Good day, everyone, and thanks for holding. I’m the operator for this event. Welcome to Barrick’s Results Presentation for the Second Quarter of 2023. After today’s presentation, we’ll hold a question-and-answer session. <<operator_script>> Just a reminder: this event is being recorded, and a replay will be available on Barrick’s website later today, August 8, 2023. At this point I’d like to hand things over to Mark Bristow, President and CEO of Barrick. Please go ahead, sir.

Mark Bristow

executive
#2

Thanks so much, and — we’ve got this under control. Welcome, everybody. Good afternoon to those of you across the Atlantic, and good morning to those on this side of it, and a special welcome to all of you who’ve sacrificed some of the sunshine outdoors to be here with us in person. Thanks for attending. I appreciate it. I thought I ought to begin with some good news. And that is — and I’m sure you’re all aware of this, certainly those of you sitting in the hall here, that the average gold price in the last quarter hit an all-time high. And it’s interesting, a lot of people are saying the gold price isn’t performing. It’s performing extremely well. And to me, the more interesting part is that some view this as driven by an anticipated decline in interest rates. And certainly, having recently traveled right around the world, I really believe it’s more about a risk-on situation as we grapple with the global economy and de-globalization of the world as a whole, and the fact that China is not — I don’t believe going to get back to where it was, it’s certainly going to recover, but not back to where it was.

Mark Bristow

executive
#3

And once more, if we don't halt and put money into our supply chains and broader economic investment—along with lifting up some of those economies that struggle more—there's going to be damage. Otherwise, the only thing we'll accomplish is building a future in which the wealthy keep growing wealthier while the poor grow even poorer. So last weekend we held a mining summit in Islamabad. It was quite striking for me to witness Pakistan's recognition that change was necessary. Remarks were made about 70 years of mistakes, and that this nation possesses everything required to rise above its difficulties—above all, it has the people—but it must care about them. I'm quoting from the leadership that addressed the mining summit's opening. Development, not merely exploitation, has to be the focus. And lastly, it must draw foreign investments. In fact, the Minister of Petroleum noted that their approach was to convert red tape into a red carpet for investors. That's very interesting. It's a huge transition. And as you're aware, that country faces numerous challenges.

Mark Bristow

executive
#4

And I think West Africa has shown us what happens when we neglect these developing countries. And we've spoken many times with some of the major economies around the world about West Africa and how important it is to stay there, to engage in conversation, and to work on investment, instead of just lecturing. And again, the elected governments right across that region have failed. And we don't seem to want to do anything about it except lecture. And so there's a big need for the world to relook at how it manages its business. And again, as far as policy toward mining and metals in the United States goes, it has to reflect on how important it is just to exploit other people's natural resources rather than develop some of its own, and to engage in support and build a real mining industry, because that's what's required if we're going to have a better world ahead of us. And so I think that — and there certainly is conversation starting around those topics. And as you know, I've spoken a lot about the importance of partnerships and development across the world, and Barrick is — hopefully, I will share with you today what we have done and the — now the real results that are starting to materialize in our policy of driving partnerships with our host countries around the world.

Mark Bristow

executive
#5

Also, I want to devote some time today to exploration specifically, since there's this persistent argument that the only way to grow is through M&A. Over the past 4 years, we've worked hard on two things: first, repairing our assets, and second, developing that bench strength in exploration. Some early indicators are now beginning to show, and we'll share them with you. We're really excited that we'll be able to back up some of these initial results with actual borehole results by the close of this current quarter. That gives you a rough picture of the message I want to convey today. Before I go further, I'll begin with a brief look at — as always, the presentation comes after a cautionary statement, which you can see on the slide. It's on our website as well if you'd like to review it more closely. Then I'll move on to our KPIs for the quarter just ended. At the start of the year, we guided that results would be weighted approximately 45/55 toward the second half, and as you can clearly see, that trend is already apparent in quarter two.

Mark Bristow

executive
#6

Compared with quarter one, the gains came mostly from finishing planned maintenance at Carlin's processing facilities, which lifted NGM's results—as you can see, and we'll see it in the figures, I'll get to that shortly—along with solid input from our Tanzanian operations and especially Kibali. Also, you'll no doubt have noticed Veladero posted a strong quarter, ahead of what we'd planned. As usual, I'll walk you through the presentation and flag the main operational points. This time, as I mentioned, I want to highlight how we're advancing across the board on exploration. Turning to the outlook: although we've had some equipment issues connected with the PV ramp-up, we're still on course to hit our 2023 guidance for both gold and copper output. And those factors ought to bring costs back down toward guidance. Nevada should build further on last quarter's improvement after maintenance, and PV will keep raising throughput as the plant expansion proceeds. Commissioning is complete, though we're now held up in the ramp-up. In Zambia, the new fleet at the Lumwana copper mine should lift mining productivity and throughput, and we'll be into better grades in the main pit during the second half of this year.

Mark Bristow

executive
#7

Turning to the financial results, higher output — supported by the record quarterly average gold price I mentioned earlier — drove a 7% rise in operating cash flow and lifted adjusted net earnings to $0.19 per share. With that, we kept the quarterly dividend at $0.10 per share. I want to stress that we run this company with a long-term view, and we are not — we are very careful about — we gave real thought to our dividend policy. We are honoring that policy rather than setting it aside. Our balance sheet remains the strongest in the industry. And as we recover over the back half of this year, we will rebuild our cash balance substantially once again. At the start of the year, as you all know, we introduced our new safety initiative, which we call Journey to Zero. And it went — I personally led it across the whole group, and it has definitely begun to deliver results. Looking at the lagging indicators, which aren't what we manage against, our injury frequency rate is down 38% quarter-on-quarter. But the key point is that, for the first time, the North America region — the entire North American region — reported an injury free April.

Mark Bristow

executive
#8

That marks an important milestone in our pledge to bring safety performance back to the level we expect. Additionally, the LatAm and Pacific region posted no lost time injuries at all across the whole quarter. Those matter more than the trailing metrics. We have been carefully following our Journey to Zero. After a comprehensive review, we have put together the new fatal risks and the standards tied to them, as you can see here, together with critical controls for each of the 10 fatal risks. As part of the risk management overview, we likewise examined and refreshed the field level risk assessment tool, which is now the standard across the whole organization. The main forces behind getting each of us, especially leadership, to fully embrace this Journey to Zero. Sustainability, as everyone here is aware, sits at the heart of Barrick's strategies and practices. It is what protects our social license to operate, which is so essential. No significant environmental incidents occurred in the quarter or year-to-date. Our average water use efficiency came in at 82% for quarter two and 83% for the half year, once again surpassing our 80% target. Greenhouse gas emissions, meanwhile, fell 5% quarter-on-quarter and 12% versus the same period last year.

Mark Bristow

executive
#9

So this slide shows how our biodiversity commitment shows up in many ways, and last quarter gave a clear example: the reintroduction of white rhinos into Garamba National Park in the Northeastern part of the Democratic Republic of Congo, led by Barrick. We've supported Garamba National Park since the Randgold days back in 2009. Seeing this happen is also a personal goal of mine, and it carries another message: when we arrived at Kibali, the Moto goldmines back in 2009, the Lord Resistance Army was all over the place. And today, the fact that rhinos can be put back in that park means we've really got on top of the security. So it's a massive sort of symbol of what mining can bring to these conflict zones. And having just come back from Pakistan, I'm absolutely convinced that if we do the Reko Diq right, we're going to see the same sort of effects, if not better, more tangible in that part, the part of Balochistan where Reko Diq is going to be built. Another key point — and I'm not sure all of you are aware of this, but staying with sustainability, also very pleased to announce that we've achieved full conformance with the recently formulated global industry standard on tailings management.

Mark Bristow

executive
#10

You'd have seen a Friday announcement, where we disclosed information on our website in line with Principle 15 of the standard covering our very high and extreme consequence facilities. I'll note that Barrick has been a leader for a long time when it comes to responsible management of tailing storage facilities, and we're glad to have this extra disclosure, which forms part of the new standard. Now let's move to operations, beginning as always with North America, where we keep strengthening our value foundation at Nevada Gold Mines — already well beyond the sum of the parts combined in the merger. And NGM is just about to enter a new growth phase, as I hope to demonstrate in a few of the exploration slides. What we've learned from a better understanding of the orebodies is producing fresh targets and discoveries, along with new concepts aimed at delivering life of mine extensions and potentially the next wave of Tier One assets in one of the world's most prolific gold districts. Here are Nevada Gold Mines' operating results, with production, as I mentioned in the introduction, up 11% quarter-on-quarter. And it stays on-track to deliver on its 2023 production plans.

Mark Bristow

executive
#11

As the slide shows, the increased output brought a substantial reduction in all-in sustaining costs. And we — that's a pattern we anticipate carrying on through the second half of the year. It's worth pointing out that since Nevada Gold Mines was formed, we've replaced 16.5 million reserve ounces that mining had depleted. And as you can see, we still hold a wealth of opportunities that have the potential to serve as big value drivers, and we're confident exploration will keep reserve replacement going and deliver an inventory that secures a 15 year planning horizon and beyond, and I'll return to that replacement strategy, because just as we did at Randgold, we're now putting together a plan to replace our reserves by advancing from inventory to resources and then to reserves. And in Nevada, that plan is beginning to show as well. There's no better place to begin on this slide than the top right. This review then covers the Carlin Trend, which is the gift that keeps on giving. We keep intersecting — and this matters quite a bit, you'll see at the bottom that 23001 intersection, that we keep going, these are Carlin top grades.

Mark Bristow

executive
#12

And as we work to grow Carlin within the larger Leeville complex, we keep consolidating the ground surrounding it. We're discussing opportunities in the multi, multimillion ounce range. That definition is beginning to take shape, and we expect to be able to share some of the holes we've drilled so far, though we're still waiting on the verified assets. But one thing I've always told many of you is that when you hit world-class orebodies, you don't need to send the logs to the assay lab to figure it out. So we're super excited about this potential. At Cortez, the Fourmile discovery, which Barrick owns, is well on its way to Tier One status. We shared some of these results with you last quarter. These are big numbers. With every intersection now, we're starting to show more opportunity, and the most recent of these discoveries is the Dorothy breccia, which you see referenced in the slide. But these intersections add significant ounces every time we drill a hole — that's where we are in the orebody today. Strong drilling results, staying with the Cortez Complex, from Robertson, which show its potential to grow into a multimillion ounce asset.

Mark Bristow

executive
#13

And this is — it really matters, Robertson. It still has to be permitted. We're in the middle of permitting it, but it's a multimillion-ounce oxide deposit. And that matters for Nevada, since we have capacity in our oxide mills. And you'll recall that Newmont planned to shut their oxide mill down even before we completed the deal, and we've kept them running. And this is a very key asset. And we're still looking to grow this footprint. It's been a highly successful exploration project. And finally, at Turquoise Ridge, we've now opened the main — what we call — Turquoise Ridge underground orebody to the Northwest and the Southeast and — as you see here. And again, significant intersections and that really — this is the least developed among all the world class orebodies in the known Nevada operations. And I'd just pause there for a minute and just point out that the greater Leeville area and certainly the extension as you see on the slide, that's a completely parallel world-class target that's running parallel to the Goldstrike Meikle trend, which is what made Carlin so famous. And we are really at a stage of developing a sub parallel target along really key — one of the key faults, which will parallel that world class trend.

Mark Bristow

executive
#14

As I mentioned, that has enriched a great many mining companies. Beyond our Nevada joint venture, Barrick keeps growing its presence in North America. Drilling across numerous targets in Nevada, outside of Nevada Gold Mines, is confirming real discovery potential, and framework drilling has now begun at our Pearl String project too. Ongoing generative work and ground consolidation are also moving forward throughout the Western United States. Once again, we have several developing opportunities that we hope to share with you over the coming quarter. In Canada, mapping and sampling at the Pic project close to Hemlo have turned up some intriguing mineralized structures. Our geologists have begun work at the new Sturgeon Lake project as well, and we have signed an agreement allowing us to earn as much as 75% on the Patris project, located just to the northwest along the same trend as Malartic. So once more, we are in the right place, we are extremely excited, and as you know we try to pursue opportunities through M&A, but our geologists are beginning to identify some genuine opportunities to grow our business here in Canada. Turning next to the Latin America and Asia Pacific region, the team is performing excellently, especially the exploration team.

Mark Bristow

executive
#15

Right now, we're actively working through the rationalization of a sizable legacy land portfolio, and that includes the Andean trend in particular. At the same time, we're taking steps to lock in fresh opportunities. Our footprint has grown in Chile, the Dominican Republic and Peru, and in those places we've achieved some encouraging early stage progress, most notably in Southern Peru at our Austral project. That region also takes in Porgera and Papua New Guinea along with Reko Diq in Pakistan, and during the quarter there have been some quite favorable developments at those assets, which I'll walk you through. So to begin with PV commissioning — as I mentioned in the introduction, the expanded plant was affected by continuing equipment failures tied to the flotation and mill circuit pumps. We're collaborating with FLSmidth to tackle these problems and correct certain design flaws. Let me just explain: we installed the largest flotation cells ever, or at least the largest FLSmidth has ever supplied. We've run into trouble with some of the shafts and the gearboxes, and we've had to retro engineer them, and they've also rebuilt some new ones and shipped them to us. So we're working closely with them, and until that gets resolved, we're operating all the circuits, but ramping up to full production is going to take some time.

Mark Bristow

executive
#16

We still anticipate the second half being significantly stronger than the first. And this expansion project — we're confident it will reach full capacity by the end of this quarter, possibly early in the next one. When it's finished, the plant inspection and mine life extension are designed to support yearly output exceeding 800,000 ounces well past 2040. That genuinely makes PV an outstanding Tier One mine — we have six of those, plus a couple more in development, and we're very clear on our definition of Tier One assets. Just as a reminder, at the time of the merger, PV would have shut down in 2021 if we hadn't found a solution for the tailings facility. So the permits are now secured, and we're set to proceed with the expansion. When you attempt to assign a value to that, it resembles a really major discovery. This is a 22 million ounce prospect — it's big. As I said, Argentina Veladero beat its planned production, which is especially impressive given the extremely challenging operating conditions. The ongoing currency crisis in Argentina has produced strong drilling results from the Morro Escondido target that indicate its potential as a satellite to Veladero.

Mark Bristow

executive
#17

Right now we're in the middle of that modeling work, and exploration is likewise concentrating on the additional targets right by Veladero. Having had some success at Morro Escondido, I believe the team is fully driven at this point. And once more, you'll remember that we scaled back at Veladero and pushed some capital out to the end of next year. Beyond the currency crisis and the election year, this is a highly dynamic year. It's an election year that has stretched across the entire year. So we now know who our governor is in San Juan, but we still have to go through that rock and roll process to get the federal government in place and elect a President. So, as I mentioned earlier again, we are rationalizing our operation portfolio in Latin America and prioritizing our portfolio. So getting our resource triangle — people who know me know exactly what that means in order. And we keep securing more ground in that area. This is a quick snapshot of where we are looking, and we are certainly excited about the prospects. And we have a completely new team. It's taken a couple of years now to get that team to start really understanding what we want and where to go.

Mark Bristow

executive
#18

And those results are beginning to come through now. Turning next to Pakistan: during the quarter just passed, the Reko Diq feasibility study advanced significantly, and it remains on track for completion before the close of next year, with first concentrate production targeted for 2028. Work on infrastructure is progressing. The airstrip refurbishment — an important item — has been cleared for flights, and a weekly charter now operates to site. Consistent with our pledge, as the inset shows, to share benefits with the people of Balochistan early on, two primary schools have already been set up under our community investment, as put forward by the community development committees that were recently formed. So this is done in partnership with our communities. Incidentally, I have personally visited all of those communities together with Barrick's senior executive. And it is worth noting, looking at the Afghan story and at this story — the Baloch people live across in Afghanistan and in Pakistan's Balochistan. And when you see the school, you see that the pupils are roughly 50 to 50 boys and girls.

Mark Bristow

executive
#19

That's really quite an accomplishment. Let me give you a bit of context on Balochistan, especially the area around Reko Diq — there's no economic activity there at all. So once people get an opportunity to make money, the results are remarkable. It's also the one spot on earth where I've come across more schools than children. As a matter of fact, every one of those schools sits empty. Why is that? The poverty is so severe that kids must work just to stay alive. That's why our presence there, backing those children, providing them a proper meal and getting them into classrooms, is the sole route to an education for them. This fits within a program we carried out very successfully at Kibali — namely, training the mine's future operators before the mine exists. So we've done exactly that. We began with — this is a mine that will span generations. So we began at the junior school level. We've likewise examined vocational training for those young teenagers, and then we went overseas, searching universities for Baloch individuals who have already completed or are nearing completion of their degrees — in engineering particularly, though also engineering, some economics and processing. And so the first group has now been signed, and they'll be transferred to our operations across the globe, beginning work with us with the aim that they will lead the operation when we switch it on in a few years' time.

Mark Bristow

executive
#20

So — and again, that’s — we brought Kibali back online using local people. So most of our workers head home each day to the villages surrounding the mine. And so the community is our workforce. And that’s what we intend for Reko Diq as well. You’ll have seen some announcement about Porgera recently. We’re finally approaching the end of the long road toward reopening that mine. And the key one is that we’ve applied for the special mining lease, which is the one that was removed, as you recall, at the end of the last lease period. And for that process to close, we needed to have a number of regulatory procedures. The first one is what they call the warden’s hearing. That’s happened in all the different selected regions. And we’ve had a security forum led by the key ministers and the Prime Minister himself. And during that forum, the Minister of Mines formally opened the development forum, which is the critical process where everyone has a chance to engage and discuss and share what they want. And it’ll ultimately culminate in the — it might not culminate in a full mutual agreement across every aspect because the negotiating tactics in Papua New Guinea have started at 120% and see where you land.

Mark Bristow

executive
#21

But this is a significant commitment, and it will — as this process unfolds, the government is going to reach a stage where its own assessment of the applications we've filed for the SML gets completed, and at that point we'll have it granted. Building on that, preparation work on the mobile fleet has begun. Given how long this has taken, we've needed to upgrade certain tanks — tankage at the processing facility. A new crusher is on order, and we're making ready for start-up. Our expectation is that we ought to be in a position to begin and to have poured our first gold bar within this year. And whenever I make that statement, people ask, can't you give us more granularity than that? And my answer is no. Yet in the fullness of time, we will. And the only thing I can tell you is that everybody wants the mine started right now. So updates will come your way as we get nearer to that date. With that said, we shift over to Africa and the Middle East. And this, as a reminder, is by far the most consistent performer within our portfolio. And it is not just a dependable contributor to the bottom line, but also home to a wealth of gold and copper opportunities.

Mark Bristow

executive
#22

The Loulo-Gounkoto complex turned in the strong results we've come to expect, and it remains on course to meet its 2023 guidance, while it keeps putting money into making its power supply grid greener, along with replenishing reserves and searching for additional ones. Once more, this asset has been truly spectacular. I'd be failing in my duty if I didn't note that Mali does have its difficulties, and I would say those difficulties have always been present. Our operations there span 26 years, and during that period, Loulo — we grew Loulo-Gounkoto into one of the 10 biggest gold mining complexes anywhere in the world, and into the country's biggest taxpayer and employer — certainly the biggest employer outside government. Across some extremely turbulent periods, we've maintained a constructive relationship with successive governments. And over recent weeks, I've personally spoken with key members of the current leadership regarding their proposed new mining code. And I'm quite optimistic that, just as happened before, we'll reach a mutually acceptable arrangement that keeps gold shining for Mali. In West Africa, I noted, there are plenty of opportunities. It's a very dynamic place at the moment, as you'd have seen in the newspaper with the latest <<inaudible>>. But sticking with Loulo, we've — we keep identifying wide high grade intersections on the extensions, along the major structures that host the multiple world class assets around and within the Loulo-Gounkoto leases.

Mark Bristow

executive
#23

Also in Senegal, just over the border, we keep assessing the Dalema joint venture specifically, plus we have the Bambadji joint venture, and our presence in Eastern Senegal keeps growing. In Cote d'Ivoire, we are looking at the Fonondara satellite deposits along with other targets of high priority. The team has done exceptionally well at extending Tongon's life of mine. Shifting to the Democratic Republic of Congo and Kibali, once more, Kibali got past the difficulties of quarter one to produce a big improvement, as the quarter two production figures here show. And it is — it has — this has genuinely put it back on track toward hitting its full year guidance. We are also placing real emphasis on our underground development so we can build added flexibility and support the new 10-year mine plan. Ongoing exploration has really made clear, right away to the West of the KCD main series of deposits, the potential for more of the same. We are quite excited by this recent development. And in Tanzania, which is a genuine success story. Our Twiga joint venture with the Tanzanian government stands as a poster child for my thesis that mining can be the force that makes undeveloped countries investable.

Mark Bristow

executive
#24

Tanzania really stands out as the clearest illustration of this. It's encouraging to watch BHP dip a toe into the water there with the nickel project. Once Barrick assumed control of North Mara and Bulyanhulu back in 2019, those assets were turned into operations able to deliver a combined 0.5 million ounces each year — effectively a Tier One production profile. We've demonstrated as well that this outcome is achievable, and shown what becomes possible when a mining company and the country hosting it join forces to develop that nation's natural resource endowment. During the last quarter, conversion drilling at North Mara managed to replace every reserve that mining had depleted, and we extracted the first ore from the Gena pit, along with further opportunities for resource conversion. Buly has an exceptionally long life — stretching well into the 20s. North Mara sits at just over 10 years. So that's a major area of focus. It's also worth taking a look at this slide, because we hold three Tier One terrains across our Central and East African holdings. The Kibali lease here is very well covered. There's a new exploration footprint to the South of Bulyanhulu, plus high priority permits running along the Gokona corridor, which I mentioned a moment ago. And once more, the Gokona corridor represents an exciting opportunity.

Mark Bristow

executive
#25

Back at Randgold Resources, we were constantly chasing those extensions. Securing the permits took us some time, since they had lapsed — they lapsed during the Acacia period. Now we have them in hand and have begun evaluating them. We're extremely excited about the chance to extend North Mara's mine life as a result. There's also a very significant intersection beneath the Nyabigena pit, which you can see here, and it has truly captured everyone's attention. How it fits into the orebodies at present is uncertain, but it is a recently confirmed intersection. Shifting over to Zambia. Broadly speaking, across our copper operations, as I mentioned, Lumwana is well positioned to meet its guidance for the year. A strong second half is really in store. With its owner miner strategy now implemented, along with the commissioning of the <<inaudible>> and commissioning of the new fleet — where we replaced the contractor, which was very expensive — we have already observed a cost reduction, as shown here on the slide. And we're excited about Lumwana's prospects. Based on our preliminary economic assessment, Lumwana has the potential to be equivalent to our share of Reko Diq investments.

Mark Bristow

executive
#26

That gives you a sense of the scale. At the moment of the merger, remember, Lumwana had no believers. It was a high-cost operation generating zero profit, and then it turned into what could become a tier one asset within our copper portfolios — yet another of Barrick's major success stories — and we're discussing substantial reserve conversion supported by the feasibility study currently underway. As I noted, the planned expansion built around this new Super Pit will contribute meaningfully to output and extend the mine's life out to 2060. We remain on schedule to finish that work next year. Pre-construction has been slated to begin in 2025. Based on our present forecast, that Lumwana expansion would arrive before Reko Diq delivers its first concentrate. There are some — we'll lay all of this out once the final studies on both projects are done. Turning to Saudi Arabia, Jabal Sayid held production steady and kept costs under the guided ranges, while early results at our new property Umm ad Damar are exciting — truly, I believe, the beginning of something significant — and beyond that, it has served as the foundation for deepening our relationship with the Kingdom of Saudi Arabia.

Mark Bristow

executive
#27

Before I get into it — the final item is Chile and Zaldívar, which is mostly the same story. I'd simply note that the real keys for AME's second-half delivery overall are Lumwana and Kibali. Even so, every AME operation remains on track and on target to hit its guidance. Then there are two more slides — the one I mentioned right at the start of my introduction — and the point is this: if any single thing distinguishes Barrick above all else, and I realize it isn't flashy and doesn't call for M&A or any of that, it has been our capacity to produce sustained, significant reserve growth from the merger onward. Keep in mind that in 2019, before that, we were all in the same position. Since we launched our new venture, we have replaced 125% of the gold we've mined — or the gold equivalent we've mined, copper included. And once again, we'll be sharing our three year rolling replacement model strategy with the market, since we do hold some very large assets. So you'll see the inventory build, and then you'll get a big boost in the resources, and then you'll get the conversions.

Mark Bristow

executive
#28

And across a three-year span, we feel quite confident, and step by step we'll shift that toward a shorter cycle. Naturally, it's obvious that what we'll add to our copper reserves and resources will be substantial, given the efforts underway both at Pakistan and at Lumwana in Zambia. We keep at our search not just for those world-class gold deposits but for copper too, across every major copper terrain globally today, with Russia being the exception. Other than that, we know a great deal about what's happening in copper — the world's major copper fields — just as we do with gold. And once more, our thinking is that Barrick's future growth rests on asset quality. I believe that's really the case when you examine our portfolio as it stands now: we hold six Tier One — genuine Tier One — assets. We also have a whole pile, five world-class assets. Porgera is among them; it's a 500,000-plus ounce operation heading to 800,000, near 1 million in certain years. We split the economics on roughly a 50 to 50 basis with PNG Inc. So that represents a meaningful share of value for Barrick.

Mark Bristow

executive
#29

Of course, we have Veladero, which is a substantial asset, in partnership with Zijin. At the moment, we're handling the political situation there. Lumwana is coming on, and that's without — if we can demonstrate it, and we have no doubt that we will, it's definitely a Tier One copper asset, and of course Reko Diq, once we get through the start and persuade everyone that this is a genuinely valuable asset, is right up there among the top five in the world. So when you look at our portfolio, Tongon is the least significant one when you examine it, but it's a very good cash producer because it was built so well that our sustaining capital is very small. And you'll see them — the costs relative to its — total cash cost, it's all in sustaining costs, so not as high as at other mines, and the question is just whether we can find more. And ultimately, to close it, it'll cost us around $30 million. So it isn't a big risk in our portfolio. And so — and Zaldívar is a partnership, as you know, with Antofagasta. And then the final asset in our portfolio — so we don't have a long tail in our portfolio; we sold the tail every time we did a transaction.

Mark Bristow

executive
#30

The sole operation we still need to address is Hemlo, and we have solid strategies in place for it. With gold trading higher, we're examining the possibility of expanding that pit once more. We've put in considerable effort, and the Pic projects right nearby are a key focus for us. In fact, I'll be on site through the weekend with the team, reviewing our approach for Hemlo. Another distinguishing factor in this overall M&A landscape is that we have a clear route to raising our gold equivalent ounces by 25% near the end of '29. That's a particularly notable and prominent point, since, as you're aware, numerous peers have been pushed into M&A simply because they could not replace the ounces they've mined. And I'd like to close, ladies and gentlemen, by noting that we're certainly celebrating the first time that, on a consensus basis, analysts indicate Barrick holds more value than Newmont. The difficulty is that we remain at a discount to that valuation. So with our business now clear and our teams in good shape, our focus is on working extremely hard to lift us to where I certainly come from — namely, a healthy premium to our underlying value.

Mark Bristow

executive
#31

And we have some significant items to address. Naturally, Reko Diq represents a major difference. Lumwana provides another substantial difference. Porgera adds yet another major difference as we bring it into operation. And once more, Nevada Gold Mines offers a considerable difference. And as we—not just across the entire joint venture, but when you factor in the prospects at Fourmile, it's a meaningful asset for us, and I'm sure it is for our partners as well. So with that, thank you for listening. We'll be glad to take questions. Some of our team members are online with us, and we're going to thank you call first. And Graham, of course, is here, and a few other executives are present in the audience here in Canada. So over to you, operator, to manage—no, we'll take questions here. So we'll manage this process going forward.

Jackie Przybylowski

analyst
#32

Thanks a lot for the presentation. This is Jackie Przybylowski calling in from BMO. Mark, could you speak a bit about what you're planning to do at Zaldívar? I know you noted in the MD&A that it's now been classified as non-core — are there any plans to divest it at some point?

Mark Bristow

executive
#33

I mean, possibly at some point. As things stand, we've only just submitted the application — together with Antofagasta — for an extension of the mine life and the permitting, and we're working through that right now, and it points to a mine life that's considerably larger and longer than the one we have today. The reason we put it that way is that, purely in reporting terms, it's a steady, small operation. Anto runs it. As a joint venture partner, we take an active part in that management. As you can imagine, standing back isn't really our strength. But that's the basis on which we've placed it in that category. And again, you know better than I do. Even though the copper market is in absolute short supply, and you only have to go a little way and then there is nothing, there is a softness in the price. So at the end of the day, we will manage that strategically.

Jackie Przybylowski

analyst
#34

Mind if I add a follow-up too? Regarding Porgera, could you walk us through what happens next and what still has to be completed before you can restart?

Mark Bristow

executive
#35

So really, it comes down to the special mining license, which we're waiting on — all the other regulatory work is complete. Everything is in place. What we need is that special mining license, and that means all the communities have signed off. Once we're able to do that — and I had a very good town hall with all our key landowners when I was last there two weeks ago — so there's no doubt everyone wants this mine opened. And it's a very significant deal because never have the landowners had the potential to earn so much from a gold mine, or any mine in Papua New Guinea. So I think there are lots of drivers. Of course there's also the obsession with being able to negotiate the terms, which we've already settled. But that's the good thing about Papua New Guinea, as frustrating as it is: a full consultation before that special mining license is issued. And we know Barrick Placer and then Barrick had 30 years of no issue, because they got that process right. And we are very mindful that it is a litigious society and you've got to do this thing by the book to make sure that we can mine for another 30 years.

Josh Wolfson

analyst
#36

Mark, you made a few remarks about how the company's fundamental outlook looks quite constructive, given the gold price, given the growth outlook, and then given where the stock's valuation sits. I'm wondering what you think about directing some capital toward the buyback going forward.

Mark Bristow

executive
#37

Yes. Josh, that keeps Graham and me pretty much entertained daily. We've repurchased shares before, and we — I believe we — once again, we aren't willing to put our balance sheet at risk at this moment. Our positioning is quite solid. Our balance sheet is extremely strong. We're projecting cash growth, and that will bring about a net cash position. And as we get closer to that point, the preferred choice among the options is repurchasing your shares. Because we absolutely — we fully share the consensus view, which is that we're trading under where we ought to be trading, and purchasing makes sense. So repurchasing our stock carries no risk. It's simply a matter of how we steer our balance sheet toward that.

Josh Wolfson

analyst
#38

There's one more question I'd like to ask. You said something about Porgera being a world-class Tier One asset, and you also made some remarks regarding bringing analyst expectations up. Could you perhaps remind us how you see the potential economics of that asset? In other words, what initial capital would be needed to bring it to Tier One status, and what would the production and cost structure then look like?

Mark Bristow

executive
#39

So it's a low-cost producer, since the grade is relatively high. It's a single refractory, and also an autoclave mill, a crusher mill — a simple process that we know well. If you look at consensus, on consensus prices the valuation comes in at around 6 billion to 7 billion, with a 5% discount. Graham?

Graham Shuttleworth

executive
#40

Absolutely.

Mark Bristow

executive
#41

And so — it comes to roughly $1 billion of capital across the coming 10 years, slightly weighted, with more of it spent early. But again, there's still a bit of work for us to do on that. Much of it hinges on how we handle the Wangima pit, which isn't in reserve yet. So what I'm discussing now is the total resource. We have 10 years banked, and that matters to us, because that's when we reach the 50/50 sharing of economics. And our intention is to create so much value for everyone that nobody else will want to — the government and Barrick will be partners forever. That's the intention. So — and there's a significant pushback on the Western wall of the main pit that we're going to address. And that's what we're busy with right now, designing it, doing that work. As I say in the press release, we are designing that pushback at the moment. I think I can say the underground is in better condition than we expected. So we're happy with that. We've had this constant sloughing of the Western wall, which has always been a challenge at Porgera, and we need to cut it back and put some remedial work into that wall.

Mark Bristow

executive
#42

The traction comes from the fact that there's a substantial amount of ore in that pushback. And our hope is that we can fund that pushback. Then you have the Wangima pit, which truly adds a great deal of extra resources into the mine plan and potentially extends it to 20 years, which produces that large figure when you look at it. And we're working with — that's a broad, rough valuation using consensus prices. But the crucial thing for us is that in 10 years we more than reach that roughly 53/47 split, the economic split. And keep in mind we sweep all the costs we've incurred to date from the government equity in order to equalize. And once we reach that point, then everybody else benefits. What matters is that the landowners and the province benefit on a preferential basis. So it's carried equity, just by way of explanation. Graham, would you like to add to that?

Graham Shuttleworth

executive
#43

I believe you've handled that well. What really matters here, Josh, is this: when you examine the economic interest we hold in that venture and set it beside the equity interest, the economic interest comes out at nearly twice the equity interest, given how the cash flow is divided. That holds true if you stack it against what a typical arrangement would deliver — one where you'd be paying corporate taxes alongside a 3% royalty. So that splitting of cash flows, taken together with what Mark just mentioned — namely the sweep of cash we have already spent — leaves our economic interest at a level that is, in effect, substantially double the value the equity interest alone would suggest.

Mark Bristow

executive
#44

And Josh, this ties back to that Tanzania agreement we struck, and what I've consistently said is that the trouble with mining is companies come in, invest, promise everything, and then fail to earn the money because they don't execute the plan. So the government ends up with nothing, since taxes are all they count on. So in Tanzania what we did was take the economic interest and divide it equally in two. We reconcile it annually. It's somewhat complex, but that's what we do. So the government receives the tax sum, yet when we pay no tax, they still receive 50%. So that's a far fairer approach. And again, Papua New Guinea hasn't — Porgera was a unique case. And ironically it paid — the foreign currency crisis in Papua New Guinea stems directly from the fact that we aren't expecting gold imports from Porgera, because it's the biggest producer and the largest, most profitable company in Papua New Guinea. So, that's the same thesis: the Prime Minister wanted 51%, which I was delighted to give. I mean, following 30 years, he wanted a different deal.

Mark Bristow

executive
#45

He wanted certainty that he'd secure every lawful tax benefit and a stake in the equity, provided we hit the plan we set out. If we fell short, he still wanted half of the production. That's the arrangement we've committed to, and in my view it's an excellent way to conduct business. The sole exposure, really, is that you must be completely certain you can deliver on your mine and on the models you presented. We've applied a quite comparable structure at Reko Diq too, somewhat more tilted, since Reko Diq is a far larger asset. Beyond that, the government is carrying substantial risk itself, via these state-owned enterprises, and is regearing it with equity, alongside a global funding package.

Josh Wolfson

analyst
#46

What about the debt?

Mark Bristow

executive
#47

Regarding debt—yes, apologies. We're structuring it using debt. My mistake, not equity; it's through the global funding package.

Lawson Winder

analyst
#48

Hey, Mark. This is Lawson Winder at Bank of America. Thanks for the presentation. Good to see you and the team today. I'd like to ask about reserve replacement. You mentioned how important reserve replacement is to Barrick's value. What's the outlook for this year, and which assets do you expect to drive that outlook?

Mark Bristow

executive
#49

Africa is going to replace every ounce of gold and copper it mines. LatAm is the one that won’t, but Porgera and Reko Diq will bring a great deal into that region. We also have this new set of projects around Veladero, and some extremely exciting ones, especially Southern Peru and elsewhere in South America, which we’ll share with you in the next quarter or two. Nevada Gold Mines will add roughly 50% to 60% of what it currently produces — of this year’s output — but then it has a big year next year and the year after. That’s why we’ve said that on a three-year rolling average, we will keep replacing on ounces. And we will get Nevada there. We’re just about there with Nevada as we are in Africa. And again, Lawson, so much so that we’re in discussions because at Randgold we used to have some incentives tied to reserve replacement — at least reserve and resource replacement. I think that’s a very good metric for any mining company to pay management on.

Mark Bristow

executive
#50

And that's why we see organic growth as so important, because — especially when you consider — we hold some truly large assets and have now nearly finished the recapitalization, since the Barrick portion of our assets had been run down, and both halves of Nevada Gold Mine were run down; the Barrick side had been high graded, while the Newmont side was simply run down. And we've recapitalized it, and on top of that we now have a resource base. So when you add that in, your returns become significant. They turn infinite, because you're adding ounces onto a capital base. And that's the nature of the game with big mining assets: if you have large orebodies and you've built the mine the right way, it keeps producing — the copper miners are skilled at this. That's the reason they're so valuable.

Lawson Winder

analyst
#51

I'd like to come back to—sorry—something you said regarding what Barrick's assets are worth versus the discount multiple the market applies. I mean, you lay out a case for why those assets are strong and why they ought to remain strong ahead, given the reserve growth. In your view, what is the market overlooking, or what has it overlooked across the last two years, that has produced that discount?

Mark Bristow

executive
#52

Well, I suppose I'd begin with the point that maybe it starts with the analysts and with management, and that conversation hasn't happened yet. So it's nice to see that valuation showing up on a blended consensus basis. That's a positive, and I'm very conscious of it — I said this back in 2019, we had a job to do, and you don't build great mining companies easily these days, especially not gold companies. Those are hard things to build. I've built one myself, and now this is the second. And again, we're mindful that we have to be able to — I mean, we've always — I've always been that kind of person, I like to support. I like to have an argument, as Josh will confirm. But I like to do it on the back of something tangible. And I think we're rarely there today. And the first step is, it's very helpful when the analyst group is recognizing value. And it's even more exciting when there's still headroom, which I've just pointed to. And by far, if you look at our performance, what we say, what we do, how we've managed our balance sheet, what we've promised to the market, we've been consistent like we always are.

Mark Bristow

executive
#53

So I really don't believe anyone has any doubts about that. Sure, a few folks feel somewhat uneasy about the direction we've taken. They reacted the same way back when we entered the DRC. Yet today, if you examine our asset portfolio across the globe, the risks look quite comparable — different yet comparable, or identical. And what we've demonstrated is that large assets succeed, provided you pay rent. If those assets are large enough and valuable enough to bring value to your host country, it's — and I'm certain, Lawson, that you've tracked U.S. mining law and the debate in Rosemont and all of that. I put in as much effort with the team in the U.S. as I do in Pakistan and West Africa. The era is over when you could operate mining companies from a 16-floor office block in the developed world. You need to be on the ground. And once more, returning to the way we handle our reserve resource replacement, that means we push that ownership out to the mines. We've restructured management into genuine business people who lead our minds, and they hold ownership of those assets. They have top-quality geoscientists and processing engineers. It's not — we don't run our business by remote control from a central corporate office.

Mark Bristow

executive
#54

We definitely make them answer for their actions, and we’re consistently present. I tell the team all the time: step outside the lines, and you’ll be hearing from us. If you almost never step outside the lines, you’ll be hearing from us constantly until we’ve got you back on course. That’s how we operate at Barrick.

Brian MacArthur

analyst
#55

Apologies. So as a follow-up — this is Brian MacArthur from Raymond James. I mean, the Super Pit is likely one of those hidden values you're beginning to bring to light. I mean, on a standalone basis, this could rank among the better copper mines anywhere in the world. On top of that, you'd get a gold credit. Given what a large and strong copper company you're going to have, does it make sense for all of that copper to sit within Barrick going forward? Second thing, without — you probably can't put everything on the PFS, but looking out through 2060, is that a fairly stable production profile coming from the Super Pit? So again, is it basically duration forever?

Mark Bristow

executive
#56

A large, low-grade pit. What happened with the Chimi pit is that it became segregated, because people — Barrick was in a spot where it was trying to generate profit, so it dove down and pursued the grade. And chasing grade in a low-grade, blended, sedimentary-hosted copper deposit is a challenge. So what we've done is simply return to geology, and there are a couple of satellite pits that are genuinely higher grade with a lower strip ratio. And the exciting part about Lumwana is that we run the risk of completing the entire pushback for the Super Pit without going negative cash flow, because we have these satellite pits that can — so we mine at the same strip ratio on a copper waste basis. And so that really — and that's our team. That's what they — but once we brought the cost down, we brought the cost down right at the start. We understood, we came to know there are orebodies and that — and then we examined the other satellites. Again, somewhat like West Africa, they were known as anomalies, but nobody had ever drilled a hole into them. So that's what we've been doing.

Mark Bristow

executive
#57

And we've made a lot of progress on that front. So we have enough confidence that there's sufficient copper in those satellite pits to carry us. At present we're mining, and in the Lumwana pit — the Chimi pit now — we're about to reach some higher-grade zones. At the same time, a new fleet of Komatsu 100 ton trucks has taken the place of the contract miner. And we've brought the cost down by $2 a ton. And that's really making a difference, and you can already see it in the numbers this quarter, this past quarter. And so that — so we all run that pit to the point where we have it open on strike and then that big push back to create the Super Pit, we'll rely on the satellite pits for that. We're right in the middle of permitting the new tailings facility. It's mostly a negotiation with the tribal chiefdom of the region, which we've had a longstanding relationship with, as far as the authorities go with what support on that.

Brian MacArthur

analyst
#58

So when I look at that slide for 2029 — I mean, Jabal Sayid is included there, and Zaldívar is included there as well, but Reko Diq isn't in it either, correct? So you're going to have, like, a…

Mark Bristow

executive
#59

Correct — that is indeed going to happen…

Brian MacArthur

analyst
#60

It's a 5-year matter, too.

Mark Bristow

executive
#61

And we're actively searching throughout the major copper belts — every copper belt across the United States. Let me tell you, there are still some significant opportunities inside the U.S., as I showed broadly on that slide. So we are — and again, we believe that, if you believe in the numbers, which I've always worked on, the U.S. is going to have to change how it manages mining. And we've taken that bet, to get out there ahead of the — and again, we're already the biggest miners in the United States. And we're probably the biggest explorer, sorry, I stepped out of the box. We probably — okay. We're probably the biggest explorer in the U.S. right now as well.

Brian MacArthur

analyst
#62

I appreciate that.

Mark Bristow

executive
#63

Is there anyone else? Operator, we're handing it back to you in case there are questions from the call-in lines.

Operator

operator
#64

Of course. <<operator_script>> Our opening question is from Cleve Rueckert at UBS. You have the floor.

Cleve Rueckert

analyst
#65

Is my voice coming through clearly?

Mark Bristow

executive
#66

Absolutely, Cleve — that's completely fine.

Cleve Rueckert

analyst
#67

Great, thank you Mark. We ran into a few technical issues with the online feed, so I apologize if this question repeats something. In the prepared remarks, though, I believe you identified Cortez, PV, and Turquoise Ridge as assets where maintenance and investment took place during the first half, and you expect that higher production run rate to carry into the second half. I asked something similar last quarter. Should we expect that second half run rate to persist into 2024? In other words, have you largely completed the bigger work those mines require so that production can be sustained at that second half run rate?

Mark Bristow

executive
#68

Sure. Let me go through them one by one. The Cortez maintenance work is really development-related — it isn't truly processing maintenance in the usual sense. At Turquoise Ridge, a premature hotspot showed up on one of the autoclaves, so we moved that work forward. It had been slated for normal planned maintenance in quarter three. Again, we pulled it ahead. We made a lot of changes. We took the opportunity to swap out a whole lot of gear pumps and tied everything up. There's still quite a bit of work ahead of us before Turquoise Ridge gets to where we want it. The roaster maintenance was a major scheduled maintenance event on the Goldstrike roaster. More importantly, it involved the shutdown on the Gold Quarry roaster, and we also used that shutdown to tie in the expansion project. So we have one more shutdown to do next year. I believe it's scheduled for the second quarter, and we'll complete the expansion of the Gold Quarry roaster. So beyond just maintaining the run rate, we increase our throughput capacity at the Gold Quarry roaster by between 15% and 20%. And so we lower the costs while adding production capacity, because right now Nevada Gold Mines is constrained on double refractory ore processing capacity.

Mark Bristow

executive
#69

We put substantial effort into planned maintenance—so much of it had been scheduled precisely because it had been neglected before. Now we're returning to a proper maintenance plan, meaning scheduled maintenance, the kind that's part of normal business operations and already built into our forecast. So, to put it plainly in answer to your question: yes, you will see throughput sustained at a higher level, mainly since we're adding more capacity next year.

Cleve Rueckert

analyst
#70

And then just one quick follow-up question. The Goldrush Record of Decision keeps coming up in our conversations. I see that you now expect it, I believe, in Q4. But there was also some discussion about certain modifications to the BLM. I'm wondering whether that Record of Decision is in any way restricting development there, or whether these small modifications are letting timely development carry on?

Mark Bristow

executive
#71

On the development front, we're still moving forward. It does begin to get in the way of production, since we have to have ventilation in place ahead of where we currently are. So if that gets pushed out much more, production will be affected. We've guided that we're examining the specific impacts. Right now, this is entirely about Rosemont and the Department of Interior, and we've stayed engaged with them throughout. And again, this matter of permitting unmineralized claims, and the fact is there are two things here. Goldrush has no need for a tailings dam. It's mineralized everywhere beneath and where we're working. Its footprint is very small, because we're drawing on infrastructure that's already permitted. So it doesn't fit, even if you wanted it to — you can't slot it into a Rosemont-type argument. And it's taken us a little while to get BLM, the state and especially the federal side to clear it. So they've now cleared it. That's why we're pointing to a specific time period. But it's a bit like Porgera — we're talking constantly and working toward it. We have permission to extend the development under the exploration permit at Goldrush.

Mark Bristow

executive
#72

So we can carry that into next year and still have the flexibility set up, but we need — as soon as we have to start putting the raisebores up so the ventilation is cleared, to be able to ramp up ore production. So that's really where things stand. And every indication now is that it has been cleared to finalize the EIS as the first step, and then that goes to the — once that is finalized, the Record of Decision comes shortly after. And that's why we have got. And we make these forecasts in conversation with our local BLM team.

Operator

operator
#73

Alan Spence of BNP Paribas Exane has the next question.

Alan Spence

analyst
#74

I have a couple of questions, and I'll go through them one by one. First, regarding Turquoise Ridge, there were some unplanned maintenance events underground. Could you elaborate on what those were and whether that has continued into the third quarter?

Mark Bristow

executive
#75

Right, so a fall of ground occurred in one section of the development at Turquoise Ridge, which, again, forms part of our design work — we had to pull back and address it as we modified that design. We also had an additional shutdown on the shaft involving certain safety arrangements in the shaft that required fixing. And we took care of that. The biggest effect really came from the autoclave hotspot — we had to shut the autoclave down and repair it. As I mentioned, we had that scheduled for quarter three. We moved it ahead. So taken across the full year, it has no effect on our production. That stands out as the most significant piece of unplanned maintenance. It was planned, just not at that point.

Alan Spence

analyst
#76

And then there's one that's probably for Graham — could you speak a bit about what you expect on costs going into the second half, and how labor and consumables have been developing, and...?

Mark Bristow

executive
#77

Is our audio coming through okay?

Alan Spence

analyst
#78

All right, I believe he returned.

Mark Bristow

executive
#79

Right, I'm back — yes. So your question was about inflation and how we're viewing it going forward?

Alan Spence

analyst
#80

Yeah, let's move on to the second half, please.

Mark Bristow

executive
#81

Alright, I’ll take that one. Graham has a technical issue on his side here. So we definitely are seeing costs level out. A bit of easing, perhaps. Our forecast is for a sticky kind of inflation, roughly where it stands today. We have certain elevated costs that remain tied to Ukraine — ammonium and cyanide, items of that kind. The major factor in the second half is that higher output will reduce our costs, as I noted in our guidance. And we do think the cost will decline, though not fully in the near term. That is how we are running things. But there is — as you — from many years of experience, I can tell you, if you hit your production numbers, costs always appear better. Right now we are definitely not dealing with inflationary costs. We have a few, but we have plans in place. For example, we are far better positioned to handle costs and logistics in AME. The U.S. has import restrictions and other tariffs and so forth. So we handle that in a different way. But, I think — I don’t know, Graham, you have the mic now.

Graham Shuttleworth

executive
#82

I believe you've addressed that, Mark. Regarding the inputs, the assumptions we used for 2023 are ones we're comfortable with. There are some pluses and minuses, but broadly speaking, we're aligned. So costs should decline in the second half of the year as production increases. And that's indeed how we arrive at that figure. Another thing worth repeating: our cost guidance is clearly predicated on a gold price assumption — for 2023, we used $1,650 — and we've also guided that each $100 move in the gold price has roughly a $5 effect on our cost per ounce. So given where we stand right now, that amounts to about $15 in added costs relative to the base case assumptions. I think that's important to factor in as well.

Alan Spence

analyst
#83

Okay, thank you everyone. Fortunately the sound came back near the close. I didn’t catch the bulk of it, though I’ll go through the transcript to get your complete description. Appreciate it.

Mark Bristow

executive
#84

Alright, my apologies for that.

Operator

operator
#85

Our following question is from Lici Wu at Haitong International Securities. You have the floor.

Analyst

analyst
#86

Hello, Mark. This is Lisa calling from Haitong International Securities. I have a couple of additional questions for you. First, regarding the Porgera project: how are the tax issues being handled — is Barrick taking them on, or is that being done jointly with Zijin Mining?

Mark Bristow

executive
#87

So together with Zijin Mining, we divided it 60/40. It came about through a negotiated settlement. Figuring out how to allocate it was fairly difficult. Still, we coordinated very closely with Zijin, and Chairman Chen and I sat down, went through it, and assigned a portion to Barrick's past, since the settlement reached all the way up to the new Porgera start-up. As a result, we left no residual tax assessments outstanding. We cleared everything. So part of the tax was future based, part was tied specifically to the assessment carried out right before they shut the mine, and then another part related to the period before Zijin joined the project. We went through all of that and essentially settled it, with the share falling to us on a 60/40 basis. So the tax was shared.

Analyst

analyst
#88

Understood, thanks. For my follow-up, I've seen that copper is where our attention will be going forward. Right now, a lot of copper miners are running into issues like falling grades and not enough water. Looking ahead, are we going to face rising copper costs as well? Thank you.

Mark Bristow

executive
#89

That's a really important point you raise. A great deal of the copper that gets produced today comes from old mines — mines that began as new operations decades back, perhaps 50 years ago. So that's a challenge, and naturally, if you're talking about Chile, water has turned into a major issue there and for copper mining. With the assets we hold, we're in a stronger position because of grades generally. Reko Diq has gold with it, which makes it more appealing and spreads its risk. On the water side at Reko Diq, that's one of the key deliverables in our feasibility study, and we're highly focused on it. As I mentioned, we'll be carrying out the first genuinely thorough water study for that entire part of Pakistan/Balochistan. But based on the work already completed, we're comfortable that at least for the first 10 years we can draw water without affecting those aquifers, and there's much more we can certainly point to at this stage, though plenty of work remains. Ultimately, further options exist. I mean, as that area — that whole Tethyan metalliferous belt — gets developed, this will be a region where infrastructure, and desalination in particular, is going to have to form part of the larger developments going forward.

Operator

operator
#90

Our following question is from Anita Soni at CIBC World Markets.

Anita Soni

analyst
#91

Alright, I’ve just got one more, and I believe it concerns PV — and sorry about the noise in the background here. Three months ago, though, I had a chance to go see that asset, and it is certainly impressive. You were mentioning a few problems you’ve been experiencing with certain FLSmidth equipment, though. Could you discuss how you expect that to develop in Q3? And I know you mentioned a ramp-up would happen in Q4, but can you tell us how things are going during this quarter and what we ought to anticipate for throughput in this quarter?

Mark Bristow

executive
#92

So, Anita, you'd figure that everyone is over at PV — John Steele, all of our engineers from other regions of the world, the commissioning specialists who are FLSmidth subject matter experts. This is a new piece of equipment. And we've run into problems with the shafts and the gear boxes. Those have already been swapped out. Right now, as we speak, we're engineering some of the design problems away and building a few extra pieces of equipment, so we have spares. So we're on it. For me, honestly, I can't gauge it at this moment, because startups like these can either resolve in a flash or take a couple of weeks to work through. So — but we're awaiting a final plan, the actual schedule for how we're going to get them back to. So we've got an — we can engineer and swap parts and engineer small pieces onto them, and that will get them running. But we need to bring this thing up to full capacity. And, you know, I'd be remiss if I didn't mention that this is a major asset that will operate for 20 plus years. We are on top of it. Certainly when I sit down with the team — and I've just come from there — we're still going to have a substantially better second half than first half at PV.

Mark Bristow

executive
#93

And at this point, our intention remains to stay inside the guidance range.

Operator

operator
#94

Tanya Jakusconek of Scotiabank has the next question.

Tanya Jakusconek

analyst
#95

Good afternoon, everyone. Thanks for taking my questions, and I'm sorry if this has already been covered — there are a lot of technical problems on today's call. I just wanted to return to Porgera if I could. I just want to confirm that, Mark, what you said was that we're simply waiting on the Special Mining License, which is on the critical path for us to start up. And I just wanted to confirm that you said local communities have all signed off. Are those two comments correct?

Mark Bristow

executive
#96

So we’re awaiting the special mining lease, which effectively amounts to the same thing—though that’s the term used for it. And the landowners agreement, as you’re aware, we disclosed that quite a while back during the period when there was friction between us and the government. The landowners stood with us and kept stressing how important Porgera is and the need to bring it back into operation. So the equity split gives 10% to landowners, with 2.5% allocated to what we refer to as the LMP landowners and 7.5% to the SML landowners—the primary owners of the land where the mine sits. And 5% is directed to Enga Province. That’s how the split works. Naturally, discussion at the development forum centers on that. And also additional contracts that are always in effect, such as for those residing downstream, people on other concessions including Dolomite concessions and various other concessions we engage with. And all of that forms part of it. And naturally, the government has also pledged to reinvest in Porgera and the Porgera Valley—things like schooling—and we’ve been discussing certain tax offsets as well, because there’s a genuine recognition of how vital Porgera is to Papua New Guinea’s economy. So the response is both yes and no, since this remains an ongoing process.

Mark Bristow

executive
#97

Naturally, a fallback always exists since we hold agreements, but this involves a consultation process mandated by statute, and the initial step is the warden's hearing. That hearing is specifically set up for the government, through the warden at the MRA — Mineral Resource Authority or the Mining Department — to convene and hear from every interested and affected party, capturing their concerns, suggestions, or whatever else they bring, and putting those on record. That step is mandatory. After it comes the development forum, which amounts to a more genuine form of engagement, and it need not wrap up immediately. Still, once matters have progressed sufficiently, the government will at some moment decide whether to grant the SML.

Tanya Jakusconek

analyst
#98

All right. And once we have the SML, can we still assume a ramp-up period of six months? Does that still hold for this mine to reach full capacity?

Mark Bristow

executive
#99

Yeah. I think six months is a solid goal once we get onto the site. Naturally, we'll be producing gold sooner than that. But for full ramp-up, that's a reasonable assumption.

Tanya Jakusconek

analyst
#100

And should I still be thinking of this mine producing roughly 500,000 ounces on a 100% basis, with total cash cost of 900 and all-in sustaining cost of 1,200 — is that figure still reasonable?

Mark Bristow

executive
#101

At this point, that’s a reasonable assumption. As we move forward, we’ll refresh it.

Graham Shuttleworth

executive
#102

My view, Tanya, is that we'll pass along refreshed figures for you once operations are fully underway.

Mark Bristow

executive
#103

And as soon as that start-up plan is ready — that's the piece we're currently putting together — we'll give you guidance on it. That said, the guidance we've already issued stands, and it will remain in place until we revise it. As for the ramp-up, it comes before that. So using 500 as an initial estimate is reasonable, on a 100% basis. Naturally, it climbs much higher than that within a couple of years.

Tanya Jakusconek

analyst
#104

Okay. All right. I’ll hold off until that updated mine plan arrives — when would it come through, once we have this up? Would it be fair to expect, hopefully, with the guidance you provide and...

Mark Bristow

executive
#105

Yes. Once we announce that the mine is genuinely beginning operations, you'll have it. Graham is sitting here, and I'm doing my best to sidestep the question.

Graham Shuttleworth

executive
#106

My view, Tanya, is that assuming everything unfolds as expected, the most reasonable estimate is February, when we issue our usual annual guidance.

Tanya Jakusconek

analyst
#107

All right. No. Appreciate that, Graham. And regarding reserve replacement, since, once more, technical problems come into play—I simply wanted to clarify this: looking at the company as a whole, did I get it right that in this year we would probably witness additional growth in resources rather than reserves, necessarily? Is that a fair way to put it?

Mark Bristow

executive
#108

You've got that right. Yes.

Tanya Jakusconek

analyst
#109

And that reserve replacement you can see happening in Africa with both gold and copper, but not in LatAm — was that also a fair statement?

Mark Bristow

executive
#110

You've got that right. Even so, you'll notice it shows up on a consolidated basis the following year.

Tanya Jakusconek

analyst
#111

Okay, that helps. And then finally, regarding the company's overall resources, was there a rise in both gold and copper?

Mark Bristow

executive
#112

Correct. That's copper and gold from mining. You're referring to the second-to-last slide.

Tanya Jakusconek

analyst
#113

Yes. All right, that works well. Thanks a lot.

Operator

operator
#114

The last question we have is from Martin Pradier at Veritas Investment Research.

Martin Pradier

analyst
#115

I've got a couple of questions. The first concerns Lumwana — is it sustainable, and are you referring to a lot more high grading in the second half versus Q2? Could you give us a sense of what you mean by a higher grade in the second half?

Mark Bristow

executive
#116

See, what counts as elevated grade at Lumwana would be considered low grade at any other site. So it isn't much, yet it's more steady and a bit better in grade. I mean, I can actually…

Martin Pradier

analyst
#117

If we look at the second half versus Q2, is the increase closer to 10% or to 15%?

Mark Bristow

executive
#118

Around 10% seems like a solid figure.

Martin Pradier

analyst
#119

And at Kibali, you saw a solid rebound. Is it possible to keep output steady or push it higher during the second half versus Q2?

Mark Bristow

executive
#120

Kibali's second half looks strong for us, and the picture overall is positive too. That latter portion of the year…

Graham Shuttleworth

executive
#121

Yeah. That lines up really well with quarter two. So that’s the kind of run rate we’re expecting through the rest of the year.

Operator

operator
#122

That brings us to the end of the questions from the conference call.

Mark Bristow

executive
#123

Much appreciated. Thanks to all of you, ladies and gentlemen, for being here. We thought we'd ask you to join us for a bite to eat and a glass of wine. We decided to do things differently at the new Barrick. So please come along. Thank you, everyone.

Operator

operator
#124

That brings us to the end of today's event. If you have any further questions <<inaudible>> and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Barrick Mining Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Barrick Mining Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Barrick Mining Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.