Morning, everyone — appreciate you joining Bird’s Q3 2026 call. With me is Wayne Gingrich, our CFO. The results we’re reporting show what the company we’ve deliberately built over several years can do. Bird is a nationwide specialty contractor at scale, combining work we perform ourselves, a labor platform that’s central to our strategy, and integrated delivery via a distributed program that matches Canada’s priority investments. Our total backlog — recurring revenue programs included — gives us multi-year visibility into growth. Margins on embedded work remain higher than they were twelve months back, supported by a mix in which 80% comes through collaborative delivery, and activity continues to be spread across sectors, geographies, and clients; every strategic sector contributes somewhere around 5% to 15% of revenue, meaning no single market sets the course for Bird's growth; we hold no concentrated bet on any one sector. Bird's history of profitable expansion is strong. Over the past six years, revenue climbed roughly 20% per year, and adjusted EBITDA increased by about 30%. Delivering those results through several construction cycles demonstrates the durability of our distributed work program and underscores what Bird gains from growing both organically and through acquisitions. The opportunity in front of us is substantial, and last week's federal budget reinforced it, putting major infrastructure, electricity expansion, defense, and AI at the center of Canada's economic agenda. Our priority stays the same: safe, disciplined execution. We are focused on turning growth into accretive margins and cash flow while keeping the project selection and risk discipline that have strengthened Bird's performance over the past several years. Bird's foundation is clearly strong, as our third quarter results show. Revenue rose 36.7% year-over-year to $1.3 billion, driven by significant organic growth across industrial buildings and infrastructure. Organic growth made up almost 90% of the total increase, with FRPD contributing the balance. Earnings growth is outpacing revenue growth. Adjusted EBITDA climbed 58.8%, reaching $106.3 million, while the adjusted EBITDA margin widened to 8.2%, up from 7% in the prior year. Adjusted earnings increased 77% to $62.6 million, equal to $1.13 per share. Profitable growth keeps being driven by an improved project mix, a greater share of self-performed delivery, and integrated One Bird delivery. Taken together with the visibility provided by our record combined backlog, these results strengthen our outlook and back our decision to lift 2027 revenue expectations from the midpoint of the original target range to $4.9 billion to $5.1 billion, the top of our initial strategic target. Opportunities extending past the current plan come from the multi-year investment outlook. During the quarter, new work kept outpacing execution, which bolsters visibility into future growth. Bird contributed over $1.6 billion in new bookings, which topped the work we performed by $329.3 million. Our backlog hit an all-time high of $6.4 billion, and pending backlog stood at $6.6 billion — that figure includes roughly $1.4 billion to $1.5 billion in recurring revenue programs, with the related work anticipated to run across the coming four years. Both the size and the quality of that backlog keep getting better. Margins baked into it are stronger than they were a year back, which gives us confidence we can reach our 8% EBITDA margin goal in 2027; and the new work we're bringing in still lines up with our risk capabilities, our preferred contract structures, and how we approach risk. Working together from the start still gives us earlier visibility into scope, constructability, schedules and resource needs, and it helps us price more intelligently and allocate risk better before construction gets underway. Last week we announced over $1.1 billion in new awards and multi-year agreements, which grows Bird's recurring maintenance portfolio, adds visibility to future growth and shows how broad demand is across Bird's markets. That announcement also takes in a significant electrical scope for a major healthcare development in Alberta, public infrastructure projects in British Columbia, an industrial construction award supporting Ontario's nuclear sector, wind energy in Eastern Canada and district energy in Western Canada. Our strategic positioning on large capital investment programs keeps supporting our multi-year outlook. Woodfibre LNG, LNG Canada Phase II, the BHP Jansen project, East Harbor Transit Hub, Peel Memorial, Dow's Path to Zero, Ontario's Ring of Fire, and Ontario's nuclear programs are all multi-year client investments. They can produce work across development, construction, and each successive execution phase. In certain markets, the opportunities might extend into commissioning, maintenance, turnarounds, and sustaining capital work. These scopes define Bird's part in the programs and position us to pursue further work as later phases advance. In the Ring of Fire area, through our Pan Ocean LP, Bird's involvement has expanded beyond community readiness and infrastructure work to include building the 184-kilometer Martin Falls Community Access Road. Lately, federal pledges to match Ontario’s contribution of as much as $1 billion toward Ring of Fire infrastructure provide the area with improved funding clarity. In industrial, buildings and infrastructure, Bird’s 10 strategic end markets provide various paths to expansion past the contracts we currently have. Bird has intentionally created what we refer to as a distributed load, with work dispersed among end markets, geographies, customers, programs and funding sources. Supported by specialized capabilities, national scale and integrated delivery, this approach enables Bird to move resources among regions, coordinate several disciplines and secure greater project value. In industrial buildings and infrastructure, Bird participates in 10 strategic end markets, as outlined on the slide. Our goal remains a balanced mix among all three businesses, and we expect infrastructure to drive growth. Thousands of electrical and mechanical tradespeople are part of the national labor program, and they can ramp up for big turnarounds and major projects. Through planning, hiring locally, union ties and moving workers where needed, we can pair qualified teams with the work without piling labor demand into any one region. The contracts we announced this quarter demonstrate that model in action, since the work spans a range of strategic markets, regions and clients across Canada. The market outlook highlights how broad and how long-lasting the investment is across Bird's 10 strategic end markets. The demand in these end markets rests on investment programs that span multiple years, extending through 2030 and often far into the 2030s. Nuclear plays a key role in that opportunity, covering the entire industry lifecycle through self-performed, multi-disciplinary capabilities, supported by certified nuclear quality systems and experience spanning operating facilities, decontamination, remediation, maintenance, and enabling infrastructure. Regarding technology selection for Canada's new nuclear build program, we apply our expertise to reactor construction, the supporting infrastructure, and other related scopes of work. Defense is another long-duration market where investment is expected to create opportunities across facilities, training, infrastructure, accommodations, and development in the Arctic and remote north. Data centers likewise stay a substantial growth market, together with chemicals, power, mining, plant and marine transportation, utilities, essential social infrastructure, and emerging openings in oil and gas. Investing across these markets reduces dependence on any one theme and underpins several multi-year growth paths past the current period. Canada's data center market sits at a far earlier stage than the U.S. market. Public data indicates roughly 47 gigawatts of installed capacity in the U.S., versus 1.6 gigawatts in Canada. On that smaller base, Canada has a proposed pipeline of about 19 gigawatts spanning more than 150 facilities. Bird concentrates on sovereign infrastructure alongside established Canadian companies and partners. The 2026 budget supports that course with steps designed to grow in-country compute capability, accelerate AI uptake, and address the energy infrastructure that development demands. Power remains an essential enabler, and projects will advance in stages once electricity, customers, and approvals are in place.

Terrance McKibbon

executive
#2

We can go after a wide spectrum of opportunities — power generation, site development, modular and fabrication supply, facility construction, electrical, mechanical and communication services, final commissioning, plus long-term maintenance. All of it comes to clients like Bell as a turnkey solution. There's a pipeline of relationships and strategic discussions that we're actively chasing. At the moment, data centers account for less than 10% of our combined backlog and rank among Bird's 10 strategic end markets. This work presents a multi-year growth opportunity within a larger distributed work program. On this slide, you'll see two additional organic growth paths for Bird. Since we bought Stuart Olson in 2020, our portfolio of recurring industrial services has been growing at about 20% a year. That has taken the business past its traditional Alberta roots and made it a service offering that spans the country. On the recent awards front, we have renewals and broader service scopes with six clients we already serve, under agreements that run as long as five years and cover mechanical, electrical maintenance, turnaround, and outage work at major industrial and energy facilities in Canada. This extends the momentum from the Norcan acquisition and the cross-selling we told you about late last year. Bird's self-perform, multi-discipline offering spans mechanical, electrical, instrumentation, piping, insulation, and high voltage. With that breadth of capabilities and a strong approach to client service, Bird has been able to keep expanding our service offering with clients. Bird additionally operates four facilities for fabrication and modularization, among them newly certified N285 capacity located in Ontario. Out of these sites come structural skids, pipe spools, package systems, mechanical buildings, and electrical panels, all of which can be assembled into bigger modules so that construction on site runs more efficiently. When combined with our ability to execute work in the field, this generates opportunities to cross-sell throughout Bird's major projects while enhancing schedule and quality control and lowering the labor needed on site. We are seeing expanding uses in data centers, oil and gas, and nuclear, which offers yet another route toward higher-value self-perform work. Additional funding visibility across several of the markets we have emphasized comes from the federal Budget 2026. This continues what the government has pursued since the election—speeding up major projects and growing Canada's infrastructure, energy, and industrial capacity. The scale is considerable: defense spending is aimed at hitting $157 billion a year by 2030, there are $52 billion in new electricity and grid commitments, and the $25 billion Canada Strong Fund backs co-investment in major projects. Nuclear gets reinforced as a central piece of Canada's electricity strategy, with as much as 14.8 gigawatts of proposed large-scale capacity in Ontario and development being weighed throughout Canada. Bird brings together wide-ranging supporting infrastructure capabilities spanning the nuclear construction subset, nuclear quality fabrication capacity, and multidisciplinary self-perform expertise. AI and data center infrastructure were also flagged in the budget as growth drivers. The Bird opportunity, similar to nuclear, stretches over the entire infrastructure build-out—covering power generation and transmission, site development, fabrication and modularization, plus mechanical and electrical construction. Federal policy and funding keep aligning with Bird's capabilities and strengthen a long-term investment outlook across our strategic markets. That multi-year investment outlook backs our 2027 targets and opens up opportunities past the current strategic plan period. Given how large this opportunity is, together with Bird's ongoing execution, the company is heading toward the top end of its 2027 revenue target and making progress toward an adjusted EBITDA margin of 8% for the full year 2027, all while keeping an investment-grade balance sheet. Our adjusted EBITDA margin for the trailing 12 months is 7.1% at present, so we still need about 90 basis points of improvement to reach the 8% target we've set for full year 2027, and we have over a year remaining in which to achieve it. Several drivers already visible in the business support that trajectory. Gross margin gains are being helped by business mix, recurring industrial services, higher-margin sectors, and a larger share of self-performed work. Further margin improvement can come from One Bird collaboration, equipment and specialty revenue, overhead leverage, and operational intelligence. So far this year, G&A expenses have risen at a slower pace than revenue, reflecting the operating leverage that comes with Bird's expanded scale and disciplined control of overhead spending. By putting money into operational intelligence, we intend to give our teams a head start in seeing how projects are performing and where risks are starting to appear, letting them respond earlier and produce steadier results as the volume of work expands. I'll now pass it to Wayne, who will go through the quarter's financial results in greater depth.

Wayne Gingrich

executive
#3

Appreciate that, Terry, and morning everyone. Third-quarter revenue landed at $1.3 billion, which is 36.7% higher than the $951.4 million posted in last year's comparable period. Roughly 90% of the gain was organic, powered by buildings and industrial, with infrastructure contributing too. FRPD accounted for what was left. Gross profit increased 50.1% to $153 million, and the gross profit percentage moved up from 10.7% to 11.8%. Adjusted EBITDA reached $106.3 million, a rise of 58.8%, giving an adjusted EBITDA margin of 8.2% compared with 7% the prior year. Margins at the underlying level continued to strengthen thanks to consistent gains in building performance, careful project selection, cost discipline, and more self-performed work via integrated One Bird delivery. A larger share of buildings revenue came with stronger margins in targeted market sectors, and more cross-selling plus internal self-performed work allowed Bird to retain more project value. General and administrative expenses fell to 5.4% of revenue from 5.7%, which shows operating leverage as the business scaled. Better project margins and G&A leverage drove earnings growth that outpaced revenue growth. Adjusted earnings rose 77% to $62.6 million, or $1.13 per share. Net income was up 61.2% to $51.1 million, or $0.92 per share. Net income reflected the after-tax impact of an aggregate $12.4 million in non-cash fair value adjustments and amortization tied to warrants issued to a strategic customer. Those are accounting charges that don't involve any cash going out, and we leave them out of adjusted earnings. Revenue for the first nine months of 2026 was up 24.1% to $3.13 billion, with organic growth accounting for over 80% of that increase. Gross profit climbed 29.1% to $335.1 million, and the gross profit percentage came in at 10.7%, up from 10.3%. Adjusted EBITDA increased 39.4% to $217.3 million, and the adjusted EBITDA margin improved to 6.9% from 6.2%. Adjusted earnings were up 51.8% to $115.2 million, or $2.08 per share. Cash flow from operating activities improved by $199.5 million, reaching $122.8 million. Earnings growth is now translating into cash generation, which strengthens the quality of Bird's earnings. The cash we're generating funds the work program we have underway and lets us put money into future growth. Over the trailing twelve months, free cash flow climbed to $267 million, equal to $4.82 per share, which demonstrates that stronger earnings are turning into cash. Bird's cash generation provides working capital for a work program that keeps expanding, allows reinvestment back into the business, and supports returns to shareholders. When the quarter closed, adjusted net debt relative to trailing 12-month adjusted EBITDA was 0.76x, and gross debt, which includes right-of-use liabilities, came in at 1.38x. Together with a current ratio of 1.35, these figures show Bird has solid liquidity and financial capacity. Bird ended the quarter holding $268 million in total cash, with $476.5 million accessible through its committed revolving credit facility. With our investment-grade credit standing, the liquidity we have on hand, and robust free cash flow, we can fund project delivery, routine working capital needs, and chosen growth investments, all while staying financially disciplined. Starting in 2022, Bird has put to work about $498 million—reinvesting in the company, bringing in strategic acquisitions, and returning money directly to shareholders. Our capital allocation philosophy stays balanced and disciplined. We continue directing funds toward working capital, equipment, technology, and productivity initiatives when needed, allowing us to deliver our growing workload safely and efficiently. Capital expenditures for the first nine months of 2026 totaled approximately $28 million, compared with $23 million during the same stretch last year. We're still actively looking at M&A opportunities, and we have a robust pipeline of strategic companies with which we're at various stages of discussion. Our focus remains on businesses that broaden our service offerings and self-perform capabilities, reinforce our position in attractive markets, and bring experienced teams that match Bird's culture. Every transaction has to satisfy our criteria for strategic fit, returns, cross-selling synergies, and balance sheet discipline; we also keep returning capital to shareholders via our dividend. A healthy capital structure gives Bird future flexibility to invest in the business, chase strategic opportunities, and return capital to shareholders while keeping leverage prudent. With that, I'll hand the call back to Terry.

Terrance McKibbon

executive
#4

Thanks, Wayne. With strong results across the first nine months and clear sightlines from our record combined backlog, we expect revenue growth for full year 2026 to come in near 25%, and we have lifted our 2027 revenue outlook range to $4.9 billion to $5.1 billion, which is the top end of the target in our strategic plan. Growth should be broad-based, spanning our industrial, buildings, and infrastructure businesses. We anticipate that the year-to-date adjusted EBITDA margin will improve over the rest of this year, which supports additional progress toward the full year 2027 target of 8%. Beyond 2027, we also see chances for margins to keep advancing as the business mix and operating model keep evolving. Our priority is turning our $13 billion combined backlog into profitable revenue. Stronger margins built into that backlog, along with demand spread across Bird's target markets, underpin our 2027 targets and give us visibility past the current plan. A wider investment outlook, bolstered by recent federal budget measures, supports how deep and how long the opportunity ahead will last. As earnings keep rising, our approach to capital allocation balances reinvestment in the business, strategic acquisitions, and returns to shareholders; we stay committed to our targeted dividend payout of 33% of GAAP net income while keeping our investment-grade balance sheet. Going forward, the size of the opportunity across our target markets gives us confidence that Bird can keep delivering profitable growth. With that, I'll hand the call back to the operator so we can open the line for questions.

Chris Murray

analyst
#5

Yeah, thanks, folks. Good morning. Maybe I'll start by touching on the outlook a bit — you know, we've clearly had a couple of revisions now for '26 and '27. I suppose a couple of questions come up here: is there anything — or what is it that gives you confidence to raise the numbers at this point? Has it been new project wins? I know you mentioned perhaps having a better jumping off point for '27 from '26, but could you talk about what's actually gone into your view that lets you increase the numbers right now? Do you need any particular projects to land in order to reach that '27 guidance, or are you fairly confident that most of what's required is already sitting in backlog today? And would any fresh wins then be incremental, pushing you toward the upper end of that '27 figure?

Wayne Gingrich

executive
#6

Yeah, I'd say the key point for us is that as we enter the fourth quarter, our combined backlog stands at $13 billion — a new record, definitely for Bird. We also put out a solid press release covering roughly $1.1 billion in awards announced recently. Looking ahead to how '27 will unfold, the work is already secured. To your point, delivering the guidance we've provided doesn't require us to land any big major project. With collaborative contracts, from the moment you receive an award, it can be 18 months before the design is finished, validation with the client is done, and all those steps are complete. In terms of large projects, there's really very little we could win today that would affect '27 results. Seen that way, it likely has more of an impact on '28 results. You can sort of see that reflected in the size of the pending backlog we disclose — $6.6 billion, which you can regard as a funnel of projects sitting at different stages, ranging from ones just won to ones nearly ready to turn into backlog. So there's always this stream of pending backlog that converts to some degree each quarter. Those items are definitely going to benefit us next year. And with that extra visibility, we head into next year with a great deal of confidence.

Chris Murray

analyst
#7

All right, that sounds excellent. Terry, I realize you folks are putting together what amounts to a longer-range strategic plan. My guess is we might get a look at it perhaps at some point next year, but thinking about the company and everything you've accomplished up to now and where things head from here, could you spend a moment on how we ought to begin framing the coming strategic cycle when it comes to revenue growth and margin progression? Is there anything around quality or mix that you referenced which will assist on the margin side and that we should expect to shift as time passes? Does this simply come down to continuing to capitalize on all these end markets, expanding, and relying on operating leverage to push margins upward?

Terrance McKibbon

executive
#8

I'd say that as we grow more clearly defined as a specialty contractor and in how we go after our business, something we've worked on for more than five years in order to position ourselves across these various verticals we operate in, you begin to watch things develop. You begin to watch items such as growth, such as oil production, start to come up in discussion. You see long-term nuclear development, which clearly is enormous. You begin to see full commitment to targets in Canada for LNG output, which are substantially higher than what the capacity currently under construction would deliver; so you begin looking at these assorted end markets, defense, data centers. You begin looking at those, and I believe you're going to see steady growth in our revenue annually. Clearly, it may not be 25%, but it will be steady growth through 2030. And beyond that, since we have a major focus on enhancing margins, you'll see accretion in the margins. Where that finishes, well, we're well along now in developing our strategic plan, and it will be presented to our board in August; and then we have a targeted date in late September for an Investor Day, and at that point, we'll rinse and repeat what we did three years ago.

Maxim Sytchev

analyst
#9

Yeah, hi there, good morning, gentlemen. So my first question, Terry, is perhaps about M&A. I mean, right now you do have a higher multiple compared with what you'd have kind of enjoyed historically. Does that create something of an opportunity to potentially consider a different set of assets going forward? I'm just curious what your thoughts are from that angle.

Terrance McKibbon

executive
#10

Yes, absolutely. And obviously, as you know, Max, we have a regular cadence when it comes to M&A. And at times there are opportunities you spend some time on that you simply can't get there on or you just don't get comfortable with, and that's a constant ebb and flow. We don't discuss those, but yeah, you can expect that we'll continue to be active. Obviously, the higher multiple certainly does help. And we've got a very well-oiled machine here, as you've seen from the past, you know, since 2020 with Stuart Olson. And that team puts in considerable efforts to investigate opportunities and obviously determine whether they're complementary and whether the culture fits and all of that, and then most importantly, whether the transactions are accretive. So yes, we're open for business, sort of sign with us; we're constantly looking for opportunities, and we're constantly evaluating them. And sometimes predicting the timeline is sometimes difficult—what the timeline will be is hard to predict, because you're looking for those real special golden nuggets that are sometimes hard to find.

Maxim Sytchev

analyst
#11

Right, and on materiality, should we still expect what you've sort of done historically? Is that the right way to think about it?

Terrance McKibbon

executive
#12

Yes, I think so. I think, you know, larger-scale opportunities are few and far between. So I think you'd expect to see things generally in the range of what we've done — that's kind of the hunting ground that we're in.

Maxim Sytchev

analyst
#13

All right, that's great. So a quick one for Wayne, if that's okay. On the subject of what feeds into margin expansion, could you perhaps break out the different buckets for us — how much comes from operating leverage as opposed to SG&A, as opposed to process improvements — so we can kind of work through how this plays out? Thanks.

Wayne Gingrich

executive
#14

Sure — we don't break out the specific lifts we expect from each of those components, though I'd say the biggest factor is definitely our business mix. It's interesting: if you look at our business across the last five, six years, buildings, industrial and infrastructure — all three have been seeing margin improvement. I'd say we likely have a larger share, or some of the growth is being driven by a larger share, of the buildings work, which is coming in at strong margins for us — but buildings margins still don't match those of an infrastructure business, for instance, which carries higher equipment revenues and more self-perform. So as infrastructure keeps growing as a share of the total business, that's probably where you'll see the largest contribution in '27, '28 and beyond. And in our strategic plan for 2025 to 2027, I believe we expected infrastructure to reach 26% of the revenue mix by the close of '27. And then perhaps past that, in an ideal world, you'd land at a third, a third, a third. So we'll see some lift there. I think there's still room when it comes to leverage on our cost structure, but at the same time, given the growth prospects ahead of us and the sheer number of opportunities across these 10 sectors, we're also putting money into business development and estimating, plus the talent we need to deliver and execute these projects. And obviously there can be a timing lag there, where you bring people in to help you win the work and then there's a gap before you actually win the projects — but even so, we're still achieving operating leverage. And I'd add there are benefits to be gained in productivity from some of the tools we're implementing and the like. So no single factor is driving it; it's a fairly balanced set of factors behind our margin improvements, which will certainly help us reach the 8% in 2027, and also leave runway past 2027.

Maxim Sytchev

analyst
#15

All right, that's excellent. Many thanks.

Ian Gillies

analyst
#16

Morning, everybody. In the past, we discussed a framework involving 10% organic growth after 2027, and given that revenue is arriving stronger both for this year and the next one, does that shift how you think we ought to consider, say, the medium-term years, or do you believe there's still sufficient work available that you can reach those kinds of levels?

Terrance McKibbon

executive
#17

My sense is it will be stronger once more, though the details are where the difficulty lies. We really need to map out everything we currently have in motion and devote considerable time and effort to that, clearly, for that framework, but my expectation is it will be shorter.

Ian Gillies

analyst
#18

And when you consider that, and locating the workforce needed to carry it out, could you perhaps provide a little update on a few of the HR approaches you're using, just to ensure you've got the right people in place?

Terrance McKibbon

executive
#19

Yes, so we definitely don't take on anything unless we have a team behind it. It's a key strength of ours — we never — we constantly look at ways to shift the workload among our many divisions and offices, and thanks to the new companies we've acquired, when a market softens a bit, we can move teams in from other areas; so that's served us very well. And obviously, our standing with labor relations is impeccable, both with the unions and with the non-union entities. So when it really comes down to it, we don't struggle that much. At times you run into a situation where demand is really intense while a lot of other factors are simultaneously limiting what you can do—but we move fast to redirect and pull in whatever resources are required. Since we're able to handle these big turnarounds involving two to three thousand people, we keep a rolodex of personnel we can shift on very short notice, moving them off a turnaround, for instance, to go handle a portion of a data center. Frequently, those highs and lows occur within the very same trade, so the mix and the crews we've put together for that kind of work are genuinely impressive, and the way we scale our operations—say, shifting from Alberta over to New Brunswick for a major client turnaround—lets us ramp up quite fast, and our track record backs that up. That's essentially how we view this business expanding, since we possess the abilities needed for this kind of undertaking.

Ian Gillies

analyst
#20

And turning to the nuclear side, could you give us a bit of an update on how things stand with growing your capabilities in that area? I know you've been pursuing quite a few different avenues so you're able to do more work on site.

Terrance McKibbon

executive
#21

So it would be useful just to hear where you're at. Yes, so really there's nothing standing in our way when it comes to doing large-scale nuclear. We aren't involved in the SMRs; we aren't involved in the refurbishments beyond the supporting infrastructure. We've completed quite a lot of supporting infrastructure for the refurbishment at Pickering. I think one point that's probably not widely known about a new build is that a new build will fall somewhere between 70% typical construction and 30% nuclear capabilities. So the size of these opportunities coming through in Canada right now includes a significant amount of conventional construction. Now, if you're going to take on that kind of work, you need impeccable safety performance. You need a reputation working for these utilities that will hopefully be building these facilities. And we have that with each one of those large utilities. We're carrying out a considerable amount of work for, and we have a resume of projects such as LNG Canada Phase I, where we were a significant construction contributor to a $30 billion project that was built on schedule and on budget with impeccable safety performance; so we're in a really good spot as the projects evolve, when they evolve. Obviously we have the full capabilities, but the projects currently underway were obviously committed to many, many years ago, and we weren't where we are today; so there really isn't anything we need, but the scale and the magnitude of the conventional construction is sometimes misunderstood. It's pretty significant.

Ian Gillies

analyst
#22

That's really helpful. Many thanks. I'll turn it back to the moderator now.

Krista Friesen

analyst
#23

Thanks for the chance to ask. I was hoping you might share some detail about how competition is shaping up. Clearly, Canada has plenty of buzz right now, given all the planning and construction underway, so I'm curious about what you're observing on that front.

Terrance McKibbon

executive
#24

To start, given the friction with our southern neighbors, people have shown a clear inclination toward Canadian firms, and that is opening up fresh possibilities — in many cases it grants us a preferred position that we otherwise would not have enjoyed. There's genuinely a strong feeling in Canada at the moment backing Canadian organizations, and it's truly great to witness — likely the first instance in my career I've experienced this. With that in mind, when we consider the firms we're up against, the competitive landscape consists mostly of the bigger Canadian players at present. In this setting, you're dealing with extremely large organizations that are highly seasoned in their operations and, clearly, businesses that are skillfully managed. What that means is you're not seeing an influx from abroad of people whose sense of pricing is entirely different, or who lack familiarity with this country—who don't grasp what working through the winter here involves, things of that nature. That's simply not present at the moment. So the situation we find ourselves in is quite fulfilling, given what the federal government, the provinces, and the premiers are doing to make sure the work on our projects goes to Canadians.

Krista Friesen

analyst
#25

All right, that sounds good. And when you consider a few of these larger projects, do you feel at ease with the margin profile or the way these contracts are structured in the current market?

Terrance McKibbon

executive
#26

Yes, by and large. And I believe we can also sway owners if they are considering striking out on their own regarding something where the risk transfer is simply too great to be employing that kind of model. We don't waste time—once we suspect a deal is structured in a way we're not comfortable with, we simply inform them we're out. My sense is they're probably getting the same message from other players too, especially when the risk level is really elevated. When a structure doesn't fit the opportunity, the owner is the one who suffers over the long haul, since the project either never moves forward or stalls for many years—and there are plenty of cases like that where the Canadian models didn't properly match the risk transfer, and ultimately things fall apart. Yeah, I believe we're staying quite disciplined, and what's equally important is that we're demonstrating how a sound model can deliver real success. It also makes sure the project is completed at the highest standards and with top levels of efficiency. So owners are beginning to see that certain collaborative models work very well, and they ought to consider them more frequently.

Krista Friesen

analyst
#27

Thanks. That's helpful detail. I'll get back in line.

Yuri Lynk

analyst
#28

Morning. I'd like to understand how your AI infrastructure pipeline is developing outside of Bell. Are other developers showing interest, and how many of those opportunities are getting nearer to construction?

Terrance McKibbon

executive
#29

There's definitely a lot of interest. Bell is our priority, I'd say, though we have other clients we've been working with for quite a long time. But clearly, given the big opportunity with Bell in front of us, we're placing a major focus there, and that's a really exciting opportunity for us that keeps developing; and there are definitely opportunities in other provinces, I think, including New Brunswick, and a sizable pipeline here in Ontario. Things are taking somewhat longer in Ontario because of power allocations and some of that, which we've worked through pretty thoroughly over the past five years. And some of our developers are in the position they're in because we secured the power and identified the land opportunity for them. So it's a very tight relationship; we got this going many, many years ago with some of the clients we have. And I definitely expect some of those to break ground in 2027, though they're still working through some hurdles. One difference between Canada and the U.S., in certain U.S. states, is that Canada has a very well-managed grid; and they have organizations that devote a lot of time and effort to managing how that grid is supported with appropriate power generation; so it's different in certain states where the grid is more of a free market, wide open, a bit of a frenzy. Canada puts considerable effort into that regard. And we're also seeing more of an influx of opportunities where the developers we're working with are bringing power. In some situations, a power allocation is needed. We're also, I think, still seeing some misinformation out there about how much water gets used and that kind of thing and the power impacts, where that is being managed very well; and obviously, the water impacts are no longer what they would have been five years ago; but that misinformation is still out there and also was somewhat of a municipal election issue, so that has to settle a little in some of the cities to clear that up. But we're sensing some of those are clearing now with their moratoriums.

Yuri Lynk

analyst
#30

Great, that's really useful. Thanks, Terry. For my final question, I'm just curious about your 10 strategic sectors — which opportunities would you say are moving ahead faster than you'd have expected six months back, and where are projects perhaps taking somewhat longer to move forward?

Terrance McKibbon

executive
#31

Honestly, all of them are progressing at a very good pace. I'd point out that a few of the larger ones — we're beginning to see conversations about oil production, which is exciting since it's the first time in a dozen years; we're getting plenty of inbound interest on mining. Of course, LNG — we saw the announcement that Canada is aiming for 100 million tons a year, which is interesting, and we'll see how that develops. But major clients of ours such as Dow and others keep expanding the path to zero, Phase I and II. We're hopeful there could be a phase III eventually. Nuclear gets a lot of coverage in the news, so that's one that will definitely be exciting over the longer term; but data centers — had we spoken about it a year ago, we wouldn't have foreseen the speed at which our data center mission-critical teams would be operating today, or the scale of the number of resources we've devoted to it. Defense is simply — the sheer quantum of it is significant. Certain projects take somewhat longer since a great deal of front-end indigenous work must be completed, and we partner with the government to develop some of that. So a portion of it has likely taken longer purely because of the complexity, but it's very much in progress. The one that's perhaps accelerating more quickly than we anticipated is probably the overall development of the Arctic — a mix of the chances to develop the Grays Bay Deepwater Port and the Mackenzie Valley highway to Inuvik, which is receiving considerable emphasis from the government, along with the Grays Bay procurement at present. Naturally, we have an outstanding record in the north, so when you mention building a road to Inuvik and note that we built the town of Inuvik in 1956, we have a rather solid resume for that type of work. And then there's still the steady stream of social infrastructure, be it school bundles in the West or hospitals — we keep seeing those, and we keep strengthening our resume. So I'd say it's fairly well balanced. The Arctic is probably the one getting the most — it's accelerating at a quicker pace than I would have anticipated. And then there are the defense bases up there too, but this infrastructure helps for those eventual bases. Oh, and there's another item I likely didn't mention that we wouldn't have been nearly as far along on a year ago, and that's Ring of Fire. It's now fully funded, our teams are on site, and we'll be hauling a massive number of loads this spring over the ice road to really speed up that work. Last spring we took more than 300 loads up there, so that equipment is operating now that funding is complete and we're getting underway and developing quarries for aggregates, that sort of thing. So that project is progressing at a really good pace. It's great to see the federal commitment come through in the latest budget.

John Gibson

analyst
#32

Good morning, and thank you for taking my questions. Mine is fairly high-level: clearly your growth rate has been highly impressive. What concerns you most, or what is the thing that keeps you awake at night the most? As far as preserving this safely goes, would you say skill creep is the issue?

Terrance McKibbon

executive
#33

Safety is always — the thing I constantly worry about is safety. You know, our record is very strong. We collaborate nonstop with a very big team, but similar to problems that arise in society, you know, at times somebody shows up at work who simply isn't ready for the day and can err just because something in their personal life has them distracted. That's a topic I likely should be concerned about. Naturally, we put a lot of effort into preventing injuries. I genuinely think that before long, with the progress we're making through our AI investments, a moment will arrive when an employee shows up at one of our job sites and, thanks to the technology and what AI can do, we'll be in a position to spot a developing hazard and halt that work. Watching that technology advance is truly thrilling, though I'd argue safety is the area where, at times, you simply have no way to govern what's going through someone's mind when they arrive for work.

John Gibson

analyst
#34

Appreciate that. One thing I'd like to ask about is data centers. Obviously Bell has made news with plans to grow further in Saskatchewan. We've also seen other projects begin moving ahead. How many of these jobs can you handle at once? Do you have a gigawatt-per-year capacity number, or is this going to look more like a phased build-out for Bird?

Terrance McKibbon

executive
#35

Well, a lot of the — many of the NAs we partner with are doing phasing, which works well and mirrors how our other businesses run; a distributed load suits us better. We're not looking to take on a project situated smack in the middle of an industrial hub that's already bustling—and a few fit that description—or one specific site that ended up right in the center of a highly active area; for those kinds of opportunities, we'll remain on the sidelines. That said, things are extremely active for us in Saskatchewan, and I expect that will hold true for quite some time given Bell's full engagement. You've all seen the announcements regarding the roughly $50 billion in potential development they've discussed with the province. So our confidence is very high, and the word we're getting is that tenant demand on their end is off the charts. That adds up to a partnership that should thrive over many years, and as you're aware, the way their ownership is structured gives them an incentive to continue with us. From our side, though, I'd say it's better to spread things out and find chances in particular places that haven't become saturated with other industrial development, and that's typically the path we favor. That said, you also need provinces and their leaders to step up and help make these projects happen, and that's clearly happening in Saskatchewan — the premier is genuinely embracing these opportunities. That pattern is beginning to show up in Ontario as well. The premier is engaging directly, and senior cabinet ministers have been given responsibility for getting these projects done, with the province declaring its aim to become a top destination for data centers. All of this is encouraging, since we have strong resources across most provinces—and especially in those that are developing, which generally sit quite near the major urban centers, our resources are really solid.

John Gibson

analyst
#36

Much appreciated for the color. I'll dive back in.

Michael Tupholme

analyst
#37

Thanks. Morning to you. Strong presentation. You brought up the Ring of Fire a short while ago during this call. I wanted to ask a follow-up regarding the Martin Falls Community Access Road. Unless I'm wrong, a considerable amount of work on that project landed in pending backlog during this quarter. So my first clarification is this: is that primarily what caused pending backlog to rise as much as it did? And second, how should we view that work shifting from pending into hard backlog and then scaling up more broadly?

Wayne Gingrich

executive
#38

Looking at '27 and past that, Mike, that's definitely among the things pushing it — though not the sole factor. We constantly land new work, after all. And given how award timing works plus how collaborative contracts function, those can sit in pending backlog for quite a while. That said, our bookings quarter was really strong too, and much of that came from pending backlog. So I'd put it this way: the wins we've landed across both backlog categories are fairly well spread out.

Michael Tupholme

analyst
#39

Okay, that helps. And then I suppose, on that particular project, does that suggest there'd be further work ahead as you keep moving that project forward? As in, not everything is already sitting in some backlog bucket tied to that project?

Wayne Gingrich

executive
#40

Yeah, I believe we're definitely going to see growth beyond what we've included in our figures. We usually take a fairly cautious stance on how these things will play out; and I think what you'll find is that, over time, you won't see a single huge shift of pending backlog into backlog. From time to time, a new work package will move over as a backlog, and it'll then hold a smaller amount in pending backlog.

Terrance McKibbon

executive
#41

That's why it converts — the funding gets released, and once that money comes through the various gates, it sets the movement off, Mike. But remember, we're talking about phase one here. Phase two comes right after it, and from there you move into 10 separate mine developments, all sitting in the same region and all under the same community oversight.

Michael Tupholme

analyst
#42

Right, that helps me get a clearer picture; and second, we heard some talk earlier regarding acquisitions, and looking at opportunities in that area remains part of the strategic plan. To me, many of the things you've bought over recent years have been quite strategic in nature, extending your platform into various areas. As you look ahead over the coming few years, what do you see right now as the areas of greatest interest when it comes to rounding out the platform?

Terrance McKibbon

executive
#43

Okay, if you look at a few developments starting to take shape over the longer horizon, I'd point to those longer-term alternatives like nuclear, and you can see the support that, in our view, reflects a long-term build in Canada around data centers backing those projects. Obviously, other segments such as — I'm getting genuinely enthusiastic about oil production, since it's becoming increasingly evident that Canada will add 2 million barrels a day of extra capacity to move oil, and production must be developed to match that. To me, that looks like a huge opportunity. Clearly, our maintenance efforts are still expanding that opportunity, and those are strategic targets for us—for instance, we could acquire an existing business specializing in a particular area, like one focused on mechanical work, then step in and bring electrical synergies to it. Opportunities of that kind would be very exciting for us. So, considering the ten vertical sectors we operate in, continuing to pursue opportunities that align with those targeted areas is where our interest would be strongest; occasionally something comes along that doesn't quite fit within those ten and could still be interesting, but our primary focus remains on those.

Michael Tupholme

analyst
#44

All right, that's clear. Thanks.

Terrance McKibbon

executive
#45

Thank you. What Bird has achieved comes straight from the effort, commitment, and ongoing focus on safety shown by our teams nationwide. Their work is at the heart of Bird's success and of the confidence we hold in what lies ahead for the business. I also want to thank our clients, partners, and shareholders for the trust you keep placing in Bird.

Operator

operator
#46

Thanks for joining us; that brings today’s conference call and webcast to an end. You’re welcome to disconnect your lines now. We appreciate your participation, and we hope you have a pleasant day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Bird Construction Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Bird Construction Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Bird Construction Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.