B2Gold Corp. (BTO) Earnings Call Transcript & Summary

August 8, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 48 min

Earnings Call Speaker Segments

Operator

operator
#1

Thank you for being with us. I'm the conference operator for today. Welcome to B2Gold Corporation's conference call on the financial results for the second quarter of 2025. Please note that everyone on the line is in listen-only mode today, and this conference is being recorded. Following the presentation today, analysts will have a chance to ask questions. To get into the question queue, press star then one on your touch-tone phone. If you need help joining today's conference, you can call and signal for a conference operator by pressing star then zero. At this point I'd like to hand the conference over to Mr. Clive Johnson, President and CEO of B2Gold. Please go ahead.

Clive Johnson

executive
#2

Thanks, operator, and welcome back to the call. We feel we had a strong quarter. In the second quarter, we saw a lot of favorable financial results. I give all my praise to <<inaudible>> second quarter results. <<inaudible>> didn't have expectations in the second quarter on the production side. We're looking at lower than expected tax operating costs throughout the operation. The operating continues to run well with the expected needs of our annual value. Additionally, <<inaudible>> 2025, we saw the amount of growth for our cash <<inaudible>>. It's hard to face. That's great for both B2Gold as it's a <<inaudible>> partners. We have worked <<inaudible>> and research treatment. Since we focused on our plans to continue studying and staying up late, and please do give full attention to that when you see some wrap-up. We commence the production of the expected to be achieved in September 2025, which is quite a rapid wrap-up. Pretty much, yeah, that's <<inaudible>> history. The following weeks have seen increased rate opportunities in our view, and I say the value that's approval to the benefit of our operation. <<inaudible>>. The approval follow-up production lease <<inaudible>> I think this is a really important point. Just for those that understand about the piece of global value, <<inaudible>> cooperating with B2Gold.

Clive Johnson

executive
#3

That's B2Gold. Being in the nation where the coal mine is operated and <<inaudible>>. In the second quarter of 2025, we also had a chance to assist with the notice of two challenges during the cycle. Even so, stability appears to be beginning. There's an understanding that the MI project has existed here for the past 12 months and is part of its project <<inaudible>>. <<inaudible>> and we already have <<inaudible>> rate happens to have a repetition. This through <<inaudible>> over the next 10 years, including production <<inaudible>>. As we look ahead <<inaudible>> financing. As I said, <<inaudible>> our guidance through 2025. With that, I would like to now hand things over to Mike Cinnamond. He's a <<inaudible>>. He will quickly give a financial ad, and then we'll have <<inaudible>>. Mike, over to you.

Mike Cinnamond

executive
#4

Thanks, Clive. Financially speaking, we had a strong quarter. Basic earnings per share came in at CAD 0.12 per share, and when you adjust for one kind of items, which were actually offsetting, we actually realized CAD 0.12 per share of adjusted earnings. It's fair to say that this definitely benefited from the strong average gold sales price. Maybe I'll touch on the sales point as well — we were slightly behind budgeted sales ounces in the quarter, but that was purely on a timing basis. The timing of shipments from several of the sites meant those ounces were shipped out just after the period end in early July. On the operating cash flow side, operating cash flow before working capital adjustments was CAD 301 million in the second quarter, another strong result. Again, that highlights the cash generation potential of our operating assets and the sales price environment. On the balance sheet, we continue to remain in a strong financial position. We've got cash and cash equivalents of CAD 308 million at the end of the second quarter. Also, at the end of the second quarter, we had the full CAD 800 million available in our revolving credit facility, which is undrawn, plus the CAD 200 million accordion feature.

Mike Cinnamond

executive
#5

I would note that after June came to a close, we drew down CAD 200 million on the revolver. The purpose was to assist us in managing working capital needs as we begin delivering against our gold clean haven commitments across the 12-month period from July 2025 to June 2026. As a matter of fact, the first tranche of those has already been delivered by us. We are working to unwind that position. Thanks to continued strong performance throughout the portfolio and a ramp-up at Goose, which is now well underway, we were pleased to restate and reiterate our production guidance for 2025 unchanged, with full-year production anticipated to fall between 970,000 oz and 1,075,000 oz. We expect Goose to still contribute between 120,000 oz-150,000 oz of those ounces. Also, on the positive side, with cash cost per ounce lower than expected at the existing three operating mine sites, Fekola, Masbate, and Otjikoto, we are pleased to announce that the company has reduced its consolidated cash cost guidance range for those three operations to between CAD 740 and CAD 800 per oz. That is below the earlier guidance range of between CAD 835 and CAD 895 per oz. With the use of the post-commercial production estimates for the Goose Mine, I remind you that Goose is expected by us to enter commercial production in September.

Mike Cinnamond

executive
#6

For consolidated cash operating costs, our guidance now sits at CAD 795 to CAD 855 per ounce. On the liquidity side more broadly, we still hold a solid degree of financial flexibility. Much of our focus is on finishing the remaining construction ramp-up at Goose, fully repaying the Gold Prepay delivery we'll enter into in early 2024, and completing the heightened sustaining and growth workstreams portfolio-wide. We'll also keep funding robust aspiration programs, which we anticipate will extend line by line. With that, I'll hand things to Bill for an operations and projects update.

Bill Lytle

executive
#7

Okay, thank you, Mike. I've just come back from Goose, so I might be a bit sparrow-like here, so please bear with me. As Mike mentioned, across the three operations, we anticipate hitting or beating every one of our targets for the year. What I imagine most people are keen to discuss is Goose. To revisit what's been finished there, at Goose, virtually all the major construction work that was needed had been wrapped up by the end of the quarter, and mine ramp-up is now progressing well. Attention in the third quarter now shifts to optimizing the operations as they currently stand and lifting throughput up to full capacity. As Mike noted, we expect ramp-up to commercial production in September 2025. Items finished during the first half of 2025 at Goose include finishing the mining of the Echo Pit. Keep in mind, that served as our tailings facility, along with commissioning. We're now depositing tails into Echo. Mining of the Umwelt Open Pit reached full ramp-up in the second quarter. We also saw continued development of the Umwelt Underground. Fresh Air Raise 1 is already complete, and we're currently developing Fresh Air Raise Number 2, which will be required in the second half of 2025.

Bill Lytle

executive
#8

We started dewatering at the Llama Pit. To keep the mill running properly, all of that is necessary. This supplies the mill with both fresh water and reclaimed water. We built out the Umwelt Open Pit and Underground, and keeping that on track stays a priority so that sufficient mill feed volumes are sustained. Turning to the other operations, Mali carried on its robust results for 2025, once more beating gold output forecasts in the second quarter. Per Mike, cash costs per ounce likewise came in under expectations. On the underground side, following our meeting with the government last quarter—or last month—underground production has begun, as we announced on July 30. Underground development is far along, with more than 9,300 m of development work, along with installation of every piece of underground mining infrastructure required, all completed before production started. If you recall, we had in fact received a permit allowing all of that development. Although we began mining ore 30 days behind schedule, we actually kept developing right through to July 30th. A question I have heard raised repeatedly is whether we believe we will obtain the ounces needed from underground. We clearly see a route to ensure that every ounce required from underground gets delivered in 2025.

Bill Lytle

executive
#9

On the regional project, we carried on with our meeting alongside them. We're still working alongside the State of Mali to wrap up approval of the regional exploitation permit during the third quarter of 2025. This is somewhat late-breaking news. In fact, we held our first technical session alongside them this morning. We definitely see a route to securing this permit. B2Gold stands ready to begin pre-stripping work with the Fekola regional infrastructure. As a reminder, once again, this was among those facilities where they let us handle the entire infrastructure build-out. So the haul roads are in place, and all the infrastructure is already there. We're only awaiting a permit for pre-stripping. Following June 30th, 2025, the Fekola mill marked a major milestone, having produced 4 million oz of gold since the project began. At Masbate, operations keep performing strongly, with a world-class safety record — which, I believe, we announced as more than 2,400 days without a lost-time incident. Mine production beat expectations by a wide margin, and we expect steady output in the second half to deliver strong 2025 performance and robust margins. Otjikoto is doing very well too. The open pit and underground both performed well in the second quarter, with production also surpassing expectations.

Bill Lytle

executive
#10

As a reminder, in the second quarter we are focused on the Antelope deposit, and we remain dedicated to advancing it, with the goal of releasing it during the third quarter of 2025. Gramalote is the other development project. We have published the positive feasibility studies. Modification work on the work plan and the environmental impact study has begun, and we expect completion in late 2025 or early 2026. We anticipate the present modification timeline will run roughly 12 months to 18 months. With that, Clive, I will hand it back to you.

Clive Johnson

executive
#11

Thanks, Bill. Operator, we're ready to take questions now.

Operator

operator
#12

Thank you. We'll now start the analyst Q&A portion. Just a reminder: to get into the question queue, press star followed by one on your phone's keypad. A tone will confirm your request. Should you be on a speakerphone, kindly lift your handset before you press those keys. And if your question gets answered at any point and you'd prefer to drop it, just press star then two. We'll take a brief pause now to put our roster together. Our first question today is from Fahad Tariq at Jefferies. Go ahead.

Fahad Tariq

analyst
#13

Hello, and thank you for taking my question. The press release references fuel costs coming in below what was anticipated in several spots, not only at Fekola but at Masbate as well. Could you perhaps walk us through what the expectation was at the start of the year, back when guidance was set? I'm simply curious as to why it is running below expectations. Thanks.

Bill Lytle

executive
#14

Mike, would you like to handle that one? Or should I?

Mike Cinnamond

executive
#15

I'll begin. Typically, when we put the budget together, we look at the forward curve for fuel prices, generally somewhere around September or October. Those figures serve as our baseline. What we've observed, and what has actually come to pass, is that HFO pricing is roughly 9% below most prices during the first six months of 2025, while diesel has been even further down — more in the neighborhood of 13% lower. We made our best estimate of that at the time we set the budget, probably anchored around the October price, since we were finalizing the budget in early November. Our change policy is that, as we've looked ahead, we've factored in those reduced fuel costs when reviewing the re-guidance we issued on the cash operating side.

Fahad Tariq

analyst
#16

That's useful, thanks. Regarding Goose, someone raised a point about the capital expenditure guidance for this year's second half — CAD 176 million. I'm simply attempting to square the total CapEx at Goose with what the project guidance, the project CapEx guidance, had been previously, and I believe it was reaffirmed in the May release. Could you perhaps take us through that? Put another way, does that CAD 176 million second-half CapEx guidance line up with what you had anticipated? Thank you.

Mike Cinnamond

executive
#17

Sure, I can begin with that, and Bill may want to add something. Overall, on the projects, costs did accelerate somewhat as we progressed toward the first goal quarter at the close of half one. We saw roughly a 5% rise in overall costs versus the budget. What we also encountered as we moved toward that point was that we accelerated certain CapEx. That CapEx is work we are carrying out in half two in the track report and in fact a bit in later years. It came to approximately CAD 60 million in total. We also had some mill and process plant upgrades, which we have described in the NDA and disclosures, amounting to somewhere near CAD 40 million. So that is roughly CAD 100 million across those two, where we brought items forward from the second half, and then about CAD 40 million that we have added into the second half, I believe. Just a little.

Bill Lytle

executive
#18

Yeah. Really, when it comes to upgrades, I'd say again that it was really about the mill's operability or availability. One of the things was that as we got in and built, we realized a lot of the lines were missing the necessary valving and piping, the built-in redundancy, the ability to maintain the mill while it keeps running. We added — I think I saw this from the finance group — roughly another CAD 26 million on the mill side, tied to what I'd call upgrades or improvements in availability. I'd say that really comes down to a lot of that small stuff: additional pumping, piping, valves, and installing all of it.

Fahad Tariq

analyst
#19

Alright, thanks.

Operator

operator
#20

We move now to Wayne Lam at TD Securities, whose question is up next. Go ahead.

Wayne Lam

analyst
#21

Yeah. Thanks, guys. We had a solid quarter and secured the Fekola Underground permit. It feels like you've built some nice momentum in Mali at this point. I'm just curious about the mechanics involved in obtaining the Fekola regional permit and what the last sticking points in negotiations could be. Are there any hurdles that might stand in the way of securing that permit before Q3 ends?

Bill Lytle

executive
#22

Yes, like I mentioned, we traveled to meet with the Minister of Mines. In the course of that conversation, it appeared almost as though the regional permit had slipped off their radar, since they were occupied with some other government matters—other mining companies operating there, which we won't name on this call. Once we raised the issue, frankly, they felt somewhat embarrassed that it still hadn't been completed. They promptly committed to trying to get it issued by the close of Q3. That timeline came from them, not from us, and they promptly agreed to form a commission and begin work on it. That took place this morning. We haven't been told of any remaining problems, apart from hearing that it wasn't a shouting match or a dispute. It was simply a highly constructive conversation, which we believe will result in the permit.

Wayne Lam

analyst
#23

All right, thanks a lot. I was just curious about how Goose is ramping up compared with the mine plan—you had laid out 125,000 oz for this year in that plan, which would put things at the low end of guidance. It looks like you've made some solid headway there, particularly with the stripping at the Echo Pit and the development work. I'm just wondering where you see the chance to beat what's been set out in the plan. Is that on the plant side, or is there also upside when it comes to the grade profile?

Bill Lytle

executive
#24

At this point I'd say both. Again, these questions come right as commissioning gets underway. Sure, we have a bold ramp-up schedule, though in the past we've managed to outperform it. Some upside exists there. There's upside too as we begin moving away from the eco low-grade material — and keep in mind, the Echo Pit was never intended to serve as a high-grade feeder for the mill. As for the Umwelt Pit, if we can figure out how to mine it faster, there's definitely some potential there. I'd point not just to the mill ramp-up side — granted, a three-month ramp-up is aggressive compared with many of our peers, yet not really aggressive compared with what we've done historically. On the Umwelt side, if we can secure additional grade from the open pit.

Wayne Lam

analyst
#25

Appreciate that. Thank you. Perhaps one quick follow-up regarding capital expenditure. With the bump in CapEx versus the CAD 270 million in the mine plan, I'm just curious how much of it would have been pulled forward out of 2026. I'm simply attempting to work out whether we ought to be expecting a smaller CapEx figure compared with the CAD 140 million set out for next year in the mine plan.

Mike Cinnamond

executive
#26

Okay. So you're asking about what might have been moved up from 2026 into the second half? Is that the question? Yeah. I think there are some site infrastructure upgrades where Bill is doing what he wants in order to enhance both the MLA and the site. That comes to roughly CAD 15 million. As Bill said, there's approximately CAD 26 million tied to the mill. So let's say that's CAD 40 million of things we didn't have to do this year, but we want to do them to enhance it. Then there are some pre-payments on some generator additions that we have. That's another CAD 24 million. It would be more than CAD 60 million that would be pulled forward from a future year.

Wayne Lam

analyst
#27

Understood. Alright. Good. Appreciate you answering my questions.

Operator

operator
#28

Our following question comes from Ovais Habib at Scotiabank. Go ahead.

Ovais Habib

analyst
#29

Thanks, operator. Morning, Clive and the B2 team. Nice quarter — congratulations. I've just got a couple of questions. Maybe starting with Fekola. With the Fekola Underground permit now in hand, does the sequencing of the Fekola mine plan for 2026 change as a result?

Bill Lytle

executive
#30

As you'll recall, we consistently said this would happen following Q2. What we saw at our Echo mine indicated it would genuinely come online during July. The Underground permit doesn't truly alter that, except that we've completed somewhat more development than what our Echo mine had in place. We might manage to capture a few extra ounces, though in my view that's really a 2025 matter rather than a 2026 one. Regarding 2026, we're still in the process of working out the budget and our direction there. At this point this year, I'd rather not say where those ounces will originate from in 2026.

Ovais Habib

analyst
#31

Understood. Bill, regarding the grade of the underground stockpiles you'll be holding at site at present, what grade do you anticipate from the stopes you're mining right now?

Bill Lytle

executive
#32

Is Fekola the one you mean?

Ovais Habib

analyst
#33

Regarding Fekola Underground, that's correct.

Bill Lytle

executive
#34

That one I honestly couldn't tell you off the top of my head — I'd need to check. I did give the board the actual figure, though. Let me get back to you on that before this call wraps up. I'll follow up with you on it.

Ovais Habib

analyst
#35

That's fine, no problem. Moving past that point, you're aiming for roughly 25,000 oz out of the underground in 2025. This is sort of a follow-up to what I asked earlier, but do you have a target in mind for 2026 at Fekola Underground? Is there a range you're able to share at this moment?

Bill Lytle

executive
#36

Right. Keep in mind, we consistently said we believed we could generate roughly 80,000 to 100,000 ounces from underground — somewhere in that 80,000 to 100,000 oz range. And remember, that displaces ounces of lower grade. In reality, you'll probably end up with about 50% of that, so we're essentially aiming for those 50,000 oz per year. To circle back to your earlier question, I see total underground tons mined through this development — which currently sits on the stockpile — at approximately 35,000 oz. That's only around 2.7 g/ton. Again, I may be speaking out of turn here, but in the stopes we'll be mining, we're at least double that.

Ovais Habib

analyst
#37

Understood, and thanks for the detail, Bill. Turning to the regional permit matter: if the permit comes through by the close of Q3, is that the timeline you're aiming for? Do you feel good about 160,000 oz–180,000 oz of output in 2026? That's roughly in line with the technical report put out earlier this year.

Bill Lytle

executive
#38

Right, so nothing has changed regarding how the mining itself is set out in the tech report. Obviously, again, when it comes to the budgeting process and deciding which ounces will be sourced from where, that could shift somewhat, but the ounces themselves remain the same as what appeared in the tech report regionally.

Ovais Habib

analyst
#39

All right, that sounds good. Thanks for that. Let me turn quickly to Goose. I’m really eager for that September commissioning at Goose. Bill, how is the underground development going there? At this point, do you have the right people and equipment in place, relative to what you were targeting for the underground? That’s at Goose.

Bill Lytle

executive
#40

Right, and I recall when I began participating in these calls, Clive stated — I believe to you — that we’re limited to three questions. Let’s begin there. Because this is the fourth question, I’ll go ahead and answer it. Things are progressing nicely. We’ve essentially found our rhythm. As you’re aware, we’ve replaced quite a few people underground. A new mining manager joined this year, along with a new Technical Services Manager. Those individuals are all now in position. We also added more equipment under the HERC program this year for the underground operation. So the answer is yes. We have the right personnel now, and yes, we have the right equipment now. There’s really no reason the site shouldn’t be able to deliver.

Ovais Habib

analyst
#41

Alright. Nice work, Bill. Really appreciate all that detail. Thanks for fielding my questions, and congratulations on a solid quarter.

Bill Lytle

executive
#42

Appreciate it, everyone.

Operator

operator
#43

Just a quick reminder — if you'd like to ask a question, hit star and then one. We'll now take our next question from Anita Soni at CIBC Capital Markets. Go ahead.

Anita Soni

analyst
#44

Morning Clive, Mike, and Bill. Since Ovais slipped in an extra question, I'll keep mine to two. So, first one: about your commercial production — how do you define it? I'd like some clarity there, because definitions tend to differ from one person to the next.

Bill Lytle

executive
#45

Yes. I believe it’s the same one we deployed at Fekola and Otjikoto. That works out to roughly 65% mill plate throughput on average across 30 days.

Anita Soni

analyst
#46

All right. From where you sit, what would you say is the upcoming milestone as far as the ramp goes? I assume that means year-end. What are you aiming at? By year-end, which throughput increases are you expecting to reach, and over what period?

Bill Lytle

executive
#47

By the end of the year, we definitely want to reach 4,000 on that nail plate.

Anita Soni

analyst
#48

Are you saying we should hit 100% across the entire quarter?

Bill Lytle

executive
#49

My recollection is that availability sits around 92% or 93%. Something along those lines. All right, I can't recall the exact figure that will appear in the tech report.

Anita Soni

analyst
#50

All right, and this is the last question, I believe, that I did ask on your behalf. Regarding the optimization plans you’re considering — specifically around running a winter ice road less often than, I think you said, less than annually — what would that involve? My assumption is that it’s kind of a — is there a method to operate an ice road that’s, you know, not on the usual ice road schedule? Or was it every other year? Or what exactly are you looking at? For instance, every 15 months or so? I’m just trying to grasp that phrase.

Bill Lytle

executive
#51

It can’t be every 15 months. The ice road has to be open almost always from February through roughly May 1—let’s say May 6. That’s the ice road window. What you’re asking is really almost an engineering-interest question. The first issue is really fuel. If you actually need 80 million L of fuel, which is what we’re currently sending down that road each year, it would have to happen annually. We simply lack the tankage to manage anything below that. Suppose we do succeed by installing those medium-speed generators, which cuts roughly 10% of that. Then you say, “Okay, now we’ll add our wind farm, which is 50 MW.” Could you reach a point where that number is under half? Then you suddenly ask, “Okay, can I now increase my raises to cover that gap in the off years and make it work?” Those studies are clearly very preliminary—so preliminary that I’m not convinced 80 million liters is really what we’ll use this year. For instance, we’re sitting here right now in August, and we still have 70 million liters of fuel on site.

Bill Lytle

executive
#52

Once you're actually at full production, how does that truly stack up? We simply don't have the answer at this point.

Anita Soni

analyst
#53

Alright, that wraps up what I wanted to ask. Also, congratulations on the solid operational performance you delivered this quarter.

Bill Lytle

executive
#54

Much appreciated, Anita.

Operator

operator
#55

Lawson Winder from Bank of America Securities has the next question, so go ahead.

Lawson Winder

analyst
#56

Thank you, operator. Good morning, gentlemen. Thanks for the update today. Congratulations on getting the permit in Mali. What I'd like to ask about is, as we go around the different jurisdictions, particularly Colombia and Canada. Recognizing that B2Gold has historically succeeded by not being tied to any one jurisdiction and instead concentrating on asset quality, I think the feedback from the market suggests that the market would favor a pivot to Canada. How are you thinking about assets in Canada? What appetite does B2Gold have to add more assets there? And on the other side, how does Colombia stack up when it comes to jurisdictional risk? Does that create a headwind right now for a possible site-changing decision on Gramalote? Thanks.

Clive Johnson

executive
#57

Yes. I believe we are consistently very interested in Gramalote in Canada. Again, projects are what drive us. Theoretically, we'd like to see additional stages of that kind. Without question, we are placing different alternatives in Canada. Gramalote sits in Colombia, and we observe a fair amount taking place there. What I mean is, we actually hold a permit for a bigger opportunity to lease back and amend that permit. We have three houses to board in Ethiopia, the local population and government in Ethiopia, and some signals from the federal government too. I'm going to pose the question since I want to shift slightly as you mentioned M&A. We will not finance fuel development projects through M&A. It's simply a matter of building one line at a time. We believe Gramalote would carry production as well as the project to launch new financial movement and begin positioning. To accomplish that, we might oversee the feasibility economy. I think it would be a very good project for us. We have to get through the permitting process and then they can see where they can move forward. I just want to stress, once more, no M&A for development projects. Especially going forward, at times if we find a chance to increase our goals, we should have some kind of a deal.

Clive Johnson

executive
#58

We should examine that section. That’s logical. Ultimately, we won’t catch them off guard with a base estimate for the development project.

Lawson Winder

analyst
#59

Thanks. If I could squeeze in just one more question about Goose. Earlier this year, in your update, you pointed to the possibility of adding processing capacity. Now that you're getting close to commercial production, what's the current view on when that processing capacity expansion might happen? And has your thinking shifted at all on how large it would be?

Bill Lytle

executive
#60

Is this the kind of question that's asking what you've done for me lately?

Lawson Winder

analyst
#61

My apologies, everyone. Many thanks.

Bill Lytle

executive
#62

Okay. So the answer is that, as you’re aware, we have multiple studies in progress. One would involve a flotation circuit that could potentially be added. Another is whether you’d increase mill capacity, taking it up to around 6,000 tons per day. All of those are really expected to have a first look by the end of this year. I think we’re — I can’t recall whether we’re talking about Q1 next year, whether we’re talking about releasing the results. Ultimately, those are extremely early in the study, you know, in terms of where they go. We believe they’re all very real. Just so you know, we discussed some of these optimizations. The mill will operate at over 4,000 tons. It’s simply a matter of whether you can maintain availability. By increasing some of these optimizations that we’ve already implemented, as I said, these valves, piping, and everything, there’s a possibility we can extract some extra capacity as things currently stand. No promises. We’re saying 4,000 tons per day.

Lawson Winder

analyst
#63

That's fair enough. Thanks so much for answering my questions.

Operator

operator
#64

Francesco Costanzo from Scotiabank has our next question. Go ahead, please.

Francesco Costanzo

analyst
#65

Hello, everyone. My apologies — I didn't intend to cut in on the Q&A portion here. I believe Ovais, Benito, and the rest of the team have likely already addressed every relevant question, so I'm sorry about that.

Operator

operator
#66

Don DeMarco from National Bank Financial has the next question. Go ahead.

Don DeMarco

analyst
#67

Thanks, operator. Morning, Clive, and everyone. Sounds as though things are progressing nicely in Mali at this point. It appears you've secured the regional permit. So, you know, what caused the hold-up? I mean, was the government's attention on Bearer? Are they able to handle other matters? Is that just typical for Mali? And do you get lasting advantages, from a tax perspective, when a mine runs at its best?

Bill Lytle

executive
#68

Sure, I'll take that one since we were just down there recently. A few things come to mind. Keep in mind there was a complete changeover in the government, and they openly acknowledged that they weren't really sure who was responsible for what. The Minister of Finance was working on what you might call an updated mining code, and the Minister of Mines wasn't clear on where his mandate stopped and the Minister of Mines' began. We pointed that out. We got the chance to sit down with the Prime Minister, and they were clearly embarrassed and told us that's a non-starter for them, and they will get it fixed. Certainly, I think some of the other mining issues in Mali are a factor. I think the fact that there were some major disputes out there that they had to focus on consumed some of their bandwidth, but in the end, they also weren't really clear on what each other was doing. I'll say that all three ministers we met — we met the Minister of Mines, the Minister of Finance, and the Prime Minister — they all apologized profusely. They all said they're committed to getting this done. Remember, they have a big stake in this too. They want to move as quickly as they can, of course, legally, to get us this permit and get us going.

Don DeMarco

analyst
#69

All right, excellent. Appreciate it. Yeah, please continue.

Clive Johnson

executive
#70

And after that.

Don DeMarco

analyst
#71

I appreciate that.

Clive Johnson

executive
#72

Perhaps I could add just a small amount to that. A number of the questions here went through without any further negotiation for the government to obtain the permit for the vehicles. There's no additional negotiation. We are not active when it comes to negotiating in the MOU last September. That made clear we are not in negotiation mode regarding getting the permit completed and are hoping the government will do it. In these periods when the government balances and other things, the revenues, their capacity to derive revenues from the gold mines would be to secure that permit for us, since they hold 35% of the vehicle. They are aligned with us. I want that permit obtained and to get moving with 2024 as soon as possible.

Don DeMarco

analyst
#73

Alright, that's useful. It definitely makes things clearer, since that would have been our read too. That's a positive sign for what's ahead. Staying on Fekola in Mali, I noticed output rose 35% from one quarter to the next. Grades are running high. Bill, do you see that carrying on through H2? What drove things in Q2?

Bill Lytle

executive
#74

A few of the factors centered on locating more material, essentially at the edges of what the resource model captured. Those weren't higher-grade ounces—they were ounces, or tons that would normally be classified as waste, that we ultimately managed to run through the mill. On top of that, the mill performed very well. It was a strong quarter for the mill, and those two items were the main contributors. Naturally, I can't forecast what happens beyond the resource model in Q3 and Q4, but the mill is running at full capacity. We've been quite transparent about one point: even if we don't feed tons or ounces from the regional material into the mill during 2025, we remain very confident in the range we published. That would clearly mean additional ounces are going to come from another source.

Clive Johnson

executive
#75

At this point, that part is scripted in advance.

Bill Lytle

executive
#76

Right, I didn't think so. Yeah, Clive, that's a really fair point. Suppose we receive a permit in August or September, say — even then, there's still pre-stripping work that has to be completed before we can begin sending tons down to the mill.

Don DeMarco

analyst
#77

Alright. Alright. For one last question, though, moving over to Goose. I notice the AISC at Goose comes in somewhat below the figure in the technical report. So what efficiencies would account for that difference, the favorable difference? Is there a read-through pointing to lower costs at Goose in 2026 compared with the technical report? And does some of the CapEx that you've sort of pushed forward also give a read-through for lower AISCs in 2026?

Bill Lytle

executive
#78

Okay, so perhaps I'll start, and then Mike can jump in and set me straight if needed. When we put together the technical report, honestly, the data we were working from was what Sabina had generated for the feasibility study plus the actual figures we'd gathered while building, correct? During construction you run into all sorts of inefficiencies — you're bringing materials in by air, you've got the wrong crew on site. Now that we've been able to tighten things up, especially on the mining side, what we're seeing is that we're probably a little worse than the number Sabina had promised the world, but considerably better than what we'd experienced as a developer. I genuinely believe the costs we're presenting now on the mining side specifically, and hopefully on the milling side too, are going to hold. We will see those come through. I think I can't recall what we ultimately said our off-chain costs would be, but they were trending down, and we do regard them as real.

Don DeMarco

analyst
#79

Alright, thank you, Bill.

Mike Cinnamond

executive
#80

I'm tracking the ads as part of what affects the 2025 figure, since we're working with post-commercial production — essentially anything after September. That part would be an estimate. You've got production happening somewhere between Q3 and Q4, and on top of that, some of this CapEx that we're pulling forward and speeding up. And that's already happened. So it does have some effect on the post-commercial production numbers.

Don DeMarco

analyst
#81

All right, that's everything on my side — thanks a lot. Best of luck for the remainder of the quarter.

Bill Lytle

executive
#82

Appreciate it.

Operator

operator
#83

Our following question comes from Carey MacRury at Canaccord Genuityp. Go ahead.

Carey MacRury

analyst
#84

Nice work on the quarter. This one's probably for Mike, about how Goose gets accounted for now that production is picking up. Should we expect OpEx at Goose beginning right away, or will that only kick in once commercial production starts?

Mike Cinnamond

executive
#85

No. Yeah, Donnie, that's a fair point. Under the new setup, I figure that for a few years everything will flow through the P&L, and we'll report all production. The idea is simply that you'll see it all starting in Q3 — whatever output you've got, whatever operating costs you've got, whatever sales you've got, all of it will show up in our financial results.

Carey MacRury

analyst
#86

Alright.

Mike Cinnamond

executive
#87

What we'll do is deduct the cash costs as well as all-in post-commercial production.

Carey MacRury

analyst
#88

Does that figure stem from the OpEx charges you provided to us?

Mike Cinnamond

executive
#89

That's right.

Carey MacRury

analyst
#90

I'm assuming, right? Yeah. Okay. So maybe just around the Fekola region, just looking at that permit in the nearer-term future. From an exploration standpoint, is that still an appealing area, or, given the economics of that area now, do you see better opportunities somewhere else?

Clive Johnson

executive
#91

I’ll need to hear it before I can see the gas side of the exploration upside, believe it.

Bill Lytle

executive
#92

Right. On the CES side, one focus is the benign dioxide resource, which we've essentially already begun, and we have enough oxide to sustain us for a good while. The major effort, I'd say, is going after higher-grade material — fresh or sulfide — beneath the off-cut zone, within the Fekola regional. That's genuinely where much of the upside sits. The other piece is examining the underground; clearly, as we advance the underground, we'll be in a position to drill, dark trench. Nothing indicates that it's clinical. We will definitely be moving that ahead. There's also potential to pick up a parallel to the main zone at the underground as well. That's truly where the potential lies. At Echo, which forms part of the Fekola regional, I think we largely have a depth that probably holds considerably more there, but that's about it, really.

Carey MacRury

analyst
#93

Could you address that for us, if you would?

Bill Lytle

executive
#94

Yes. For collaboratives, we've allocated a $62 million budget within the U.S. Goose accounts for roughly half of that amount. And then, clearly, drilling continues at a high level as we pursue extensions of the Antelope deposits in Namibia. We're also examining the potential for surface material in Namibia to complement and support throughput, as we look ahead at Otjikoto to use more than just the stockpile — blending the high-grade material we have there. That's the situation. We're also chasing new areas, drawing on and leveraging our experience in Masbate, the Philippines. Right now we're reviewing opportunities in New Zealand, though all of that remains very early stage. That's where things stand.

Carey MacRury

analyst
#95

Alright. Great. Perhaps I have one final question, and it concerns Gramalote once more. Did the feasibility study essentially come in line with what you were anticipating? What I'm really asking is this: assuming you complete permitting over the coming 12 months to 18 months, in a CAD 3,000 gold price setting, what are the chances this project advances?

Clive Johnson

executive
#96

I believe the microscopic studies will come to us. We won't have a huge amount of work performed. The only thing we need to do is purchase ETA, purchase ourselves, and purchase the supplies you're willing to pay for. Many people likely know what I'll need to send them. There's considerable technical effort involved, and many studies take place going forward. They're utilizing the localized ingredients that <<inaudible>>. I think it's worthwhile for our clients. We <<inaudible>> to hopefully be with the DA. You know, I think if you examine how we have the potential to generate 240,000 oz a year at the gate at Gramalote, there aren't many <<inaudible>>. You'll only need to say so if we don't purchase it. Like the economist, you know, I don't know how you would, you know, help fill that. What will you do regarding projects that <<inaudible>>, which you own, and <<inaudible>>

Carey MacRury

analyst
#97

All right, that's excellent. Many thanks. Appreciate it, everyone.

Clive Johnson

executive
#98

Much appreciated.

Operator

operator
#99

Once more, analysts who have a question should press star followed by one. Right now, the queue holds no additional questioners. That brings today’s question and answer session to its end. At this point I’d like to hand the conference back to Clive Johnson for any closing remarks.

Clive Johnson

executive
#100

Thanks, Clive. Given that we took a question and covered quite a bit of territory there, I have one last question for the analysts: if anyone is working out the market, I'd like to hear how these gold <<inaudible>> — I mentioned that the market's price was connected only to price to work, I suppose. Thank you so much for being part of the call.

Operator

operator
#101

That brings us to the end of today's conference. We appreciate your joining the presentation, and at this point you're welcome to hang up and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete B2Gold Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to B2Gold Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in B2Gold Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.