Barrick Mining Corporation (ABX) Earnings Call Transcript & Summary
August 9, 2021
Earnings Call Speaker Segments
Operator
operatorFor the presentation portion, everyone is in listen-only mode. After the presentation, we'll hold a question and answer session. At that point, if you have a question, please press star followed by one on your telephone keypad. Whenever you need operator assistance during the conference, please press star and zero. As a reminder, this conference call is being recorded, and a replay will be available on Barrick's website later today, August 9th, 2021. I'd now like to turn you over to Mark Bristow, Chief Executive Officer. Please go ahead, sir.
Mark Bristow
executiveI appreciate that. Hello everyone, and welcome to the presentation of Barrick's Q2 results. Even with that brief period of value-creating consolidation that came before the pandemic, my sense is that our industry remains overly fragmented and must raise its sights and pay somewhat more attention to what lies ahead. Since the turn of the century, we've been benefiting from a gold price that keeps climbing, without placing much emphasis on substituting the ore bodies we mine with ones of comparable quality. As I've often remarked, having gone through the previous gold price boom without generating any genuine value, the gold industry—and, honestly, a great many investors in this sector—still finds the appeal of instant gratification hard to resist, and that comes at the cost of investing in the future and in sustainable profitability, as we saw between 2013 and 2015. Barrick, by contrast, takes a fundamentally contrarian stance. What we pursue is a long-term strategy built to steward the industry's finest asset portfolio and project pipeline so they deliver the strongest returns for every one of our stakeholders across the longer term and well beyond into the future. As this presentation will demonstrate, all of our major mines now possess reality-based 10-year plans that are presently being refined, and the team's task is to extend that view to 15 and even 20 years.
Mark Bristow
executiveI'd like to draw your attention to the cautionary statement on this slide, which you can also find on our website if needed. At a moment when ESG topics draw the market's close attention to our industry, Barrick's environmental, social, and governance strategy has been developed across many years and was not hastily assembled just to tick compliance boxes. It sits at the core of the business, spanning everything from biodiversity management to diversity on the board. Our approach specific to climate rests on climate science, not on wishful thinking, and features targets that are ambitious yet realistic along with results we can measure, all of which we disclose in a transparent and thorough manner. Safeguarding our employees' health and safety forms a central element of that strategy. Although lost time injuries fell once more in quarter two, that accomplishment was cast in shadow by the death of a contractor's employee at our Hemlo mine in Canada following the close of the quarter. An investigation of this tragic accident is in progress, and we are continuing to support the family in the interim. On the environmental side, no Class one incidents occurred during the quarter. We keep working to maximize our rates of water reuse and recycling and remain firmly on track toward our water efficiency target of at least 80% by the end of this year.
Mark Bristow
executiveConsistent with Barrick's flat structure and decentralized management approach, the climate change strategy for the group is being put into practice on the ground, and every site adapts that strategy so the best local result is achieved. We keep looking for new technological developments capable of speeding up or improving these plans. We've also carried on with the independent human rights assessments begun in Q1, and a review of the Kibali operation was finished during this quarter. These constitute the group's KPIs, and as you can see, it has been an extremely busy quarter for us. I will address these as we move through the presentation. What we did at the time of the merger 2.5 years ago is plainly paying off, as shown by another sector-leading cash return to shareholders — an effective $0.23 for the quarter, comprising the base $0.09 dividend plus the second $250 million tranche of the shareholder-approved return of capital. A strong foundation has been created for reaching our vision of managing the best assets with the best people to achieve the best returns, and Barrick's future depends to a great extent on what we are doing now. On that point, I'm delighted to report that, on a group basis, we appear set to replace the reserves depleted by mining this year with ounces of at least the same quality.
Mark Bristow
executiveWe're growing our footprint in additional nations across promising gold regions, and the exploration work we're doing in greenfields is turning up encouraging chances for fresh discoveries. It's also pleasing to see that every one of our big capital projects has advanced considerably. Even with some notable obstacles, we turned in a solid set of operating results. A mechanical failure of a kind never seen before at the Goldstrike roaster hit the North American region, yet Africa and the Middle East and LATAM, America, and Asia Pacific all did well and are tracking toward the upper end of their production guidance, which makes the worth of Barrick's worldwide footprint emphatically clear. As you'll observe, when the quarter closed we held over $5 billion of cash on the balance sheet, even after some sizable cash outflows during that period. Beyond delivering one of the industry's top shareholder returns through dividends and return of capital, the second quarter is likewise when most of our tax obligations fall due and interest on our bonds gets paid. On top of that, we made royalty and tax prepayments to back some host countries' COVID campaigns. It deserves mention that our attention to the future, which I'll cover in greater detail in the presentation, isn't stopping us from rewarding our investors right here and right now, and it's what will let us continue rewarding them down the road, a strategy I'm confident will set us apart over time.
Mark Bristow
executiveLet's begin our review of operations in North America. During the quarter, Nevada Gold Mines hosted its first virtual tour, and if you missed it, the detailed presentations remain available on the NGM website. In its brief existence, Nevada Gold Mines has accomplished a great deal. Both the mines and the management team have been successfully integrated into a Barrick-style structure, and the company has also rolled out a series of programs aimed at securing recognition as a valued partner to the state and the community. Through establishing the Mining Education Tax—an excise tax that will go directly toward funding education in the state—Nevada Gold Mines and Nevada's mining industry as a whole have cemented that partnership. This stands as an example of true collaboration between industry, legislators from both sides, and the governor's office. Across the region, non-core assets within the North American portfolio have been brought to account thanks to the higher gold price. Meanwhile, elsewhere in the region, we are leading the industry in re-examining how we manage closure sustainably, such as reprocessing tailings at Barrick's Golden Sunlight closure property in Montana. Nevada is far from a mature gold province, and plenty of opportunities exist for significant reserve additions, as well as new world-class discoveries.
Mark Bristow
executiveMeanwhile, steady advancement is being seen at both Goldrush and Fourmile. Carlin experienced a difficult quarter. Right after the successful completion of the annual maintenance shutdown at both roasters, a failure occurred at one of the Goldstrike roaster mills, which cut throughput at that mill by roughly 40%. It's a pleasure to tell you that the team met this challenge head-on — raising throughput at the mill still in operation, modifying ore blends, and giving priority to high-grade oxide underground ore at the Cortez Mill. The repairs at the Goldstrike mill ought to be finished later this quarter. What this chart emphasizes is the earlier point I raised — that Nevada is far from a mature gold region. Exploration keeps delivering meaningful reserve additions, refinements to the geological model, and fresh conceptual targets, which I'll get into. At Leeville, resource drilling is producing especially robust results, as the slide shows. High-grade continuity has been confirmed, along with the possibility of linking up adjacent high-grade intercepts, and to the east a significant intercept has broadened the mineralized footprint. A maiden resource at North Leeville is expected by the close of this year, in line with plan. Cortez was likewise affected by the Goldstrike mill failure. Guidance there is unchanged, thanks to the earlier reference I made to boosting oxide mill and heap leach output.
Mark Bristow
executiveOver in the Cortez area, we've seen tremendous advancement at the Robertson project. Recent work has verified the four million ounce potential there, and our goal is to finish a pre-feasibility study before this year is out. The deposits remain open in several directions — the drill results from the distal portion of Robertson demonstrate that — and we've also generated new targets in the space between Robertson and the world-class Pipeline mine. That's an area that hadn't been tested before but holds high promise. It's one more example of how much remains for us to learn and the upside still ahead of us. We also finished the Goldrush feasibility update in the quarter, and total initial capital is now expected to come in somewhat below the roughly $1 billion estimated in the prior study. That study will back the conversion of reserves in the new year and mirrors the plan of operations filed as part of permitting. We anticipate the notice of intent will be published in the Federal Register very shortly. That positions the program so we can expect — and we do expect — the record of decision in Q4 of next year. Significant room for future gains in project economics still exists, thanks to resources that were not included in the feasibility study.
Mark Bristow
executiveNaturally, Fourmile sits right next to the Goldrush ore body. Simply put, the revised study reinforces our conviction that this asset is world-class and comfortably surpasses our investment criteria. The high-grade Fourmile project, which Barrick owns, also qualifies as world-class. Our view remains firm that its complete potential is yet to be realized. As we told you during the previous quarter, the plan is to reach it via Goldrush for underground exploration that would grow the resource. Right now we are assessing the optimal approach for mining this project in the end. Turquoise Ridge may well be the Nevada site offering the greatest upside. That said, the complex — encompassing the Twin Creeks mines and processing facilities — arrived with numerous difficulties. We have since enhanced the geology, refreshed the models, and, building on that work, delivered a revised mine plan with high confidence. Upgrades at the plant plus fresh spending on underground equipment and ventilation should produce better performance starting in this year's second half. Consistent with Barrick's clean energy strategy, Turquoise Ridge is presently testing four 50-ton electric trucks, and, as happens with every piece of cutting-edge technology, we are addressing certain early-stage difficulties involved in making sure the batteries are sturdy enough for underground operating conditions.
Mark Bristow
executiveAt the same time, building of the mine's third shaft is proceeding on schedule and on budget, and sinking has just hit its final depth. We expect commissioning of that shaft late next year, and at that point it should begin to help relieve bottlenecks by raising hoisting capacity, supplying extra ventilation — which is among the factors limiting expansion of production from Turquoise Ridge underground — and, naturally, cutting haulage distances. Our emphasis on high-quality geoscience and on grasping the geological framework and the controls on mineralization is yielding numerous targets in the gap between the giant Turquoise Ridge and megadeposits. Recent drilling supports our model and affirms the potential for meaningful brownfields discoveries in that area. This truly is among the most exciting prospective areas within the Nevada Gold Mines district. Elsewhere in Nevada, Phoenix and Long Canyon both posted good quarters. Robust copper by-product credits lowered costs at Phoenix, while Long Canyon kept delivering outstanding margins. At Long Canyon, a review aimed at optimizing the project is ongoing, and the present expectation is that the mine will enter care and maintenance in Q1 of next year. In Canada, Hemlo's reinvention as an underground operation was held back by COVID travel restrictions, which have affected the Australian contractors with whom Barrick has worked very successfully in Africa.
Mark Bristow
executivePerformance at the mine fell short, and it is now tracking toward the low end of 2021 guidance. Even so, work to transform the underground operation is moving forward, and extraction from a new portal is slated to begin during this quarter. On the exploration front, we keep working to pin down possible additions to resources that might push the mine's life past 2030. Considerable headway has already been achieved in outlining targets lying beyond Hemlo's present mine plan, and drilling done recently has pinpointed the E Zone beneath the western portion of the old open pit. It is also worth mentioning that we are lucky to enjoy backing from our First Nation partners as we work to safeguard Hemlo's future. Looking farther out, throughout Canada's goldfields, we remain on the lookout for fresh opportunities that can clear our investment criteria. My own view is that Canada will be taking on a growing role in Barrick's future. Over at Donlin in Alaska, I am growing more at ease that we are coming to grasp the basic traits of the ore body — or ore bodies — more clearly, along with a sharper spatial picture of where the metals and ore types sit. That is the piece that will lower risk in the mine plan and bring added value to the project.
Mark Bristow
executiveThis work is essential if we're going to build a better, more thoughtful mine plan and use it to make a sound call as we move toward refreshing the 2011 feasibility study. Separately, we hold an intriguing set of study-stage assets. That includes potentially world-class ones such as Donlin, Alturas, Norte Abierto, and Pascua-Lama. They're all big, capital-heavy projects, but we keep grinding away and reducing risk so we can either reach a sensible development decision or find other ways to pass the value along to our shareholders. In Latin America, the Asia-Pacific region beat its quarter two production target, with Veladero leading the way after a strong showing driven by better ore stacking and new ounces coming from the Phase six heap leach facility that was recently commissioned. Expenses across that region also came in below plan. At Pueblo Viejo, output took the expected hit from the planned autoclave maintenance shutdown, yet the mine is still well-positioned to hit its annual guidance. The plant and tailings expansion project — built to unlock nine million ounces of reserves and stretch the mine's life past the 2040s — carried on, and processing plant work is slated for completion by the end of 2022.
Mark Bristow
executiveTalks about where the new tailings facility will go advanced significantly, as Barrick and the parties that could be impacted agreed to an independent environmental impact assessment led by the government, which will run alongside the third-party studies we are conducting ourselves. Even with that progress on the expansion project—including the engagement we continue to carry out with local stakeholders so that our social license is maintained—the project's timeline has slipped somewhat. Our plans do contain a cushion, though, and the new storage facility has to be finished and in operation by Q1 2026. Turning to exploration, at Pueblo Viejo the work on the Zambrana target keeps outlining a 1.5 km long target striking northwest, with strongly mineralized rock and soil samples located inside the mine lease area. That target reaches past the lease boundary, and there Barrick holds rights via a joint venture; we will drill it out after the required permitting process is finished. We now move to Veladero in Argentina, where heap leach processing was curtailed during the first half of the year as the mine made the transition to the new phase six facility. That facility was successfully commissioned on time in Q2 and in line with guidance, which supported production above forecast and a solid performance across the board—and further improvement is expected in the second half of the year.
Mark Bristow
executiveAlthough the main exploration goal is to prolong Veladero’s operating life, we are simultaneously evaluating fresh possibilities in the area linking that mine with our close-by Lama project, located on the Argentinian side of Pascua-Lama. Work with drill rigs across this district has already established that a broad gold-copper mineralized system exists within the stratigraphically significant zone lying between the Pascua-Lama deposit and the Penelope porphyry target close to Veladero. On this slide you can see this target, and we call it Lama East. It belongs to a portfolio of known and highly promising targets that will guide upcoming work. This district plainly offers substantial exploration upside. Indeed, as winter ends, we intend to be in a position to bring in roughly 12 drill rigs across this region. At the same time, looking considerably farther afield, our exploration group keeps producing new targets along the southern portion of the El Indio Belt. Having finished the first stage of mapping, assessing, and ranking the different targets, we anticipate beginning to drill in that district during this quarter. Our recent move into the Guiana Shield forms part of the strategy for broadening the frontiers of our exploration. In that country, we have already progressed beyond generative activity toward assembling a meaningful land package via several exploration earn-in transactions.
Mark Bristow
executiveThe Makapa Project, spanning a substantial portion of the country's prospective Kuruni Basin, shares strong geological parallels with our West African operations, and we'll bring that know-how to bear as exploration begins there. Turning now to Papua New Guinea, where reopening the Porgera mine depends on finalizing several agreements. That comes after a binding framework agreement was signed with the government earlier in quarter 2. The mine remains on care and maintenance, though we've begun opening access to the pit bottom and the underground workings. We've also begun assembling a leadership team ahead of restarting operations, while at the same time the government is conducting the community and landowner consultation process. Moving further around the world to the Africa and Middle East region, this region turned in its customary strong results and remains on track to hit the upper end of its annual production guidance. In Mali, Loulo-Gounkoto beat its forecast for the quarter thanks to strong plant performance and held costs under plan. It also built full-grade stockpiles, which will add operational flexibility into next year. One highlight of the quarter was first ore delivered from the complex's third underground mine at Gounkoto, in line with guidance.
Mark Bristow
executiveYalea Ridge — which is also within the Loulo-Gounkoto complex and sits right next to the Yalea open pit — has lately come forward as what could be an exciting new discovery, and results keep delivering striking intersections. Drilling is now in its second phase. The Loulo district is still a very prospective one. Our work at the Boundiali joint venture and on the Senegalese side of the border is ongoing, and during the last two exploration seasons we screened a huge area stretching 40 kilometers. We think there is strong potential for a significant new discovery, or a series of them, and we are working to consolidate an even bigger land position in the district. On the other side of the river, there is a sharper focus on expanding exploration targets so as to replace reserve depletion from mining at both Gounkoto and Loulo. Tongon, in Cote d'Ivoire, stayed on course to meet its annual production guidance, as greater throughput offset a slightly lower grade. Encouraging brownfields exploration results indicate strong potential for extending the mine's life. We have just had confirmation that the Tongon mining lease has been extended by 10 years. On the nearby permit that hosts Tongon, drilling at the Seydou South target has outlined a plunging shoot of high-grade mineralization, which raises the odds of finding new satellites near the plant.
Mark Bristow
executiveOver at Boundiali, we've identified a new mineralized target at Karibou, and we're still looking into whether those targets can feasibly be mined and fed into the Tongon plant, which sits roughly 40 to 70 km away. Moving to Central Africa and the Democratic Republic of Congo, Kibali's output came in well ahead of plan thanks to higher grades, and it's on track to hit the top end of its yearly guidance. That mine continues to lead the world in automation. Incidentally, in the quarter it brought in predictive maintenance software, which draws on machine learning to help pinpoint failure modes at its hydropower stations. Back to Kibali: three targets currently stand out from the exploration portfolio. Deep drilling has verified that the folded mine sequence hosting the exceptionally high-grade KCD ore bodies remains present 500 meters down plunge beyond the boundaries of the current resource. In my view, this is an incredible ore body, and I'm certain it still holds plenty of welcome surprises for us. Along the highly prospective KZ zone, deep drilling at Kalimva is just getting underway. Recent drilling results have verified that the high-grade mineralization isn't limited to plunging shoots alone — there's also potential for down-dip extensions to be mined from underground.
Mark Bristow
executiveThere's also the MMR target, which is drawing our interest right now. It shares a lot of characteristics with the primary KCD ore body, and as you can see on this slide, it sits quite near the Kibali processing facilities. Moving further east and south, North Mara in Tanzania kept raising its underground productivity and hit an ideal mix of fresh ore from underground and lower-grade stockpile material. We expect another gain once the new mining fleet shows up in the second half of the year. By the way, we've just named a Tanzanian general manager at North Mara, which fits Barrick's worldwide practice of hiring host country nationals—not just as workers but in key leadership roles. Over at Bulyanhulu, underground mining and processing kept ramping up as we lift this long-life, low-cost mine to Barrick standards. Work on an optimized mine plan keeps moving forward, and steady-state annualized production should come next year. Meanwhile, Barrick keeps expanding its footprint in Tanzania. In July, we received 19 new permits across multiple greenstone belts nationwide, and we're waiting to hear on our applications for additional ground. Our copper portfolio once again delivered a major contribution to Barrick's bottom line.
Mark Bristow
executiveHigher throughput and grade at Lumwana pushed production up, and we expect that trend to carry into the second half of the year. Jabal Sayid also delivered a good quarter and remains on track to hit its annual guidance, while more than replacing depleted reserves. High-grade ore from newly identified feeder zones points to a material extension of life of mine. Veladero keeps recovering from the impact of Chile's COVID restrictions and has significantly advanced its chloride leach project, which is scheduled for completion in the first half of next year. As part of expanding our global footprint in pursuit of new discoveries and opportunities, we secured four exploration licenses covering over 2,900 square kilometers in Egypt's well-endowed Eastern Desert region. Those license areas were chosen for their structural and geological similarities to the world-class Sukari deposit. When Barrick and Randgold merged two and a half years ago, one of our objectives was creating a modern business with a flatter, leaner structure and highly efficient executive oversight. That has let us cut general and administration costs by more than 30% in absolute dollar terms, while at the same time increasing revenue.
Mark Bristow
executiveLooking at it from every angle, our corporate costs have fallen well below those of our peers right now, and this slide illustrates that. When we merged, one of the central fundamental objectives was to create genuine value for shareholders by running operations more effectively and making the business leaner. This slide shows how we've delivered on those goals across a range of metrics—from stronger cash flow and better returns for shareholders to more cash on hand and a stronger balance sheet. And finally, ladies and gentlemen, as I've said many times, we're pursuing a long-term strategy, built to produce sustainable output and profits at whatever gold price one might reasonably imagine. As we told you at the beginning of the year, a 10-year runway lies ahead of us, backed by mine and business plans put together using a conservative assumption of $1,200 per ounce for gold. Our team has made solid progress, yet work remains before we fully unlock the potential at Nevada, Pueblo Viejo, Veladero, and Porgera. Beyond that sit already identified opportunities in the pipeline, such as Fourmile, Donlin, and the South American portfolio. Following that, the focus turns to investing in our future via our fast-moving greenfields initiatives, which I strongly believe will deliver meaningful value in due course.
Mark Bristow
executiveEven though we're staying grounded and realistic, we're definitely also watching that wide blue sky overhead. We appreciate your time, and we'll gladly open the floor to your questions.
Operator
operatorThe opening question is from Greg Barnes at TD Securities. Go ahead.
Greg Barnes
analystYeah. Thanks. Mark, one thing I noticed is missing from everything you said about the press releases — there's no mention at all of inflation pressures or cost pressures. A number of your peers have pointed to 3%-5% upside on costs through 2022, yet it doesn't look like you're experiencing those same pressures.
Mark Bristow
executiveNo, Greg, I think there's a bit of pressure there. It really hinges on how you see oil and gas prices. That's likely around 1%. Looking at where we stand year to date, we're on track with our budget. If you take today's spot price and extrapolate it through the end of the year, that adds roughly 1%. On top of that, factoring in a higher gold price contributes another %. You probably know better than I do that the cost issue across the gold sector is frequently driven more by grade than by actual costs. From our side as well, steel is where the other cost pressures sit, as you're aware. On our major capital projects, we saw a small impact at Pueblo Viejo from some logistics-related delays, though we've since caught up, and most of the steel for the remaining projects — including the bulk of the PV steel — was already pre-ordered. Also, when COVID hit, we raised our stockholding of consumables and have maintained it at that level, which helps us in managing this. The other significant cost pressure comes from supply chain difficulties worldwide as the globe recovers, or begins planning to recover, toward normal conditions.
Mark Bristow
executiveOnce more, our teams have delivered a great deal of flexibility. In the past, we had lengthy supply chains originating in Africa. We work with several suppliers, which has let us avoid getting trapped when a single supply chain suffers a serious logistics disruption. Beyond that, we have simply gotten far better at consolidating shipments. On the whole, though, I don't think we're yet where we want to be. When it comes to logistics and supply chain management, I'm paranoid, so more work remains. In Nevada, we have removed hundreds of millions of dollars in costs. At Pueblo Viejo, we're genuinely gaining ground. Down in Argentina, we still face difficulties stemming from the financial crisis, the currency crisis, and all the restrictions we're dealing with. Apart from that, across the board there are of course costs and efficiencies. The more efficient you get — everyone talks about technology, automation, and that kind of thing. As you're aware, we've only just begun to see the earliest benefits from the rollout of a brand-new data platform and all that goes with it. When we merged with Randgold, our goal was to substantially boost our management's capacity to report on real-time data.
Mark Bristow
executiveThat brings significant efficiency with it. We are only beginning to realize those gains. There are, I believe, another three mines left to complete, and after that the focus is on ensuring we actually capture the benefits. We have invested heavily in training so our managers are prepared to make use of this new real-time data platform. Beyond that, Riaan and his supply chain and procurement team have renegotiated a great number of contracts. We have genuinely leveraged our purchasing strength and our global muscle. We have established a solid partnership with our 2 major equipment suppliers, Caterpillar and Sandvik. Overall, I believe we are in good shape, and we certainly will not treat inflation pressures—whether transitory or real—as an excuse. Constantly seeking ways is the manager's job. Having high-quality assets always makes that easier to manage within the gold industry.
Greg Barnes
analystMark, do you figure you can keep that under control through 2022, or do you see those pressures mounting as you look ahead to next year?
Mark Bristow
executiveI think the crucial thing, Haas, is that you have to be able to forecast — tell me what's going to happen with commodity prices. Many of the large capital projects we have underway are already secured. We're in good shape on that front. But then there's the worry — and you saw it — there is so much uncertainty in the global economy, and over the weekend we witnessed that downward spike in the gold price and other commodities. It's a strong reminder that things rise and fall, and not necessarily in that sequence. Right now, we're not interested in trying to squeeze the most out of real-time opportunities. We are delivering the kind of returns — industry-leading returns — as we announced once again today, thanks to what we did following the 2018 merger plans. What we're doing today really is about the future. What does Barrick's future look like? We've demonstrated that we can deliver right up there with the best. We don't need to put our ore bodies at risk. We are investing not only in extending our current ore bodies, dropping the cut-off grade, increasing the life of mine, maximizing the returns, but also in our future. We use $1,200 in a disciplined way, and that keeps the focus on cost control and efficiency.
Mark Bristow
executiveTo wrap up, I'd say a major difficulty during the high-price portions of the cycle is how that elevated price gets exploited and how ore bodies get consumed, and we've begun to observe that showing up in the lower grade, and at year-end we will observe it when reserves are declared. That, I believe, is a significant factor. It's the same situation in copper right now, since those lofty copper prices conceal mining discipline and processing discipline among miners. There's nothing we can complain about. Whatever deck of cards gets handed to us, we have to do the job with it. Inflation will come, in my view. There is such a quantity of money circulating. My major concern is how the real world copes with what is heading toward us. The pandemic's effect on the remainder of the global economy is something we don't grasp. It has remained highly insulated. Regarding the developing world and its prescriptions on climate change, we still have no genuine grasp of the impact, without any real engagement with the emerging and developing world. My worry is that, just as with 2008 to 2009 and the Global Financial Crisis, the impact was really only seen by us three years afterward.
Mark Bristow
executiveMy sense is that a few surprises lie ahead. Not every one of them will be welcome, however much we'd like the picture to improve.
Greg Barnes
analystOkay, Mark — thank you for that. I'll make sure the message gets through.
Operator
operatorAnita Soni from CIBC World Markets has our next question. The floor is yours.
Anita Soni
analystTo build on what Greg asked, and thanks for the fairly detailed response there. I believe your earlier cost guidance anticipated a decline in costs for next year. Since you're now looking at a 1%-2% increase, is that measured against the sort of mid to top end of the guidance range you provided for this year — roughly $700-$730, which is about where we are — or is it measured against the midpoint? Essentially, what I'm asking is whether we should expect costs to fall year-over-year, or whether we're simply looking at a smaller increase than your peers are forecasting?
Mark Bristow
executiveYes. I believe that is a very solid question, and once more, I would say it illustrates our business extremely well. The main factor behind that, when we consider cost per ounce, is precisely the shape of next year. We have a decline at Nevada, and that is going to affect our costs, but our forecast takes that decline into account. We have Pueblo Viejo, which we are bringing into production next year, so it comes down to exactly how the team can actually adhere to the plans, and we are working hard on those plans at the moment. Then we are bringing Porgera in, and we had always intended to bring Porgera in next year. So that starts out with a higher cost per ounce, but only because of the startup costs. Apart from that, all the other mines are looking good. Once more, Goldrush, once we get that into production, which is, as we said, expected to receive its record of decision at the end of next year. Once more, that supports our plan to keep the costs going down. Anita, the answer broadly is-
Graham Shuttleworth
executiveYeah.
Mark Bristow
executiveThe direction we're seeing is downward. Graham, would you like to chime in on that?
Graham Shuttleworth
executiveThat is correct.
Mark Bristow
executiveGraham? One more thing I’d mention, Mark: that 2021 guidance assumed a budgeted gold price of $1,700. Yeah
Graham Shuttleworth
executiveIn contrast, our planning covering five years beginning in 2022 relied on a gold assumption of $1,200. As we move to refresh the 2022 guidance, chances are we'll adopt a higher gold figure, one nearer to spot, and that does generally have the effect of lifting the prices.
Mark Bristow
executiveTurning to royalties.
Graham Shuttleworth
executiveWhen it comes to those costs, royalties apply.
Mark Bristow
executiveWhich is a good—
Anita Soni
analystYeah, I'd say that's right.
Mark Bristow
executiveThat's a nice problem to have. Good point — thanks, Graham.
Anita Soni
analystSure, that’s a helpful observation—thanks. That covers what I had to ask, so I’ll hand it over to the next participant.
Mark Bristow
executiveThanks.
Operator
operatorMichael Jalonen from Bank of America has our next question. The floor is yours.
Mike Jalonen
analystOh, hey Mark and Graham. I only had one question about the government-led strategic environmental assessment for the mine life extension project — which, as you said, Mark, runs alongside your own studies. Is it something like a committee or a panel made up of independent people that gets appointed to it? I was just hoping for a bit more detail there. Thanks.
Mark Bristow
executiveAs you know, we adhere to the international standards for tailings dams, and we also follow the consultation process for interested and affected parties. At Barrick, we have been through a process. We have examined roughly 22 different sites. That has now been narrowed down to two sites. In any of these processes—and we have begun public engagement at these sites—we started informal engagement in 2020, and then from the start of this year, we began the public process, and you would have seen that given all the press coverage that comes out of that kind of consultation. As has always been the situation in the Dominican Republic, a handful of detractors make a great deal of noise. Pueblo Viejo matters a great deal to the Dominican Republic's economy. To give you a sense of it, if you simply average its contribution to corporate tax for the Dominican Republic from 2013 through the end of 2020, it amounted to 18% of all corporate tax. That is very material, as you can imagine. With the government, again, we did not want to end up in a conflict. We genuinely believe in proper engagement. We were beginning to encounter detractors who were taking the law into their own hands.
Mark Bristow
executiveWorking alongside the government, we reached out and tried to determine what the actual concern was. That concern, as is true in most instances, relates to environmental effects — namely the safety and security of the surroundings when a storage facility of that size gets built. In the interest of full disclosure, Rosario were the initial owners of PV back in its smaller earlier incarnation, and they departed leaving substantial environmental hazards and pollution that had never been addressed. As part of the acquisition, Barrick made a commitment and has remediated that environment, and we now fully comply with international standards. We concurred with the critics that the finest means of reassuring them is this: we will, naturally, carry out our own third-party studies, and those focus on biodiversity, hydrogeology, and hydraulics — covering potential leaks and various pumping tests, and the water systems as well. We have, naturally, already begun this work. We will keep at it. It has been agreed that the government will name an independent global expert to head an independent study, naturally following the accepted guidelines for evaluating such installations and the closure plans that follow. We will, naturally — the government will undoubtedly set our work against the independent work. A coordinating committee exists so that we don't race ahead and diverge in our efforts, and so that should any issues arise, we get informed and can address them.
Mark Bristow
executiveI believe this is another case where Barrick has spearheaded some quite innovative efforts as we pursue our goal of turning into a genuinely modern mining company. This really doesn't unsettle us in any way. We feel quite at ease with the locations we have ultimately chosen. That independent panel of specialists, a consultancy, is also going to examine our methodology regarding the way we investigated and ranked the options until we narrowed things down to these 2 sites. Ordinarily, following the protocols, we would finish by picking 1. Given our dedication to ensuring complete transparency in how we proceed, we've agreed that we will examine both the first and second choices in that process. I hope that clarifies things sufficiently, Mark.
Mike Jalonen
analystOh, thanks for that. I suppose my question is just this: those global experts will presumably need time before they're picked, and they're beginning from scratch.
Mark Bristow
executiveNo, we’re already working with the government. On most of the sites, we’ve begun the process already. We need to get the drill holes in. We have drill machines available. On one site we have 14 holes to drill, and probably a bit fewer on the other, since we’ve already drilled some holes there because it actually locates where the conveyor belt crosses over to the first site. Then we need to get in a full year, then there’s six months of modeling, a full year of samples and tests and analysis. We’re happy with our program if we start soon enough. They’ve shortlisted five people. They have approval to fast-track the procurement — in inverted commas — under the government policy. In the meantime, we’re working with the director generals and the Ministry of Environment to make sure we start the process, agree on the sites, and get into the field and begin measuring the fauna and flora as part of biodiversity tests. We’re comfortable, and we’re in shape. Their job is to make sure — and what the detractors are looking for is — that somebody independent of the interested party, which is us, is overseeing this process.
Mike Jalonen
analystOkay. Well, I appreciate that thorough response. We’re eager to see what unfolds here. Thanks once more.
Operator
operatorJackie Przybylowski from BMO Capital Markets has our next question. Please go ahead.
Jackie Przybylowski
analystMuch appreciated for the chance to ask. I'd like to inquire about the dividend policy. Mark, I'm aware that in the past you've discussed your view that commodity prices rise and fall, and it might be premature to comment, but you have a robust dividend for 2021. Is there any consideration, or could you offer any remarks on whether that special dividend program might carry over into 2022?
Mark Bristow
executiveProbably not, is the answer to that. This year, we've described as unpredictable. There was a specific chance we had to give capital back in a way that was cost-effective, especially for our Canadian investors. That chance was taken by us. It was the right chance. It's a real return to shareholders. And beyond that, you'll see now, we were committed to it. Plenty of people questioned whether it was a real move. Naturally it is. I always point out to people that I'm a shareholder too. Nothing we do is haphazard. We told the market we'd work toward a more defined return of excess funds, since that is the current debate. We're at that stage of discussing precisely how to do it. As you know, at Randgold, I was a strong backer of — we led the first ever fixed balance sheet number, then paid out the rest. I believe we've shared all the options with you, Jackie, and we'll keep working on it. I think another thing is you just need a day like yesterday or today, this morning, to remind you of exactly what we're all about. It isn't only about paying dividends. It's also about paying tax. It's about making sure we have a business that's sustainable through the cycles, and that's something we're absolutely emphatic about, and we'll hold that line.
Jackie Przybylowski
analystApologies — is my voice coming through?
Mark Bristow
executiveYes, we can hear you. There seems to be a bit of interference.
Jackie Przybylowski
analystAll right.
Mark Bristow
executiveApologies — I’m connected now.
Jackie Przybylowski
analystSure.
Mark Bristow
executiveJackie.
Jackie Przybylowski
analystI wasn't certain—that was just a different question. I saw in your MD&A that you've noted Catherine Raw will be departing, and I'm sorry to see her leave. In my view, she has contributed a great deal to Barrick. The same paragraph also says you'll announce any successor, and possibly changes to the regional management structure, in due course. Could you say a little about your thinking, or what the options might be, when it comes to altering that regional management structure? Is there anything specific you have in mind right now?
Mark Bristow
executiveCatherine is seated right in front of me. I feel the same sadness you do. For Catherine, this is a personal matter. As you can see, she has agreed to remain through the end of the year and to work alongside me, since she holds some firm views that match my own regarding bringing women into senior positions, and also youth, a different perspective. We also wished to honor Catherine's request concerning timing. There is ample time for us to work through it. Our team is strong. Catherine is not leaving a big hole behind. Our team is very strong. Nevada is a strong team. We see the chance to bring someone into that position who truly is able to grow into the future of Barrick. There is a group of people I will be drawing on. Our HR people are scouring the globe for talent. We have, of course, internal talent as well that we will look at. I think this is something we would rather do properly than in a rush. The key for me is, one of the things we need to keep focus on is continuing to deliver on my promise to the market that brings younger people, capable women executives to balance our future leadership of this organization.
Mark Bristow
executiveThat, I believe, is going to stay top of mind for us throughout this process. You can count on seeing Catherine appear.
Jackie Przybylowski
analystAbsolutely.
Mark Bristow
executiveShe is a highly capable woman, and she’ll get there very fast.
Jackie Przybylowski
analystI’m really looking forward to that. For sure—thank you, Mark.
Operator
operatorThe following question is from John Tumazos at John Tumazos Very Independent Research. You may proceed.
John Tumazos
analystThanks a lot, Mark. Inflation patterns look like the strongest they’ve been in 40 years, possibly longer, and even with how prices moved today, this could be a very favorable moment for gold. With the sizable cash reserve you’re holding, do you see it as a wiser approach to purchase Barrick stock, to acquire another company’s shares in order to consolidate assets, or simply focus on your core operations, where certain mining projects—Donlin Creek, Norte Abierto, and others—could each require several billion dollars and you may need to keep cash within the company?
Mark Bristow
executiveJohn, I suppose—not trying to tell you your job. The entire game in our business is, first, we want to keep our relevance within the global markets. Both Newmont and Barrick have shown that if you're larger, you draw generalists onto your register, and we certainly have done that, both of us. This industry needs consolidation by that very thesis. We saw that led by Barrick's merger with Randgold and then the subsequent consolidation of Nevada and then the takeout of the minorities in Acacia, followed by Newmont's acquisition of Goldcorp, the Kirkland Lake Gold acquisition of Detour Gold, the Australian consolidation, both in Australia and across the Pacific. Everything died because the gold price got so high that no one needed to do anything except sit back and take a COVID rest. We've seen a big gap develop between the two leaders in the industry and the rest of the industry, and it doesn't make sense. We're still too fragmented. It still needs consolidation. At the same time, we're not replacing the ounces we're mining with the same quality ounces, so it's always difficult to seek value. That's why I'm a big proponent of at-market transactions, albeit that if we can get at a company early enough, we can offer both its shareholders and our shareholders value creation.
Mark Bristow
executiveWhen you've identified a project and it's at the peak of promotion, undeveloped projects always peak and never reach that same peak once production begins. That's a difficult thing to do. Spending dollars on something like that isn't a good idea. The last boom ended with major high-speed accidents across the mining industry because people did that. We're mindful of that. We certainly have the experience to make sure we don't do anything rash. At the same time, high-quality assets are worth a lot at any point in the cycle. On top of that, you'd have seen me talk a lot about organic growth. It's what I've built my career on. We've put a lot of money and investment into upskilling our exploration teams, and we're starting to see the results of that. As I said at the beginning, this is a long game. We are not shy, as we've indicated, of reacting to opportunities. At the same time, we're definitely not cutting back on our own investment and our own future. At the end of the day, we would rather reward all our members, our shareholders, with some cash value. The biggest challenge in the gold industry, which is very cyclical, is determining what the value is.
Mark Bristow
executiveA share's worth is frequently tied to what it's valued at in that instant or for that particular year. As a management team and as a board, we have carried out buybacks before. We will carry them out going forward. The question is whether right now is the appropriate moment?
John Tumazos
analystI appreciate that.
Operator
operatorMatthew Murphy from Barclays has the next question. You have the floor.
Matthew Murphy
analystHi, Mark. A question about Goldrush and the record of decision timeline slipping once more. When does that land on the critical path? Is it there at the moment? If it isn't, when does it turn into critical path? And how tough a permitting process do you anticipate for Goldrush?
Mark Bristow
executiveThis has been a long time in the making. The hold-up we saw with the notice of intent stems from the administration change, which we've now gotten past, and it's been confirmed that the notice will come out right away, within a short window. That essentially establishes the path for the record of decision. The only thing I can tell you is that we've been exploring Goldrush. We've advanced into the ore body. The authorities are fully aligned with what we're doing, and we're running it in line with the plan of operations. Nothing leads us to think the record of decision won't arrive. We've built some buffer into that timeline when we say end of 2022. Your mic is on. I'm not sure if you'd like to add anything, Catherine.
Catherine Raw
executiveTo simply affirm your earlier point — Goldrush has indeed taken quite a while to reach this stage. We've stayed involved the whole way through. It sits within a complex. Our approach to developing the ore body factors in the entire environmental community as well as Native American matters, which have been central to the new administration's attention. As for the exploration declines and underground exploration development, those let us ramp up fast once the record of decision arrives. Right now, the timeline aligns with our 5- to 10-year mine plan. Should anything slip further, we'll clearly need to revisit that.
Mark Bristow
executiveGreg, is there anything you’d like to add?
Speaker
unknownAlright.
Mark Bristow
executiveEveryone on the team is with us.
Speaker
unknownMark.
Mark Bristow
executiveYeah.
Speaker
unknownMark, Catherine already addressed that point exactly right.
Mark Bristow
executiveAlright.
Speaker
unknownTo respond straight: right now it isn't on the critical path, though we're expecting the record of decision in Q4 of next year.
Mark Bristow
executiveAlright, thanks.
Matthew Murphy
analystThanks a lot. Appreciate it.
Operator
operatorThat wraps up the questions from our conference call. Today's call now comes to an end. If anything further comes to mind, feel free to reach out to the Barrick Investor Relations team. You're welcome to hang up at this point. Thanks for joining us, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Barrick Mining Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Barrick Mining Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Barrick Mining Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.