BKW AG (BKW) Earnings Call Transcript & Summary
August 19, 2026
Earnings Call Speaker Segments
Marisa Fetzer
executiveGood morning, everyone, and welcome to all of you joining us. Speaking for BKW, I'm glad to have you at this analyst and media conference covering BKW AG's 2026 Half Year Results. I'm Marisa Fetzer, Head of Corporate Topics in BKW's Corporate Communications Department, and I'll be moderating today's online event. I'd also like to extend a welcome to BKW's CEO, Robert Itschner, and BKW's CFO, Martin Zwyssig. In just a moment, they will present BKW AG's half year results for 2026. On the cover of our 2026 half year report, you'll see Markus Späth. His role is Project Manager, LTB Leitungsbau, which belongs to BKW's network. Within the Ultranet project, LTB Leitungsbau is modernising power lines that already exist along the stretch between Mannheim and Phillipsburg in Germany, and putting up many new pylons. The goal is to make it possible to transmit direct and alternating current at the same time along one route. In this way, Ultranet raises transmission capacity for moving electricity from Northern to Southern Germany. Before Robert Itschner takes the floor, let me quickly lay out the agenda for today. To start, our CEO, Robert Itschner, will walk you through a brief overview of the results for the first half year of '26 and talk about the key developments during the first 6 months in our 3 business segments: Energy Solutions, Power Grid and Infrastructure and Buildings.
Marisa Fetzer
executiveAfter that, Martin Zwyssig, who serves as our CFO, will walk through the financial results for the first half of 2026 in detail. Then I'll hand things over to Robert Itschner, who will wrap up the presentation portion of this conference by giving an outlook for the current fiscal year. You'll also get a chance to ask questions. As is customary, we'll close out today's online conference with a comprehensive Q&A. Feel free to submit your questions in writing at any point during the presentation. We'll answer them during the Q&A. Let's begin now with a detailed explanation of BKW's half-year results for '26, and I'm pleased to hand over to our CEO, Robert Itschner.
Robert Itschner
executiveThank you so much, Marisa. Good morning, ladies and gentlemen. I'd also like to give you a warm welcome as we gather for BKW's online Analyst and Media conference covering the 2026 half year results. As usual, before our CFO, Martin Zwyssig, digs into the financial results, I'd like to use this chance to walk you through an overview of the key figures and offer a brief comment on how things have developed in our business segments. Our half year at a glance. We delivered a solid result in the first half year, though those first 6 months proved quite challenging. I'll go into that a bit more later on. In Energy Solutions, the environment is dynamic, shaped by the uncertain situation in the Middle East and the very dry weather with little wind. That said, we managed to seize opportunities in Energy Solutions, above all thanks to the significant fluctuations in the System Services business and in short-term trading. As a result, we offset part of the negative results. On the whole, total operating income and operating profit in Energy Solutions came in lower than the prior year. In the Power Grid business segment, we delivered a steady performance across the first 6 months of the year, with total revenue at the previous level and EBIT just slightly below the same period of '25.
Robert Itschner
executiveI'm especially happy about how Infrastructure and Buildings have kept performing well — we managed to raise EBITDA, EBIT, and profitability across those business segments. You can see these developments reflected in 4 figures shown here. Total revenue, EBITDA, and EBIT have all declined versus the same period a year earlier, since the stable-to-positive trends we mentioned in the Power Grid and Infrastructure Building segments could not make up for the headwinds in the Energy Solutions business segment. Even so, net profit came in 7% higher. As our CFO will explain shortly, free cash flow is above last year's level, and we were able to increase our EBIT — equity. That -- this is the reason BKW is a solid company. During the first half year, we found ourselves in a very stable situation. And we remain on track with our Solutions 2030 strategy and stay committed to our target of an EBIT of CHF 850 million to CHF 1.2 million (sic) CHF 1.2 billion in 2030. Now let me turn to the individual business segments. We'll begin with Energy Solutions. On the right-hand side you'll see some KPIs that relate to our strategy.
Robert Itschner
executiveOur goal is to grow the production portfolio to 3.6 gigawatts. We've managed to add 80 megawatts to that portfolio. There are numerous portfolios in the pipeline. We'll cover that later on. Direct marketing is another area of growth. We stand at 7.9 gigawatts there. We've surpassed our announced target, partly thanks to last year's acquisition of Südvolt. And on virtual power plants, we're at 2.6 GW. Our focus is on scaling decentral flexibility further. Turning to how we're enlarging the portfolio, there are plenty of highlights. You've already heard from us about Cerignola. The second phase of the wind farm in Southern Italy has been commissioned. Those are very positive results, and we've secured a building permit for the battery storage facility in Waltrop. It's a very large battery storage facility. We intend to operate 300 megawatts ourselves. Construction is set to begin soon, and investment decisions have already been made. In Switzerland we're also investing according to plan — we've started the Grimsel 4 pump storage facility. I'm very pleased to announce that. It's a very important component of the future energy system, since it delivers flexibility in the energy system, and we'll need that going forward. A smaller highlight, though also important for the future, is securing the agreement in principle with Swissgrid for the planned large-scale battery in Mühleberg, at 400 megawatts.
Robert Itschner
executiveWe're right in the middle of executing on this project. We're providing solutions for customers as well. We successfully completed the acquisition of the energy company Volterres in France. Volterres is delivering fantastic growth opportunities. We already had a presence in France. As all of you know, we managed customer plants. And through Volterres, we've gained one more interface with customers, and we believe we'll generate attractive growth there, because market regulation in France has changed. And for the first -- on 1st January '26, large volumes became available on the market, volumes that previously were made available by EDF under EDF regulated conditions. We also hold a 10-year management contract with the French project developer Acacia. Here, we aim to scale up to 700 megawatts when it comes to managing third-party plants. So we're well on track there. And lastly, a very exciting project that contributes to our value creation, namely the energy solution hub, was still launched in Switzerland in a first phase, and we're going to roll it out in neighboring countries over the midterm. This project is about giving major customers the chance to benefit from integrated energy solutions.
Robert Itschner
executiveWe’re also going to provide automated management of energy assets on behalf of customers. That makes this a really interesting project, and it’s great to watch customer requirements evolve in the way we anticipated a while back. Let’s turn now to the power grid. We stated that CHF 1 billion would be invested through 2030. We’re making solid progress. Considerable investment has already been made in the past. Those investments are being made so that we can support the energy tradition. Many renewables have expanded. Here you can see where things stand as of June. There has been a huge rise lately, and the BKW grid now has 800 megawatt of installed capacity. That is a further increase this year. The growth is substantial, which is why investment is needed. Turning to the smart meter rollout, we’re making solid progress. We can finish this project 1 year sooner than forecast. That is another very important prerequisite for managing the grid efficiently, and we have already taken the first steps. On the left-hand side of the slide, you see topics I’ve already covered. The investment program is making solid progress. And I’m glad to report that we are able to place a green bond for investments in the distribution grid.
Robert Itschner
executiveThese investments can be sustained. And going forward, green bonds will be used to finance them as well. What matters for supply security is that our central control center holds certification under the European standards EN 50518. We are among the first grid operators to receive this certification, which makes us proud and guarantees we have solid infrastructure to run. Now, I've already covered what appears here on the slide. Let me turn to Infrastructure and Buildings. There, we did well during the first half. We've announced <<inaudible>> for 2030. We remain well on track. We're progressing one step at a time. And my colleague, Martin Zwyssig, will give you the details on what's happening there. This improvement came about thanks to very strict financial discipline, but also to good projects, particularly regarding project management, hospital planning. Hospital planning is a huge market, especially in Germany. There, we have -- we were able -- we managed to be awarded the second construction phase of Bonn University Hospital. We're also active in data centers with Building Solutions in Switzerland, but also with engineering in Germany. Several projects are currently underway and we are planning more.
Robert Itschner
executiveOn top of that, the high-voltage transmission system is delivering strong, profitable growth. High investment volumes are feasible in that area, as my colleague Marisa mentioned earlier. We're in a good position. And in this space, we've managed to reach some milestones — notably the East Coast line, where 185 kilometers of high-voltage lines went in, and our transmission capacity there has doubled. One interesting project that demonstrates our innovative capabilities is work we're doing jointly with BOS: the refurbishment of the Weissenstein Tunnel near Solothurn. There, we brought in an automated drilling robot for the first time. We tested it together, and it allowed us to cut overall cost by roughly 50%. If this project interests you, there are videos available online. Turning to the service business, we also generated additional growth, particularly in Building Solutions — better margins, lower risk. So we're keen to expand within these projects, and we'll also have a number of projects lined up, specifically bolt-on acquisitions. We've completed 2 acquisitions so far this year, with plenty more in the pipeline. Our interest lies in acquiring specific competencies and integrating them into their network, which will back our long-term objectives. That's a brief recap of the last 6 months.
Robert Itschner
executiveAt this point, I'll pass things along to my colleague, who will walk you through the financials.
Martin Zwyssig
executiveThanks a lot, Robert. Good morning from my side as well, and a warm welcome to today's half-year call. As always, I'll walk you through the particulars of the 2026 half-year financial results now. We'll begin with a look at the key figures. BKW AG brought in revenue of CHF 2.2 billion during the first half of 2026. That marks a 3.1% decline versus the prior year. I'll return to the detailed performance when we get to the individual business segments. Let's begin with EBIT. It dropped by CHF 47 million, or 15.1% year-on-year, to CHF 262.7 million. Net profit, in contrast, rose 7% against the previous year, reaching CHF 217.6 million. The reason is the positive contribution from Mühleberg/STENFO, which offset the weaker operating profit. Mühleberg/STENFO's performance showed up in the financial results, which as a consequence went up by CHF 61.5 million versus the previous year. In the prior year, we recorded a loss of CHF 9 million. The operating net profit has been adjusted -- and operating net profit comes to CHF 169.1 million, a decrease of 19.6% compared with the previous year.
Martin Zwyssig
executiveOperating cash flow came in at CHF 122.5 million even with the lower profit. You'll find the details in the commentary on the cash flow statement. Growth is 7%, well above BKW's WACC. And then the equity ratio: it rose to 52.3%, helped by retained earnings and actuarial gains. That's 1.4 percentage points higher than a year earlier. This slide now shows which business segments drive our performance, for total revenue as well as EBIT. Let's start on the left with total revenue. In the Energy Solutions business segment, the decline was CHF 41.3 million. So the drop in consolidated revenue is mainly due to the Energy Solutions business segment. In Power Grid, total revenue was a bit higher, driven by increased transmission volumes. In the power -- in the Infrastructure and Buildings segment, we saw revenue fall CHF 24.6 million year on year because of the focus on profitable business. And in the support functions, the decline comes from last year's sale of BKW's 2/3 stake in cc energie, the customer service and billing provider. On the right-hand side, you see the EBIT bridge, which shows how the Energy Solutions business segment weighed on the group overall.
Martin Zwyssig
executiveWhen you look at EBIT, profit was down CHF 15 million. Basically, the higher hedge prices couldn't make up for weaker trading results and the low production volumes caused by weather. Over at Power Grid, rising costs pushed EBIT a bit lower, while Infrastructure and Buildings, even with revenue declining, still raised its profit by CHF 3.9 million versus the prior year. On this -- moving to the next slide, I'll go through each business segment in more detail: Energy Solutions, Power Grid and Infrastructure and Buildings. Energy Solutions is the first segment shown here. Revenue for this segment dropped 4.2%, or CHF 41.3 million, coming in at CHF 950.7 million. Those higher hedge prices are helping total revenue. Since lower generation volumes were already a drag on us last year, the low production volumes are the only real significant hit to revenue. What mainly drives this fall in total revenue is the weak energy trading margin. Turning to EBIT, it came to CHF 156.9 million in the first half, which is 24.2% or CHF 50 million under last year's level. The dry weather's impact doesn't really show up year on year, because the first half of 2025 was similarly dry.
Martin Zwyssig
executiveThat said, it played a significant role in the normalized volume that underpinned our planning assumptions. The primary cause of the EBIT decline is the electricity trading business, which during the reporting period faced a tough marketing environment, with prices not being driven by fundamentals, largely because of developments in the Middle East. Such erratic price movements made positioning in trading difficult. And earnings contributions from certain proprietary trading segments were especially hit by this. In contrast, the intraday business kept delivering good returns. In addition, revenue opportunities emerged in intraday trading, especially during the June heat wave. The positive fund performance of Leibstadt/STENFO lifted earnings by CHF 27.7 million versus the same period last year. Let's now briefly look at the generation mix, as you can see on the right-hand side. In the first half year, BKW generated 4.6 terawatt hours of energy, roughly 3% above the prior year. Dry weather caused a further drop in hydroelectric power generation of 0.1 terawatt hours to 1.6 terawatt hours. Output from wind farms and PV plants stayed under pressure owing to poor wind conditions.
Martin Zwyssig
executiveThat 0.2 terawatt-hour gain comes mainly from bringing the Cerignola wind farm online. Output at the nuclear plants where BKW holds a stake, along with the thermal plants, matched last year's level. The next slide puts hydro production and the Leibstadt/STENFO fund performance side by side over several years. Hydro output stands at 1.6 terawatt hours, again under last year's figure — itself a dry year — and beneath the long-term average, so it falls short of what we expected. When the trend is positive, Leibstadt/STENFO's performance works as a reduction in energy procurement costs. At 6.1% in the first half of 2026, that performance came in well above the standard return of 2.8% and cut energy costs by CHF 27.7 million versus the prior year, as I mentioned earlier. A key driver behind trading activities is electricity price volatility. The left-hand curve is one you already know from earlier presentations. It displays how forward volatility has moved, now extended through the first half of 2026, while short-term volatility's trend appears on the right-hand side. Forward volatility makes it possible to generate trading margins on hedging transactions by closely countering forward spreads.
Martin Zwyssig
executiveThat has dropped a lot from its peak in '22, and it accounts for the big fall in trading results we've seen since then. That's not really anything new. Even though this volatility picked up a bit in the first half of '26, the level is still fairly low. And that is putting pressure on the profit contributions coming from longer-term market positions and restricting the chances to realize trading margins. On the other hand, short-term day ahead volatility has climbed steadily since its low point in 2023. It was at 137% in 2025 and went up further, to 152%, in the first half of 2026. This high short-term volatility opened up extra trading opportunities in the first half of the year and lifted earnings from the System Services businesses and intraday trading in particular. But, and this matters too, and I touched on it briefly earlier, if price movements are erratic and aren't driven by fundamentals, that is, if they're not based, for example, on weather forecasts where you can take a position, but instead are driven by social media causing corresponding price movements, then this makes it very challenging, if not impossible, to take a position. And as a result, no trading margin is realized. That was particularly the case in the first quarter of 2026.
Martin Zwyssig
executiveTurning now to Power Grid. Overall revenue went up a little — 3.5%, which works out to CHF 3.5 million, or 1.1%. The reason for that increase in overall revenue is somewhat larger transmission volumes. Grid business EBIT, though, dropped by roughly 1.9%, from CHF 69.3 million down to CHF 68 million. The cause was greater expense for transmitting energy, driven by reduced run-of-the-river generation. We had to source more power from the Swissgrid transmission grid, and that pushed transmission costs up accordingly. On top of that, depreciation and amortization climbed by CHF 3.8 million, reflecting the expanding regulatory asset base that comes from our investment activities. Such costs are part of production cost and will be taken into account in future tariffs. All in all, when it comes to earnings, the Power Grid business segment is highly stable, with only small fluctuations from one year to the next. And now, last of all, the Infrastructure and Building segment — let's begin with revenue. It declined by 2.6%, or CHF 24.7 million, as we kept concentrating on profitable business. On an organic basis, the drop was 2.8%. That was compensated for by modest inorganic growth totaling CHF 2.6 million, or 0.2%. EBIT rose to CHF 34.7 million, which is an increase of CHF 3.9 million versus a year earlier.
Martin Zwyssig
executiveBetter operating results show up as lower operating costs measured against total performance. That gain pushed the EBIT margin up, from 3.2% to 3.7%. One thing to keep in mind is how seasonal results are in this business segment, and as expected, that seasonality is pronounced once more this year. And to repeat what I said in earlier presentations, we can report another half year of continuous operational improvements in the Infrastructure business segment. Let us now shift from the income statement to the cash flow statement. At the reporting date, cash and cash equivalents for the group came to CHF 699.7 million, a decrease of CHF 155 million versus the end of 2025, both blue bars on the slide. Operating cash flows before the use of nuclear provision amount to CHF 168.4 million, which is CHF 43.4 million lower than the previous year. The main reason is the lower operating profit. As in the previous year, additional funds are tied up in the net current assets on a seasonal basis. I will talk about investments in more detail. Investment activity -- the inflow of STENFO covers provisions utilized amounts to CHF 77.4 million, which is high this year relative to the payments of CHF 45.9 million.
Martin Zwyssig
executiveThat should even out. The reason is a one-off payment of CHF 15.4 million stemming from a reassessment of decommissioning costs relating to 2020 and 2021. All in all, that gives us positive free cash flow of CHF 96.6 million for the first half of '26, and at CHF 68 million it is well above last year's CHF 28.6 million. That free cash flow, though, was not enough to cover the dividends paid out, which came to CHF 211.3 million — but this has to be looked at on an annual basis. So in the near term we have mainly tapped our existing liquidity, and that explains why cash and cash equivalents are lower than at the end of December, at CHF 699.7 million, as I mentioned at the start. As announced, let's briefly look at where BKW has been investing. During the first half of '26, capital expenditure on property, plant and equipment, on intangible assets and on acquisitions of group companies came to CHF 209.7 million in total. Of that amount, 49.4% went to growth and CHF 106 million, or 50.6%, to maintenance. Within the Energy Solutions business segment, CHF 56.7 million was invested in growth. Some of that went toward expanding the Cerignola wind farm and developing battery projects.
Martin Zwyssig
executiveWith Volterres, if we could buy a major energy supplier in France, that marks a significant step toward fulfilling our Energy Solutions 2030 project. In Infrastructure and Buildings, we completed small acquisitions, which allows for additional investment in growth and maintenance. And in Power Grid, growth investments went into grid reinforcements and the strategic expansion of the electricity grid. And out of the CHF 106 million spent on maintenance, the bulk — CHF 56.7 million — went to the Power Grid division to upkeep existing grid infrastructure. This overview shows the trend in net debt on the left-hand side and, on the right-hand side, the maturity profile of our outstanding bonds and debentures. Let's begin with net debt. On the left-hand side, you see liquidity bars above the 0 line, as I explained earlier. Here, you see short-term financial assets, which have been included. Financial liabilities stayed stable at around CHF 1.89 billion. And because of declining cash and cash equivalents along with stable financial liabilities, net debt in dark blue rose seasonally by CHF 234.4 million as at the reporting date, reaching roughly the same level as in previous years. On the right-hand side, you see our maturity profile, which is balanced out.
Martin Zwyssig
executiveBack in March, BKW made its first-ever successful placement of green bonds, raising CHF 200 million to fund distribution grid investments. As the chart illustrates, BKW enjoys excellent diversification across the time horizon. That translates into low refinancing risks, considerable flexibility, and matching room for maneuver when it comes to financing future growth. One important factor that isn't reflected in these figures is the syndicated credit facility of CHF 1.5 billion. It acts as an extra liquidity buffer and remains undrawn. The facility matures in 2031. On this slide, you can see a schematic overview of how the balance sheet has been trending. The balance sheet stays stable, with only minor shifts. Current assets dropped by CHF 0.2 billion, driven by lower cash and cash equivalents, receivables, and short-term financial assets. Fixed assets, by contrast, rose by CHF 0.1 billion, largely because of ongoing investment activities. Loans borrowings declined by a total of CHF 0.2 billion, and outstanding bonds were reclassified between current and noncurrent borrowings according to their remaining maturity. Equity grew by CHF 0.1 million. The main drivers behind the strengthening of our equity are, first and foremost, the net profit generated of CHF 217.6 million, and additionally, actuarial gains of CHF 39.3 million from the valuation of employee pension provisions, which strengthen equity.
Martin Zwyssig
executiveDividends totaling CHF 211.3 million that were distributed during the half — the first half year — are charged against equity. The equity ratio keeps climbing, up 0.8 percentage points to 53%, and that provides a foundation for additional growth while allowing us to keep taking an active part in shaping the energy transition. Lastly, a few words about return on capital employed, ROCE, and net debt to EBITDA. ROCE is at 7%, and that is well above BKW's cost of capital — apart from the record year '22 — and it remains very stable. On the right-hand side you can see the net debt-to-EBITDA ratio, which has stabilized at a level a little above 1. That brings me to the end of my comments. I'll hand back to Robert Itschner for the outlook. Many thanks for your attention.
Robert Itschner
executiveThanks a lot, Martin. Let me take a brief moment to walk through our strategy, especially when it comes to market potentials, which are still looking very positive. Our understanding of our market segments is stronger than it was in 2024. We've come to see that the potential is actually even greater when you consider midterm growth. Rather than drowning you in numbers, I'll simply highlight a handful. The investment required for electricity in Germany through 2040 comes to somewhere between CHF 600 billion and CHF 630 billion. Switzerland adds a further CHF 40 billion to CHF 50 billion — those are big figures. Turning to infrastructure, especially across the EU, the investment needs we see are immense, and that's particularly true in Germany. More than CHF 50 billion will need to go into schools and hospitals by 2030. Motorway bridges are a major issue. In Germany, they require refurbishment, and roughly 8,000 of them will need to be refurbished. What these data tell us is that plenty of potential exists. The market is there. BKW has numerous opportunities, and we intend to seize them in order to grow profitably. As for how our strategy is being implemented, I'd like to walk you through our investment program.
Robert Itschner
executiveWe've already committed roughly CHF 4 billion, which is over 60%. That's what the blue bar represents. CHF 1.8 billion has gone to projects that will be carried out over the next several months, and CHF 1.6 billion will still need to be allocated in line with our earlier plans. At this point, I want to make clear that we won't make investment decisions simply for the sake of making them. Our investments go only to profitable projects, and that holds true across every one of our business segments. What this chart doesn't show is our investment in the Oberhasli power plants. A further CHF 200 million is expected by 2030. This demonstrates that we're in a good position. You can see it in the feedback we get. We're achieving enormous progress. More than 50% has been allocated in Energy Solutions. That reflects our extremely strict capital discipline. It's just 50%, no more. Still, we believe our pipeline is very strong, and we'll keep developing it further, and we intend to bring upcoming projects to realization. I've already talked about Power Grid. The planning situation there is very good. Everything is planned through 2030. Naturally, things are easier within a regulated system. When it comes to infrastructure and buildings, we continuously develop our pipeline for future investments.
Robert Itschner
executiveThis cycle is shorter than what you see in the energy business here. But in short, we're very much on track, and we will carry out every one of the investments that will contribute to our 2030 strategy. That takes me to the close of my presentation and to my conclusion. BKW's financial situation is sound. Our position in the market looks good. Markets keep offering substantial opportunities for profitable growth. And during the first half of the year, we reached important milestones in implementing our 2030 strategy, and we are on track with the investment we planned, as I explained earlier, when I gave you some examples. With that in mind, we believe we will keep delivering profitable growth in attractive markets. As for the remainder of 2026, for Energy Solutions, Infrastructure & Buildings, we expect significantly stronger performance, while Power Grid should perform steadily, in line with our expectations. With that in mind, we anticipate EBIT for the full year '26 will land at the lower end of the CHF 650 million to CHF 750 million range announced at the beginning of the year.
Marisa Fetzer
executiveI want to thank Robert and Martin for walking us through the half-year results for 2026. With that, we move into Q&A. Ladies and gentlemen, it's time for your questions. Some have already come in. We'll begin with the first one, which was submitted by <<inaudible>> from UBS. It was asked in English. The question is: how much of the H1 shortfall in Energy earnings within Energy Solutions stemmed from the temporary market disruptions related to the Middle East? And how far have those effects normalized in Q3 so far? I'll hand that over to our CFO.
Martin Zwyssig
executiveSo the big amounts, especially those that showed up during the opening months of the first half, stem from what happened in the Middle East. A lot of these charges that hurt our results came from what took place in Q1. That didn't settle down during Q2 — and by Q3, we had already seen in April that trading results had normalized and were back at or even above planned figures.
Robert Itschner
executiveA portion of the decline we saw in Q1 came from valuation effects. There's a fair value rate that's going to get adjusted down the road. So that's why we described it as temporary — that's the word we chose in the press release.
Marisa Fetzer
executiveThanks a lot for that reply. Another question from <<inaudible>>. In Energy Solutions, BKW has brought in additional resources within its trading division for volatility in 2026, should results come in lower. What is going to change in the second half of 2026? Why? That's the first part of your question. And the second one is, why aren't you growing electricity capacity more quickly in Europe, given that electricity demand has begun to accelerate and the outlook is positive. I'd like to hand that question over to our CEO.
Robert Itschner
executiveOkay, so there are 2 things in the second half of the year. We've been looking to strengthen our capacities. We've seen a change there because of the drought. In the second half year, we think there's good potential, and we'll be able to produce good results. Second, as I mentioned earlier, there is this temporary effect from the assessment of our positions, which will largely be corrected — I think these are the two items in the trading area that make us — that lead us to believe we'll close that gap. When it comes to expanding our production portfolio, I already gave you some information about that. It's the fact that energy demand is rising significantly. We do believe, though, that we need to examine closely the investments we want to make. There are some very unrealistic prices and price expectations in the market. So we are carefully selecting our choices. With Cerignola, we've demonstrated that we can make very good decisions. This wind park is a very promising investment, and we intend to strengthen profitable investments in energy production.
Marisa Fetzer
executiveThanks a lot. Emanuele Oggioni from Kepler Cheuvreux has 4 partial questions. Since they can't all fit into a single context, I'll ask them one at a time. First one: could you go into more detail on how trading broke down across the different moving parts, given that ancillary services and intraday trading benefited from elevated short-term volatility, yet that wasn't enough to offset the other parts?
Martin Zwyssig
executiveOkay, let me begin. I won't be giving a breakdown of the results. Still, one point regarding System Services where volumes are concerned: on an annual basis, we generate between CHF 80 million and CHF 100 million. We examine things half year by half year, and we believe that — what we see is that our results doubled. That said, profits from services are unable to offset trading results.
Marisa Fetzer
executiveThe second question comes from Emanuele Oggioni, and it concerns hydro production. Year-on-year, hydro production came in just 0.1 terawatt-hours lower. How do you expect the second half of 2026 to compare with 2025?
Robert Itschner
executiveSo first off, what we're doing is comparing a very dry year, and actually an even drier one, against a dry year last year. We had been expecting things to look different. Our calculations rely on long-term rainfall averages, and at year-end we always review the rainfall figures in order to plan for the following year. And here, the comparison is with extremely dry years. Consequently, the weather — well, there I'm not able to make any predictions — but the volumes for filling the lakes are very low. If you look at BFE data, you'll see they're very low in the canton of Grisons. In Valais, volumes are around average. And in other places, we're well below the averages. That gives an indication of what can be expected next year, and it has an effect on our planning. The Oberhasli power plant has good results because the heat has caused glaciers to melt. Naturally, we need more rain, a great deal more rain. We calculate on the basis of statistical averages. But naturally, we are now factoring the filling volumes into our planning for the years ahead.
Marisa Fetzer
executiveThe following question is about Grimsel 4, so we'll stay on hydro production. Can you give us additional detail on what EBITDA contribution Grimsel 4 is expected to make? And when should that EBITDA contribution be expected?
Robert Itschner
executiveActually, Grimsel 4 won’t be hooked up to the grid until ’31. From that year onward, we’re budgeting for a 2-figure EBITDA contribution. So that’s a really positive step. Of course, we won’t be releasing detailed figures, but we are including a 2-figure EBITDA contribution in our assumptions.
Marisa Fetzer
executiveThanks a lot. Our final partial question comes from Emanuele Oggioni. Can you give us an update on hedging for 2029?
Martin Zwyssig
executiveYes, that's possible. You might recall our comment that we shifted away from a rigid hedging approach at the start of the year, when we hedge production three years out within a brief window, and that framework has stayed in place. Not all of 2029 is hedged. Some positions remain open, and that's deliberate, so at this moment we aren't able to give you the precise average price. Thank you very much.
Marisa Fetzer
executiveThanks a lot, Martin. We have another question coming in from UBS — from Alexandra Bossert specifically. I believe we've already covered this. Let me read the question out. Could you share something about how the very dry summer affected the first half year, and what we expect for the second half year figures? Robert already mentioned that predicting the weather isn't possible, but maybe you'd like to add something?
Martin Zwyssig
executiveNot really — I’d just note that the dry weather also meant we got very little wind. We think, and we’re hoping, that the weather will shift and bring more wind. That should give our wind production a boost. We hope conditions return to normal.
Marisa Fetzer
executiveWe’re certainly hoping for a wet and blustery fall—that’s exactly what we’d like to see. Thanks so much, Robert. Another question has come in from <<inaudible>>, and it asks whether you can update us on how the dams stand following the extended drought. Will that keep weighing on the second half of the year? Do you think bottlenecks could emerge there? And is there anything you can share about the Middle East?
Robert Itschner
executiveAs I mentioned, the fill levels differ. The large hydro assets sit in the canton of Valais and the canton of Bern, as we know. Conditions there don't appear too severe. In the canton of Grisons, the fill levels are very low, and we have sizable facilities there, but the picture could shift fast with additional rain over the next few weeks. On your second question, the Middle East and what's happening there: we don't think the situation will normalize anytime soon. And naturally, that will influence gas prices, especially over the mid and long term, though that could change. At present, we believe things won't change rapidly.
Marisa Fetzer
executiveThank you very much. Let's move on to the next question. We have <<inaudible>> from Montel. He has one question regarding Energy Solutions in the second half year. Do you believe figures are going to be more positive in the second half year? Why do you believe that is going to be so? The geopolitical situation continues to be very dynamic. And can you tell us anything about the hydro development in the second half year? I think that's what many people are interested in. So this question goes to the 2 of you.
Robert Itschner
executiveI think I've already covered the trading results. Maybe you'd like to respond?
Martin Zwyssig
executiveOkay, so on one hand we do have negative assessment effects. During the second half year, as we're all aware, some improvement was anticipated in that area. Those assessments are going to be corrected, in our view, and we'll get back on track in the second half year. As I mentioned earlier, certain positions are clearly plannable. And looking ahead, that gives us confidence that development will be positive in the second half year. That's the reason we relied on those planned data and positive figures for the second half year.
Marisa Fetzer
executiveAlright, let's move on now to Infrastructure & Buildings. We have one question from <<inaudible>>. First thing they're asking: which areas aren't performing well?
Robert Itschner
executiveWe keep getting better across the board. Honestly, I couldn't point to a single particular area that's underperforming. Naturally, plenty of challenges exist, which is to be expected. Still, one point worth mentioning is that Switzerland's infrastructure isn't being built out as quickly as it ought to be, considering what the energy transition requires. That said, our market position is strong, and our operational results keep improving. On the whole, I'd say not every place is performing the way we'd hope, yet we are constantly getting better. Thank you very much.
Marisa Fetzer
executiveThere's another question from <<inaudible>> that we've partly addressed already. Let's keep the focus on Infrastructure and Buildings. Two questions we have relate to the target of 8% profitability by 2030. The question now is that many objectives have been confirmed. Does that also apply to the 8% by 2030?
Robert Itschner
executiveYeah, that’s what we’re aiming for. We think that if the steps we’ve put in place across the last 2 to 3 years start paying off, we can drive growth even further. And we can also — provided we’re able to lift profitability within our portfolio, those 8% are within reach. Thanks a lot.
Marisa Fetzer
executiveunintelligible asks about investments that haven't been allocated yet. Robert, you spoke about what's already been allocated. The question is, for the CHF 3 billion of unallocated investments, how many concrete projects are there? Considering construction takes multiple years, can those really help toward the 2030 EBIT target? If investment ends up significantly lower by 2030, would you still be able to hit the CHF 850 million EBIT target by 2030? Robert?
Robert Itschner
executiveWell, we've mentioned that CHF 7 million has already gone in, with over CHF 8 million now committed to projects. So I'm not sure what the CHF 3 billion refers to. There's CHF 1.6 billion that still has to be allocated. That's obviously a challenge in itself, but we're confident we can get it done. We're confident we'll identify solid potential investments. Depending on the technology, projects naturally take quite a while to implement. We're aware of that. Still, we have some strong projects — the Waltrop battery storage facility, for instance — and it will soon start adding to EBIT. And we're confident we'll balance our portfolio in a way that lets new projects add — that new projects will add to profitability.
Marisa Fetzer
executiveLaura Bucher from Octavian AG has a question. It concerns the EBIT we expect for Energy Solutions during the second half year. She also has one more question. Regarding the pickup in energy EBIT in H2, just to confirm, are you factoring in any tailwind from the central fund? Or are you assuming a normalized 2.8 performance?
Martin Zwyssig
executiveWe go about this in a very methodical way, since we can't predict how the -- how the stocks will evolve. We examine the performance delivered in the first half year, and after that we work it out using standard term profit -- using standard returns. So the normalized planned return for the second half year is based on the first half year's figures.
Marisa Fetzer
executiveWe’ll move on to the following question from Rene Rückert at Baader Bank once more. How much extra revenue should be anticipated from the Waltrop battery project, and what impact on EBIT do you expect after that project is fully implemented?
Robert Itschner
executiveSo, what matters with battery projects is flexibility, and the EBIT impact from them is really significant. Revenue isn't all that relevant, since the goal is to put electricity into the grid at times when prices are favorable. So it isn't about energy volumes—it's about feeding power into the grid when that makes sense. Exact figures won't be published by us, but they will land in the 2-digit million range.
Marisa Fetzer
executiveThanks a lot, Robert. I think we'll take 3 to 4 more questions, and after that we'll wrap up the Q&A. Let me begin with the next one, from Patrick <<inaudible>> at IFS AG. It concerns intraday volatility. And earnings in the balancing energy market as of '29, 2030. How will those develop if every planned battery storage plant gets implemented?
Robert Itschner
executiveThat's a really good question. Naturally, the market situation will keep shifting and evolving. We think those battery facilities we mentioned put us in a very strong position. That said, there are plenty of plans out there to expand renewables. So flexibility is going to be needed down the road. We don't see ourselves putting money into assets that won't deliver the returns we're expecting. Our facilities are very good, and so are our plants and projects. I'm not referring to what competitors have planned — I mean our own projects specifically.
Marisa Fetzer
executivePeter, a tax adviser, is asking: you've already sold the bulk of your electricity for 2026. Are you able to supply that from your own power plants, or do you need to purchase it from third-party providers?
Robert Itschner
executiveSo, when we have customer agreements in place and our own capacity isn't enough, we end up having to purchase electricity. Naturally, that hurts our business. We steer clear of it whenever possible, but sometimes that's just how it is. We always honor the promises we've made to our customers.
Marisa Fetzer
executiveWe’ve got time for one final question in this Q&A. A lot of questions are still coming in. Thanks so much for your interest. We’ll respond to your questions. We’ll get in touch with you. The last question we’ll take here comes from Andreas Schneller at de Pury Pictet Turrettini. What about expanding hydropower in Switzerland? Trift—I’m thinking about Trift and raising dam walls. What about nuclear energy and the decommissioning of Mühleberg?
Robert Itschner
executiveWe're confident that expansion of the Trift and Grimsel walls will get underway next year. Some final choices remain to be made, and approvals still have to come through. Even so, I think support for those projects is substantial, given how the energy situation in Switzerland stands at present, and that we will carry them out. That said, I don't expect the impact to show before 2030. On the Mühleberg power plant, we're well on track. As everyone knows, the fuel rods were put into storage a while back. The dismantling phase now has to be finished by 2032. By next year at the latest, we will put together a utilization plan. We have an idea involving battery storage. I believe we're well on track. If that interests you, please read the article published at NZZ last week. That article lays out the current situation in great detail.
Marisa Fetzer
executiveMuch appreciated, Robert. Thanks for all the detail you supplied. And thank you to our participants as well for posing their questions. Anything that hasn't been answered at this moment will get a direct response. We'll be in touch with you. So, ahead of wrapping up today's analyst media conference, I'd like to point out a few events coming up. On Tuesday, 10th of November 2026, a 9-month business update call is going to be held. This marks the first time it takes place this year, and the aim is greater transparency with the capital markets in the stretch between the half year and annual results. As for the presentation of the next half year results, that will be held in Zurich in March. That takes us to the conclusion of this event. Many thanks once more for taking part. We're looking forward to having you with us again on Tuesday, 10th November '26 for the 9-month business update call. Thank you. Enjoy a lovely autumn and see you soon.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete BKW AG transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to BKW AG earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in BKW AG or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.