B2Gold Corp. (BTO) Earnings Call Transcript & Summary
November 3, 2021
Earnings Call Speaker Segments
Operator
operatorGood morning and good afternoon. I'm Sylvia, and I'll be serving as your conference operator for today. Right now, I'd like to extend a welcome to each of you on behalf of B2Gold for the Third Quarter 2021 Financial Results Conference Call. Every line has been muted so that background noise won't interfere. Following the speakers' comments, we will hold a question-and-answer session. <<operator_script>> Thank you. Mr. Johnson, the conference is now yours to begin.
Clive Johnson
executiveThank you, operator. We're glad to have all of you join us for the call on our third quarter and interim results. I'll make just a few opening comments, and then I'll hand things over to Mike Cinnamond, who will take you through the financials, and after that we'll open the line for any questions. As the release shows, we delivered another strong quarter in Q3, and even with the COVID challenges continuing and some inflationary pressure on the cost side, we're quite pleased with what the third quarter results show. As Mike will explain, this leaves us in a very strong financial position now and going forward — strong on cash and debt free — and we expect to generate roughly $650 million from cash flow operations over the year. Mike will cover the details of that. The company's books going forward will reflect continued optimization of responsible, profitable goal production, and Mike will say more about our new guidance, <<inaudible>>. Among other things, we'll keep advancing our development projects, so obviously Gramalote, where we're looking at a feasibility study by the second half of next year, and we've seen some positive results from certain parts of our engineering review so far, and we're examining the capability to reduce capital costs.
Clive Johnson
executiveAnd we're continuing to drill as well, trying to convert additional inferred resources into indicated, so that capital can potentially be spread out over time by anyone else. So we believe the program at Gramalote is moving in a favorable direction. I think another thing that has us quite excited is the potential we're seeing from Menankoto in the Anaconda area, 20 kilometers north of Fekola. And what's exciting there is the ability at first to begin hauling saprolite, the weathered material, the 20 kilometers from the deposit down to the Fekola mill. The Fekola mill has been operating very well and it can certainly handle saprolite material, since it's softer material sitting on top of the hard rock. So we see potential there around the second half of next year to start hauling more. And of course, the other biggest excitement has been the Cardinal discovery, 500 meters from Fekola on the same licenses as Fekola. So we've received a permit from the government to begin mining there and we are mining there, and that can contribute to production as well — so positive developments there in the short term. Over the longer term, on the Menankoto license, we continue to have very productive, successful conversations with the Government of Mali to resolve that situation, where we hope in the next few months to see our license extended or renewed for Menankoto.
Clive Johnson
executiveAnd that's going to matter a lot when it comes up — we've said a number of times that Menankoto holds its own separate license, which lets us begin tracking from that point, though naturally we'd want to be drilling both of them. So there's extensive drilling carrying on at Menankoto, and some truly excellent results are coming in. The end goal there is to determine whether the sulfites beneath the saprolite hold the potential for Fekola-style sulfite mineralization. We're beginning to observe that now in a few of the recent joints. Beyond that, we have a very substantial, hot, aggressive yet high-quality exploration budget — roughly $65 million — and clearly a lot of that work continues, with about 65% going toward what we've done well for a long time, which is practice at the existing mines, and you've seen some good results coming essentially from everywhere, from all three mines, in terms of additional success from the drill bit. But we have a significant $25 million budget for grassroots this year. We've been — we've always tried to be driven by geology rather than geography, so we've ended up now with some targets we've been chasing for years in certain cases, and there are some exciting opportunities in places such as Uzbekistan; we've recently seen our partner Orion <<inaudible>> release some good, exciting results from Finland, and I think there's great potential there for another discovery.
Clive Johnson
executiveWe're examining M&A opportunities. We're constantly doing so, but I'd say we're reviewing a handful of different possibilities that could boost our production via an accretive deal or might add another development project to what we're doing, but we feel pretty good about the pipeline, including the Anaconda potential, and of course, if you look at Gramalote, those are two projects we like in the pipeline. We recently announced a sale to West African mining of the Kiaka Project in Burkina Faso. And we felt that was a good thing to do. Corporately, we've got other things we're focusing on, plus they are established in Burkina Faso. We're happy to be a shareholder of the company and wish them well going forward on a sizeable deposit in Burkina Faso. We are happy to be at the shores of West Africa, and it's not the same, but it's — there are similarities to the deal we deal with Cardinal and Gramalote in the sense that we take these assets and want to focus on other things we're doing, but we like them, so we want to be involved. And in the same case, Cardinal has done a very good job in Nicaragua with the Nicaraguan assets, so we're happy showed results as well.
Clive Johnson
executiveSo there's kind of a pattern in how we handle these situations—we want to stay focused on what we're doing, but also recover value for the projects we hold and keep gaining value as they move forward in development. So again, just like with Nicaragua, every one of our employees in Burkina Faso will now be employed by West Africa managed, and that's a really good way to structure these deals. We keep continuity of people, their jobs are secure, the project moves ahead, and the government of Burkina Faso—I'm not blaming them, like any government, when there's a project that can bring economic development, they expect it to be developed and built—so West Africa has a solid program going forward on that. One thing to note is we did receive—just recently received—a three year extension of the Bantako license, which is really quite significant in that it demonstrates our relationship with the Government of Mali is very good. So that's the license relating to the north of Menankoto, as many of you know, but we got that very, very quickly and rapidly working with the government, the three year extension that we had the right to apply for.
Clive Johnson
executiveThat's a good sign too, and naturally we also received the Cardinal mining permit from the government. So relations with the government remain very positive, and of course the government holds a 20% partnership in everything we do, so as I mentioned, we expect core resolution in the very near term. I believe that's everything from me for now. I'll hand it over to Mike so he can go through the financials, and then we'll open things up for any questions.
Mike Cinnamond
executiveAlright, thank you, Clive. So to begin — I'll take us through the three — the results for the quarter, some commentary on year to date, and then just how we see the year panning out. So firstly, on the quarter, revenues of 511 million, so that was based on the sale of 287,000 ounces, at an average released price in the quarter of $1,782. So year-to-date, our average released price for sales is $1,794 per ounce, so very close to that $1,800 price that we've been — that we used just to put out our cash flow guidance so really reinforces that we're still on track there. On the production side, good production quarter, we were on a consolidated basis, including our share of calendar results, total production was 310,000 ounces, which is 21,000 ounces, ahead of budget where we thought it would be and the reasons for that are really the same as we talked about in the earlier quarters in the year. Fekola is still a production machine, there's higher melt throughput going through there, closer to 8.4 million tons annually, so far this year versus the 7.75 million tons that we assumed in the budget.
Mike Cinnamond
executiveAnd at this point Fekola is pulling low-grade material from the stockpiles to fill that extra mill feed, so the grade going through the mill is a bit lower overall, but output is higher. For the quarter, Fekola came in at 166,000 ounces, which beat budget by 10,000 ounces. Masbate delivered 61,000 ounces in Q3, and 8,000 ounces is better than budget. Once again Masbate keeps beating the model, with grades and recoveries both better than the model assumes, so that's a nice positive difference. Now there was — but the highlight, and we did mention it in the MD&A and the news release, we didn't mind being slightly out of sequence on Masbate this quarter. Some of the higher-grade main vein material originally planned for Q4 was mined and produced in the third quarter, so you'll see part of that clawed back in the fourth quarter as we move forward. But we did — since we had that additional production and better mill output in the quarter, we did take the chance to bring forward some mill maintenance in the queue. At Otjikoto, 69,000 ounces, 2000 ounces ahead of budget, and everything is just slightly better than budget, so very solid production across the board from Otjikoto.
Mike Cinnamond
executiveAnd when you convert that and examine our performance on the cost side, it's quite favorable, so bringing it all together with the estimated attributable figures for Calibre, $445 per ounce came in precisely at budget, so strong results there. And taking that high-level view of the larger picture, what we observe is cost inflation happening across all the sites, purely because of the conditions we're operating in. Fuel expenses have risen, certain shipping expenses have risen, some reagent expenses have risen, but simultaneously, our production was stronger and better, and that genuinely assisted in counterbalancing those extra, elevated costs. So we ended up essentially flat and exactly at budget. Looking through your models, if you'd like the detail on the fuel side, it's likely risen roughly $25 per ounce year to date, I'd estimate, for fuel. But keep in mind, we also have a fuel hedging program running, so the derivative gains have counterbalanced at minimum 50% of that, we believe, as the year progresses. So we're quite steady on fuel, in my view. And then another factor that affected Otjikoto's results during the quarter was a stronger Namibian dollar. We budgeted at 16.5 against the US dollar, and it's arriving at roughly 14.5, so that probably created an effect of around 45 dollars per ounce year to date on those costs.
Mike Cinnamond
executiveBut as they say, the advantage of greater output has essentially offset the bulk of the cost rises. So in terms of all-in sustaining costs, consolidated again on a year-to-date basis, counting our share of Calibre, it's $795 an ounce, which is merely $14 above budget, so essentially right on budget given the circumstances. And the situation there is roughly the same, so our cash costs are in line with budget. We do have elevated royalties for the quarter and year-to-date, since we initially budgeted $1,700 gold and we've ended up, as I noted, very near $1,800 gold so far, so royalties are elevated. But higher production offsets that, and it's also offset by the fact that a portion of our CapEx has been shifted into the fourth quarter. So we did see reduced sustaining capital in the quarter and year to date. And those expenditures are largely a matter of timing. And we do expect them to be made up in the fourth quarter. We're projecting that this will occur. Moving to the nine months, a very brief comment on the nine-month results, so production year-to-date, 699, counting our share of Caliber 743,000 ounces, so 49,000 ounces better than budget.
Mike Cinnamond
executiveAnd I'll get to where we expect to land for the year in a moment, but it was very solid, for the same reasons I gave for the quarter. Then on the cost side for that production: cash costs came in at $556 per ounce on a consolidated basis, including our share of Caliber, which is $14 below budget, again for the same reasons as the quarter. All-in sustaining costs were $900 per ounce sold consolidated, including our share of Caliber, and that is $45 under budget. The driver behind that $45 beat versus budget is really mostly just the timing of CapEx. So where do we stand for the year? We did post some revised production guidance for the year based on where we are today. Our original consolidated guidance, including share of Caliber, was 970,000 to 1,030,000 ounces. We've now raised that to between 1,015,000 ounces and 1,055,000 ounces, and the increase came from Fekola. The prior guidance range for that asset was 530,000, and we'd never counted it up to between 560,000 and 570,000 ounces, simply because Fekola has performed so well. And then Masbate as well, because we had — we've outperformed during the year; originally 200,000 to 210,000 ounces, we raised that to 215,000 to 225,000.
Mike Cinnamond
executiveKeep in mind, though, that a portion of that strong Q3 performance came from the last-minute out-of-sequence material, so a bit of that will be caught back in the fourth quarter, and that's why we ended up with a guidance range for Masbate of 215 to 225. Then, looking at the cost side, we reviewed all our guidance, and based on what I mentioned about some cost inflation but offset by higher production and the benefit of some derivative gains, we think for cash costs we are going to come in within our overall guidance range for the year of $500 to $540 per ounce. If you looked at the individual sites there, Fekola probably comes in at the upper end of that, just because it's putting more high grade or lower grade material through higher volumes of low grade material. But the other two sites, we think, will certainly be just right in the middle of the ranges. And then on the all in sustaining cost side, again, our original guidance was $870 to $910 per ounce, and these include our share of Caliber. We still think we'll be in that range, but we think we'll be at the upper end of the guidance on a consolidated basis, and that has some offsetting factors in it.
Mike Cinnamond
executiveOn Fekola, we do have it — we believe it's going to land at the top end of the all-in guidance range we provided, once again owing to the type of low-grade material being processed. At Masbate, we believe we could be at or under the bottom of that range, simply given the production we've achieved so far. And at Otjikoto, depending on when sales fall as we move through the close of the year, we could be at or a bit above the top of the guidance range. Overall, though, for all-in sustaining costs, we believe we'll land at the top of the range. I think that's a fairly strong testament — a very strong testament, really — to how every site has performed, since we're operating in a cost environment with inflation. And I think you're just seeing that throughout the reporting coming out across the industry at the moment. Yet even with that, and thanks to the production we've been able to pull forward and run ahead of budget, we believe we're going to hit those ranges. Let me offer a few additional thoughts on where we stand — some general remarks on certain operations too, as we go along.
Mike Cinnamond
executiveRegarding Fekola, I want to remind everyone that the mill is now doing extremely well. We've indicated that for 2021 we anticipate an annualized figure in the neighborhood of 8.3 million, perhaps 8.4 billion tons. Over the long term, across the life of mine — which includes running some saprolite material through the mill — we think we may be capable of handling 9 million tons per annum at Fekola. Also a reminder that we have now begun incorporating Cardinal into the mine plan; development there started in Q3, and we are getting some production from Cardinal. We did obtain the permit for that as part of the overall — well, really as part of the overall Fekola permit, but we had our environmental assessment completed and approved by the authority. So over the longer term, we believe Cardinal can contribute to Fekola's overall production roughly 60,000 ounces a year for the next six to eight years, based on the drilling results there and the inferred resources we have already drilled there. <<inaudible>> just a reminder as well that this is now finished and operational, and really the overall benefit is that it lets us hold back some of the spinning reserves we have, whether gensets there, and the net effect on costs overall is probably matched and has reduced Fekola's total cash — overall cash costs by roughly 3%, because it lowers the amount of our milling cost — power costs for milling.
Mike Cinnamond
executiveAt Otjikoto, the underground work at Wolfshag is ongoing, and we remain on schedule to access and extract additional material from that underground development by the close of Q1 next year. Activity at Gramalote is continuing as well. Feasibility work is progressing on two fronts: drilling out some of the remaining targets at the site, and updating the engineering while examining the revised permitting needed to advance that project. We continue to anticipate an update on the new feasibility study at some point around the midpoint of next year. Turning to Burkina Faso — as Clive mentioned — during the period we sold an 81% interest in the Kiaka project; the agreement has been signed, and that transaction should close right around the end of November. Alongside that, we also revised the earlier agreement under which we were to sell West Africa our interest in the <<inaudible>> project. For Kiaka, the consideration is what we expect to be 45 million, split evenly between cash and shares in West Africa at closing, which, as I noted, is expected by the end of November. Then a further 45 million in cash and shares at our option at some point next year, and certainly no later than a year from closing the deal.
Mike Cinnamond
executiveWe also keep our interest, along with any shares we may receive, by holding a royalty in the project. So, two points of our shares, two points of milling <<inaudible>>, a 2.7% royalty on the first 2.5 million ounces produced from Kiaka, and then a 0.45% royalty on the next 1.5 million ounces produced. And just to remind you as well that, in conjunction with revising <<inaudible>> the deal, with the closing of that deal, the deal brings in another $9 million tranche, the original option payment that will be due now upon closing the deal at the end of November when the deal closes too. So we can expect that to show up in Q3. And let me just touch on the earnings side, the GAAP our share — GAAP earnings $0.12 per share, our share adjusted for the quarter $0.12 per share as well. Then year-to-date, our share of GAAP earnings $0.27 per share and our share adjusted EPS $0.26 per share. And a couple of comments on the cash flow statement, so we had an excellent quarter for generating operating cash flow in the period. 320 million, which certainly met our expectations, and that was — that translated into $0.30 per share, operating cash flow.
Mike Cinnamond
executiveAnd you know, that's partly because we produced and sold more ounces than we'd originally forecast, which is great. Oil price behaved itself first during the quarter and we also had the benefit of some working capital movement changes that went through there that actually benefited cash flow. So, in the end, 320 million for the quarter. Now, we had guided before for the half year, for 2021 second half, we do somewhere around 500 million. We bumped that slightly in our guidance that we put out there. At the end of this quarter, we're now seeing somewhere around 510 million for the half year, so you can expect somewhere between 190 million, 200 million operating cash flow therefore for Q4, as we claw back some of those working capital changes that we benefited from in Q3 and we make some year-end tax payments that are required. Our total tax — cash tax guidance 380 million for the full year remains unchanged, so just remind you that. On the investing side, for the quarter, we were only probably about 6 million under budget with some pluses and minuses across the site. I will say that for the year-to-date on the investing side, just over 200 million, we're probably about 35 million under budget.
Mike Cinnamond
executiveLike I said when we went through the all-in cost, on some of that sustaining CapEx we're trailing them through the piece. And also — in some areas, exploration for instance, we haven't yet spent as much as the original budget called for, but by year-end we do expect to catch up on those CapEx costs. So for CapEx overall, the guidance we've given, if you check the MD&A, would provide you some direction there. On sustaining CapEx, for the year we'll probably come in roughly 10 million over on an all-in basis, which is fractional relative to the total sustaining CapEx we have. And then on the non-sustaining side, probably also around 10 million over budget for the year overall, but the main piece of that is just some cost for Cardinal, some development and fleet cost for Cardinal, which weren't in the original budget since we didn't have Cardinal in that original budget. We closed out the quarter — during the quarter we paid a dividend of $0.04 per share US, annualized at $0.16 per share, which still places us somewhere between 3.7% and 4% over the <<inaudible>> dividend yield, which remains one of the highest in the industry. And we're still holding the line there, and our intent is to keep paying at that level.
Mike Cinnamond
executiveSo at quarter's end, we closed with $546 million in cash on hand—very solid—and we still have 600 million available under the revolver, which is a strong position right now. I think those are the key points I wanted to highlight. As a reminder on operating cash flow for the year, we expect to land around 650 million. Our original guidance was 630, but given the better beat so far on production and revenues, offset by some higher costs from inflation passing through the year, we think overall we'll come in somewhere around 650 million for operating cash, with approximately 190 million to 200 million of that in Q4. That's my update.
Clive Johnson
executiveMike, were you asking about the dividend?
Mike Cinnamond
executiveI did.
Clive Johnson
executiveI was checking on <<inaudible>>. Alright, thank you, Mike. We'll be taking questions shortly. Just as a comment, I suppose, the third quarter results had us quite pleased, and I believe a lot of our shareholders will feel the same way. And for the analysts out there, we recognize you have a demanding job, with plenty of companies to cover and a great deal to do. And I think largely, you get to write and do the job. The one disappointing thing is seeing, when there's a $0.01 miss on earnings per share, headlines that say Q3 missed — I think you might want to think about a better approach. I think you're doing a disservice to our shareholders, your clients and companies when you do that with a glaring headline — how about the cash flow, how about other positive things. So just a suggestion — that can trigger the algorithms, it can cause selling, it can cause the investor who reads only headlines to sell shares etc. I just think there's a better way to do it, so that's just my comment for the day, a bit of advice. So with that, I think we'll open it up for questions.
Clive Johnson
executiveThe whole executive team is here with us, so there's essentially no question we can't handle. Should you be an analyst wanting to dig deep into, say, what the strip ratio will look like at Fekola three years out, or similar matters, I'd suggest getting in touch with me, or you can reach Bill Lytle straight away at <<email_hidden>>. That said, that's the route for any detailed questions. We fully understand that you have models and that you want detail, but with so many people on the line, I don't think this is the moment to be asking too many questions of that kind. So, with that said, let's open it up for questions.
Operator
operatorOur first question comes from Tyler Langton with JPMorgan — Tyler, the floor is yours.
Tyler Langton
analystGood afternoon, and thank you for taking my question. I suppose I'll begin with costs: you said those kinds of costs came in somewhat above budgeted levels during Q3, though strong production offset that. Could you offer some detail on how you expect costs to trend in Q4 and as we head into 2022, and on whether general prices will simply stay where they are now?
Clive Johnson
executiveI can share some very high-level thinking on that. And Bill—perhaps I should hand things to Bill afterward, since he has some of the detail, but on the production side, we're observing inflation in fuel prices. Year-to-date, it's probably near 10%, I'd say. But as I mentioned, we have fuel derivatives in place that currently offset roughly half of that expense. We're seeing certain other input costs running higher, definitely in transportation, some of those input costs. I mean, on the whole, if I had to estimate cost inflation, you're likely looking at 5% or 6% for the year—that's probably in the ballpark. And then you're looking at production rising versus budget somewhere around that 4% range, right. So you can see that this manages to absorb quite a bit of that cost overrun as an offset.
Bill Lytle
executiveAnd perhaps I could just build on that point — shipping expenses are certainly a major factor, correct. What we've paid to ship goods has risen considerably during this year, and those higher rates will continue into 2022. Then naturally there's labor — since various economies are experiencing inflation and inflationary pressure, employees are feeling it too, so they're requesting wage increases. We actually did something quite good this year: at Fekola, our key asset, we locked in raises for the employees of roughly 5% annually across the following three years, essentially ensuring stability, and naturally at Otjikoto we usually follow the same approach with a two or three year agreement, which will be up for discussion this year — so that process has already begun for 2022, though we'd expect to land in that same 5% to 7% range probably. So I'd say shipping, fuel, spare parts — those are up as well. We had a productive conversation with Caterpillar here in September. Caterpillar has given B2Gold global pricing. So essentially, we pay an identical price for everything, but they've announced that due to production costs and shipping costs they will be passing along certain increases too on that front, so those are the primary items.
Tyler Langton
analystThat's useful. And on Fekola and output specifically, I realize you've provided some formal guidance for the coming several years, but would you mind speaking, I suppose, at a directional level about how you see production shaping up with Cardinal coming in, perhaps the north talk a bit further out, and the various moving pieces that might influence output there across the next several years?
Clive Johnson
executiveWe are still clearly engaged on that. So, Cardinal — what I believe we have essentially discussed is an inferred resource exceeding 600,000 ounces, and we would envision bringing that into production across roughly the following four to six years. One measure we are taking to ensure we align with guidance involves drilling the 2022 production into reserves. That will therefore be released by year-end, and then we will repeat the exercise in 2022, at minimum for 2023. So we intend to attempt to stay a year ahead. What we have been indicating, I think, is that we sit in that range of 60,000 ounces, plus or minus, for Cardinal arriving, but then naturally you also have what could be Anaconda at Bantako — we currently have a mine plan for that, and depending on what unfolds with Menankoto, that is how we will determine how to proceed — yet certainly, we could envision a couple of 100,000 ounces across the next couple of years should we decide to bring that instead of having it trucked in from Bantako. So all those items are currently in play. What I would note is that, if you recall, there was actually a dip in 2022 in production when we completed our initial life of mine, but we have removed that dip through certain work we have carried out at Cardinal and potentially an Anaconda.
Clive Johnson
executiveWhile 2022 isn't wrapped up at this point, it's shaping up to be a genuinely strong year. On the production side, I won't claim it carries a six at the front, but what I will say is that we'll definitely climb close to that figure.
Tyler Langton
analystThat’s great—thank you very much.
Operator
operatorMuch appreciated. Our following question comes from Josh Wolfson of RBC. The line is yours.
Josh Wolfson
analystThanks. My first question concerns Cardinal. When we discussed this opportunity earlier in the year, there was some guidance indicating the grade for the initial feed would be roughly three grams. I realize the resource at the time it was issued was lower, but the initial stockpile that has been accumulated is also somewhat closer to that overall resource grade of about one and a half grams. What accounted for the difference between that original guidance and how the stockpile looks today?
Clive Johnson
executiveApologies, I’m not sure I follow what you’re asking. Are you referring to the grade, or—
Josh Wolfson
analystRight, regarding the grade — on that point, my understanding at the outset, I recall Cardinal speed overall, or the resource, being around 1.5, though I believe some guidance earlier in the year suggested it would be considerably higher at first, unless I'm mistaken. And today the greatest is 1.5. Was there any variance there relative to expectations, or not?
Clive Johnson
executiveNo, no, I'd say certainly what we've witnessed is that essentially every element contained in the inferred estimate has largely unfolded as expected up to now. What I can share with you is that, like, during 2022, we expect the grade from Cardinal to rise somewhat, and I believe it will be — it's certainly going to exceed two grams per ton in 2022. And once we incorporate that into the reserve, naturally, we'll report it.
Josh Wolfson
analystAll right. And when we consider the overall mix for handling the guidance of 9 million tons of feed moving ahead, it's quite comparable to what the assets are doing at present. Should we take it that a similar sort of split between sulfides and oxides—like what the assets are processing today—will more or less carry on going forward?
Bill Lytle
executiveOkay, so again, this is sort of a — John's on the call, I believe, so he can jump in if I've got it wrong. What we've consistently stated, though, is that we really don't believe the mill can take beyond that 10% to 15% of saprolite material. So everything hinges on what the mine plan calls for at Fekola and how much saprolite is available at Cardinal, plus whether or not we bring Bantako in. What I can tell you, though, is that at 15% saprolite, we'd feel quite good about that 9 million tons per annum. And again, that also presumes the material won't become significantly harder as we go deeper at Fekola, but that's roughly what we're projecting right now. John, I know — anything you'd like to add there?
John Rajala
executiveYeah, Bill, that's correct. Everything you just mentioned is on the money, I'd say.
Bill Lytle
executiveI appreciate it.
Josh Wolfson
analystSure. All right, and perhaps one last question about Gramalote. Given some of the work that has been carried out since the previous update, is there any further insight into, I suppose, how extensive those changes are and what the permitting and modifications needed for that would involve, or does that remain a work in progress?
Bill Lytle
executiveAlright, I'll just bring you up to speed on where things stand. So as you recall, there are several moving pieces here. First off, there's the engineering effort, where essentially we're working to streamline things and eliminate some of the confusion that built up across 10 years of design. That effort has gone quite well, and we've definitely noticed some improvement in the IRR tied to infrastructure; the resource and drilling work continues — they've actually got a very substantial program underway there, and my understanding is drilling won't wrap up until around the end of November or December. So after that, naturally, we need to await the resource to find out where it lands. And then, naturally, there are matters such as the social issues, resettlement among them, which is genuinely one of the central challenges we're working to address. So the lengthy response to your question is that we have observed certain gains. What we've done is engage the government regarding a phased approach when it comes to permitting. We'd anticipate roughly in Q2, possibly even late in Q1, bringing them some adjustments to our current operational permit and EIA; we're presuming those would be fairly minor modifications, which would let us, during the latter half of the year, assuming a favorable outcome, carry out some activity on the ground.
Bill Lytle
executiveAnd after that gets the green light, we'd move on to some bigger modifications. Those would involve reworking the tunnel so it functions as a diversion ditch, and our expectation is that approval for that wouldn't come until 2023. So to put it simply, we plan to go to the government around the end of Q1 with a request for a modified permit, and then roughly six to eight months after that, we'd file a second half. That second version of the modification is what carries us into 2023.
Josh Wolfson
analystThanks so much — I really appreciate it.
Operator
operatorThanks. Ovais Habib from Scotiabank has the next question. Go right ahead.
Ovais Habib
analystThanks, operator, and thanks to the B2 team. A couple of my questions have already been answered, and I don't want to spend too much time harping on the Cardinal side, but could you tell us exactly — basically, how much of the revised guidance for Fekola is due to Cardinal? And also, regarding the guidance provided on Cardinal, which says the deposits potentially hold about 60,000 ounces of gold per year — again, could you give us a bit more clarity on the constraints around that 60,000 ounces a year, especially given that the mill is running at 9 million tons per annum?
Bill Lytle
executiveSo, just to make sure I've got your question right — you want to know what the ounce profile looks like from Cardinal across the next couple of years?
Ovais Habib
analystAnd then Bill was simply attempting to work out whether there is any kind of limitation on that 60,000 ounces of gold each year that you have set out, I suppose as soft guidance?
Bill Lytle
executiveRight. The real limiting factor here is comparing the Fekola permit, or the grade at the Fekola pit, against what Cardinal offers, along with the mining sequence — all of that gets factored in. Keep in mind that Cardinal involves a somewhat longer haul, so naturally we go after the higher grade first, and then, of course, you have to factor in stockpiles. What I can tell you is that for 2022, as things stand, we estimate roughly 650,000 tons will come from the Cardinal deposit, which works out to around 50,000 ounces for 2022. And then once you move deeper into some of those higher-grade zones, you'll see that reflected in some of the later years.
Ovais Habib
analystUnderstood. And on the inferred ounces, clearly you've been drilling into those too — and maybe this one is for Tom — but have you also been doing any step-out drilling? To what extent does this extend in terms of strike potential?
Bill Lytle
executiveOkay, so first I’ll say that, essentially, we’ve split it up, or the operational group is presenting the inferred resource to show it, but the geologists are right beside us since it is definitely open, and perhaps either Tom or Brian can talk about that. But it is completely open, and we see this continuing to expand to such an extent that we have actually put into the 2022 budget some additional work on the social side to ensure that the communities are not, in a sense, land restricted as we enlarge this pit.
Clive Johnson
executiveTom, would you like to say something about the exploration climate?
Tom Garagan
executiveYes, Ovais, to address what you asked, Cardinal remains open — open at depth as well as along strike. We also have a nearby deposit named FMZ, located on the west-northwest side of Cardinal, which nearly touches our ground. Our exploration work is not just expanding Cardinal; it is also expanding FMZ, and that deposit is still open too. We will keep up that exploration again next year. It fits inside next year's budget.
Ovais Habib
analystAll right, that works. My apologies — please continue.
Clive Johnson
executiveNo, I already mentioned that — thank you, Tom.
Ovais Habib
analystNo problem at all, okay. So Clive, I'll hand things over to you now, and at the start of the call you mentioned that you've begun — or B2 has begun — reviewing some M&A opportunities too. Could you give us any color on whether you're considering development projects, or is it operating mines, JV opportunities — anything more you can share?
Clive Johnson
executiveSure, my answer is that we keep scanning, just like we always do. As I noted, we're pleased with what our pipeline holds, along with certain strong exploration assets in our portfolio, Gramalote included, plus what Anaconda could become. That said, given that our shares have lagged the sector — though hopefully they're beginning to close the gap lately, and we want that to carry on — clearly we'd rather not dilute our investors meaningfully, so we'd seek an inventive transaction while staying disciplined on acquisitions, as we have for the past 30-odd years, avoiding paying for promises that may or may not materialize and refusing to overpay for projects. Going out and prevailing in a bidding contest against rivals who didn't act as we did over the last 10 years and construct mines while that was unpopular, and who lack a pipeline as strong as ours, would be difficult. So, that being settled, I think if some kind of exceptional chance arises through which we can apply our capability in constructing mines, in financing them, or in approving them as we did — don't forget — in most bodies some years back, we are examining those sorts of situations and monitoring a range of items.
Clive Johnson
executiveThat said, I do believe one genuinely encouraging piece here is the chance to pursue M&A by combining cash with our stock, which helps keep dilution down. We're sitting on a very large cash position, and beyond that, as Mike mentioned, we can draw 600 million from the banks — with another 200 million on top of that — so 800 million is on hand to us as potential funding for an acquisition. That shifts my thinking somewhat, because I struggle to picture locating anything accretive right now that we'd actually win a bid for. Beyond that, I also struggle to picture completing something today funded purely with our shares, unless it were an extremely unusual case where an asset was deeply undervalued. So we keep looking, and we'll keep looking in interesting places. At times we're upstream wading around for opportunities, but — if we do a deal, I'm quite confident that you folks, along with our shareholders and our Board of Directors, would concur that it's accretive, since we wouldn't proceed otherwise.
Ovais Habib
analystSounds good, Clive, and thanks to all of you. That's all from my side.
Clive Johnson
executiveAppreciate that, Ovais.
Operator
operatorThanks. Our next question comes from Anita Soni with CIBC World Market.
Anita Soni
analystHi. My first question concerns the Bantako permit. I believe you said in the MD&A that bringing it into production will depend on the mine plan as well as securing every required permit. Could you elaborate on which permits are still outstanding for that?
Bill Lytle
executiveRight, so Bantako sits within a distinct license area. It isn’t the same as Cardinal, which was straightforward — we essentially only needed to update the IAEA, demonstrate how it slotted into the mine plan, and then it received approval for production, and that side is now fully permitted. With Bantako, once a feasibility study is submitted, you must then complete the entire process of securing an approved EIA, and after that, naturally, comes the shareholders agreement — specifically what percentage the government would seek to take, which we expect would be quite similar to Fekola. Following that is the convention, which sets out your fiscal stability and all the rest. So a very lengthy process is certainly going to be required. That’s why, in reality, for Bantako specifically, we already have a study prepared that could be submitted tomorrow if you asked me to. But the real question is how long all those legal steps that must take place will actually take. That’s why you’ll frequently hear Clive refer to the second half of 2022.
Bill Lytle
executiveWe picked six months arbitrarily, since that's our estimate of the time required, though it could end up moving more quickly.
Anita Soni
analystOkay. All right. Yeah, I was curious about how that would arrive in 2022, and we're still waiting on permits, but since you already have a study ready, that's good. And then just to get a sense of the tailings — I think you mentioned that, given the Cardinal and the higher throughput levels you're running through right now, which is great that the mill is performing — but for the tailings facility, could you just give an idea of what kind of a lift would be needed and how often you'd have these extra lifts conserved in the capital tied to that?
Bill Lytle
executiveWell, I'm not sure I have the capital figures right in front of me, but from a lift standpoint, certainly—remember, we were consistently signaling that we had this roughly 6 million to 7.5 million tons per annum. So our tailings expansion schedule was built on that basis. Now, since we're running at 9 million tons per annum, I mean, that creates a knock-on effect for many things across the site, but the one you brought up was the tailings facility. So the reality is we've already begun putting the next lift on it. And it will be a double lift, basically taking us up to the final elevation that facility is capable of. That's going to take us, I think—I believe that gets us into 2025, or 2026, somewhere in that vicinity, so basically, we'll have to begin the design work and the engineering for a new structure, for which we've already identified a location, and get that permitted in 2022. Then we can construct in late 2022, 2023, which puts us into production in 2025.
Anita Soni
analystAll right, and then the last thing I wanted to ask — sorry, did you want to — are you still going?
Bill Lytle
executiveNo, I just want to say that I didn't have — obviously, I don't have that cost in front of me, but typically the operating costs or construction costs — I think I recall seeing something around $10 million, somewhere in that range for the next lift.
Anita Soni
analystAll right, and regarding the double lift <<inaudible>>. Okay. Then finally, on Gramalote — your choice to sort of hold off there looks quite sensible in hindsight, considering the inflation everyone is running into. You're clearly watching costs climb across your operations and taking steps to counter that, but when you think about Gramalote and moving it further along, could you share some parameters for how you view cost escalation given the capital build? Many of your peers have been running into real headwinds, and they're all competing for the same single component to get something moving. So can you give us, I suppose, some color on your thinking about whether you might push Gramalote back even more or would you proceed at full speed on it?
Clive Johnson
executiveFrom a company perspective, we're clearly factoring in some inflation assumptions when it comes to what we're currently examining at Gramalote. Just how long those pressures will persist is, of course, a matter of considerable debate, as is the duration of the inflationary trend. That said, I'd note that where we have a solid economic case — and we previously had a 15% IRR, though we concluded that project could improve, and we've observed indications that this is indeed occurring through meaningful adjustments that are lowering the capital, possibly by a substantial margin — inflation might erode some of that benefit, but we'll be monitoring it carefully. Still, I have to say that, historically, as a company, when we've got something with sound economics, we're going to want to proceed, and the Government of Colombia, like governments everywhere these days, if there's an economically viable project, they're going to want to build it, and we have a very supportive government there, we're in the right location in Colombia, in Ethiopia, and the local population genuinely wants this to go ahead. So there's another consideration there as well: if it's economic, we're going to want to move forward.
Clive Johnson
executiveAssuming we're happy with how this inflation is shaping up — and the Colombian government and people locally are genuinely keen for us to push ahead — HGa has <<inaudible>> a signal that they see things the same way we do, though naturally everyone is waiting on what the final feasibility study shows.
Bill Lytle
executiveAnd perhaps I could add just a few points. Obviously, we recently refreshed the cost figures for our study, which was conducted in 2021. Those will be updated once more as we work through further specifics on the mill and related items, and those costs are clearly being fine-tuned very closely. Then there's another factor to keep in mind: the Colombian peso, the exchange rate, has softened somewhat, so what we'll observe is that items of that kind purchased onshore will actually come cheaper for us, and that will certainly provide some offset.
Anita Soni
analystOkay, thanks. That covers everything I wanted to ask.
Clive Johnson
executiveMuch appreciated.
Operator
operatorThanks. The following question comes from Don DeMarco with National Bank Financial.
Don DeMarco
analystThanks, operator, and nice work on the strong free cash flow this quarter, guys. A lot of what I had has already been covered, though perhaps I’ll put one question forward about ESG. I believe I caught Mike mentioning that cash costs at Fekola are down roughly 3% thanks to the solar plant. And broadly speaking, I keep hearing that electricity and fuel are fueling inflation. At Fekola, is producing solar power less exposed to inflationary pressure than producing power from gensets? And second, across the whole company, which ESG initiatives are coming next?
Bill Lytle
executiveAll right, so — yes, absolutely, the answer is yes. I mean, going solar leaves you far less exposed to inflationary pressure. That said, I'll hand it over to John — John Rajala is pretty much our authority on power — and let him walk through solar costs and what all of that means for how we run things?
John Rajala
executiveOkay, thanks Bill. So regarding what it costs to produce solar power, that's only a fraction, whereas making electricity with HFO came at a much higher price. And we anticipate favorable costs ahead — Q3 was a really strong quarter on costs — our power generation cost came in at $0.152 per kilowatt hour against a budget of $0.156. That gave us total savings of roughly $0.60 per ton of ore cost. And looking forward, we're now moving into the months with greater solar irradiance, so we expect the solar to deliver even better cost performance. Does that address your question?
Don DeMarco
analystYeah. And are there any plans to perhaps grow that solar installation at Fekola, or to construct additional ones at your other mines?
John Rajala
executiveSure, that could work — please proceed. Go on, Bill.
Bill Lytle
executiveNot you, John—you can take the first turn.
John Rajala
executiveYeah, that's exactly what I was about to mention — we have had that under consideration, though there aren't any plans to expand right away. Down the road it could perhaps happen, both there and at other sites, should there be demand for it.
Bill Lytle
executiveSure — we had a genuinely interesting conversation about exactly that at yesterday's board meeting. Take a case like Bantako, or Menankoto: we return there and want to deliver power to the site, and of course that's feasible. But remember, we now have a 7.5 megawatt installation at Otjikoto, plus this one at Fekola. We see ourselves as being at the cutting edge — at the very front of this — and so at present we're examining, and Dennis Stansbury is in fact examining, questions such as: is it programmable, all right, does that make sense? Clearly, that site is somewhat land constrained, but could we do it there? Could we do it at Masbate? Some technologies exist — and I know both John and Dennis have been researching this — whereby you could place it on the tailings facility, or place it on the dam face. We're reviewing all of that, and we're quite enthusiastic about it, certainly. Then the latter part of your question concerned further ESG initiatives that you will observe, and again I'd contend that we sit at the cutting edge, or the leading front, of ESG, and we've consistently been very successful at that.
Bill Lytle
executiveI'd say that in 2021, a couple of important developments are going to stand out. One is the climate change initiatives we currently have underway. We're planning to carry out a complete inventory of our emissions, and naturally, there's our water conservation work as well. We operate in certain locations with desert conditions, so we're placing real emphasis on finding ways to cut water usage, and again, staying at the forefront of ESG and those kinds of topics.
Clive Johnson
executiveAnd naturally, as you’ll recall, we installed one of the earliest solar facilities in mining at Otjikoto a number of years back <<inaudible>>. So expanding that capacity represents a major commitment on our part, and we’re also examining which other locations could be developed so that we can make use of it.
Don DeMarco
analystAlright, thank you for those details. My last question builds on what an earlier caller raised, and it's directed again to Clive. During your opening remarks, you said you would look at accretive M&A opportunities. By accretive, did you mean in terms of production? What I'm asking is whether that would involve considering an operating asset, if it can be justified, or does your M&A attention remain mainly on development projects?
Clive Johnson
executiveNo, I think we recognize it has the potential to be special. There can be special situations where, say, a mine has been set a problem through poor management or other issues, and we believe we can improve it. Now, plenty of people send us deals and make that promise, and then sometimes it doesn't materialize, although I do like the fact that the industry overall seems to be getting better technically. If you think back to Masbate in 2013, I think that was when we acquired CGA Mining, as a single mine company. They did a pretty good job, but we required them — their operating costs were $890 an ounce. And I remember some of the guys brought it forward and I was saying, well, why are we talking about this, if it's 890 an ounce, and they said, well, here's out, there's a lot of things we would change. So last year, I think we had a couple of quarters under $500 an ounce for operating costs. So not only are we very good at building mines with our reconstruction team, and we'll continue with that, but there is that opportunity. Also, sometimes these days, it's harder and harder for a single asset company to convince investors and banks etc. sometimes that they can build it — do they have the team to build it?
Clive Johnson
executiveWhen it comes to a contract build — which I think is a bit risky — do they have a strong owner's team in place? And are they able to finance it on reasonable terms? So some of those situations exist. There's competition, as I mentioned earlier, so we might end up in a location where others are afraid to go, which we've done successfully before, or we may find that the right fit, as I said, is something we can improve. Clearly we'd like to find — if we came across a good development opportunity where we could successfully argue to our shareholders that it was accretive, we are keen to do that as well. As of now, we were pretty optimistic that Gramalote could very well be the next construction build for us. Then again, we also have the potentials we talked about one day — possibly another mill — and Fekola, it's too early to say now, but that possibility exists.
Don DeMarco
analystAll right, appreciate it. Best of luck for Q4.
Operator
operatorUp next, we have a question from Geordie Mark of Haywood Securities. Go ahead, please.
Geordie Mark
analystI have just a few questions — some follow-ups on earlier points and a few fresh ones. Perhaps starting with Fekola: since you may have several source origins in the near to mid-term — Bantako and Cardinal, <<inaudible>>, plus the upgrade — I believe, to 9 million tons per annum in a blended source. Do you feel comfortable with non-earning ton per annum capacity, or does the functional capacity allow going past 9 or 10 per annum over the midterm <<inaudible>> from the drill bit.
Bill Lytle
executiveI can already picture John yelling, when does it stop being enough? So the short answer to that, Geordie, is that if you recall, we did this a long way back when we were expanding, when we moved from 4 million tons per annum up to 5 million tons per annum. After that we examined optimization, and we genuinely got a step function, and we considered plus 1.5, which essentially meant expanding the circuit we already had. Then the second study we looked at was 10 million tons per annum, and it got dismissed very quickly, because the step function up to 7.5, which today is 9, was far cheaper, 50 million bucks. So the capacity exists to go bigger, it's a big — that's a substantial step function and it would take a lot of extra work. Is there room to put it there? I believe John would tell you yes, but at that point you'd need to begin weighing the whole idea of whether it might potentially be cheaper to put something up at Menankoto, right? Would you end up with an entire complex where you'd perhaps have two mills operating up there, so you wouldn't be hauling all of that ore that kind of distance, and so, I think if you discovered enough ore, you would eventually want to build something separate, but those studies would still need to be carried out.
Geordie Mark
analystAll right, so 9 million at this point, okay. Perhaps turning to Masbate — there are some fairly encouraging recovery percentages there, and given how positive percentage recovery has historically compared with that model, do you plan to update the model, or are you keeping a somewhat more conservative position on it, or how should we view that going forward?
Bill Lytle
executiveSo for the 2022 budget, we did nudge the recovery system up a bit, depending on the ore type and how it fit in, or where it was coming from. Keep in mind, this is all somewhat anecdotal, right — it all comes from results we've already gotten, rather than doing extra drilling or more metallurgical testing. So at this point, we're still — I believe we're still — somewhat conservative, but we're heading toward a higher recovery based simply on experience. And I'm not sure there's any science behind it. It's just that this is what we see, and this is what we're saying.
John Rajala
executiveI'll just add to that, Bill — we've been running some ore campaigns through the mill at Masbate, covering the main ore types, to get a solid estimate of recovery at plant scale. So that has also been incorporated into the model for 2022.
Geordie Mark
analystAll right, thanks. And maybe as a final question, regarding Otjikoto and Wolfshag underground, what steps remain before you ultimately reach underground production—right now it isn't far off from converse production, so what are you seeing there?
Bill Lytle
executiveWhat would you like to ask?
Geordie Mark
analystYeah, that came through a bit unclear.
Bill Lytle
executiveSure, Randy is actually over at Otjikoto right now, so perhaps I'll let him take that one, but what I can say is that we're simply carrying on with the development of the <<inaudible>>, and the plan calls for us to begin producing ore in Q1 — or at the very least, to get some ore out of there during Q1. Randy, would you like to walk through the remaining final steps we still have left to complete?
Randy Reichert
executiveRight, so that's basically it — the development contractor is currently handling the main decline. At this moment, we've made a few small adjustments to the development plan, and once we reach ore, we'll begin extracting some development ore during the first quarter. We've also chosen a production contractor, which will be ramping up and arriving around the middle to end of Q1 to get going there.
Geordie Mark
analystOkay. <<inaudible>> ore development, and after that we get to the large share of <<inaudible>>.
Randy Reichert
executiveThat's right.
Geordie Mark
analystI appreciate that.
Operator
operatorGeordie, anything else you'd like to ask?
Geordie Mark
analystThat concludes it. Thanks.
Operator
operatorThank you. <<operator_script>> I'd now like to hand the call back to Mr. Johnson.
Clive Johnson
executiveAll right. Appreciate it, operator. Thank you all. Those were solid questions. Should anything else come to mind, please don't hesitate to get in touch with us. We're looking forward to planning and reporting yet another strong quarter when the year comes to a close. Thanks for your time.
Operator
operatorThank you, sir. Ladies and gentlemen, that truly brings today's conference call to a close. Thank you once more for joining us. And right now, we kindly ask that you disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete B2Gold Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to B2Gold Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in B2Gold Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.