Ballard Power Systems Inc. (BLDP) Earnings Call Transcript & Summary
August 12, 2024
Earnings Call Speaker Segments
Operator
operatorWe appreciate everyone being on the line. I'm the conference operator, and this is Ballard Power Systems' conference call covering second quarter 2024 results. Please note that everyone attending is in a listen-only mode and that we are recording this conference. Following the presentation, you'll have a chance to pose questions. If you'd like to enter the question queue, press star followed by one on your phone's keypad. If you require help at any point during this call, pressing star then zero will signal an operator. At this time, I'll hand the conference over to Kate Igbalode, Vice President, Investor Relations. Please go ahead.
Kate Igbalode
executiveThanks, operator, and good morning. I'd like to welcome everyone to the conference call covering Ballard's financial and operating results for the second quarter. Randy MacEwen, Ballard's CEO, and Paul Dobson, our Chief Financial Officer, are joining us on today's call. During this call we'll be making forward-looking statements, which rest on management's present expectations, beliefs, and assumptions about future events. Those actual results might differ materially. Our complete disclaimer and related information can be found by referring to our most recent annual information form and other public filings. At this point I'll hand the call over to Randy.
Randy MacEwen
executiveThanks, Kate, and welcome, everybody, to today's conference call. In Q2, we achieved measured progress on the key 2024 deliverables tied to products, advanced manufacturing, and markets — all supporting our long-term strategy. Regarding products, we introduced our ninth generation PEM Fuel Cell engine, which sets a new industry benchmark for PEM Fuel Cell engine performance in heavy-duty mobility. Thanks to an innovative open architecture design and other fresh design advances, the powerful and compact FCmove-XD delivers several significant performance gains versus our prior generation engine, including 120 kW power output from our latest high-performance single stack, a 33% reduction in total part count, which substantially improves reliability and lowers costs. High peak system efficiency of greater than 60%, enabling better fuel consumption and efficient heat rejection. A wide operating temperature range, up to 95 degrees Celsius. The integrated power controller combines a DC-DC converter, air compressor inverter, and a power distribution unit, together with proprietary software controls, enabling improved engine operation and efficiency. Rapid up and down transient times with an innovative hot standby mode, enabling rapid power increase, improved manufacturability with assembly times cut by more than half, and easier access to parts for faster and lower cost field maintenance. Another compelling feature of our new FCmove-XD is scalability based on modularity.
Randy MacEwen
executiveDepending on the vehicle class, the use case, and the duty cycle, we're able to give customers efficient integration across 120 kW, 240 kW, and 360 kW solutions. Take, for instance, two engines producing a combined 240 kW of power output: those can be mounted without much trouble in the engine compartment of a typical Class 8 heavy-duty truck, which boosts standardization and provides redundancy. The FCmove-XD engine comes with a design life of 30,000 hours plus hours of operation — or more than 1,000,000 mi in truck operation under typical duty cycles — and it's built to deliver class-leading durability along with a low total cost of ownership. Some select customers already have initial units in their hands, and the feedback we've been getting has been positive. Market interest keeps growing, and we have manufacturing builds scheduled for the remainder of the year. Turning to advanced manufacturing, we're on track against plan for Project Forge, the program through which we aim to scale graphite bipolar plate production by roughly 10x and cut costs on next generation plates by as much as 70%. We've developed a number of novel manufacturing processes that make full automation of the bipolar plate production processes possible, and we expect that to bring significantly reduced labor costs, better material yield, shorter production takt times, lower energy demand, and the elimination of water consumption from plate manufacturing.
Randy MacEwen
executiveWe anticipate that our new bipolar plate manufacturing processes in Burnaby will be commissioned and optimized by late 2025. Turning to markets, we announced a strategic technology partnership with Vertiv aimed at demonstrating technical feasibility and customer benefits of fuel cell backup power solutions for the rapidly growing data center market. Initial validation tests conducted at Vertiv's Ohio facility have shown successful operation of zero-emission fuel cell backup power integrated into Vertiv's UPS architecture for data centers. We will keep working alongside Vertiv to grasp market requirements, develop an optimized technical solution, and engage the market. I want to offer a few remarks regarding our order book and also broader market adoption. First, regarding the order book. After almost $130 million in total new orders across the previous two quarters, Q2 net order intake came in soft at $5 million as certain customers postponed new orders. Given where the industry stands in its development, we anticipate continued quarterly lumpiness for the foreseeable future. Second, on overall market adoption, it is important to note that although we remain confident in the long-term value proposition of hydrogen fuel cells, the timeline for market adoption is clearly moving to the right. We continue to see a slow pace of contract awards for new clean hydrogen projects.
Randy MacEwen
executiveAs we've mentioned previously, the inflationary and interest rate climate of recent years has had a dampening effect, and that's producing difficult economics for numerous hydrogen projects. Projected policy uncertainty is another factor we're observing, and it's slowing market adoption. Take the U.S., for instance, where uncertainty persists, including the prolonged debate over the rules for the 45V clean hydrogen production tax credit. Industry participants are still arguing about the draft regulations that came out 8 months ago. Whether those rules will be settled ahead of the U.S. presidential election remains unclear. Investment in the American hydrogen industry is being delayed by this, including in large-scale clean hydrogen projects. Policy uncertainty and associated market delays also continue to be visible to us in Europe and China. Broadly, we foresee a multi-year push out in the availability of low cost, low carbon, hydrogen and hydrogen refueling infrastructure, and that constitutes a significant headwinds in our markets, including the truck vertical. In light of this environment, we keep carefully monitoring market adoption indicators and closely examining the pace of our investments and spending. As an illustration, and as Paul will note, we have toggled back our 2024 CapEx spend. Against this backdrop, we want to provide a brief update on our proposed production facility in Texas, where we've been awarded U.S.
Randy MacEwen
executiveWe have secured funding that adds up to $94 million. Our efforts continue as we evaluate whether this project makes business sense. A comprehensive review is underway covering scope, timing, cost, alternatives, and the financial return of the proposed project, and that includes examining how capital deployment timing lines up with market adoption and volume timing. Permitting, conditions, and documentation for the project are also under review, including matters with the U.S. DOE, other funding sources, and items tied to site acquisition. This work matters, and it is underway to help us reach a go or no-go final investment decision later in 2024. We look forward to giving you an update later this year. Before handing the call to Paul to cover our Q2 financials, I want to stress once more that despite the slower timeline for market adoption, our confidence in the long-term direction of travel remains strong, including the important part hydrogen fuel cells will play in decarbonizing the global economy, in heavy-duty mobility markets as well as elsewhere, and in Ballard's long-term positioning. Our focus stays on what we can control, including customer experience, product development programs, initiatives to reduce product cost, and advanced manufacturing capacity planning, all while keeping a strong balance sheet for long-term sustainability. With that, I will now hand the call to Paul.
Paul Dobson
executiveThanks, Randy. Ballard brought in $16 million of revenue during Q2, powered by robust expansion in the bus vertical, which climbed 84% quarter-over-quarter. Revenue from our fuel cell product sales rose 48% year-over-year and accounted for 84% of total revenue, compared with 59% in Q2 last year. That again underscores how we are transforming into a commercial products company. As we've noted in prior years, Ballard's revenue tends to be heavily weighted toward Q4, and 2024 — and 2024 is tracking along a similar pattern. Given the revenue mix shifting toward power products and fixed production overhead costs being carried across seasonally weak revenue, gross margin came in at -32%, which is an 11-point drop from Q2 of 2023. We still expect underlying gross margins to reach break-even in Q4 as revenue grows and product cost reduction efforts deliver more impact. Total operating expenses came in at $36.2 million, and cash operating costs were $30.9 million, with both roughly flat against prior year comparables. Capital expenditures were approximately $7 million in Q2. Our guidance range for total operating expenses stays unchanged. That said, we are lowering our capital expenditures guidance for the year to $25 million-$40 million, down from $50 million-$70 million.
Paul Dobson
executiveIn our view, given where the market stands and how adoption is trending, scaling back capital spending is the sensible choice, and it also lets us use the flexibility built into the timelines of our capital projects. Our balance sheet remains strong, and we closed the quarter with cash and cash equivalents of $678 million. I'll now hand things over to the operator so we can take your questions.
Operator
operatorThank you. We’ll now start the question-and-answer portion. To get into the question queue, press star and then one on your phone’s keypad. A tone will sound to confirm your request. If you’re on a speakerphone, please lift the handset before you press any keys. If you want to take back your question, press star and then two. We ask that callers please keep to one question and one follow-up. We’ll wait briefly while callers join the queue. Today’s first question is from Rupert Merer at National Bank Financial. Please go ahead.
Rupert Merer
analystGood morning to all of you. Perhaps I could begin the questions with your product, that ninth generation of PEM Fuel Cell. Randy, you shared some details with us regarding the performance gains. In what way does that stack up against the competition? And what comes after that for you? From this point, how much further improvement is possible?
Randy MacEwen
executiveMorning, Rupert, and thanks for asking. From a competitive standpoint, I'd say there is definitely a significant amount of investment happening among certain players who are launching products or have plans to launch them. On durability, for instance — that 30,000+ hours of durability — we see that as a major competitive edge for Ballard. On power density, measured either volumetrically or gravimetrically, this FCmove-XD actually delivers the highest power density in the industry for heavy duty applications. Then, looking at architecture and part counts, we keep bringing part counts down, and we believe that matters critically. Another point is the integration of DC-DC and software, along with the air compressor inverter. Together, all of this produces a solution that customers find simpler to integrate, simpler to package, and simpler to service. So overall, we're feeling very, very pleased — not only with the improvement this represents over our prior generation, but also with where it stands in the competitive marketplace.
Rupert Merer
analystLooking back at that technology and cost-cutting roadmap you set out a few years back, where do things stand at the moment? And how much more ground remains before you reach the end of that journey?
Randy MacEwen
executiveYes, that's an excellent question. We pointed to essentially two elements of that plan. The first we termed 3 by 3, which involved targeting a 70% reduction in cost for our stacks. And beyond that, we were also examining roughly a 70% cost reduction on balance of plant components. And of course, the efforts we've undertaken on MEA across the past several years, the work we just outlined today on next generation bipolar plates and enabling lower cost plate production, which ranks, after MEA, as the second most important cost into the stack. And then the efforts we've made on developing engines and the supply chain to reduce balance of plant components. There's substantial work that I would say over the past 3 years, we've witnessed not only the in-house designs, but strong collaboration with what I would describe as a maturing supply chain for new balance of plant components. So, you know, I, I think we've achieved significant progress. We're probably around 2/3 of the way through, perhaps more than that, overall. And we expect to see, you know, over the next 18 to 24 months, kind of completion of these important projects, particularly with the bipolar plate project completing by the end of next year.
Rupert Merer
analystExcellent. I'll stop at that point and rejoin the queue. Thanks.
Randy MacEwen
executiveYeah, that's right. Great, thanks.
Operator
operatorMac Whale from Cormark Securities is up next with a question. Go ahead, please.
Mac Whale
analystMorning, Randy — I've been wondering how we ought to frame that shift when the next generation is introduced. Would your customers be moved onto that product inside a year, or how should we think about it?
Randy MacEwen
executiveSure, good question there, Mac. What I'd say is that it genuinely varies from one customer to another. So certain customers who've already built our products into their platforms and are seeing good results from them may prefer to hold on to those products for some set period, while others might want to shift to newer products quite rapidly. With the newer customers, what I'm observing is that they're aiming to take on the most current technology. And I'd add this as well: engine is purpose-built to appeal to the truck market, and that's where we've seen it. If I sort of break down the markets, we usually consider bus, truck, rail, marine, and stationary. In the bus market, we have products that are mature and field-proven. We actually had an exceptional first half of the year in the bus market, with growth of more than 120% for fuel cell engine deliveries and the revenue tied to that in the bus market. So the bus market has products in place. This engine, though, is designed for the truck market, and I'd say the truck market has been slower to adopt, but we have — bringing out this new product ought to help in terms of sort of catalyzing that.
Randy MacEwen
executiveTo circle back, I also wanted to point out that bus, rail, and stationary are the three markets where we remain fairly pleased with how things are progressing, while truck and marine are the two where I'd say movement is much slower than we had anticipated.
Mac Whale
analystAll right. Now, regarding the backlog, how does that function when you bring out a new generation? Do the orders sitting in backlog represent older products, or can those orders be converted to a newer generation? How should we think about the backlog during a period when a new generation is being introduced?
Randy MacEwen
executiveYes. Nearly all of that backlog is tied to products customers already use. Only a small portion of the orders we have on the books involves new purchases of the XD. That said, I'd expect the XD to account for a larger share of both the backlog and the order book as we get toward the end of this year and into the middle of next year.
Mac Whale
analystAlright. And finally on that point, when we look at how the order book develops over the next couple of years, say on a kilowatt basis, presumably you're passing along some of those cost savings through pricing. So the equivalent dollar value of revenue in backlog going forward would actually reflect a different number of kilowatts. Is that a fair way to look at it?
Randy MacEwen
executiveYes. Absolutely.
Mac Whale
analystAlright.
Randy MacEwen
executiveThe price we charge a customer for each kilowatt is definitely going down. That decline has already been visible across the past few years. What makes this hard for us — and I believe it explains why we put so much money into product development and advanced manufacturing — is ensuring our own costs fall more quickly than selling prices erode, which is how margin expansion comes about.
Mac Whale
analystOkay, and if I could just follow up, my final question concerns the change in the CapEx guidance. Did the earlier guidance figure include any spending on the Texas facility?
Paul Dobson
executiveYeah. Hi, Mac. Paul here. Yeah, yeah, there was a bit, but as we said, we've reduced that to a fairly minimal level this year. We do expect — you know, we're going to make an FID decision later this year. And even if we proceed with it, I still expect the CapEx for that facility to be comparatively modest this year, just given the timing of it. So—
Mac Whale
analystAll right.
Paul Dobson
executiveThere's more I'll share on that in a bit.
Mac Whale
analystAll right, thank you. I have nothing further. Appreciate it.
Randy MacEwen
executiveYeah, Mac, thanks.
Operator
operatorAaron MacNeil from TD Cowen has the next question. Go right ahead.
Aaron MacNeil
analystGood morning, and thanks for taking my questions. I wanted to dig in a little more on those booking deferrals. Can you speak to how large those potential orders were that maybe were close but got deferred? For instance, are they the sort of bigger Siemens or Solaris type bookings, or are they more smaller dollar orders?
Randy MacEwen
executiveMorning, Aaron — appreciate the question. There are, I'd say, roughly 3 major orders we've been pursuing throughout the year, and they've slipped into the back half, we hope. Still, I don't want to put a number on them, though they matter quite a lot to us.
Aaron MacNeil
analystAlright. And moving on — along the same lines, I suppose, as the lower capital expenditures. I understand cost-cutting efforts remain the top priority, but what should we anticipate for R&D spending as we head into 2025? Do you think there will be a decrease there, similar to what we've observed on the capital side?
Randy MacEwen
executiveYeah, I think, Aaron, given how things stand right now and the delay we talked about earlier, we're keeping a close eye on those indicators of market adoption and trying to pace how we invest. So yeah, we're taking a hard look at our investments, and I think you'd probably expect to see some reduction in 2025.
Aaron MacNeil
analystAll right, thank you. I’ll hand it back now.
Randy MacEwen
executiveYeah, Aaron, appreciate it.
Operator
operatorJordan Levy of Truist Securities has the next question. You have the floor.
Jordan Levy
analystMorning, everyone. Appreciate all the detail. I wanted to begin with margins. You might have covered this already, but could you speak to — we know how gross margins landed for the quarter, but was there any shift in that versus where contribution margins for the products themselves landed? And then, along similar lines, any shift in the timeline — given the slowdown in market activity — on the gross margin breakeven side?
Paul Dobson
executiveYes, Paul again. On the gross margin for the quarter, it was just -32%. That came in 4 points above Q1, yet 11 points below Q2 of last year. Within that 11-point year-on-year gap, the bulk came from contribution margin. In both power products, we deferred certain orders into later quarters, and those carried higher margins. We also applied strategic pricing for some key customers, and product mix along with cost played a part, so contribution margin came out lower. Beyond that, revenues in our technology solutions business were lower as well, on active. And margins on active customers were lower too. Partially offsetting this — or offsetting it in part, I should say — were the provisions we took, especially on inventory, inventory write-downs, compared with last year. For older generation products, we did considerable cleanup last year, and that gave us an improvement. So on net — contribution margins down in the quarter, partly offset by better provisions — it meant that in the quarter we were down by 11 points. Turning to the full year, we forecast gross margin improving overall versus last year, and it could land in the range of 5 to 10 points, as you know, depending on the final revenue figures.
Paul Dobson
executiveAs I noted in my comments, we expect Q4 to show positive gross margin. On the contribution margin side, we're seeing gains in power products. So as cost reductions come through and volume grows, contribution margin for power products is rising year-on-year. But again, lower contribution margin from technology solutions is offsetting that—it will have less of an impact over time, but we're still seeing it, and we're going to see it this year. Also, for the full year, we're not—we took a large inventory write-down last year in Q4. We don't expect that to repeat for inventory. And that, combined with contribution margin, will mean our gross margins improve slightly on last year, 5 to 10 points, as I mentioned. I should also mention our fixed overheads are slightly lower, so there's not a big impact or change on the gross margin percentage. As Randy just mentioned, though, we continue to scrutinize all of our spending quite heavily, our spending across the board, and could see a reduction in some of our overheads going into next year, which will help gross margin as well.
Jordan Levy
analystAppreciate that, Paul. Perhaps an update on the Texas facility as well. I realize you folks haven't reached a go or no-go call on it, but my recollection is that when you were evaluating that initial investment, it followed a choice to forgo additional CapEx spending in the China market. So I suppose my question is this. I know all of you are quite knowledgeable and have put substantial effort into the European market too. So when you assess that decision, and as part of it, whatever potential alternatives you might consider, how does that shape up? Or does it essentially turn into a matter of, "When is the right moment to make this move?"
Randy MacEwen
executiveSure, that's a fair question, Jordan. Honestly, one of the difficulties is that the funding we've lined up in the U.S. is really substantial — roughly $94 million in total funding, which includes money from the DOE as well as some of the 48C credits. When you add all of that together, it amounts to a considerable pool of capital, almost a once-in-a-lifetime funding opportunity. The problem is that the overall investment cycle is arriving ahead of market adoption. So what we're really grappling with is making sure we pace Ballard's own investments appropriately, so that when we bring production online, there's demand for that product. Obviously, at this point we don't have an order book for the kind of volume we're discussing for a 3 GW facility in Texas. So we keep working to ensure we have as much time as possible to observe the market adoption indicators before we pull the trigger on capital. That, in a nutshell, is the challenge.
Jordan Levy
analystThank you very much. I appreciate that.
Operator
operatorOur following question is from Soumya Jain at UBS. You have the floor.
Soumya Jain
analystHey, any news on that Solaris order? And what does the supply timeline look like, I guess? Plus, if there's anything more on the order front, or anything from New Flyer too.
Randy MacEwen
executiveSure, Soumya, I appreciate the question. I think it's worth emphasizing once more that our bus market is performing strongly — it rose 84% during the quarter and more than 120% year-to-date, bringing us close to $20 million in revenue for the first half of the year. I also want to point out, regarding the U.S. market and New Flyer, which you brought up, that we're quite optimistic given that the Low-No emission grant program from the Federal Transit Administration in the U.S. has been in place. Awards this year have climbed substantially — they're nearing $300 million, roughly 150% above last year. That's an encouraging signal for bus program growth heading into next year as those Low-No funds are put to use. So that matters a great deal. New Flyer generally places orders later in the year for the year after, so we anticipate some opportunities in the second half of the year for the 2025 order book. And with Solaris, as the figures demonstrate, we've been delivering against Solaris and other bus customers during the first half of the year. We also signed an order for 70 modules, or engines, for Wrightbus, which we discussed earlier this year.
Randy MacEwen
executiveAll in all, I'd say Solaris has placed a few more orders on top of that big one we talked about, though compared with that large order, these have been fairly incremental.
Soumya Jain
analystUnderstood, thanks. So I suppose, in terms of the U.S. rail market, how do you expect Ballard to play out there, more specifically?
Randy MacEwen
executiveThat is an excellent question. In rail, we see chances on the passenger side, and some of those are developing—we're actively pursuing them—along with opportunities for freight locomotives, which we're also working on. So in both of those markets we have meaningful opportunities that we're trying to move forward in the back half of the year. And my belief is that the freight locomotive market will become a hydrogen market. It's simply a matter of when. When you look at that application—heavy trains, long routes—you're dealing with very high power requirements, around 1.2 to 2 MW of power for some of these line haul locomotives. In my view, the only path for them to decarbonize is hydrogen. So we're enthusiastic about both of those markets. I think over the next 6 to 12 months we're going to see important market indicators showing both of those markets in North America—freight as well as passenger—moving into the next stage of development, demonstration, and commercialization.
Soumya Jain
analystUnderstood — thanks.
Randy MacEwen
executiveI appreciate that.
Operator
operatorOur following question is from Kashy Harrison at Piper Sandler. You have the floor.
Kashy Harrison
analystGood morning, and thanks for taking my questions. So, first one, about the deferred orders—sorry if I missed this, but what are your customers saying is driving the deferral of orders? Is it the U.S. elections, or is it something else?
Randy MacEwen
executiveRight, with these particular cases and the opportunities we're talking about, there's no reliance whatsoever on the U.S. election. What it really comes down to is customer timing — you know, getting funding finalized, getting program timing finalized, and making sure their hydrogen supply, their access to hydrogen, is locked in. So those are largely the variables at play, but on these 3 opportunities we're discussing, they're all pretty well in hand.
Kashy Harrison
analystUnderstood. Now, regarding adoption being slower — suppose, purely hypothetically, that the 45V rules got finalized today and qualifying for the credit became far simpler. How long would it take, in your view, before that benefit showed up in your orders and revenues? What kind of lag should we expect?
Randy MacEwen
executiveSure, that's a fair question. The European Hydrogen Bank program strikes me as a useful illustration of how the timing could play out, since it's quite comparable. In Europe, there's a hydrogen bank program worth $2.2 billion, and the initial auction was announced in April of this year, covering 7 projects with roughly EUR 720 million in funding. Those 7 projects are located in Spain, Portugal, Norway, and Finland. Signing is expected by the end of November, yet developers of the projects must begin production within 5 years. A number of them are suggesting they anticipate producing within 3 years, though the program permits up to 5 years. So my way of framing it would be this: if we had clarity in the U.S. market, I'd view 3 to 5 years as the timeline before hydrogen production would genuinely come online at scale for offtake opportunities. What may matter more, in my view, is having that visibility and policy clarity, and knowing capital will be available to back hydrogen project development and the build-out of hydrogen infrastructure — to me, that's sufficient for customers to begin planning their next stage of deployments at larger scale, since certain of these deployments require 3 to 5 years of planning.
Randy MacEwen
executiveSo I don’t think you’ll see anything occur within the next 2 to 3 years, even if, from a scale standpoint, that would be set off by, you know, the regulations being passed. And by the way, the way those regulations are resolved also matters. So, you know, the existing ideas of additionality and regionality and time matching — how they are resolved is going to affect not only, maybe, the timing, but also the scale of that timing through 2030.
Kashy Harrison
analystUnderstood, and that context is really useful. Perhaps this leads nicely into what I wanted to ask about the FID decision in Texas later this year. Do you have any sense of the timing? Could you share a sense of when that might land? Is it a December, November, or October decision? And then, what particular indicators are you and your team watching to help you reach that decision either way?
Randy MacEwen
executiveSure, that call will definitely get made in Q4. Various stakeholders are creating some schedule pressure, so the answer isn't simple, since right now we're in sensitive talks with several of those parties. So the only thing I can tell you is that we're working hard to secure as much runway as we can before any decisions have to be triggered about actually spending on facilities and spending on equipment. And so the gap between contract and actual capital deployment, along with the off-ramps, is something we're taking into account.
Kashy Harrison
analystUnderstood. Thanks for that additional detail. Many thanks.
Randy MacEwen
executiveYeah, that's right.
Operator
operatorOur following question is from Rob Brown at Lake Street Capital Markets. You have the floor.
Rob Brown
analystMorning — hello, everyone.
Randy MacEwen
executiveRob, good morning.
Rob Brown
analystTo pick up again on the mixed signals we're seeing in the truck market, what sorts of things would have to fall into place before that market starts advancing? Is it mainly the government support measures, or is it more about getting nearer to the timeline on some of the clean truck initiatives in California? Just give me a sense of where the truck market stands and how you expect it to unfold across the next 12 to 18 months.
Randy MacEwen
executiveSure, that's a fair question, Rob. One thing that comes through pretty clearly to me is the strong end-market appetite for zero-emission options. On that front, really nothing has shifted. I'd say the ESG pendulum has moved back somewhat, but the majority of big fleet operators we've spoken with as end users remain firmly dedicated to reaching zero emissions across their fleets. So that part hasn't changed. I do believe the vehicle OEMs are, you know, finding it tough to invest across a varied set of technologies. So it's not only cleaner diesel, fuel cells, and in certain cases hydrogen internal combustion engines, in certain cases... and then naturally battery electric, autonomy, and ADAS features. So a great deal of investment is going on, and as a result, directing capital toward the top priority is, I think, a difficult task for the OEMs. And, you know, considering how long hydrogen adoption will take, I think this is simply, you know, timed somewhat later than certain other investments. So, you know, there aren't many OEMs that currently have, you know, trucks ready for fuel cells.
Randy MacEwen
executiveWe've discussed our so-called dual lane strategy: partnering with some big OEMs aiming at long-term market adoption, alongside those scrappier upfitters bringing products to market sooner. As one illustrative case, a partner of ours, Wisdom Motor, is building fuel cell trucks and buses for several markets beyond China. They've made considerable headway on their product lineup, plus market engagement and demonstration projects, in Australia, the Middle East, and Europe among other places. So I'd say both of those pathways are proceeding in parallel, and they're taking longer than we would like. And we're trying to refocus — even on trucks — on applications allowing centralized depot refueling or point-to-point refueling, which lowers the barrier to entry when it comes to hydrogen refueling infrastructure.
Rob Brown
analystAll right, I appreciate the context there. I’ll hand things over now.
Randy MacEwen
executiveAppreciate it, Rob.
Operator
operatorAmeet Thakkar from BMO Capital Markets has the next question. Go ahead, please.
Ameet Thakkar
analystMorning, everyone, and thanks for the chance to ask. Randy, I believe you've brought up the 45V credit a few times during today's session. My question is this: the Section 48C guidance came out at the end of May, and to us it looked fairly strict, and I think some of your fuel cell peers felt the same way. Have your U.S.-based customers made much use of that investment credit previously? And since it takes effect in 2025, are you expecting any demand pull forward in the U.S., at least to get ahead of that date? Thank you.
Randy MacEwen
executiveRight, I haven’t observed any pull forward in that respect, and I also haven’t observed any heavy dependence on this credit when it comes to our market applications. If you look at those market applications, the U.S. market for us at present is very strongly led by the transit bus segment, which isn’t covered by that credit. Usually you’re referring to, you know, Low-No and other federal funding used to support transit operators.
Ameet Thakkar
analystThanks. And then, you mentioned some of the, I suppose, sort of hurdles when it comes to adoption on the mobility side. I was just curious, do you have any news on sort of how your stationary power product is perhaps getting a bit more of a receptive response, sort of given some of the, I suppose, concerns about power supply going forward here, whether that's, you know, as a backup, and so on?
Randy MacEwen
executiveYes, that's an excellent question, and I'd say we're essentially looking at two compelling opportunities in stationary power. The first involves situations where you're either off-grid or dealing with grids that aren't dependable, and you're seeing quite a few applications there—things like filming, filming applications, or event applications—where standby power, backup power, or primary power is needed in any of those scenarios, for what I'd describe as a fairly brief window of time, for an event. So we're seeing that, and construction, for instance, is another market of that type. The one I find genuinely quite interesting, of course, is the data center market. And here we're not discussing primary power, and renewable energy is clearly the key enabler for data centers when it comes to time to market. But once you look beyond primary power and start examining backup power, it becomes very clear that end users want zero emission solutions across their critical infrastructure. And with our announcement of the strategic technology partnership with Vertiv, I think there are roughly four key points worth highlighting. First is this large and rapidly growing market—not only for primary power for data centers, as a result of GenAI and the increase in compute power, but also for the backup power that's required.
Randy MacEwen
executiveThe second point is having a market-leading partner in that space, and we feel very lucky to be collaborating with Vertiv, which holds a strong position in the data center market. The third really involves demonstrating the value proposition, and I'd say there are five main elements to that value proposition when we consider fuel cells for backup power in UPS architecture. First, you're essentially dealing with a single-supplied, highly complex power infrastructure from just one vendor. So Vertiv is essentially handling all the systems integration across all the critical infrastructure for backup power. Second, it's not only zero emissions but low noise as well. And combining those two, when compared with diesel generators, is something you're seeing become more and more important for permitting. Third is relatively low maintenance. We believe hydrogen fuel cells will deliver a cost advantage over diesel generator backup solutions for maintenance in the long run. And then there's extended backup, meaning UPS for days rather than hours. With a fuel cell engine, your sole real constraint is how much fuel storage capacity you have. And finally, there's the ability to optimize your footprint, to fit megawatt scale applications into a tight configuration, which fuel cells let us achieve and batteries do not.
Randy MacEwen
executiveI'd say fuel cells bring quite a few benefits to the table. We are proving out those value propositions and making sure we land on the best possible solution for what I believe could be a market opportunity that changes the game for Ballard, alongside a really solid partner in Vertiv that is putting money into this solution.
Ameet Thakkar
analystPerfect, I appreciate it, everyone.
Randy MacEwen
executiveI appreciate that.
Operator
operatorOur following question is from Craig Irwin of Roth Capital Partners. You have the floor.
Craig Irwin
analystHello there, good morning, and thank you for taking my questions. Randy, could you perhaps share some thoughts on what's happening with pricing? Has much shifted over the past quarter or the past year? Are customers truly sensitive to price, or is it more common for them to base their decisions on functionality and quality?
Randy MacEwen
executiveAbsolutely, Craig, that's a good question. What I'd say is that during the most recent quarter we haven't observed any shift. Over the course of the past year, we have definitely encountered some pressure pushing prices downward. But mostly, you know, that's occurring where customers are examining larger-scale programs at this point and want to scrutinize what their costs are in that context. In the demonstration space, with projects at an earlier stage, I still believe the focus is more on safety, reliability, and durability — making sure that when they put their first bus into service, or their first truck, or their first train, the Ballard technology they've chosen is one they know will fulfill what was promised. So in the smaller orders within the demonstration market, I don't think pricing is what drives the decision, you know, but once you get to orders of higher volume — as we saw earlier this year, for instance, with Solaris, for 1,000 fuel cell buses — then pricing becomes very important.
Craig Irwin
analystThanks for that. My second question concerns positive gross margins during Q4. Could you perhaps break down the risks involved for us? Is the biggest risk perhaps tied to business mix, or do timing issues come into play, or is there any price sensitivity in Q4? What, in other words, ought we to regard as the largest risk to getting to positive gross margins this year?
Randy MacEwen
executiveYeah, so perhaps I’ll just offer a brief remark, Craig, and then hand things over to Paul. From where I sit, one of the biggest risks over, you know, a stretch of time, Q4 revenue is Q4 gross margin, and it really ties back to revenue, and whether you bring in enough revenue to cover your fixed overhead costs beyond contribution margin. And you know, that’s what we’re projecting for Q4. We still require extra orders for that revenue to materialize in Q4, and Q4 could represent 50%-60% of our revenue for the full year, so there’s some risk in that. I’ll let Paul add some further color as well.
Paul Dobson
executiveRight, no, I believe that sums it up. So, you know, we have solid visibility into what's already been booked, along with the margins we anticipate earning on those orders, and naturally our costs too, and we're working toward that. Some portion remains unbooked, but we have strong visibility regarding where those bookings might originate. I'd say the other risk involves possible further deferrals from customers—if they choose to push orders, or deliveries rather, into the following quarter. At this point we aren't seeing much of that for Q4, though that could certainly pose a risk too. So, as I noted earlier in my remarks responding to another question, we don't anticipate the same degree of provisioning against our inventories, meaning our inventory management is considerably tighter now. And as we accumulate inventory ahead of deliveries, we'll see those inventories decline, and we're fairly confident we won't face write-offs anywhere close to the magnitude we saw last year. We completed a great deal of that cleanup effort, which will contribute substantially to gross margin as well.
Paul Dobson
executiveWith all other factors held constant, we anticipate gross margins turning positive this quarter.
Craig Irwin
analystLet me just clarify one thing, though. Randy, you said deliveries this year could reach as much as 50%-60%. For that level of revenue contribution, is the fourth quarter required, or can positive gross margin be achieved at lower levels?
Randy MacEwen
executiveSure, I think as things stand, when you consider the revenue run rates for Q1, Q2, and Q3, those aren't enough at the contribution margins we currently have to reach a gross margin given our fixed overhead cost structure. So you do need to have, you know, enough revenue. So I think, you know, that's among the challenges we face: the fixed overhead cost structure has already been invested in. We need to scale revenue and achieve revenue that's more consistent across the four quarters going forward.
Craig Irwin
analystThat's great. Appreciate you giving me the chance to ask a couple of questions.
Randy MacEwen
executiveYeah, thanks, Craig.
Operator
operatorThat brings the Q&A portion to a close. I'll hand the conference back now for any closing remarks.
Randy MacEwen
executiveYes, thanks for being with us today. Paul, Kate, and I can’t wait to talk with all of you again next quarter.
Operator
operatorThat wraps up the conference call for today. You're free to disconnect your line now. Thanks for joining us, and have a pleasant day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ballard Power Systems Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ballard Power Systems Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ballard Power Systems Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.