executiveGood morning, everyone. Welcome to our 2024 full year results. Phil Harrison is here with me — my very capable wingman — and he'll walk you through the financial side of things, while I'll cover the aspiration and the future. Let's get started. You can read the numbers yourselves. I think they're all extremely good. Profit is up. I love the fact that we ended with close to GBP 1 billion of cash in the bank. By the way, I'm going to refer to this nearly GBP 1 billion many, many times during this presentation, so please don't mix up the cash with the share buybacks and all the other bits and pieces. I'll be quite clear about it. Of course, you're familiar with the GBP 18.4 billion backlog or order book, with improved margin quality and de-risked. Of course, you know about the increased share buyback this year. I want to begin by going back to 2014 and really what's behind all of this. It's quite interesting when you go back and look at the presentation. Back in 2014, I think at the nine-month point, our cash flow was -$1 billion. We had a takeover offer from Carillion. I don't know if you remember, but John Lang made a pitch for our investment portfolio at GBP 1 billion.
Leo Quinn
executiveWe had 89 distressed projects, and by the time we finished dealing with all of them, that number was nearer to 110. There were eight profit warnings — I believe that set a record, though not one anyone would want. We were in a fairly dire state. We introduced something called Build to Last. One of the most interesting aspects, I think, is that we committed to carrying out this transformation and recovery through self-help — meaning we would not approach the shareholders to ask for money. Instead, we would sell the assets we held and take the steps required to run the company properly. What you're seeing here today is not merely a blip. This is something shaped over a long stretch of time — 10 years — and it is genuinely underpinned by our cultural transformation. The question you have to ask yourself is, okay, this is what you've done for me this year, but what have you done lately? How do I know it's going to be repeatable? The culture we have behind this, I think, makes it sustainable for the next decade. If you actually look at employee engagement year on year for 10 years, it has in fact improved.
Leo Quinn
executiveRight now we're scoring around 84%, and that's actually 10 points above where our peer groups sit, which is a phenomenal achievement. When you think about our license to operate, you have to have a license to drive a car. You cannot work in this industry unless you're safe. If you look at our safety record over the last 10 years and how it's improved, observations are up. More interestingly, in the last three, four years, where we've totally digitized our permitting system, whereby we get better safety and better accountability with people signing off, people going to work, improved productivity and better assurance, you can see that the dramatic improvement almost halves since 2021. Now, it's quite interesting. We've put up these stats and it looks good, but it's interesting when you can explain this in terms that any layman can understand. Our best-in-class businesses are running at 0.03. What that means is that 32 people out of every 33 return home safe every day, and for their entire career at Balfour Beatty, will not have a lost time accident for one day. That's actually world class. It's really interesting that the culture which underpins our performance is in these sorts of areas of employee engagement and safety.
Leo Quinn
executiveNaturally, our attrition figures are beginning to decline. That stands out in the highly competitive market we find ourselves in right now, where we're essentially battling to retain the strongest talent available. Achieving a 10% attrition rate, in my view, is remarkable. It all traces back to our culture. Lastly, we require additional individuals committed to our sector going forward. We keep putting money into learn and earn programs, apprentices and graduates. We hold gold membership in the 5% club. Taken together, that explains why the figures you're seeing today will hold up as we move ahead. What results from all of this? Remarkably, 10 years of profit improvement, 10 years of margin percent increase, an investment portfolio that stayed flat even after we took GBP 1.1 billion out of it. Our cash generation has been genuinely remarkable. Averaging GBP 766 million, it now sits just under GBP 1 billion. As for the last billion on this slide, across the past five years, through buybacks and dividends combined, we've given back slightly below GBP 1 billion in cash to shareholders. Taken together, the results we're presenting today gain from 10 years of hard work, 10 years of cultural transformation, and a foundation that will serve the company for the next 100 years.
Leo Quinn
executiveOnce Phil has gone through the financial figures and brought you down enough, I'll come back and sketch out that nice picture of where future growth will originate, and where you'll see a further GBP 1 billion of capital returned to our shareholders across the coming five-year period. Phil, over to you.
Philip Harrison
executiveThank you, Leo, and good morning to all of you. As you've already heard, the group delivered a positive underlying performance across numerous areas in 2024. I'll walk you through that in greater depth, along with the figures. Revenue rose 4%, reaching GBP 10 billion, driven by higher volumes in Gammon and Support Services. Profit from the group's earnings-based businesses — construction services and support services — was up 7%, hitting GBP 252 million. Gains on investment disposals and net finance income both exceeded the previous year, and together with growth from the earnings-based businesses, these helped lift the group's profit for the year by 11% to GBP 227 million, while earnings per share climbed 17% to GBP 0.436. Our order book likewise expanded during the year, rising 12% to GBP 18.4 billion. The director's valuation was up 3%. Average net cash of GBP 766 million beat our earlier expectations, and net cash at year-end stood at GBP 943 million. Given this strong performance, the board is today declaring a final dividend of GBP 0.087, which brings the total dividend for the year to GBP 0.125 — a 9% increase on the prior year. Turning now to the business units. I'll begin with construction services, which overall saw modest growth this year, though most businesses have made good progress.
Philip Harrison
executiveWithin the U.K., PFO rose to GBP 81 million. Strong operational execution combined with a portfolio of projects carrying less risk meant PFO margin climbed to 2.7%, and the business still aims for a 3% PFO margin in 2026. Turning to the U.S., the buildings business delivered another solid year. That said, a modest count of civil jobs that cut into profitability during 2023 kept dragging on profits, and PFO fell to GBP 40 million. As we work our way through those delayed civil projects, we anticipate U.S. construction PFO will improve in 2025. At Gammon, revenue went up as the two major Hong Kong airport projects reached peak run rate. Looking ahead, we do expect revenue will begin to decline, since the mix of future work is less dominated by the airports. PFO is projected to stay around current levels, with margin moving back closer to 3%. Now on to our support services business, which centers on power, road, and rail maintenance. That business enjoyed a very strong year. Revenue was up 20%, with greater volumes in both road maintenance and power. On the road side, 2024 marked the first full year of contribution from two new road contracts, which began in the middle of 2023.
Philip Harrison
executiveWhen it comes to power, growth genuinely got going in 2024. Activity picked up across the industry, and that began showing up in delivery. Higher revenue produced a 16% rise in PFO to GBP 93 million, while the PFO margin fell 30 basis points to 7.7%, reflecting the mix of work we took on. As we look toward 2025, support services should keep expanding on the back of greater power volumes, and we expect the PFO margin to stay near the upper end of our 6%-8% target range. Turning to the group's order book, it grew 12% over the year to GBP 18.4 billion — a 10% gain once exchange-rate movements are excluded. U.K. construction edged up to GBP 6.2 billion and is still tilted heavily toward lower-risk contractual terms, consistent with the group's continuing push to secure better terms and conditions. The U.S. order book rose 25%, with advances in both businesses. U.S. buildings, a growth market for the group, enjoyed a very strong year for winning work, and Leo will go into that in more detail later. US civils has kept concentrating its bidding on projects that sit closely with its core capabilities and that we think can produce attractive returns.
Philip Harrison
executiveThe order book stands 25% below its 2020 level, though it has increased during 2024 thanks to new highways awards. At Gammon, the order book has fallen 11% as we move through the peak of those major airport projects. Support services rose by roughly 15% this year, helped by new power orders. With this bigger order book, we have more visibility on future work, and revenue coverage for the next year is about 6% higher across the group than it was a year ago. On top of that, the group's awarded but not contracted position is still strong. Turning to investments. We were glad to beat our disposal target, as the group cut its stake in student accommodation at the University of Texas at Dallas and booked a gain of GBP 43 million. That asset delivered an end-to-end cash multiple of approximately three times for the group. Apart from disposals, the underlying business recorded an operating loss this year. In the U.K., a student accommodation project for which the group had held preferred bidder status was canceled by the customer during the first half. Consequently, we have written off the capitalized costs tied to the work on that project up to now.
Philip Harrison
executiveWithin the U.S., military housing expenses rose because of the monitor's work. Turning to financing, our net position went up by GBP 3 million, reaching GBP 19 million. The group managed to recover costs tied to fixing a faulty OFTO cable, which produced an impermanent right back. Lower interest receivable on subordinated debt partly offset that. Now let me walk you through how we value the portfolio. We began the year at GBP 1.2 billion, and the valuation rose by 3%, putting it at GBP 1.25 billion today. Going through the bridge, GBP 28 million went into new and existing projects, among them a student accommodation project in Texas and a multifamily housing project in New Jersey. Disposal proceeds came to GBP 43 million, and the portfolio generated another GBP 34 million in cash distributions. The discount unwind added GBP 81 million to our valuation, while operational performance brought a small reduction of GBP 2 million. Lastly, foreign exchange movement contributed a GBP 12 million increase. Still on investments, I want to discuss our returns and plans for future investment. The portfolio plays a key part in the group's structure and financial strength, yet it also contributes major cash for us, making it an important driver in deciding what we can return to shareholders.
Philip Harrison
executiveDuring the past 4 years, dividends received from the project—what we call the average cash yield—came to 5%. Once you factor in our investment and disposal activity, that figure rises to 8%-9%. The chart illustrates that this translates into more than GBP 500 million of value realized from the portfolio across that stretch. Now looking at the top right—and note this is before disposals—you can see we are in something of a dip as we work our way through the monitorship, yet our forecast for future cash yield is strong, which once again bodes well for shareholder returns. As we seek to invest further and generate additional value, our target remains an end-to-end cash return of at least two times, and we are holding firm on our prudent IRR hurdle rates, concentrating on U.K. and U.S. student accommodation, U.S. residential housing, and U.S. P3 projects. We are also continuing to redevelop the U.S. military housing portfolio, and work at three bases is expected to begin in 2025. Turning back to the overall group, including the non-underlying items, we have been pleased by the resolution of historic items that will affect cash positively. That said, the impact from the Building Safety Act has been larger, and we are disappointed with the U.S.
Philip Harrison
executiveRegarding the Jury Court ruling, both we and our joint venture partner will defend it vigorously and pursue restitution from our subcontractors. Allow me to walk you through the details a bit more. First, a charge of GBP 83 million has been recorded for the group's obligations under the U.K. Building Safety Act. During 2024, as the legal landscape around the BSA continued to evolve and the group's due diligence moved forward, the group raised its provision, and cash is likely to flow out across a number of years. At this point, our estimates exclude any potential cash recoveries from third parties, which we are still reviewing. Second, we have booked GBP 52 million tied to a jury verdict rendered against the group and its JV partners on a U.S. highways project finished in 2012, for a customer with whom we have not worked since. The group's view is that the jury verdict fails to accurately reflect the evidence presented at trial, and that the issues that do exist stem from design elements of the contract, which subcontractors carried out. The joint venture firmly denies fault and will appeal any final judgment should that be necessary, while also chasing recoveries from those subcontractors.
Philip Harrison
executiveTwo non-underlying credits partly offset those two provisions. First, we recognized a GBP 43 million insurance receivable; that recovers the bulk of costs previously provided for as a non-underlying item in 2021 and 2023 related to rectification work on a London development the group built between 2013 and 2016. Second, a GBP 21 million credit was recognized after warranty provisions for the group's German rail operations were released, since those warranties expired during the year. Altogether, the net charge after tax from non-underlying items came to GBP 49 million. Turning to cash. Cash management is a vital element of the group's financial discipline, and performance was strong once again in 2024, with average net cash of GBP 766 million, ahead of the expectations we guided to a year ago. At year-end, the net cash position had risen by GBP 101 million versus 2023. Most items on the bridge came in as expected, but I'll touch on just two. First, working capital was an inflow of GBP 99 million for the year, driven partly by mobilization payments received on new power projects in the second half and by the impact of provision increases.
Philip Harrison
executiveSecond, capital expenditure came down to a more normalized level of GBP 28 million, versus GBP 66 million spent in 2023 — and that prior-year figure included extra upfront plant investment to support our medium-term growth plans. Moving to our multi-year capital allocation framework, now in its fifth year, we keep investing in the business, with two projects added to the investments portfolio and a more normalized level of CapEx. As mentioned, we received GBP 43 million of disposal proceeds, and cash remains strong. The board is recommending a 9% increase in our dividend per share to 12.5%, which is in line with our policy. We are once again delivering additional returns to shareholders this year, funded by the excess cash generated in 2024, and have confirmed today that this year's share buyback program, which commenced in January, has increased to GBP 125 million. I will finish by summarizing our guidance. We expect PFO growth from the earning-based businesses in 2025, with improved margins in each of the three construction services divisions and revenue growth in support services driven by power. Profit on investment disposal for the year is expected to be in the range of GBP 20 million-GBP 30 million as we continue to realize value from the portfolio.
Philip Harrison
executiveBeneath PFO, we anticipate net finance income of roughly GBP 25 million, and there should be no repeat of the impermanent right backs that were recognized this year. On tax, effective tax rates will again stay near statutory rates. Turning to cash, average net cash should rise to approximately GBP 800 million, with the working capital position staying broadly flat, and CapEx is expected to land between GBP 35 million-GBP 40 million. To wrap up, I'm looking forward to another strong year in 2025, and I'll now return the call to Leo.
Leo Quinn
executiveThank you, Phil. That went more smoothly than normal. All right. When I last spoke with you, I had just demonstrated to you the reasons it was sustainable — both our prior results and this year's results. In this half, what I'd like to discuss with you is what lies ahead and exactly how bright that bright future really is. Let me begin with a point I've made on numerous occasions, though clearly no one pays attention, since our share price fails to move in line with it. Above all, we have two clearly separate businesses. There's our earnings-based business, with GBP 18.4 billion of backlog, whose margin is rising and whose risk has been reduced, so to speak. Then there's our investment portfolio, GBP 1.3 billion, which truly serves as the anchor for our balance sheet. As I've mentioned, adding GBP 1.3 billion to the net cash position we ended the year with — roughly GBP 1 billion — gives GBP 2.3 billion. Would anyone here care to guess our market capitalization? It sits below GBP 2.3 billion. The implication is that you're getting a GBP 9 billion infrastructure construction company that is the market leader in the U.K.
Leo Quinn
executiveAt no cost, and it produces GBP 200 million annually. As a stock, we are definitely undervalued. Let's discuss why I have confidence in the future and the notion of what we're going to return, and that those returns will match the past. First and foremost, very simply, heading into 2025, 2026 right now, our backlog cover, which gives us good visibility, is stronger than it has ever been. Secondly, the margin within that backlog has not only improved, but it keeps improving, and I'll show you why in a few seconds on the next few slides. We are entering 2025, 2026, which leaves us feeling rather optimistic about our output and return, with better backlog cover, better visibility, improved margin, and lower risk. If I turn now to our growth initiatives, I've spoken previously about energy, energy security, power generation, and transmission. I've spoken about defense, U.K. transport, and also U.S. buildings. I'm going to pause at this point, and I'm going to make a statement that in all of the 10 years I've been in this business, and actually I started it, I think, in 1979 with Balfour Beatty, I've never known or seen such dynamic growth and momentum in the marketplace.
Leo Quinn
executiveMy head of plant and fleet — the person who mobilizes every one of my sites across the U.K. in particular — said to me the other day, and I think he was complaining when he said it, "I've never been so busy with all of these sites mobilizing at this point in time." I took that as good news. I can't see why he didn't see it quite the same way. Our growth initiatives are really going to turn in some real momentum for the business. This is a picture of Scotland, and this is primarily the work we're doing today with SSE. You can see the yellow lines are four transmission schemes. You can see the yellow circles with the flash of lightning through them are substations and converter stations. This is quite interesting because the minimum amount of revenue that's going to come from this is over GBP 4 billion. It is going to run over the next 10 to 12 years, but it's GBP 4 billion. What's also interesting here is you recognize this primarily with our power business and our service recurring revenue. What we're finding is that this is now migrating into our civils and our construction. We are seeing a migration of what were historical civils margins moving up to the service level of return.
Leo Quinn
executiveThis is going to be really, really exciting for us. On every one of these schemes, we're engaged in what's called ECI — early contractor involvement. I'm actually out on site mobilizing, working on design, handling ecology, effectively taking the risk out of all these jobs before we sign a formal contract. Why does that represent a change to the business model? Because historically, the model was that we would hard bid a job, we'd win one in three, and all the cost of that bidding would actually come back to me. I get paid and funded to carry out all these feasibility studies. That does lead to a sort of reduction in my selling costs. If you begin looking at margin improvement and overhead reduction, sooner or later, even Phil can get that through to the bottom line. Another thing I'd point out is that although we're talking about SSE, if you read this statement here from National Grid — and they've published some fabulous papers on this — National Grid is going to build over five times more transmission in the period up to 2030 than they have over the last 30 years. We are the largest supplier of transmission, and I won't claim we've built the only large scheme in the last 10 years, but the biggest scheme in the last 10 years was built by us.
Leo Quinn
executiveWe are right at the heart of this enormous wave of orders. It's really key to grasp that this doesn't flow through the treasury. Everything is financed via the RAV model, which means it lands on your bill, so you end up paying for it early. Another thing I'd mention is that we are the biggest fabricator of pylons in the U.K. We've got a factory that, over the past few years when pylon demand hasn't been large, has actually been producing for the rail industry on our behalf. Luckily — or thanks to great foresight on my part — we've just re-equipped that whole factory through a GBP 3.5 million investment in new capital equipment, CNC machines and similar. We've genuinely laid the groundwork to double and double again the throughput. We're already examining a move from one shift to two shifts using the same capital, and we're now weighing three shifts. This won't show up in three months. It will show up over the next two to three years. The key thing is that we're in the right place at the right time to deliver on that. If that doesn't put a smile on your face, here's actually a picture of what is going to happen to revenue.
Leo Quinn
executiveWhat we're examining today is essentially the power revenue inside the construction services operation. When you start at the bottom and work upward, these are in fact contracted. Moving further up, what you see on this side is awarded work that hasn't been contracted yet. What this shows you is an operation set to double, then double once more. The constraint here is really capability along with supply. That demand simply cannot be served by us, and we have no plans to serve it. A demand level like this does three things for us. Above all, the volume gives us the ability to be selective. Let me return to this particular item. Every one of these schemes we're involved in was chosen and negotiated on the basis that these were the jobs we wanted, since they sat close to urban conurbations where we can bring people in, train them, and put them to work supporting delivery. None of our work happens in those remote outlying areas where, as far as I'm aware, there are no people available to carry it out. I'm very optimistic about what this can produce. In my own head, I'm aiming to cap capacity at roughly GBP 800 million in revenue, measured against where the business stands right now.
Leo Quinn
executiveThe momentum here really is tremendous, and it's important to grasp that. What's hard is that we need to recruit people, we need to train them, and we need to place them in regions of the country that can sometimes be very hard to reach. That isn't simple, but it isn't simple for anyone, and when it comes to this, nobody does it better than we do. Moving to power generation, this too is genuinely exciting. To start with, marine is Hinkley — or rather, Hinkley Marine is already under contract. We hold the civils scope, and we also hold the mechanical and electrical scope. As for where growth is coming from, it's coming from Net Zero Teesside and Sizewell. Once again, these sit in the category of awarded but not contracted. At this moment we are engaged at Sizewell. We're constructing the railhead, which comes in at circa just under GBP 100 million. They are putting in the roads. There's a GBP 5 billion budget for early works so that the job can get started. Negotiation on the contract is about 90%-95% complete, after which it has to go to FID. Turning to Net Zero Teesside, once again we are on site, we are mobilizing, and we are putting up the site huts.
Leo Quinn
executiveThat comes to roughly GBP 800 million. Under an ECI contract, we've already received payment. On Net Zero Teesside, we are still in negotiations as we move toward signing. My expectation is that both of these will be under contract by year-end. Looking at this black revenue line, you can begin to see how it is actually climbing. In the pipeline area above it, which represents future work, we have additional carbon capture on Teesside along with hydrogen. On civil nuclear, we are examining SMRs — both in the Holtec case and in discussions with Rolls-Royce. Those will arrive within the next three to five years, yet they are genuine. Turning to defense nuclear, which is not strictly power generation but relates to our defense work and our nuclear capability moving across into the defense side of the business. I'd point you to this bottom line here. Each of these is an independent business operating inside our portfolio: ground engineering, temporary works design and planning, mechanical engineering, transmission, and power, all of which feed into these jobs. These capabilities also run through our power business at the front end. That represents another couple of billion pounds of business for us beyond what the graph shows.
Leo Quinn
executiveYou're truly seeing genuine momentum in this business over the next few years. If I turn to defense for a few minutes, we're focused on three customers—or actually four: DIO, the Defence Infrastructure Organisation; Babcock at Devonport; the Atomic Weapons Establishment; and Aldermaston and Rolls-Royce. Across all four of those, we're carrying out work. We're on site on a GBP 700 million job in Derby with Rolls-Royce. AWE is the science research building for GBP 300 million. Going forward, we're working with those customers to move into the fissile end of the nuclear process, which is really the processing of nuclear material. The budgets around those, which apply to us, are in the billions. I'd say conservatively two to three, but it could be even more than that. We're ideally placed, by being on site with those customers, to expand our footprint into those areas. This business for us turns over roughly GBP 150 million-GBP 170 million a year in defense-type contracts. That will double for us in the next three years. Looking at U.K. transport and roads, a very successful closure of the M25 over the weekend, and again, the demolition of two bridges.
Leo Quinn
executiveWe’re genuinely absolute specialists at this kind of work, and when it comes to National Highways, we’re the biggest supplier. Strong, strong business, brilliant brand. Major schemes are set to move forward next year: A66, A57. We’re on the A9 in Scotland. The one we truly want, and the piece of nationally critical infrastructure we need, is actually the Lower Thames Crossing. That probably will slip to 2027, but then it will be funded through probably the tolls on the Dartford Tunnel. If I look at our maintenance business — which is effectively, they don’t like me saying it, but fixing potholes — record revenue last year, and that came on the back of the 2023 wins of Bucks and East Sussex as those turned into full mature contracts and delivered full revenue. Right now we’re in the market pitching for Warwick, Cambridgeshire, Essex, and one other, which I’ve forgotten. Again, very optimistic about what’s going on here. Rail, obviously HS2, high-speed railway. I was speaking with the press this morning, and I know some of you have been out to some of our sites to see it. It is truly the most phenomenal project being built in Europe at this moment in time.
Leo Quinn
executiveWhen you visit a site and watch the work going up, that's something I'd take pride in telling my kids—though I don't have kids—that I built this over the course of my career. It's going to be a tremendous success. It's a bit like the Elizabeth Line. It will serve as a fantastic advertisement for U.K. infrastructure. Looking forward, challenges exist, and the client wants a commercial reset, etc. In the end, by the time you could renegotiate the contract, you'd already have it built. We're pursuing electrification across the railway and the TransPennine routes in the middle of Mainland Line. There's been some concern around CP7 and a slow start. I'm not especially worried about it because we're working on the railhead for Sizewell. We're doing additional works with the Piccadilly Line upgrade and the Bakerloo Line upgrade with London Underground. The resources that serve this and this really are, in some cases, almost quite transferable. What I see is that we've got enough business out there to keep us happy. It might be flat for a year, but in rail, that's not a worry for me at all. If this isn't exciting, this gets really exciting when you start looking at aviation and the expansion in aviation.
Leo Quinn
executiveWe've all heard about Heathrow and the third runway. That doesn't interest me, since it likely won't get built while I'm alive. What does interest me is the terminal expansion, especially at Heathrow, where T2C will be an airside expansion of the terminal — and we're the most qualified contractor for that, having completed the T2B airside expansion. I expect good things there. Also, we have a good relationship with Gatwick. I'm very optimistic about our transports. Just a few more slides, and I won't bore you with plenty of good news. U.S. buildings, 24% growth. I looked at it and thought, that is simply too much growth in any single year. When you see how it's distributed, I'm not really concerned. I'm not concerned when I look at our business model. Remember, the business model is that we're sort of the prime contractor. We will win the job. What we do is subcontract it out to our supply base. They will take all of the risk associated with that, and they're bonded in doing that or sub-guarded. We run then at a low margin. We have a 4% gross margin fee. We have a 2% overhead, and we make between 1% and 2% on the bottom line.
Leo Quinn
executiveThe exposure really sits with the supply chain or the subcontractor side. That's a key point. It's a sizable business, yet margins are thin—however, risk is minimal. That's what I want to emphasize. I'll move through this quickly. It's the technology segment up in the northwest, performing well for us. Southern California—the biggest school builder in that region. Hospitality and entertainment are booming in the southeast. -9% in the Mid-Atlantic. Not concerned, since this business is lumpy. Contracts range from GBP 500 million to GBP 1 billion. At any given moment, we might grow 40% or we might shrink, depending on timing. Very optimistic about growth ahead. If you consider what's going on around airports, we've ended up benefiting from the success of the LAX train that we're constructing. That experience, we've found, has carried over to Sacramento with the airport there, and also Raleigh Airport. We recently secured a GBP 5 billion framework with LAX Airport, thanks to the service we're providing through the LAWA project on the train. We've bid recently on a GBP 1.5 billion framework for Dulles Airport.
Leo Quinn
executiveRight now the U.S. is pretty frothy. We're being selective, though it's a lower-risk business for us. There's a lot of growth in this area over the next few years. Last, with Hong Kong, thank goodness we have business that isn't growing. The airport will be wrapping up, and that means backlog will come down. Revenues next year are going to decline. The momentum in work is shifting to the Northern Metropolis, where we've had success on some land development up there. We're also building out one of the new metro stations. Getting in early matters because we then understand the soil, the structures, the foundations. In fact, that leaves us in a better position as these areas begin to build out for commercial and residential. Last, with Singapore, Singapore is normally around 10% of our revenue. We've seen a lot of government investment when it comes to data centers, transportation, the airport, and the like. Singapore is actually doing very well and booming right now. Revenue will decline in this area, but we'll be holding our profitability. Last, my final slide. It's worth spending a few minutes on this because I want to return to the results that we've delivered and why they are sustainable.
Leo Quinn
executiveHonestly, it all traces back to our culture. The simplest way to put it is that we have 26,000 people aligned in a single direction, each one making a modest move, and collectively that produces an enormous transformation over time. That transformation centers on the reality that our backlog stands at GBP 18.4 billion. We feel good about 2024 and 2025. We recognize there is substantial volume available to us, and that lets us pick and choose where we play. Our margins are on the rise, we know, since supply and demand are now in balance in a way where demand outpaces supply. That gives us the ability to de-risk our projects, and risk is shifting back up the supply chain toward the operators and the regulators. It leaves us in a strong position. Through share buyback and capital allocation — buyback plus dividend — we've returned just under GBP 1 billion over the last five years. Given the momentum in the business, I expect us to return at least another GBP 1 billion across the next five years, and nothing less should be expected from this business. That's the end. It's over. Questions? Are we going to? Gregor it is.
Gregor Kuglitsch
analystThanks. It’s Gregor Kuglitsch from UBS. I want to go back to slides 22 and 23, where you laid out the potential revenue ramp. Could you expand on that a bit? On the first one, I believe you said GBP 1.5 billion in theory but GBP 800 million in reality. Just to clarify, is that right? And on the incremental growth, are you saying it will be divided between the two businesses — construction and services? I suppose my question on the second one is similar: it concerns the ramp-up in power generation, and I’m just trying to get a sense of what the incrementals really are there, because a lot of numbers were mentioned.
Leo Quinn
executiveAll right, so that was a multi-part question, which means you may need to repeat some pieces of it. Going back — if somebody could switch to the slide and get it on the screen — actually, I'll handle it. Okay, or someone already has it up. Looking at this slide, it's easier if I stand. What you see here is our revenue, a bit above 300, and right now it sits mainly in the power segment. These are the frameworks we've managed to win, and awards will come through them. BTNO is an order handed to us last year — I believe GBP 360 million in Suffolk with the National Grid. EGL2 was also awarded to us; from memory, EGL2 came in at just under GBP 100 million. All of those are in the backlog, and we're actively working and converting them today. When I look ahead to the ASTI program, or whatever — going to the prior slide — beneath that program are the schemes shown here, and these are all early contractor involvement, where we're on site performing the work and getting paid for it, and the output of that will be these orders here moving from awarded but not contracted into contracted.
Leo Quinn
executiveThat curve is going to begin climbing in this way across the coming 3 to 5 years. As a matter of fact, a portion of it will genuinely take place within the next 12 months. Does that address your question?
Gregor Kuglitsch
analystI believe you mentioned something along the lines of GBP 800 million as the level this could reach. Did I understand that correctly?
Leo Quinn
executiveSo what I've done is establish a theoretical cap on how much we can deliver at the GBP 800 million mark. Now, some might argue we should aim higher, but in my view, capping our revenue while enhancing margins and reducing job risk is worth more to us in return terms. I really want to stress once more how selective our choices have been here. We're pursuing these jobs since we're confident we can execute them with minimal risk more effectively than any other player in the market.
Gregor Kuglitsch
analystAlright, thanks. On the second question — going back to what you said about the balance sheet and the straightforward arithmetic of GBP 1.3 million plus GBP 900 million, which sounds good, but the problem always comes up that in reality that cash can't be distributed. And presumably.
Leo Quinn
executiveSo his response to that is that the money belongs to the client. My view is that it's mine. You could argue about this all day long. The key fact is that it sits in my bank account, and the interest on it comes to me. From where I stand, it's mine. Phil's take is much more realistic and pragmatic: he says that not the whole amount is our money. The idea there is that some artistic license applies. There was another point you raised but didn't pursue, and it concerns this area right here — take a substation, for instance: building one requires concrete walls, a roof, and so on. That alone could be GBP 100 million. The Peterhead substation under construction measures 300 meters by 300 meters, and that's a UKCS construction job rather than a Power job. So you can see what gets drawn through from all of this power and energy and the way it feeds back into our core business — which, put simply, is what Phil describes as roughly a 3% business. Keep in mind that on the service side, we operate at 6%-8% on the power dynamic.
Gregor Kuglitsch
analystAlright, so maybe his last question — I mean, obviously there was an announcement that you've decided to step back, I think, by the end of the year. I assume that's retirement, though I'm not certain.
Leo Quinn
executiveRetirement isn't something I buy into.
Gregor Kuglitsch
analystOkay, so perhaps you could share your thoughts on the timing, and just how involved you've been in recruiting the person who'll take over from you.
Leo Quinn
executiveChoosing who takes over from me is something the board handles — that's their process, not something I own. One point I'd like to make, though. Philip Hoare — I've had the chance to meet him, and I've known him across the industry for some time. A truly wonderful person, and far nicer than I am. Extremely well qualified too: 35 years in the industry, and he carries the credibility of genuinely being a real civil engineer. When I look at the market, managing to secure someone of that caliber is truly remarkable. The good news, I believe, is that the business is in genuinely great shape. And I think we now have a leader capable of taking it to the next level.
Gregor Kuglitsch
analystThanks so much.
Leo Quinn
executiveI'll take my seat at this point.
Andrew Nussey
analystGood morning, this is Andrew Nussey calling from Peel Hunt. I have a few more questions, if I may. First, just to clear something up regarding what Gregor asked. That GBP 800 million figure you mentioned — it applies to power as we currently understand it in support services, and you'd expect a multiplier on top of that in construction and services.
Philip Harrison
executiveNo, that’s not the case. The slide refers to group opportunity, and that covers construction services as well as support services.
Andrew Nussey
analystAlright.
Philip Harrison
executiveBefore we begin attempting the numbers — something we all know he isn't very skilled at.
Andrew Nussey
analystUnderstood—thanks, that's completely clear. Regarding the U.S. monitor, could you remind us how much longer his or her term runs? Have any notable findings come up, especially since I've observed that you clearly plan to keep investing in military housing?
Philip Harrison
executiveThe monitor has just moved into the next review period. That runs through the summer, and she'll report back then. Once we have her report and recommendations, we'll determine where we go from there. We're scheduled to exit the monitorship in Q4 2025. What her report says will determine things.
Andrew Nussey
analystAlright.
Joe Brent
analystMorning. This is Joe Brent from Palmer & Lieberman. I have three questions, if that works. Would it be helpful if I gave them to you one by one?
Leo Quinn
executiveThat does help.
Joe Brent
analystFirst, regarding the exceptionals, a few people have asked us about additional costs related to the Building Safety Act. Could you explain what's happening there?
Leo Quinn
executivePhil, I’m not permitted to discuss figures, correct?
Philip Harrison
executiveThe Building Safety Act is fair game for discussion. It's just that figures shouldn't come into it.
Leo Quinn
executiveCould you repeat that question, but leave the numbers out?
Joe Brent
analystOn the Building Safety Act—what exactly is happening there, and what's the reason behind that charge? In fact, you aren't the only company to have reported that.
Leo Quinn
executiveUltimately, the legislation was introduced around 3 years ago. In my view, it has clearly become a burden not just directly on our industry but also on housing. Proper construction should happen from the outset. That much is entirely fair. What we observed was that quite early on, a large volume of claims came through. A number of those were not necessarily valid. In certain instances, we discovered we hadn't even constructed the building in question. We aren't a developer in the conventional sense, though we have acted as the builder. Consider the legislative change and look back 30 years. Before that, there was a 12-year history. Records from 12 years and further back aren't very reliable. What we have seen is that the count of — what's the right word — not claims, but notifications, has in fact been declining. From a prudency standpoint, and when examining the liability, we believe we are properly accrued at this point for what we know. Over time, I think we'll see this diminish in terms of notification numbers. We continue to monitor it very closely.
Joe Brent
analystThanks. For my second question, it's about the working capital absorption — you didn't mention it in the slides, but to me it matters quite a bit that the negative working capital absorption of 15% appears fairly static at that level, which means that as you grow, you should begin generating even more cash to help fund those future buybacks. Is that understanding correct?
Leo Quinn
executiveIs that a question about a number, or not? I'm not certain.
Philip Harrison
executiveNo, that one's a numbers question, so I can't take it. On working capital, what we've guided for 2025 is that we'll stay broadly flat. In other words, we'll hold at roughly 15% of revenue. For the past two to three years, working capital has run at about 15% of revenue. Given what we see ahead of us, chances are we stay within that 15% range. Just keep in mind that when we run our excess cash calculations for the share buyback, what we're really focused on is cash earnings — we're never going to hand over our working capital, because, as I keep telling people, that would be very dangerous, since working capital can unwind, and we're not going to get ahead of ourselves.
Leo Quinn
executiveAnd honestly, I’m fully behind that cautious approach. One more thing I’d add is that when it comes to our payables — meaning what we owe subcontractors — roughly 95%, 97% is basically at an all-time high too. That isn’t the result of working capital manipulation or anything of that kind. It comes from solid contracting.
Joe Brent
analystGreat. Last one from me on Hong Kong: revenue is lower while profit has stayed level. What’s your approach to managing that?
Leo Quinn
executiveI should have made it clearer that Hong Kong is a 50/50 joint venture with Jardine Matheson. What it mainly does for our portfolio is pay a dividend of roughly GBP 30 million annually, and it has done so for the past five or six years. We aren't really concerned about revenue fluctuating. Profit changes are minor. As long as that dividend holds up, that's what it's worth to us in the portfolio.
Joe Brent
analystApologies, just to pick up on that point — activity levels are falling off due to the airport. So how are you keeping profits up? Is that down to profit recognition being weighted toward the back end?
Leo Quinn
executiveYes, margins are getting better across the remainder of the portfolio. That is how we view ourselves sustaining the returns we have today.
Philip Harrison
executiveYeah, look, at the end there'll be some outflow from profitability from the airports. Yeah, we tend to be prudent in how we book this stuff.
Arnaud Lehmann
analystThanks. This is Arnaud Lehmann from Bank of America. I've got a few questions, and I'll take them one at a time. On support services, my understanding is you guided toward the top end of the range — 8% for 2025. That would make several consecutive years at the upper end. If you're never going back to six or seven, is a range still necessary?
Philip Harrison
executiveIt always comes down to the mix, since the mix varies. I believe I mentioned last year that our aim right now is to remain in the seven to eight range. That's the reason we're referring to the top end — in my mind, the top end is seven to eight. That's the level we're attempting to maintain. We do observe mixed shifts in that business. It's road, rail, and power. Things can swing.
Arnaud Lehmann
analystThanks. I’ve got a couple of questions about the U.S. They’re connected, but have you noticed any disruption from DOGE or from the IRA changes when it comes to workforce availability? A lot seems to be shifting in the U.S., yet you sound quite confident about your ability to execute there.
Leo Quinn
executiveI spoke with the president of the U.S. a couple of days ago. One of his remarks was, we've got this
Philip Harrison
executiveTrump.
Leo Quinn
executiveNo, no — our president. Exactly right.
Philip Harrison
executiveGoodness, I figured you had reached the highest level.
Leo Quinn
executiveHe was tied up. He was mentioning that our backlog hasn't looked this good since 2007 — so, 2007. The business stands in a strong position. None of those items we've watched affect DOGE, the IRA, or anything else of any materiality. The single area drawing our attention is really the tariffs. When steel gets raised 50% coming from Canada, we have to be careful, since we carry a substantial backlog, and every bit of it feeds into the subcontract base. Now, the risk isn't ours to hold. It's held by the subcontract base. Through change-of-law provisions or particular terms and conditions, it flows back to the customer. We're literally a conduit throughout this. We're aiming to contract early so the risk gets pushed down to the supply chain. Even after it's pushed down and they're providing materials and labor, things could still go wrong, because they could go — they themselves could go bankrupt. Once they go bankrupt, that liability then returns to us. We're handling this tariff situation very, very carefully to make sure our subcontractors are bonded, that they're secure, etc. Also, for changes of this magnitude, it goes back to the client — it doesn't actually sit with Balfour Beatty or the supply base.
Philip Harrison
executiveAs Leo mentioned, it comes back to us, and we also carry insurance. Every one of our suppliers must either post a bond or obtain specific insurance. If a supplier were to go belly up, we would then look to call the bond or recover the insurance.
Leo Quinn
executiveWe would receive payment for finishing the work on our own.
Philip Harrison
executiveThe risk we carry is always planned for, not necessarily a subcontractor going bankrupt.
Arnaud Lehmann
analystOkay, thanks for that — it's really useful. I suppose this last one is for Leo. Over the past 10 years, you've accomplished a great deal at Balfour Beatty. What advice would you give Philip looking ahead five to 10 years? At the strategic level, beyond running the business day to day, executing, and returning cash, what remains to be done? Are there areas or things you regret, or that you feel could be improved further compared to?
Leo Quinn
executiveHonestly, the number one thing is that this company has a fantastic culture — one that's driven by performance — and that culture has actually returned more than GBP 1 billion in cash to shareholders. What I'd tell him is to stay laser-focused on the cash and figure out how we can hit GBP 2 billion over the coming five years instead of just one.
Philip Harrison
executiveArnaud, go ahead.
Robert Chantry
analystRobert Chantry from Berenberg here. Appreciate the presentation. I have just a couple of questions. First, on U.S. PFO, I think you laid out the high-level economics as 4% gross margin and 2% cost — the 2%, I mean. The last few years came in at 1.4, then 1.1. I believe you're talking up 25. Clearly, you showed a very buoyant order book in the presentation. Could you walk us through, I suppose, the scenarios for the U.S. business in 25, keeping in mind how much civils has lagged? That's quite a long question, but what are the scenarios for 25 in the U.S., given the civils issues? Second, on the investment portfolio, there's a slide essentially discussing focus areas and current activity. It's very U.S.-weighted, I would say. Could you give us some color on the kinds of opportunities the team is looking at? Is there stuff in the U.K. that just doesn't work? Is there a strategic rationale for why you're seeing more activity in the U.S. in these areas at the return levels you guys need at the moment? Thanks.
Leo Quinn
executiveWould you like to handle the second one first, and then I’ll take the first one after that?
Philip Harrison
executiveYes, that's possible. Look, when it comes to investments, we're definitely seeing more opportunity in the U.S. I believe we've been saying that consistently for the last couple of years. Look, the market for the kind of work we do is much deeper there. In the U.K., I'd say we remain focused on U.K. student accommodation. We still believe opportunities exist there. We have several projects. Right now we're building one out in Sussex, at Sussex University. We've also got — which I don't think appears on the slide — we're exploring what we can do around energy transition. We've put money into an EV startup at this point. We'll see how that plays out over the next 12 months. We're examining what opportunities exist in the U.K. We haven't given up on the U.K., but clearly we've got to get. We're very disciplined about achieving our returns. We'll go to whichever market where we feel we'll achieve sufficient returns for the business.
Leo Quinn
executiveI think the other thing is, you would expect the U.S. to account for a larger share, since it's 10x the size of even more than the U.K. The unfortunate part about the U.K. is that we've never really had anything that followed PPP or PFI. What happens then is you end up with a different market. You're taking on more risk. At one extreme, you're almost buying land and putting up buildings and taking on developer risk. We've decided not to go down that road. As Phil says, we are in the market. We're trying to find the right opportunities at the right returns. Right now, U.S. legislation is much more favorable in that respect. On the U.S., it's an interesting one, the way you framed the question around scenarios. You highlighted the challenge we've had with civils for a long, long time. Believe it or not, the buildings business did very well last year. The overall reduction in the U.S. number was really about the conclusion of a few projects in terms of the write-down in terms of profits. You see GBP 40 million. Translate that back into dollars now. There's a reasonable gap between what buildings delivered and what we've produced there. I would say that in terms of buildings, we should just do more of the same.
Leo Quinn
executiveThis is honestly a solid, steady business with fairly limited risk, and we execute on it extremely well. It's spread out geographically and across different markets, as those slides show. Our US business president has mentioned that the backlog, along with the risk and margin within it, hasn't looked this strong since 2007. So we're feeling optimistic. On the civil side, the positive development is that we wrapped up several quite significant rail projects at the close of last year. Those won't come around again since they're now complete. Looking ahead, our strategy centers on a strong focus on highways in Texas and the Carolinas. In California, we have a center of excellence constructing the LAWA train, the People Mover. We'll be handling the GBP 5 billion framework at LAX airport. My view is the US will improve next year, and 2026 likewise, since we face less downside. With large civil projects, you can't be certain of the outcome until it's truly finished. Does that answer your question?
Robert Chantry
analystThanks, that's really useful. Jonny Coubrough here from Deutsche Numis. On the working capital inflow in FY 2024 — you suggested that mobilization of power contributed to it, which is interesting, since that market historically hasn't generated much cash. Are you seeing that shift now?
Leo Quinn
executiveThe way I see it, it really boils down to the frameworks, and the reality that demand for the work exceeds the supply available, and that gives us the leverage to negotiate what amounts to a stronger contract — both when it comes to what the job returns and to reducing risk. Take consequential losses: we don't carry those in these areas. If you look back 10 years, the clients were asking for them. We have no retentions. In some cases, going back 10 years, we had 10-year retentions on a job, which is bizarre. There are no damages in the contract. Not only is it growing like topsy and we're selective, but margins are improving and the contracts are being de-risked. That means the outcomes are going to be more certain. The notion of receiving a mobilization payment of a large number isn't really surprising.
Jonny Coubrough
analystGood. On the infrastructure investments side, that 3x end-to-end return is well above the hurdle. If they can keep delivering those kinds of returns, is there room to put more capital into that business?
Leo Quinn
executiveLook, we're glad to put money in for a 2x return, but they need the discipline to build the right structure to achieve that. They review plenty of investments and possible investments. I believe they do a solid job of narrowing it down to those they feel highly confident will deliver 2x. In fact, we're quite pleased when they achieve 3x. As you'll recall, we're currently in the cycle of the student accommodation investment we made in the U.S. seven years ago. If you recall our cycle here, we're now in the phase of realizing some of that capital we deployed. I think, honestly, they've done a very strong job on the returns.
Jonny Coubrough
analystI appreciate that.
Philip Harrison
executiveI believe that wraps it up. Oh, wow. One, two, two final ones.
Leo Quinn
executiveIf you could frame those questions in a way that makes us look good, that would be helpful.
Graham Hunt
analystI'll give it my best shot. Yeah, Graham Hunt from Jefferies. Let's talk more about business right now. On those contracts—what's the structure there? Would you want to see more of those types of contracts in the order book? And is there any capability you don't have today that you'd need to put investment into to build out, if we see defense spending rise, or when we see a significant increase in defense spending? Starting with U.K. defense first.
Leo Quinn
executiveYeah. Look, to start with, defense appeals to me. I consider it a highly reliable customer. Their terms, conditions, and processes are extremely clear. So when you file a claim, it gets settled, and they have the money to pay you. That isn't true across many parts of the markets we serve. Looking at where we stand now and our footprint with the DIO, I see that growing. The terms and conditions, I think, are solid. Take the Atomic Weapons Establishment, take Devonport, take Rolls-Royce — those contracts reimburse costs and add an incentivized fee. Big delivery risk isn't something I'm carrying. Yes, I like those contracts. I'd do many more of them. On capability, mechanical and electrical will be the tightest constraint across the whole industry. In some of the jobs we're building inside these barbed wire fences, a lot of it — 30% of the building — is actually going to be mechanical and electrical. Securing those skills matters a great deal. Buying companies isn't what I want, and taking on someone else's problems isn't either, but I have to train people up and I have to hire a lot of people to get all of that done.
Leo Quinn
executiveWhen you take a broad view—Hinkley, Sizewell, Net Zero Teesside—the enormous wave of skills required to deliver M&E is going to matter a great deal. That's a capability I must secure at the industrial level. I won't accomplish that. Acquisition won't get me there, since all that amounts to is taking on another party's commercial and contractual headaches. Defense strikes me as a great market for us—not merely a good one, a great one. One more point you may find useful: total fissile expenditure budgeted for AWE comes to somewhere in the range of GBP 15 billion to GBP 20 billion across roughly the coming decade. That underpins the nuclear program.
Graham Hunt
analystThanks. Staying on the portfolio rather than acquisitions — you and Phil have done substantial tidying of the portfolio over the past 10 years. U.S. civils is one we've discussed. Could you maybe just help us get a clearer picture of what it is that keeps you committed to that business, given it wasn't part of the pieces of the business you cleaned up during the last 10 years?
Leo Quinn
executiveIt's a genuinely excellent question, and honestly there's an aspect of our industry I see as somewhat problematic. From a financial standpoint, a cost-plus arrangement looks favorable since it carries no risk for us. But it tends to leave you bloated and soft rather than sharp. Once you're operating in the hard bid contracting environment, you're forced to pick up systems, processes, and methodologies that keep everything extremely tight. That has real value, because the world won't always be one of cost-plus with incentives. You have to maintain that competitive edge. What's interesting is that a few of our civil-side contracts have delivered a billion in revenue at a 20% operating profit. The difficulty arises when we land in claim disputes — sometimes with no justification whatsoever — where the client isn't eager to settle within the timeframe at hand. Naturally, given Phil's cautious approach, we book an accrual right away at that moment. As a result, we end up recording the loss. If our practice of accruing for these kinds of events keeps going the way Phil has done it historically, one day there's going to be a substantial payoff.
Leo Quinn
executiveLet me be honest: in highways, in the Carolinas and Texas, we do perform well. When it comes to certain airports and similar work, our execution is strong too. The problem is simply that we have never managed to bring it back to a steady cash flow. I completely agree. Across 25 years, cumulatively we have never truly turned a profit. At some point you tell yourself either you will act on this or you won't. That is among the matters I intend to hand off to my successor.
Graham Hunt
analystI appreciate that.
Mark Howson
analystMark Howson here from Dowgate. First off, on the U.K. — one item you left out is that U.K. hospital program that's been pushed back a great deal; my understanding is it reaches the market this week, and on a cost-plus basis. So really, can you bid on it right now, given how much you already have underway, or might you go after later schemes instead so that capacity stays manageable?
Leo Quinn
executiveThat's a great question. Hospitals are famously challenging. We built the Midland Met Hospital, and it cost us dearly. So we've actually chosen not to bid on the hospital program, even if it were cost-plus. We might take on cost-plus work, but right now it isn't cost-plus, so we aren't bidding on it. We're willing to serve in an advisory role, one where we don't carry construction risk, to help ensure they deliver the best possible hospital in the best possible time.
Mark Howson
analystAll right. Since I seem to be the final person in the queue with a question, let me just say — probably speaking for everyone here as well as for investors who are thinking it — great work, a really strong job.
Leo Quinn
executiveThanks. It's a pleasure.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Balfour Beatty plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Balfour Beatty plc earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Balfour Beatty plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.