operatorGood day, everyone, and thanks for holding. I’m the operator for today’s event. Welcome to Barrick’s Results Presentation for the Second Quarter of 2024. After today’s presentation, there will be a question-and-answer session. <<operator_script>> Please note that this event is being recorded, and a replay will be posted on Barrick’s website later today, August 12, 2024. At this point, I’d like to hand things over to Mark Bristow, President and CEO of Barrick. Please go ahead, sir.
Mark Bristow
executiveThank you so much, and a very good morning, plus good afternoon to everyone at Barrick's corporate office here and around the world. Welcome to the quarter two results presentation. So as we reach the halfway point of 2024, it's a pleasure to say that our performance has been strengthening as we strive to hit our production guidance for the year. Just as important as our operations is the headway we're making on our major growth projects. As this presentation will show you, a new potential Tier 1 gold mine, wholly owned by Barrick, is taking shape in Nevada. Our copper business is on track for a transformative expansion, and the enlarged and upgraded Pablo Viejo is hitting its stride for a fresh 20-year run as a world-class producer. These mines will bring new gold and copper to the market at a very opportune moment, showing the value of Barrick's long-term planning and investment strategy, along with the enormous upside optionality embedded in our asset base. This is the usual cautionary notice about forward-looking information. And for anyone who wants to study it further, you'll find it in full on our website. Beginning with the group highlights, the safety, financial, and operational results for the past quarter all point in the right direction, reflecting a business that is delivering across the board.
Mark Bristow
executiveHigher output along with better margins set us up well for a solid second half, and the numbers also suggest we're in good shape to finance expansion and therefore keep returning value to shareholders. Taking a closer look at the financials, what stands out in particular is the rise in attributable EBITDA margin to 48% along with the considerable growth in free cash flow. Gold margins climbed 39% quarter-on-quarter, and copper margins increased by 124%. Adjusted net earnings per share came in 68% higher quarter-on-quarter, and debt net of cash fell by 12%. In addition, the share buyback program was restarted and the courtly dividend was kept at $0.10 per share. On the operational side, gold production rose slightly quarter-on-quarter. Somewhat higher costs reflected larger royalties, but essentially costs held steady, and the cost drivers were really set with PV as we ramped up and then the push backs at Carlin and Cortez. Copper output went up while costs declined, helped by better grades and upgrades to the mining fleet, and going forward we anticipate substantially greater production from PV, Turquoise Ridge, and La Moana in the second half of the year. Looking at our detailed health and safety report, it's a real pleasure to show you that performance keeps moving in a positive direction as we work toward our zero-harm goal.
Mark Bristow
executiveSustainability has always been woven into how we run the business, in a holistic way. It's an approach that sets us apart, built around the long term and around recognizing that every environmental and social element is connected and integrated. Science always underpins what we do, and it has to be measurable. That's the reason we created the Industry-First Sustainability Scorecard, so we can track and disclose how we're performing on sustainability. We further align our targets and reporting with the UN Global Compact and the UN Sustainable Development Goals, the SDGs, which themselves ask for a sustainability approach that fits with our strategy. That's also why, during the past quarter, we built and rolled out a comprehensive biodiversity assessment tool of our own. Its purpose is to measure how we affect nature and to guide conservation strategies that can be acted on, and in time to come, targets to measure against, all while keeping a human-focused lens for developing our host communities as we aim to alleviate poverty. Our climate change strategy reflects that same integrated approach, and adding 200 megawatts of renewable solar energy at the TS Power Plant in Nevada is one more contributor. So, as usual, we begin the operational review in North America, where Nevada Gold Mines hosts three of our Tier 1 mines, with another in the making at the adjacent Fourmile project, which is 100% Barrick-owned.
Mark Bristow
executiveFourmile stands out as an especially thrilling opportunity. The more information we gather on it, the stronger the case that it may rank as today's biggest high-grade gold deposit anywhere that hasn't yet been developed, sitting right next to Nevada Gold Mine's current infrastructure in one of the finest mining jurisdictions globally. The finest mining jurisdictions in the world. After the Sage autoclave maintenance shutdown wrapped up during the first quarter, Turquoise Ridge lifted output by 16%, whereas Carlin concentrated on underground development to boost its operational flexibility, offsetting the gold quarry pit redesign that followed the pit wall failure in Q1, and Gold Rush kept ramping up at Cortez. With that said, let's take a closer look at Fourmile, which sits adjacent to Gold Rush but, as I mentioned on the previous slide, is 100% owned by Barrick. I'll pause here so you can absorb the very significant intersections from the 10 diamond core drill rigs now on site. When you look at these drill rigs, these drill intersections, they seldom fail to bring to mind yesteryear, the gold strikes, the Carlins, the big discoveries. And many fall in the 2 ounce per tonne category. Truly, Fourmile brings back memories of those company-making Carlin deposits of the past, a world-class project in every sense.
Mark Bristow
executiveLike we told you during the previous quarter, an updated mineral resource is expected near the end of this year, at which point you'll be making a call on the pre-feasibility alternatives. That said, as I mentioned, this really is one of those assets geologists dream about. Given enough time, I'm convinced this asset could become as valuable to Barrick as the stake we currently hold in Nevada gold mines. And that's even before our geologists locate additional Carlin elephants — the ones I keep bringing up. That leads me to Leeville, a 14 million ounce project that, much like Gold Rush, is turning into yet another major growth driver, with the potential to double or triple existing reserves and extend Carlin's life past 2045. I think this matters, so let me spend a bit more time on it. Looking at what we're working with today, we completed a number of transactions in 2019 and 2020. We never paid a premium on any of them. These kinds of ore bodies are embedded in those transactions. What we're doing now is bringing them forward and working to fold them into our production profile. You'll see more of this going forward, but just before I move on from North America and Nevada specifically — so we have Gold Rush driving the Cortez Complex.
Mark Bristow
executiveSo the emerging Leeville expansion is what's driving Carlin. And naturally, Turquoise Ridge is a standalone operation — high-cost, low-grade, low-cost producer. And honestly, that's Nevada's future right there. And once you look at the kind of quality Fourmile is delivering, you have to think there are further chances to find new deposits in this region, and that's where we're focused. So moving on from the North Americas, we go now to Latin America and Asia-Pacific, where Pueblo Viejo — our flagship growth project, the plant expansion and mine extension — is running again. Over in Papua New Guinea, Porgera, which restarted recently, is ramping up toward commercial production, and in Pakistan the Reko Diq feasibility study remains on schedule to be finished this year. Construction has already begun on what we call early works infrastructure, and there's a recruitment push aimed at employees from Balochistan province, which is really the foundation of what we're going to build at Reko Diq. Just to remind everyone that the Pueblo Viejo project is designed to lift annual production sustainably above 800,000 ounces for more than 20 years. Following the conveyor infrastructure failure last year, it's now been rebuilt, and over the past three months the emphasis has been on throughput.
Mark Bristow
executiveMoving to the third quarter, the focus now falls on grinding, flotation, and recovery, as we ramp up toward reaching the design output parameters. In the interim, construction of the new El Naranjo tailing storage facility is progressing according to plan. At this point you're able to see how the project has moved forward across the last 12 months, along with the outlook for the rest of the year. Turning now to the Africa and Middle East region, which turned in its customary dependable performance, with production holding steady and costs kept well in check. Those are the highlights, and I'll share more detail on them as we proceed. Loulo-Gounkoto posted another steady quarter, with cash costs well contained and all in sustaining costs affected by extra stripping for the <<inaudible>> pit pushback. Encouraging results from ongoing brownfields exploration signal additional opportunities to extend the life of mine. And as we said last quarter, we remain engaged with the government of Mali regarding their wish to raise their benefits from the mining industry, while safeguarding our rights and the economic viability of the Loulo-Gounkoto complex going forward. In the northern part of the Loulo permit, drilling results from the Baboto target have outlined a large-scale, well-endowed system with high-grade intercepts. That, together with other near-mine targets, bodes well for Loulo-Gounkoto to once again replace the gold it mines this year.
Mark Bristow
executiveNow, turning to the DRC: Kibali gained momentum following a sluggish beginning to the year, as waste stripping opened up access to higher-grade open pit ore. At the same time, the solar power and battery storage facility scheduled to be commissioned next year will work alongside the mine's three hydropower plants, lifting the renewable share of its energy use to 85%, and in fact for six months out of the year, 100% renewable energy will be driving our power delivery. As at Loulo-Gounkoto, Brownfield's exploration keeps delivering additional growth potential, with high-grade results from the <<inaudible>> targets indicating a significant deposit located within just four kilometers of the plant. The prolific KCD trend is likewise generating fresh opportunities for reserve additions, and that is where the quality lies — everyone, you know, sort of came up with a definition of Tier 1 assets, but genuine Tier 1 assets carry enormous upside opportunity, as you can see at Loulo-Gounkoto and at Kibali and significantly in Nevada. In Tanzania, North Mara and Bulyanhulu both raised production while pushing costs lower, and the revival of these mines stands as one of our major success stories, as does the concept of Fourmile benefit sharing partnerships with host countries, which we successfully pioneered together with the Tanzanian government.
Mark Bristow
executiveAt the Lumwana copper mine in Zambia, we achieved greater output at reduced expense, exactly as planned, and we're positioned for a still stronger second half of this year. That mine is likewise nearing the launch of its super pit expansion, which is going to lift output to roughly 240,000 tons of copper and add over 30-years to the operation's life. We expect first production from this project in 2028. The Lumwana super pit alongside Reko Diq represent two of those organic growth projects I mentioned at the outset of the presentation and that we've recapped here. Combined, they'll give strong backing to Barrick's push to expand our gold equivalent production by 30% over the course of this decade. And it bears repeating that Reko Diq is going to be a gold mine as well as a copper mine, built to yield 400,000 tonnes of copper yearly and 500,000 ounces of gold each year during Phase 2 of its development. On top of that, we have the ramp up of essentially two new mines, Gold Rush and PV, with a possible brand new mine at Fourmile to follow — Barrick holds 100% of it, and it can take advantage of the existing Nevada Goldmine's infrastructure and processing facilities.
Mark Bristow
executiveBarrick possesses a growth portfolio without equal, one that sets us apart from the rest of the industry, with the potential for still more to come out of the exploration work we are continuing. That leads me to a topic I have been raising for a while now: just how undervalued Barrick's shares are at present. So, to close out my presentation, I wanted to walk you through some research built on the consensus net asset value of our assets. This slide highlights two of our core businesses. On the left-hand side is Nevada Gold Mines, which stands far and away as the finest gold asset located in the most mining friendly jurisdiction anywhere in the world. The right-hand side shows our expanding copper business, which is squarely on track to rank among the world class peers, several of which have drawn international attention of late. Taking things a step further, this table pinpoints the unrealized value sitting inside Barrick's portfolio. Nevada Goldmines alone ought to command the highest valuation in the industry. On that basis, the analysis conservatively assumes a price to NAV multiple matching that of Agnico Eagle, even though one could argue NGM would be rated higher given its size and quality. The analysis applies an equally conservative market multiple to our copper assets, consistent with copper peers, though once again I would point out that the recent BHP London transaction assigned substantially higher multiples to those undeveloped copper assets in Argentina.
Mark Bristow
executiveOnce more, this analysis relies on the current consensus NAVs, though we anticipate those NAVs will rise, since we'll be releasing updated feasibility studies on our two key growth projects toward the end of the year. As the table shows, based on this analysis, the value of merely our interest in the Nevada gold mines plus our copper portfolio on its own is greater than our present market cap. Indeed, judged by the current market value of our shares, the remainder of our business carries a negative value of $1.2 billion. That remainder takes in our interest in three Tier 1 gold mines outside Nevada, the world-class Fourmile project, additional gold mines and development projects still in the pipeline, and our exploration team's unmatched record of covering and uncovering new answers. In short, my contention is that buying a Barrick today gives you a great deal for free. Back in 2019 we set out to build a sustainably profitable gold and copper mining company centered on world-class assets. We didn't need to acquire them at a premium, as I noted in my introduction. They were already embedded in the combined portfolio we assembled at market. All that was required was identification, evaluation, development and delivery, and that is exactly where we stand today.
Mark Bristow
executiveBeyond that, every ounce we've extracted has been replenished, and we've restored our balance sheet to a position that leads the industry and can back both our dividend policy and our growth plans. Plainly put, Barrick offers an investment opportunity without equal in our sector, and I trust that by the end of this presentation you'll have a clearer grasp of just why the argument for putting money into it is so persuasive. Thanks to all of you for listening, and as always we'll gladly take your questions. Who'd like to begin? Over here, in the audience, okay.
Lawson Winder
analystMark, I appreciate the presentation. This is Lawson Winder calling from Bank of America.
Mark Bristow
executiveLawson, hi there.
Lawson Winder
analystI'd like to begin with copper and ask specifically about La Moana. There are a couple of questions regarding that asset. First, on the power situation in the country: right now there's been a cut of 20% at the outset, and now 40% when it comes to electricity availability. Do you expect that to keep improving as we move forward? Is there any risk it could be trimmed even more? And second, as you consider La Moana ramping up and reaching first production in 2028, what's the current thinking on a power solution for that asset?
Mark Bristow
executiveLawson, there are indeed plans to add extra power infrastructure in Zambia. The capacity we need to support the expansion in Zambia has already been awarded to us. So in technical terms, we're cleared to draw from the grid while the country itself works to expand its infrastructure. Barrick has also recently finished a study covering all of Zambia's power infrastructure and its potential. Naturally, we shared that with the authorities. And on the near-term side, you're correct that rationing now stands at 40%, but we hold a back-to-back agreement with the utility letting us buy third-party power from outside Zambia at a discount relative to what diesel generation costs, and we also have full diesel backup power on site. That said, we saw this coming, we put money into our own insurance, then we engaged with the government to secure access to extra external third-party power at a lower price than what we produce ourselves. At the same time, we added more infrastructure and generating equipment so we could support ourselves.
Mark Bristow
executiveAnd within that framework, we've likewise finalized a cogeneration arrangement, which lets us produce electricity on our own and push it into the grid. So we've essentially covered just about everything — I mean, we were raised in West Africa, where you've got to depend on yourself to secure power supply. And because of that, the AME team is extremely well set up to handle this kind of thing. That said, challenges do exist, of course — from time to time the power delivery gets out of sync and we need to address it. We've got — but we're becoming far better at managing that. And so at this point we don't see a risk over the medium to long term, though we'll keep examining solutions. And naturally, as you're aware, we've recently brought the TS solar plant in Nevada online, which is 200 megawatts. So, you know, looking back at our experience all the way to Randgold days, you know we began by generating diesel, then moved to heavy fuel, and now we're on gas turbines and solar. So we possess a very solid technical ability when it comes to managing power.
Mark Bristow
executiveThe initial step involves collaborating with the utility to ensure, first, that they grasp both the opportunities and the infrastructure. Merely adding power isn't sufficient, as demonstrated in Pakistan, which has abundant electricity yet cannot distribute it due to an unreliable infrastructure. That was our inaugural investment made alongside the Zambian government, or on its behalf. So we're highly conscious of this issue. We aren't brushing it aside. We acknowledge it as a risk. Yet once it's understood, you can then take steps to mitigate it.
Josh Wolfson
analystJosh Wolfson from RBC here. Mark, could I ask you something about how you're allocating capital? In the past, I believe you've mentioned that your priority, or the priority you'd like to have, is financial liquidity for parts of the copper growth portfolio — development capital, you know. You know, the company has now begun a bit of a buyback. Would it be fair to think that this might keep going from here, or is it more of a one-off?
Mark Bristow
executiveNo. First, Josh, let me set the record straight on what you said in your report this morning: the buyback approvals were put in place so we can handle shorts in the market and any softness in the stock. Our discipline is genuine, and you have watched that across my entire career. I don't say one thing and then do something else. Managing capital allocation is central to how we operate. The way our model works — and we've explained this to our investors — is that whenever we have extra cash after netting off debt, we pay it out as a dividend. As management, we have the flexibility, as we move toward that point, to use that money for buying back stock, and in that case you push the dividend later. We will manage it against how we judge the value of the shares, and right now there is no question the shares are a good buy. You know, we got past some of our challenges earlier this year. We had some extra cash. We had a window, because remember, we have closed periods during which we can't buy. And again, as we said in the press release, we restarted our share purchase.
Mark Bristow
executiveAnd we're going to accomplish that inside the guidance we've already provided to the market. I'd also note that when you examine Barrick's returns via dividends, share buybacks, and return of capital, we aren't out of step with our peers, and our balance sheet remains very strong. So when you consider the returns, especially at the present share price, they're quite healthy relative to the equity. But our first objective is going to be getting the share price up — that's the real focus. Over the long term, we'll pay dividends the way I did at Randgold Resources, and we firmly believe that in a mining company like Barrick, dividends ought to come from the P&L; you shouldn't be borrowing money to pay dividends. That's how we've always operated our businesses, and that's how we intend to keep going. And just a little more color: this quarter is good because you can see costs are flat. Okay, on the swings and roundabouts, a couple of assets still have a way to go, while other assets are ahead of the curve — PV, for instance, has some way to go, and Turquoise Ridge as well.
Mark Bristow
executiveBut for the most part, we've reached the stage where we're beginning to—we've largely closed the gap on a lot of the development work. We're starting to hand things over to our own teams, moving them back from the contractors who've been doing the development, especially in Nevada, so we can catch up and build flexibility into the underground operations. And much of that supporting capital—what you'd call sustaining capital—begins to taper off, as we're now forecasting for some time. And it gets replaced by growth capital that keeps rising as we move into the La Moana expansion and the Reko Diq rebuild. And then, of course, Fourmile is an entirely new asset. It remains at the pre-feasibility stage. And we need to get our heads around that, but you can see how fast the geology began to tie together. So that's one more opportunity. And then the rest of the capital at Pueblo Viejo is entirely about the tailings facility. The capital for the expansion itself has mostly been spent.
Josh Wolfson
analystFollowing up on that same line of thinking you were exploring — I do appreciate the slide you showed that lays out the value proposition with the stock here and really highlights the core value drivers. I'm curious: if shareholders and investors don't end up recognizing that, would the company ever look at spinning out some assets or divesting some of these non-core positions to try to realize the value on a quicker time frame?
Mark Bristow
executiveOkay, first off—has anyone actually seen that approach succeed? Shedding non-core assets, sure, that's completely sensible. But taking high-quality assets out of a portfolio doesn't make any sense at all. To start with, the mining sector already has far too many companies with too little management talent. And breaking these businesses apart without a third-party acquisition led by capable management is a difficult way to create value. That's a short-term play, you know—it's like folks asking, why not hold off on developing your assets and pay us the dividend instead? So how do we actually grow the company, because this is a consumptive industry—you have to replace whatever you mine. Let me take you back to two examples. We had that same argument with the market in 2011 at Randgold. We ultimately reached more than 2 times NAV, trading above 2 times NAV, in the end, as we delivered on those assets. Another really strong example is Freeport. You know, we tried to persuade Freeport to merge with us back when they had a $10 billion market cap. They were adamant about the value of their company and about how important it was to invest in Grasberg's underground infrastructure.
Mark Bristow
executiveGetting to that point required a long stretch of years. And they sat stuck near the low end of value, or even below it. But take a look at where they trade now. They followed through on that plan, and the market gives them credit, despite having been quite downbeat about the choice to put money into that nation, Indonesia. So, you know, and if you examine all the, if you examine what made BHP grow, it was those investments from the last century in high-risk developments, Escondida, the oil and gas, that really, the iron ore, that truly turned that company into what it is now. And that is what propelled Rio to reach its position, and then it hit a rough stretch, and at present it is thinking through how to get back to that level, yet it still made some major calls in Mongolia, it is now, you know, in West Africa, and so this world has shifted in that direction. And if you wish to participate in mining and we have moved beyond the mid-cap, lower-cap, instant gratification model. We are here for the long haul, we generate plenty of value and we understand that this value produces meaningful value for every one of our stakeholders. So that is the game we have committed to, and splitting this company back into where, into its separate pieces would make no sense at all, certainly not to me.
Mark Bristow
executiveAlso, from what I can see in our register, all of our main investors remain very much in place compared with 2019.
Brian MacArthur
analystMorning, Brian MacArthur from Raymond James. Mark, you’ve emphasized how promising Fourmile could be, but could you walk us through and review how it will be vended into NGM, since I’d expect the specifics matter most now? And I suppose the real question here is this: I realize a study has to be completed, but technically, what kind of study must it be? Is Newmont able to compel you to carry out that study? Who determines the timeline for it? Perhaps just how you’re thinking about this as we move ahead.
Mark Bristow
executiveLet me start with the strategy piece, and then Graham — since he actually handled the negotiation — can walk through the specifics. That said, no one can compel anybody to do anything in this life, and definitely not under this agreement. The key thing, as you're aware, is that we've got a partnership with Newmont in Nevada, and both we and Newmont hold the right to access and make use of Nevada Goldmine's infrastructure. So ultimately there's a chance to figure out how to advance this in a manner that serves the best interests of both shareholder groups, which is exactly what we ought to be doing as stewards of these assets. Meanwhile, our duty for as long as Fourmile stays a 100% asset is to squeeze the most value out of it for our shareholders. That's why the work underway right now — we have 10 rigs on site; if you go out there it resembles the old days in Carlin, with rigs and trucks spread all over the place. And each intersection, as you can see, is a multi-ounce intersection. We're dealing with very thick, Breachier-style ore bodies. So the effort this year is about getting a sense of what it is.
Mark Bristow
executiveThere's no hiding it on our part. This is data we openly provide to the market, to our shareholders, and naturally to Newmont as well. And after we have that, we'll be in a position to form a clearer picture of what our choices are. And developing Fourmile as a standalone operation is possible. There is unquestionably a path to accomplish that. But once more, all of that sits within the optionality ahead and the manner in which we'll elect to pursue it, though returning to the actual legal foundation upon which we can oversee this, I'll hand things over to Graham.
Graham Shuttleworth
executiveThanks, Mark. Yes, the joint venture agreement contains specific provisions addressing this. First and foremost, regarding bringing the asset into the joint venture: as long as the joint venture satisfies a minimum return hurdle rate, the asset goes in, and that would be supported by a feasibility study. As for establishing the asset's value for the purpose of contributing it to the joint venture, that gets set on the basis of market valuation. So effectively that would be consensus gold prices — a blend of consensus spot and recent historical gold prices. And then, importantly, market multiples for the appropriate asset. So it's very much a valuation grounded in the market. And then on top of that, when it comes to determining its value, it receives the benefit of all the infrastructure that's already embedded. So effectively, the feasibility study doesn't carry any of the existing infrastructure. It simply looks at what the cost would be on a go-forward basis for that asset. So effectively in the case of Fourmile, it would benefit from all of the Gold Rush infrastructure that's already pre-developed. And then the cost of the feasibility study itself is also something that forms part of the compensation — so in other words, on top of that market valuation.
Graham Shuttleworth
executiveThose are the main points, then.
Mark Bristow
executiveLet me just clarify that not a lot remains afterward in terms of how everyone—you cover the entire amount for getting it to feasibility, and then the worth is determined according to that feasibility.
Anita Soni
analystMark, this is Anita Sony from CIBC.
Mark Bristow
executiveAnita, good to have you with us.
Anita Soni
analystMorning. I'd like to ask about Pueblo Viejo. Thanks for including the slide that lays out recovery rates through year-end. As I read it, there's a rebound to 79% and then 80% in Q3 and Q4, respectively. Could you speak to how that trend continues into 2025 as well? If I'm right, the targeted rates sit at roughly 92%?
Mark Bristow
executiveNo, I believe it's just over 80. Is that right? The final targeted recovery. Simon, do you happen to be on the call?
Simon Jimenez
unknownI am present.
Mark Bristow
executiveSo ultimately, Mark Hill, what recovery rate are you targeting for PV?
Simon Jimenez
unknownSo it builds up gradually across the coming two years — we raised it to 79%, and after that, the 92%.
Mark Bristow
executiveCorrect, 92% is possible. Mark, are you there? Mark Hill, are you on this call? Not Hill — John Steele? John Steele?
John Steele
executiveMark, hi — I can’t recall that precise figure offhand, though as we move up through the mid-80s, to 85 next year, I’m not certain what the exact number is; I’ll need to check on that and follow up with you.
Mark Bristow
executiveSo that's the figure I've got in mind — roughly the mid-80s. And as you can see, our targets are 80% by the end of this year, then 82%, and then around 85%, 86%. And Anita, what we're focused on right now is — and I'm sure you've heard this kind of line many times before in the mining industry — this is a single SAG mill plus the original SAG mill, or the ball mill, and getting those mills to optimize the grind, optimize the float, optimize the recovery. That's where our focus sits at the moment: balancing that. We've got — we're comfortable with the throughput, we're comfortable with the front end of the plant, and now it's about making sure that we — we've also got the process control into the flow sheet, and now it's really about teaching that process control to optimize the balance between grind and not gritting up the circuit and the flotation. I was there just the other day and all the float cells are working. Everything's working now — it's just about optimizing that balance. So the big focus was getting throughput to a point where we're comfortable with our ability to achieve that throughput, and now we're working on optimizing the actual design criteria, which are recovery and flow and grind size, or grin — the grind bracket, and not overgrinding it or undergrinding it.
Anita Soni
analystMoving to the second question, for both Carlin and Cortez: stripping rates have risen at Cortez, and I saw in the MD&A that this work would be mostly finished by mid-2025. So at the rates you're currently running — around 13 to 1, I believe — will that hold through Q2 of 2025? Is that how it stands?
Mark Bristow
executiveYeah, it will decrease — so look at Cortez's former Crossroads and Arturo, and the main priority is getting Crossroads in particular fixed, and then in — and we're handling that, you know. The team has done a great job of wrapping their minds around the Crossroads difficulties, which mostly involved changes in the ore body itself between oxide and sulphide or refractory ore. And so yes, it will drop somewhat, but in my view Cortez's is in decent shape. The 7C failure at the Gold Quarry pit is the one we're grappling with right now. And you know that's a pit that has a record of failures, and you recall, I believe, the 2009 failure, which was the pit's clay white spot, as they used to call it, I think, Phase 6. So at present we have a group of geotechs, and really you need the geotechs from Arizona and that area rather than the geotechs from here, because it's, you know, entirely different rock — young, lots of clay, lots of water in the pit sidewalls, greater hydrostatic pressure. So we're hard at work with that now to redesign the pit.
Mark Bristow
executiveThe near-term goal is getting back into the pit at the 7C position, and over the longer term it's about what that pit looks like across the longer life of mine — how much you need to lay it back, or whether you can design those sidewalls differently through dewatering the pit. That's what we're examining right now. So we'll update you further on that when we reach the end of the year.
Anita Soni
analystAnd finishing up the top five with Turquoise Ridge — could you give us a bit more detail on how things play out there over the remainder of the year? I did see that autoclave grades came down, and I'm just not clear on why that occurred while underground grades are ramping up?
Mark Bristow
executiveTurquoise Ridge really comes down to backfill and getting that infrastructure in place. So we deliberately chose to reduce the mining and processing rate. We have plenty of stockpiles, which is what you're seeing, and we're now on top of the backfill infrastructure—that work is done. At this point it's about catching up on the backfill so we can build full flexibility into the Turquoise Ridge mine plan. The plan calls for steady improvement through the end of the year. That infrastructure catch-up plan is working, and we track it every week. So I'm confident we'll be back there by year-end. We'll have caught up to plan. And that's really the big thing—Turquoise Ridge is a very high-grade ore body. It holds some upside opportunities, but if backfill isn't kept up to speed right at the face, you run into geotechnical problems. So that also brings safety issues, along with flexibility and mining. So that's really what's driving Turquoise Ridge.
Ralph Profiti
analystGood morning, and thanks, Mark. Ralph Profiti here, from Eight Capital. Two questions for me. First, could you update us on where things stand in your talks with the Mali government? Some of the peers appear to be moving somewhat nearer to something more definitive, and in a positive direction, it seems? Can you give us the latest on that? Second, you mentioned making use of Nevada infrastructure at Fourmile — could you speak specifically to labor? How have you performed in the near term when it comes to tackling some of those constraints, and then, once Fourmile eventually enters production, what do your long-term studies indicate regarding labor constraints?
Mark Bristow
executiveSo, Mali — in the disclosure, that's pretty much where things stand. As you know, we're believers in sharing the economic benefits of a country's asset that is a mine while we're mining it. Regardless of how ownership is structured, my view is that these are all national assets. So when the Junta took over, there was a perspective that Mali ought to gain more from its mining sector. And as you know, no other industry contributes more to Mali's economy than mining does. I've been involved since the very start. And of course, we're saying that's fine. We'd be very happy to do that. We need to get into the details and examine the models. We're still paying dividends — we paid one two weeks ago, 10 days ago. And we're the largest contributor to the Mali Treasury. So the question for us is: we're happy to do that on a percentage basis — slightly more than 50%, for instance, which is a good position for a government. And it also has to be affordable for the company — Loulo-Gounkoto as a company. And what concerns us is that we see no merit in paying out large amounts of future cash right now, because that simply makes the future harder to manage.
Mark Bristow
executiveWe have to approach this in a transparent manner. Our team is in discussions with the President's Office as well as the Ministry of Finance and Ministry of Mines, and we are working cooperatively to identify a path forward. That is genuinely all I am able to share at this point, and we have been at it for a considerable time already. Regarding the question about Fourmile, let me just recall — ah yes, we have devoted substantial effort to labor. Labor matters enormously everywhere in mining today. And once again, we have recently completed a restructuring in which we removed an entire management layer from Nevada. We are examining additional automation, repositioning, and another point is that you saw us purchase and invest in a great deal of new equipment, mobile equipment in particular. We are conducting an automation trial that will subsequently be extended throughout the complex, and we have also pushed management on idling equipment, since whenever you fail to use equipment efficiently, you wind up needing two operators. That translates to two operators. It translates to six operators. So you remove one piece of equipment, and all at once you have that requirement. And those people can be reassigned to other positions.
Mark Bristow
executiveWe now operate a training mine for underground crews, for open pit crews, and for processing staff. And we could still use somewhat more capacity there — we're putting money into that and growing the capability — because technical skills here in the U.S. aren't viewed the same way as they are in Europe or in the colonies or former colonies such as South Africa and Australia. So we're essentially instilling those skills into the workforce. At the height of COVID, turnover reached 25%. We've come down considerably since then. And once more, as people have cycled out, retention among those who complete the training mines sits very high, in the 90s. Since, as you'd imagine, you arrive at a major operation such as Nevada and you aren't — you haven't been fully trained to work in those large underground mines or those enormous open pits. That's tough to pull off, you know, but once you understand the task and you've been trained well, the job becomes far simpler. So our investment in people has been — and there's another factor — with the lithium market having collapsed now, because bear in mind we're also the place from which all the highly qualified miners in the USA come, since we're the largest miner in the USA.
Mark Bristow
executiveThat pressure has lifted, and I think you can see it, and as we've gotten Nevada to perform, you also retain people—folks don't walk away once you begin to perform. So Nevada overall sits in a very different spot, and it keeps shifting the whole time as we work to make it an owner-led style of business rather than a corporation, which is what it used to be.
Steven Green
analystHi, Mark. This is Steve Green from TD Securities. Staying with Fourmile for a moment, you said you expect to be able to provide pre-fees options by year-end, or to have those pre-fees options available. Does that mean you plan to update the market with pre-fees level figures, such as CapEx and size therefore?
Mark Bristow
executiveAbsolutely. Access is really the big variable at the moment, since the defining feature of Gold Rush is how reachable it is. Those twin decreases were depletion-related, and you turned them into operational ones. They sit halfway up a hillside in daylight. If you're going to build access to ore bodies beneath a mountain, you should aim to reach them at valley elevation. So we're weighing various possibilities. Could we get in from Cortez itself? That's one possibility. Could we come in from the North, where the metallurgical facilities are? And what's the best possible approach to tying Fourmile's infrastructure together with Gold Rush's infrastructure, given that it's the same ore body continuing? What defines Fourmile is its location within a large metamorphic halo, which makes it brittle. As a result, the mineralization style has shifted to a breccia — the classic Carlin breccia — which is larger, bulkier and higher grade. Interestingly, we're also seeing some of these flatter, planer ore bodies show up, which we hadn't anticipated. It's very interesting, though. Even for me, watching it evolve, that section really shows how interconnected the geology has become as we've drilled these holes.
Mark Bristow
executiveThis is genuinely thrilling, or a body, and it shouldn't be underestimated in any way.
Steven Green
analystSo I'd imagine you'd prefer to see how this develops for a bit prior to deciding whether to vend it?
Mark Bristow
executiveAs you know, I've always been a pretty open and transparent person. So we own it, as Graham says. It makes sense for, you know, <<inaudible>>, and it has the right to Nevada infrastructure, and the conversation will keep going in a transparent way, and when we feel we've reached something—if we do—that's of value, proper value, we'll make that decision. But to your point, there's still a way to go before we get there, and the first thing is to try to get a grip on exactly how big this prospect is.
Steven Green
analystAppreciate it.
Anita Soni
analystHey Mark, it's Anita again. When you brought up the Fourmile sale, you said something about a joint venture hitting a return on invested capital — did you mean Fourmile achieving that return, or the JV as a whole, meaning all of Nevada Gold Mines?
Mark Bristow
executiveNo, no — that's just Fourmile, and it's a set figure. It's a blended figure. I can't recall the exact figure. What is it?
Graham Shuttleworth
executiveThat works out to an internal rate of return of 15%.
Mark Bristow
executive15%, but…
Graham Shuttleworth
executiveTo put it to work effectively…
Mark Bristow
executiveGold prices tend to reflect what's already happened.
Graham Shuttleworth
executiveThis figure reflects both the two-year historical spot and the consensus.
Mark Bristow
executiveThat hurdle won't be hard to clear, I give you my word. All right, shall we wrap up here and get on to the call? Fine, Operator, the floor is yours.
Operator
operatorThanks. Daniel Major from UBS, your line is open.
Daniel Major
analystMark, Graham — hello. Am I coming through clearly on your end?
Mark Bristow
executiveHi Daniel, you're coming through clearly.
Daniel Major
analystHello, and thanks for taking the questions. Yes, there are a couple of things I wanted to ask. The first concerns the cost profile in Nevada — I've already noticed quite a few questions about that, so let me just make sure it's clear. Is Turquoise Ridge where the main difference lies? It appears that unit cost there has to fall substantially, but is that the primary gap to close in order to get back within the guidance range now that you've finished the autoclave maintenance and the backfill infrastructure work? Is that the key variable?
Mark Bristow
executiveYeah, I think — I mean, at Turquoise Ridge, the autoclave maintenance is in good shape at this point. The process is running well. I'd say the all-in-sustaining cost drivers are still the additional infrastructure and backfill that we're installing right now, sustaining capital. So that will fall away, and you're right. Once we complete that mining rate, and that's — you know, Turquoise Ridge had a large — you just run the numbers. The figures that need to — the production increase is quite significant, and that will certainly push unit costs lower. So that's really the major driver at Turquoise Ridge. Graham?
Daniel Major
analystAll right, thank you.
Mark Bristow
executiveDan, Graham has a point to add.
Graham Shuttleworth
executiveYeah, just confirming that. So Carlin and Turquoise Ridge are the main assets, and naturally, Pueblo Viejo as well. That one is another significant factor affecting costs for the year.
Daniel Major
analystCool, thanks. And my second question is about tax — you recognized that $137 million tax adjustment tied to the proposed settlements in Chile, right? Is that expected to turn into an actual cash payment at some point? Could you just walk us through any cash implications related to that tax charge you recognized?
Graham Shuttleworth
executiveYes, thanks, Dan. Yes, that's right, yes. So these simply pertain to the 2015 sale of the Zaldívar asset. As we've disclosed for quite a while now, we've been talking with the government there about the interpretation they had, which involved a claim that was significantly higher. We've now arrived at an in-principle agreement to resolve that. We're in the process of finalizing that agreement, and we expect to complete it in the third quarter. So yes, that ought to result in a cash payment this year.
Mark Bristow
executiveAnd Dan, I believe you're raising a really valid point. If you look back to 2019, when we were examining this business, it faced a great many difficulties. Tanzania wasn't running. Argentina was facing a threat. Papua New Guinea was working on securing its renewals, Ricker Dick was tied up in arbitration, we had Chile, and on top of that we had a whole set of closure assets that were simply being postponed. And where we stand now is that, you know, we've — as I've consistently done throughout my career, you tackle the liabilities first and then you free things up, and there's no better moment to tackle the liabilities than when commodity prices are high. So we've put real focus on those liabilities and we've got them under control. We've completed our first two safe closure tailings facilities, or closure sites. We're going to complete another eight this year, or that's the goal, six to eight closure sites, safe closure. And Pierina reaches full closure early next year, and we've engineered that. And one of my priorities is the non-operating costs within the organization, and we're pushing those costs down, and that really boosts the margin. And I adopted the position that we won't postpone that any further.
Mark Bristow
executiveAnd if you compare Barrick with its competitors, we're heading down the path—we're on a trajectory—toward having very few liabilities tied to non-operating assets, and that's something we've always focused on. So once more, within this mix, let me remind everyone that we paid no premium for any of the assets we've discussed today. We hold very substantial assets, which I've walked you through again. On top of those, we have operating assets that are significant, with life of mine and margin upside. We've tackled the challenges. Every one of the mines is up and running. As for Porgera—we switched on the final autoclave last week. So every autoclave at Porgera is now operating. And we have a couple of non-core assets that, as you know, we may or may not bring to account over the near term. And then we've been working through these liabilities—Chile, of course—and Chile is quickly turning into an opportunity as we handle those legacy issues, in the form of both Pascua-Lama and Zaldivar. And then Peru, Pierina—that's a large portion of non-operating costs that will come out of our cash flow, or our cost flow.
Mark Bristow
executiveAnd so, you know, my view is that, you know, into next year we are a different company again as we were from ‘23 to ‘24 and very quickly you've got and that's why this quarter is so significant, because you got a flat cost and we caught all the margin in the commodity price, which is what that's the first step in our future strategy and that is to sweat these assets. And as soon as you get on top of that, you can manage the investment in those closure sites. So you can, you know, we are compliant with GISTM. We've got nothing that's, you know, dangerous in our portfolio. And so we can start managing non-operating costs as we go forward. So that's where the company is today.
Daniel Major
analystThanks a lot. If I could squeeze in one more, it goes back to what we were saying about the buyback and the dividend. The opportunistic rationale behind the $50 million makes complete sense to me, but looking ahead, should we simply assume you'll stay opportunistic — while, from a modelling perspective, you draw the balance sheet down toward that cash position before building in any meaningful extra buybacks during the second half?
Mark Bristow
executiveNo, we’ll repurchase shares in a deliberate way, building on the activity from the prior quarter. So Graham and I will oversee that. Our board has been shown the strategy, and all of them are comfortable with the plans we have. At the same time, we’re keeping demand in mind as we enter a phase requiring heavy capital investment, and again, all of that can be handled within our balance sheet, so we don’t want to reach — and the one thing, Dan, that we have consistently done is adhere to our own rules. A number of our peers fail to do so; they state one thing and then act differently. But we are extremely clear on the way we allocate capital. As a management team, we review it weekly. We examine options for intervening. During my career, I’ve had to handle several short positions in a stock, and I don’t believe there are too many people who would take a large short position in Barrick today. Would you like to add anything, Graham?
Graham Shuttleworth
executiveYes, just to restate that point, our balance sheet is exceptionally strong even though we have those large capital growth projects in front of us, and that's the position we want to keep. But even if we keep repurchasing shares, as Mark says, in a measured way, our debt to EBITDA ratios will remain very low by any measure. So we have the opportunity to take advantage of what we view as exceptionally good value in the stock, though still in a very measured way.
Daniel Major
analystUnderstood completely. Many thanks.
Operator
operatorBob Brackett at Bernstein Research has the next question. You may proceed.
Bob Brackett
analystMorning. I have a few questions about the feasibility studies we expect to see before year-end. Is there anything you can share on those studies? In the MD&A, you mentioned roughly $2 billion of CapEx around Lumwana at 50 million tons of processing? Is there anything to say about Reko Diq? And between now and when the feasibility studies come out, what concerns you about moving these projects forward?
Mark Bristow
executiveI'd say that if you ignore capital projects, they invariably go badly. And often, if you fret over them and take no action, they still go badly. But Lumwana is in a solid position. And Lumwana covers its costs at the expansion at $3 a pound, so, you know, not many copper assets can say that, and as you know the copper industry keeps saying push the copper price up and we'll develop our assets. And so that's an expansion. You know, we have the one circuit, and we're essentially duplicating that circuit, so we don't see the big focus — the miner's focus is the fleet and the efficiency of mining and the cost of mining. That's our focus. And we have a new fleet, and we'll be expanding that fleet. And with everything we're monitoring at the moment, we're comfortable with our assumptions. And then on Reko Diq, right now we're in the final negotiations on long lead items, looking at numbers, and there's no material change in our original estimate, and by the way we're going to hold a webinar on Lumwana on 11th of September to share some color on Lumwana as we did with Reko Diq.
Mark Bristow
executiveThat gives us room to devote a bit more attention to Reko Diq at the November Investor Day. But regarding Reko Diq as well, you know, there have been ups and downs. Our water strategy and our infrastructure strategy have advanced quite well, and Graham, you know, is moving the financing options forward. I think everything is — there's nothing there that falls outside the original assumptions we shared with you as we look ahead. Would you like to add anything to that?
Graham Shuttleworth
executiveYeah, I'd say that captures it well. I mean, some design changes have emerged from the feasibility work, which is what you'd expect. So, for instance, yes — versus the original feasibility, we expect to use rail, and that brings infrastructure with it, though there are also benefits showing up in the financial model, so all of that will be presented at the end of the year, when the feasibility study is finished.
Mark Bristow
executiveEven so, we'll provide a solid update in September, and you'll receive some detail on it then.
Graham Shuttleworth
executiveYes, so…
Mark Bristow
executiveApologies, that one belongs to Lumwana.
Graham Shuttleworth
executiveFor Lumwana, that’ll be in September, and then, of course, the Investor Day in November will provide a bit more detail, with the final feasibility study coming out at the start of the new year. We have a — Mark there.
Anita Soni
analystI just want to follow up on Fourmile. To reach the indicated and inferred categories by your end, what level of drill density are you aiming for?
Mark Bristow
executiveI realize we won’t reach that point by the time your period ends. So we’ll get partway there, but not all the way — and I’m not sure we can answer that question yet. Simon, would you like to add anything? On drill density, I think we know the level we need to reach, but that remains some time away — that’s a pre-fuse.
Simon Jimenez
unknownWe have a clear target, so we indicated we would be aiming at roughly 70 to 75 meters according to the present geological models, though that is under review right now as part of the preliminary economic assessment. What we are aiming to deliver around year end will essentially be an inferred resource update along with a perspective on the project's broader potential, and also, as Mark mentioned earlier, a narrowing down of some of the various options that we will concentrate on within a feasibility study.
Mark Bristow
executiveIs there anyone else on the line? Two additional participants.
Operator
operatorOur following question is from Mike Parkin at National Bank. The line is yours.
Mike Parkin
analystHey everyone, thanks for taking my question, and congratulations on the strong quarter. I wanted to ask about the relocation work at Pueblo Viejo. It looks like things are off to a good start, but there's quite a bit going on, right? Could you remind us what the critical path is there? Is it completing the town and moving the people, or is there something else that's the main item to keep two eyes on?
Mark Bristow
executiveThe preference, naturally, is to move the key communities early on, so you aren't later stuck doing major earthworks while communities are passing through or around the footprint. I was actually out there just the other day — we now have a couple of hundred houses under construction, and we keep adding to them. We're engaging with the communities, and relocation will proceed on a priority basis; that really means shifting people from rural settings into an urban one, and food security comes along with that, so it's quite a complex undertaking, and it brings schools, community centers, and all the other elements that belong in an integrated community. On the geotech side, the next step in this process is finishing the feasibility study for the dam itself, which is due this quarter. That will be the next big milestone. At present, we expect to bring the dam into production at the back end of 2027, early 2028. So we remain well within our plans, and at the moment no critical path has emerged. I think everything is — as is typical at this stage of a capital project — everything is assumed critical.
Mike Parkin
analystIs there any trouble yet with people who have just moved into the area attempting to profit from the arrival of a new house? For instance, we have heard about this before in other particular cases, largely in Africa. Is there any such activity there — yes, do you have a reasonably clear picture, such as through some form of documentation, of who you actually need to work with, as opposed to certain individuals who are seeking to take strategic advantage of the circumstances?
Mark Bristow
executiveSo Mike, that's something we deal with constantly. People will try to take advantage of the situation, you know. These days satellite imagery really helps with that — it helps us manage who was actually there and who wasn't. It's quite difficult to lie against, you know, to deny a photograph. I think that's just part of the broader social engagement — handling, you know, individuals who exploit the circumstances, who seize the chance to sort of make claims, and we deal with that on an ongoing basis. This is a community we'll be living with for a very long time. So we manage it. The good thing about where we stand today is, you know, we went through a really thorough process to pick the site together with government, with civil society, with the Catholic Church, you know, the whole Kakuchi. And under the lease agreement through which we run Pueblo Viejo, the government has an obligation to take part in the relocation and the payment for it. So it's a joint effort. But at the moment, it's our community people who are working with the relocation committees established for each community, and then various other authorities, and from time to time, as you mention, other folks who want a share of the benefits.
Mike Parkin
analystOkay, thank you very much, Mark.
Operator
operatorOur following question is from Tanya Jakusconek at Scotiabank. You may proceed.
Tanya Jakusconek
analystOh, great, thanks for taking my question. Good afternoon, everybody.
Mark Bristow
executiveTanya, hi there.
Tanya Jakusconek
analystI wanted to return to how the remainder of the year, you know, plays out, and I just want to be sure I have got it right. So regarding the Nevada gold mine, which Carlin will be driving, you know, through better grades, and Turquoise Ridge too with improved grades? Should I take it that the volume will come from you processing those higher-grade soft tiles at Turquoise Ridge, given the work you've done on the case bill underground, and then the cost reduction arrives not only from volume but also from eliminating the contract workers as you move into soft mining? Is that the right way to understand it?
Mark Bristow
executiveFor the most part, yes. Yeah, generally speaking. Output volume isn’t—you know, it ends up being held back since what determines the grade is ore from underground rather than open pit material. That therefore affects the throughput figures too. Still, on the whole you’ve got it right—it comes down mainly to grade. I’m referring specifically to Carlin and Turquoise Ridge.
Tanya Jakusconek
analystAll right, so has the pickup shown up yet? We're a month and a half into the quarter now — into Q3. Have you noticed that pickup in the gray?
Mark Bristow
executiveAbsolutely.
Tanya Jakusconek
analystAlright, thanks for that. And in a similar way, over at Pueblo Viejo, I just want to be sure I've got it right — and many thanks for including that slide showing 78% recovery. I'm looking at it as we speak. Apologies — 79% going into Q3, and then 80% going into Q4. Did you say throughput is now where you need it, and it's just the grind side and recovery you're still working on — again, 1.5 months into the quarter — are you actually seeing that recovery?
Mark Bristow
executiveYes, Tanya, I'd put it this way: more often than not, we are observing it. So it remains very much a part of things — this is a refinement. That's the point we need to convey. It isn't some magic box. This is sag milling at its most difficult. We have one very large single sag mill that has been added to a sag ball mill flow sheet, and we've just finalized construction of the new conveyor belt, so we now have additional crushing capacity, and the task now is ensuring the grind parameters are correct. Once the grind is right, the float is right, and once the float is right, we can feed the autoclaves properly. The entire flow sheet logic behind PV is to raise the sulfur content of what goes into the autoclaves, which is really what drives the fuel content. And that in turn drives the oxidation. What we did in the interim, which I shared last time, is we created a variance to that, so we can still feed run of mine ore into certain autoclaves. We can reconfigure those autoclaves to accept run of mine ore.
Mark Bristow
executiveThe real issue is the ground size, and that's where we have to put in more effort—it all comes down to control, specifically the processing control we've built into the milling and screening portions of the flow sheet. So it's genuinely technical work, getting the operation bedded down. What we can say, though, is that we've definitely had runs in which everything functions and we hit the unit-per-hour rate we require, and once we achieve that consistently, we'll reach our objectives. And no question, throughout my entire career I've gone through processes like these—they're frustrating and stressful—but ultimately, we arrive at the destination we're aiming for.
Tanya Jakusconek
analystYeah, and following up on something Anita brought up — the 92% recovery — I know you set us straight about the 86%, but my understanding was also that we were heading to 92%. I'm just wondering whether that's simply how we remember it from the mine tour, or whether something has actually changed. Some clarity on that would be great. Thank you.
Graham Shuttleworth
executiveHi, Tanya — Graham here. You're right that the feasibility 43,103 does reach up into the 90s. That's a gradual process, as you know, so getting all the way up there takes us some time.
Tanya Jakusconek
analystSo the goal with the grant is still to reach that point — it's just that it won't really happen over the next few years. Is that right?
Mark Bristow
executiveRight, as we said, that's certainly not happening this year.
Tanya Jakusconek
analystWill we reach that point in the coming year?
Mark Bristow
executiveNo — it was the year after that.
Tanya Jakusconek
analystMoving on to the next year. All right, thanks for that too. And could I ask about — Mark, I always bring up reserve replacement. I always want to understand how things look ahead. So since you're, you know, 8 months into the year, how is reserve replacement shaping up for you in this year? Both from a mine site standpoint versus resource? And then that, you know, the key question of, you know, with gold priced at 2,400 plus, are you thinking about having to change your reserve and resource pricing?
Mark Bristow
executiveI'll take the straightforward portion of that question, then hand things over to Simon Bottoms for the specifics. Right now, the two major feasibility studies have us more than replacing our reserves and resources. Those are substantial figures, in both gold and copper, coming from Reko Diq and the Lumwana super pit. That said, Kibali, Loulo and Gounkoto are likewise well positioned for replacement. On PV, we're slightly — on PV, we lifted reserves to 21 million ounces last year, which is a sizable number, and while the geologists point to further opportunities, that won't be coming in. And the major focus in Papua New Guinea at present is really getting that mine operational. We have a 10-year life of mine. There's work required to add further reserves to that life of mine. So at a broad level, that's roughly how we see it. Simon, would you like to take that up?
Simon Bottoms
executiveYes, absolutely. So, as Mark mentioned, for the year, Africa-Middle East looks set to replace its regional depletion overall. Again, as we've noted in some of the releases, that's really being driven by those core Tier 1 assets, Loulo and Kibali. But we're still seeing strong signs that we'll be able to carry that through in Tanzania as well. In Latin America, not all of the assets are forecast to fully replace their depletion this year, but with Reko Diq added, as Mark already said, that's forecast to deliver substantial growth for the region. In North America, for Nevada goldmines, again, we're working through the models right now, but we're forecasting replacement of our depletion within NGM, particularly with updates to the open fit studies, especially at Hamburg. Then on reserve pricing, we are seeing some cost pressures. We're reviewing the pricing at the moment. We're doing the studies, and we'll look to announce later in the year where we stand on that. Our intention, as it always has been, is to maintain the quality of our mine plans, and because many of our mine plans are more geologically constrained, meaning that even at the current reserve price, we actually mine the majority of the high quality, high grade material.
Simon Bottoms
executiveWhen you raise that reserve price, you're automatically bringing in marginal material, so we look at it asset by asset to make sure any rise or adjustment in the reserve price would contribute material that genuinely creates value rather than simply triggering extra capital needs through additional plant and process plant expansion requirements. On resource pricing, I believe we went through our copper resource price last year, and right now it remains very much consistent with long-term consensus. I would anticipate that we'll be examining our long-term resource pricing this year.
Mark Bristow
executiveAppreciate that, Simon.
Tanya Jakusconek
analystMuch appreciated, and thanks a lot for giving me the chance to ask.
Mark Bristow
executiveHappy to take that. Anita, over to you.
Operator
operatorOur final question is from Daniel Major at UBS. You have the floor.
Daniel Major
analystHi there, and thanks for the follow-up. I’ve just got a couple of quick ones, more around modeling dynamics. It looks like G&A, perhaps, is coming in a bit below your guidance — obviously a good result if you’re bringing G&A down. How should we be thinking about that? Should we expect a big step up in the second half, or are you undershooting the $180 million, particularly on the G&A? And a similar question on the exploration and project.
Mark Bristow
executiveWe take pride in being the most efficient mining company operator on the planet when it comes to G&A, and we keep looking at ways to make our corporate oversight as efficient as possible, and we'll keep doing that. That trend is a good one, and it's interesting when you see what we do with a company twice the size and with fewer people, but super-efficient systems — that's what we stand for. So that trend is right. And then Dan, I've tightened up a bit on the expiration this year. We had just gotten to a stage where, you know, my resource triangle — we were getting sloppy with the resource triangle. We needed to tighten up people's priorities and not just lump more and more targets into the resource triangle and needed to be properly tested. And so we tightened up on the budget and said, the budget's available, but you've got to pass some filters to get more. And it just needed that discipline, and that's what we did. So again, you've picked up very smartly, a little tightening in the way we're allocating exploration dollars. We've got a lot of opportunities. We've got to get the geologists and the evaluators to be a little bit more focused on moving the portfolio up through towards feasibility study, and that's the reason that we've just tightened up.
Daniel Major
analystI appreciate that.
Mark Bristow
executiveAnita, that's yours.
Anita Soni
analystYeah, that was a follow-up to the question about the reserve gold price. So — I get that on one hand you don't want to, you know, wear down your margins, but on the other side of things, I think you can — you know, inflation clearly is sticking around, and that's one reason gold is sitting at $2,400. So I mean, would you think about raising it to make sure you're capturing all the value given where costs are right now?
Mark Bristow
executiveThis is a really fascinating subject. I'll do my best to be brief. First, gold has risen not due to inflation but because the globe is in disarray—and inflation forms one piece of that disarray. We therefore concern ourselves with the long term, which is why we maintain discipline regarding the reserve price. There comes a point where, owing to cost pressures, you begin degrading your ore bodies through the gold price. That is precisely why we shifted to $1,300. We struck the correct equilibrium between the Barrick and Randgold assets, and, echoing Simon's point, we examined the shapes of the ore bodies. If you bring a higher gold price into an—and we mine quality ore bodies, so with Turquoise Ridge, if you raise the gold price, you begin mining waste. You begin mining material that is very marginal or sending it to the mill. To maintain the same output, you must then expand your mill. And as a result you drive up your costs, and your asset's value declines. So mine management each year must produce an NAV equation for their business, and explain why they believe they ought to do something different if it undermines the inherent value of the operation.
Mark Bristow
executiveWe have relatively few assets that sit above that, and there's a rationale for a modest uptick in the gold price, which basically preserves your grade — so your ore bodies stay intact — since the worst thing you could do is begin cutting a slice off the natural boundary of your ore body. On the flip side, take Tongan, for example: you'll notice we altered the gold price we apply to Tongan, since it's a closing mine and we don't want to leave value behind. The ore bodies are such that we've begun building capacity in the processing facility so it can accept that marginal ore and still generate profit from it. So we evaluate each of our operations separately, and Simon is completely correct. What we did with the $1,700 gold price is we re-examined the ore bodies, especially the low-grade pits within that, and we concluded we don't want to jeopardize our shareholders' future potential by placing infrastructure on the ore bodies, so we used $1,700. At $1,700, our resource was pretty well mined out. That's the reasoning behind a big gap. It's quite interesting now at $2,400 — the $1,700 actually looks quite attractive.
Mark Bristow
executiveStill, the capital required to carry that forward is substantial. Absolutely, the oxides we're already taking—we'll keep taking oxides at the margin, especially in Nevada, since we have capacity there. So, just to give you a sense of how we run our portfolio. Dan, did you want to add something?
Daniel Major
analystI was just going to add to that, Anita — effectively, we are mindful of that inflationary effect, and clearly, if we view it as a lasting rise in costs and, as Mark says, it is going to wear away the core value of those ore bodies, then we would make an adjustment for it. So it is something we monitor, and we keep it under review. The teams are busy with that work, as you would expect at this point. And we will see whether it is necessary or not. But at the moment, we are pretty close to where we need to be.
Mark Bristow
executiveIs there anything further? All right, everyone.
Operator
operatorThat brings us to the end of the question-and-answer portion.
Mark Bristow
executiveAlright. Operator, are you set on your end?
Operator
operatorRight, that looks like all the questions.
Mark Bristow
executiveMuch appreciated. Thanks to the operator for running this, and thanks to all of you for being here. For anyone who wants to stick around, there are some snacks next door. I'd just add that a few detailed questions came up and we kind of held a bit of a modeling session here — you're always welcome to contact our team, whoever you feel at ease getting in touch with; we're always available to walk you through the detail and set you on the right path. So please don't hesitate to get in touch afterward. Thanks once more for taking the time.
Operator
operatorThat brings us to the end of today's event. If anything further comes up that you'd like to ask about, the Barrick Investor Relations Department is the team to reach out to. At this point you're welcome to hang up your lines. We appreciate you taking part.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Barrick Mining Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Barrick Mining Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Barrick Mining Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.