Bushveld Minerals Limited (BMN) Earnings Call Transcript & Summary

September 26, 2023

London Stock Exchange GB Materials Metals and Mining earnings 33 min

Earnings Call Speaker Segments

Operator

operator
#1

Hello, and thanks for joining us for the Bushveld Minerals presentation of our 2023 interim results. At this point, I'll pass the call to your host, Craig Coltman, our Chief Executive Officer. Over to you, sir.

Craig Coltman

executive
#2

Thank you, George, and good afternoon, and welcome to the presentation covering our interim results for the six months ended 30 June 2023. I'll soon hand over to our Finance Director, Tanya Chikanza, to talk through the period under review. First, a few words on where we are with some of our initiatives we spoke about on the recent quarterly call. First of all, the improvement measures implemented at Vanchem early in my tenure are starting to bear fruit, evidenced by the increasing monthly production numbers. Since the implementation of these initiatives, Vanchem's performance has improved, producing 160 MTV in July, and then a further 10% on top of that for August, achieving 175 MTV. The average for July and August production represents a 63% improvement over the monthly average for the first six months of the year. August is also the highest production month since Bushveld Minerals took over the asset in 2019. Importantly, these measures were implemented safely without injuries. Now, we want to see these initiatives be maintained sustainably over a longer period, and for Vanchem to achieve the monthly rate of 180 MTV by the end of 2023. We maintain our revised production guidance of between 3.7 to 3.8 MTV, supported by improved operational performance at Vanchem.

Craig Coltman

executive
#3

Regarding financing, we still aim to complete the Orion transaction by December 2023, and the Southern Point Resources deal will leave us in a much stronger financial position going forward. On that point, we have received roughly $8 million in working capital funds, which is part of that transaction. I'll be glad to take questions about these or anything else at the end of the call. First, though, I'd like to turn things over to Tanya to walk us through the first half-year results. Tanya?

Tanya Chikanza

executive
#4

Thanks, Craig. Good afternoon, everyone. During the six months that ended in June, we generated 1,784 MTV of vanadium, up 9% from the same period last year. We also kept reducing our stockpiles, so 2,096 MTV was sold during the period. Our cost for each unit sold came to $33.4 per kgV. That is a 12% drop compared with the previous year, mainly because we sold more volume and because the rand weakened against the US dollar. Adjusted EBITDA profit fell 34% to $10.3 million, the result of a lower realized price, higher cost of sales, and increased other operating costs. That affected operating cash flows, which came in at negative $0.9 million, taxes paid. Because operating cash flow was negative, the group finished the period with negative free cash flow of $2.7 million. At the close of the first half, we had $3.7 million in cash and cash equivalents. We are making headway on both the restructuring of the Orion convertible loan note and the Southern Point Resources transaction that Craig just referred to. Getting these transactions completed will help strengthen the company's balance sheet and contribute towards reducing debt. Craig has already covered most of the points set out in this slide.

Tanya Chikanza

executive
#5

I do want to quickly mention the most important of these, though. Since Vanchem has kept delivering better operational results and Vametco has remained stable, our guidance for group production and cash costs is unchanged. On top of that, we have decided to move 8 days of maintenance on the Vanchem kiln earlier than planned so that the kiln performs better. Because of that shutdown, we expect roughly 130 MTV of production for September. Turning to Vametco: its July output of 132 MTV was hit by unexpectedly heavy rainfall, which forced a plant stoppage because of constraints at the Barren Dam and the Sulphur Recovery Plant. Output has been climbing since then, and Vametco produced 215 MTV during August. Although there has been progress on SRP performance and on Barren Dam levels, Vametco has run into reliability problems at the Leach Plant. We are making headway in fixing those issues. Even so, as a result of this event, Vametco is expected to produce 180 MTV in September, while from October output should be back at the 200 MTV monthly run rate. Finally, as part of our push to get the most out of capital allocation, cut costs, and make the business simpler, we revisited whether it was worth pursuing the mining right application tied to the Bridge Project and decided we should not go after it.

Tanya Chikanza

executive
#6

Given that Vametco's mine life is conservatively put at more than 30 years, the company intends to concentrate on the secured assets it already holds. Now to the income statement. The waterfall chart shown here highlights the factors that affected adjusted EBITDA during the period. The gain from higher sales volume was cancelled out by lower vanadium prices and rising overall costs, which together produced a $5.3 million drop in Adjusted EBITDA, down to $10.3 million. Costs will be covered in greater detail on the following slide. Although an operating profit of $2.1 million was posted, that figure came in $4 million below the prior year, reflecting lower realized sales prices, partly offset by greater sales volumes. As you can see, other major drivers of the $12.5 million net loss included finance costs that rose by $7.1 million, mainly because of interest on the Orion production finance agreement and the Orion convertible loan note. The $3.4 million of other losses is tied to the fair value loss booked on the Mustang convertible loan notes and the extra funding extended to CellCube. Turning now to costs, the group's cost per unit sold for the half year, inclusive of sustaining capital expenditure, came to $33.4 per kgV.

Tanya Chikanza

executive
#7

That works out to a 12% gain versus the previous year, driven by greater sales volumes of 2,096 MTV, which I touched on earlier. This was helped along by inventory sales and a softer exchange rate, and partly countered by rising cost of sales along with other operating costs. Cost of sales went up for a number of reasons: more volume sold, greater use and higher prices of raw materials, increased maintenance expenses at both Vametco and Vanchem stemming from plant breakdowns during the period, and elevated energy costs from higher prices, plus more diesel consumption caused by unscheduled power disruptions at Vanchem. Other operating costs rose by $2.2 million, reflecting items such as greater distribution costs tied to the higher sales, higher idle plant costs, and a write-down of work-in-progress inventory at Vanchem of roughly $1.3 million. Turning to cash flow and capital expenditure: during the six-month period, the group recorded a cash outflow from operating activities of $0.9 million, versus an operating cash inflow of eight point seven million a year ago. That outflow, together with capital expenditure of $4.3 million and the $2.2 million payment of finance costs on the Orion production finance, were the primary drivers of the decline in total cash and cash equivalents to $3.7 million.

Tanya Chikanza

executive
#8

Capital spending came in at nearly 50% of what it was in the same period a year earlier, since 2022 marked the completion of a major phase of investment in capital projects — a stretch during which we carried out substantial refurbishment and optimization work at Vametco and Vanchem and also built the Belco Electrolyte Plant. Now on to debt. Total debt — leaving out lease liabilities of $87.9 million — rose by $4.8 million versus the year before, driven mainly by $6.3 million of capitalized interest. We also received $1.3 million in extra funding proceeds from NESA and the IDC. Those items were partly offset by repayment of $2.2 million in finance costs to the Orion PFA. Net debt went up by $11.1 million relative to the prior year, largely because of the items I just listed along with the $3.7 million drop in the cash and cash equivalent balance — $2, $3.7 million. The money coming from the Southern Point Resources transaction gives us a chance to de-gear the balance sheet by retiring some or all of certain financing instruments that are already in place. Let me just touch on the proposed investment from SPR. Here we'll briefly summarize the recently announced funding arrangement with Southern Point Resources that I mentioned a moment ago. Under this transaction, fresh capital would be injected into the business, which would supply the near-term working capital we need, help bring overall debt down, and support the company in meeting its shorter- to longer-term capital expenditure and optimization needs.

Tanya Chikanza

executive
#9

There are a few pieces to this proposed investment, and I'll go through the key ones quickly. First, Southern Point Resources, our new partner, has given us an interim working capital facility totaling ZAR 150 million — roughly $8.1 million — which is aimed at the Vanchem plant and at easing Bushveld's near-term cash flow pressures. Second, Southern Point Resources is buying 60% of the subsidiary that holds Vanchem, along with a 64% interest in the Mokopane Greenfield project, for a combined $25 million. Third, Southern Point Resources has committed $12.5 million as an equity investment in Topco... in connection with the new marketing arrangement, which includes a $25-$30 million trade finance facility; under that arrangement, Southern Point Resources will handle all marketing and sales of products coming from Bushveld. This should take place across a 5 to 17 month period, as the existing agreements with our current partners lapse. As part of this partnership with SPR, we also have the chance to assess the business case for recommissioning Kiln One at Vanchem. From a going concern standpoint for the group, our ability to keep operating as a going concern hinges on completing the refinance of the Orion convertible loan note and finishing the remaining elements of the transaction with SPR.

Tanya Chikanza

executive
#10

Looking at our present cash flow projection, it shows the group needs more liquidity to cover its obligations and activities over the coming 12 months. We've pinpointed levers within our control and are actively pulling them, and those will supply the group's liquidity. Importantly, the transactions with SPR will bring a significant injection of cash into the group and mark a major step toward resolving this issue. Thank you. I'll now hand things back to Craig.

Craig Coltman

executive
#11

Thanks, Tanya. I’ll give a quick bit of detail on what we’re prioritizing for the second half, and then we can take questions. In recent months, we’ve announced 2 major financial transactions — with Orion and, now, Southern Point Resources. Orion has a December deadline, and by then we’re hoping to achieve meaningful progress on several of the Southern Point Resources transactions. As Tanya said, today we are keeping our production guidance for the year at 3,700 to 3,900 MTV, and going forward, we want Vanchem to reach a sustainable rate of 180 MTV per month, while Vametco should run at the circuit 200 MTV level for the remainder of the year. To boost the group’s profitability, I’ll be concentrating on a range of cost-containment efforts alongside those 2 initiatives. I’ll pause here now and open the line for questions.

Operator

operator
#12

Thanks so much, sir. Ladies and gentlemen, should you wish to pose a question, just hit star one on your phone's keypad. Also, please make sure your mute isn't switched on, so your signal can get through to your equipment. So, to repeat, press star one to ask a question. Today's first question comes from Marina Calero, who is calling from RBC Capital Markets. Go right ahead. Your line is open.

Marina Calero

analyst
#13

Morning, and thanks for taking the call. I’ve got one quick question about operational performance. You showed meaningful improvement in the third quarter. Given what you know now about the progress made to date, what would you describe as the steady-state production levels for Vametco? Thank you.

Craig Coltman

executive
#14

Okay, the connection on my end is pretty poor. Let me share what I caught, and perhaps, George, you can help us out. It concerned operational performance, and my understanding of the question was: what do we believe the steady state of operation looks like for Vanchem and Vametco? Did I get the question right?

Marina Calero

analyst
#15

Yeah, that’s right.

Craig Coltman

executive
#16

For Vanchem, the near-term stable output is 180 MTV. That figure represented the goal of our turnaround program. August was disappointing for us because we hit 175 rather than 180, as we lost two days to power outages. Without that situation, we would have reached 180. I would be happy if we could maintain 180 consistently through the final three months of the year. We're also examining further initiatives, possibly involving different ore synergies with Highveld Steel, which is the new owner of by SPR. Once those synergies begin to deliver results, we'll be considering figures above that. But until we put those extra initiatives in place, the short-term steady state, from now through the near term, will be 180 MTV for Vanchem. For Vametco, we've just completed part of the work on the temporary arrangement with the SPR, along with freeing up additional headroom on the Barren Dam and a few other initiatives there, and again, the steady state for that, from now until the end of the year, would be 200 MTV. In parallel, we will conduct an exercise on a pre-feasibility study to determine what needs to be done to raise it to the next level.

Craig Coltman

executive
#17

But only after we complete that investment appraisal analysis—to figure out whether putting in more CapEx is worthwhile to push those numbers above that level—would we shift our steady state. So near term, it's 200 MTV for Vametco. I hope that addresses your question.

Marina Calero

analyst
#18

That does answer my question. Thanks.

Operator

operator
#19

Thanks, ma'am. Next up is Nick Chalmers from ARC, please go ahead.

Nick Chalmers

analyst
#20

Hello, good morning to you both—or actually, good afternoon where you are, my mistake. I'd like to ask about the convertible loan note refinancing. What are the main obstacles still standing in the way before that restructuring can be completed? And since at least the equity portion of the Southern Point transaction depends to some extent on that CLN refinancing being finalized, is it fair to say you're aiming to wrap up the initial stages of that deal by the close of this year? Or could that potentially slip into next year?

Craig Coltman

executive
#21

Tanya, could you handle that one, please?

Tanya Chikanza

executive
#22

That's great. Hi, Nick. Everyone, Nick, is pitching in to get these deals done before Christmas on our end. The Orion transaction is scheduled for the end of December this year. So, you know, that matters, and, and just that pairing we've laid out there, I mean, I think a few points, obviously, the going concern issue we discuss is really centered on Orion, so it's crucial that we, we, get that finished before then. And I think the market is fairly conscious of that. And then the pairing of the, of the pricing, where SPR will come in at $12.5 million at the same price as Orion, in a sense, you know, ties those two together. Orion is a key partner for our business, and so, even as we carry out the SPR transaction, it's important that, you know, we're collaborating side by side. So what we're really concentrating on right now is the documentation with both Orion and SPR, as for the second element, the 50% disposal to Orion, and then the equity component.

Nick Chalmers

analyst
#23

Okay, so on the SPR transaction, do you see the equity piece of it — that $12.5 million — and the sale of 50% of your stake in Vanchem happening at the same time, roughly?

Tanya Chikanza

executive
#24

Yes, they’re all taking place simultaneously this year—same timing across the board. We’ve got all of it in motion at once.

Nick Chalmers

analyst
#25

Alright.

Tanya Chikanza

executive
#26

When it comes to the precise dates, I’m not able to be too specific — to say that this one is happening today and the next one, you know, tomorrow.

Nick Chalmers

analyst
#27

Mm-hmm.

Tanya Chikanza

executive
#28

Everything is being worked on at the same time, you know. Yeah.

Nick Chalmers

analyst
#29

Sure.

Craig Coltman

executive
#30

Next is absolutely correct. We're working on everything simultaneously, but in terms of the sequencing of those events, what we'd like to see is the sale of Vanchem happen first, and that's absolutely aligned with SPR. You know, followed thereafter with the Orion deal, and shortly thereafter, the SPR deal, for obvious reasons, because of the alignment of the share price. So we are working simultaneously, but there's no reason why the Vanchem sale can't happen in advance of the Orion deal and the SPR deal. Those. The last two need to happen very close together, but there's no reason why the other one can't happen sooner. And that's what we'll be pushing with the SPR guys. Thank you, Nick.

Nick Chalmers

analyst
#31

Got it. That's excellent. Thank you.

Operator

operator
#32

Thanks, Mr. Chalmers. Ladies and gentlemen, one more time: should you have any questions, just press star one on your telephone keypad. We're now going to Thomas Martin, who's calling from BNP Paribas. Please go ahead, sir.

Thomas Martin

analyst
#33

Good afternoon. First, a quick clarification. What is the Orion maturity date — originally November — and has it been pushed back by one month? And if so, what's behind that?

Craig Coltman

executive
#34

Tanya, would you like to clear that up? The month is actually December.

Tanya Chikanza

executive
#35

Yes, and this is really a technical detail, Thomas: we did sign into the deal in November. But when it comes to the cash actually moving, and so the closing of the transaction, that happens in December. So the final date by which we're able to pay, I believe, is 21 December 2023.

Thomas Martin

analyst
#36

And then there's one more thing there. I believe you brought up during today's announcement some reliability issues at the Leach Plant. Sorry if you already went over this right at the start of the call.

Craig Coltman

executive
#37

Right.

Thomas Martin

analyst
#38

I missed the opening part. Is there any more detail on those reliability issues — any material costs to fix them? Yeah, are there any material costs to rectify that?

Craig Coltman

executive
#39

I wasn't able to hear what was asked.

Thomas Martin

analyst
#40

Oh, my apologies.

Craig Coltman

executive
#41

Could you ask that a different way? Your audio is coming through really weakly on your end.

Thomas Martin

analyst
#42

Sorry about that. Let me try speaking directly into this microphone and see whether that works any better. I believe the announcement today referred to some reliability issues at the Leach Plant. My apologies if this came up at the beginning of the call — I was occupied for a few minutes early on, so if you covered it, I missed it. Could you share any additional details specifically about those reliability issues, and would fixing them call for any material cost?

Craig Coltman

executive
#43

Right, thanks. So regarding the leaching plant process, it runs from where things finish at the kiln — meaning regrinding, leaching, and filtration, that entire flow. A few maintenance problems came up with the leach unit itself, and those have been taken care of. What we discovered, though, is that the supplier — I believe it was July, August, during their short shutdown window — did the lining inside the mill improperly, and they returned at the end of August, early September, to redo the mill lining, and that was at their cost, not ours. So it's resolved at this point, and we're ready to go across the whole leaching plant process to return to the 200 MTV. So some maintenance on the leaching side, but the major work involved relining the mill for the second time in 2 months. The supplier covered that cost, though, since their first attempt wasn't done right.

Thomas Martin

analyst
#44

That's very clear. Thanks a lot. One last thing: you brought up the cost-saving initiatives. I was wondering if you could elaborate a bit more on those. Are they confined to savings on operating costs, or do you see potential as well to achieve savings on the group administrative cost side?

Tanya Chikanza

executive
#45

Which side would that be?

Thomas Martin

analyst
#46

Regarding administrative expenses for the group as a whole—and not solely that one piece.

Craig Coltman

executive
#47

Oh, all right.

Thomas Martin

analyst
#48

The costs at the asset level.

Craig Coltman

executive
#49

I hear you. No, no. Nothing's off the table. Nothing's off the table. The operation's operating costs, and very much what goes on in the corporate center. Be it costs, labor, each and every activity is on the table for review and for cost curtailment.

Thomas Martin

analyst
#50

Thanks a lot. That's very clear. With my mic.

Operator

operator
#51

Thanks, Mr. Martin. Ladies and gentlemen, one last reminder — if you have questions or follow-ups, please press star one now. We'll pause for just a few more seconds to let you signal. Our next question comes from Sergei Ravski, calling from SP Angel. Please go ahead.

Sergey Sheremetiev

analyst
#52

Good afternoon, everyone. Thanks for making the time, Craig and Tanya. I have a quick question. First, regarding your production target at Vanchem and Vametco, at monthly rates of 180 and 200. I just wanted to see how you — if you risk those numbers, how confident are you in those targets, and what would you say are maybe the top risks to those numbers, as in, perhaps reliability of power supply? How much of a cushion is there, if, you know, you run into some of those again — power supply issues or maybe, like, weather issues — how confident are you in those numbers?

Craig Coltman

executive
#53

Yes. Thank you. I mean, I believe those figures are realistic. If we encounter major external headwinds — whether that's labor unrest or power — then we're exposed. But we do everything possible to reduce that exposure. Our relationship with the authorities at the Vanchem local municipality is really strong, so that risk is minimal. We also have a solid stakeholder engagement plan with the community, and it's managed well. Again, that risk isn't eliminated, but it is significantly mitigated. I think the plants have been under-maintained in recent times, and we do see some volatility. That's something we're going to fix with a proper planned maintenance system. So there's always some element of risk. That said, when we gave you the market guidance in early August, at the time we were thinking of an approximately 3-week shutdown for Vanchem in September. That didn't materialize for various reasons, and we kept that plant running. It was a calculated risk because the kiln needs to be relined every 12 months as part of a planned maintenance system. We sweated that asset to 18 months, and in September, we found some real hot spots coming up on the kiln.

Craig Coltman

executive
#54

We took it offline for 8 months in order to reline roughly 6 meters of the kiln. We are awaiting the final report on that brief shutdown, but the team's view is that we can proceed into Q1 until the next shutdown comes around. That means even though we lost eight days in September, we probably won't need the three-week shutdown in October. So we recover roughly two weeks. There is therefore a modest bit of headroom, or room for contingency, though not much. So I believe the prudent statement is that, given the current data and the current outlook, we are realistic to hit that market guidance. I hope that answers your question, Sergei.

Sergey Sheremetiev

analyst
#55

Yes, that does. Thanks, I appreciate it. And there's probably another one for Tanya. It concerns whether you could provide guidance on, sort of, how working capital is expected to move in the second half, and on the tax you anticipate paying. I mean, since vanadium prices stand where they do relative to the first half, one shouldn't really expect substantial tax payments, but if you could give us that guidance, it would be really helpful.

Tanya Chikanza

executive
#56

Thanks, Sergei. So clearly, you saw the figures for what we sold in terms of units, and what the cost was for those units. What we're observing in the market right now is that while prices are still holding up fairly well in the U.S., which is where the bulk of our sales are made, we're seeing near-term pricing soften in Europe and China. That, of course, affects our working capital, along with the CapEx we still anticipate spending during the second half. I think that's really the main guidance point, and it will always be fairly closely linked to what we're seeing with those softening prices. But having said that, you saw that 47% of our sales are in the US, so that gives us a bit of a cushion.

Sergey Sheremetiev

analyst
#57

All right, and only to make sure I understand — apologies, I just want to ask a follow-up. So you’re anticipating yet another, say, negative cash flow stemming from working capital during the second half? Or are you — how should I put this — going to discuss it in a way where you have something that’s, I know, either balanced or perhaps a positive change in working capital?

Tanya Chikanza

executive
#58

When you consider where our stock stood at the start of the year, that explains the sales figures you're seeing—quite a high level of sales—because early in the year we actually drew down a significant portion of our inventory left over from the prior year, and then we began production. So as for our stock, we aren't carrying excess inventory in reserve. And if you factor in that we did have some shutdowns in August, along with the one currently underway, we don't hold that surplus stock that we'd be looking to sell into the market in order to alter the picture I've just described for you. So, the big clear point—obviously, we place great emphasis on containing costs and simply managing things on a unit sold per unit sold basis. But prices right now are looking soft, and I believe that's the guidance you should be taking away from that.

Sergey Sheremetiev

analyst
#59

Alright, understood. Thanks.

Operator

operator
#60

Thank you, Mr. Ravski. Since no more questions remain right now, I'll hand the call back to Mr. Coltman for any extra or closing comments. Thank you.

Craig Coltman

executive
#61

Thanks a lot for that. These results do reflect a tough stretch for the company, but I have confidence that the steps we've already taken in the second half, along with hitting the key priorities we laid out today, will produce a far more improved and focused business down the road, which ought to then begin translating into considerably better financial numbers. Thanks to all of you.

Operator

operator
#62

Much appreciated, sir. Everyone, that brings us to the end of today's call. We're grateful that you joined us. You're welcome to disconnect at this point. Take care and farewell.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Bushveld Minerals Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Bushveld Minerals Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Bushveld Minerals Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.