Bushveld Minerals Limited (BMN) Earnings Call Transcript & Summary
January 31, 2023
Earnings Call Speaker Segments
Fortune Mojapelo
executiveGood morning to everyone, and welcome to our operational update for Q4 2022 as well as for the full year ended 31st December 2022. Thank you very much for dialing in. Apologies for the delayed start, which was caused by some technical challenges. Now over the course of 2022, Bushveld has seen a record level of production with 3,842 mtV, which is only slightly below our lower end of guidance of 3,900 mtV. This minor deficit was the result of the extended unscheduled load shedding in South Africa. This ramifications seen particularly at Vanchem, where our calculations show that over 200 mtV was lost in the second half of 2022 alone, due to load shedding. Vametco, however, we exceeded the upper end of production guidance of 2,650 mtV for the year, delivering 2,705 mtV for the year. At both Vametco and Vanchem, we approached to report quarter-on-quarter increases in production with a record 1,184 mtV for the group in the last quarter of the 2022 financial year. This performance is a reflection of work -- a lot of work that has gone into stabilizing and optimizing operations, particularly at Vametco, which over the past 18 months is now demonstrated fairly stable operations. Group production cash costs for the year averaged at $27.7 per kilogram vanadium up from 2021. The increase is due to higher energy and raw material costs, partially offset by higher production volumes. However, in Q4, the group production cash cost was $25.10 per kilogram V. This was $4.20 lower than Q3 2022, just emphasizing and underscoring the impact of increased production throughput at both operations. Despite the continued logistical challenges experienced worldwide during the year, which have resulted in relatively high stocks of material being in transit sales for the year. Sales for the year were up 8.1% at 3,584 mtV. We are confident and plan to sell all the stock, which is approximately 250 mtV, that was not sold in 2022 during the course of 2023. Looking forward, to the year ahead, and the Bushveld's production guidance, we anticipate a total figure between 4,200 mtV and 4,500 mtV, with volumes weighted towards the second half of 2023. And while we continue to maintain our target of a production run rate of 5,000 mtV to 5,400 mtV per annum as noted in previous quarterly reports. The current load shedding situation in South Africa has meant that we need to be more conservative in our expectations for production. And as such, we have adopted this conservative view. This is particularly the case at Vanchem, where the load shedding in Q3 and Q4 severely impacted our efforts to optimize Q3 processing performance. In November, Bushveld and the Emalahleni municipality agreed a load curtailment solution, thus aimed at preventing Vanchem from experience in total power loss during scheduled load shedding. Vanchem, as we have mentioned, has experienced most of the import of load shedding. While we still envisage some impact, this arrangement, we expect will reduce the effect of the power outage and enable Vanchem to continue to ramp up towards steady-state production. With a country-wide electricity price hike of 19% coming into effect in April 2023, as well as inflationary factors on several inputs like raw materials, we anticipate a group production cash cost of between $26.10 and $27 per kilogram V. This guidance also reflects the further impact of increased load shedding in the country. Construction at the Bushveld Electrolyte Company BELCO, the electrolyte manufacturing plant is well underway, and we expect to be operational in the first half of 2023. This plant is a targeted annual capacity of 8 million liters of vanadium electrolyte. And it will provide a further product platform from which we anticipate to enter new markets. And BELCO is currently undergoing qualification process with several VRFB manufacturers to use their electrolytes. Progress too has been made by Vametco where we are constructing the hybrid mini-grid. We will provide the market with further updates on these 2 projects in due course. On the capital investment front, in 2022 we completed Vanchem's Kiln 3 refurbishment. Importantly, as a result of completing this project, notwithstanding the optimization work that is still underway, the capital expenditure budget for 2023 of $9.2 million to $9.7 million is primarily related to sustaining capital with most of that CapEx being denominated in South African rands. We see the vanadium market for the year ahead remaining relatively buoyant, particularly in the aerospace and specialty chemical sectors, including the electrolyte space. And as such, we are looking to optimize ourselves to ensure returns from these high-value markets, particularly in North America. That being said, we continue to maintain a global footprint with a presence in all markets. Our agreement with Orion Mine Finance, which included a $35 million convertible loan note with a 10% coupon over a 3-year term, which financing was secured to support the critical refurbishment at Vanchem. This agreement reaches maturity in November of this year. And with this approach in Bushveld has commenced discussions with Orion and other potential funding partners on the refinancing options available. In order to determine a sustainable capital structure, in relation to the group's operations and long-term ambitions for growth, we will, of course, provide further updates to the market once a decision has been reached. There continues to be factors that we cannot control such as national load shedding, which impact our production levels and cash costs. However, we have invested capital in the refurbishment and optimization of our operations to ensure consistency. And we are pleased to note the progress that has been achieved in our pathway to further growth. The work we have put in to achieve this stability is now being reflected in our production numbers. We are committed to building Bushveld into sustainable cash generative, low-cost production and processing platform, and I look forward to updating Bushveld shareholders and stakeholders on our progress at the end of the coming quarter. Before I conclude, I just want to end off with just an important strategic reflection. We have spent substantive long-term capital over the last 5 years. As we have built our asset base, and as a consequence of which we have -- as we have often said, 2 of only 4 operating primary vanadium plants in the world. This period of extensive capital investment and refurbishment, optimization of Vametco as well, has resulted in Vametco operating consistently and producing at a steady state, while capital refurbishment at Vanchem means that Vanchem is increasingly positioned to increase production significantly as well. I'd like to just make the point that in spite of the challenges that we have experienced in the few years in the past, including COVID which appears like a distant memory. The company has weathered this storms and is in a good position looking forward. The strategic focus of the group will continue to be on building a sustainable cash generative, low-cost production and processing platform that supports the steel, chemical and energy sectors. We will particularly be focused on this year on ensuring that we meet our production targets. We recognize the significance and importance of being a low-cost producer, and focus will continue to be on ensuring that not only do we contain but we reduce our costs. Our limited capital spending this year mainly on sustaining CapEx as indicated, will support the company's cash generation efforts. We anticipate resolution on the Orion convertible loan note as indicated, which we would see elimination of the near-term debt pressures. This on top of significant movements already in the course of 2022, where we paid down the RCF, that was dealt to Nedbank, as well as dealt with other liabilities associated with the Vanchem acquisition. Finally, the cover to Bushveld Energy, which is anticipated in this quarter, should lead the company with a fairly crisp clear investment proposition around our upstream houses, while the downstream houses are located in a stand-alone vehicle that we believe will be able to attract the necessary support both from the capital markets in general to ensure the success of the downstream business. I'd like to pause here and thank you all very much for your time. And I would like to take your questions.
Operator
operator[Operator Instructions] Today's first question is come from Marina Calero from RBC Capital Markets.
Marina Calero Ródenas
analystI have a couple of questions. The first one is on the impact of load shedding on Vanchem. Assuming the agreement with the municipality works as impacted, when would you expect the group to reach production level of 5,000 mtv, 5,400 mtv?
Fortune Mojapelo
executiveMarina, assuming that the load shedding situation at Vanchem is normalized, what it means is that we can continue with our efforts to optimize the recoveries and the yields. And we anticipate that, that would be very much, the focus of the first quarter and would anticipate that during the course of the second quarter, we will be able to reach that run rate of 2,500 mtV to 2,600 mtV. Again, I can't emphasize enough that the important thing here is to ensure that we are able to run our kilns continuously, and which would allow us then to focus on optimization efforts.
Marina Calero Ródenas
analystAnd the second question is about the convertible loan. I appreciate that the discussions are still ongoing, but can you give us more detail about how the conversations are going? Are you confident you will be able to reach an agreement with Orion or obtain funding from a third party to cover the payment?
Fortune Mojapelo
executiveLook, we have a long-standing, very healthy relationship with Orion. So I want to just start off with that. And secondly, make the point that our discussions with Orion, I think they've been going on in that spirit of the kind of healthy relationships that we have. We are fairly confident that we will be able to reach resolution. I think, I must also say that what gives me confidence is the fact that we're having this conversation on the back of the capital spend on the refurbishment of country. And with some stable operations coming through at Vanchem, you will expect to see an operation that is generating cash. And as you can imagine, with dedication rating operations, it just enhances our options in terms of dealing with the convertible loan note. So if you ask me the question, am I confident, that we'll reach an acceptable solution, the answer to that is, yes, we are confident.
Operator
operatorWe'll now go to Tom Mayer calling from SP Angel.
John Meyer
analystIt's John Mayer. Well done on reaching a form of stability in a difficult operating environment. As you say, COVID is a bit of a long-distance memory and load shedding is, hopefully, now under some form of control. The next biggest issues for us analysts, to look at are clearly inflationary factors and pricing. And what I see when I look at prices around the world is an enormous divergence between the various prices given by the London Metal Bulletin, Orion's notes or Asian Metals. And some of this reflects, I think, pricing disparities between ferrovanadium and maybe other vanadium products and what's going on in different markets. Can you give us a bit more of a view on where you think the prices are going? And how Bushveld is going to manage that? Because clearly, you're able to set direct some more shipments into the U.S. for bigger prices there. And I guess you might be able to play around a bit with the mix of products that you're able to sell. Because there's such a big divergence in these prices, perhaps you could give a bit of a view on where you think you might be with pricing through 2023. And as a second part to this question, can you give us a view on orders for BELCO electrolytes, and how you see the vanadium redox battery market developing this year.
Fortune Mojapelo
executiveThanks, John. Let me start with the first part of the question, which is the pricing diverse -- let me start with the inflationary factors. These are real, I think, across the entire industry. We have seen a general inflation in the mining industry, for example, in our -- of high teens over the course of last year. In South Africa, we were striving that, on the 1 hand, is increasing energy costs, but also is the other input costs that we've seen prices increase quite significantly. Where any of these inputs are dollar-denominated it's an issue. But fortunately, most of our input costs are rand denominated. And why is this important is because, of course, we earn our revenues in dollars, number one. But also, due to the high inflationary environment, we will pay quite close attention to the exchange rate between the South African rand and the U.S. dollar. And already, we are seeing a weaker rand driven by a number of structural factors, including these inflationary factors. And that weaker rand will come in quite handy, we believe, particularly given how conservative we are in our budgeting processes around the exchange rate. So it's a reality we have to live with, but fortunately, we do have a few things in our favor, that we can -- that will help to counter the impact of inflation. On your comment -- and on that point, again, I just want to emphasize the significant importance of throughput, as I said earlier on, when I was giving the update. Just in Q4, we saw as much as a $4 reduction in the cash costs compared with Q3. And that's just sort of the kind of impact that you can get from increasing your throughput. So as we do that, we think that's going to also help cut some of the inflationary factors we're dealing with. On the question of divergence in prices, you're right, we have seen quite a significant divergence initially just between the U.S. on the one side and Europe and China on the other side. And in fact, some people would be -- would have expected that to close that gap, we would see U.S. prices come down towards European and Chinese prices. And perhaps informing that sort of conservative view would have been a number of factors. One is the impact of the zero COVID policy in China, two is a property sector and that was under some pressure, and then three, of course, the war in Ukraine. Now what has happened since is we've seen that the Chinese government relaxed the zero COVID policy. We have seen some relaxation on some [indiscernible] positions around the property sector. Both of which have actually been quite positive for vanadium prices. So we've seen Chinese prices move to levels where today they are closer to $42 per kilogram V. So if -- and in the meantime, European prices have also [indiscernible] points. I think today, we're looking at prices in the order of about $37 per kgV. At the same time, prices in the U.S. have continued to held relatively steady, and that's notwithstanding relatively low levels of utilization of steel plants there. So when I look at all of that together, I think that going forward as plant utilizations in the U.S. increase in support of infrastructure spending. We expect to see more support to Vanadium prices. And by the way, all of this is before we factored in the influence or the impact of demand from the VRFB, which talks to your second question. I don't know if you've noticed this, but there's certainly been a ramping up of supply chain for VRFBs in -- particularly in China, and we have started to see some supply chain development in Europe as well. I always think that supply chain developments are a very good point to how China's policy is playing out. There's certainly very strong support for VRFBs in China, we've seen construction of electrolyte plants. We've seen joint ventures with the big vanadium producers that are looking at just the electrolyte production capacity. We've seen AMD announce a 6 million-liter electrolyte facility in Germany, which they're currently constructing. So what all of these says to me is to support the narrative of growing VRFB demand. And suddenly, if you also look at projects that have been announced in the last 6 to 12 months, there's a significant large [indiscernible] gigawatt scale projects, which also are going to require a lot of vanadium. What we have done is BELCO is obviously, we're busy with the product qualification process with various OEMs. And we have taken a bit of conservative view in terms of ramp-up this year. But we are seeing strong interest, which gives us a lot of confidence that we will be able to sell products, that comes out of BELCO. I hope that answers the question.
Operator
operatorWe'll now move to Mr. Nick Chalmers from ARC.
Nick Chalmers
analystFortune, would you be able to elaborate a little bit on the steps you're taking at Vanchem to find a solution to mitigate load shedding issues? And does that involve putting in any backup power generation.
Fortune Mojapelo
executiveThanks for the question, Nick. So to start with, just really understand the difference between Vanchem and Vametco. Vametco has got a direct contract with Eskom and in terms of which -- in terms of load shedding, all that is requested or Vanchem, together with other high-end large power users is to reduce in curtailment their consumption. That's typically that reduction hardly ever goes above 25%. So it allows plants to work around this. At Vanchem, on the other hand, because we were 1 on the municipal grid, and 2, we didn't have actually a curtailment contract in place. The consequence of which is that during load-sharing we were losing power completely, hence that terrible impact we had during the course of 2022. Our approach to resolving that has been, I'd say, threefold. On the 1 hand, we do have some standby generators -- but remember, there is a facility that uses as much as 10 megawatts of power. So you can't run a facility like that on just generator. So we've used generators only in critical areas. And of course, you're not that, that is also quite expensive. The second thing that we did is to negotiate with municipality and elect them to get onto a curtailment solution. That solution was only implemented in December. It goes a long way to alleviating the power shortages. In fact, I'd say in January, already we've seen substantial improvement. We are currently going through daily load shedding, but in our operations, we are not. At Vanchem, what we are working on is curtailment. So that's quite the -- however in reality, what we have also seen is that in terms of severe stress on the grid, some municipalities will rank behind others. And consequent to that is even with the curtailment solution at Emalahleni, we can still and being load shed, even though the occurrence of that is much, much reduced. And as I said, we have been seen that really in the month of January so far. So that alone is a huge step forward. But ultimately, what we want to get to ideally is a relationship with Eskom, like other large power users that ensures that we're guaranteed of curtailment rather than load shedding.
Nick Chalmers
analystAnd we're agreeing that sort of provide a stand-alone contract with Eskom, would that be a prerequisite to embarking on any further production capacity expansion at Vanchem through further refurbishment?
Fortune Mojapelo
executiveIt's a good question. It's certainly very, very key that you have a reliable power supply I think before you embark on any other expansion initiatives. So the answer to that is yes. But I should also just highlight that we're not leaving everything to Eskom. We have stated before that with implementing of the mini hybrid. So they have been integrated Vametco, we're able to demonstrate that you can pay renewable energy with VRFBs and actually supply power on a cost-competitive basis to our operations and on a reliable basis. Our Bushveld Energy team is hard at work to also develop the self-generation solutions, as well as -- which include application of long-duration energy storage solutions at our operations. The relaxed regulatory environment that has not been ushered in, is something we certainly do intend to take advantage of like many other mining companies. And that way at least you have the best in your own hands. So that is something that we are prioritizing going forward, especially on the back of the successful execution of Vametco mini-grid.
Nick Chalmers
analystOne final question for me. You talked earlier about sales volumes lagging production a little bit. Did I -- I think quite hear the number you mentioned was it 250 tonnes volumes behind production. Is that correct?
Fortune Mojapelo
executiveYes, that was in 2022. We accumulated quite a significant inventory. And that was largely because of the logistical challenges that we were dealing with, much of last year. But as we've said, we're comfortable that those volumes will be able to sell them down during the course of this year. That's why we would expect that our sales volumes for this year will be higher than our production volumes.
Operator
operator[Operator Instructions] Next question is coming from Mark Ryan from Tower Capital.
Unknown Analyst
analystI wonder if you could explain the sales pipeline for [indiscernible] which stood at 250 megawatts hours for a number of years, a suddenly increased tenfold overnight to 2,500 megawatt hours. Obviously, you've got the mini grid coming online, but can you explain where these figures came from and the sales process and are these potential projects real, or are they just hypothetical? Are they internal or are they external? I leave that one first.
Fortune Mojapelo
executiveYes, let me deal with that first. Obviously, as we commission BELCO, we will start to provide more granular guidance in terms of sales numbers. So this tenfold increase that you referred to, should please not be deemed to be guidance. In any event, just to be clear, operating at full capacity, BELCO can only supply 200-megawatt hours worth of electrolyte. What that number relates to is a pipeline of projects that our Bushveld Energy team is developing. You will find that's a very typical thing with energy companies, that they will talk about the scale of their pipeline. There will be a probability factor applied to that in terms of how many of those actually convert into actual transactions. So the pipeline is a good indicator of the probability of actual contracts down the road, but it's not to be taken as the actual committed sales.
Unknown Analyst
analystBut do you see that as being sort of disingenuous or -- I'm not going to use the word deceitful, but obviously, to jump from 250 megawatts where we stood for a number of years to 2,500 overnight with no explanation, no progress made or any sales made that, that really shouldn't be there?
Fortune Mojapelo
executiveLook, you make a good point, and I will look into that certainly from a perspective of what we report from Bushveld Energy. As I said, reporting on pipelines is something that is fairly common within the energy industry. And needs to be read within that context. But I take your point that perhaps it does need to come with all the necessary qualification and explanations that somebody who's not as familiar with those terminologies, if they can read through those lens. But I also want to make a second point, which is that, obviously, as we have advanced our BELCO plant. We are engaging more with -- with OEMs, and we have inquiries that go into what we see as a reasonable pipeline of electrolyte deliveries, that would come. Thirdly, we've got a deployment team, whose job is to go and develop projects where VRFBs will be deployed. Now the deployments team need not be constrained by the capacity of BELCO. If they're able to secure a project to deploy 400-megawatt hour somewhere for, for example, just making this to make the point, we will not be able to supply that electrolyte in a year from BELCO. And I would also add that even CellCube would not be able to deliver that scale of project. But our deployment team is set up in such a way that they can work with other OEMs, to ensure that the projects are deployed. What we want to see is VFRB is gaining momentum. And so we've taken a particular approach with deployment. -- to essentially drive towards that. And if it means collaboration with other parties, there will be collaboration. So it's a lot I'm saying here, but I take your point around how we represent pipelines and that we need to perhaps provide a little bit more color.
Unknown Analyst
analystIs there enough land or company-owned land around Vanchem to realistically install the mini-grid or even VRFBs?
Fortune Mojapelo
executiveThe short answer to that is to install solar and VRFBs, the short answer to that question is no. But is the land around it nearby, yes, there is. So part of what we look at is if we develop a captive solution, that captive solution would have to have a willing agreement to allow us to roll the power over to Vanchem. There's a willing framework that is being developed. And already, we've seen some contracts that have been deployed in South Africa for renewable energy. Located some roads and willing power to our customers look at it some distance away. So I would have to use a similar framework -- but having said that, we also are looking at the prospect of just battery storage and the impact it can have on improving the security of our power supply. The ultimate construct, the ultimate project set up, we will provide more details in the due course. But that's something that our energy team is currently engaged with.
Unknown Analyst
analystWhat is your relationship like with Garnet now following the court action?
Fortune Mojapelo
executiveLook, the court action was very unfortunate. But when that case was concluded, we won, yes. But what does that mean? It basically meant that there are talks to go and figure out a way of working with each other, which is exactly what we have done. I think that we have, of course, been quite mature about it and realizing that we have both invested in the success of CellCube. So from that perspective, and I think it's fair to say we don't necessarily expect our relationship to be the coziest. But certainly, we have had, I think, a stable and the working relationships since.
Unknown Analyst
analystNext question. After 7 or 8 years of Bushveld Energy with very little to show for it, I wonder if you can explain exactly how you foresee and what the business model is for Bushveld Energy going forward once it's carved out. And will there be any connection with the Mustang, CellCube, Enerox arrangement. Will it all be into one or will Bushveld Energy be completely separate from the OEM, which is CellCube, Enerox, Mustang?
Fortune Mojapelo
executiveLet's start with the first question about Bushveld Energy after our 8 years. If you recall, we set up Bushveld Energy back in about 2015. And with nothing more than just an ambition division to support and drive the adoption of VRFBs in the stationary energy storage market, when we started all of this, even the term stationary energy storage, which was still a fairly foreign trend. That is not widely talked about. And very much the big focus was around electric vehicles and mobility. So let's talk about what is it that we have done since then. I think number one is we have driven a fairly aggressive effort to ensure that there is widespread support for VRFBs with multiple stakeholders, whether working with the World Bank, whether working with the regulatory players here in South Africa or working with the broader vanadium industry. We today have a vanadium energy storage committee that is working quite hard this fall to make sure that VRFBs have replaced in the sun when it comes to energy storage. I think the impact of that effort is one that you will see in the coming years. Second thing that we did do was to actually make an investment into the VFRB space. We invested into Invinity and supported -- played a key role in the formation of Invinity from the merger of redT and Avalon, which now seems quite a distant memory. And we've been happy to see the success Invinity is having in the market, in which, in many respects, was enabled an investment we made, which we also exited by the way, with a very healthy return. And we did that in order to focus our efforts more on CellCube, which is a company that we're developing together with Garnet. Thirdly, we now are looking to commission an electrolyte plant. We were the first to build such a plant outside of China and outside of the Reading facility in the U.K., certainly at that scale. So we're pleased to see the provision of that plant, which has been funded together with the IDC, and will play a significant role in the VRFB space. Third point is that we have pioneered a rental product which today is in operation. If you look at the Invinity project at the Oxford [indiscernible] project which was showcased on Skynews the other day, the electrolyte in that project is based on a rental construct, which we developed, which we think is going to be a catalyst for deploying more VFRB systems around the world. And then finally, of course, we have the mini-grid, which we are now constructing at Vametco, which showcases the viability of renewable and VFRB storage today which is set to be going to be more attractive going forward is scale of impact is felt. So there is a lot of progress, that has been made. I think that it's fair to say that the progress might be a little obscured because we are a mining company, and much of our narrative has been of our on mining and the processing operations as it should be, hence, the decision to cover Bushveld Energy. And that process is underway. Now you all have seen that we announced the sale of our interest in CellCube into Mustang. And we have indicated that ultimately, we intend to convert all our energy assets outside as if on a stand-alone basis. I'm unable, unfortunately, to tell, to give you a lot more color in terms of the relationship of our remaining energy assets and Mustang and/CellCube, we will provide the market with an object at the appropriate time if there is to be any such relationship. Suffice to say that the process to convert the energy is well underway and is on track.
Operator
operatorWe do not appear to have any further questions. Fortune, I'd like to turn the call back over to you for any additional closing remarks. Thank you.
Fortune Mojapelo
executiveThank you very much, everyone, for your time. And again, apologies for that late start. We really appreciate all the questions, and we welcome continued engagement on this update. I look forward to speaking with you further on our Q1 2023 update. And assume I'm looking forward to be sharing continuing progress both in respect of our operations in terms of meeting our production targets, our cost targets, as well as all the other strategic initiatives that we have announced that we've told the market we're busy with. That includes the cover of Bushveld Energy as I indicated and ensuring that we get this business into a place where it is generating cash, with a solid balance sheet with the near-term debt pressures resolved. We certainly think that getting all of these issues in place would support this company for us to reiterate going forward. And I'm hopeful, if not confident, in fact, that these efforts will all bear fruit for all our shareholders going forward. With those words, I'd like to thank you all for your time and for your attention. Thank you very much.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Bushveld Minerals Limited transcript — plus 256,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Bushveld Minerals Limited earnings transcripts and 256,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Bushveld Minerals Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.