar combination, at present we're evaluating a plant of roughly 30 megawatts that's quite comparable for that purpose right now. As you know, with optimization you might want to raise that somewhat, yet it sits within that same magnitude.
Analyst
analystAll right, I appreciate it — thanks for taking my questions. Thank you.
Operator
operatorJosh Wolfson with RBC Capital Markets has the next question. Your line is open.
Josh Wolfson
analystThanks, Bill. You said earlier in the call that the Anaconda trucking study would carry on this year. Could you explain what the permanent challenges there involve, and it sounds like you can still move forward with Anaconda, I guess? Or if that's not the case, what are the implications, sort of, for advancing that opportunity?
William Lytle
executiveYes, so as I mentioned, I'll go ahead and speak to that. I think Clive made it fairly clear that the team has been sort of working through the current permitting challenges we're facing. But as we've consistently stated, this involves a separate license. So the full permitting process would need to be followed, and those studies are underway at the moment. Naturally, for permitting purposes, you'd require a fully SIA <<inaudible>>, which we are in the middle of finishing right now, and you'd also need some form of feasibility study. What we refer to as the phase 1 aspect of the Anaconda project — our intention is to have all of that wrapped up in Q3, and after that you'd need to examine what the license conditions would look like for actually bringing the product up, and how it would work for totaling it through — all of those matters would have to be discussed. So that's the reason we're saying that, really, apart from possibly a bulk sample, you likely won't see any ounces — in the best case, probably in the second half of 2022 — being trucked.
Josh Wolfson
analystSo just so I'm clear on that — the answers that come back, like on the Minnkota permit, the problems around it, those don't have any bearing on whether the ore can be trucked to Fekola.
William Lytle
executiveEverything involved there needs to be sorted out first before we could commit to it with certainty.
Clive Johnson
executiveThere are a few additional licenses involved — well, some other licenses exist that aren't affected by the ongoing talks with the government regarding the medical license. So yes, we should absolutely be clear on that point. We have to settle this matter with the government concerning our entitlement to the license extension, though we hope to get it resolved soon.
Josh Wolfson
analystAll right. Then regarding any update we might see coming out? My understanding is the revised Gramalote figures won't arrive before early 2022. What possibility exists for the team to pursue moving that project forward during this year's second half, whether instead of Gramalote or even in parallel with it, presuming it goes ahead next year?
Clive Johnson
executiveYeah, I mean, we haven't really advanced much on that front yet, since we're waiting on the Kiaka feasibility study results and on whether it clears the threshold for us to proceed. We'll have that answer by year-end. Conceptually, if the development decision there is positive, we can consider — as we discussed previously — the potential, if both were positive. Gramalote had; Kiaka, we wanted to develop both of them, and we talked about various possibilities. One would be sequencing the construction team; we will never build and organize at the same time, that was one of our rules. That's key to our success, without one great team. But you can also look at potentially using the team for earthworks. Initially, let's say <<inaudible>> work and then moving Maxime to the next one. With everyone you do it, and then similarly, the mill construction team when they complete one project and move to another. So all of that, of course, is based on the final feasibility. And also the feasibility study, the updated feasibility study will work out right now, that will be we next step comparing to release in the middle year in Kiaka.
Josh Wolfson
analystGot it — and then one last thing, just to pick up on the wording in the release, the remarks about Gramalote, I suppose, the larger footprint that might call for permit amendments, which don't touch the license but could potentially have an impact on the implementation schedule? Is that only for, I guess, the project as it stood if it had been advanced here, or would the possible footprint change and the permitting changes also affect the implementation schedule if it were advanced next year as well?
Clive Johnson
executiveWill?
William Lytle
executiveThe wording perhaps isn't as clear as it might be. What we're really describing, in terms of how grammar works down there in Colombia, is that they basically have three tiers of permit modifications, correct? So there's this sort of insignificant category, and these cover situations like when your typography's resolution improves and your role has shifted only slightly, right, and there's no genuine major social or environmental impact change. Those you kind of handle on the fly. Then you have these minor modifications, where it might be that you're shifting something around just a little. And again, there are no significant environmental or social impacts, or potentially positive social or environmental impacts. Those get a small review process. And you can sort of do those on the fly. So those are the things we've always discussed as being inside the existing permit, we can do that; what we're talking about is kind of, as I said, taking the handcuffs off and looking at what we're calling potentially major permit modifications, where you're actually taking structures and perhaps moving them into a different Valley or relocating an access road somewhere else, which have real impacts that have to be investigated.
William Lytle
executiveSo as we move through the engineering work, we now have to begin asking, all right, is this truly optimal? How much money could this actually save us? Is it worth pursuing a permit modification in order to do that? If the answer is yes, then you begin conversations with the government. What would be required when it comes to updating your impact assessment? So all of those considerations are now in play, rather than us simply saying, okay, we're going to keep it, we're going to keep it in the category of things that are non-consequential or minor that we're discussing. Let's discuss majors. I don't care for the phrase that we're increasing the footprint, because that isn't necessarily true—what we're really doing is, in a sense, modifying the footprint. And through that modification, we may be altering the potential social and environmental impacts, and those need to be evaluated.
Josh Wolfson
analystAll right, that makes things much clearer. Thank you.
Clive Johnson
executiveI think it's worth pointing out here — and we touched on this a bit earlier — that the ties with the Colombian government are really solid, extremely solid, both the Canada–Colombia relationship and the one with the Minister of mines and the government down there. That government is highly supportive of responsible mining, which is a key part of their economy. So we've said all along that gravel is, obviously, in a fantastic spot within their mining district, Antioquia, if you flew over companies, and where's the ideal place to put the country's first large goldmine — and you'd probably land on Gramalote. Local and community backing is absolutely tremendous, and there's some disappointment right now, since people thought this was going to ramp up pretty fast. But again, if we succeed, what we're aiming to do here is a genuinely important source of jobs. And plenty of people are working there. That carries on now, all of that work carries on, as we discussed, we settled on collaborating with the government, small miners, and other things. So between ourselves and the GA, a lot of solid work has been accomplished here. Over the years, it's worth noting that I'm building these together with the local community and the federal government, and all governments.
Clive Johnson
executiveAnd this project has a great deal of backing. So we believe it’s very logical, the government understands that, and I think they’re strongly motivated to collaborate with us so Gramalote can become the best possible project from start to finish, and so it gets built for all kinds of positive reasons for the economy, the local economy, but also the wider benefits to government and the people of Colombia. So this project enjoys a lot of support. And that’s really important to remember.
Josh Wolfson
analystAlright, and apologies — last question, I realize I've used up quite a bit of time. When you consider these possible footprint changes and modifications, are there any permanent pieces you can speed up ahead of that first quarter 2022 target date, or does that date instead mark the beginning of the permitting process for those modifications?
William Lytle
executiveYeah, well, that’s a really good question. And the answer is, we have to look at that. That’s really literally what we’re doing right now. You know, as I said, it’s, it’s a huge trade off study, in our mind, on the potential delays. As far as permitting versus a potential economic benefits, as Clive indicated, I said already, we have a positive project now, but can we make it that much? Can we make it even better? You know, those are the things we’re looking at, what I will tell you is, well, you have to remember that that resettlement still kind of is on that critical path. And so we’re now working through that resettlement action plan. And that’s really going to push us out into Q1 2022 in any case, and so, how do you play around with that that’s what we’re looking at right now.
Josh Wolfson
analystAll right, that’s excellent. Thanks so much.
Operator
operatorDon DeMarco with National Bank Financial has the next question. Your line is open.
Don DeMarco
analystMuch appreciated for letting me join, folks. I just want to follow up on one of the questions near the end. Someone brought up a comparison between Kiaka and Gramalote. Perhaps we could push that a little further — could some of the projects Tom discussed end up taking precedence over Gramalote within the coming 12 months? After all, you've spent a few years now in Egypt, Finland, and Pakistan. Of those projects, which one is furthest along, perhaps even nearest to the PDA <<inaudible>>.
Clive Johnson
executiveYeah, I think so. No, immediate doors back—we haven't been working on that for a couple of years. We did some work in Uzbekistan, relatively speaking, and this is fairly early-stage software. We've completed some longer drilling and similar activities, and we're doing reverse circulation drilling and moving toward diamond drilling as well. I mentioned both of them. All of these are pretty early stage. They're genuinely large, attractive targets, but we don't want to—or some of them are at an early stage. So we're a long way from discussing a PEA on any of these, but we're in elephant country and there's a certain chance we're looking at them. Tom, can you—do you want to comment further on that?
Tom Garagan
executiveI'd say that's fairly accurate. That said, we're still at an early stage. But as Clive puts it, all of these are elephant country targets. That's the reason we picked them. Still, I'm not sure that in a year — well, definitely not in a year, we'll be swapping out the other development projects for these.
Don DeMarco
analystAll right, thanks. So even with Gramalote as it stands, the NPVs sit around $500 million, and as you said, there's clearly room for that to grow. But has this project reached a size where a single owner makes more sense? And if you have faith in it, is now the moment to raise your stake? What's your view there? From what you've said before, we know Anglo is just as keen on this project as you are.
Clive Johnson
executiveYes, I think I can’t speak for AGA. But we’ve had a lot of calls lately, of course, discussing the situation with a lot of transparency, in a solid joint venture, and from what — we looked at what we’re saying, of course, one of the <<inaudible>>. And they’ll be releasing their quarter results and their views on more of the development projects shortly. But both of us are disappointed, and it wasn’t as strong as the economics we saw in the PEA. Let’s look at the opportunity — as we said, in normal times, you can improve that. Regarding ownership, I think what I’ve heard is that AGA was willing to spend a significant amount of money alongside us to see if we can try to make it a better project. So I’d be a little surprised if — we wouldn’t be considering changing our ownership at this point. We’ve put in a lot of money and time, etcetera, and believe me, the path we’re on, the potential again — you can ask AGA that question in their quarter, which I think comes out in the middle of May. But the indications were based on sources: they want to be a player in Colombia, they have other projects, etcetera, that they’re pretty excited about.
Clive Johnson
executiveSo, their view — what they told me — is that this matters a lot to what we're trying to accomplish in Colombia, and they were hoping that with us running the operation, we could show off what the two of us can do together. So the Colombian government — we still hope we can make that happen, just with the delay we've mentioned here. Of course, we've consistently said that if a chance came along to raise our ownership stake, we would look at it. Based on what I've seen up to now, I don't see a seller who's willing. My sense is we'd move ahead. So again, I can't speak for AGA, but that's what we've been told <<inaudible>>.
Don DeMarco
analystAll right, I appreciate that. And then just one last thing — you folks have a solid development group. You constructed Fekola, and the Fekola expansion got done. Given that Gramalote has been pushed back, do you feel any drive to put that development team to work on some kind of medium-term project?
Clive Johnson
executiveWell, I think there are certain areas inside the company—things we're actively working on, whether that's examining expansion opportunities or similar items. We may draw on part of the team, or some of the senior team, for input, but we're not about to go out and acquire something and construct something simply because we have a tremendous construction team that needs to be kept busy. In our view, that's not how this business should be run. Well, we have a great team, and I think this team has stayed together for so long—or come back together, which is a better way to describe it. So back in the beta days since <<inaudible>> and then, of course, meeting our stakeholder, they had some of the work for a period of time, but as soon as they got the call to return to the culture of B2, the vast majority came back. So, a second-old sort of rock band in a way, where they take some time off and then they decide to do another tour. Then the whole band gets back together, or most of the band, and they're able to attract other high quality people because of that.
Clive Johnson
executiveAnd I'd say there's respect on both sides, along with trust. The construction folks on our team genuinely feel appreciated by the company just as they are, and they enjoy doing work for us. So if we come across the right opportunity—whether that's acquiring a depositor or something along those lines—naturally we'd examine it, though not for the purpose of keeping the team occupied. My belief is the team will be there when we're set to go and get the band back together. But should we find something, then of course they're ready to roll. William, is there anything you'd like to add?
William Lytle
executiveYes, I’d like to add something here. There’s one thing I look at that, you know, people don’t really realize: clearly a lot of these folks in construction are extremely skilled at all the civil-type work. So some of these people are currently deployed within Ed for Cola, you know, or maybe they’re handling—maybe they’re doing a quick project, getting most of it done—but they’re actually working on the operational side. You know, one of the key secrets is this whole core team, like the logistics team, the procurement team, the warehousing team; those people sit down on a site. So right now, they’re Nicola bringing up the next group, but we haven’t lost them, right—they’re still there. Obviously, the exciting part of mine running is the construction aspects, so everybody wants to go on a construction project, but they understand there’s not a project, but they’ll sit down and wait for the next one.
Don DeMarco
analystAll right. Thank you very much — you're live now. I appreciate everyone taking the time to join us.
Operator
operatorThe following question is from Lars <<inaudible>> with Bank of America. Your line is now open.
Lawson Winder
analystHello, good morning, and good afternoon. Thanks for the update. I just have one question, and obviously I acknowledge that managing political risk is a core competency for BT gold, given where granulocyte is located and kayak's future into, which you might ultimately prefer developing.
William Lytle
executiveCould you repeat that, please?
Analyst
analystWhen you're weighing kayak versus grandma, does where each one is situated play a role in which of those two projects you'd rather move forward on first?
William Lytle
executiveThat's a good question, and I think I'll take the first stab at it. My sense is that both of them sit in favorable spots within their respective countries, in regions where we operate, and in the comparatively chilly, more secure section of the country — in the way I mentioned a bit earlier. We're in Antioquia, a historic mining district, where the local population gets it, and we've put in real effort to show them what this would look like and what our aims are; there's a great deal of backing for us there. And those are genuinely sites inside Colombia, no doubt about it, so I'd say — I realize someone else might want to jump in here, Bill, or whoever it may be, but I'm not certain — my view is that each one is in an appealing part of the country, so I don't see one being picked over the other for that reason, or for capability, that kind of thing.
Analyst
analystYeah, I get it — you're completely right, man, no doubt about that. What I'd say is we simply favor solid projects, and to be honest, most of the folks on the construction side, you know, we've put in the past 3 or 4 years over in West Africa putting that project together. So a fresh location appeals to them, and naturally the fishing is a whole lot better down in Colombia, so, you know, they definitely lean that way.
William Lytle
executiveThe situation has improved.
Analyst
analystYou also said previously that a partner could be brought in to develop it. Has any conversation moved in that direction?
William Lytle
executiveNo, you know, I think the main point, of course, at this stage is that you'll receive the feasibility, and see how it looks, you know, the alternatives have always involved bringing a partner in or selling, so that we don't think it's right for us, or we simply don't want to, you know, take on too much, there's always another option. So, I think what's key now will be obtaining the results of the feasibility study, she even meets our criteria, if not, then there's somebody else interested in it, potentially, all those options remain on the table, but it's difficult to have those discussions, when she really knows the economics of the project.
Analyst
analystFair enough — if I may, could I ask one thing about the men in quota permit and what's actually happening on the ground there? Has that third party that holds a license now already begun exploring? And following on from that, can you tell us who this third party is, at least in broad terms? Are they a junior, a local company, or a major mining company? If you could share that, it would be helpful.
William Lytle
executiveYes, you know, I think, obviously, we are in the process and have been for some weeks of having extensive conversations over the government, and then we, you know, we can we feel, we've had some positive indicators from those discussions. It's just, it's a small Malian company, frankly, without a history of mining, construction expertise, or financial strength, so at the end of the day, we just feel that, I do want to point out, and I think, I meant to say earlier, but you know, the history of Mali and gold mining, it's been a good set a really good place to do business, and I've said this many times. If you go back to our mine opening up in the years ago, and listen to the speech of the president at the time, it was tremendous, and the government's performance was really great, and a mutual trust relationship, we delivered on the promises we made, which we have, this is what we try to do always, and we're transparent with the government affairs cycle, really good relationships. And I think they, if you look at, you know, talk to Mark Restyle, and look at the wrangled experience and not American experience, he's argued for decades, and he got it right, he got there early, and was constrained and paid off really well, for the mangled shoulders.
William Lytle
executiveHe expresses the same view, yet it's among the better ones — a genuinely good company to collaborate with alongside the government. They grasp how vital Monaco's mind is to their economy — enormously important, more so now than ever, considering COVID and so on — and they have consistently respected their laws. You know, few countries worldwide actually offer a mining convention like the one we have in Mali, capping your taxes for your project's duration — that's really something you see. And back in the early days, wrangle, that was quite an appealing tax setup, standard for the industry then, but these involve things such as five-year tax holidays and fairly low royalties, yet the government has never, ever tried to alter the tax structure in those mining conventions, and those mining conventions are well supported, and should problems arise, you wind up in Paris to sort them out. So, and with this new government, we've managed to work successfully, this new government in the Ministry of mines, the civil service there, many of whom remain the same, and then securing things such as permits for low sample permits, for other matters.
William Lytle
executiveSo this is a situation where, as we mentioned regarding the news waste, we believe we're entitled to an extension of the medical licenses — that's what ought to have occurred — and we're collaborating with the government to genuinely present our perspective on that matter in that dispute. You know, we've put $27 million into it, and the truly sensible outcome for medical, for everybody, including the government, is that we hold 20% of that acquittal and own 20% of a cola — the clearly superior choice for investment for the people of Mali, we believe, and for our shareholders, and for the government given their ownership stake, is to see that medical, or pursue it through the court, and we believe we possess a legal entitlement to that license. So we will take — we will be cooperating with the government respectfully simply to settle this matter, but we will, you know, we will take whatever steps are needed to protect our rights, as necessary as we proceed through the process. So our hope is to settle it through conversation and return to work — you know, we had scheduled no less than $8 million of work in the UK on air, portions of which are continuing until the north of the genetic correlations were so favorable.
William Lytle
executiveThat said, this matters a great deal for the chance to deliver additional gains at cola, and there's more upside for cola as well — we perceive substantial potential there. So yes, Maui's track record has been quite solid, and I've held a firm stance in telling shareholders, and people who know better than to — as my father would advise folks, don't generalize, or rather, that's mistaken, don't generalize about Africa, or even West Africa; examine each situation and its location. Mali possesses centuries of gold mining, they understand it, the history, governments have consistently grasped that, and we're expecting this government to carry on the tradition the Malian governments have maintained — which is only the most recent — and to recognize how important gold mining and future investment in gold mining within the country are. So that's where we stand today, and we're engaged in some constructive discussions about it, and I hope to see the matter resolved.
Analyst
analystAll right, thank you — and I just noticed we're already 15 minutes past the hour, so I had one more question but I'll try to get through it fast. This comes from Mike, I believe: back in January, you guided to significantly higher H1 unit costs, and Q1 actually landed well below the low end of that guidance — so is it fair to expect a pretty material jump in all-in sustaining costs as well, in Q2?
William Lytle
executiveOkay, so on the operational front, we simply performed better — correct? When you examine the elements driving the improved cash class this quarter, they include stronger recovery that we hadn't factored into our model. So we anticipate retaining those gains as we move forward. Then there were reduced input costs for cola, for items such as OSI and ICE — so once again, we expect to hold onto that advantage. I think certain things will carry over and simply help overall; you shouldn't shove everything into the back half of the year. The guidance we provided for the back half, we believe remains solid. And then regarding on-site: yes, it reflected the gain from those cheaper costs and greater output — and we're thinking a lot about higher output as we progress through the year — and part of it was that calf actives is tiny, so you'll notice that what we don't spend in H1, we still anticipate spending in H2. So on the Catholic side, yes, those expenses will simply carry over into the second half; on the effect side, most of those advantages we ought to keep.
Analyst
analystAll right, thanks — that's all I've got, everyone.
William Lytle
executiveI appreciate that.
Operator
operatorThe next question is from Carey MacRury with Canaccord. Your line is open.
Carey MacRury
analystMorning, everyone. Perhaps just a single additional question regarding grammar latte. My sense is that all-in sustaining costs are 15% above the PDA — how much of that reflects underlying cost inflation as opposed to, say, fewer ounces in the plan, or are other factors behind that shift? Which I'll build on, Mike?
Mike Cinnamond
executiveYeah, so all-in sustaining costs are going to rise somewhat, driven by inflation for sure — especially, as I believe I've said, in terms of labor, power and fuel prices compared with what the PSBA.
Carey MacRury
analystRegarding the Journey context, it might be enabled — something like what the dollar, uh, <<inaudible>>.
Mike Cinnamond
executivePossibly I’ll pull that up, or it isn’t right here at my fingertips.
Carey MacRury
analystAll right, thank you.
Operator
operatorAnita Soni from CIBC has the next question, and your line is now open.
Anita Soni
analystMorning, everyone — I have to say, I enjoyed how Jelani slipped a question in there. I’ve got just one left, and it concerns the grandma tag. I realize that’s a wide-ranging question, but could you give me a sense of the timing? What’s the length of the permitting process in Colombia? I’m not very familiar with Colombia.
Clive Johnson
executiveYeah. So like I mentioned, there are basically three tiers here, and we've had fairly thorough conversations with the government about these specific matters, so, you know, you're essentially looking at — as I said — the trivial ones, those get handled on the fly, the smaller ones might fall into that three-to-four-month window for review and approval, and I believe it's six to nine months for the major ones starting from when you submit.
Anita Soni
analystAlright, and this is the final question — I realize it's also at a very early stage — but when you're considering a construction decision, what timeline for construction are you evaluating on this one?
Clive Johnson
executiveHonestly, I'd put it this way: we consistently framed it as somewhere between 30 and 36 months. I really can't come up with any reason that would shift.
Anita Soni
analystOkay, thanks so much.
Operator
operatorJared Hoover of Morgan Stanley has the next question. Your line is open.
Jared Hoover
analystMorning everyone, thanks for joining the call. I realize several questions have already come up regarding Gramalote, but I wanted to move on to a few more MPs. From much of the commentary, it appears the two key factors that could deliver improved economics on this project are, first, infrastructure—specifically how you can relocate and optimize it—and second, the possibility of extending the life of mine production. However, when I look at the two monitors West and the Trinidad puts, those appear to be lower-grade pits to me, so bringing them into the life of mine would seemingly raise your costs automatically. So is it more a matter of, yes, you potentially bring that into the life of mine, but really it comes down to your assessment needing to focus on recoveries around that project and that potentially strengthening the economics—could you just address that part? Then my second question concerns your partner and your goal: if for some reason it fails to meet their particular hurdle rate, and they wanted to become sellers of the project.
Jared Hoover
analystIs there any mechanism that would let them—or, within your agreement, that would let you potentially take those projects on? At 50% of the review stages, sort of 10, 20, 30, and so on, so if you could just check on that, it would be very helpful. Thank you.
Clive Johnson
executiveOn your second question, we were saying in cricket that the question of whether VGA would be open to us buying a portion of their interest in stages is a question. And is there a mechanism?
Jared Hoover
analystYes. Are all the authors on?
Clive Johnson
executiveAbsolutely.
Jared Hoover
analystRegarding the situation with Indian, or is that part of the overall 50% <<inaudible>>?
Clive Johnson
executiveOkay, so there is a mechanism here. Yes. All right, looking at it through the personal development lens, that one might come first, then the second. Yes, the agreement contains a mechanism under which, if your development plan is poor, the operator NDGA <<inaudible>> has not, within the period of 30 days, or both parties respond to deciding to determine whether our plan — or there's a mechanism through which you can buy out the other 50% from the party, based on fair market value, based on a feasibility study on which the developer's decision would rest. Beyond that, though, a provision exists allowing either party to go down to 30% as a mechanism, to move to 50%, if you wish to remain involved, the project would not have before 50%. So those mechanisms operate in both directions within the agreement — would you like us to take the first one?
Tom Garagan
executiveYeah, absolutely — you've got that right. At Trinidad, MOS's resources right now are lower grade, and honestly, at this stage we internally view them as potential that sits, you know, near the end of life, and the mine itself offers some upside for sure when it comes to extending its life, and that really wouldn't help your MPV much. But what I meant when I brought up drilling is that we're talking about the gravel loti Ridge area, just beyond the current design pit, and even past that, within the indicated and inferred measures, we see some potential to boost NPV and IRR by converting inferred ounces into indicated, which naturally then lets us include them in the 43 101, and regarding infrastructure, you're right, that was the other problem.
Jared Hoover
analystThat's perfect, really great. Many thanks. Appreciate it.
Operator
operatorThe last question is from Charles Row <<inaudible>>, a shareholder, whose line is now open.
Analyst
analystThanks for taking the call. A lot of what I was going to ask about relates to the malaria issue in Mali, I suppose, so that's already been answered. The one thing I'd ask you to do — I've been requesting a copy of your annual, what do you call it, your annual information form, and the last thing I got was from shareholder relations; he had put something in the mail to me the week of April 6, and I still haven't received it. So if you could just remind your shareholder people, I'm still waiting for the annual, patient, for notice. And obviously I'm following what's going on with Mala, because so much of the company's interests are there, but again, without the annual information, I'm kind of winging it. I've got 40,000 shares, pure, very small compared to the corporate vehicle.
Clive Johnson
executiveBut reportedly nobody has, and transparency is something we take pride in, along with delivering on what we promised. So clearly something slipped through the cracks there, so it's very important, Charles, and you can send an email, if you'd like to, even the plane — I'm McLean, that'd be to go calm, or to me, see Johnson beach and grow calm, and I will get out, and make sure that you get, that not by snail mail, best buy a mechanism that gets it to you, quickly. Thanks for your support as a shareholder.
Analyst
analystAll right. Best of luck to everyone; we're here to assist. Many thanks.
Clive Johnson
executiveAppreciate that, Charles.
Operator
operatorThat brings us to the end of the Q&A. At this point, I'll hand it back for any closing remarks.
Clive Johnson
executiveWell, I believe we've gone through quite a lot here, and I appreciate the time you've spent, and that you're interested in some really good and interesting questions. We were pleased with the quarter, obviously, and we're looking forward to another very good, productive year. Profitable production and loss of all this exploration and development opportunities that we see. So thanks, everybody, for your time. And obviously, if you have follow-up questions you can reach out to me and I'll put you in touch with the person you want to, or if you know, the person you want the answer from, you can go directly. So, thanks for your time, everybody, and stay safe. Thank you.
Operator
operatorThat brings us to the end of the call for today. You’re welcome to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete B2Gold Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to B2Gold Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in B2Gold Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.