Operator
operatorGood day, everyone, and thank you for holding. I'm the operator for this event. Welcome to Barrick's Results Presentation covering the first quarter of 2024. After the presentation today, we will hold a question and answer session. Should you have a question and be participating via telephone, kindly press Star followed by one on your keypad. Questions will also be taken from those present in the room. Please note that this event is being recorded, and a replay will be made available on Barrick's website later today, May 1, 2024. At this point I'd like to hand things over to Mark Bristow, President and CEO of Barrick. Sir, please go ahead.
Mark Bristow
executiveMuch appreciated, and before we begin, let’s quickly verify the audio, since some feedback is coming through. How does it sound now? Is that certain? Could someone please verify that for me? All right. With that settled, a very good morning and good afternoon, ladies and gentlemen, and especially to those who have taken the trouble to be with us here in person. Many thanks for attending. I thought I would begin today by taking a look at the world, where we have seen change speeding up, uncertainty turning into something more lasting, and chaotic events becoming far more frequent. The worldwide push for renewable energy has lifted demand for copper, and along with it the price, which rose 15% during the first quarter of this year. Unparalleled conflicts, together with economic uncertainty, pushed the gold price higher by 15% last year, and by that same amount in the year to date, reaching record levels and confirming yet again the metal’s standing as the ultimate safe haven asset. Unfortunately, Barrick’s share price, in common with those of its peers, trails the gold price, which prompts the question: if you have faith in gold, why not put your money into the producers? The investment case for Barrick is that our built-in capacity to expand our copper and gold output will magnify our profitability in a rising commodity market, as I will demonstrate during this presentation.
Mark Bristow
executiveSince this presentation contains forward-looking statements, I want to point you to the standard cautionary note, which you can also find on our website. Barrick today employs over 50,000 people, both directly and indirectly, throughout our operations, and their health and safety come first for us — that's why I'm opening the presentation with a report on how we performed on that front last quarter. Sadly, two fatalities occurred at our African mines in January, which we announced when we released our quarter four results. This has sharpened a focus that was already laser-like on eliminating fatalities as the key element of our journey to zero, and a carefully designed fatal risk management program has now been introduced across the company. It has received a tremendous amount of attention over the past 18 months, and as an executive team we are resolved to reach our objective of zero fatalities across our operations. Turning to better news, our various injury frequency rates kept falling substantially compared with the same period a year earlier. During the latest quarter, 10 of our sites recorded no lost-time injuries. The Latin America and Asia Pacific region has performed particularly well, with a strong safety record, having just finished 14 consecutive months without any lost-time injuries.
Mark Bristow
executiveTied closely to health and safety is our unwavering dedication to sustainability in the broadest meaning of the term. Sustainability formed the DNA of this business well before the term ESG came into use. That predates ESG turning into an investment metric by a long stretch. Our unique holistic strategy, built on the principles of partnership and recognizing stakeholders, has secured for us the vitally important social license in every location where we run operations. A handful of achievements from recent quarters appear here, and we'll give you a sense of the concrete outcomes we are delivering. A thorough account of our performance and targets can be found in our annual sustainability report, which is due to be published later this month. I'd encourage you to find it on our website. Now we move to the main highlights from the past quarter. As we guided, the year began similarly to last year. Gold output matched plan but declined versus the prior quarter, which I'll cover on the next slide. We are still on track to hit our full-year guidance. Copper production likewise came in line with last year and, as with gold, is projected to rise as the year progresses. I'll also address the better financial results relative to this point last year a bit later on.
Mark Bristow
executiveBrownfields exploration keeps paying off — and that's really the core driver behind Barrick's unmatched capacity to replenish mine reserves — while our greenfields programs are broadening the portfolio and creating opportunities worldwide. Now for the operating results. As we expected, seasonal maintenance — above all the Pueblo Viejo conveyor rebuild — along with mine plan sequencing, pushed gold production down, and that in turn raised our cost per ounce. Commissioning of PV's replacement conveyor has now wrapped up, and restarting mining and processing at Porgera will further support the gold production ramp-up we have planned for the remainder of the year. Lower production was offset by a higher gold price and drove improved financial results versus the same period last year. Net earnings per share on a year-on-year basis climbed 143% for the quarter, while adjusted net earnings per share rose 36%. At $0.19 per share, we came in ahead of consensus for the quarter. The attributable EBITDA margin increased 5%-41%, and operating cash flows stayed strong at $760 million. The quarterly dividend was held at $0.10 per share, and it's worth noting that at a time when both the gold and copper sectors are ex-growth, Barrick's strong balance sheet backs its organic growth projects, letting it project a significant rising production profile for the next five years and beyond.
Mark Bristow
executiveWe begin the operations review in North America, as we typically do, and the ramp-up at Nevada Gold Mines' Goldrush underground mine is now progressing well. Attention has likewise moved to the Advanced Fourmile target nearby, which Barrick owns and which holds world-class potential. With permitting secured at Goldrush, Fourmile's journey up the value curve will speed up, and a substantial evaluation drill program got underway this month, testing the extensive inventory base and expanding the mineral resources so as to inform a pre-feasibility study decision that is anticipated before the close of this year. Elsewhere in Nevada, Barrick's global grid kept getting greener, moving forward with commissioning of the initial 100 MW from the TS Solar power plants, and the second 100 MW phase is expected to be commissioned during this year's second quarter. As we had guided, Nevada Gold Mines began the year somewhat softer. Cortez actually exceeded plan — in fact, it was well ahead of plan. Carlin stayed on track on a run rate for the full year, while Turquoise Ridge anticipates meaningful improvement as it works through its backfill and development backlog after a planned shutdown during the quarter. For a gold district considered mature, Nevada continues to be a highly prospective Tier One terrain for our exploration team.
Mark Bristow
executiveThose numerous sizable brownfields targets you see on the map are going to underpin the five-year reserve replacement program, and the team is pushing forward a pipeline of exciting greenfields targets. At the same time, ongoing work on our ore body models has brought to light some meaningful untested potential. I've talked with you about Greater Leeville previously, but a further illustration of that work appears in these before-and-after cross-sections of the Turquoise Ridge deposit, showing how refreshing geological models can generate growth. It's still early days, yet this remodeling process has produced some exciting new targets, as marked by those red circles on the right-hand section. My expectation is that these will lead to substantial additions to the already high-grade Turquoise Ridge endowment. We now go down to the Latin America and Asia Pacific region, which enjoyed a very good quarter across the board. Highlights included progress at Pueblo Viejo, which I've already mentioned, another strong performance from Veladero, and operations restarting at Porgera. The Reko Diq feasibility study remains on track for completion by year-end, with first production scheduled in 2028. Pueblo Viejo processed lower grades while its new conveyor was being rebuilt, and that affected production for the quarter, which also had an impact on costs.
Mark Bristow
executiveThe replacement conveyor is now commissioned, and we expect the plant to ramp up over the course of the second quarter. As output rises, we anticipate costs will decline. With the expansion of the plant essentially finished, attention has moved to the associated new tailings storage facility, where construction is advancing on schedule, and the feasibility study should wrap up in quarter three. Earlier I called the Pueblo Viejo expansion our flagship organic growth project, and here's the reason: it will lift and hold gold production at or above 800,000 ounces for a minimum of 20 years. Keep in mind that five years ago Pueblo Viejo stood on the brink of closure, until the new Barrick team worked out how to unlock its enormous reserve and safeguard its long-term future as a Tier One gold mine. What you see here is a graphic showing how equipment failures affected the project last year, and even more importantly, where things stand now that the new structure has been rebuilt and commissioned. Turning to Africa and the Middle East, Loulo-Gounkoto delivered its customary steady Tier One performance. The feasibility for the Lumwana Super Pit expansion is still on track to be finished by the end of the year, and the infrastructure needed to mine Lode 1 at the Jabal Sayid copper mine has been completed.
Mark Bristow
executiveMoving further toward renewable power at Loulo-Gounkoto and Kibali also brought substantial savings. At Loulo-Gounkoto, output went up while costs stayed firmly in check. A second solar facility came online in the quarter, swapping heavy fuel oil for solar energy, which produced a cost saving of roughly $6 million in that quarter alone. Still on Mali, we are mindful of press speculation — first reported in Africa last year and more recently taken up by Canadian outlets — regarding the government's purported plan to expropriate the Loulo-Gounkoto complex. As we have said before, we have held continuing talks with Mali's government on a number of issues affecting our operations. Through that engagement, the government has lately assured us that it has no intention of expropriating the complex. As any government would, Mali wants to get the most benefit it can from mining, and Barrick stays dedicated to sharing those economic benefits fairly with our host country, while safeguarding our shareholders' rights. Our dialogue with the government goes on on that footing. The Loulo district continues to hold strong prospects. Deep framework drilling is aimed at the possibility of large-scale extensions through repetitions of the principal high-grade Yalea system. Results affirm that the system remains open, with high-grade mineralization found at depth, while shallower drilling to the south is delivering encouraging intersections from the main Yalea structure itself.
Mark Bristow
executiveAt Kibali, output declined, matching reduced grades stemming from scheduled waste stripping at a pair of open pits. Results at the mine should improve considerably thanks to better grades during this year's second half, once that stripping wraps up. Exploration in the quarter near Kibali further delineated a notable high-grade 10 trend sitting right next to, and resembling, the enormous KCD deposit upon which Kibali was constructed. We're modeling many high-grade intersections along with possible lode shapes, which might yield a sizeable satellite project. Over in Tanzania, North Mara posted lower production versus the prior quarter, consistent with its mine plan. That reduced output translated into elevated costs. Bulyanhulu held steady on production, as greater tonnage processed compensated for weaker grades. Those weaker grades alongside the larger tonnage showed up in the quarter's cost increase, yet once more, we anticipate that coming down across the coming three quarters. A copper growth project of global significance — the Lumwana Copper Mine Super Pit expansion — remains on schedule for first production in 2028. Completion of the accelerated feasibility study is slated for the close of this year, and construction activity is anticipated to begin in 2025. The expansion will remake Lumwana as a major copper mine boasting a life exceeding 30 years.
Mark Bristow
executiveA planned shutdown and lower grades cut output in quarter one, though once again, better grades ahead will bring improvements over the course of the year. Barrick, as well — given all the rumors circulating in the market — keeps working alongside ZESCO to ease strain on Zambia's power grid, and we don't anticipate any power shortages affecting production. We're currently finalizing a power supply agreement with ZESCO that will secure offtake from Mozambique. Beyond that, we've put in place a cogeneration program that uses our diesel standby generators. That will supply alternative power sources of roughly 29 MW, which is over 50% of Lumwana's present demand. I've frequently remarked that exploration is to a mining company what R&D is to the pharmaceutical industry. Discovery and development are the sole genuine drivers of value creation in mining. Our teams keep up their hunt for Tier One opportunities throughout the world's gold and copper regions, as this map shows. In the United States, we keep advancing our Nevada portfolio, both within the joint venture and under Barrick's name itself, while also developing opportunities in a number of other prospective states.
Mark Bristow
executiveIn Canada, we are building out an expanding set of projects throughout the Superior Craton. Over in Latin America, priority targets are being tested near Veladero, Pueblo Viejo, Ecuador, Peru, and, more recently, Jamaica. Turning to Africa, I noted earlier the promising targets near Loulo-Gounkoto and Kibali, and across many nations where we have operations, we are expanding the amount of ground we hold. In Pakistan, the focus for our geologists is on extracting the fullest value from the several known porphyries located in the Reko Diq project area, while also pursuing new discoveries close to existing mines. In Saudi Arabia, together with our partner Ma'aden, we have reached agreement to contribute extra ground near Jabal Sayid and Umm Ad Damar and further afield into the joint venture. As I mentioned before, steady headway is being made in our shift to clean energy, which not only moves us toward our target of a 30% cut in greenhouse gas emissions by 2030 but also boosts efficiency and lowers costs. One more priority that matters greatly to us is making sure our environmental footprint stays minimal, both now and for generations to come. Our backing of Garamba National Park in the DRC and our efforts to protect the Sage Grouse population in Nevada are merely two illustrations of how we approach biodiversity.
Mark Bristow
executiveSo folks, as I bring my presentation to a close today, I figured it was worth going back over all the reasons Barrick stands out as an exceptional investment opportunity. As you can see, there are plenty of strong reasons that set us apart from our competitors, among them our unmatched record on replacing reserves, our high-quality portfolio of assets, and a balance sheet that leads the industry, which will make sure we can fund our future growth and return more value to our shareholders. As things stand today, we are the most undervalued major gold and copper mining company in the industry. But as we execute on our operational plans and growth projects, I have no doubt that will change. Our portfolio includes a copper business that is already a meaningful contributor and is positioned to grow. We have all witnessed the excitement surrounding the latest BHP bid for Anglo American, and it is clear that Anglo's significant copper portfolio is what drives this bid. You might be interested to know that once we have completed the Lumwana expansion and the construction of the Reko Diq project, our copper production will be on a par with Anglo's copper portfolio today. That is certainly not reflected in our stock currently. With that said, I will conclude my presentation, and we would be happy to take questions, starting here in Toronto with the audience and before going to those connected through the webcast.
Lawson Winder
analystThanks a lot for the presentation, Mark. This is Lawson Winder with Bank of America Securities. I have two questions to ask. The first one concerns what was said about the 2024 outlook and the royalty. I just want to get a sense of whether you folks have any worry about hitting that cash cost guidance if the average gold price ends up above $2,100 per ounce?
Mark Bristow
executiveSo, I mean, Lawson, everything's baked into the models and the forward plans. And like I told you, I'll walk you through it. So Nevada is now at a point where we're completely clear on our cost and production challenges and opportunities. And I, you know, I've been really focused on flattening that structure and getting ownership at the mine site, for those who've visited our mines lately. And the big driver, if you look at Carlin, is, you know, slightly softer per the overall grade we're forecasting for this year. A slightly softer quarter at Carlin because of the grade. But bigger throughput, so we managed to get our gold production, but the grade starts lifting up, and so we have an opportunity to drive down the cost. And so that's a big driver. There are two big drivers in Nevada, that one and Turquoise Ridge. And Turquoise Ridge is all about backfill and making sure that the infrastructure to support our backfill... Because Turquoise Ridge is a high-grade mine, low cost, but its geotech is challenging. So you've got to manage the extraction with backfill, and we needed to really put some more redundancy into our backfill infrastructure to make sure we can meet our plans.
Mark Bristow
executiveAnd that's exactly what we did. At the same time, we took a major planned maintenance shutdown on the SAG mill. So those two factors are what close the gap to guidance and reduce costs, because Turquoise Ridge is delivering more tons at a higher grade, and Carlin is too, for different reasons, and that has helped. As you know, that's the best way to tackle costs — a cost, on a cost-per-ounce basis. I'd note that the team has been very focused — as you know, I've always been very focused — on unit cost per ton. So we're far more confident that we have a handle on unit cost per ton in Nevada, which is really what ultimately drives overall cost per ounce. In Latin America and Asia Pacific, the key is Veladero. And again, we've now... You know, we would have hit our guidance last year if Veladero had ramped up properly, but the conveyor belt infrastructure collapsed. I mean, sorry, PV. Thank you for that. So we would have met guidance if we had gotten PV right, but that collapse hit us right in the fourth quarter.
Mark Bristow
executiveWhat I mentioned during our previous conversation is that this is an engineering hurdle, and we have actually resolved it at this point. We've reconstructed it, put it into commission, and it's finished. So at this stage we're increasing the tonnage, as you observed, and along with that comes the fine-tuning of the flotation circuit. And we require the full throughput in order to get that flotation circuit properly tuned. That is truly what drives the overall cost, since it captures the recovery and the grades in that area. It isn't a high-grade mine, but the concentration—the flotation—concentrates the grade. PV is by nature a low-cost producer, so because much of the feed we're using comes from stockpiles. It has already been mined. So that's the other driver. And then the last driver was Kibali. And once again, that's a process driven by the mine plan. If you look at the run rates across the other mines, we're in good shape. But at Kibali, we had to carry out those pushbacks on the two pits, because Kibali is—it has always depended on the flexibility that the open pits provide to use the excess throughput capacity in the plant, and we needed to get those pits open. And so that affected production for quarter one, and in quarter two, there's a big lift in both grade and throughput.
Mark Bristow
executiveSo at this point, we're at the run rate on the production profile. For the next three quarters, Loulo will be more of the same. North Mara is the other one. Once again, we've brought open pits into North Mara. As you're aware, we discussed that a couple of times last year. The underground is now operating, and it's a matter of optimizing it. And again, there was some scheduled work at North Mara that had an impact on... And we, once more, will see a modest improvement in grade in quarter two, and then a fairly significant improvement in grade as we move through the back half of this year, and really that's, so, you know, you hear me laying out the profile, and so when, you know, whereas at the start of last year, we had to catch up, whereas this year, we're on plan. It's very clear to us. Of course, the good thing about where we are is that we've been working diligently to reach that... What's the right word? Inflection point on production, and it was going to be last year, but with the PV hesitation, we've pushed that into this year. But we're truly at that stage.
Mark Bristow
executiveAnd I constantly tell the team, you know, a great company versus a good one comes down to execution and leaving behind a solid legacy. So with the higher gold price, expanding margins get some support from that, plus our costs are declining. And so, you know, moving ahead we're in a decent spot to grow our margin, and that's what we strive for daily. That answers your question.
Lawson Winder
analystThanks a lot — that was great. One thing really stood out to me in your slides: the strong emphasis on exploration wins and the sheer number of targets you have. That's clearly a big piece of the story. It may be a bit early in the year for this question, but I'll ask it regardless: how are you thinking about reserve replacement in gold for this year?
Mark Bristow
executiveSo I believe Nevada will, for the first time, come close to that — or possibly even hit it, eh, Simon? In Nevada we're now on a five-year plan, which represents a major step forward, and there's some really exciting stuff happening. We've got things that are still progressing — the extensions at Greater Leeville are real. That isn't fully baked into our plans. The fresh modeling we've completed at Turquoise Ridge — if that turns out to be a duplication on those folds beneath the main horizon, which are in the reserves — that's an exciting development. We haven't quantified it yet, but it's significant. Anything you'd like to add, Simon? Just speak up, eh.
Simon Bottoms
executivePakistan is also going to make a substantial contribution.
Mark Bristow
executiveAll right, yes — I’ll take care of that. And after we complete the feasibility study in Pakistan, it comes to roughly 15 million ounces of gold. How much was that? 13 million ounces of gold, plus a substantial amount of copper. So, as you can see, we’re really demonstrating a significant increase in our reserves going forward. And I think Loulo and Kibali are in the same position — simply replacing the ounces they produce.
Greg Barnes
analystMark, this is Greg Barnes from TD, with a few questions. First, on PV. You have that ramp-up slide showing tons and throughput — at least I believe that's what it shows; I don't have my glasses on.
Mark Bristow
executiveAbsolutely.
Greg Barnes
analystOn the grade side — I mean, on recovery — when do you figure you get that dialed in? Does it happen over the course of the year, so that by 2025 you're at full run rates on throughput, grade, and recovery alike?
Mark Bristow
executiveSo, you know, the grade in PV runs about 2.4 ±1.5 grams on either side. And we blend the ore coming out of the pit together with the stockpiles. That's what we do, and we concentrate that into the autoclaves. And one of the things we did during last year's ramp-up — just to remind you — is we built this new flowsheet, and what it did was add fuel to the autoclaves. So we put the autoclaves into a higher temperature regime, and so we added a technology, a flash cooling vessel — effectively a flash point — so we could flash off the heat when it got hot. But with the stumbling last year, we had to go back to run-of-mine feed on the autoclave. So we ended up having, in two of our autoclaves, the ability to do both. So to take run-of-mine feed and to take the higher concentrate, high sulfur feed, which is much more efficient because it's at a higher temperature. So we've got a much more flexible flowsheet. We are now at that stage, to your point, Greg, running up the throughput. We need that throughput to get, you know, to a, to the sort of nameplate, to be able to optimize the float circuit.
Mark Bristow
executiveThe float is already being brought up. That’s the recovery part. We’ve brought in pretty much every expert — operational and metallurgical — from the Barrick Group, along with some outside assistance, specifically to manage that reagent suite, since that’s the trick. All the test work has been done. We test constantly. We’re comfortable with the targets. We just need to settle the throughput run rate. And that’s what the slide shows: during that build-up, there’s still a little dynamic in the feed, but we are getting there.
Greg Barnes
analystThen regarding Mali, for the second question — just how far apart are the two sides? Because I understand the government has come to you with fresh demands. Is that gap a wide one, or do you feel it could be settled quite fast, or will this end up being a situation that goes on for a while?
Mark Bristow
executiveSo I think it's — you know, I've invested a lot of time there, and Sebastiaan Bock, who leads Africa and Middle East, has put in even more. So we've devoted a great deal of time to engaging. And what happened was, like any kind of revolution — in inverted commas — because it was essentially a highly uncomfortable situation between the population and the civilian government, which was, to put it politely, less than efficient. And so it drove this change, as we've seen before in Mali. And so right away, the transitional government that was formed, headed by the junta, was seeking ways to extract more from the mining industry, since that's the only lever they have to pull. So they conducted an audit, which, again, we supported. We're never shy about backing audits. But the aim of that audit at the outset was to try to find fault rather than seek opportunities to build a better industry, which is what all of us agreed we would do, including the people in authority. Anyway, they took a long time to release that report, which we now have. So we've been able to respond to it, and to sit down with the Ministry of Finance at this stage, and more recently, there's a minister of mines who is engaging with us.
Mark Bristow
executiveThat's the current state of the engagement. And we have—just to try to explain it, Mali's government organs are for the most part intact, and then there's the junta, which has appointed a kind of executive sitting above the normal government organs. Mali has a fairly bureaucratic structure, a bureaucratic government. We're acquainted with all of those people, and we've made a point of getting to know the new people in power. So my instinctive response is that if you're putting forward claims, you ought to have a model, some basis on which they're raised. So you should share it with us, and naturally, we have a model of our own, so the two can be put together, and we can determine who's right and who's wrong, or where the matter stands, and find a path forward. As you know, engaging has always been my preference, and I've already had that conversation. You know, should we be seeking a solution together, or should we be fighting? Because arbitration is available to us, and a competent authority, again, as we've done previously in Mali. And both parties agree that engaging is far more constructive. So that's where things stand. And the 2023 mining code, which has now been approved, and we're awaiting all the regulations, specifically provides for an old order right, to coin a phrase, to accept the 2023 code when the permits come up for renewal.
Mark Bristow
executiveWe haven't reached the point of renewal yet. There are two separate permits in play, and they're spaced fairly widely apart in terms of timing. But as we've done in every country where we operate, our preference would be to talk it through — and in fact we did exactly that with the civilian government before, engaging well in advance. Our stance is that wherever we can identify solid grounds to make improvements, we'll pursue them; items of that kind were never part of our 1991 code, since what now serves as the standard convention has a. It has evolved away from the '91 code as we've taken on modifications along the way. So that's the crux of the discussion. Naturally, the people we're sitting across from aren't especially skilled when it comes to mining. Our point, therefore, is this: take care not to harm Mali's benefits by extracting too much and diminishing the worth of the ore bodies we have delineated. This is a complex discussion. For me to claim it will be simple — look, we've enjoyed some genuinely constructive exchanges in Mali across the past 28 years. That's the situation as it stands. So... What I can say with certainty is that we've pressed the authorities on these rumors, and in writing they've told us unambiguously that expropriating their assets is not something they intend to do.
Mark Bristow
executiveSo that's really all I can share with you right now. But things are dynamic. The economy is under a lot of stress. We're dealing with the... All five of the G7 countries have full embassies in the country. Everyone is concerned about moving this country forward, especially the Western powers. And the Malian authorities, definitely, you know, are clear that they want to do something that's good for Mali. They're not trying to sort of take Mali and well, that's certainly what they've told me directly. So, you know, I'm sorry I can't give you more granularity, but I'm actually, as I usually do, I'm just giving you the lie of the land.
Greg Barnes
analystPerfect. Appreciate it, Mark. Over to you.
Jackie Przybylowski
analystHi, Mark — this is Jackie Przybylowski from BMO. Perhaps, to explore that a bit further, could you speak about Mali's government and the stability there? I'm simply not acquainted with how a military junta is structured. For instance, how stable would you say it is, and do you anticipate any sort of shift in that government's structure as time goes on?
Mark Bristow
executiveHonestly, I believe what you're asking me to state is something I'm not ready to state. So, as you're aware, this marks the third military leadership that the country has had. The first one lasted only a brief time. The general aim, and by the way it has defined itself, it calls itself a transitional government. The goal is to move toward that, to bring back a normal civilian government down the road. And as you know, there is considerable tension in that region. We've watched Niger shift to a military government, and Guinea as well, where, you know, significant investments are underway in the iron ore sector. So that entire region is a difficult environment, and the adversary is ISIS, the radical Muslim movement in the Sahel. So, you know, there's a... It is quite complicated, and then none of them are really in question, except for Guinea.
Jackie Przybylowski
analystMy apologies — it wasn't my intention to trip you up on anything. Moving to a different subject, could you perhaps speak about Porgera and how that startup is progressing there, especially considering the mine has been halted for some time?
Mark Bristow
executiveYou know, the one thing I'd mention is that it's going surprisingly well. It's sort of like, well, sometimes it feels like running in the dark. You don't really know what challenge is coming next, but since we, since we made the move to the official startup, and then we got engaged with Hela Province on restarting those gas powered power stations, which sit in the province next door, re-erecting the pylons that carry power through to the mine, we've completed all of that. We've commissioned the generation facility, and we're feeding the mine. So, you know, and we're ramping up. And we did a great deal of pre-work on ramping up, but, you know, so far it's going well. So far, we're ahead of plan.
Jackie Przybylowski
analystMuch appreciated — that's excellent.
Ralph Profiti
analystMark, Ralph Profiti here from Eight Capital. I'm curious — as you head toward that feasibility study at PV in Q3, will much of it basically involve recalibrating and retooling the equipment work done over the last few months? And could you speak a bit about some of the shifts in tailings facility management that have been underway, and that will feed into that study?
Mark Bristow
executiveOn the processing facility expansion — that's complete. What I was talking about with feasibility concerns the tailings side. Our permit was granted based on a pre-feasibility, and the final feasibility study will wrap it up. The key issue is the geotechnical testing on the wall, making sure the design meets requirements for a seismically active area, which is where PV sits. Naturally, we also have the original tailings facility as a benchmark — it was designed just as well. To get to that pre-feasibility, we carried out all the consultations in the interim. And we're quite far along when it comes to engaging the community about relocation. I visited just a few weeks back. We're actively constructing the new towns, and these are sizable towns. Frankly, they're especially impressive towns. After that, relocation will begin. The first group of relocations takes place this year. So things are moving forward. We see no reason we won't finish the feasibility study, and we're making headway on all the engagement efforts, the social programs and everything of that nature, along with the technical work to confirm the final design of the retaining infrastructure itself.
Ralph Profiti
analystAnd then second, could you speak about getting the pre-feasibility study completed at Fourmile, and how the talks and negotiations with Newmont, along with folding that into NGM, would sort of come after that?
Mark Bristow
executiveAnd I have to say, it's worth emphasizing this point again. I don't believe folks fully grasp how significant it was to get Goldrush permitted. And honestly, the team performed really well. If you recall, we kicked off that process back in 2018 and wrapped it up in 2023, in effect. So that's an especially strong accomplishment. All the consultation work, everything involved — as you're aware, permitting mining projects here in the United States is no easy thing. And we enjoyed backing from both sides of the aisle, from our senators and congresspeople — that's the Federal Senate and Congress out of Nevada — along with the Nevada governor and the legislature in Nevada. So it was — and last week we cut the ribbon with the state's governor, so it's now officially open. Fourmile is an extension of that project, though with a different style of mineralization, in that you're taking the classic Carlin-style mineralization into a metamorphosed, far more brittle rock. So you get those large breccias, which over the years have sat at the heart of some of the famous super high grades in Carlin. And so you end up with considerably bigger ore bodies, at a better grade. And so under the joint venture, we are.
Mark Bristow
executiveIf we finish a feasibility study showing the project is viable, then we can take it to Newmont. There's a formula in place, and once we clear the filter on that formula, we present it, and then a process kicks in to calculate a market value. So it's a market value, not an NPV. After that's complete, Newmont is obligated either to purchase their share with cash and reimburse us for all the costs we incurred getting to that point, or to dilute. That's the choice. And as you know me, I've always been someone who engages, because this is a genuinely real asset. We enjoy a good relationship with Newmont in Nevada. We've collaborated well as partners, so we're open about the conversation and the progress with our partners. We haven't agreed. Sorry, I'm out of the... So we haven't settled on a specific path forward. But we have agreed that at the appropriate time, we'll have a conversation to explore options. Because doing so benefits everyone. Newmont also holds some excluded ground under the... Because remember, this was a hostile engagement, and we had agreed that we would value the deal based on the market.
Mark Bristow
executiveAnd a few assets, Fourmile among them, weren't given any value by the market, and the same holds on their end. So we have some lower-grade options sitting within the excluded assets. But... And as you're aware, over time in mining, these are genuine assets. They come into play when the oil price rises.
Ralph Profiti
analystOn Fourmile, is there a permit you already hold, or does it have to begin the whole permitting process the way Goldrush did?
Mark Bristow
executiveThere will be some permitting involved, though Goldrush assists with that thanks to the infrastructure. We're able to reach the underground — it is an underground mine. We can get to it from positions that are already permitted. And naturally, per the joint venture agreement, we can also make use of the installed Nevada infrastructure. So, at present, we need to drill it out. What we're doing right now is we have a dedicated Barrick team examining its infrastructure layout, drilling a number of holes from surface — roughly a $42 million project for this year — so we can scope the project and understand what it's going to entail to get a pre-feasibility study completed. That's what we're doing.
Ralph Profiti
analystAnd as far as Pueblo Viejo goes, aside from what you mentioned — you know — are there any other issues we could run into, or is everything set to go, and at this point it's just a matter of ramping it up?
Mark Bristow
executiveWhat's your tenure in mining? Nothing is flawless. Yet as things stand now—I mean, we laid plans for this expansion back in 2019, at a point when the mine would otherwise have shut down in 2021. And despite every objection or skepticism, we accomplished that, and we're actively implementing it. So, you know... To paint a picture, through 2020, Pueblo Viejo's typical share of the Dominican Republic's corporate tax stood at 18%. So we dropped over the last two years because we had to get by using stockpiles, and the expanded processing plant wasn't accessible to us. But now that it is, and we push that cost down back above 800,000 ounces for a very long time, we return to that highly privileged or hefty contribution to the Dominican Republic. I'd note as well that PV is the very bedrock of the power infrastructure for the entire country, and a major taxpayer and a major employer. It's transformed the whole province, the province where PV sits. So it is a very big, and this construction, when we carried out the big construction expansion, what we did is we had to bring in outside partners, but we also paired those outside partners with local business partners.
Mark Bristow
executiveWe truly did provide support to the economy throughout the entire COVID period as well. So, as you know, we have established a very solid license to operate in that country. Okay, let's proceed. Could we turn to the telephone participants, please?
Operator
operatorAbsolutely. If you’d like to get into the question queue, press Star, then One on your phone’s keypad. A tone will confirm that your request has been received. Should you be on speakerphone, lift your handset before you press any keys. If you want to take your question back out, press Star, then Two. Our first question is from Daniel Major at UBS. Please proceed.
Daniel Major
analystMark, hi—am I coming through clearly?
Mark Bristow
executiveAbsolutely, that works well. Appreciate it, Danny.
Daniel Major
analystHey, thanks. Yeah, I’ve got a couple of questions. So the first one is a bit higher-level, obviously — M&A is a hot topic in the sector right now, and one of the discussions around valuation centers on how complex portfolios are, with lots of assets and lots of minority interests, plus a good gold price environment. Are you reviewing the portfolio and thinking about any assets you could use to streamline and recycle that capital into your expansion projects?
Mark Bristow
executiveSo, you know, we have a couple that could reasonably be called non-core. Tongon is one of them. The remaining ones are strategic, namely Hemlo, and we've devoted considerable effort to repositioning Hemlo, and you'll see that. And at present, it's a key part of our business, since it's our sole asset in Canada. And although we're investing heavily in Canada, we don't believe it would be prudent for us to have to walk away from Canada. We want to expand our Canadian footprint profitably. You know, the Veladero asset is run by Antofagasta, but again, I mean, sorry, the Zaldívar asset is run by Antofagasta. And again, you know, the copper price matters. Our copper strategy matters, so, you know, at this point, that's our — that's where we stand, and we have some work underway in Chile, which we're, you know, quite enthusiastic about. And that's it. The rest are Tier One assets, you know, fitting neatly into our strategy. So, you know, we will, at the right moment, as we've shown... But I think the key point I'd give you in answer is, at the time of our transactions, the joint venture between — the consolidation of Barrick and Randgold into one company, we sold the non-core assets.
Mark Bristow
executiveSo when we examined further possibilities and that Nevada joint venture, we had to handle the difficult properties, namely Long Canyon, along with the disappointing elements that came with folding those joint ventures together. Therefore, we don't. You know, plenty of companies are still carrying troubled assets around following large premium deals. That issue isn't ours. So, you know, Dan, I can't see... No, that's my answer. At this moment, we hold truly outstanding, world-class assets, as I mentioned during my presentation. You know, one benchmark is simply to consider what BHP had indicated it might be willing to pay for Anglo American's copper assets. One could argue a bit of other material comes along with it, yet it remains a substantial price tag, and we have built ours organically. So that's where our attention lies, and we possess our growth assets in Nevada and the surrounding areas, the remainder of our portfolio, especially PV. And after that, it's the exploration team that is beginning to establish meaningful footholds across the world's major gold and copper regions. And we think that represents Barrick's future at present.
Daniel Major
analystGreat, thank you. And then, if I could, just one more thing. It appears that at Reko Diq a transaction is nearing on the remaining side of the 50%. Does that have any effect on your funding, and on how you are viewing the financing of the project?
Mark Bristow
executiveThat’s not the case in any way.
Daniel Major
analystAll right, that's excellent. Appreciate it.
Operator
operatorOur following question is from Tanya Jakusconek at Scotiabank. You have the floor.
Tanya Jakusconek
analystOh, great, good morning. Thanks a lot for taking my question. Mark, could I just ask about the elections in the Dominican Republic? You know, with everything at the high gold price and everything else going on in the world, how are those going? Is there anything we should know about with respect to changes in royalties, taxation, anything else that would impact Pueblo Viejo?
Mark Bristow
executiveRight now, all signs point to the president — the sitting president — securing a second term. When he first won office, nobody was anticipating COVID. As leaders go, he likely handled that crisis better than any leader in any nation where we hold investments. He has steered a very good ship, you know. He's tackled a number of the challenges, and on top of that he's had the next-door neighbor challenge, so that has been a challenge. But, I mean, we're not expecting... The opinion polls at least suggest he is more than likely to be the successful candidate. And if that happens, we know he has shown and highlighted how important investment in that economy is, and I don't believe there's gonna be — well, there's certainly not gonna be any aggressive engagement with the private sector. I think there's gonna be real focus to it, to build it, the private sector going forward.
Tanya Jakusconek
analystAll right, that's reassuring. That's reassuring to hear. Could I follow up with one more question—actually, Graham might be the right person for this. Graham, on that point, remind me again about Chile and Pascua-Lama: the $430 million—if the mine isn't operating and paying by 2026, we have to repay it. Can you remind me what options exist to extend that deadline, and any work underway at Pascua-Lama right now—and I know you're reviewing the EA—would that effort help defer it? Just refresh my memory; I've forgotten how the process works there.
Graham Shuttleworth
executiveWell, Tanya, this really breaks down into a couple of pieces. First of all, of course, that date got moved later than when it was originally set, so it's always open to renegotiation. But what matters more, honestly, is that once we got the electricity line in place running from Chile over, we began selling power abroad. That's significant for us since it supports the VAT refund, because in a way it satisfies the production criteria. So that has genuinely reduced the exposure tied to that VAT claim.
Tanya Jakusconek
analystAll right, that's helpful. So my last question is really just so I can grasp this myself — and Mark, thanks for explaining how the assets will do at the close of 2024. But is it fair to think the split between the first half and the second half looks like last year's? In other words, 45% of production coming in the first half and 55% in the second, with a strong Q4. Should I model your production profile that way?
Graham Shuttleworth
executiveYeah, Tanya, that's a pretty reasonable interpretation. It might be 46, 54, or something along those lines, but it's roughly in that area. It's definitely a... As we've mentioned in our guidance, production is going to rise throughout the year, with a strong finish to the year. So yeah, that's a fair reading.
Tanya Jakusconek
analystAnd what about the copper side of things too?
Mark Bristow
executiveAbsolutely.
Graham Shuttleworth
executiveCompared with gold, copper is somewhat more tilted toward the second half.
Tanya Jakusconek
analystAlright. And last, apologies, one additional item. Certain firms are starting to see inflationary strain return in steel and cyanide. Labor appears to have eased. Are you observing the same thing? I'm merely attempting to grasp what you're witnessing across the regions where you do business.
Graham Shuttleworth
executiveYeah, yeah, that's fairly steady. I wouldn't characterize it as ongoing inflation. It's more that certain key commodities—or, as you put it, the steel balls, cyanide, explosives—we've been working to push those prices back to where they were in 2021. In plenty of other areas, we've already returned to 2021 levels, but a handful of them have stayed sticky, and we still need to get them down. It isn't really across the entire group. It tends to be more regional. So in North America, we're facing more pressure than in other parts of the business. And then, as you mentioned, labor isn't under the same pressure it was a year or two ago.
Tanya Jakusconek
analystAll right, thanks very much. I'll let somebody else pose that one, but I do appreciate your taking my questions.
Mark Bristow
executiveYeah, I think regarding labor in North America, one point is that, as you know, we've put a lot into upgrading our Nevada workforce's skills, and those signs are beginning to show. So the opportunity is to raise the. It's a costly commodity, a truly essential asset. But. And the way we're approaching it is. And the team has done remarkably well in, you know, building up that skill base so we can boost efficiencies and offset the cost. So that's what we've concentrated on for the last couple of years. Okay, next?
Operator
operatorAnita Soni from CIBC World Markets has the next question — please go ahead.
Anita Soni
analystMorning, Mark and everyone. I have a few questions, and they mostly build on what Tanya raised. First, on Lumwana: what made the grades processed come in so far below what was mined? Is material being drawn from stockpiles, and when does that stop?
Mark Bristow
executiveJust a second. I’ll have Simon take that one.
Simon Bottoms
executiveNo, it simply comes down to our position within the pit. We're currently just beyond the high-grade shoots, so with the stripping taking place right now, we'll expose the better grade afterward in the year, so.
Anita Soni
analystI suppose the real question, though, is why not send that straight to the mill? My understanding was that the grades we mine are considerably higher than the grade we process.
Mark Bristow
executiveNo, I think the second one — just to add a comment — the latter half of the grade, as Simon mentioned, does rise because of how the mining schedule works. And keep in mind, we're laying the groundwork for a major expansion, so we don't want to end up, sort of, plunging down into the ore body. This has to be handled as a long-term investment. So, yeah. And we'll manage it along the way, including growing some of our stockpiles. But, you know, that's just the way it is. It's going to be a back-half-weighted year at Lumwana especially. And that's what underpins the point Graham raised — Lumwana, you know, a considerably stronger second half of the year, on the copper side of our business.
Anita Soni
analystAll right, so turning now to PV — you provided some disclosure regarding the tonnage anticipated across the year. Could you shed a bit of light on what grades we should expect? Are they fairly consistent at 2.3 gram, or will they climb or decline as the year goes on?
Mark Bristow
executiveYeah, 2 — again, we have the latter six months, and, you know, that's how it is. So the mean grade across the year comes in at slightly above 2.4. That gives you a sense of it.
Anita Soni
analystOkay, and then I've got another question that's quite detailed. Over at Turquoise Ridge, you brought up the backfill issue. Is that — and how much time is it going to take to, you know, to get that, to get that sorted out? I mean, obviously it's having an effect on the mining costs, the underground mining costs, and, and I'm also going through what might be the autoclave process costs too. But, I'm just wondering when those unit costs are going to begin trending down.
Mark Bristow
executiveOur expectation is that we'll be back at plan—the rolling plan—by the close of quarter three. That said, we're putting in the work right now. On backfill, we're actually ahead of plan and catching up, and by the middle of the year we'll be close to budget, though not fully there. Quarter three, however, is when we reach that point.
Anita Soni
analystAll right. And finally, something similar regarding Carlin. What should we anticipate when it comes to grade increases as the year goes on? I believe that's another case where you mentioned grades came in low during the first quarter and would bounce back as the year progresses.
Mark Bristow
executiveGrades will be somewhat lower, and they are indeed lower in Q1, and I’ll walk you through the… So for the year, we’re expecting a grade of roughly 4.3. But it moves around—again, this is a very large mine. Next quarter should see improved grades, and then I believe the quarter after that is, once more, a solid grade, and after that we return to about four grams in Q4. So it’s somewhat uneven, yet on average there’s a gap of 10,000 to 20,000 ounces between H1 and H2. And I—with Carlin being a big beast, you attempt to hold it as near to the running average as possible, and that’s how it appears on the profile.
Anita Soni
analystOkay, so that brings us to the last question. Are there any additional mill maintenance shutdowns we ought to know about during the year?
Mark Bristow
executiveRight, so we have that major shutdown involving the Gold Quarry roaster coming up in July, and that's tied to the expansion. After that point, we'll ramp things up, and our forecast for this year is really aimed at the back end. So across the last half and one quarter, throughput at the Gold Quarry roaster should be running roughly 15%-20% higher, depending on how fast the ramp-up goes. It's a significant shutdown we're undertaking. We're upgrading the converter, and we're carrying out a great deal of additional work that has genuinely been affecting efficiencies at that site. We anticipate a substantial reduction in cost following that expansion — partly because throughput rises, but even more so because we have actually resolved several of the issues with the ancillary equipment on that roaster.
Anita Soni
analystOkay, that's all I had to ask. Appreciate you answering them.
Mark Bristow
executiveThanks, Anita.
Operator
operatorOur following question is from Josh Rales at RFI Associates. Your line is open.
Josh Rales
analystThanks, and good afternoon, Mark.
Mark Bristow
executiveHello there, Josh.
Josh Rales
analystThis is private ad—can you hear me?
Mark Bristow
executiveYes, you’re coming through clearly. Thanks.
Josh Rales
analystGreat, thanks. I wanted to ask about the Donlin deposit up in Alaska. Thomas Kaplan gave a presentation where he spoke about the extremely high grades at that site and described it as a truly remarkable resource and asset, and you folks haven't said much on that front. In your view, does a stronger gold price speed up the potential there? Then my second question, quickly: you said you believe Barrick is the cheapest gold company and the most undervalued one globally, so could you name a metric or two that you rely on to get to that view and share them with us?
Mark Bristow
executiveSure. If you take a look at where consensus sits on NAV multiples, we're trading below 1x — roughly between 0.89x and 0.93x NAV, depending on whose numbers you follow. And naturally, when the gold price moves above those consensus prices, same as with copper — and copper really is the key driver too — that discount gets wider. So that one's straightforward. On Donlin, we've always seen it the way Tom does, as a very large resource. It's refractory, so it's a Donlin located in a very geographically challenged area — geographical, not geopolitical. So it's a Donlin deposit at 2.4, somewhere in that vicinity, grams per ton. So infrastructure is the difficulty, and our focus has been getting it to deliver a return that satisfies our investment criteria. And we've been working hand in glove with the NOVAGOLD team, really trying to sweat every line item in the capital schedule. And on your final note, of course, rising gold prices float these kinds of boats. So there will come a time when NOVAGOLD would be an investment, you know? So that's how we see it. It's an inventory. It's part of our global inventory. It's a valuable asset in our inventory, and so, you know.
Mark Bristow
executiveAnd at no point have we claimed differently. So, yes. Graham, did you want to add anything?
Graham Shuttleworth
executiveActually, it was Donlin you were referring to, not NOVAGOLD.
Mark Bristow
executiveI mean, Donlin.
Graham Shuttleworth
executiveSure.
Mark Bristow
executiveRight, but no — well, NOVAGOLD is the remaining piece of Donlin.
Graham Shuttleworth
executiveYes, definitely. That said, it's—
Mark Bristow
executiveSure.
Graham Shuttleworth
executiveYou brought up Donlin. That project is going to get developed, and it—
Mark Bristow
executiveYes, it’s going to be developed.
Graham Shuttleworth
executiveThat represents a valuable asset.
Josh Rales
analystSounds good, though it won’t happen soon. That’s far off in the future.
Mark Bristow
executiveYou attempt to forecast where gold is headed. You know—
Josh Rales
analystIf it—
Mark Bristow
executiveThe gold price has risen 15% — actually, in the past 18 months it's climbed almost 30%, so yes.
Josh Rales
analystIf the gold price holds at this level, would that work at these levels?
Mark Bristow
executiveYeah, I'd say it's beginning to get pretty close.
Josh Rales
analystExcellent — thanks so much. I really appreciate the effort and dedication from everyone.
Mark Bristow
executiveThanks.
Operator
operatorOur following question is from John Tumazos of John Tumazos Very Independent Research. You have the floor.
John Tumazos
analystThanks a lot. Along the same lines, there are three or four prospective projects you have in Chile, and copper has come back, as has gold, both there and in Alaska, and also at Fourmile and Dorothy and other extensions at Cortez and the Nevada Gold JV. When you assess these projects, do you take it that industry costs will climb by half as much as gold and copper prices, or would you figure that three-quarters of the added revenue stays with the project, or how, how do you weigh these economics and the climate of rising gold and copper prices, Mark?
Mark Bristow
executiveOkay, John, let me respond to that by laying out a scenario. Think back to 2020 — actually, 2008 and 2006 — with gold climbing from $450, which was the case in 2005, up to roughly $1,000 by 2009 and $1,800 by 2011. If you remember, much like the past 24 months, you saw a market where major deals got done while the gold price rose quickly, and buyers paid a hefty premium. That is exactly what took place back then. What differed is that everybody was doing it, since more majors existed at that time than there are now. Then the gold price pulled back, and inflation showed up starting in 2005. Once China entered the global economy, it fueled that inflation. Oil prices climbed, everything climbed. Yet commodity prices consistently beat the rest. So it wasn't the situation we have now, where inflation arrived without gold rising and with a large fill-up at the — as we have seen during the last 18 months. So the real question is... And certainly, that marginality — being able to earn on the margin — is a genuine, has always historically been a draw within the gold sector. But then again, you're the expert.
Mark Bristow
executiveThe issue across mining is that companies have used the gold price to sustain that margin, convincing shareholders they're growing reserves when in reality they aren't. That's a difficulty our sector faces. It's just as much a difficulty for copper producers. What we've done at Barrick is position ourselves opposite to that way of doing things: we've concentrated on the correct assets, put capital into them, and ensured the gold we mine gets replaced with reserves of identical quality. And that marginal flexibility exists for us thanks to our discipline around the $1,300 gold price. So consider some of our assets — not every one, since many are geologically locked inside the 1,300 envelope, but a few carry lower-grade halos surrounding that 1,300 envelope. So we pursue that. When gold prices are high, we'll take it, because the infrastructure means it delivers a very comparable margin. If you hold a $1,000 margin while building infrastructure on a 1,300 model, you can accept marginal — marginal by our definition, not anybody else's — gold on that basis, and that's sound business.
Mark Bristow
executiveSo that's what we do. It's been done—we did it back in 2011. We deferred the Loulo pit and mined a large amount of high-grade, low-recovery ore, and that was that. You know, and we could do it. So we do it, but. And you know, Donlin is a very different asset compared with Fourmile. Fourmile is a Tier One, world-class opportunity. And it will generate profit at any gold price you can realistically forecast. It comes down to banking it, which we do, again, diligently. We won't take risk on that. On the Chile side, you know, copper prices certainly gave Zaldívar a boost. The Veladero mine—I think we fixed that rather than being rescued by the gold price. It's a gold mine, not a copper mine. Pascua-Lama, we are working on, you know, a preliminary economic model for Pascua. It's also really a gold and silver mine, with a big silver stream, as you know. But it, you know, it would. We don't hedge, so we would have to see. You know, we'd have to be. And we base our reserve gold price on input costs. We don't set it against the spot gold price.
Mark Bristow
executiveIf it makes sense, John, we'll take advantage of a high gold price in our mining plans, but we won't adjust our reserves on that basis. So for us, you know, our opportunities are the expansion at Leeville, the whole Carlin, the expansion at Turquoise Ridge, the Goldrush ramp-up, which is already there. There's an expansion opportunity that's more complex than at Fourmile. We've got some very exciting upside at Kibali and Loulo-Gounkoto. PV is about delivering 20 years, so any further additions are life rather than profile, and it's a, you know, it's an 800- to 1 million-ounce producer. And then the real excitement is some of our copper plays in our new jurisdictions. As we go through this year, I'm confident we'll be able to share more with you as we grow it. We're still consolidating some of the titles in those areas. And then, of course, the gold play and, you know, our very solid relationships in Zambia and DRC offer us significant opportunities again, which we're, you know, we're cautiously optimistic we're gonna grow those positions. I hope that answers your question.
John Tumazos
analystOh, that's excellent, Mark. A few of your projects have been held for more than 10 years, and Barrick analyzes and engineers them rigorously. If, say, Fourmile is leading the pack, or another one is, and other companies lack sufficient projects and are ready to pay premiums, would you allow someone to pay you a premium and acquire one of those projects from you, paying you $1 billion or more?
Mark Bristow
executiveWe'd be quite glad to sell an asset to anyone willing to pay above what we believe it's worth. Yet mining is, at its core, our business. And as you can see, take Loulo — we began at 1 million ounces, and now it holds, what, 7, Simon, 7 million of reserves even today, following more than 10 years of mining — 2005, that is — so that amounts to 15 to 22 years of mining. So, you know, when you're operating in these Tier One jurisdictions with assets of this size, they endure for a long time, and that's where we sit. Nevada, you know, is an exciting place. When you discover assets in Nevada such as Fourmile, they are massive assets. So we aren't in this for the short term. It's a long game, and over time it has served our shareholders well. I think if you look at the Randgold shareholders, this deal has worked out very well for them. If you look at the Barrick shareholders, they've got — we still have some work to do to deliver them value, those that remain in from back in 2018.
Mark Bristow
executiveAnd yet we're putting together a strong company, you know, one that can deliver value. And we've already paid out substantial dividends, along with other capital returns, to our shareholders while we were fixing the business.
John Tumazos
analystI appreciate that.
Operator
operatorThat appears to be all the questions from the conference call at this time.
Mark Bristow
executiveOkay, thanks so much, everybody. I really appreciate the questions, and once more, thank you to those of you who joined us for the one-on-one sessions. As you know, we're always around to take questions down the road. We're looking forward to speaking with you again, and starting Monday we have an analyst visit to our Kibali and Tanzania mines. The presentations and so on will be posted on the website, so I'd encourage you to follow the trip virtually, and we're always available to help if you have any questions. Thanks again.
Operator
operatorThat brings us to the end of today’s event. If you have any further questions, please reach out to the Barrick Investor Relations Department. You can now disconnect your lines. Thank you for joining us, and have a pleasant day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Barrick Mining Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Barrick Mining Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Barrick Mining Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.