Broadstone Net Lease, Inc. (BNL) Earnings Call Transcript & Summary

October 29, 2026

New York Stock Exchange US Real Estate Diversified REITs earnings 50 min

Earnings Call Speaker Segments

Brent Maedl

executive
#1

We appreciate everyone being with us today for Broadstone Net Lease's earnings call covering the third quarter of 2026. During this call, you'll be hearing prepared remarks from John Moragne, our Chief Executive Officer, Ryan Albano, our President and Chief Operating Officer, and Kevin Fennell, our Chief Financial Officer. All three of them will be on hand for the Q&A portion of this call. As a reminder, the discussion that follows and the responses to your questions include forward-looking statements, which carry risks and uncertainties that could cause actual results to differ materially because of various factors. We urge you not to place undue reliance on these forward-looking statements. For a more detailed discussion of the risk factors that may cause such differences, please refer to our SEC filings, including our Form 10-K, for the year ended December 31, 2025, and note that those risk factors may be updated in our quarterly SEC filings. Any forward-looking statements provided during this conference call are only made as of the date of this call. With that, I'll turn the call over to John.

John Moragne

executive
#2

Thank you, Brent, and good morning to all of you. Before we get into the quarterly results, I want to briefly discuss the dramatic shift in the capital markets and macroeconomic backdrop that every one of us has witnessed lately. Although those movements have been significantly negative during the past quarter, since this management team came on board in 2023, our people have shown time and again that we can run this business through wider market turbulence of every type. We will keep executing the same playbook that has served us since we began this journey: disciplined execution, creative thinking, and controlling our own destiny. You've probably heard us say over the past two years or so that we've kept our selectivity at a high level for a good while now, and the market's recent swings confirm where we stand rather than disrupt our plans. In fact, our strategy was built from day one for exactly this kind of environment. Solid same-store growth and careful balance sheet management, plus a differentiated growth approach that gives long-term visibility into appealing growth without relying on the typical heavily marketed net lease acquisition channels, works in any environment — but especially one dealing with the volatility and uncertainty we're seeing today. Now, on to the results. Q3 carried forward the momentum we've been building all year—and really over the past three years. AFFO came in at $0.39 per diluted share, up 5.4% versus the third quarter a year ago. We went back to the public equity markets for the first time in four years, closing a $259 million forward equity offering. We launched three new build-to-suit developments totaling $326 million, while six others reached stabilization in the quarter. With that capital already working and a clear road ahead, we think we're entering Q4 in good shape to hit our full-year guidance and keep the momentum going into 2027. In Q3, our investments totaled $236.6 million. That breaks down as $63.8 million for one industrial acquisition, $137.1 million for build-to-suit developments, $35.1 million for transitional capital, and $0.6 million for redevelopments. The acquired industrial property, roughly 544,000 sq ft, closed with an initial cash capitalization rate of 7.7%, a 15 year lease term, and 2% annual rent increases, giving a straight line yield of 8.8%. The three build-to-suit developments we began this quarter carry an estimated project cost of $325.8 million in total, at a weighted average initial cash capitalization rate of 8.4% and a straight line yield of 11.3%. Beyond our Colorado endeavor, we launched a pair of retail developments in Manor, Texas — one for Hobby Lobby and one for Academy Sports. As mentioned before, six build-to-suit developments reached stabilization this quarter, representing $95.3 million in estimated total project investment and a weighted average cash capitalization rate of 7.3%. Furthermore, following the quarter's end, our Southwire project — a $115 million undertaking — stabilized at a first-year cash capitalization rate of 7.8%, a welcome addition to an already strong quarter. Today, our in-process build-to-suit pipeline stands at approximately $456 million, of which we have invested roughly $150 million, leaving an estimated remaining investment of about $306 million. From that in-process pipeline, we expect about $36 million of additional annualized base rent to begin flowing between Q4 of this year and the close of 2027. Roughly $2 million of it appears in the fourth quarter. Around $31 million arrives during the first half of 2027, when Colorado and other projects reach rent commencement, with the rest landing in the second half of 2027. On our current ABR of $449.5 million, that translates to growth above 8%, driven by projects that are already committed, under construction, and capitalized — giving us forward visibility into growth that is uncommon in our sector. The portfolio we already own continues to deliver exactly what it was built to deliver. On a square footage basis, occupancy stood at roughly 100% when the quarter closed, and 766 of our 767 properties are under a lease. By the time we issued our release, we had gathered 99.9% of the base rents that came due during the quarter. Dispositions also kept moving: we sold three properties in the quarter, generating $12.5 million in gross proceeds at a 6.6% capitalization rate. That brings the year-to-date figure to 13 properties sold, $86.7 million in gross proceeds, and a weighted average capitalization rate of 6.3% on tenanted properties. Project Triboro is still a top priority for us, and we're cautiously optimistic about meeting the 2026 objectives we set for this project at the beginning of the year. Ryan will soon provide a more thorough update, covering our progress on this year's key milestones. Regarding capital, we made a major move this quarter by finishing our first public equity offering in four years—12.65 million shares sold at $20.50 apiece, generating estimated gross proceeds of roughly $259 million tied to forward sale agreements. Including roughly $167 million in forward sales through our ATM program at a weighted average gross price of $20 per share, we now expect about $409 million in net proceeds from unsettled forward equity. That capital enables us to fund our committed pipeline regardless of the continued volatility in the capital markets. Our approach remains the same. We'll remain disciplined and opportunistic across every one of our capital sources, and we'll keep match funding our investments. Kevin will take you through the specifics of our balance sheet and funding plan shortly. With the results we've posted so far this year and the clarity we get from our build-to-suit pipeline, we're restating our 2026 full-year AFFO per share outlook at $1.55-$1.57 — a midpoint of $1.56, which works out to almost 5% earnings growth versus 2025 — and we're lifting the ranges on both investments and dispositions. The momentum carrying us into Q4 of 2027 stems from disciplined execution over many years, deliberate portfolio construction, a build-to-suit platform, and a differentiated growth strategy that is delivering at scale. I'm excited about the road ahead, and I'm glad to hand the call over to Ryan and Kevin, each of whom will walk you through more of what underpins our confidence.

Ryan Albano

executive
#3

Thanks, John, and good morning, everyone. During this quarter, our platform demonstrated it can operate at scale: we kicked off $326 million in new build-to-suit developments, brought another $96 million to stabilization, and kept moving our redevelopment projects and Project Triboro forward. Let me take you through the current state of the pipeline, how the in-place portfolio is performing, our redevelopment work, and then an update on Project Triboro. Beginning with the pipeline, as of today our in-process build-to-suit investments come to roughly $456 million spread across seven projects, and about 83% of that is industrial. When you look at that pipeline, the weighted average estimated cash yield comes to 8%, while the weighted average straight-line yield sits at 10.4%. Supporting those figures is a weighted average lease term of 14.8 years, along with yearly rent escalations of 2.7%. These are tenant-driven, mission-critical developments, and from the very beginning they were structured to reduce the risks that ground-up development usually carries. During this quarter we stabilized six projects — two industrial and four retail — and those are now contributing to ABR, with several more expected to follow shortly. In Bremen, Georgia, our Southwire facility — a $115 million, 1.2 million sq ft project — also reached stabilization this month. As for our Academy Sports project in Magnolia, Texas, we're targeting November. Turning to the in-place portfolio, square footage occupancy was near 100% as of quarter-end. Same-store rental revenue for the third quarter climbed 0.7% compared with a year earlier. Contractual rent bumps contributed 1.9% of growth throughout that same-store portfolio, with industrial accounting for 2.1%. About $1.2 million in prior-year rent from a pair of industrial properties now undergoing redevelopment weighed on the headline number. Excluding those two assets, same-store growth would have been roughly 1.9%, matching our year-to-date result; through the year so far we have performed strongly on 2026 and 2027 lease renewals alike, achieving a 111% recapture rate. As we think about 2027, the experience we've built up makes us confident about handling the expirations that lie ahead and about locating chances to generate value via redevelopment. Redevelopment continues to be a distinctive way we create value. Our inaugural project — turning a functionally outdated office property in the Chicago MSA into roughly 156,000 sq ft of industrial space — is moving forward. The total projected investment for the project comes to about $17.9 million, and roughly $3.7 million of that has been put in so far. The property had original ABR of roughly $1.4 million, and we anticipate stabilized ABR of roughly $2.7 million, with substantial completion aimed for Q2 of 2027. We're currently in active discussions with several prospective tenants that may have interest in this property. The second item on our list is the Hoffman Estates, Illinois asset. Before the lease expired, we weighed re-leasing it, selling it vacant, and a number of redevelopment options, and at the beginning of the third quarter we shifted it into redevelopment. Our estimate for the overall investment is about $28.4 million, which includes the remaining basis in the property, and we intend to repurpose the existing structure. Stabilization should arrive in Q3 2028, and we project stabilized ABR of approximately $3.3 million — in line with the property's original ABR — while reducing the office square footage in the building substantially and greatly improving both its quality and its overall value. Turning now to Project Triboro. Just to remind everyone, this is a large site up in northeastern Pennsylvania — more than 550 acres, with a committed one gigawatt power supply. As of September 30th, we've put roughly $154 million into the project. You've all heard this repeatedly, but we didn't underwrite Project Triboro as an investment with just one outcome, and all three separate paths generate genuine value for shareholders. Those are: monetizing the land in the near term, building a hyperscale data center campus, or putting up four large box industrial buildings. We've kept investing in this opportunity while generating value and preserving optionality across every path forward. Regarding on-site work, we're still moving forward with the horizontal activity shared by both the industrial and data center developments. Vertical construction can begin soon on the first of four building pads, which is almost ready. Horizontal work at various stages is ongoing across the rest of the land. On the power front, we're continuing to coordinate with PPL and are finalizing our ESA and CSA. Design and engineering of the on-site substation are still advancing, and our timelines for the initial power delivery expected in the first half of 2028 remain intact. As for zoning, we've kept up a constructive dialogue with the borough to move the project under consideration forward and to address the concerns of the borough's residents. For each of these, we anticipate getting clarity during this year on zoning, power, and tenant demand, and that underpins our goal of choosing among our three options by the end of the year; we're still quite enthusiastic about the value creation opportunity that Triboro represents and look forward to sharing updates on our progress soon. With that, I'll hand the call over to Kevin.

Kevin Fennell

executive
#4

Thanks, Ryan. For the quarter, adjusted funds from operations came in at $77.8 million, or $0.39 per share — a 5.4% increase over the third quarter of 2025. Same store rent growth, recent investment activity, and build-to-suits reaching stabilization drove those results. General and administrative expenses were in line with expectations, with core G&A of $7.4 million, trending toward the low end of our full year guidance range of $30 million-$31 million. On the balance sheet, we closed the quarter with total debt of $2.9 billion and pro forma net leverage of 5.4x, versus 5.9x the prior quarter, reflecting the forward equity we raised, which we intend to settle alongside rent commencements in future quarters. Counting the August offering John mentioned plus what we did through our ATM, expected net proceeds still outstanding from forward sale agreements not yet settled totaled roughly $409 million as of September 30th. We also discussed our new $300 million senior unsecured delayed draw term loan on the prior call, and to date we've drawn $100 million of it. Beyond that, with $428.8 million in available capacity under our revolving credit facility at quarter close, we have over $1 billion in liquidity already in place to cover the $337 million of estimated investment still remaining in our build-to-suit projects, along with other opportunities. Looking ahead, we'll continue evaluating every possible funding source, operating with a pro forma leverage target of 6x. Earlier this week, the board raised the quarterly dividend 1%, bringing it to $0.295 per share. It goes out to shareholders on record by December 31st, 2026, with payment due on or before January 15th, 2027. Turning to guidance: given our performance so far this year and the clarity our build-to-suit pipeline provides, we're maintaining our full-year 2026 AFFO guidance at $1.55-$1.57 per diluted share. That outlook assumes investments of $700 million-$800 million, up from a prior $600 million-$800 million. Dispositions are now $150 million-$200 million, raised from $100 million-$150 million, while total core G&A expenses stay unchanged at $30 million to $31 million. Thanks to how the portfolio has performed to date, we're also trimming our bad debt assumption down to 25 basis points. We should note, as we always do, that annual per-share figures can shift depending on when investments and dispositions happen, how large they are, and how they are mixed, along with any capital markets actions taken during the year. Our current guidance reflects dilution of less than $0.005 per share, estimated from approximately 350,000 to 600,000 weighted average shares related to our outstanding forward equity under the treasury stock method. For more detail, please see last night's earnings release and supplemental, and at this point we'll take questions.

Eric Borden

analyst
#5

Great, and thanks for taking my question. My first one concerns Triboro. It's encouraging that you're still aiming for a decision by year-end. But as things stand today, which of the remaining items matters most in determining that path forward — would it be zoning, the power agreements, or securing a tenant commitment? Thank you.

John Moragne

executive
#6

Yeah, thanks, Eric. It keeps moving forward. As Ryan said, we've had really good, constructive dialogue with the Borough, trying to make sure that we're going about this the right way and responding to local resident concerns and providing the best possible mutually beneficial answer for this moving forward. Throughout the year, we've consistently emphasized three factors: zoning, power, and the tenant—listed in that priority order. Unless we're certain that the data center zoning is fully secured, discussions about power or the tenant can't take place. Consequently, much of our focus has been directed there. That doesn't mean we've stopped cooperating productively with PPL as they evaluate their transmission and distribution lines. As Ryan mentioned, the ESA and CSA substations will be built on the property, and we've kept up a solid early dialogue with prospective tenants. Naturally, though, those tenants are holding off until the zoning matter is resolved. Getting the zoning sorted is therefore our top priority; we expect it to be completed by year-end, after which we can promptly proceed with the remaining two components.

Eric Borden

analyst
#7

Great. Thanks. So perhaps we pivot slightly and consider 2027. I realize you aren't giving guidance, yet the rent commencement schedule offers a useful baseline. Still, how should we view the primary offsets between your embedded rent growth and AFFO per share growth? I know interest expense and G&A contribute significantly, but I'm curious whether other offsetting factors exist there. Thanks.

Kevin Fennell

executive
#8

No, Eric, this is Kevin. I believe you have identified them fairly accurately. One variable that seems to shift daily—and certainly weekly—is the interest rate environment. So that's an item we'll sharpen our view on as we move through the calendar here. But the ones you've focused on are the correct ones.

Anthony Paolone

analyst
#9

Yeah, thanks, and good morning. I'd like to begin by asking about cap rates and yields — both on your development pipeline and on what you're seeing when it comes to acquisitions — and whether you could speak to how the adjustments have looked so far, or where you believe things need to land before you'd green light a new project.

John Moragne

executive
#10

Yeah. So clearly, given all that's shifted over the last 90 days when it comes to interest rates, the broader market, and transaction activity, we're seeing what everybody would expect. Things have slowed somewhat. There's a flight to quality. As you know, we aren't participating in any meaningful way in the heavily marketed deal flow that's out there. What we're seeing is that expectations for good, solid deals are probably up 25 to 50 basis points. Deals that might have priced and executed previously that are more highly levered and PE backed — in a lot of cases, there are no bids; they aren't trading; so that's why, for us, as I said during my remarks, our strategy is specifically designed for an environment like this. Given the volatility the transactional market is experiencing, we're still looking down at an in-place build-to-suit pipeline of more than $400 million that carries really attractive yields, both upfront initial cash yields and straight line yields. We continue to see good opportunity in the build-to-suit space, and we're working towards executing on a handful of new ones that we hope to get done over the next couple of quarters, to keep filling out that ladder of build-to-suits going into the end of 2027 and through 2028. So we think our strategy is well designed for this. We're still seeing good opportunities for value, and we believe the way we've built this strategy — with a focus on the long-term accretive growth of those build-to-suits and then filling it in with relationship-based direct off-market opportunities on the acquisition side, the more traditional acquisition side — is going to be a winning formula going into 2027.

Anthony Paolone

analyst
#11

Understood. Thanks. You've mentioned before that you'd prefer leaning a bit more on self-funding by selling off things you develop over time. I'm just curious whether you feel that's been affected by the shift in rates. Specifically, I believe UNFI is now in the clear-to-sell zone, and in the past you've cited it as one that could be a sizable capital source at an appealing price. Does the changed environment have any bearing on that thinking?

John Moragne

executive
#12

Yes. Maybe I should begin with how we view what's already in place from a dry powder perspective. At present we hold $500 million or more of dry powder that we can put to work in solid, appealing, accretive investments, with an in-place cost of capital rooted in Kevin's work this year across the equity and debt capital markets in the low to mid-6s. So we have dry powder available to deploy accretively to earnings, and there's no need for us to focus too heavily on dispositions the way we did in 2023 and 2024, while we were repositioning the portfolio. That said, we're doing more. As you saw, we raised our disposition guidance for the year; that reflects both additional assets Mike Caruso and his team have been working on, considering selling, and finding solid chances to move them along, plus the usual risk-mitigation type activity we'd undertake. Included in that is something somewhat chunkier. We're weighing a sale of our transitional capital investment in the Sunset Hills retail center; that's a major reason we lifted guidance for the year. Should we complete it, we'll be able to redeploy that into the existing pipeline and pair it with the capital we have from a dry powder standpoint. I want to stress first and foremost that we have ample dry powder at a great cost of capital for us to redeploy accretively into the investments we're seeing, especially our build-to-suit pipeline; beyond that, we have flexibility to generate more through our disposition strategy, which was really nice when the sun shone on us for a couple of months over the summer. But we've been controlling our own destiny via sales and other activities to fund ourselves for the last four years, so none of this is new to us.

Anthony Paolone

analyst
#13

All right. Thanks very much.

Jay Kornreich

analyst
#14

Hi there, good morning. My question concerns the Colorado development. Specifically, regarding the possibility of a second building at that site, have any conversations with the tenants moved forward since the initial announcement, or is there any indication that this potential second building might come to fruition?

John Moragne

executive
#15

Yes. So we have kept talking with that tenant regarding Colorado 2.0 and pursuing the next one. Nothing has been decided yet. As I've told investors for some time now, my sense is they remain in a position where they want assurance that the project will succeed. We're delivering the vertical construction, the powered shell construction. The MEP work isn't ours to do. That falls to the tenant, and so the tenant likewise has considerable work they need to be concentrating on and considering; so it's a mix of not just ensuring our portion of the project is executed well, and I can tell you that it is at present. In fact, we went vertical last week. The site photos are quite something to see that project advancing at a much quicker pace, thanks to the prefabricated construction involved there compared with some of the other tilt-wall construction we have witnessed in some of our other build-to-suits. It has been extremely interesting for us. My guess is that's probably a 2027 decision at some point for that tenant, and we're cautiously optimistic they'll proceed with it.

Jay Kornreich

analyst
#16

All right, thanks for that. Then regarding how much forward equity remains unsettled and when you expect to settle it, should we anticipate a more match-funding approach tied to development completion, or a more ratable approach as you supply capital throughout the development process?

Kevin Fennell

executive
#17

Assuming match funding tied to completion is more reasonable. I'd say a mid-quarter convention around that is probably fairly reasonable.

Jay Kornreich

analyst
#18

All right. Thanks. That's where I'll leave it.

Caitlin Burrows

analyst
#19

Hello. Good morning. Perhaps focusing on the build-to-suit pipeline for upcoming deals — I know the timing of those announcements tends to be uneven, but I believe the most recent two came in August. I'm curious whether volatility in interest rates has affected those discussions in progress. Considering the customer and the reason they choose to work with you, my assumption is they're looking to expand their business. Have their own plans shifted, and how much do they react to changes in your required returns?

John Moragne

executive
#20

It's partly one and partly the other. We do see some cases where tenants are spending a bit more time working through their decision. Given the movement in interest rates and how they weigh financing options against the build-to-suit, the cost, and all of that, this isn't a surprise. The timeline for converting build-to-suits has always been lengthy; we never count on those moving particularly quickly. Conversely, our financing equation shifted dramatically too over the last 90 days, and we went back and held some tough conversations with certain potential deals to confirm we were achieving the right pricing relative to how we consider our in-place cost of capital, opportunity cost, and all of that. A handful of deals we chose to stop pursuing because it simply wasn't going to work, and we couldn't reach a point where it made sense. That said, the pipeline remains robust; we're still seeing solid opportunities. There's plenty we're enthusiastic about and we hope to make some announcements in the near-term, provided we can find a way for both sides to feel comfortable that the economics keep working in a world that's fairly changing and volatile.

Caitlin Burrows

analyst
#21

Understood. All right. So I noticed a few things seemed to have leveled off a bit sooner in Q3, so congratulations on that. I suppose I'm curious whether there's anything particular to highlight regarding what caused it, and whether that could happen again. And when we consider the full-year guidance, you also said you reduced bad debt, so I'm wondering whether there were any offsetting items we ought to keep in mind as to why AFFO guidance didn't shift. Thank you.

Kevin Fennell

executive
#22

Regarding that timing element, Caitlin, I'd say it varies by project. You've watched us land roughly ± 45 to 60 days away from where we first estimated; we try hard to refine those as completion gets nearer. I'm not sure there's anything thematic worth pointing to there. On the guide, the treasury stock component of this worked out to under $0.01, but given a guidance range of $0.03 to $0.01, it definitely plays a part in keeping the range where it is.

Caitlin Burrows

analyst
#23

Thank you.

Upal Rana

analyst
#24

Great, and I appreciate the question. Kevin, you have some debt maturities approaching and certain existing swaps that are rolling off. What's your thinking around refinancing early, extending hedges, or maintaining floating rate exposure there? What kind of increase in the all-in borrowing cost should we expect to underwrite in our models?

Kevin Fennell

executive
#25

Yeah, look, I'd say on that front being opportunistic has really been the name of the game. You saw us come in September last year. We're always assessing longer and fixed. Naturally, in this environment, we're staying shorter. I think our floating rate exposure is probably ranging between 20%-30% of total debt, and that's probably not a long-term target. As the swaps roll off, there will certainly be some added short-term exposure. When it comes to the overall headwinds, that's really a decision for later. Regarding the maturities we hold, those are within our control, and we have the delayed draw term loan available to address them. We also have a very supportive bank group toward the end of the year should we need to approach that differently. But the opportunistic element remains available to us. I'm considering longer-dated and fixed, so seven to 10-year options at roughly 110 over—125 over as the marginal debt cost is a reasonable assumption. For the immediate future, though, my take is that keeping maturities short and sticking with floating-rate exposure is likely the more straightforward choice.

Upal Rana

analyst
#26

Okay. All right. That helps. So then turning to Triboro — I'm sure you've spoken with a lot of prospective tenants. Can you share anything about some of those discussions? Is there anything specific they want or are asking about regarding the property or the lease? Or anything that worries them about the executive order's requirements?

John Moragne

executive
#27

The talks have been productive. I'd still describe them as quite preliminary. Nobody wants to invest a huge amount of time digging into every detail and negotiating a lease before they know the site can actually work as a data center. That's why our focus is on securing the zoning first and foremost, and as I mentioned, we remain cautiously optimistic on that for this year. But what we've heard, and what we keep seeing, is that demand isn't falling. Tenants keep telling us they have genuine demand for these kinds of projects, and they're seeking these kinds of assets. One thing that has put us, we believe and hope, in a far better position than others is that we've kept pushing the horizontal site-level work on this; in terms of being able to shift gears a bit harder to move from the work completed to date into starting construction on the substations and the first buildings that would form part of phase one, and reaching delivered power at some point in 2028, we think that places this asset incredibly well against the demand we're hearing still exists and the interest we're seeing from tenants on a preliminary basis.

Upal Rana

analyst
#28

All right, that's useful. I appreciate it.

Linda Tsai

analyst
#29

Hello, and thanks for the opportunity to ask. Compared with 90 days ago, has the shift in your cost of capital altered the general thinking about what the ideal outcome for Project Triboro would be?

John Moragne

executive
#30

Yes. Ryan has already spoken about this. Our view remains that this has a very solid fallback in the industrial build-to-suit that we originally underwrote it against. Should matters not progress in the manner we hope for or anticipate, we can always switch back to 4 million sq ft of industrial facilities. Industrial build-to-suit interest in that market has persisted, so the backstop gives us confidence. As we've said over the last year, if this can go forward as a data center, we are considering either a sale of it or carrying on with it as a powered shell construction. What has become clearer over the last 90 days, I think, is that should it proceed as a data center, there are really two routes. Either we sell it, or we locate a private capital solution to fund it. The notion that we might raise public equity around this off our balance sheet to fund it is, I think, more or less off the table now, both given the size and given what the market has shown us over the last 90 days. When you proceed with a project whose budget is going to be in the multiple billions of dollars, you need some certainty about where that money will come from; we don't have much confidence at present that we could accomplish that through the public equity markets; so either this project gets sold or we find a private capital solution for it.

Linda Tsai

analyst
#31

Is there substantial interest coming from the private capital solution side?

John Moragne

executive
#32

Yeah. There is an enormous level of interest in keeping the funding going for these things, and that goes together with the ongoing enormous demand for projects of this kind. I think that with projects aiming at delivery in the back half of 2027 and into 2028, like what you're describing with the initial phase delivery on power for Project Triboro, and similarly situated ones where they've done the work at the site level that Ryan and his team have been continuing to advance. There's plenty of capital out there that's looking to be deployed into projects just like this.

Linda Tsai

analyst
#33

Thank you.

Michael Goldsmith

analyst
#34

Morning, and thanks very much for the questions. You reduced the bad debt assumption for the full year once more, down to 25 basis points, yet this quarter you also recorded a $2.9 million net write-off of accrued rental income. Could you take us through what caused that write-off, tell us if it was concentrated in a single tenant, and say whether any accrued rent exposure tied to that tenant exists? Thanks.

Kevin Fennell

executive
#35

Yeah, those two items really aren't connected. The accounting for that rental income write-off relates more to a case involving some small industrial assets. We're working with a tenant on moving out by the end of next year. That lease originally ran 11 years. It's purely a result of shortening the lease term, and we'll work through it with them. Little to no effect this year or next year from that event. Those are basically two separate matters.

Michael Goldsmith

analyst
#36

Understood, and thanks for that. You brought up a 111% recapture rate on the 2026 and 2027 renewals that have been completed year-to-date. There's still 7.1% ABR scheduled to expire next year. As you get closer to that, is that the recapture rate we ought to anticipate for next year? And how have negotiations been progressing so far? Thanks.

John Moragne

executive
#37

Things have been moving along well in negotiations. Mike, as you're aware, we begin working on many of these lease rolls two-five years ahead of when the term ends. Typically we have a fairly good sense of where those are likely to land — whether we'll be re-leasing to a different tenant, exercising an option, the tenant exercising an option, or a vacant sale where we're looking to redevelop or do something else. The team was already working on 2027 back in 2024 and 2025; we feel fairly confident about where we believe all of these will end up. I'd love to tell you to expect 111%, but I think, looking back historically, our low to sort of mid 102% to 104% or 5% is really closer to what's reasonable to expect. Because frequently we'll be in a situation where the tenant has the option to renew at 2% or 3% or whatever the number is. If we can reach a better solution from there, that's great, but they always have the fallback of simply hitting their option and continuing to hold at an increase from whatever the standard lease increase is. 111% is great, and kudos to our team for finding some really great solutions and positive outcomes on our lease rolls this year. Hopefully we keep seeing opportunities to do that in some discreet situations going forward; but I think it's more in that low 100% range where we should be setting expectations.

Michael Goldsmith

analyst
#38

Thanks so much. Best of luck in the fourth quarter.

Ryan Caviola

analyst
#39

Thank you, and good morning to everybody. Perhaps a question about Broadstone's willingness to pursue additional data center developments going forward. Clearly there's great news, great updates on Triboro today; but overall, getting a data center development from beginning to end seems somewhat harder now than it did at the start of the year. Does your team see it that way? Are the complexities involved in these offset by the appealing yields? Thanks.

John Moragne

executive
#40

Yeah. At the moment, I'd say our appetite is really focused squarely on Colorado 2.0. We'd love to see that come through. We hope that's something we'll see in 2027. We have fantastic partners on Triboro in Sansone and Emergent, and they, of course, keep looking at other opportunities around the country. Whether or not there's a role for us to play, I think that remains up in the air; these are very large capital commitments. They are very large projects. So our ability to play a role will be very much project dependent on any of those things. But there's nothing we're discussing right now that is material enough for us to be discussing, but it really will be very much project dependent, and we'll see where things go; but as I said, we have great partners. We're very pleased with what we see in Colorado and what we're working on with Triboro.

Ryan Caviola

analyst
#41

Understood — that's useful. So with midterms coming next week, I figured I'd add one about onshoring. I realize we've covered this before, but given that trade and industrial policy are still in flux, would you say onshoring's tailwinds have unfolded the way you anticipated so far under the current administration? And does the result next week change any of that? Thanks.

John Moragne

executive
#42

There's definitely a political piece to it, I'd say. After tariff day, and given some of what the administration has done to pull more manufacturing into the U.S., we anticipated that would generate extra tailwinds for industrial, and I'd say that is happening. Whether it's happening to the degree perhaps everyone anticipated when this began, I'm not sure. Beyond that political piece, I'd also point to the tailwinds from shifting perspectives that many industrial and manufacturer folks picked up coming out of COVID — they simply recognized they had to reconsider their supply chains so they could keep generating revenue for their businesses and steer clear of the troubles we've witnessed from geopolitical matters or from pandemic era style COVID supply chain troubles. So I think there are both: the political tailwind, which gives a bit of help, and then something more like a secular market tailwind, where people — businesses — are examining their supply chains and wanting to ensure they're as resilient as they can be domestically, and not leaning as heavily on international shipping lanes.

Ryan Caviola

analyst
#43

Thanks. I appreciate the additional detail.

Ronald Kamdem

analyst
#44

Great. I'd like to return to the pipeline and how you're thinking about advanced manufacturing, data centers, and so forth. First, I was wondering whether there are any bigger deals or bigger conversations taking place on that front. Second, some thoughts on construction costs. I realize you hedge a great deal of it, but we've been hearing about steel, we've been hearing about other items, and I would really like to hear your thoughts on construction costs, or any components or any shortages. Thanks.

John Moragne

executive
#45

Yes. I believe I'd refer back to what I said earlier regarding the advanced tech and data center side. At the moment we're essentially at capacity with the work in front of us. We're always receptive to new accretive opportunities down the road, but we're quite happy with where Colorado stands and where Triboro stands. There are a few larger build-to-suits beyond that scope that we keep evaluating, and with luck we'll be able to secure a few of them. But only time will tell as we work through that. On the construction cost front, costs have definitely risen; however, that has simply created a chance to confirm we're pricing things the right way and that rents are being set at appropriate levels. Whether you mean hard costs or overall project budgets, we're perhaps looking at roughly a 10%-15% increase at this stage. That, as I mentioned, then really forces a discussion about how we're approaching pricing this, how we're approaching rents, and how we're approaching residual values and cap rates at both the front and back end of these projects. So it's a fluid situation at present given how fast things are shifting, and we're making certain — going back to what I said earlier about the pipeline itself — that while our tenants are taking time to consider whether these projects are the right move for them, we're doing the very same thing. Not every project will make sense, so ensuring we prudently allocate the capital we have toward the projects we believe will be the most accretive and earnings powerful going forward is where our time and focus are going.

Ronald Kamdem

analyst
#46

That's useful. Turning back to regular way acquisitions, you know, after the interest rate shift, you folks have consistently been quite choosy, but do you figure this might create more chances for BNL here? Just a few thoughts on regular way acquisitions too. Thanks.

John Moragne

executive
#47

Yes. We've stayed highly selective for quite a while, and that won't change. In terms of regular way deal flow, there's very little we act on these days; we always keep ourselves plugged into it, staying in touch with every broker and making sure we know what's going on. Should a solid opportunity ever come along, we want to be certain we're involved. Our approach really centers on those build-to-suits that create long-term value, and then on locating chances for direct off-market deals through our existing relationships, where we're able to put capital to work more creatively. If you consider a setting where their cost of capital has shifted somewhat, financing markets have shifted somewhat, depending on how banks are viewing lending, what the brokers are observing, what the appetite is among the other participants in the net lease market to put capital to work, perhaps that produces a few direct deals for us if people want certainty of execution rather than having to grind through a more heavily marketed process. So we're hopeful.

Ronald Kamdem

analyst
#48

All right, that's all from me. Thanks.

Michael Gorman

analyst
#49

Yes, thank you. Good morning. Perhaps I could take a somewhat different angle on the Colorado project and Project Triboro. Clearly, these are big developments and big projects, but leaving aside the capital cost, from an income standpoint they ramp up pretty fast, correct? If I've got the math right, more or less in a straight line, Colorado comes online at roughly 7% of NOI-ish. You sound upbeat about building two there, and then whatever happens with Triboro. From a portfolio management standpoint, how do you view the exposure to this sort of new tech category as these two projects keep progressing?

John Moragne

executive
#50

Yes, excellent question. We've devoted considerable time to thinking about it, since in a traditional view of our tenant mix they represent an outsized share. Our Colorado tenant will be 6% or 7%, depending on how we look at our forward pipeline, all their build-to-suit and acquisition activity. Now, given the quality of the tenant we have there, I'm quite comfortable sitting at 6% or 7%. Should they wish to proceed with Colorado 2.0 or whatever it might be, and push it into the double digits, I'd be very happy to do that as well. But these are big projects, and with Triboro I think we need to think somewhat differently, and that perhaps ties back to what I said about how we're considering financing it. We can do Colorado, and if we're fortunate enough to have Colorado 2.0 go forward, sitting in that 6%-12% range is fine. With that tenant and that project, I'm not concerned. Project Triboro stands on its own. It's somewhat of a supernova. As I mentioned, given how we currently envision funding that project, we're either selling it and then using those proceeds to de-lever and redeploy into our core verticals, or we'll find a private capital joint venture solution for it. At that stage, as far as tenant concentration goes, it will be much lower than it would be under a more headline, fully on balance sheet figure.

Michael Gorman

analyst
#51

Understood. That helps. So perhaps turning to the other growth channels — whether that's revenue-generating CapEx, transitional capital, or something else — how would you describe the financing conditions your tenant base is facing? My guess is they're experiencing some of the same turbulence you are, and does that create more opportunities across those other growth channels, like assisting with expansion or CapEx?

John Moragne

executive
#52

Yes. The way they think about their cost of capital and their financing options is shifting right alongside our own thinking. In some cases it depends on whether they're pricing off the 10-year or pricing off a SOFR — and volatility between those has differed considerably. The 10-year, day to day, is up something like 60 or 80 basis points versus the start of July. SOFR is up, I'm not sure, it was 20 the other day or thereabouts. So how you approach pricing these things varies — if you're running an ABS facility or something else, alternatives exist. Still, the build-to-suit structure, which helps with revenue-generating CapEx for existing tenants since we already own the asset, keeps offering what we believe in most cases is an appealing alternative to anything else likely to be available out there; and we keep having constructive discussions about putting capital to work across all of those potential verticals.

Michael Gorman

analyst
#53

Good. Appreciate you making time.

Eric Borden

analyst
#54

Good. Appreciate you taking my follow-up. Turning to Project Triboro, where the initial pad is almost finished, could we potentially advance an industrial building on a portion of the site while keeping intact our ability to seek data center development on the remaining acreage? Or would the site's layout and infrastructure needs mean those two routes can't coexist?

John Moragne

executive
#55

If it proceeds and you hold data center approvals from a zoning perspective plus the power and the interest, we wouldn't go ahead. We wouldn’t proceed with an industrial project on that land, since every hyperscale tenant considering it wants the entire parcel—and actually needs more than that. Initially, we wouldn’t place industrial there. We’d only develop industrial on those 550 acres if we ultimately have to shift our approach toward industrial. That said, as I mentioned, we’re cautiously optimistic this will be settled by year-end. Ideally, we’ll then move fairly quickly into discussions about power and tenancy.

Eric Borden

analyst
#56

All right, thanks. So, if it turns out you do need to pivot toward industrial build-to-suit or development, would you proceed on a speculative basis, or would you prefer to secure the tenant before pushing ahead with that project?

John Moragne

executive
#57

Having tenants lined up beforehand is always what we'd want, but considering the demand we're aware of in northeastern Pennsylvania for this kind of large format box, we'd feel quite at ease pressing on, even to the point of going vertical on certain of those assets if that became necessary.

Eric Borden

analyst
#58

All right. Well, I appreciate the time. Thank you. Thanks.

John Moragne

executive
#59

Thank you, everyone, for being with us today, and we hope to see many of you—if not all—in Atlanta at Nareit in a few weeks. Enjoy the fall season. Thanks.

Operator

operator
#60

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Broadstone Net Lease, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Broadstone Net Lease, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Broadstone Net Lease, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.