operatorGood day, everyone, and thanks for holding. I’m the operator for this event. You’re welcome to Barrick’s Results Presentation covering the Third Quarter of 2023. After the presentation today, there will be a question-and-answer session. <<operator_script>> Just to remind you, this event is being recorded, and a replay will be posted on Barrick’s website later today, November 2, 2023. At this point I’d like to hand things over to Mark Bristow, President and CEO of Barrick. Sir, please go ahead.
Mark Bristow
executiveThanks, operator, and good afternoon and good morning, ladies and gentlemen. I'll begin with the state of global metals and minerals right now, which honestly brings to mind 2015, when the mining sector lost momentum following a strong stretch. This time it's compounded by inflationary pressures, few or no fresh discoveries, and a disordered world. Then as now, it suffers from the fixation on the short term shown by governments and investors alike, who want instant satisfaction and grab at quick fixes, brushing aside mining's long-term character. If you're building a sustainable business or a better world, achieving your objective takes carefully thought-out strategies and workable plans. Be it the worldwide shift to renewable energy or a business that generates and provides genuine value for all its stakeholders, wishful thinking won't get you there. That's the reason Barrick holds a long-term vision for its future and a strategy that, as I'll demonstrate during this presentation, is organically built to provide value today and growth tomorrow through genuine partnerships with our host countries and other key stakeholders. As in every quarter, I'll be making forward-looking statements today, so please note this cautionary statement, which is also posted on our website.
Mark Bristow
executiveThe KPIs make clear this quarter was extremely active. Output of both gold and copper rose versus the prior quarter, and it has climbed from quarter one into quarter two, and from quarter two into quarter three. That said, we encountered a few difficulties—most notably a slower ramp-up at the Pueblo Viejo expansion, which is our flagship organic growth project located in the Dominican Republic. That is affecting our capacity to hit this year's gold production guidance, yet as I've frequently noted, mining is a long game, and Barrick is not run on a quarter-by-quarter basis. Despite the slower ramp-up at PV, we continue to anticipate that mine will surpass 800,000 ounces in 2024, and our group forecast of 30% growth in gold equivalent production by the close of this decade is still intact. Beyond that, there was plenty of positive news in the quarter—in particular, the advances we are making on our other growth projects, La Moana and RekoDiq, along with a strong financial performance. I'll share more detail on these and the remaining KPIs as we move through the presentation. Operating results for the quarter, as I mentioned earlier, showed an improvement over the prior quarter, with greater gold and copper output at reduced costs.
Mark Bristow
executiveWe anticipate additional gains in output during the fourth quarter. However, as I indicated, yearly production is now projected to come in slightly under the bottom of the 4.2 million to 4.6 million ounce range. Copper is still expected to hit its guidance of 420 million to 470 million pounds. As you can observe here, the financial results came in strong, with operating cash flows rising 35% to over $1 billion quarter-on-quarter, free cash flow climbing substantially to $359 million, and adjusted net earnings up 26% to $0.24 per share. Barrick’s solid balance sheet ensures our ability to keep investing in our growth projects regardless of the market, both new and existing, while we keep rewarding our shareholders through dividends. Alongside growing our business, we have also been fostering a new safety culture, including a fresh set of standards and initiatives to keep enhancing this vital part of our business. We refer to this as the Journey to Zero. Regrettably, this key priority was affected by two fatalities in the quarter, which is deeply disappointing for me and the company. We stay highly motivated to reach these Zero goals. And over the past quarter, we have created and updated a fatal risk management program to help make sure we remain on track with our Journey to Zero.
Mark Bristow
executiveBarrick has kept up that really encouraging pattern of reusing and recycling more water across our sites, and for quarter three we posted an 85% efficiency rate. We're also still making solid headway on our Scope 1 and Scope 2 emissions goals. And in the quarter, the group, power plants included, recorded a 6% drop in emissions versus the same period in 2022. We also hit a major milestone on tailings management during the quarter, as Barrick aligned with the global industry standard on tailings management and, on the 4th August, published its disclosure covering all very high and extreme consequence facilities. Our teams have already begun the work needed to meet the standard's requirements at our remaining facilities by 2025. As is the case for most gold companies, Barrick's Scope 3 emissions — at least 40% of our total emissions — fall mostly within Category 1, our suppliers, and Category 3, fuel and energy transmission. Thanks to our extensive supplier engagement and data collection efforts over the past three-years, we could set qualitative and quantitative targets that are achievable and measurable, as disclosed in this slide. Moving now to the operational review in North America, already the largest gold miner in the United States.
Mark Bristow
executiveOur goal is to grow our presence across the continent, moving past the sizable foundation we have at Nevada Gold Mines, or NGM, and into other promising regions of the United States and Canada. And, as I'll demonstrate to you afterward, we're achieving meaningful headway on those efforts. Performance at Nevada Gold Mine is spearheaded by Turquoise Ridge, where a successful turnaround effort by its fresh management team has lifted output by 14% versus the corresponding period in 2022, aided by the successful commissioning of the third shaft. That mine possesses one of the highest grade ore bodies in the industry, yet around the time of the merger it was finding it hard to fulfill its potential. Today it once more completely earns its Tier 1 designation. What was learned at Turquoise Ridge — chiefly regarding how essential teamwork and planned maintenance are — is now being introduced at the remaining NGM mines. As we frequently emphasize, NGM holds abundant growth opportunities, and a robust exploration push is underway both to replace reserves and to uncover the next major stand-alone discovery. It is producing highly encouraging results across the three trends illustrated here. In particular, Leeville in the Carlin Trend, Goldrush in the Cortez trend, and the extensions at Turquoise Ridge.
Mark Bristow
executiveDrilling results across the NGM portfolio have already supported its plan to replace reserves and resources over three years. The Fourmile project, which Barrick owns and which sits next to Cortez's Goldrush but is not part of NGM, deserves special mention. Fourmile is, by a wide margin, the top undeveloped gold asset in its class, and we fully expect it to turn into a long life, high value mine. Conceptually, once combined with Goldrush, it will rank as the largest gold mining operation in the Americas. Waiting so long for the government's record of decision on Goldrush has been frustrating, but the EPA published the notice of availability for the final environmental impact statement for Goldrush on October 27th. So we expect to receive the record of decision before the end of the year, as previously guided. This is an overview of our expanding work and land consolidation across North America. As you can see, we have many growth opportunities beyond NGM. And as we work through this in the coming quarters, we will give you more clarity on exactly where we are building those footprints. Across the U.S., our teams are hunting for and securing significant early stage opportunities to feed into our project pipeline. In Western Nevada, Phase 1 drilling has been completed at Pearl Stream, with Phase 2 scheduled to start soon.
Mark Bristow
executiveUp in the north, at Alaska’s advanced Donnan project — which holds a very large resource — we’re advancing key work streams to keep pushing it up the value curve, as this slide lays out. And over in Canada, fieldwork was carried out successfully across three properties, which builds confidence and moves each project closer to testing priority target concepts. We turn now to Latin America and the Asia Pacific region, where our exploration portfolio has been growing. The primary focus, though, has been — as I noted in my introduction — on ramping up the expanded Pablo Viejo Mine and on updating RekoDiq. When the merger took place, the Tier 1 Pueblo Viejo asset was set to end mining this year and processing by 2030, held back as it was by low grades and insufficient tailings capacity. A visionary expansion project has unlocked optimization of 20,000,000 ounces of reserves, stretching the mine’s life well past 2040 at an average yearly output above 800,000 ounces. A project of this scale invariably brings risks and challenges. And with PV, that meant the gearbox failures for the flotation cells and, more recently, the partial failure of the end of the new conveyor belt feeding the single stage SAG mill.
Mark Bristow
executiveWith the design engineers and original equipment manufacturers, long-term engineering fixes have been created, and short-term workarounds—mobile crushers among them—have been put in place. Scheduled commissioning and ramp up have been held back by the equipment failures, yet the corrective steps the team has taken are letting work and production carry on and, to be sure, the ramp up proceed, though more slowly. In spite of these difficulties, as I said at the outset, we continue to expect PV to produce over 800,000 ounces in 2024. Meanwhile, the new tailings storage facility—a vital component of this expansion—has obtained its environmental permit, and relocation of the project affected people away from the site is due to begin in 2024. Earlier this year, you may recall, Veladero was an operation under severe strain, facing a mix of operational and geopolitical difficulties. We decided to scale back the mine plan and capital while we weighed the mine’s future against the risk. In the interim, the mine’s new management team has performed excellently in this environment, and Veladero is now positioned to exceed the top end of its annual production guidance. Over the quarter, the mine raised output and lowered costs, and we expect it to hold a positive cash position by year-end and to present a positive outlook for 2024.
Mark Bristow
executiveFinishing Phase 7A of the Leach Pad successfully gave us the confidence to begin building Phase 7B, and that work should wrap up ahead of the Andean winter's arrival in mid-2024. Throughout LatAm, we're reviewing fresh opportunities in the Dominican Republic and Chile. In Ecuador we've just locked in a sizable land package, and in Peru we've built up a pipeline of permitted drilling targets. We're likewise focused on lengthening Veladero's life by restoring certain resources that had earlier been taken out of the mine plan. Turning to Pakistan, the infrastructure on site at RekoDiq now stands complete, and the feasibility study update is advancing well, with completion expected in the fourth quarter of next year, and Laika Podium has been named as our project engineering partner. Surveys using seismic methods of aquifers nearby point to the potential to satisfy the mine's near-term water supply requirements, and drilling is underway to verify that potential. Mine construction should get going in 2025, with first production targeted for 2028. Once fully operational, RekoDiq will stand among the 10 largest copper mines globally. Yet, as everywhere else, Barrick remains highly mindful of its social license to operate.
Mark Bristow
executiveAnd consistent with our commitment to bring benefits to the local community long before mining began, we've delivered three primary schools, a health centre and a mobile clinic to the villages nearby. During the last quarter, we also introduced an international graduate program in Balochistan, with an initial intake of nine exceptional graduates, four of whom are women. Our aim is to begin developing a cadre of future experts and leaders for Pakistan's fledgling mining industry, and we also intend to begin training future employees from the region, with a target of the first 1,000 by early 2025. In Papua New Guinea, the road toward reopening Porgera has been long and winding. But the end has finally come into view with the granting of a new special mining license and the execution of the mining development contract and a fiscal stability agreement. We are engaging with the landowners to extend the current compensation agreements so that a restart can happen before the end of the year. Detailed reopening and ramp up plans are in place, and we are taking all the preparatory steps to be ready for that day. Persisting with Porgera has been well worth our while.
Mark Bristow
executiveThis is a major asset with genuine Tier 1 potential. Every quarter, my opening to the Africa and Middle East section of this presentation has followed the same pattern, and this quarter is no exception. Since the merger, no part of Barrick has performed more consistently than this region. It is, as well, an exploration destination with strong prospects and a central engine of growth for the group. The Loulo-Gounkoto complex in Mali turned in its customary robust results and has earned its spot in our Tier 1 portfolio outright. Its record of steady reserve replacement is exemplary, and continuing brownfields exploration suggests it is likely to keep that up. Deep framework drilling is presently testing for repeats of the high grade Yalea system. And at other points on the site, fresh high impact targets have been pinpointed, while a review across the whole project has brought to light opportunities a long strike in south of Yalea and at depth at Gounkoto and Baboto. Work to green the complex grid is moving ahead, with Phase 2 of its solar farm due for completion before the end of this year. Barrick is Africa's largest gold miner, and Kibali is the continent's largest gold mine. It has bounced back well from a slow start to this year and remains on track both to meet its guidance and to replace depleted reserves once again.
Mark Bristow
executiveKibali stands out as a pioneer in automation and mining, and it's a showcase example of renewable energy. Since the start of operations, we've constructed 3 hydropower stations at Kibali. At present, those stations together supply over 70% of the electricity the mine requires. When its 16-megawatt solar facility paired with battery storage comes online, the mine's power needs will be covered entirely by renewable energy for 6 months each year, cutting its greenhouse gas emissions by more than 19,000 tonnes of CO2 equivalent every year. Production at the two Tanzanian mines came in below the prior quarter, though that aligns with their plans, and they stay on course to hit their guidance for the year. To maintain their combined Tier 1 profile for decades ahead, North Mara intends to extend its life via an optimized pit plan, while the brownfields growth strategy keeps delivering at both North Mara and the long life Bulyanhulu. Great potential remains for world class discoveries near our operations and farther out across the Africa and Middle East region. These rank among the many opportunities stretching from Zambia in the south to Saudi Arabia in the north. Given its resource wealth and our strong partnerships there, Tanzania is an especially strong candidate for our next 1 million ounce discovery.
Mark Bristow
executiveIn Zambia, the Lumwana expansion sits alongside RekoDiq as another of our key growth projects. Combined, those two will turn Barrick into a major league copper producer that complements our peerless Tier 1 gold portfolio. We've sped up its feasibility study so it finishes toward the end of next year, with construction beginning in 2025 and first production targeted for 2026, matching RekoDiq's timetable. The 50 million tonne per annum process plant expansion at Lumwana, together with the planned super pit, will raise copper output to roughly 240,000 tonnes of copper per year across a minimum 36 year life of mine, and several additional targets should stretch that mine life even further. Our other copper mines, Jabal Sayid in Saudi Arabia and Zaldivar in Chile, each delivered consistent production. Jabal Sayid, a joint venture between Barrick and Ma'aden, is acting as a springboard for growing our very successful partnership. New permits around the mine are being brought to account, and we're widening our focus past the current Jabal Sayid catchment area and out to the Arabian Nubian Shield, which we believe is poised to become a major new mining destination. Ladies and gentlemen, value today and growth tomorrow has been the theme of this presentation, and I believe we are equipped to deliver both on the back of our uniquely successful and sustained organic replacement of depleted reserves, coupled with a disciplined, long-term growth strategy.
Mark Bristow
executiveSo, as you can see on this slide, we've replaced 125% of our reserves since that 2019 merger. And going forward, as we've shown, we anticipate that reserve replacement plus our organic growth projects will lift production by roughly 30% gold equivalent by the end of the decade. Thank you for your attention. I'll now hand things back to the Operator to run the Q&A, and we'll begin here in London with the first question.
Speaker
unknownHello there. <<inaudible>> calling from UBS. I've got a couple of things to ask. The first is about this year's guidance. You've clearly signalled production coming in around 3% under the low end of the range. Could you give us some direction on how costs will trend at group level in Q4, and where you see us finishing the year versus the upper end of the guidance?
Mark Bristow
executiveYes. I think the main factor behind the growth that got reduced was Pablo Verve expansion. That’s still set to increase substantially in quarter four. And, again, every region is expanding, and we expect our quarter four forecast to come in above quarter three. Along with that, we’ll see a better cost profile too. So that pattern carries on as we planned for the quarter. The effect comes from the PV expansion itself, and I’ll give you a quick explanation since I believe people want to understand. That is, when we commissioned the—these are—we commissioned the biggest float cells ever constructed. And the OEM that provided those float cells—we have used them certainly throughout my entire career. And they under designed the gearboxes and the shaft. So we managed to retrofit and engineer a temporary fix. So those float cells are operating now, but the supplier has agreed to send us entirely new assemblages by the end of this year, and they’ll arrive one at a time. And so by year-end, we will have that issue properly resolved.
Mark Bristow
executiveThe engineered fixes may serve us for two to five-years, yet typically float sales endure for decades. So we want it done properly. And at the same time, somewhat similar to what took place at Loulo a couple of years ago. The very large conveyor belt's far end, and that is the feed into the run of, the crushed ore stockpile for the single stage SAG mill. We have experience with this since, as I noted, it happened to us previously. And so we moved quickly and installed a whole lot of mobile crushers to handle that situation. And again, we have a series of, conveyors that have arrived on-site for our Dollar Mart process upgrade. And we are going to use those, in fact, as I speak, installing them. And we will use those over the short-term period, so the next four odd months. While we rebuild that piece of the conveyor belt. And so we expect that production will range between 70%, 75% of planned throughput and we are now continuing with the ramp up now. And there is a very complex flotation circuit. What we have effectively done, as we did with PV, is that it had run into a part of the ore body, which is the rest of the ore body, 20 million ounces, which has got a grade of around 2.4 grams a tonne.
Mark Bristow
executiveAnd we had to boost the throughput. So what we did, process experts, is we put in a very large float circuit at the front end of the plant and expanded that entire front-end combination section. Then the float's job is to concentrate the gold and, even more importantly, the sulphur, which lets us — and we added flash coolers to the autoclaves. And so now we can move from a 14 million tonne front-end plant back to a 10 million tonne rest of the process, with the same amount of gold going through. We cut costs substantially since there isn't much processing in that circuit. And that opens up the whole 20 million ounces. And PV is a very low-cost producer. We generate our own power. It's a natural gas fired power station. And it's a very efficient operation overall. It's very compact. The mining is efficient, so we have a profile. It will range between 800,000 and 1 million ounces out past 2040. And that's really the impact in the short term this year. But the main driver of the quarter-over-quarter increase is still that project.
Analyst
analystIf I could squeeze in one more — a major worry people in the industry have is expropriation and nationalization in places beyond your portfolio. Turning to Pakistan, this asset clearly has had a checkered history. So two questions: first, what makes you confident that the framework agreement you're now reaching means a Cobre Panama-type situation won't happen somewhere down the line? And second, back in the Randgold days, you always spoke about a 20% IRR at thousands. Against this backdrop, what's your hurdle rate for RekoDiq?
Mark Bristow
executiveSo Daniel (Ph), after 40 years, I figure I know my way around mining. And let me point out that when we merged with Randgold, the Barrick portfolio, what struck me was how high-quality the assets were. But each and every one of those assets had an issue. Argentina was in trouble. Tanzania — both mines had been shut down by the government, and that's exactly the reference you're referring to. Porger ultimately had its permit canceled. RekoDiq had been nationalized. Nevada was an inefficient setup of assets, because Barrick and Newmont owned properties that were intertwined and should have been run together, which they are today. And if you look back — fast forward to today and look back — we've dealt with all of those issues. The last challenge, which is also an opportunity, is the Pascua-Lama process. But what we did do is fix Veladero. And so it creates — and it isn't about your agreement. It's about your license to operate. You can pin any agreement in this modern world. Whether it's in a developed country or an emerging market country, you can do that. If you don't — and that's what I've said for many years, and you know this.
Mark Bristow
executiveAs I've said before, the key stakeholder for any mining operation is the country hosting you—shareholders come second. Get that relationship wrong, and shareholders are left with zero. That's been my view throughout my career; it was the foundation of how we built Randgold from the very start. Concentrate on your license to operate, and make certain the economic gains are shared with the host nation and its citizens—hire local people, cultivate local managers—and you'll be equipped to handle nearly any crisis. Yet without a social license—something we're seeing yet again, and this isn't unique to the past year—no matter what agreement you hold, it won't rescue you. That doesn't mean everything becomes perfect. You've watched the effort we've invested in Tanzania to reach this point. Today we're a partner of choice and the largest contributor to the economy across the whole country—and that follows claims that we never contributed anything. As for Mali, we've faced numerous difficulties there over the years.
Mark Bristow
executiveI believe I've lived through 16 separate governments and 3 coups. We're still up and running. And in Mali, we hold a very solid social license. That isn't to claim we face no difficulties. And I think the industry should hear this: that's a crucial piece of mining today. And mining today has plenty of work ahead to truly establish its credentials, to make sure it can deliver what the world requires from mining, since absent mining, we will never have a world in good shape for future generations.
Alan Spence
analystAlan Spence from BNP Paribas here. I appreciate the presentation. There are two questions I have, and I'll ask them separately. The first concerns Carlin and that significant decline in open pit grade. It came from the Orphan Gold Star stopping and drawing more material from stockpiles. How should we view that across 24 and the way grades will progress?
Mark Bristow
executiveOkay, that's finished now. So the real, the major difficulty at Carlin — and Goldstrike — is this: what we've done with Goldstrike is place it, and historically it served as a filler within our production. Management attempted to turn it into a core business, and it isn't one. So we've placed it into a separate category, and going forward we'll manage it that way. <<inaudible>> has performed very well. New remnant mining is a hard business, as you're aware. So certain portions of our remnant mining, the older sections of Carlin, still contain plenty of new mining blocks. We've managed to stay ahead of the phases and drill out a future for those, but Goldstrike isn't among them. Then there are the open pits, and we're transitioning away from those open pits. But the central focus for us as well is growing toward the north, via <<inaudible>>. And today we're drilling brownfield extensions right along that call and train.
Alan Spence
analystNow, regarding the portfolio, there's just a single operating asset in Canada. I realize you've mentioned wanting a larger presence there. What I'm curious about is, since that transaction when you took over as lead, why hasn't more progress been made? Has it been that the opportunities you've reviewed couldn't compete on geology or valuation, or is there another reason?
Mark Bristow
executiveThere's been a great deal of M&A activity up in Canada, as you're aware, and we've been involved in nearly all of it, and we've chosen to step away. What we've done instead is assemble a very substantial portfolio at this point, and we just highlighted during the presentation the three main projects that we're now moving toward drilling, and each of them is positioned well. The geological group we have up there is on par with any team in our organization. I suppose a lot of people in Canada, in particular, hold the belief that we ought to be doing M&A or that it's something we deserve to do. M&A is one component of the business that, as the market — we were discussing this the other day, and Kevin raised a very good point. Assets at a certain point in the market cycle will always present value. But at other phases of the market, they carry serious risk. We witnessed that in 2011 when the whole mining sector destroyed itself. All of them — even Glencore is divesting assets in order to survive. And the reason I'm standing here with the Randgold team and together with the Barrick team is that Barrick and the other major gold players did exactly the same thing.
Mark Bristow
executiveFor us, this is business—pure and simple. Being big just to be big isn't what we're about. What matters to us is relevance. At times, an opportunity will come along to create value through acquisition. We began the merger with three highly aggressive acquisitions, all at market, all at market. And another time will come when we get a similar opportunity to do the same thing. In the meantime, though, we didn't just rely on that—relying on M&A isn't a strategy. Right now, that's the mining industry tree, because it's X growth. And Barrick stands out. Even though we didn't do those M&A transactions, we can show you 30% growth. It hasn't cost us any money—only effort. The gold portfolio has steady growth out to 27, 28, as we showed at our Investor Day, the recent one on 12th September, and the copper profile is significant. More importantly, we have five-years of planned gold replacement. Our brownfields exploration and drilling are well ahead of the face, so we can show that we'll convert inventory to resources and resources to reserves over that five-years.
Mark Bristow
executiveAnd naturally, as time goes on, we’re doing more of that. Then there are the new projects arriving. LaManna will add a large amount of copper reserves — the LaManna expansion into our portfolio — and RekoDiq even more. Plus roughly 15 million ounces of gold in our reserves. So those are not only replacing reserves at the mine and across our current Tier 1 assets — and I’d note our Tier 1 assets are defined by criteria rather than fabricated. That growth we’re discussing is new growth. It covers both gold and copper, since RekoDiq is that classic asset you want as a gold miner. It contains copper, and it contains plenty of gold too.
Analyst
analystMark, great to see you in London again. On this chart showing your growth from 22 to 29, could you remind us what that costs, and how the capital spending plays out over the coming few years? And I notice we're growing our debt levels from the low of a couple of years back. Where do you think peak debt might land for us to reach this goal in the first place?
Mark Bristow
executiveSo, Justin, as you’re aware, we show up here annually—that’s deliberate—to deliver this presentation and the LSE. If the stock exchange didn’t require us to carry out a full IPO in order to keep our listing and London, we’d be listed here. So just for FFO, nothing. On the capital side, so, let’s begin with LaManna. It’s roughly $1.6 billion to $1.9 billion. And that is we’re still in with the feasibility study, but we will be around there. And that is we should at market, at consensus prices, it’s about $800 million, Simon, that we would fund from Barrick. And so that is, it’s an easy project for us to do whatever you, the copper price is up or down, we will put a bit more in or a bit less. But again, that is a — and if I take you back to Randgold and we can talk about this a bit. We have got, gold assets are well stacked up, and we have got long life assets now drilled out. So in the scenario that you find us today, remember when we bought gold mines out and Randgold in the early 2000, gold price was not very high.
Mark Bristow
executiveBut as we moved forward, gold prices continued climbing, and we simply created value for our shareholders. So it's a good location for constructing copper mines, specifically when copper prices are depressed. And especially at this moment, since none of us, I believe, expect copper to remain at this level. But the strength in gold gives us the backing to fund that development. And then RekoDiq involves roughly $5.5 billion for phase one and $3.5 billion for phase two. But that figure still requires refinement since we're actively working on it. And we see some significant chances to bring down that initial phase, $5.5 billion, and that's on a 100% basis, apologies. And then we're also, as we've disclosed, working on project financing for half of the first phase. So for Barrick, it's quite affordable regardless of which gold price you assume. And we've initially used a copper price of $3.75, $3 per pound. And thanks to the leverage from project finance, RekoDiq comfortably surpasses the 15% IRR. And so once more, that's a project that's easily handled. We have, Goldrush represents a $1 billion investment.
Mark Bristow
executiveThis is a high-grade mine, and it’s simple to finance. That’s calculated on a 100% basis. The other major capital undertaking is PV, a $2 billion project, with $1 billion going into it. So those are the projects in their current state. I’ll have Graham walk you through the profile — our capital profile. But when you mention debt, we don’t really build up layers of debt. I’d simply note that everybody in this industry listens to people like you — not you, since you didn’t do it — but most fund managers pressing for ever-larger dividends in a capital-intensive industry when you’re growing it. And you’ll have noticed we didn’t do that, even though we returned substantial amounts of cash to our shareholders. That was grounded in our P&L and the cash we had available, not borrowing to fund dividends. So as of today, we’ve brought debt down to nearly zero leverage. We’ve invested more than $7.5 billion into our business, and we’ve paid out roughly $6 billion in dividends, all of it cash returns. That’s meaningful value we’ve generated. And now we have these projects, and every one of them clears our 15% hurdle.
Mark Bristow
executiveWhen we assess the return on the capital we invest, it comes to roughly 10%, and the IRR lands near 50%, though that varies by project. RekoDiq, however, stands out as exceptional, since we think we can apply leverage to it, and that is what delivers a return of that kind. So would you like to complete your question?
Graham Shuttleworth
executiveYes. So, Justin, as Mark mentioned, we've got two major capital projects coming up, and both are set to really begin ramping up in 2025. So from a capital standpoint, the peak years are 2025 and 2026. So yes, this year, we'll spend roughly $2.5 billion on an attributable basis for our capital. Next year, we'll see a bit more as we start putting some money toward those pre-fee items ahead of those feasibility studies wrapping up at the end of 2024. Then 2025, those are our peak years. And then 2025 and 2026 are the peak years. And then in 2027, it begins to decline again as those projects wind down. So the key point Mark is making, though, is that even if we use commodity price assumptions below current spot prices — so, if you use consensus prices, which have a declining profile — we don't build debt through this period. The cash flow from our business funds all of that capital. So we don't have any debt buildup on that basis.
Mark Bristow
executiveEither way you look at it, Justin, you’ve got to purchase additional inventory. Anyone else? Great. Now let’s go to the people on the call.
Operator
operatorOur first question is from Lawson Winder at Bank of America Securities.
Lawson Winder
analystThanks a lot, operator. Hi, Mark — good to hear from you. My question is about Donlin. In the MD&A's discussion of project growth, you said something about exploring additional partnership opportunities to unlock value. I just wanted to check: does that imply Barrick is looking to sell part of its stake in Donlin?
Mark Bristow
executiveI’m not quite with you there. I don’t believe that’s something we state regarding Donlin. So I’ve put this slide up for you. I’m not sure whether it’s visible on your end. But if you turn back to the North American exploration side, here’s what we’re currently working on. Let me walk you through it. At the time we completed the transaction, Donlin had a global resource. It lacked any real capacity to model where the gold department sat. So over the past couple of years we’ve improved how well we understand the ore body, and we’ve also dug into considerable detail across the various phases and the various geological domains of the ore body, and come to understand their variograms. As a result, we’re now at a point where we feel entirely confident about the modeling and about our capacity to optimize mining and mine plans. That means we still have a bit more drilling to do to fill in some of the gaps, so the first bullet there covers the continuation of our geology work, and we want to incorporate some measured resource. Right now, the bulk of the resource sits in an indicated category. And this will now be able to — and we’ve completed our preliminary mine plans plus modeling and pit scheduling.
Mark Bristow
executiveBut with this in hand, we can genuinely begin optimizing it, and that's the next step. And at the same time, while we were doing that, we managed to gather more and more samples to carry on with our metallurgical tech test work and processing trade-offs, and we've got some — we're going to construct a lab-scale testing facility so we can simulate some of our metallurgical flow sheets. And then the next one is, one of the big things that has shifted over the last few years is the cost profile and the capital cost, particularly. And so we need to refresh all of the capital estimates for that design. So once we get a real handle on that — and it isn't far away — we'll be able to do that. And then the important other aspect is that because power cost, power generation, power strategy have all changed. And so work remains there to make sure that we have that part of the project, which is a critical part of this project, well understood. And we've still got some permitting to complete, particularly around the tailings storage facility.
Mark Bristow
executiveSo then you reach a point where it becomes possible to genuinely determine the gold price at which this project turns viable as an investment. For our part, we're a highly focused gold mining company with a real obsession about sustainability. And a substantial resource of 32 million to 36 million ounces matters within our portfolio. And certainly over my career, I've observed ore bodies shift from unprofitable to significantly profitable as time passes. And if you simply look back to 99, the gold price stood at 2.60. Today, it sits at 2,000. And when you examine the industry's average grade, it has been falling materially because people are able to use higher gold prices to make money. And that's how we view it. I can say honestly that not a single day has passed when we considered putting it out on the market for sale.
Lawson Winder
analystAnd then regarding exploration, there's again some discussion of North Eagle. So it's great to see the exploration success there so far. And I was just wondering: is an additional maiden resource expected as of year-end 2023 for that Fallon Miramar gap? And then is there any expectation for a significant update of any kind on the North Eagle resource in this year-end update? Thanks very much.
Mark Bristow
executiveYes, I believe we'll be updating our reserves and resources at year-end, just like we always do. And along with that, some — we will definitely highlight a few of these emerging projects. They're extensions, but material ones. So let's — we will make a decision. What I mean is, we'll share it with you once we get there. Our goal has always been to replace what we're mining, but at the same time, we've guided that Nevada operates on a three-year rolling average, and we aim to replace reserves. So we build — since many of the ore bodies are deep, we build the inventory, and that's what we've been doing. You roll the resources forward, and then there will be a period when you've got enough of a pipeline to keep replacing reserves annually. So we're getting there where North America is concerned, but you're going to see a big resource — or inventory and resource — growth going forward.
Operator
operatorOur following question is from Martin Pradier at Veritas Investment Research.
Martin Pradier
analystI've got a question about Pueblo Viejo. The recovery rate went down from 89% in Q2 to 70% in Q3. So I'm wondering what we should expect for Q4. And is this all tied to the cells you were talking about, and since production at Pueblo Viejo came in at 79,000 ounces, will it be materially higher in Q4, or do we have to wait until Q1 for that?
Mark Bristow
executiveSo the recovery is really just a function of the ramp-up, and as you bring these new processes or flow sheets online, you know, everything has to be balanced. We accomplished that, and on the commissioning side we've been drawing on lower-quality stockpile ore. As you can imagine, our goal isn't to try to send as much gold as possible to the tailings dam. We should be aiming to get it into the gold room instead. So to commission the mine we've used ore of lower quality, with less sulfur and a lower grade, and that has an effect on recovery. Gradually we'll finish that off, and we're working on it right now — the ramp-up, which was delayed owing to those flotation cell challenges. And as we do that and get the process settled down, we'll switch back to better ore and return to the design recovery rate. Even so, we expect quarter four to show improvement over quarter three in terms of production. And we should begin to see recoveries getting better. And then quarter three will be the same. We expect to be fully back at full operations at the, during quarter one next year, and toward the back end of quarter one next year.
Mark Bristow
executiveEven so, as I mentioned, the design profile for Pablo Viejo exceeds 800,000 ounces. And based on what we're seeing right now, we will definitely exceed 800,000 ounces in 2024. So it's a slower beginning, but a robust ending to the year.
Operator
operatorOur following question is from Tanya Jakusconek at Scotiabank.
Tanya Jakusconek
analystRegarding Pablo Viejo specifically, I’m looking at the November 2022 Investor Day presentation where you laid out the production profile for that asset. And 2024 was meant to be a one million ounce year for it. So with all the delays and push outs and so forth that we’ve had, I’m just trying to get your view. Should I be thinking about moving that one million ounce production profile down — am I looking in the 900,000 ounce range — and taking that differential and pushing it into 2025, where we had to dip back down to about 900,000 ounces? So I’m just trying to understand overall what 2024 looks like relative to what you gave us at the Investor Day?
Mark Bristow
executiveThat's absolutely right. The way things stand, what we can tell you is that we will certainly exceed 800,000 ounces. Any answers we don't deliver next year will carry over into subsequent years. So that's correct. But the point we wanted to make is that even with the slower ramp-up, our task is to finish building this mine and get it operating. We will still surpass the design — the long-term design production. And could it be meaningfully more than 800,000 ounces? Yes. Would it reach 1 million? No. So it falls somewhere in between. And we'll clean that up with you, Tanya, when we talk in early February, when we provide the full guidance at that point. But we simply felt this is something you should be aware of.
Tanya Jakusconek
analystI just want to be sure that when you give guidance next February, I won't be carrying this 1 million ounce production profile, right?
Mark Bristow
executiveCorrect — that's exactly the reason we provided that guidance to you.
Tanya Jakusconek
analystSo given the changes to the 2023 production profile — lower output and higher costs — plus this deferral at Pueblo Viejo, should I be thinking that capital returns ought to mainly center on dividends for the rest of this year and into next year rather than share buybacks, even with your stock looking relatively cheap? Is that the right way to think about it?
Mark Bristow
executiveNo, I really don't think that's the way to look at it. At present, we have a dividend policy in place, and what it says is that the moment we have cash or net cash on the balance sheet when the quarter closes, we'll pay out the dividend — that's very clear, it's our guidance. And, Tanya, we've stuck with that strategy loyally, more than any of our peers have. That said, we could alter it, because buying back stock would drive the net cash position under zero, and then we wouldn't pay the dividend. So both are possible. We can choose one or the other. We can choose both. That's exactly right, but we need to have some — we need to maintain a strong balance sheet, because at this moment, as I said earlier, we're independent of the market. I've been in these stages before, and it doesn't serve our interest to put stress on our balance sheet when, as you heard from Graham, we have significant capital ahead of us, and that capital delivers real returns. So that's where our focus lies. As it has been our whole career.
Mark Bristow
executiveOur concern is about generating value through mining. We want world-class ore bodies rather than attempting to prop up our share price by continually raising dividends while taking on more debt.
Tanya Jakusconek
analystSo what I'm hearing is that dividend comes ahead of share buyback?
Mark Bristow
executiveNo, that's not the case. It's ore instead.
Tanya Jakusconek
analystAnd then, if I could, my last question. I just want to revisit health and safety. I'm simply trying to get a handle on, Mark, what is happening regarding health and safety with these fatalities. We discussed it somewhat on a different conference call last year. We had a fair number of fatalities, and then another two. Could you just walk us through it — is it that procedures aren't being followed, or do your procedures need updating? What exactly is taking place? I'm just trying to get my head around everything I'm seeing.
Mark Bristow
executiveSo that single death—the one in the United States—still hasn’t truly been given a classification. There’s still some work needed on that before we can speak about it in much depth. But the core of this comes down to operational excellence, Tanya. And when you get—and it is the necessity to get people focused, and properly qualified for the job, and conscious of what they must do before they start any task. And as you move through those phases, you have to devote considerably more time to ensuring our people are trained the right way and that they can handle the demands of underground work and of working in a heavy industrial setting or heavy industry setting. As with every accident, some neglect is involved—either not genuinely completing a proper risk analysis prior to beginning the work, or overlooking procedures and standards. And the question—and it’s simple for us to point the finger there. But that’s—there’s more involved than that when you’re managing health and safety. And just as you’re seeing our environmental strategy begin to deliver results. Within a large organization it takes time to genuinely ensure that each person walking through the gate and each person working in this goes into a particular environment inside that heavy industry is qualified to be there and can work safely.
Mark Bristow
executiveThat’s the main thing we’re concentrated on at this moment.
Tanya Jakusconek
analystAll right, so my assumption is that during Q1 you made your procedures stricter…
Mark Bristow
executiveWe haven't just tightened our procedures. We've set up training schools and proper training minds in Nevada, because in America a lot of people don't have this philosophy of a technical qualification, so we're doing it ourselves. We've partnered with the technical training institutions, both in Northern and Southern Nevada. And in Africa, we've revisited that induction and made sure that our technicians, like electricians, are current and kept current through our training programs.
Operator
operatorOur following question is from Mike Parkin at National Bank.
Mike Parkin
analystI’d just like a bit more detail on what to expect for PV in 2024. As for shutdowns, are there going to be any significant downtimes so the conveyor can be repaired and brought back into service, and so the new gearboxes and drive shafts can be swapped out for the sturdier units on the leach tanks? Would all of that take place in Q1? Or my guess is the asset will probably have a year that’s weighted somewhat toward the back half. Any extra detail you could give would be great.
Mark Bristow
executiveWe’re able to handle the downtime within our present profile, and every leach tank involved in the retrofits—or in refitting the new assemblages—will be completed ahead of year-end. By that point, we ought to be fully ramped up in terms of process, flow sheet, and similar aspects. We also have reduced throughput during the first quarter, since we’ve engineered an interim solution that brings us 70% to 75% of the way toward full design throughput. That solution does not depend on the existing conveyor infrastructure. So addressing it and building the new extension won’t be affected and definitely won’t affect operations. Then, once everything is finished, we’ll change over to the newly installed conveyor and take apart the temporary conveyor system we placed there in its stead. That’s the reason we’re confident we’ll exceed 800,000 ounces next year. And if we accomplish it sooner and achieve a more efficient ramp-up earlier, it all contributes to what Tanya was discussing, so we end up with more—not less—above the 800,000-ounce forecast.
Mike Parkin
analystJust to follow up on that, regarding the new tailings dam that's required — is that still tracking well to plan as of the May site tour, or are there any delays when it comes to securing final sign-off on the permits needed to get that work started, or with relocating some of the villagers who, I believe, had to be moved out of the way? Is all of that on track?
Mark Bristow
executiveEverything is monitoring according to plan for the plant, and all permits are in place. So the remaining work needed for the final design is that we have a few additional holes to complete on the main wall, purely to confirm that — since this is the Lagoel Dam <<inaudible>>, the one we are currently using, which ranks among the most engineered tailings facilities anywhere in the world and has come through seismic events — so this dam is very highly engineered. Foundations matter critically in how we engineer it, so that work is underway. Beyond that, the dam itself holds its permit. Also, we are well along in our consultation program with the community. And as I noted during my presentation, we will begin relocating people. Some of these people are effectively squatters, either on state land or on land owned by others, yet under Dominican Republic law they hold a right to that land because they have lived there for so long. What we are doing is constructing new village infrastructure. So proper communal village living, complete with infrastructure and all the services too. So finding solutions and securing the commitment to relocate has been relatively easy, and we are busy with that.
Mark Bristow
executiveAnd as you're aware, at Randgold we've handled a number of the largest relocations globally, and every one of them has been tour.
Operator
operatorAnita Soni from CIBC World Markets has the next question.
Anita Soni
analystThe first question is about costs. I can see they decreased this quarter and are moving closer to the guidance you issued at the start of the year. Could you discuss some of the areas where you've found cost relief, and any implications that has for the CapEx figure going into next year?
Mark Bristow
executiveAnita, good to hear from you. Look, we're projecting costs to come down again, together with output rising further in 2020 — sorry, in quarter four. As you know, the world is highly dynamic. And in many of our operations, oil and gas rank among the main cost drivers. So yes, I'd say that's a favorable trend. Still, I'd rather you let us guide you on next year's costs when we provide the complete guidance. But at the moment, that really is the direction of travel. And you're correct. We are moving back toward the guided costs. We won't get there — not quite reach it — because another cost driver, as Graham has mentioned previously, is the higher gold price affecting the royalties. So $100 means $5 on cost, Graham. So $100 is $5 above our — and remember, we planned at 6:50. 16:50, sorry.
Anita Soni
analystMy second question concerns the weaker quarter—sorry, the softer year you'll see at Carlin and Cortez in 2023. Is it fair to think that next year—I believe your guidance had Nevada Gold Mines somewhat weaker in 2024 originally—but given these sorts of production delays in 2023, might some of that be pushed into 2024? And perhaps it won't be as soft as your earlier guidance suggested?
Mark Bristow
executiveNo. Regarding the 2024 guidance we discussed most recently — as I mentioned, similar to what I said about Argentina, one key point is that this team needs some room to breathe. They're constantly stretched to the limit and simply aren't able to get ahead of things. That was part of the conversation you, Tanya, I, and a few other analysts had when we were together in PV. We're keeping that in mind, and we provided that indication of where things will land. At this point, I'd prefer to leave it there for now, but we'll clean it up next year during our February discussion with you.
Operator
operatorOur following question is from Jackie Przybylowski at BMO Capital Markets.
Jackie Przybylowski
analystI'm sure you've gotten this question many times, but it may be useful to raise it on the call. You've mentioned previously that you would be examining copper assets. I realize you've touched on this somewhat indirectly today. If you could perhaps be more direct, though. Regarding buying Freeport, you stated you would act if you saw it trading at a distressed discount, and clearly that window has closed. The media has also connected you with possibly pursuing First Quantum in the past. Most people would probably agree the share price currently appears to reflect some kind of distressed discount. Does that shift your thinking about acquiring First Quantum now?
Mark Bristow
executiveSo, Anita, at this moment, the situation is quite fluid. As you can imagine, First Quantum must be going through a difficult time. The press is not my investment banker. And so, I think it would just be ill advised for me to comment on that question. I think First Quantum needs to focus on its challenges, and none of us like to see that sort of event in our industry.
Jackie Przybylowski
analystAlso, just so you know, it’s Jackie.
Speaker
unknownMy apologies.
Jackie Przybylowski
analystThat was a hard one, so I get why it got mixed up. On RekoDiq, maybe there’s been a lot of chatter once more in the media regarding possible partners there. And I believe I actually put this question to you folks last quarter, but since then there’s been additional discussion about whether it’s Saudi or Egyptian individuals? Could you just restate how you see the project shaping up from your perspective? Do you intend to keep your 50% interest in RekoDiq? Or would you be open to partners coming in by sharing the Barrick equity?
Graham Shuttleworth
executiveSo Jackie, what I can say is that a reporter brought this up out of nowhere again. I've never discussed it with him, and he has little to no chance — probably no chance — of ever obtaining equity in RekoDiq, and I believe he's aware of that. That's not a reflection on <<inaudible>>. He's a dear friend of mine, but no equity is being sold by us. This isn't an equity sale list. As you know, the discussion regarding Saudi and Pakistan and their equity — Saudi played a major role in backing the IMF rescue of Pakistan. It's a longtime friend, partner and supporter of Pakistan. Those talks are happening in some form, and we're there to support, and as you know, we're strong partners of Saudi Arabia and Saudi Arabia, and we're very committed partners to Pakistan and Pakistan. We're there to help wherever possible, but we are definitely not interfering in any conversation. And one thing is clear: our 50% is not for sale. So I think that will probably help. If you ask me again next quarter, I'll give you the same answer, I promise.
Operator
operatorOur following question is from John Tumazos of John Tumazos Very Independent Research.
John Tumazos
analystMark, congratulations on all of it. I hope this doesn't offend you, but I put together a small spreadsheet that compared 56 companies, and a few of those weren't gold companies. Over the last three years, those 56 companies repurchased $73 billion of their own stock. Every steel company, every forest products company, and every fertilizer company I looked at bought back shares. Gold companies are a different story, Mark, so I don't compare you against gold companies. As a matter of fact, five companies have bought back more than $1 billion so far this year. And the largest was Vale, which has spent $14.25 billion on buybacks over the last three years to date. Barrick bought back stock last year; this year, you aren't. How do buybacks stack up against expanding Lumwana, extending Pueblo Viejo, RekoDiq? Just walk us through how you make those choices?
Mark Bristow
executiveJohn, that's a fair question, and I appreciate the kind words. Well, I believe they were kind words.
John Tumazos
analystTo be clear, my comparison for you is against actual companies, not gold-related ones.
Mark Bristow
executiveYes. Thanks. So, to repeat what I mentioned before, one key point — if you look back over my career, and the bulk of it was spent with Graham, and we hold a very clear view of how our balance sheet should be run — is that you must have both a capital allocation strategy and a policy, and we do have one. We operated under one from the very start in 2019, and then we developed one and shared it with you 18 months ago. As things stand today, we pay a base dividend of $0.10 a quarter at all times, since our long-term business strategy supports that base dividend regardless of the gold price, or whatever the most foreseeable gold price or minimum gold price happens to be. And then, once we reach a net positive cash position, we add to that $0.10. Now, the way we are able to manage this — and we achieved that — is because we are in the growth phase. And I have demonstrated this before, and I am set on demonstrating it again. If you continue investing into profitable assets, in the end you generate more money than you need to reinvest in your future. And that is precisely what took place at Randgold after 10 years, and we had 13 years of growing dividends regardless of what the gold price was.
Mark Bristow
executiveSo the way we handle that — buybacks versus dividends — is that when we see the trajectory moving above net cash, we've got a choice. Either we buy back the stock or we let it go past that point. And then, at quarter-end, if net cash is there, it triggers the dividend policy. That way, as management, we're able to manage it, and we never put the balance sheet at risk. And I've always said, the one thing you need to know in mining is that when the market turns against you, you have no friends. And when you go asking for money at that moment, you get slaughtered. All the stock buying will never help you. So I've always worked to be independent of the market, and shareholders like that. They might not like that in time and hot times. We've just been through a very hot time. But look how suddenly the base metal companies have started having to cut back on expenditure, reduce staff, defer capital, lots of things, because everyone thought commodity prices would continue to go up and up and never come down, and that is not the case. So for us, that is the way we manage share buybacks.
Mark Bristow
executiveAnd back then, as you're aware, we had substantial cash flow coming in. We had options available to us. We needed to strike a balance between returns to shareholders, and we've accomplished that. But we also noticed a considerable drop in our share price. And even more significant, a relative decline compared with the broader gold sector, which is itself weak. So we concluded that using some of that surplus cash flowing off our P&L to repurchase shares was the correct move. I've long believed that in the mining business — and Barrick sits in a specific situation — with a large number of shares outstanding, it's difficult to move the needle much, yet we'll keep at it. Whenever an opportunity arises and we have spare cash, we'll repurchase the stock. If the price falls too far, we'll repurchase it then too. In my view, we've gotten past the genuinely hard stretch of rebuilding Barrick. A solid foundation has been laid. A strong team has been assembled. We understand our direction, and we won't second-guess any decisions we've made, since they were made well and we can fund our growth — and few mining companies can point to 30% organic growth lying ahead of them.
Mark Bristow
executiveAnd I think our position is strong when it comes to gaining from the bullish long-term outlook on copper. And at this moment, I really don't see a lot of downside risk where gold is concerned, simply because of the chaotic global environment that we're in right now — whether that's the global economy or just geopolitical risk and all the other things that come along with it.
John Tumazos
analystSo in your view, the growth that comes from RekoDiq is worth more than repurchasing shares.
Mark Bristow
executiveYes, over the near term. Because if you find yourself in the market with no cash for a major project such as RekoDiq, then you damage the longer-term reserves overall. So that comes down to a decision about capital allocation. And we will not be issuing new stock. We will not be putting shareholders in jeopardy at all over the next 5 years — we can see it, it is banked. And in the end, our share price will rise on its own, since we are going to show people that we have got the discipline. You know, people still assume we are going to do some wild M&A transaction — that is not the case. We have shown that if an opportunity comes along to create value through acquisitions, we will take it, even if we have to be aggressive. But at this moment, we are in good shape and we have no regrets when you look back 5 years.
John Tumazos
analystMark, I realize this didn't happen under your leadership, but between 94 and 98 the stock stood at a much higher level than it does now. And even during those rough years when the Swiss were offloading their gold reserves — 98, 99. And I understand every gold stock looks cheap at present. The market isn't giving you any credit for all the successes you've had in Tanzania, PNG, Pakistan, and so on. So I suppose we'll simply have to be patient, wait for the earnings to arrive, and for the market to acknowledge all the good work you're doing.
Mark Bristow
executiveYes. John, I think there's no need for me to give you a lecture on this point. A single poor call can do damage to a reputation. Rebuilding it takes years. And we literally had to rebuild the Barrick portfolio piece by piece, as I noted earlier in the presentation. So, and the 90s that you're referring to — remember 90, I modelled Randgold on the Barrick of the 90s. And that was a different company from what emerged in 2010, 2011, 2012, and 2013, when, effectively, the company wrote down $20 billion of investments, and every one of them was a U.S. dollar investment. On top of that, there were the equity issues. So it was in a very stressed situation at the time of our merger.
Operator
operatorAt this point, we have no further questions coming in from the conference call.
Mark Bristow
executiveWell, many thanks, everyone — those of you joining us on the call as well as those here in London. It's wonderful to be back in London. Good to make a point of confirming that the weather is exactly as it was. And I'm looking forward to keeping in touch with all of you online until we get together face to face again 12 months from now. Thanks so much.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Barrick Mining Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Barrick Mining Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Barrick Mining Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.