Boralex Inc. (BLX) Earnings Call Transcript & Summary

February 27, 2026

Toronto Stock Exchange CA Utilities Independent Power and Renewable Electricity Producers earnings 40 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and thank you for joining Boralex's conference call on the financial results for the fourth quarter of 2025. I'd like to point out that every line has been placed in listen-only mode. After the presentation, there will be a question-and-answer session, and during it, financial analysts, shareholders, and investors will be invited to pose their questions. To register a question, press *1 1 and then wait until your name is announced. Please be aware as well that this conference is being recorded. If you are joining via webcast, you may also submit questions during the conference by entering them in the question box and clicking submit, though those will be answered by email once the call has ended. Lastly, members of the media are welcome to reach out to Camille Laventure, Senior Advisor, Public Affairs and External Communications at Boralex. You'll find her contact details at the end of the quarterly press release. At this point, I'd like to hand the call over to Coline Du Saussois, Director, Investor Relations for Boralex. Please go ahead.

Coline Desurmont

executive
#2

Thanks, operator. Morning, everyone. Pleased to have you with us for Boralex's call covering fourth-quarter and full-year results. Joining us today, Patrick Decostre, President and Chief Executive Officer, will walk through how the business is doing. After that, Stéphane Milot, Executive Vice President and Interim Chief Financial Officer, will take you through the quarter's financial highlights. Following that, we'll open things up for your questions. On this call, we'll touch on both historical and forward-looking information. In discussing the future, various risk factors apply — these have been set out in our various filings and could materially alter our estimated results. All of those documents can be consulted on SEDAR. Mr. Decostre will begin with his remarks. Over to you, Patrick.

Patrick Decostre

executive
#3

Thanks, Coline, and good morning, everyone. Appreciate you being with us today. It's a pleasure to walk you through our results and key achievements for the fourth quarter and fiscal year 2025. For Boralex, 2025 was a year of strong execution, even with more quarterly volatility in resource generation and an unfavorable year-over-year pricing comparison in France. We stayed disciplined in our approach, kept our focus on the long-term strategy, and went on delivering sustainable growth while strengthening our leadership in renewable energy. We were very active in the fall, submitting projects in four different RFPs: two in Ontario, one in New York State, and one in the UK. Demand for renewable remains very solid across our different markets, and we're counting on a very strong pipeline of projects to benefit from for years to come. These results reflect not only the strength and commitment of our talented teams across the organization, but also the resilience of our business model and our strong focus on creating long-term value for our shareholders and partners. On financial performance, for fiscal year 2025, total combined production came in 8% higher than in 2024, but 10% below anticipated production. Wind conditions in 2025 improved compared to last year throughout North America, and the commissioning of new projects provided a significant advantage.

Patrick Decostre

executive
#4

But wind resources across France and the U.S. generally came in under what we had projected. Consequently, our 2025 financial results trail our targets—combined operating income of 248 million CAD and combined EBITDA of 655 million CAD, a 2% decline versus 2024. Higher output did not fully counter the drag from softer selling prices in France, which came in as anticipated because of reduced pricing on our short-term contract. Stéphane will walk you through our fourth-quarter results in greater detail later. Turning to development, 2025 proved a strong year for Boralex, with our pipeline of development projects and growth trajectory now above 8.2 GW. Installed capacity sits at 3.8 GW, up 615 MW, all of it from organic growth. Over the year, the company moved into a new phase as we launched our 2030 strategic plan, drawing on the solid base built across many years and charting a clear course toward lasting long-term success. Since that launch, we have advanced considerably across our four key markets. In the U.K., bringing Limekiln Wind Farm into service shows our expansion in that promising market. We also strengthened our position by securing ministerial approval for the 189 MW Clashindarroch Extension, which bundles wind and battery storage, and through the recent CFD award for the 44 MW Sallachy Wind Farm under the AR7 process.

Patrick Decostre

executive
#5

Now turning to France, where our leading position has been strengthened by bringing two wind farms online — Fontaine-le-Bouillon and Fépin-Palifart — which together add up to 29 MW. On top of that, Boralex came out on top by cumulative capacity in the latest French wind auction, winning two projects whose combined capacity reaches 125 MW. Over in the US, we have signed a pair of contracts with NYSERDA covering the Fort Covington and Two Rivers solar projects, which total 450 MW. Within the year, both of those projects have moved ahead to the secured stage. Turning to how things stand in Canada, bringing our Apuiat Wind Farm into service represents a significant step along Quebec's renewable energy path. We are likewise pressing ahead with construction on two major wind projects: Des Neiges-Sud, for which we locked in financing earlier this year, and, most recently, Des Neiges-Charlevoix. Lastly, a major milestone was achieved through the successful rollout of battery energy storage technology. During this quarter, we commissioned the San Dionisio battery energy storage system — Boralex's first storage project in North America to enter operation, built together with the Walpole Island First Nation. The Hagersville battery energy storage project likewise started operating in Q4 2025, and we are delighted to report the site's commercial commissioning, since yesterday we received retroactive confirmation from ISO, effective February 18.

Patrick Decostre

executive
#6

This project stands as Canada's biggest battery storage facility, and we built it alongside the Six Nations of the Grand River First Nations. Combined, these two projects bring 380 MW into our installed capacity, which makes us the biggest battery storage operator in Canada. They also underscore how quickly our storage business is growing in Ontario and how our portfolio keeps diversifying—both by technology and by revenue type. Both projects show how well our team executes and how we can successfully scale new technologies in new regions. On the market side, Quebec keeps building strong momentum in renewable energy. Hydro-Québec has confirmed it will open a new wind power tender call in spring 2026 for southern Quebec, and earlier this week it launched a call for partners for its major development zone. Given our sustained presence and ongoing development work in that market, we are well positioned to seize these upcoming opportunities. Federally, Ottawa has brought in a 25% global tariff on certain steel-derived products, wind turbine towers among them, and it has also tightened import quotas. Partial exemptions have been granted, and more carve-outs could come, especially for projects already contracted or currently under procurement.

Patrick Decostre

executive
#7

In the U.S., the NYSERDA 20 2025 tender process wrapped up in December, and we should have results soon. NYSERDA also received broader authority to procure as much as 5.6 TWh annually by 2029, which points to ongoing policy backing and long-term renewable demand in New York State. Turning to France, following a stretch of uncertainty, the third pluriannual energy plan came out in February 2026 and at last establishes the nation's energy trajectory through 20 2035. Its goal is to raise decarbonized energy's share of final consumption to roughly 60% by 2030, backed by a combination of renewables and nuclear generation. That framework additionally confirms that renewable tenders will restart beginning in 2026. Let me now quickly walk through the key variances in our development project portfolio and growth path. Our early, mid, and advanced-stage project portfolio now stands at 7.2 GW. This shift stemmed largely from adding early and mid-stage projects amounting to 1,383 MW, partially offset by projects moving into the secured stage and by other projects being discontinued or sold. The growth path is now made up of 1.1 GW of wind, solar, and battery storage projects. Changes to the growth path involved adding new secured-stage projects, among them the Fort Covington and Two Rivers solar projects totaling 450 MW along with the 125 MW Oxford BESS project.

Patrick Decostre

executive
#8

That gain was partly offset by the fact that six projects began operating over the course of the year, adding 615 MW that came into service. As it embarks on its new strategic plan, Boralex is positioned extremely well to achieve robust organic growth ahead across every one of its targeted markets. Before I pass things to Stéphane, I'd like to comment briefly on this morning's announcement that Philippe Bonin is becoming our new CFO. It's a real pleasure to have Philippe join the Boralex team. He brings wide-ranging leadership experience gained at large companies across a variety of sectors, along with a strong strategic mindset, which will be essential in supporting our 2030 growth ambitions. We look forward to what he will contribute as we keep evolving Boralex to deliver on our key objective. I'd also like to sincerely thank Stéphane Milot for the outstanding work he did during the interim period. His dedication and his deep knowledge of our business have been invaluable throughout this transition. On a more personal note, Stéphane, I want to say how grateful I am to be working with you. Your leadership — truly compassionate and people-centered — has made a meaningful impact here at Boralex. You are highly appreciated across the whole company, and we are very fortunate to have your continued support and great spirit, well beyond the scope of your responsibilities.

Patrick Decostre

executive
#9

Thanks, Stéphane. Merci.

Stéphane Milot

executive
#10

Hey there, everyone, and thanks, Patrick, for the nice remarks. This has been a wonderful opportunity — plenty of hard work, but honestly plenty of enjoyment too, I can tell you. I really value it, and I'm eager to keep moving forward on this journey with all of you. A special thank-you goes out to our finance folks at Corporate, North America, and Europe. You all are amazing. What a six months we've just shared — you truly made the difference. Thank you. So, turning to the quarter: total combined production rose 17 17% versus the same quarter a year earlier, fueled by more favorable wind conditions, coughing, and the effect of newly commissioned sites across Europe and North America. Even so, production came in 7% below what we had anticipated, owing to unfavorable weather in North America and, to a lesser degree, Europe. Combined EBITDA reached $200 and $203 million, an increase of $12 million, while consolidated discretionary cash flows totaled $56 million, up $9 million relative to the fourth quarter of 2024. Better wind conditions and the contribution of newly sites in Europe and Canada gave the financial results a positive push, partly offset by lower prices on short-term contracts in France. Now I'll give you a more detailed look at our quarterly production.

Stéphane Milot

executive
#11

For North America overall, combined output during the quarter ran 5% above the same period a year earlier, yet it fell 9% short of what we had projected. Wind generation in North America rose 9% versus the comparable quarter of last year. That said, it landed 6% under our expectations, largely because US wind farms contributed less. Hydro production dropped 23% year over year and missed forecasts by 30%, chiefly on account of adverse weather throughout North America. Solar output in the United States declined 9% relative to the same quarter last year and came in 5% below what we anticipated. Turning to Europe, total generation was up 40% against the same quarter a year ago, though it was 4% under expectations. On the balance sheet side, available liquidity plus authorized financing reached $681 million as of December 31, 2025, which is $158 million more than on December 31st of last year. Total debt came to $4.4 billion, and project debt made up 85% of that figure. Once more, I want to congratulate our finance team for delivering particularly strong results this year—securing $1 billion in project financing and closing $250 million in corporate financing jointly led by la Caisse and Fonds d'action in Quebec.

Stéphane Milot

executive
#12

These accomplishments really show how we can put together complex financings on the best possible terms, which boosts our financial flexibility and puts us in a strong position to hit our 2030 objectives. And finally, this year mattered a great deal on the CSR side. In the yearly Best 50 Corporate Citizens list from Corporate Knights, Boralex came in first, which shows our sustainability leadership among Canadian companies. We also picked up other honors this year, including an award given to Boralex France for its diversity efforts, and the prize that the Canadian Renewable Energy Association gave the Hagersville battery energy storage project as the innovative Canadian clean energy project of the year. What all of this shows is that Boralex can bring together performance, innovation, and a lasting positive impact in the communities where we work. If you'd like more detail, I'd encourage you to read our 2025 CSR report, which came out earlier this morning, along with all the other annual documents that were released. To wrap up, 2025 was a successful year for Boralex, with the launch of our new strategic plan, backed by the commissioning of large-scale projects in our key markets. As we look forward, we're very excited about the years ahead, and we'll keep working to execute on our projects.

Stéphane Milot

executive
#13

We've been taking part in some recent tender rounds in Ontario and New York State, and at the same time we've been methodically getting ready for the 2026 wind power tender that Hydro-Québec has announced. With demand for renewable energy holding strong, Boralex keeps expanding in a way that's disciplined but ambitious, supported by a renewable team that's fully engaged and dedicated to carrying out our strategic plan and hitting our growth targets. Thanks for listening. We're ready now to take your questions. Yeah.

Operator

operator
#14

Thank you. Just a reminder: if you'd like to ask a question, dial *1 1 on your phone and hold for your name to be announced. Should you need to pull your question, press *1 1 once more. So again, that's *1 1 to submit a question, and *1 1 once more if you want to withdraw it. For those who prefer to ask through the webcast, simply type your questions into the question box and hit submit. Thank you. We'll now move on to our first question. It's coming from Baltej Sidhu at National Bank of Canada. Go ahead with your question.

Baltej Sidhu

analyst
#15

Morning, everyone.

Patrick Decostre

executive
#16

Hi there, Baltej.

Baltej Sidhu

analyst
#17

I'm eager to keep collaborating with you, Stéphane. I have just a handful of questions. Regarding the French wind assets coming off contract, I believe the French government indicated it will concentrate on repowering existing wind farms in order to boost capacity and safeguard the environment, and we think that will work in your portfolio's favor. Could you give us some insight into how we ought to view your French portfolio in that context, and what you've pinpointed for repowering? I'm aware you have Ally-Mercœur as well as Grand Camp, but is there anything more you can share?

Patrick Decostre

executive
#18

Sure. In fact, the government is coughing—looking at this to help, let's say, with social acceptability of projects and to make them easier to get authorized. Our team, we've had a repowering strategy since before the 2022 crisis, and we postponed it a bit because prices were so high that it was interesting to capture that value up to 2025. Meanwhile, the team has worked on roughly 450 MW of new repowering projects that will increase—within this 450, there's 200 of new capacity. That means we've taken 250 MW of projects in operation, and we've worked to obtain authorization on these projects. Half of these projects are already authorized, and we'll be ready to bid them in the next RFP when they come. Typically, the Ally-Mercœur project is both a repowering and an extension of a project we put in service 21 years ago. I was 21 years younger at that time, and so were you, in France, of 39 MW, and now it's a 104 MW project that will be put in service in 2028. This is typically an advantage, as you mentioned, for Boralex going forward.

Stéphane Milot

executive
#19

Perhaps just one thing regarding that megawatt figure Patrick brought up. Over roughly the coming five years, I'd say, it's going to be bid into forthcoming RFPs. That's all I wanted to note.

Patrick Decostre

executive
#20

Yes. Obviously, from a return standpoint, this is also a favorable situation. We're developing where we already are. Thanks to the situation in the US, I'd say, there's somewhat more pressure on turbine pricing globally. As you've seen, we're able to lock in a good price in France—roughly €86/MWh in the latest tender—and turbine prices are being held down. These are good returns that we'll need to deliver on with these projects.

Baltej Sidhu

analyst
#21

Great, that's really helpful detail. Staying with France, let's turn to the pricing side of things. On the merchant and recontracting prices you mentioned, are those coming in where you expected? And how should we think about the pace at which those assets get recontracted as they roll off those short-term contracts?

Patrick Decostre

executive
#22

Basically, in France, we follow a policy we refer to as the rolling hedging path. Each year we set the price ahead of time, going as far as 3 years in advance, and the share that gets hedged rises the nearer you get to the gate closure for the prior year. That's precisely what we do. You need to realize that our team is in the market on this at all times. These are always pay-as-produced contracts as well. We aren't making any volume commitment on that. They're weighing it against the option of going with a brownfield PPA too. You understand that 250 MW of projects to be repowered over the coming years belongs to this portfolio of projects that are merchant today, since that was the contract we terminated early in 2022. That gives this project another route to be expanded and to lock in a 20-year contract with EDF once more.

Stéphane Milot

executive
#23

Given where things stand right now, the EDF contract is definitely the priority — that's what we'll use to bid on these projects. As Patrick said, this applies specifically to those assets whose contracts we exited. We earned a great deal over the last few years, so moving the repowering ahead was a sound call.

Baltej Sidhu

analyst
#24

Thanks. One last item from me: can you update us on the two US solar farms — Fort Covington and Two Rivers — that I believe have contracts locked in, the ones Patrick mentioned during the prepared remarks? What conditions have to be met before those two projects can move toward FID, and is there any sense of timing — any details you can share on that?

Patrick Decostre

executive
#25

Right. Basically, for these projects, what we're doing is working toward finalizing the investment decision — meaning we're wrapping up negotiations with the module suppliers, wrapping up negotiations with the BOP supplier, and doing engineering at the same time so we can optimize them. The team is putting in hard work on this, and yes, we'll share information once we're ready to make that investment decision.

Baltej Sidhu

analyst
#26

Excellent. Thanks very much. With that, I’ll hand things over. Appreciate it.

Patrick Decostre

executive
#27

I appreciate it.

Stéphane Milot

executive
#28

Thanks, Baltej.

Operator

operator
#29

We'll move along now to the following question, which is coming to us from Sean Steuart at TD Cowen. Go ahead with your question.

Sean Steuart

analyst
#30

Thanks. Morning, all. I have a few questions.

Patrick Decostre

executive
#31

Hello there, Sean.

Sean Steuart

analyst
#32

Patrick, I was hoping you could share some perspective on the wind tender Hydro-Québec has coming up — whether that means partnering with them on larger-scale projects or moving your own projects forward. Could you give us a sense of the magnitude you expect to participate in, or at least submit into that tender, and what you expect on timing, or any clarity on timing, when it comes to awards for that tender?

Patrick Decostre

executive
#33

There are a couple of points. One concerns large-scale projects, and Hydro-Québec has launched a partnership selection process in one area, which is called Wôlinak. Boralex satisfies every one of the minimum eligibility criteria for that selection. Since we have been a partner of Hydro-Québec for years, we know our communication with them is good. We know how to collaborate with them. Right now our team is reviewing all the RFP requirements, the government structure, and how we can engage on this with them. This is a partnership involving Hydro-Québec, Alliance de l'Est, and an IPP, and it confirms what Hydro-Québec stated 2 years ago — that for the large project, they would proceed with IPP. That, I think, is good news, because I know there was question in the market about this; it confirms what we have been saying and what Hydro-Québec has said for the last 2 years, that there will be a role for IPPs there, so that's one thing. The other point is that they mention there will be a consultation for a call for tender for a project of a minimum of 150 MW in southern Quebec. This is typically aligned with Boralex's development footprint and experience and the relationship we have with indigenous community.

Patrick Decostre

executive
#34

The consultation is taking place right now. Bids have to be submitted by February '27, with the award planned for August '27, which is next year. Once again, this would be a long-term contract — a very classic kind of project in Quebec for Boralex — and we will be participating in the bidding.

Sean Steuart

analyst
#35

Alright, thanks for that detail. So maybe a question for Stéphane. As you’re working to move more projects into the secured development pipeline, could you comment on the funding platform, and any thoughts toward incremental asset recycling or refinancing initiatives that you might have in your thinking as you look to bolster liquidity?

Stéphane Milot

executive
#36

Yeah, that's very much in line with the plan we laid out last June. Asset recycling isn't necessarily something for the near term, but it is part of the plan. And as you've seen with the debt involving la Caisse and Fonds d'action, corporate debt, asset recycling, and possible refinancing — we're working on a big one in France, and we're always looking at other opportunities to secure better terms or more flexibility when it comes to financing. Pretty much consistent with the plan.

Sean Steuart

analyst
#37

Alright, that's it from me at this point. Thank you so much.

Stéphane Milot

executive
#38

I appreciate that.

Patrick Decostre

executive
#39

Thanks, Sean.

Operator

operator
#40

Just a quick reminder — if you'd like to ask a question, hit *1 1 on your phone and hold on until your name is called. Should you need to take your question back, just press *1 1 once more. For those who'd rather submit questions through the webcast, go ahead and enter them into the question box, then hit submit. At this point we'll move on to the next question, which is coming from Nelson Ng of RBC Capital Markets. Please go ahead with your question.

Nelson Ng

analyst
#41

Great, thank you. Morning, everyone. My first question is about Hagersville — congratulations on getting that project commissioned. I just want to clarify something: given that it had been operating since December but was only commissioned last week, will that project contribute financially for a full quarter in Q1?

Stéphane Milot

executive
#42

During Q4 we saw a small amount of revenue, though it will begin ramping up—let's say from mid-February onward—as a steadier income flow. For your modeling purposes, you can treat that date as the point at which to start applying the contribution we've previously discussed with you.

Nelson Ng

analyst
#43

Great. So, if we focus on that chart showing the growth trajectory and consider a few of the larger projects among those secured, I believe you mentioned the New York solar projects earlier. The intention is to finish those by 2028, or during that year — is that correct?

Stéphane Milot

executive
#44

We continue to keep that timeline in view as we work. We're moving at the fastest pace we can.

Nelson Ng

analyst
#45

All right. Now regarding the Oxford battery project, does that one also have 2028 as its completion date?

Patrick Decostre

executive
#46

No.

Stéphane Milot

executive
#47

If I remember correctly, that one's a 2027.

Patrick Decostre

executive
#48

Yes, that would be in the middle of 2027.

Stéphane Milot

executive
#49

Right.

Nelson Ng

analyst
#50

Alright.

Patrick Decostre

executive
#51

Every approval has now been secured. A few last sign-offs still needed to be gotten, and our plan had been to get those in March, yet in February we ended up with all of them this year. The project's kickoff meeting took place this week, and

Stéphane Milot

executive
#52

Things are going quite well. Financing too — all of it is on track. On this one, everything is green, so to speak.

Nelson Ng

analyst
#53

Great. Then another point: you mentioned recontracting in France, but I understand that in Texas and New Mexico there are, I believe, a few projects that could be selling power on a merchant basis, and I know this is, I guess, a joint decision since you hold 50% of the assets. With the demand for power in that region, what do you think about whether those assets should be recontracted or repowered? Yeah.

Stéphane Milot

executive
#54

Before you take it, Nelson, I’ll add just one point.

Nelson Ng

analyst
#55

Yeah. No, I'm just thinking about it from a repowering angle — I think the window is closing when it comes to getting them pre-qualified for tax credits. Could you just speak to recontracting and repowering, and what some of the factors are that you're weighing?

Stéphane Milot

executive
#56

I'll let Patrick take that one, but right before you brought up recontracting in France — what we're actually looking at there is closer to a standard repowering effort, and really it's almost a full rebuild. It isn't the kind of repower you'd see in the US; it's a new project we're evaluating, and coughing, and we're accounting for the fact that whenever we repower or rebuild, the existing equipment gets removed, and in our returns analysis it's a net return across the whole project. I just want to be sure everybody on the line catches that point. When it comes to the US, we aren't in a position today to say precisely what our strategy will be there, but we are working through various scenarios.

Nelson Ng

analyst
#57

Understood. So just a final question from me. You brought up the short-term contracts in France as far as a pricing headwind goes. I was roughly calculating it, and my sense is that the realized European wind price fell by around 22% year-over-year, and I assume those short-term contracts are the main factor. Looking ahead to 2026, is there a rough expectation for what the realized wind price would be? Specifically, is it a much smaller step-down in '26?

Stéphane Milot

executive
#58

I think the pricing effect, Nelson, has several components to it. For merchant, looking at the forward curves should give you a sense of it. On the contract side, we still anticipate a negative impact in 2026, though considerably smaller than the one we saw in 2025 — yet still a decline, given how the contracts were structured when we exited them in 2020 and at the end of 2022, and also because we had a window under the 18-month measure from which we could gain. That is what delivered benefits a few years ago, and now it is essentially unwinding. So 2026 will be the final year in which we see this effect. Beyond that, things will return more to normal. So

Nelson Ng

analyst
#59

Perfect, Stéphane — appreciate it. That’s all from me.

Stéphane Milot

executive
#60

I appreciate that.

Patrick Decostre

executive
#61

I appreciate that.

Operator

operator
#62

We don’t have any additional questions right now, so I’ll return the floor to you for your closing comments.

Stéphane Milot

executive
#63

Okay, Coline, let's get started.

Coline Desurmont

executive
#64

Yeah. Thanks, everyone, for listening. The next call where we'll announce results for the first quarter is set for Thursday, May 14, 2026, at 9:00 AM. Have a good day, everybody, and a good weekend.

Operator

operator
#65

That brings us to the end of today's session.

Stéphane Milot

executive
#66

Appreciate it, everyone. Take care.

Operator

operator
#67

That brings us to the end of today's conference call. Thanks to everyone for joining in. You can go ahead and disconnect your lines now. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Boralex Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Boralex Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Boralex Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.