Leo Quinn
executiveWelcome to the presentation of our Half-Year Results. Watching that video, I have to say it's amazing — I reckon it's the finest one we've produced so far. The remarkable work we genuinely carry out and hand over each and every day is pretty astounding. Usually when a presentation wraps up, you'd hear, "Thank everybody." What I'd like to say is that, for the 27,000 employees who do this day in, day out, this is an amazing accomplishment, and we will stay thankful always. Right. Sore throat. I'm Leo Quinn, Group Chief Executive of Balfour Beatty, and I want to discuss our first half results. The key thing is, look, we are on track to hit our full-year earnings and expectations. There are three points I want to make here, and I believe they are really, really important. First and foremost comes the strength of our underlying earnings business and the fact that we have genuinely achieved our 3% margin in U.K. construction. Proving Phil wrong is an achievement all by itself. Then, of course, the astonishing growth we secured within support services. I'd also like to highlight our record order book, and this comes on the back of a rising infrastructure tide. As you know, Balfour Beatty is the market leader in infrastructure.
Leo Quinn
executiveWhat's pretty distinctive about this business is how we convert earnings and, in fact, the order book into cash. That's what supports the dividend increase as well as the share buyback. If you'd like to ask me afterward how orders support cash, I'll walk you through that too. Basically, a genuinely strong beginning to the year. That's only part of the picture, though. The slide coming up now matters a great deal, since what it really does is highlight, in effect, the quality of both the backlog and the pipeline we hold. Above all, it lets us stay selective. That selectivity enables us to lift margins, both when it comes to pricing and when it comes to delivery. Let's begin with the fact that we hold GBP 19.5 billion in order book — a record order book. Even more significant, that's supported by a pipeline, a large share of which is in fact secured, of a further GBP 20 billion. The single biggest challenge we confront in today's market is that infrastructure demand goes far beyond what supply can meet. Across the past two years, we've been examining exactly that and seeking to capitalize on it through our pricing approach, our margin approach, and also when it comes to de-risking.
Leo Quinn
executiveThe de-risking matters a great deal, since it means the margin you book is genuinely what you deliver as the delivered margin — rather than the situation where, when you deliver the booked margin, it actually comes in below the actual; when you deliver that margin, it lands under the booked margin. Let's examine some of this closely. Looking at the GBP 20 billion, there are five growth engines inside the business. Right now, the first and foremost of these is the power transmission business. That has really been propelled by net zero, but even more so by AI. Certain demands for data centers and power connections are simply phenomenal. We get involved in early contractor involvement, which you may know better as a FEED study. That FEED study is in fact paid for by the client. Historically in that market, we would be hard bidding the work, where we'd submit three bids, win one in three, and then deliver it bearing all of the risk. What happens now is that we come in early, we'll actually survey the site for planning conditions, for soil conditions, early design, and in some cases, early procurement.
Leo Quinn
executiveSo what this does is let us take a lot of the risk out of the business. The volume of work coming from our early contractor involvement right now stands at GBP 6 billion to GBP 8 billion, and that represents roughly 1/3 of the GBP 20 billion market out there. In power generation — specifically within power generation — over the last six months, what we've effectively witnessed is an acceleration of orders into the first half of the year, driven by net zero T-side as well as by Sizewell. Sizewell has now cleared FID, the government's financial investment case, and activity is moving ahead on site as though it will be built in full. On top of that, on Sizewell we have signed — and we are party to — a three-way alliance agreement involving ourselves, Laing O’Rourke and Bouygues to carry out GBP 14.5 billion of civils construction work. That is in fact a signed commitment. I'll go into more detail in the second half. When it comes to defense, we are involved at three or four defense sites, and over the next 12 months those sites will actually need to appoint a partner to deliver the fissile. The fissile work across those sites carries a value of between GBP 2 billion and GBP 5 billion. We are on site delivering today and are in a very strong position to win some of that.
Leo Quinn
executiveWith Lower Thames Crossing, the contract for which has been awarded to us, we expect a start around 2028. That fits into our growth pipeline. In our buildings business, we're looking at a run rate business worth another GBP 3 billion, which is already being secured but not awarded at this moment. This strong backlog of enhanced margin and de-risked contracts, together with a GBP 20 billion pipeline, leaves me very confident that we'll be exceeding what effectively is the average cash going forward. That underpins what effectively is an accretive dividend and an increasing share buyback. I'm very confident that, with the momentum in the business on the rising tide of infrastructure, we'll be actually delivering significant shareholder returns into the future. On that note, I'm going to hand to Phil in order to explain the reality.
Philip Harrison
executiveThanks, Leo. Good morning, everyone. Across the first half we achieved genuinely solid progress in our growth markets, and we're still on course to meet our full-year expectations. That covers our continued expectation of higher profits from the earnings-based businesses, with very strong contributions from U.K. construction and support services, which more than offset a forecast reduction in profit from U.S. construction, where we've had a frustrating write-down in U.S. civils in the year to date, and we are confident we will ultimately get cost recoveries on that. Taking a closer look at the first half, revenue rose by 10% to GBP 5.2 billion, which represented a 12% increase when excluding FX movements, largely driven by growth in U.S. buildings and support services. Profit from the earnings-based businesses was up by 7%, with strong profit growth in U.K. construction and support services, largely offset by a loss in U.S. civils. When including higher costs in the investments business, group profit from operations was flat at GBP 77 million. Profit for the period fell by 10% to GBP 73 million, which included lower net finance income, as last year's first half benefited from an impairment write-back. Earnings per share decreased by 6% to GBP 0.144, and our order book at GBP 19.5 billion has increased by 6% in the period.
Philip Harrison
executiveThe director's valuation of the infrastructure investments portfolio went down 8%, to GBP 1.2 billion. Cash at period end rose to GBP 1.2 billion, thanks to a big working capital inflow, and that also pushed average net cash up to GBP 1.1 billion. As I mentioned, we're still on track for full-year expectations, though the profit mix will shift, and that gives the Board confidence in significant ongoing shareholder returns. In line with this, the interim dividend has been raised 11%, to GBP 0.042 per share. Turning to the business units, I'll begin with construction services. U.K. construction delivered an excellent first half, excluding insurance recoveries. Profits were up 35%, and we hit our long-standing 3% PFO margin target a year ahead of forecast, with that improvement coming from better operational performance and the lower risk nature of the contracts being undertaken. We also gained from an insurance recovery of GBP 10 million tied to an ongoing project. For the full year, we expect the business to reach a 3% margin before including the insurance recovery. U.S. construction posted a loss in the first half, as good performance in the buildings business was offset by cost overruns and scheduled delays at a civil highways project in Texas.
Philip Harrison
executiveThis project, which is being delivered through a joint venture, is scheduled to finish in the middle of 2026. Naturally, the group will look to recoup those cost overruns from subcontractors. Before this year, highways work in the Southeast and Texas had been profitable for the group, and we anticipate that will be the case once again after this project wraps up. In line with that expectation, during the first half we signed another highways contract with those same clients, and we'll deliver it independently over the next six years. For the full year, our expectation now is that U.S. construction will deliver a profit of around GBP 20 million. At Gammon, the first half came in largely as expected. Revenue was 23% lower, driven by reduced activity at Hong Kong Airport, where our two major projects moved towards completion. PFO rose by 13% to GBP 17 million, and the PFO margin percentage increased to 3.1%, driven by the mix of work delivered. I'll also touch on non-underlying items here. You'll recall that at year end, we provided GBP 52 million in respect of a jury verdict given against the group and its JV partner regarding a U.S. highways project completed in 2012.
Philip Harrison
executiveWe're happy to report that during the first half, a settlement was reached with all parties, our subcontractors included, and its insurers covered the group's share of that settlement in full. Accordingly, after accounting for legal costs incurred, the group has released this provision entirely. Turning to support services, made up of our power transmission, road, and rail maintenance businesses, every one of which did well in the first half. As you're aware, the big investment in the U.K.'s power transmission network is starting to ramp up, and the first half figures show it, with support services revenue up 19%, driven by greater volumes in the power business. Consequently, profit for the period rose 35% to GBP 46 million. Across the full year, we anticipate PFO margin toward the top of the targeted 6%-8% range, helped by additional profitable revenue growth from the power business and steady performance from road and rail maintenance. Now let's turn to the group's order book, which stands at GBP 19.5 billion, with growth in each of the four divisions. U.K. construction edged up to GBP 6.3 billion, and 82% of orders are now either on target cost or cost plus contractual terms.
Philip Harrison
executiveIn the U.S., measured in dollars, the order book for the buildings business increased by 6% during the first half, and civils contributed the new road project that I mentioned earlier. Gammon enjoyed a solid stretch for order intake, especially on the buildings side, with its order book up 12% in local currency, while support services rose 16%, mostly thanks to new rail orders — among them a long-term fleet supply contract with Network Rail, a spot on Network Rail's CP7 Western Reactive framework, and additional track renewal work with the Central Rail Systems Alliance. Compared with revenue, the power order book inside support services grew only modestly in the first half, since a lot of the big schemes the business is delivering are being contracted in phases. Early contractor activities are presently underway, and the contracts covering later phases — where most of the value lies — will enter the order book over the coming years. Turning to infrastructure investments, which posted a loss for the period. Costs in U.S. military housing tied to the monitor's work remain the main reason for the division's losses. This month we reached an agreement in principle to extend the monitorship through the 6th of June 2026, which we think allows the military housing business enough time to fix the outstanding work.
Philip Harrison
executiveDuring the first half, the group additionally booked costs tied to three U.K. PFI assets, where remedial work was needed before handback in 2026. We posted a modest disposal gain in the first half, including GBP 2 million of contingent consideration tied to a 2024 disposal. Turning to what's ahead, we anticipate a small loss in the second half before disposals, which means the full-year operating loss will be marginally bigger than the GBP 12 million we are reporting today. It's worth stressing that investments stay profitable once you strip out the continuing expense of the monitor's work. Lastly, for the full year we expect gains on disposals in the GBP 30 million-GBP 40 million range, with several transactions still in progress. Now to the director's valuation. The investments portfolio's valuation fell 8% in the first half of the year, to GBP 1.2 billion, driven mainly by two changes. First, we raised discount rates across both the U.K. and U.S. portfolios, reflecting shifts in long-term interest rates and bringing us in line with the secondary market. That produced a value reduction of GBP 61 million. Second, since more than half of the portfolio sits in the U.S., the strengthening of sterling against the U.S.
Philip Harrison
executiveThe dollar’s movement in the first half also mattered a lot — it cut the valuation by GBP 65 million. We’re still putting money into the portfolio and recycling capital out of it: we bought two new multifamily housing assets in the U.S. in the first half, and we have disposals lined up for the rest of the year. Turning to cash, which was especially robust for us in the first half: operating cash flows came in higher, and they’re up 26% versus the first half of last year. What mainly produced the bigger cash balance was a GBP 290 million working capital inflow. That came from advance receipts on a number of new projects in U.S. construction, plus working capital timing in U.K. construction. The other items on the bridge came in broadly as expected, among them roughly half of this year’s share buyback being done. One more item to flag is our other category, which is usually a far smaller figure, but it included GBP 26 million of FX movements in the first half, reflecting the weakening of the U.S. dollar. I’ll wrap up with a summary of our full-year guidance for 2025. We still expect PFO to rise from the earnings-based businesses. Within that, we now see U.K.
Philip Harrison
executiveConstruction is running at a 3% PFO margin as it keeps moving upward, and support services are making further progress—holding margins steady while revenue grows. For U.S. construction, we're expecting a much stronger second half, and we anticipate finishing the year with PFO of roughly GBP 20 million. On gains from investment disposals, we expect GBP 30 million-GBP 40 million for the year, since we keep realizing value from the portfolio. Net finance income should come in at about GBP 30 million, and the effective tax rate will once again be near statutory rates. Turning to cash: we now expect average net cash of GBP 1.1 billion-GBP 1.2 billion, with capital expenditure of GBP 40 million-GBP 50 million. To sum up, we're still on track for the full year, and we remain well-positioned to take advantage of improving operational performance and the momentum in our growth markets in 2026 and beyond. That will keep underpinning our long-term commitment to growing shareholder returns. I'll now hand you back to Leo.
Leo Quinn
executiveOkay, thanks, Phil. To begin with, I'd say we have spent no less than 18 months — two years, in fact — discussing the growth engines that sit behind this business. To sum up, they account for roughly 70%, or cover roughly 70%, of our revenue. I must say that, as things stand today, I have never seen the business positioned this well for what lies ahead. As I depart the company, the robustness of our order book and our pipeline is genuinely remarkable. In any company, my view is that if you hold a portfolio and you have one or two growth engines, that produces a solid overall result, since those growth engines offset all the missteps made elsewhere. When you have three growth engines, it is somewhat akin to three Bellfruits on a one-armed bandit. It's a jackpot, you know. At this moment, we have five. Our greatest challenge is genuinely how to handle demand at that level when supply is constrained. After all, there are just 27,000 of us to deliver it. That requires us to be selective, and to grow ever more selective. I'll walk you through each of these briefly.
Leo Quinn
executiveWhat I'd highlight for you here is that, looking at this graph—which is essentially our backlog going forward plus our revenue projections—the power transmission business actually doubles between 2024 and 2026. And if that isn't interesting enough, it has the potential to double once more between 2026 and 2028. There simply aren't enough people or resources to deliver all of that. So our number one message really centers on selectivity. Just a bit of history: we've been in this business for roughly 114 years. It's where Balfour Beatty actually began. National Grid, one of our major customers, is a company we've been doing business with for 100 years. We're deeply ingrained in this industry. Our market share is about 20%-30%. We have roughly 2,300 blue-collar workers in this market. A couple of other things: it's not only National Grid and SSE, but now Scottish Power as well. We're very focused in what we do. We do 400 kV and 132, which is rather specialist. Again, there isn't a lot of competition in that market. I said earlier that demand is actually being driven by consumption. It's about net zero and how do we connect wind farms into the grid?
Leo Quinn
executiveWhat’s our approach to de-risking the grid? And on top of that, AI-related demand and data centers are booming right now, along with getting connections onto the grid. Everything we do feeds into that. We handle 400 kV and 132, plus substations, and these days we’re also building converter stations. Converter stations — I was up in Scotland not long ago and visited one. They’re 300 m sq. Just picture a field where we’re actually going to plant a converter station of 300 m by 300 m to take wind power off into the grid. Truly phenomenal stuff. This isn’t future growth. We’re delivering it now. This business will probably nigh on double this year, looking at it. We’re delivering on the likes of BTNO, Eagle, and we’ve got the Rio frameworks we’re delivering against. We’re working on early contractor involvement into for SD, which is SSE’s power plan. The other thing about selectivity, which I’ve said before, which is really important, is that we’ve chosen the schemes we want to deliver. There’s a whole portfolio out there, and some of them are extraordinarily difficult in very remote places. All of our picks are actually where we’ve got good urban conurbations and we can actually get people and talent.
Leo Quinn
executiveSomething that stands out is that over the past 18 months, we brought 850 people into this business to handle the growth. That alone is a real challenge. I have a great deal of confidence that what lies ahead for us here is exceptionally promising. Looking at power generation, it's quite interesting that Sizewell B, which came before Sizewell C on this, had its diaphragm wall and foundations built by us 40 years ago. It's fascinating how these projects keep resurfacing over time. At Hinkley Marine, work will taper off across the coming 8 to 10 years while we complete all the mechanical work. For us, the civils work is mostly done. After that, we'll transition into Sizewell C. As I mentioned earlier, Sizewell C has advanced at bullet-train speed. During the past six months, we signed the alliancing agreement among ourselves, Bouygues, and Laing O’Rourke for delivering the civils. The government has approved the financial investment case. At a minimum, we'll end up sharing GBP 14.5 billion of civils delivery on that program across the next 8 to 10 years. Truly, truly, truly encouraging. The other order that has arrived during the past six months is Net Zero Teesside, published at, I believe, GBP 880 million.
Leo Quinn
executiveThis is a situation where it's a negotiated contract, as Sizewell was a negotiated contract. What really matters about the way these projects are de-risked? Previously, we would always have some kind of penalty tied to retentions or liquidated damages. With all of these contracts, we get bonuses and incentives for actually performing. There's only upside, and our downside risk is actually minimized in the sense that there's a minimum level of margin we can earn come hell or high water. Also, as I look ahead, you've got SMRs, you've got more carbon capture. We're working on fusion and the like. Not only is this very visible in the short term, but in the long term, we've got even more growth coming through. I think you saw things this morning on Rolls-Royce about the value of their SMRs for power supply to data centers for AI use. Fundamentally, our generation business is growing as well. I'll point out that between 2024 and 2026 it is doubling, and there's also the potential for that to double again. If I look at defense, defense is really one of our smaller businesses. The challenge we're going to have here is, again, we're circa GBP 250 million here or GBP 200 million.
Leo Quinn
executiveOnce more, through 2026 it’s doubling, and looking ahead, there’s potential for it to double another time. On the defense side, we have three main customers. Everything we do centers on submarines and nuclear. The portion of the defense budget that stayed protected was in fact the nuclear piece. We’re engaged with companies such as Babcock at Devonport—that’s for the Astute class submarine, where we’re constructing the dock. We’re also working with the Atomic Weapons Establishment at Aldermaston, where we’re on site building the hub, and they have not yet named their fissile partner. In Derby we’re working with Rolls-Royce, building out the AUKUS facilities. Again, they haven’t yet appointed their fissile partner. Given our background knowledge and experience, plus the fact that we are physically present on these sites, we feel fairly confident that we’re in a favored position to secure a very large share of that work. In total, that will be worth somewhere between GBP 2 billion and GBP 6 billion. Naturally, we work with the DIO, which—in light of defense spending—has a backlog that keeps growing. Beyond that, many of the projects we’re handling fall within cybersecurity.
Leo Quinn
executiveThose secure projects are going to flow straight into one another, really. They aren't really put out to tender. Given their nature, they're kind of negotiated. When I think back to power, something called early contractor involvement, or feasibility studies, has taken the risk out of our power business. We've actually negotiated these orders directly with the client. Performance can only go up, and the risk on the downside is capped. Turning to our transportation business, that's a blend of several businesses. First, in rail, we were very lucky in the first half of the year to land a number of rail maintenance contracts, and also in plant hire and plant equipment. We've won the Tampa contract, a 10-year commitment to Tampa hire. Within that, we've also picked up another contract, which is plant hire for rail over the next 10 years as well. With HS2 absorbing a lot of the transport budget right now, the remaining budgets are getting rather tight when it comes to highways, local roads, and rail. Having a secure pipeline for rail is very good, and it's underpinned by the ongoing maintenance that we do.
Leo Quinn
executiveFor us, rail looks flat across the coming 4 to 5 years. Turning to roads, that segment splits into 2 pieces. One piece is local authority roads — that's our Living Places business, and it sits within our service business. Then there are highways, meaning our national highways, motorways, and similar assets. On Living Places and local authority roads, we have a very solid business ahead. Each 12 months, 1 to 2 major councils will put out major tenders. We're currently working on a couple of them, each in the hundreds of millions, and they're invariably one on all. You either win them or you lose them. The outlook in this market encourages us a great deal, though right now we aren't forecasting any growth coming out of it. Moving to highways, our 2 major projects at present are, obviously, wrapping up the M25 A3 at Wisley. For everyone here in the room and on the call, the M25 opens at the end of September. Anyone who's spent long stretches sitting in traffic will welcome that relief. The A3 is going to take a bit longer.
Leo Quinn
executiveWe recently landed the M3 Junction 9 project, a highways contract worth a hundred-odd million. We're also at work on things like the A66 and the A57. We aren't projecting growth from any of those, but the growth we do anticipate lies in the Lower Thames Crossing, which is already secured and should kick in around 2028. That will fill things up nicely for us. This is a very, very solid business, and it has delivered good profits and good cash flow over the last 20 years. It really is one of the foundations. We see plenty of prosperity in areas such as the growth at Heathrow. We're more interested in the T2C terminal, likely coming up within the next two to three years. I think the runway will be out past 2032 and the likes of that. Aviation is very big for us. Since this business is an expert in raw material and haulage, we cluster reservoirs here. There's going to be a lot of construction of new big reservoirs around the U.K. On the right terms and conditions, we'll engage in that sort of work. There's a lot of opportunity ahead of us in this business, built on a very solid rail, local roads, and highways business.
Leo Quinn
executiveLooking at the US, around 2023, we started what was essentially a growth push there. The point of that was really to stretch our territories past the main branches. For us, the US role is that it spreads our risk away from the U.K. and gives us a second string to our bow. Inside the US, we're very well diversified from Seattle all the way to California, over to Texas, Florida, and back up to Washington, DC. So what we did is, geographically, we set out to grow the business. You can see the payoff: our order book has moved from $5.7 billion to $7.1 billion. For us the model carries much lower risk. It's a low return in terms of its fee, but the risk gets passed down to the subcontractor chain. The initiatives working very, very well for us include, besides the new branches we've opened in places like Sacramento, our ability to cross-fertilize customers across the U.S. Take Disney, where we have a very big presence in Florida — we've now begun doing work with them in California. Universal, similar, we're now starting to do work in Texas.
Leo Quinn
executiveDemand for data centers has been enormous, and we rank among the biggest suppliers to a tech company based in Portland, Oregon. That business has now extended into Washington, DC, where we just landed a $200 million data center order, and we're examining something comparable in Phoenix. Geographically speaking, the U.S. is performing extremely well for us. It's expanding, and the specialties we bring — hospitals, education, and similar areas — position us strongly to grow beyond the locations where our operations are currently concentrated. To wrap up, it's quite compelling to hold, I believe, a genuinely robust order book with margins on the rise and risk taken out of it. That's only one piece of the picture. The other piece is: what do we have in place that gives us confidence delivery can happen down the road? A decade ago, we introduced our Build to Last program, centered on lean, expert, trusted, and safe. Where are we now? Above all, we have strong governance and controls throughout the business. We have a dedicated, committed workforce nationwide and worldwide. On trusted, we are clearly the market leader in infrastructure by a wide margin, and people trust us to deliver what we promise.
Leo Quinn
executiveWhen a person is considering an infrastructure project, Balfour Beatty has to be on their list. In my view, we hold some of the strongest safety practices anywhere, and we're leading the industry when it comes to digital and putting AI to work. Our employees genuinely care about the environment and are dedicated to the communities where they live. That is the base the company's future will rest on. So what has Trust Built to Last actually given us? Earnings are up 47%, but even more important, that sits on a level of cash generation the likes of which I have never really witnessed before. We have handed back slightly less than GBP 1 billion to shareholders through buybacks and dividends, and we have in fact repurchased 28% of the company at an average price of roughly GBP 3.30, which, going by today's price, turned out to be a good deal. We hold a GBP 19.5 billion backlog that is highly de-risked, with strong margins, and as I said, highly de-risked. We also have a GBP 20 billion pipeline of further work, which in fact will be delivered across the coming 10 years. That backlog gets delivered across the coming two to three, while the pipeline stretches across the coming 10.
Leo Quinn
executiveWhen it comes to confidence in our capacity to keep returning cash to shareholders over the long term, I personally have a great deal of confidence that all the right things are in place. And to close, in summary, I think we began with Build to Last. In my view, Balfour Beatty has already Built to Last. With that, I'll hand things over for questions.
Robert Chantry
analystRobert Chantry here from Berenberg. Many thanks for the presentation. I have three questions. First, regarding the U.S. order backlog, which rose strongly again: could you elaborate on how confident you are about the U.S. margin and EBIT generation within that backlog over the years ahead? I believe historically you may have mentioned a normalized EBIT level of roughly $40 million-$50 million, though clearly there was somewhat of a step back in the first half. Please discuss your confidence in the margin within that backlog. Second, also on U.S. civils, could you explain precisely what went wrong? I know you have announced several additional Texas roadside contracts this year. Is the risk profile the same, or are the challenges? I know you mentioned lower return and lower risk, but please provide more clarity on that given how much exposure you have to Texas. Third, just some remarks about the infrastructure investments item concerning the U.S. military housing monitorship. I know there was news in the first half that it has been extended, I believe, to the 6th of June next year. Just some thoughts on how that affects your view of that asset, some of the background, and your thinking regarding that ongoing process.
Robert Chantry
analystThanks.
Leo Quinn
executiveI've got a few for you, Phil. I figured you could take all of those on, giving it one final attempt to see whether you can get them right.
Philip Harrison
executiveYou should join me as well.
Leo Quinn
executiveYou're asking me to take that on.
Philip Harrison
executiveSure, go ahead and do that. That's typically what you handle.
Leo Quinn
executiveOkay, we'll share. I'll take the… First off, buildings growth is supported by what's really fairly diversified throughout the U.S. continent. That's pretty strong. On the buildings side, we keep going—we had a great first half with buildings, and we expect the same in the second half. The first half result was held back by the civils project, which is delivered through a joint venture in Texas during the first half. I have to say we've truly had an outstanding first half for buildings, and we have plenty of confidence in that business. What I'd say matters more is that the risk in that business does extend down into the supply chain. When something goes wrong, it doesn't automatically land on our account, but that is actually reflected in the fact that we only earn something like a 2% margin return on the fee. It's low risk and low return. I'm very comfortable with that particular business and business model growing for us. The downside risk obviously occurs if a subcontractor does go bankrupt and that delays the overall schedule, then it will come to liquidated damages on our account.
Leo Quinn
executiveWhen something goes wrong with a subcontractor, the cost of finishing that work falls back on either the bond or the insurance. Phil, feel free to add to this, but in Texas the contract we currently have is set up as a joint venture. Over the past 18 months, we haven't entered into any joint ventures in Texas with that particular partner, mainly because we no longer see that relationship as adding value for us. In this specific case, the contracts involve subcontractors and design, and because of that, work had to be redone. If something is designed and placed in the wrong spot, liability typically comes back to parties such as the designer. We intend to pursue full recovery of that from the company. The challenge with our business model is always this: once you acknowledge that a job will take longer, which means prices will go up and you may face liquidated damages, you must recognize that in the period. You might not actually receive the money back for two years or so, and it's typically a lengthy negotiation process.
Leo Quinn
executiveThat covers the ifs and buts of it. Anything else you want to add?
Philip Harrison
executiveNo — it's just that we're, you know, going after the third parties. We're confident we'll come away with a good result from that.
Leo Quinn
executiveThe point I'd add to — and Phil captured it nicely — concerns 161, the insurance matter we dealt with not long ago, where at year-end we set aside a GBP 50 million reserve against that liability. It ended up being resolved and settled, and we've released the whole amount back except for the legal costs. Settling something within that window is remarkably uncommon. It's fascinating when I look at it. So we booked a GBP 50 million reserve, and it has been written back. We have since put aside a further reserve, meaning that on a net basis there's zero effect on cash. Whether you look at the middle column or underlying, it makes no difference. The two cash items offset one another, so nothing stands in the way of our continuing the share buyback and returning capital to shareholders. What I'd emphasize is that our balance sheet is so resilient that bumps in the road can be taken in your stride. Of course, nobody wants to be taking bumps in the road, and potholes are unwelcome too. The reality is that the strength of our balance sheet and the cash sitting on it simply mean it's bloody annoying when these things crop up.
Leo Quinn
executiveIt's part of the reality, you know.
Philip Harrison
executiveRegarding the US military housing monitorship, the majority of our efforts will be finished by the end of the year, and after that the monitor will carry out their duties. From what I recall in our conversations with the Department of Justice, we chose a date that all parties felt confident would allow us to bring this matter to a close.
Leo Quinn
executiveMoving on to the next question.
Graham Hunt
analystThank you very much, Graham Hunt from Jefferies. I have three questions, if that works. First, returning to the U.S. buildings market, you mentioned several areas of strength. I was just wondering whether any weak spots are worth flagging, or more broadly how you view the various subsegments there. Second, regarding the U.K. construction business, you've now reached your 3% margin target sooner than planned. When you discuss those large projects, or the major projects that will fill your pipeline going forward, do you feel confident that you can hold that 3% or perhaps even go slightly above it? Third question, a somewhat bigger-picture one about the two administrations we have in the U.K. and the U.S. on the government side. Do you have any thoughts on what they've been doing to speed up infrastructure build-out, where that has had the greatest impact on your portfolio, and what gives you confidence regarding the policy they're putting through? Thanks.
Philip Harrison
executiveYep.
Leo Quinn
executiveI should probably handle these myself, since every one of them is going to be fact-based, right?
Philip Harrison
executiveI'm eager to respond to your question.
Leo Quinn
executiveYou wanted a moment of weakness. As a company, we keep a low profile. For various reasons—some good, some bad, and publicity—we don't really like putting a lot of what we're working on out there. I think your question was maybe about low lights and so on, but Trump's recent visit to the Federal Reserve, which we're building, wasn't necessarily the publicity you garner. That said, the project, again, is very low risk, and what we're doing is phenomenal—basically jacking up the entire building and putting a new building inside it. The things we do are quite extraordinary. The business continues to do very, very well, and as I said, the first half has really been one of the best first halves we've had in the business. I'm very encouraged about the pipeline that we see. Our market leading position for schools in California is just going from strength to strength. There's one here on my shoulder. If you look at it, sometimes they spend over $200 million on a school. You don't hear of that in the U.K. I don't know if Phil wants to add. In terms of the 3% margin, look, I've always said that our U.K.
Leo Quinn
executiveConstruction companies run at five. I've always maintained that. Without the mistakes we made previously, we'd be heading that way. Phil prefers to keep me well anchored and make sure I grasp that 3 is the realistic picture. When I begin examining what's going on around us, what we're tendering for, the growth rates, the fact that we've got specialized services delivering inside our framework — in effect, we'll provide our ground engineering as best in class. Whether it's us delivering it or another party, we'd earn a fee on that too. There's definitely a route to surpassing the 3%. I'm not sure how long that will endure. I think the question you should be asking is where it goes from here. I can't recall the third one at the moment, but.
Philip Harrison
executiveLet me give you the big picture when it comes to the U.S. and U.K. governments.
Leo Quinn
executiveHere's the thing — the U.K. government is caught in a tight spot. It's attempting to generate growth. If it can't achieve growth in the property market and similar areas through normal macroeconomics and that sort of thing, then it's pursuing it through fiscal expansion. It's pouring money into infrastructure — money it doesn't truly possess in reality. Once those projects get underway, they don't halt. I must say, the projects we're involved in, when they produce the benefits like Crossrail, or the Elizabeth Line as it's now called, are simply extraordinary. I think they're very, very different. Over in the U.S., our exposure to fiscal expansion or anything like that isn't significant. We have a handful of road projects. They're properly funded. They're interesting, but our footprint there isn't large. In the U.K., we genuinely lead the industry in a highly positive manner. I don't know whether you'd like to add anything to that, Phil?
Philip Harrison
executiveNo, no, no.
Leo Quinn
executiveHow about 5%?
Philip Harrison
executiveThe good news, I think, is that we've reached 3%. We got there sooner than expected. I believe that really stems from the operational discipline we've maintained in the business. There have been fewer mistakes. If we stay on that path, then, you know, we can perhaps dream of five. More sensibly, how do we move from three to three and a half, and how do we get from three and a half to four? That's the way we need to think about it. I think we have a chance to do better than three.
Leo Quinn
executiveClearly, he's gone with the blue pill, right? You know, from The Matrix. Yeah.
Graham Hunt
analystMuch appreciated.
Jonny Coubrough
analystThanks. Jonny Coubrough here from Deutsche Numis. My first question is about power. In the past you've described that as a business with a 10%-12% operating margin. Does that remain the correct figure? You've also said before that you expect to reach GBP 800 million in revenues there next year. Leo, you said the potential is still considerably greater, though resource is holding you back. What do you think that revenue line can realistically be? My other question is on transportation. You laid out the pipeline through 2030, leaving HS2 out. How would that chart appear if HS2 were included, and if it ran on to 2030? Thanks.
Leo Quinn
executiveAlright, let me cover HS2 briefly. Revenue this year and last year, I believe, is at what is essentially a record level. Next year, we'll see HS2 revenue come down a little. I'm aware the funding is set aside so all the civils can be finished and then the track systems brought up and made ready. Their aim is to have every civils package done by the end of 2029, and then a clean sheet handed over so the track systems and the power can be delivered. My estimate would be that HS2 revenue next year will be down by around 20%, something in that region. Which is fine, by the way, since the people from our side working on it will move across to things like Sizewell and some of the power jobs. Resource is the critical piece. Overall revenue for the group doesn't drop. We'll still see growth overall thanks to growth in areas like Sizewell and power. As for the 10%-12% for power systems, double digits remains our target there. I wouldn't want to constrain them in any way whatsoever. In fact, we're bidding at higher margins because we have to be more selective.
Leo Quinn
executiveWe see the situation as very substantially de-risked. Our capacity to deliver the book margin is very significantly improved. As for the $800 million target, I wouldn't count on that for next year. I'd really expect it to take roughly 18 to 24 months to reach that level. You have to build up to it. This year we'll come in just under doubling the business, but in the following year we'll keep growing. We don't want to push growth, because that's when mistakes start happening. I'd prefer a dependable, smaller business that secures my return and my cash over a large business that goes wrong on you. Keeping it under control matters enormously. I've operated in many markets. I've witnessed plenty of growth, but the growth in power right now is astonishing. The fact that we can de-risk it and we're getting paid to de-risk it means that what historically counted as selling cost is now revenue for us.
Jonny Coubrough
analystThanks. And Leo, since I have the microphone, this being your final outing and final set of results, may I congratulate you on 10 years? The numbers really do speak for themselves under Build to Last. The share price stood at GBP 1.50 when you joined, and it's GBP 5.50 now. We wish you all the best going forward.
Leo Quinn
executiveThanks for that. Naturally, nobody achieves anything alone. This couldn't happen without 27,000 employees and a Finance Director who has been through a lot of pain. It would be entirely wrong for me to claim all the credit. Taking most of the credit is fine by me, but some has to go to my wingman, who has done a fantastic job keeping things steady and has been a great partner and a friend the whole way through. All credit to you.
Jonny Coubrough
analystHonestly, Leo, I'm a bit surprised that when you wrapped up the power discussion, you didn't actually state 20% margins. My understanding was that you were limited to, you know, 10%-12%.
Leo Quinn
executiveAre there any further questions?
Jim Ryan
executiveIt doesn't seem like anyone has a question on the line. There are some folks listening in, though. Let's wait 10 seconds, and if any of the people on the phone want to ask something, maybe they can raise their hand — but at the moment, nothing has come in.
Leo Quinn
executiveHonestly, I think it deserves mentioning that the business's fundamental strength and the balance sheet are phenomenal — truly phenomenal. That strength is sufficient to absorb shocks while continuing to produce those shareholder returns consistently, year after year. A while back I ran a rough calculation covering the past 5 years. We moved from roughly GBP 2 up to GBP 5 and change, I'm not sure exactly. Should you simply carry the strategy forward in a mathematical sense — returning an identical sum of money annually across the coming 5 years, with the multiple unchanged — you arrive at a GBP 10 share price, purely on the math. If we genuinely hold the strategy steady and keep doing what we're doing today, there's an opportunity to double the share price once more. A record order book, a record pipeline, heavily de-risked, and arguably among the highest margins we've ever had in the backlog. In all my time, I've never seen this business in such strong shape. I want to acknowledge and extend my best wishes to Phil Hall, who succeeds me on the 8th of September. To begin with, he's a fabulous individual. He is a genuinely nice person. He's spent 30-odd years in the industry, is extremely capable, and understands the bloody industry better than I do.
Leo Quinn
executiveI have to say, in my view the board did a fantastic job picking him. I'll remain here through the end of the year to assist wherever I'm able. I think it's a great business. Oh, there's a question, is there?
Jim Ryan
executiveYeah, we do. I believe there are two people on the line. I'll let the operator make the introductions.
Operator
operatorThanks. Our first question on the conference line comes from Joe Brent at Panmure Liberum. Your line is open now. Please go ahead.
Joe Brent
analystGood morning, Leo. Just as you figured you were free of me, may I ask three brief questions? First, regarding the monitorship on U.S. military housing, is my understanding correct that we had been hoping this matter would be resolved by the close of this year? The only consequence, financially speaking, of it being settled by the middle of next year. Second, I'd be interested to hear your perspective on the secondary market for PPPs, in light of the higher discount rates you mention. Third, I'd like your take on what constitutes a sustainable level of negative working capital, and on the sales potential for the group.
Leo Quinn
executiveLike you said, Joe, we figured we'd slipped past everything. Right. Phil, would you like to handle the U.S. military housing monitorship? I'll say a bit about it — actually, you could take on all 3.
Philip Harrison
executiveNumber two is something I don't know.
Leo Quinn
executiveThe second one concerned PPP. So, what's the outlook there given that interest rates are coming down?
Philip Harrison
executiveSo the monitorship was formally set to conclude in the first week of September this year. As I mentioned, our expectation was that most of our work would be done by the end of the year. It simply comes down to the monitorship and how the monitor process moves ahead into the final period in June. We anticipate being able to handle it within the cost budgets we currently have in place. That covers the first item. I didn't fully grasp the PPP question, so I would need to ask for it to be repeated.
Joe Brent
analystYou're asking about how secondary market valuations look now that discount rates have risen?
Philip Harrison
executiveSo during the half-year valuation work, we obviously examined interest rates, and we also considered what we're seeing in market values and in other parties' secondary activity. Our conclusion was that an increase in discount rates was required — roughly 0.6% in the U.K. and 0.5% in the U.S. At this point, I'd call that simply the usual ebb and sway of the market and a reflection of where we sit in the cycle. Again, we'll maintain our discipline: we have certain values in mind for our assets. Should we not achieve those, or not see ourselves achieving them, we won't necessarily sell, because we believe we know the return we want on those assets. That's number two. Number three — I'm always proven wrong. I said we'd be around 15% of working cap to revenue. We've just posted, I believe, 18%. We do expect to come off that. We do expect a bit of an unwind in the second half. I think our sustainable level remains 15%. I still think 15% is a very good point to be at.
Philip Harrison
executiveWe’re going to work really hard to hold on to that 18%, though. If we already have it, we’re not eager to hand it over. We’ll make a strong effort to preserve that. Over the long term, in a sustainable sense, we’d probably put it at roughly 15%.
Leo Quinn
executiveAnd on that point, growth is actually a help to our working capital. When your pipeline and order book start to grow, you receive mobilization payments and items of that kind. That is likely one reason, or among the reasons, we sit at such a high level today. Joe, there was something you said — I thought you were asking a different question, and it would have been a brilliant one. It was about the outlook for PPP in the U.K. Without question, the government lacks the money to do everything it wants, or more importantly, everything it needs to do. I do believe there will be some kind of shift or revival in bringing private money into infrastructure. As you are hearing around Sizewell C, they brought equity in, and also around the Lower Thames Crossing. Remember, our infrastructure investments portfolio was founded around PPP. We were one of the leaders in that area. We still have that expertise. It may well be that there is something of a renaissance in that area for the right type of capital structures, particularly around highways and things like that, where we actually financed part of the M25, call it 15, 16 years ago.
Leo Quinn
executiveYeah.
Joe Brent
analystThanks, Leo. That was a great response to a question I never posed — but I appreciate it.
Leo Quinn
executiveYou're welcome. Anything more?
Operator
operatorWe move to our next question, which is from Nicholas Mora at Morgan Stanley. Your line is now open. Please go ahead.
Nicholas Mora
analystYes, good morning. I’ve got three brief follow-ups. First, on cash generation, which was very impressive. Even after setting aside every bit of cash required for construction, you might close the year with an additional GBP 500 million, GBP 600 million just sitting there. Given where you are right now, you didn’t want to increase the pace of the share buyback in the second half. That’s the first question. Second, regarding U.S. civils, if we set aside the Dallas contract that went wrong, where do you think that business can go? Among peers, we see PFO margins anywhere from 2%, 3% to the low teens now. Within a basically reasonable timeframe, where do you think your business can get to? Last one, on support services. You’ve emphasized that you remain confident in a low teens margin for the business. Given the mix, you aren’t confident enough to raise the margin guidance above and beyond the 8%.
Leo Quinn
executiveSure, I’ll take that one since it was on my mind. Let me start by saying that power as a standalone business is not the same thing as support services. Power makes up roughly 1/3 of the portfolio. What I was addressing was double-digit performance in power, not in support services. When you combine that with a weaker return from our living places segment, which covers local authority roads, the blended margin comes out at around 8%. My sense is that this is why we pointed toward the top end of expectations there. You also raised a question about cash, so I’ll handle that one, and Phil can address the civils question. Regarding the GBP 500 million you mentioned, the source of those funds is irrelevant. That money lands in our account. Continuing to maximize cash matters a great deal for two reasons. First, we earn income on it through interest, and second, it gives us the ability to put capital into our infrastructure investments portfolio, where we aim for a better return. That is what makes the cash valuable. Returning working capital through a share buyback or dividends isn’t really feasible, since doing so wouldn’t be sustainable. In fact, you could argue that it isn’t truly our money. We do gain the advantage of holding it on the balance sheet, and that advantage is significant.
Leo Quinn
executiveRegarding civils, I'll put this somewhat jokingly: if we could simply deliver 2 years of steady profit — even at 1%, I'd be pleased, never mind 2% or 3%. You're correct that when you look at Tutor Perini and certain other companies, they've achieved double-digit margins in their civil operations. This sector is uneven by nature, since those projects last 5 years or longer. The truth is, only as you approach the very end do you find that you're able to book the entire profit you've earned. Phil, I don't know whether you'd like to add something.
Philip Harrison
executiveRegarding U.S. civils, I believe we keep reducing our risk. The character of those contracts has never appealed to us. Our attention is on Texas highways, where we've enjoyed a very lengthy track record of making money with that client, and on the Carolinas. If we stick to that approach, I think we're able to match the peers. The only thing is, we need to work through the old backlog, so to speak, in order to move into the new backlog. Yeah, I can't see any reason we wouldn't be able to get up there and match with peers. Jim.
Jim Ryan
executiveWe have one final question, and I’ll read it — it comes from Andrew Nussey at Peel Hunt. Regarding the power growth engine, resource is a key theme. As projects enter delivery phases, how dependent will you be on local supply chains as opposed to in-house capability? And how worried are you about the ability to secure resources so as to bank incentive components of margin?
Leo Quinn
executiveYeah. Look, we have to be honest about it. Right now, infrastructure work is booming — not just for us, but for everyone. Finding and keeping the best, brightest people is a real fight. As I mentioned, we think we've taken the risk out of the downside. Previously, we'd submit a hard bid for something with the power businesses. Then we'd carry the liability for ground conditions. We'd carry liability for retentions. We'd carry liability for liquidated damages if delivery ran late. None of that is in the contracts we're bidding today. The downside risk has a cap on it. Upside incentives are now tied to performance. That depends on local supply chains plus our own in-house capability. Because we pre-selected every one of these jobs to make sure we're inside urban conurbations, we've given ourselves the best possible chance. I wouldn't want to be delivering something up in Thurso and Spittal and John O'Groats, because having driven around that area fairly recently, there's nobody there apart from sheep. Getting anything delivered is a total nightmare. One thing I didn't mention on power, and I really should, is that we're actually the market leader when it comes to delivering pylons. Pylon growth is eye-watering across the coming three to five years, and in fact across the coming 10 years.
Leo Quinn
executiveWe've got a factory that's been re-equipped. It now has all brand new CNC machines in it. Over the next five years, we'll be looking to double and treble the volume. We've gone from single shift to double shift. We have another arrow in our quiver around power. That will let us enhance the returns in that area. I don't know if that answers the question. Just in summary, as I said, I've never seen the business in such good shape. The balance sheet is very, very strong. The backlog and the pipeline are materially de-risked, and the returns are higher. I'm personally very confident about another five years or a decade of infrastructure growth underpinned by another five years of shareholder returns, both in increasing dividend and buyback. What more could you ask for? Thank you. Appreciate it. Bye-bye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Balfour Beatty plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Balfour Beatty plc earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Balfour Beatty plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.