Thanks, Andrea. It's a pleasure to have everyone with us this evening for BWXT's call covering the second quarter of 2021. Alongside me today are our President and CEO, Rex Geveden, and our Senior Vice President and CFO, David Black. During this call, we'll address some topics that qualify as forward-looking statements. Such statements carry risks and uncertainties, among them those outlined in the safe harbor language included in today's earnings release as well as in the company's SEC filings. We'll additionally cover non-GAAP financial measures, and you can find reconciliations of those to GAAP figures within the quarterly materials posted on the BWXT website. With that said, Rex, over to you.

Rex Geveden

executive
#2

Thanks, Mark, and good evening to all of you. Earlier today we announced strong results for the second quarter, with earnings per share of $0.62 and revenue above $0.5 billion, as we get ready for a robust second half. Even though they are lower on a comparative basis, our year-to-date earnings match what we expected as we pass the halfway point of 2021, and we have clear visibility into the rest of the year. In addition to operational performance, our attention stays on hitting key milestones that will set the company up for continued growth. Before I turn things over to David, who will walk through the financials and guidance, I want to bring you up to speed on the business and what's happening across the BWXT portfolio. Even with COVID and the interruptions caused by the capital build-out, the Nuclear Operations Group continues to turn in dependable, solid results, and it's doing so while keeping up a demanding operational pace. Like 2020, 2021 is a year of transition, since we're moving toward higher labor production volume and fewer long-lead material procurements. The business is hitting those milestones nicely and generating impressive cash as it positions itself for a robust second half this year. To repeat what we've mentioned previously: when you're dealing with the Navy segment, the schedule for hitting particular milestones and how we record gains can vary quite a bit, since several variables come into play. Beyond the usual irregularity you'd expect in this kind of work, we dealt with COVID-related absences during the early part of the year, and that created some strain on our output. There's also a one-off circumstance worth noting — we're simultaneously managing an extensive capital expansion while keeping operations going, and that brings its own headaches. Take one of our NOG locations, for instance: we just brought 5 large machine tools online inside the plant, which interrupted production somewhat and required us to come up with quick, flexible solutions. The encouraging part is that as this capital campaign nears its conclusion, those constraints are becoming less of a problem. Turning to Canada, our medical segment is recovering to where it stood before the pandemic, and during Q2 we recorded a 60% increase in top line revenue. We anticipate that this favorable momentum will carry on throughout 2021 while we continue advancing our commercialization work on technetium-99 generators. Broadly speaking, the new production line for technetium-99 generators has transitioned out of the construction phase and into initial testing, with systems now up and running at the Kanata facility. Of the 4 major milestones, 3 are now largely finished — these include the installation of in-cell radiochemistry equipment, significant modifications to the facility, and the target delivery system, which has been put together and is undergoing factory testing ahead of a future installation on a Darlington reactor. The last big piece of the puzzle is the radiopharmacy line — the automated, complex one — and it's almost finished. Once the program shifts entirely into testing, we'll run the integrated system using cold chemistry first, and after that we'll move on to hot chemistry runs. We're still on schedule to send FDA reference batches along with the necessary documentation near the close of the year, as we pursue a priority review. Over in Nuclear Services, we're waiting on new awards expected before this year is out, and those include the Pantex and Y-12 management and operations contract, plus the Savannah River integrated mission cleanup contract. If we succeed in landing some of these opportunities, our Nuclear Services division could experience meaningful revenue expansion over both the near and medium term, with the aim of restoring that division to the prominent standing it once held. Thanks to our deep heritage in nuclear operations, we hold a competitive edge that positions us to lead in this marketplace, which is demonstrated by our recent string of contract awards and a robust pipeline of fresh possibilities, especially when it comes to bigger contracts. Moving on to additional growth efforts. Our enthusiasm remains high regarding where nuclear microreactor development is heading for government use cases. Several weeks back, BWXT, alongside partner Lockheed Martin, was chosen to move forward the design of a nuclear thermal propulsion system as part of a joint undertaking with NASA and the Department of Energy. Through this fresh award, the team will concentrate on bringing the reactor design to maturity — encompassing the fuel, reactor core, shielding, instrumentation and control systems — while we draw on corporate investments to fold everything into a conceptual design; this initiative extends the many years of effort BWXT has already completed alongside NASA on nuclear thermal propulsion technology. Most recently, that effort encompassed testing several coated low-enriched uranium fuel types for a reactor, which will result in a final fuel design next year. This work moves us closer to a demo mission that would highlight the core advantages of using nuclear power and propulsion in space — a capability BWXT is especially suited to provide. In addition to what we're doing with NASA, we're nearly done finalizing our agreement with the DOE under the Advanced Reactor Demonstration Program. That initiative accelerates work on the technology required for the coming generation of nuclear power generation, plus a variety of high-temperature industrial uses; we're also continuing to advance the DOD microreactor program on the fuel and reactor design front. Taken together, this wide-ranging collection of programs covering high-temperature gas nuclear reactor design, manufacturing and testing keeps setting BWXT apart and puts the company in position to take part successfully in these thrilling emerging markets down the road. From the standpoint of the government budget, we keep watching and feel heartened by the bipartisan backing for recapitalizing the naval nuclear fleet and BWXT programs right across the board while the House and Senate Appropriations Committees get their fiscal year 2022 markups ready. Another thing that gave us confidence: Carlos Del Toro, the administration's pick to lead the Navy as Secretary, said at his Senate Armed Services Committee confirmation hearing that he would keep up the review of ways to boost how quickly Virginia-class submarines are built, and he repeated that he supports Columbia remaining the Navy's top acquisition priority. Beyond the defense budget, the administration's position on nuclear energy also encourages us, because of the money it is putting into nuclear research and its consideration of policies that would help. In April, at a White House press conference, Gina McCarthy, the White House's National Climate Advisor, publicly described the role nuclear energy plays alongside renewables. Next up was the President's budget request for government fiscal year '22. That proposal included several notable figures: a 65% increase allocated to the Office of Energy Efficiency & Renewable Energy, a 22% bump for the Office of Nuclear Energy, and nearly 50% additional funding directed at DOE's Advanced Reactor Demonstration Program, also known as ARDP. As we've noted previously, the way we engage with the commercial nuclear sector is not the same as our strategy in other markets, since in those areas it's simpler to discern what the government and customers plan to do and how much money is behind it. At a high level, we intend to support the development of commercial advanced reactors by participating in the supply chain — serving as a designer and producer of components and fuel — while also looking for opportunities to commit funding and resources to our own proprietary technologies through customer RFPs that provide more predictable results and require lower levels of investment. Consider what happened last December: we were among 5 firms chosen to receive the Department of Energy's ARDP risk-reduction awards. Through a cost-share structure of 20 to 80, BWXT and the DOE will direct more than $107 million toward R&D of technologies that mitigate risk in fuel and manufacturing, aiming to bring American-made small modular reactors to maturity. Likewise, we're quite enthusiastic about how things stand in Canada. Canada's government is backing the creation of a domestic small modular reactor sector as a way to meet its clean energy standard. A significant pool of money has been set aside by Canadian Nuclear Laboratories for R&D on advanced nuclear reactors, and that organization has also strengthened ties with the U.S. Nuclear Regulatory Commission, all so that deployment can move more quickly. One of Canada's major utilities, Ontario Power Generation, intends to bring advanced reactors online near the end of this decade — a situation that creates a strong market in which we could grow our position as a preferred Canadian domestic supplier. For a number of years, many companies in the commercial sector paused their spending as they faced challenges tied to cheap electricity rates and incentives given to competing renewable sources. Even so, our willingness to wait, our determination, and our extremely distant horizon meant we maintained what we can do in this sector — including the sole site and supporting systems in North America capable of delivering big nuclear parts. Consequently, with accountable countries rushing to confront a changing climate, we expect fresh focus to fall on atomic energy options, and BWXT occupies a strong spot to become a key participant in an expanded supplier network that assists in resolving these worldwide challenges. David?

David Black

executive
#3

Thank you, Rex, and good evening to everyone. I'll begin on Slide 4 of the earnings presentation, covering total company results. For the second quarter, revenue came in at $505 million, which was roughly flat versus the same period a year ago, since strong gains in the Nuclear Power Group were canceled out by lower Nuclear Operations and Nuclear Services revenue. Second quarter earnings per share declined 13% to $0.62, driven by reduced operating segment earnings, increased commercialization costs tied to the tech-99 generator line, greater interest expense and a higher tax rate; those pressures were partly offset by increased pension income and foreign exchange gains. Operating income and margins also fell during the quarter, mainly because favorable contract adjustments in the Nuclear Operations Group were lumpy and timing-related, as we discussed in the segment results. For the first half of 2021, consolidated revenue declined 1% and earnings per share declined 10% compared with a strong first half in 2020. You can find the second quarter and year-to-date EPS bridges on Slides 5 and 6. Now turning to second quarter and year-to-date segment results on Slides 7 and 8. The Nuclear Operations Group brought in $381 million of revenue, a decline of roughly 7% versus the prior year period, largely due to reduced long-lead material production, partly offset by increased production volume. NOG operating income reached $69.2 million, a 20% drop from the prior year period. As Rex noted, operating income fell disproportionately relative to revenue because of both reduced volume and fewer favorable contract adjustments, which are mostly a matter of timing. NOG operating margin came to 18.1% in the second quarter, and we expect it to improve during the second half of the year as realized cost savings combine with more regular workflow once capital project bottlenecks ease. On a year-to-date basis, NOG produced $783 million of revenue, down roughly 6% against a strong first half performance in 2020. First half operating income fell 19% on lower revenue, which reflected less long-lead material production and fewer favorable contract adjustments stemming from both timing and COVID disruptions. Year-to-date operating margins stand at 18.3%. We still expect the typical high-teens margins, with upside from pension reimbursements, for the full year, similar to 2020 results. Within the Nuclear Power Group, second quarter revenue totaled $102 million, up 50% from the second quarter last year, fueled by a combination of increased field service activity, fuel production and fuel handling in the commercial nuclear power business, along with a strong rebound in BWXT medical, which rose nearly 60% off COVID lows from the second quarter last year. NPG operating income increased significantly, driven primarily by higher volume and some additional government funds to offset COVID-related expenses. That produced a 10.6% operating margin for the segment in the quarter. Year-to-date, the NPG segment is up 34% of revenue, and operating income was nearly double the amount compared with the first half of 2020. Even though margins so far this year are running below what we guided, we expect improvement during the second half, driven by a better mix, increased fuel sales, and medical isotopes continuing to recover. Moving on, the Nuclear Services Group posted $5.8 million in operating income for the second quarter, an increase over the prior-year period, mainly on stronger contract performance. Through the first half, NSG income matches the first half of 2020. And given award fee true-ups, it's hard to envision a strong second half for that segment. We also think possible new wins might begin to help the financials, though that depends on when those awards land. Taking everything together, we're reaffirming our 2021 guidance on Slide 9, and we're making a few small changes to other information to reflect year-to-date actuals. As we said on the previous call, we still expect greater development and commercialization costs tied to getting the tech-99 generator product line ready, and we're giving specific guidance of roughly $30 million of expense reported in Other under segment income. The offsetting adjustment sits in Other net outside of operations, and we now expect that to come in $5 million above our earlier forecast because of year-to-date FX gains. That line item is now expected to deliver $55 million to $60 million of income for the year. Pension income makes up most of Other net, and our pension income assumptions for 2021 remain unchanged. And as Rex noted, we can see the work ahead in the second half, and we expect earnings to accelerate more meaningfully near the end of the year, driven by timing and milestones that shape profitability across all 3 segments. Finally, I'll wrap up my comments by moving to the balance sheet. As we laid out on the previous call, we issued $400 million in senior notes due in 2029, intending to redeem the senior notes due in 2026. After the quarter closed, that's exactly what we did, and it will lower interest expense on fixed debt. The company remains well positioned on the balance sheet, with no long-term fixed debt coming due until later in the decade, and we continue to have solid balance sheet flexibility. With interest rates currently attractive, we'll look carefully at using the balance sheet more aggressively, whether to invest back into BWXT opportunistically through share repurchases or to put additional capital to work to advance our strategic intentions. With that, I'll hand it back to Rex for closing remarks.

Rex Geveden

executive
#4

Thanks, David. Like David said, our balance sheet gives us quite a bit of room to maneuver, and because of that, we're taking a hard look at ways to put it to work more efficiently. If you set aside how much the 2 big capital initiatives in naval reactors and nuclear medicine matter, the company is producing very strong underlying free cash flow. Those 2 heavy capital campaigns are scheduled to taper off late next year, and we're starting to think about how to capitalize on that room to maneuver. Because we're confident about the company's future growth, as we weigh future capital uses, David and I will keep treating the risk-adjusted returns we can reliably get by reinvesting in ourselves through share repurchases as a solid benchmark, while also weighing other opportunities; and finally, we're excited to host our Investor Day on November 16 in New York City, where we intend to provide deeper insight into the company's growth initiatives and our strategy for guiding BWXT through the remainder of its first decade as a public company, along with our ambitions past that; and with that, I'll ask the operator to open the line for questions.

Bob Labick

analyst
#5

I'd like to begin with what was said earlier regarding moly technetium. Can you go into more detail about what needs to happen for the radiopharma line to be finished? And after that, what additional steps are required before the generator can be submitted to the FDA?

Rex Geveden

executive
#6

Absolutely. Thanks, Bob. Only a few things remain to be done on the radiopharma line. The terminal sterilization technique still needs to be installed. That's e-beam technology, electron beam. And that equipment is almost ready to be installed. After that, we bring it all together and test it on the radiopharma line. All the hot cells we require are in place. We've integrated the majority of that equipment into those hot cells. So sterilization is really the last piece. Then, regarding preparation for an FDA submission, essentially we have to — our plan is to perform cold chemistry runs through the radiochemistry and radiopharmacy line. That refers to unirradiated material, which is acceptable, since the chemistry remains the same whether or not it's irradiated. So we'll conduct cold runs, and afterward we'll move on to hot runs, which will serve as the runs of record, and put together the data needed to accompany the reference batches and send the package to the FDA.

Bob Labick

analyst
#7

Understood. Has the call been made yet on whether you'll use irradiated moly out of the MURR reactor? Or does it remain OPG for now? And at what point will that get decided?

Rex Geveden

executive
#8

That call has already been made, Bob. When we first brought MURR in as a sort of backup supplier, the plan was always to kick off the initial ramp with MURR. Irradiating there is somewhat simpler for a number of reasons. But once we're at the full production volume we need, that takes us to the Darlington reactors with OPG. So irradiating at Darlington on the CANDU reactor is the long-term answer.

Bob Labick

analyst
#9

All right, fantastic. And the final item from my side. You brought up, of course, that the NPG segment saw decent margin improvement during the latter half. It looks as though it climbed up to somewhere around 15%, 16%. So that we don't read too much into it, what's the trajectory for that across, say, the coming 4 to 6 quarters? Since my understanding is that with moly increasing output, additional depreciation will kick in; so could it stay uneven? Or what's the right way to approach forecasting it across that stretch of time?

Rex Geveden

executive
#10

Yeah. So on that moly line, we're putting in roughly $0.25 billion of capital. The bulk of that consists of long-lived equipment depreciated across, let's say, 12 or 15 years. That leaves you with a depreciation obstacle of somewhere between $15 million and $20 million to get past. On top of that, there are start-up costs tied to that line; so early on, profitability definitely takes something of a hit while we bring production up; yet as time passes, of course, we get beyond that. And once we capture more market share and finish the ramp, we anticipate a profitable program that — to use the description we gave earlier — should deliver gross margins around 50%. We also anticipate capturing a very substantial share within the North American market; so there are obstacles early on, but in the end, we see a program that's very, very profitable.

Rob Spingarm

analyst
#11

To build on what we said about the FDA, once the review is underway, how long should we expect it to take — whether it's a priority review or a standard one?

Rex Geveden

executive
#12

Sure, Rob. A priority review is what we're asking for, and regarding the timing — the FDA sets a 9-month target for itself, and within that period they have to either approve or reject, unless the applicant gets asked to supply more data, which pushes things out and restarts that clock. Even so, we're optimistic about securing approval inside that period, meaning as long as 9 months.

Rob Spingarm

analyst
#13

All right. Then regarding what small reactors bring to the table — the adaptability and reliability of the electricity they deliver — is that advantage, how would you evaluate the possible cost for each kilowatt-hour from a rivalry perspective when compared with different generation options? And in what way should we view that as things develop?

Rex Geveden

executive
#14

Yes. Rob, perhaps I'll shift the perspective somewhat on that matter. The way we see it, the economics surrounding small reactors, small modular reactors, and even microreactors aren't clearly grasped at this point, especially the last category. However, when it comes to small modular reactors, my sense is you could consider the overnight cost landing between $6,000 and $7,000 per kilowatt. That's pricey, from where I sit, compared with other choices; therefore a cost disparity exists that, in my opinion, the sector must narrow for small modular reactors as well as microreactors. If you want to compete against solar and natural gas and similar options, I think you'll need to reach the $2,000 or $3,000 per kilowatt level. What I mean is installed — the expense of installed capacity, so that it might be taken into account for deployment on the grid.

Rob Spingarm

analyst
#15

All right — and you feel sure we can reach that point?

Rex Geveden

executive
#16

Yes, I think so. What makes me especially hopeful is those advanced reactors — the high-temperature gas ones and similar designs — since they deliver better efficiency while being more compact. That brings certain inherent benefits, and beyond that, the high-temperature gas coming out of them can serve industrial processes; take, for instance, the idea people raise of using them to crack hydrogen. Given how hot they operate, they're ideally positioned to enable particular industrial gas processes — that is, industrial heat processes. So being able to do that clearly strengthens the business case. So yes, I'm hopeful, though we're still in the early stages.

Rob Spingarm

analyst
#17

Robert Spingarm from Credit Suisse here, with a follow-up question. I'm not sure whether this came up already, since I joined the call late. Regarding staffing: I believe you're beginning work on an additional Columbia core in the coming year. Does that mean you're currently bringing more employees aboard in preparation? And considering the tight labor conditions we're seeing right now, how do you view your ability to attract new personnel?

Rex Geveden

executive
#18

That's right, Rob — we are certainly recruiting. We still have hundreds of positions posted, and we generally succeed in filling them. News from the labor market gives us some pause, though I'd repeat my usual point on this: in the areas where our BWXT facilities operate — Lynchburg, Virginia; Erwin, Tennessee; Mount Vernon, Indiana; and 2 sites in Ohio — we're typically a preferred place to work. Our pay tends to be strong. Our benefits are solid. Perhaps even more significant, our backlog is so transparent that job candidates are able to envision where their careers are headed. These programs have viability spanning decades, so we generally attract highly qualified applicants, and we generally attract them in large numbers. We're therefore monitoring the situation. It's something we're keeping an eye on, yet at this stage I don't have major worries about our capacity to staff up for it.

Peter Arment

analyst
#19

Peter, you brought this up in your opening remarks, and David, I believe you touched on it too — the idea of a stronger second half. Is there anything worth highlighting about Q3 compared with Q4? And on a related note — you're roughly 70% of the way through your CapEx plans after the first half — does that spending stay level across the second half? How should we frame that?

Rex Geveden

executive
#20

I'll handle the Q3, Q4, and second-half picture, and maybe ask David to weigh in on capital. So 2021 is taking shape in a way that will feel familiar to you — very much like 2019. Back in that year, 2019, operating income split 43 to 57. This year, it's tracking at 44 to 56. So we've seen this movie before. The drivers behind the stronger second half break out roughly by segment. At NOG, volume keeps climbing; we've generally been ramping around the Columbia program, plus the fact that a few years back we moved to a permanent 2-Virginia tempo. We've been running this capital campaign to keep up with that volume level. So the ramp continues. That means you should expect volume in the second half to generally come in higher than the first half. Another element: as we begin the second Columbia — which kicks off early next year, late this year — you'll see long-lead materials get much heavier, and that has a strong effect on Q4. As David said, we get this sequential build from Q3 into Q4; Q4 comes in quite a bit stronger than Q3; the reason is that long-lead materials get layered on top of a production ramp that's already increasing. That's what drives NOG. Over at NPG, the second half carries much heavier component manufacturing, plus higher sales in fuel and fuel handling systems from our Peterborough operation. That operation is performing quite well, and we'll see that show up in the second half. We'll also see continued growth in isotopes. And just so you know, generally speaking, that business has a bit of cyclicality that always favors the second half, because the large cyclotron we use in Vancouver is shut down for maintenance for a stretch during the first half. That favors the second half, together with the recovery from the pandemic and general increases in demand for the products we make there. So we're expecting isotopes to be quite a bit stronger in the second half, and then generally just better mix at NPG. First-half margins were below average; we expect recovery to roughly that 12% level — 12%, 13% overall as we execute the second half of the year. Also, lastly with NSG, it tends to lean toward the back half too, since we reconcile site performance and TSG profitability during Q4, meaning you nearly always get a sizable bump in that unit during 4Q. Then, like David said, if those TSG awards come through on schedule and we win them, that would be meaningful for us as well; we'd gain some absorption advantage, maybe a little earnings from it, and then clearly a whole year of it in the following year; so there's plenty happening in the latter half, and right now we're pushing hard, executing effectively, and holding to our guidance.

David Black

executive
#21

And Peter, on your question about capital, you asked how much we'd spend for the balance of the year. We guided to roughly $250 million for the full year. We also said that next year, '22, would come in below that level. Then by '23, we'd be sitting at our maintenance capital, equal to 3.5% to 4% of revenue. So what's left of this year will still be quite strong. The first 6 months came in at $137 million, so expect a pretty similar figure for the second half. And then — the split between those 2 periods should be about equally strong; plus there can always be some timing shifts between this year and next. Still, my sense is that across the coming 4 quarters, you'll have a substantial amount of capital available to accomplish what we need to accomplish.

Michael Ciarmoli

analyst
#22

I wound up joining a little behind schedule. But regarding — I'm just attempting to figure out — that $30 million figure for Tc-99 commercialization expense right now, I believe you described it as exceeding 1%. So my guess is it went up by roughly a couple million. How should we consider, I suppose, that other expense as it starts to taper off? And how should we consider the possible tailwind when that spending halts? I mean, does it simply return to, I suppose, your typical other expense? It likely was around $22 million, $23 million further back. Perhaps it sat somewhat under $20 million. But how should we consider the direction of that? And is there — do you believe you've accounted for every expense at this stage?

David Black

executive
#23

Yes. So obviously, we are working to scale up for the moly-99 product line; therefore our typical corporate expenses would stay near that level, $20 million, $22 million or thereabouts. That has grown somewhat owing to the added cost. Once we arrive at — late in the production window for moly-99, everything will then belong to the moly-99 product; so it will revert to what we'd expect a corporate level cost to be.

Michael Ciarmoli

analyst
#24

Understood. All right. Now regarding that FDA clearance, Rex, I believe you mentioned MURR would be the first one used. Are there any dangers involved? Or is extra paperwork required from us? Or is everything of that sort already accounted for within the complete filing that starts with MURR, then switches over to Darlington? Or might the FDA raise that as a possible concern?

Rex Geveden

executive
#25

Indeed, Michael, this has to be handled as 2 separate parts. Therefore, once we hand in the reference batches along with the remaining paperwork, those will be specific to that setup — meaning irradiation at MURR, plus our radiochem line, radiopharma line, shipping containers, and so forth. Consequently, upon transitioning to the Darlington facility slightly further down the road, a supplement to the initial application becomes necessary. Even so, that step is fairly small, and the timeline for its clearance is considerably quicker. As a result, we view it as not especially hazardous.

Ron Epstein

analyst
#26

Just a few fast questions; regarding the Virginia class, what's the situation you're observing with long-lead components? Also, is the tempo picking up at all for that extra submarine they've mentioned?

Rex Geveden

executive
#27

Ron, for several years our strategic projection has assumed 2 Virginias, and that third Virginia has never been included in our assumptions. If that were to happen, it might assist in reaching the top end of our medium-term — intermediate guidance range. However, we aren't making plans for it, and right now we aren't hearing much backing for it; plus I don't think anything coming from authorization or appropriation would result in one entering this appropriation cycle; we are prepared for it. And if that were to happen, we could handle it with fairly limited capital investment, but at present we simply aren't planning for it.

Ron Epstein

analyst
#28

Understood. Understood. Could you also give us some detail about the thermal nuclear propulsion work you're doing alongside NASA — where things stand right now and where this might lead? And at some point, will you actually have a spacecraft flying with that technology aboard?

Rex Geveden

executive
#29

That is what I hope for most strongly; nuclear applications for space are something we're deeply interested in, Ron. What we've been working on together with NASA since 2016 is developing — primarily developing fuels that would work in a nuclear thermal propulsion system. Such systems operate at extremely high temperatures, and they place very demanding requirements on materials and on fuel. So for the past several years we've been developing and testing a range of fuel types, and for us it has been a fascinating, difficult, and fruitful program. This latest award mentioned earlier in the script is one in which NASA has moved toward the notion of proceeding to design the reactor, the spacecraft, and the systems, in preparation for a demonstration mission down the road. So I believe the concept is that NASA — and there's been talk of NASA partnering with DARPA on such a mission — would put a complete nuclear thermal propulsion system on a spacecraft and carry out some sort of mission demonstrating how effective NTP technology is. So that — I think it's — I think it's going to happen. The timeline I can't be certain of, but we are definitely positioned to back it. Beyond that, NASA is examining fission surface power as a nuclear technology. And on that — we anticipate hearing something from NASA before too long, since their power needs on the lunar surface are substantial, and the favored answer for that is fission surface power. So much is on the way there, and all of it is fairly thrilling.

Mark Kratz

executive
#30

Appreciate that, Andrea. That wraps up the conference call for today. Save-the-date notices for the Investor Day happening on November 16 will go out from us, and official invitations will come afterward. Should you have any additional questions, feel free to reach me at (980) 365 to 4300. Thanks once more for being with us this afternoon.

Operator

operator
#31

That brings today's call to a close. We appreciate your joining this presentation, and you're free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete BWX Technologies, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to BWX Technologies, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in BWX Technologies, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.