Thanks, Kathleen. Good evening, and welcome to today's call. With me are Rex Geveden, our President and CEO, and Robb LeMasters, our Senior Vice President and CFO. During this call, we'll refer to the first quarter 2024 earnings presentation, which you can find in the Investors section of the BWXT website. We'll also cover certain matters that constitute forward-looking statements; these involve risks and uncertainties, including those described in the safe harbor provision found in the investor materials and the company's SEC filings. We'll frequently discuss non-GAAP financial measures, which are reconciled to GAAP measures in the appendix of the earnings presentation available in the Investors section of the BWXT website. At this point, I'd like to turn the call over to Rex.

Rex Geveden

executive
#2

Thanks, Chase, and good evening everyone. Earlier today, we released BWXT's results for the first quarter. We achieved organic revenue growth of 6%, adjusted earnings per share growth of 9%, and cash flow that was exceptionally strong relative to typical seasonal trends. Operating performance came in as we had anticipated, and we are confirming our guidance for the full year, which anticipates mid-single-digit growth in revenue and adjusted EBITDA, resulting in adjusted earnings per share between $3.05 and $3.20. Before diving into the segment review, I want to take a few minutes to discuss our recent announcement about expanding the Cambridge plant, which already stands as North America's biggest facility for manufacturing heavy nuclear equipment. As we've mentioned on recent calls, demand in commercial nuclear markets is strong, driven by new and continuing life extensions of CANDU reactors in Canada and abroad, the possibility of large new builds, and the emerging demand for small modular reactors. Given this concrete future demand and our current commercial nuclear backlog exceeding $700 million, we are proceeding with a project to grow the Cambridge facility's footprint by 25% and enhance it with advanced manufacturing equipment. Over the next 2 years, we'll invest roughly $60 million, with construction beginning in the third quarter of this year and expected completion by mid-2026. I'd also note that this added capacity allows for more efficient execution of our existing backlog and creates space for new and exciting growth projects. Although it's on a much smaller scale, our aim is to stay ahead of demand that we know is emerging in this market, similar to what we did with naval propulsion, microreactors, and the medical business in recent years. This investment also lets our customers demonstrate supply chain strength as they vie for and secure more clean energy projects. In fact, just last week, GE Vernova announced that BWXT is the first qualified company in the BWRX-300 supply chain group. Our customers need products that satisfy extremely high-quality standards and are delivered on time. By investing meaningfully now, we'll be prepared to meet demand at the right moment with top-tier credentials and capacity. Prior to making this investment, I personally held discussions with our top customers and will be traveling to meet with others over the next couple of months to emphasize BWXT's dedication to the industry and our requirement to earn suitable returns for the value we deliver. As capacity inevitably becomes tighter, BWXT will be in an enviable spot thanks to its world-class workforce, facilities, and experiential qualifications. Now shifting to a review of segment results and the market outlook. Government Operations continues to grow well, with 6% organic revenue growth this quarter. From a demand standpoint, I'd like to address a couple of key areas. First, at a high level, the long delayed fiscal 2024 appropriations offered solid funding across all our programs in Government Operations. Turning to what comes after this year, the President's FY '25 budget backs the long-term trends—specifically great power competition along with global decarbonization—that serve as the foundation for BWXT's growth story over the long haul. Under this request, the Columbia Class submarine program gets priority, and it puts considerable money into modernizing the submarine industrial base so the shipbuilding plan can be sustained and preparation for office can happen. An extra boost came through $3.3 billion in the defense supplemental bill, which the President recently signed. Clean energy also gets support from the FY '25 request, with funding directed at advanced nuclear technology development—something that matters for expansion in the micro and small modular reactor markets. To be more precise, it provides full funding for the NASA and DARPA DRACO project, which will be the first demonstration of a nuclear thermal rocket engine in space, and BWXT is producing the reactor hardware and complex coated fuel for that program. Next, there's been considerable recent news coverage regarding Navy shipbuilding delays at U.S. shipyards and shifts in procurement schedules as shown in the Navy's new 30-year shipbuilding plan. When it comes to those shipbuilding delays, keep in mind that BWXT invested significantly and early so we'd be able to manage the workload tied to the serial ramp in Columbia Class orders happening alongside 2 Virginia class orders each year and carrier work moving through our facilities. Largely, we've managed to work through some of the labor and supply chain challenges the shipyards faced during and after COVID. Because of that, we're relatively insulated from the shipbuilding delays. Even so, we stay watchful and keep collaborating with our customers to maintain stability in our execution schedules. The revised 30-year shipbuilding plan, which came out after our last discussion at Investor Day a little more than 2 months ago, shows the pressures and trade-offs the Navy confronts in — amid tighter times with varied priorities. Plans for the Virginia class are mixed, though that doesn't carry much significance for BWXT because of our backlog of work. However, a potential change by the Navy to the Ford class aircraft carrier schedule would hit harder, given the reactor scale and quantities involved. Under this new plan, CVN-82 will be procured in 2030 instead of in 2028, with advanced procurement beginning in 2027 instead of 2026. For BWXT, that might mean the carrier low in '24 and '25 could stretch out by another year. Just as we're doing in 2024, we'll seek to counterbalance this potentially longer lull using other programs. Regardless, our visibility into demand for naval propulsion, reactors, components and fuel work stays clear, thanks to the steady procurement cadence of Virginia class submarines and serial production of Columbia Class submarines. Also, though it's still early, the Navy might possibly take advantage of a longer carrier lull to move ahead on August related work. BWXT has gotten funding for initial architectural and engineering facilitization work scope to back future increased workload demand, including possible AUKUS activity. Even though the timing of orders for any particular ship set might vary annually, we still think the 10-year compound growth rate of 3% to 5% for our naval propulsion business, which we presented at Investor Day, can be achieved. There is no question that the country remains dedicated to its long-term objectives for the nuclear fleet, and shifts across different administrations or other Washington developments have not traditionally overridden the national security imperative. Our microreactor efforts for land and sea are advancing well. Project Pele, the terrestrial microreactor we are building with the Strategic Capabilities Office, is now in the procurement phase, and together with Idaho National Lab and the DOE, we are finalizing the requirements for the authorization basis required to license operation of the system. It should be noted that Pele was given the full funding request in the fiscal 2024 defense bill, underscoring government backing for this vital technology, one that might eventually provide a strategic edge because of rising needs for stable power at remote military bases and for uses such as high-powered radars and the electrification of military tactical vehicles and weapons. In the same way, though still at an early stage, DRACO was ramping well and was a major driver of revenue growth in the quarter. In addition to DRACO, we keep expanding our space franchise as the U.S. and its allies invest more and more in nuclear technologies to grow their presence and capabilities in this area.

Rex Geveden

executive
#3

Not long ago, we signed a teaming agreement with Rolls-Royce, and through it we landed a contract from the U.K. Space Agency for nuclear space power missions; under this agreement, our collaboration will stretch past space into additional advanced nuclear applications, such as fuel and component development for microreactors and small modular reactors. Our microreactor strategy centers mainly on defense uses, though we keep evaluating possibilities in commercial markets. Having built nuclear reactors for the Navy for years, plus our devoted manufacturing capacity and considerable technical know-how, we are positioned favorably as commercial chances arise. When it comes to special materials, we have built a substantial portfolio grounded in our strengths and technical abilities in radiochemical processing, handling and accountability. In the earlier part of this year, we disclosed a 2-year extension of our downblending contract, which follows the success of 2023, a year in which we won a 5-year uranium purification and conversion contract as well as a multiyear contract to recycle scrap material from the Y-12 National Security Complex into high assay, low enriched uranium. During March, a joint venture led by BWXT received a 10-year Hanford integrated tank disposition contract from the DOE; that same contract was first granted to us in April 2023. Following several protests from the incumbent, the DOE chose to re-award this contract to the BWXT-led joint venture. Although it is once more under protest, we put forward a superior proposal, which is shown by our selection on two occasions. If it resolves in our favor, we anticipate the contract transition happening later this year. Even as market demand gives us reason for optimism, we stay sharply focused on making our operations better. As I mentioned previously, we have invested heavily in our people and our facilities. During the first quarter, we kept seeing gains from our operational equipment effectiveness program, with efficiency metrics improving at our key sites. To illustrate, one team working on tube sheet drilling, a process demanding enormous precision, almost doubled the efficiency of that work track. That is merely one illustration of how our attention to OpEx is assisting us in driving profitability and countering inflationary pressures on the business. Now let me turn to our Commercial Operations segment. Revenue for the segment rose 7% in the quarter, while adjusted EBITDA climbed 55%. Extending a recent pattern, this growth came from rising demand for medical isotopes and a better medical EBITDA contribution. As I explained earlier on this call, demand is robust in the commercial nuclear power market. At the close of January, Ontario Power Generation made a formal announcement that it would move ahead with life extension for the Pickering site units 5 through 8. There's a big opportunity here for BWXT that will fuel growth in backlog and revenue, plus give us another decade or longer of visibility into the life extension work in that region that kicked off in 2017. Over in the SMR space, we're partnering with GE Hitachi on the reactor pressure vessel for the BWRX-300 project alongside OPG, and we expect the manufacturing award to be fully released within the next few months. Our pipeline of opportunities also stays attractive, since utilities across North America and Europe are looking at building SMRs to satisfy rising electricity demand. The Cambridge expansion I mentioned before strengthens our standing as North America's leading supplier of large nuclear equipment. Now to BWXT Medical. Revenue climbed quickly, carrying forward last year's momentum in base diagnostics and expansion of contract drug manufacturing, and we still anticipate roughly 25% growth in medical revenue for the full year. Demand keeps rising for diagnostic and therapeutic isotopes, and consolidation in the therapeutic sector moved fast, with AstraZeneca saying it will buy Fusion Pharmaceuticals — a crucial BWXT partner and a pioneer in actinium-based drug development — for as much as $2.4 billion. We keep seeing encouraging data points as various actinium- and lutetium-based radiopharmaceuticals move through clinical trials, which is fueling substantial expansion of the addressable market. More than 155 active clinical trials exist for drugs that use these isotopes, including some involving drugs already shown to work. Novartis, for instance, just said it will pursue approval for Pluvicto in the pre-chemotherapy setting. Pluvicto leads the market among lutetium-based prostate cancer drugs, with yearly sales above $1 billion, and right now it's only cleared for post-chemotherapy use. Getting approval would unlock a much bigger patient population, underscoring the considerable growth potential in this market. At present we're the sole commercial supplier of non-carrier-added actinium, we're backing multiple clinical trials, and we intend to ramp lutetium commercial sales substantially next year once we complete our drug master file with the FDA. So all in all, it was a solid quarter, and we're reaffirming guidance for 2024. BWXT sits at the front of the nuclear industry, holding meaningful competitive positions across several markets. We benefit from long-term secular tailwinds and a portfolio built to handle near-term swings in demand and funding. Our workforce is highly credentialed and experienced, our infrastructure is unique, and we have world-class manufacturing, processing and services capabilities, all of which we're strengthening through organic investments. We're dedicated to delivering nuclear solutions for our customers' critical missions in global security, clean energy, interventional oncology and other nuclear applications, which puts us in a strong position to hit our medium-term financial targets. With that, I'll hand the call over to Robb.

Robb LeMasters

executive
#4

Thanks, Rex, and good evening, everyone. I'll begin with a few company-wide financial highlights, which you can find on Slide 4 of the earnings presentation. Revenue for the first quarter came in at $604 million, which represents 6% organic growth on a consolidated basis, and both segments grew at a similar rate. Adjusted EBITDA reached $115 million, a 4% increase year-over-year, as gains in Commercial Operations and reduced corporate costs were partly offset by a modest decline in Government Operations EBITDA. The decrease in corporate costs during the first quarter was primarily driven by the timing of health care-related costs, and we anticipate these will return to a more normalized level across the next several quarters. Our projection for unallocated corporate EBITDA across the entire year remains unchanged — flat to a bit below what we saw in 2023. On the adjusted earnings per share side, we landed at $0.76, an increase of 9% compared with $0.70 during the equivalent quarter a year ago. Looking at the EPS bridge on Slide 5, you can see that operations contributed about $0.02 of that year-over-year gain, while the remainder was split across somewhat higher pension and other income, a decrease in interest expense, and a reduced tax rate. When we look at the whole year, we expect nonoperational items to have a net impact on adjusted EPS that's roughly neutral relative to 2023, because a number of factors tied to the timing of certain expenses, FX gains, and interest expense that gave us a boost in the first quarter will be offset across the remaining 3 quarters. For the quarter, our adjusted effective tax rate came in at 22.5%, and that was largely a result of greater excess tax benefits tied to stock compensation expense. That said, our outlook for the entire year still calls for a rate of roughly 23.5%, so in the coming quarters it's possible you'll see a rate closer to that figure. We brought in $3 million of free cash flow this quarter, whereas the first quarter of 2023 saw a $43 million use of cash. Small as it is, this was the first positive free cash flow we've posted in a first quarter since we became a stand-alone company, which speaks to how closely we're managing working capital and staying disciplined on CapEx. We spent $30 million on CapEx this quarter. For the whole year, we're still looking at roughly flat to a bit lower than what we spent in 2023, and that figure includes some early outlays on the Cambridge facility Rex mentioned before. Turning now to how each segment performed, which you can find on Slide 6. Starting with Government Operations: revenue there climbed 6% in the first quarter, reaching $487 million. The gains came from producing more naval nuclear components, along with special materials and microreactor volume, though those improvements were partly canceled out by reduced procurement of long lead materials. Despite that revenue growth, adjusted EBITDA for this segment slipped slightly in the first quarter, coming in at $100 million. That gave us an EBITDA margin of 20.5%. In the first quarter of 2023, the margin was 22.5%, and that period got a lift from an especially favorable mix as well as the timing of certain items — and this quarter, both of those went the wrong way for us. Looking at the full year of 2024, our expectation is still that Government Operations EBITDA margins will be down just a little from 21.1% in 2023, and that's because of a handful of key dynamics. Those include the onboarding friction and higher labor costs we're working through after growing our workforce by 10% last year, and also absorbing the significant revenue increase from cost-plus microreactor projects and other new initiatives, along with the fact that the missile tube expense recovery we had in Q4 of 2023 isn't there. Giving margin guidance each quarter can be tough. Still, as we see it right now, Government EBITDA margins during Q2 and Q3 should land around the 20.5% figure we posted in Q1, followed by the usual modest seasonal improvement in Q4. Once again, this puts us squarely within the Government Operations margin outlook we shared three months ago. Moving to Commercial Operations. Revenue climbed 7%, powered by greater field service activity within our commercial nuclear segment and strong growth at BWXT Medical, though this was partly offset by reduced nuclear components and fuel handling volumes. Adjusted EBITDA for commercial operations rose roughly $5 million, reaching $14 million. That improvement was mainly the result of stronger performance in Medical, though it was partly counterbalanced by slightly lower input from commercial nuclear. As a result, commercial EBITDA margin reached 11.9%, up from 8.2% during the same period last year. For 2024, we continue to expect Commercial Operations to expand somewhere between high single digits and low double digits, with EBITDA margins also improving relative to 2023. Medical is expected to lead that expansion, and commercial nuclear should contribute as well, particularly in the second half. Turning now to the guidance on Slide 7: we are reaffirming the outlook for the four key metrics we presented last quarter. We expect mid-single-digit growth for both total company revenue and adjusted EBITDA, which would yield revenue of at least $2.6 billion and adjusted EBITDA of roughly $500 million. Built into this projection is a year-over-year D&A increase of roughly $10 million, largely from Government Operations, as the new equipment and capacity we've invested in for naval propulsion and microreactor projects get used more fully. Accordingly, we're reconfirming adjusted EPS guidance of $3.05 to $3.20. Regarding how earnings will fall across quarters, we anticipate modestly stronger operating results sequentially across the coming 2 quarters, plus a seasonal bump in Q4. On how nonoperating items will progress sequentially, we look for the upcoming 3 quarters to bring greater net interest expense, somewhat reduced other income, and an elevated tax rate. Altogether, that ought to produce EPS in Q2 and Q3 roughly in line with Q1, then a seasonally stronger Q4. Finally, we're holding our free cash flow guidance at $225 million to $250 million, fueled by EBITDA growth and better working capital management. Capital expenditures should be flat to slightly lower, including early outlays on the Cambridge plant expansion and other chosen growth investments throughout our businesses. During Investor Day, we talked about how intently we're working to boost free cash flow by handling working capital better and keeping CapEx in check, all while aiming for that medium-term goal of 90% free cash flow conversion. In short, our first quarter was solid, and we're on pace to hit the guidance we set for the entire year. We're still concentrated on seizing chances to grow within our main operations, creating new products to enter fresh markets, and pushing for top-notch operations along with strong financial results. With that said, we're ready to hear what you'd like to ask.

Scott Deuschle

analyst
#5

Robb, I just want to make sure I understand — for Government Operations this quarter, did all of that margin pressure compared with a year ago come from the onboarding inefficiencies and cost plus mix? Or are there other things in there pulling the margins down?

Robb LeMasters

executive
#6

No. That margin compared with last year — the GO margin you're talking about, that roughly 200 basis points — those pressures were part of what we saw, Scott. But honestly, if you look back at last year, you'd see that was the best margin we had across the whole year, so that's the first thing worth pointing out. That quarter benefited from a couple of things. First, if you go back and check, it got a sort of one-time boost from TSG performance fees that we'd typically expect across roughly the following couple of quarters; we also had really strong NOG volume. I believe that was tied to just a general release as we worked through the workforce ramp-up. In that first quarter, we did see some favorable items we discussed, if you go back and check the script. Honestly, that accounted for around half of that peak. The other half of the step down — that roughly 100 of the 200 basis points — came less from inefficiencies, in the sense of describing mix, Scott, and more from simply what's happening with certain new projects of ours. As we ramp the U-Metal project and the initiatives within AT, our Advanced Technology group, particularly Pele and DRACO, all of those businesses are simply new for us, correct? So they carry a lower margin; so again, roughly half of it came from that exceptional performance we had last year, which was really a peak; and the remaining half came from the ramping of what you might call mix, the ramp of certain of these new projects.

Scott Deuschle

analyst
#7

All right, that's useful, Robb. Moving on to Rex — my understanding was that this pricing deal spanning multiple years was meant to wrap up during the prior year, if I recall correctly. So it appears to be dragging on well past the usual timeframe. I'm just wondering whether you could explain what's behind that holdup, and if a bridge contract was secured so you could keep things moving before the full multiyear arrangement is finalized.

Rex Geveden

executive
#8

Yeah, absolutely, Scott. Naturally, the fuel portion of that agreement got done at an earlier point. That piece is finished; however, regarding everything else, for some time we've been carrying out work via a bridge contract as the negotiation specifics get sorted out. What I'd point to is the ambiguity surrounding the FY '24 appropriations, which, alongside the defense supplemental, produced questions about which funding would be made available. And at this point, since those matters are resolved, we can finally push this over the line. Still, what you said is accurate — correct? For quite a while now, we've been performing the work scope tied to that pricing agreement by way of bridge contracts.

Bob Labick

analyst
#9

Rex, you brought up the drug master file for lutetium. Could you share a bit more about where things stand on getting Canadian approval to irradiate ytterbium at your target delivery system, plus the remaining steps needed to complete the DMF for lutetium?

Rex Geveden

executive
#10

For lutetium. All right. So lutetium and the rest of those active pharmaceutical ingredients involve a fairly straightforward path. What occurs is that pharma companies intending to use that radioisotope will cite our product when they file with the FDA; that makes for a simpler, cleaner process, and as far as timing goes, we expect to be operating commercially on lutetium at some point next year, and my belief is the same holds for ytterbium.

Robb LeMasters

executive
#11

Correct. Perhaps I can add a bit more detail here: the stage of producing targets has been completed. As everyone knows, that step has to be finished. After that, those targets eventually go into an irradiation source. Two locations are being considered for the radioactive material initially, starting with the Missouri Reactor. That represents essentially the initial phase. Then, in the end, as you pointed out, Bob, at OPG our TDS was constructed for tech purposes, clearly, yet it can handle irradiating ytterbium. So some effort will be required to have that credentialed by the regulators, though that is underway regarding OPG; we don't view it as an obstacle there. And finally, we're also setting up a processing line for that irradiated material, Bob, as you're aware, in order to produce active pharmaceutical ingredients. So that's an additional step. Construction is now being launched there; things are progressing well. As the market develops, honestly, we're observing many different customers both for irradiated material and for API.

Bob Labick

analyst
#12

All right. Fantastic. So, continuing on the topic of isotopes. Clearly, there's a great deal happening for you during this quarter. I didn't catch any news regarding moly-99. Is there anything from the FDA? Or when might we hear something next?

Rex Geveden

executive
#13

Yeah. Yeah. Appreciate it, Bob. Perhaps I can offer a somewhat wider view regarding that product line and this development. For offerings such as this one, I think you can break things into roughly 3 major stages: first, the research and development stage, which, naturally, we left behind quite a while ago; second, the industrialization stage, which is what we're currently moving through; and third, naturally, the commercialization stage, which is the one everybody has shown the greatest interest in. So we find ourselves right at the very end of industrializing that product line. And incidentally, it's happening at the same time as commercialization for that product. So when you consider the industrialization stage, the systems we've told you about, and you've observed them, most of you have laid eyes on them, but essentially it involves putting the target delivery system through its paces and then putting our radiochemistry and radiopharmacy line through its paces. There are additional items as well, waste management systems and things like that, but those 3 are the main ones. And incidentally, allow me to stop for a moment and point out that, as Robb mentioned in his earlier response, we shifted away from a MURR radiation campaign and moved straight to the target delivery system, which did end up costing us some schedule, but it prevents the need for a second filing to secure FDA approval for that product. So I believe we'll look back and regard that as a sound choice. So here's where things stand: we have put our target delivery system through its paces. We've run targets through the reactor at Darlington in a high-neutron flux environment and generated high activity targets. We have put all 4 of those target elevators through their paces; honestly, we had to iron out some issues in that system, and we've done that. It's operating very well at present; we have run those high activity targets through radiochem and radiopharm. And I'd say we're performing the last adjustments on both of those systems to get the product precisely right. I'd say we're extremely pleased with the quality of the product. It satisfies every drug pharmacopeia requirement. And after that, we're working through the last remaining items on our checklist with the FDA. Meanwhile, we've been concentrating on the commercialization stage. There's a fair amount of excitement in the market regarding this product; so we've been conducting some product testing by sending our generators out to radiopharmacy networks and tagging our product with cold kits — tagging cold kits with our product. We're now working in fairly serious ways on supply agreements with the radiopharmacy networks. And we're handling logistics specifics at this point, the shipping costs and the way we distribute the product, especially regarding which radiopharmacy. I mean, I would say that all of this progress makes me really happy, and it's — we are driving on toward the end.

Josh Corn

analyst
#14

Josh Corn here, filling in for David. My question is regarding that Cambridge facility expansion tied to the SMRs. Could you share whatever you can about when that higher demand might begin showing up, and what extra capacity would let you turn out?

Rex Geveden

executive
#15

Yeah, absolutely, Josh. I'll take that one first. Robb might want to chime in. What really caused us to stumble when deciding on that capacity expansion was the official announcement regarding Pickering. That project is enormous. We'll produce the steam generators — 48 of them across those 4 reactors, meaning 12 apiece. Those 48 steam generators are very likely to come with feeder fabrication too, along with heat exchangers and additional component categories. That represents a strong arrangement. When you look at what that facility already handles, we produce all of the steam generators — including replacement units — for Bruce. We also manufacture feeders destined for Bruce. Heat exchangers are another item we supply to Bruce. Feeder work for the Darlington refurbishment program is underway as well. On top of that, we now have this scope tied to the small modular reactor and its reactor pressure vessel, and as noted earlier during this call, we expect to secure confirmed purchase orders over the coming months. When you put all those factors together, basically, walking through that facility, there's no space left. I'm serious — it's completely packed. So at this stage, we genuinely require that additional capacity. We anticipate receiving subsequent orders covering the other three reactor pressure vessels. Beyond that, there's additional scope on the reactor itself — the three fueling systems plus assorted other components — where we intend to bid. After that comes the next wave of adopters, companies such as TVA, which is getting the Clinch River location ready for this same category of small modular reactor. Other power companies have expressed interest in this as well, along with possible reactors destined for Poland and other locations we've mentioned previously. As a result, interest appears to be arriving in something like a surge, and we've expanded our capacity so we're prepared for it.

Robb LeMasters

executive
#16

Yeah. Maybe I could simply mention that plenty of business cases have been put together by us. For the past 2 quarters or so, we've actually been discussing this very thing with all of you. And I truly wanted a business case built to answer whether the numbers can be made to work on the expansion using basically the book of business we already hold, correct, and then set aside the upside of being able to serve either international or U.S. demand on the SMR side. To us, that part is essentially extra. So, like Rex mentioned, once the Darlington OPG refurbishment winds down at some point, you're ramping up on the Bruce Power work and eventually the Pickering work, all of that refurbishment activity, and then you've got the GE Hitachi effort on the first SMR plus the probable follow-on, that combination is really what creates your business case; and after that you want a tail of opportunity that in the end drives it toward being a truly strong business case. And that's the moment I started looking at international growth, <<inaudible>>, or refurbs of either kind. What you're discussing now leans more toward greenfields; and so none of that can be baked into projections as something to rely on, but it would look rather smart if it all materializes. So the economics of that build-out have us fairly excited.

Peter Arment

analyst
#17

Rex, Robb, Chase, congratulations on the strong results. To continue with what we were discussing about Pickering: I believe during your Investor Day, you pointed out that certain refurbishment work tied to BWX content accounted for around 10% of the overall project cost. Would that figure hold roughly true for Pickering as well? Also, when should we anticipate that orders for long-lead materials will begin?

Rex Geveden

executive
#18

Regarding Pickering, Peter, let me think about that. Whether I can offer a general guideline expressed as a share of overall project costs, I'm not sure. Still, the chance here can be viewed as comparable in size to — a solid reference would be the Bruce reactors, for which we produced the steam generators across the whole set, and if I recall correctly, that contract came to CAD 600 million, CAD 650 million at that point. So you might want to account for some escalation plus a greater quantity of steam generators. After that, include the feeders along with heat exchangers. That amounts to an opportunity on the order of $1 billion. As for OPG's overall project cost estimate, I don't have that figure, but clearly this represents a substantial opportunity.

Peter Arment

analyst
#19

All right, that's useful. So when exactly does the activity around long lead materials start? Clearly, you're placing the CapEx ahead of it.

Robb LeMasters

executive
#20

Yeah, I'll handle that one. Right. So discussions are already happening about whether that long lead material might arrive soon; they're also examining a schedule for pursuing a batch of those more sequentially, with the goal of bringing costs down in the end. So it wouldn't shock me if you end up with something more front-loaded, or if you work through it alongside the customer to determine how fast they wish to proceed. Still, my expectation is that it happens soon.

Peter Arment

analyst
#21

That's useful. And about Romania — any news on that front? You said the export financing has been arranged. When do you figure the order timing might land?

Robb LeMasters

executive
#22

Yeah, I can handle that one as well. It still appears to be roughly 1 or 2 years away before it makes a sizable impact on our books. That date keeps shifting, though they are pressing ahead. The OEM and EPC are pressing ahead. So we are beginning to see schedules issued and beginning to get our business arranged. So I would describe it as, let's say, 2 to 3 years away before it becomes meaningful for us.

Peter Arment

analyst
#23

And then just one final thing on the CapEx side, Robb. From what you're saying, it sounds like this was already something you'd factored in. So it doesn't look like CapEx rises all that much. Given this announcement, are we looking at roughly the same levels when next year comes around? Or would you say this is a bit of growth CapEx that you're now putting in place?

Robb LeMasters

executive
#24

Yeah. The way I'd frame it is this: go back to Investor Day — we were at slightly above $100 million, $110 million, if you take 4% of sales. And on top of that, we're wrapping up the microreactor projects left over from last year. So that probably left us at the lower end, so to speak, of the guidance we gave, correct? Within the free cash flow range I've put out there, a couple of different scenarios are baked in. So on the higher side of free cash flow, you could say CapEx would come in at $125 million, $130 million. For this year, then, from a CapEx standpoint that might tilt us — as Cambridge gets built out — toward that upper end, though we fully expect to offset it through all the goodness showing up in operating cash flows. That's precisely what lets us stay within our range: even if $10 million to $20 million gets spent on this project this year, that was essentially contemplated. All the good initiatives on operating cash flow could absorb it. When you say next year, I think it's a tad too early to talk about that. Yes, no problem. Just I'll comment about next year. I think it's a little far out, but no major changes in this project do I see. It can live within that normal budget.

Pete Skibitski

analyst
#25

I've got just one question, Rex. Earlier, during your opening remarks, you mentioned the '24 baseline budget and the supplementals that got approved. I believe there was $3.3 billion in SIB funding. So, first, does any portion of that SIB money come our way to you folks? Or is it more that you're in good shape and already have the facilities, so it goes to other suppliers? And second, are there any changes at all between the '24 budgets and the new '25 budgets at NASA or DOE involving anything you guys care about?

Rex Geveden

executive
#26

Let me look here. Regarding the submarine base industrial funding, that money is meant for the broad submarine industrial base, which could include us, Pete; and naturally, that would come by way of our customer. I'd say there's more to come on that as to what, if any of it, would reach us. And could you repeat the second question for me again?

Pete Skibitski

analyst
#27

Yeah. Regarding that '25 fit-up which came out, about NASA and also DOE, I was simply curious whether anything new or interesting on the nuclear side showed up in those budgets and the plans there.

Rex Geveden

executive
#28

Anything new and interesting on the nuclear side. Probably nothing, though what I'd say is that support remains sustained and really solid for the programs of record, such as DRACO and Pele; and with luck, that keeps going.

Michael Ciarmoli

analyst
#29

Good numbers. Rex, perhaps we could return to that multiyear pricing topic. Was there — I suppose you referenced what might be a postponement. I'm not certain that's the correct term, yet what exactly happened regarding the fiscal '24, '25 budget? Does the Ford CVN timeline play some role in what's occurring with that fresh multiyear contract?

Rex Geveden

executive
#30

Correct. When we negotiate those arrangements alongside our customer, Mike, every element matters, isn't that so? That means: what does the shipbuilding timeline look like, what funding is on hand, what quantity of spares would they like to purchase, and what's happening regarding escalation. Combining all that produces something quite complicated, especially at present given labor and materials, plus inflationary strain. So we're working our way through it. And incidentally, it's definitely not rare for fellow defense contractors to operate under bridge contracts while hashing out such matters. So it's a bit of — it's every one of those factors. The FY '24 appropriation played a part. The supplemental did as well, and the shipbuilding timeline together with the budget request all merge into determining our current situation. And we will definitely get it resolved.

Michael Ciarmoli

analyst
#31

Understood, understood. So then, Robb, regarding the medical segment and Tc-99 specifically — has your perspective shifted at all? I mean, directionally speaking, it seems as though the Tc-99 approval might be slipping a bit to the right. Yet you're still at ease with how '24 and '25 revenues are tracking for the medical business overall, heading toward $200 million, and presumably getting that margin up into the mid-30s?

Robb LeMasters

executive
#32

Yeah. No, I really don't see any real change on the whole. Once more, we don't expect any tech to truly move the needle during 2024. That was something we discussed last quarter; we're not truly observing — we'll make an attempt at commercial, but the near-term effect is going to be small. In the end, when we put that target out there, we indicated it would genuinely stem from a few separate places: our core portfolio, the therapeutics portfolio, and then the tech portfolio is the final one; and going through each of those, if you really consider it, Nordion has delivered some fairly solid upside. Therapeutics, at least in terms of the market, is a surprise, I think; we have to secure some contracts. We mention lutetium. In actinium, we're the sole commercial supplier. So an upside surprise wouldn't shock me there. And tech, despite all the fits and starts we've experienced, is actually coming together quite well. The market is prepared for a third player. So nailing that one wouldn't shock me either; therefore the overall target for, let's say, '25, '26 to reach that $200 million revenue level still looks readily achievable.

Michael Ciarmoli

analyst
#33

Understood. And then, Robb, just one final question from me. Considering your experience, what went through your mind when you learned that Fusion — which had no revenue and no EBITDA — was being bought for $2 billion, especially knowing what you have on the medical side?

Robb LeMasters

executive
#34

Yeah. For the buyer, I viewed it as a strong purchase. We are collaborating quite closely. As you're aware, we issued a press release saying we're working hand in hand with a few major players. Fusion is one of those. Their offerings and their expertise have consistently impressed us — grasping how to secure actinium supply, which is essentially the foundation of their drugs, matters greatly. And should you look at the acquirer's press release, their emphasis is squarely on the ability to deliver that advantage to the parent organization. So it isn't merely the products they possess, but also their grasp of the supply chain. We serve as a partner in that effort. Thus, indirectly, they are validating our approach — confirming that this element is truly central to why that company is strong. I've consistently been upfront that we aren't sellers — we aren't a drug company, so those kinds of valuations amount to revenue multiples, essentially. We function more as a pick and shovel participant. Still, we are a highly dependable component of the ecosystem, and I believe that will justify a valuation once we execute our full business plan. I realize everyone has shown patience regarding that. If we achieve these goals, though, I think that entity's valuation might be rather striking.

Ron Epstein

analyst
#35

Perhaps just a fast question. Looking at how submarine manufacturing is paced, Virginia class appears to have been, I'm not sure, eased off because of what the sector is capable of. And how does that affect your company? I mean, is it — do you have a direct link to that? Or do you hand over your items on a separate track? I mean, what's the right frame for us here?

Rex Geveden

executive
#36

Ron, I mentioned this briefly in my prepared remarks. You can regard us as fairly detached from the yards, I'd say. To start with, the yards, HII and GD, aren't the ones buying from us. That product goes to naval reactors, and we provide it to them according to their timeline. After that it's government furnished to the yards; therefore we're somewhat insulated from that. And I think that's one way to look at it. One more angle — perhaps 3 items to consider. One more angle worth considering is that, well, this is the President's budget request. And that's the shipbuilding schedule, yet it doesn't carry much weight until the authorizers and appropriators finish enacting the budgets for '25 and beyond. So I'd say it's definitely very early innings in that Virginia production game. We've heard peer companies of ours, HII and others, discussing how crucial it is to maintain that production rate funding. And clearly, very, very strong bipartisan backing for the Virginia program. So I'd say that one isn't finished yet. The third point I'd make is that the industrial base in the end, and BWXT in the end, must reach a greater production rate so as to satisfy the requirements for AUKUS. And therefore this Virginia rate has to reach 2.3 for 10 years or more. And so we need to create the industrial capacity and the workforce capability for that. And so a slowdown strikes me as making no sense. And so we'll find out what the appropriators do. But it doesn't trouble me very much, considering how deep our backlog is and considering the strategic priority that the Virginia embodies.

Ron Epstein

analyst
#37

Understood, understood. Yeah, that's logical; and then I believe you touched on this somewhat, but could you discuss the situation with labor for your company? I mean, labor has proven difficult for, it appears, everyone throughout the industry. I mean, has your experience been any different? Are you keeping employees, bringing on employees, and possibly the individuals you'll ultimately need to add to eventually scale up to satisfy the Navy's demand?

Rex Geveden

executive
#38

Yeah. I'd say perhaps there are a few points I'd make regarding that; and I've discussed this extensively during earlier calls, which is that we've overhauled our talent acquisition process under Bob W's guidance, who leads human capital for us, over the last, let's say, 1.5 years. And what that produced was hiring 10% of our total workforce last year, as we mentioned in the script; and so we — there were 2 aspects to that, correct? We managed to achieve — mostly achieve our growth requirements and accomplish that in a climate where attrition post-COVID exceeds what it has been historically. So I'd say we essentially succeeded on both fronts there. Having said all that, it's a difficult climate for labor, correct? I think we're reindustrializing the U.S. economy and definitely attempting to ramp up submarine production; and that isn't a simple task to accomplish, and it's tough to obtain those limited resources; and so when Robb mentioned the strain we're experiencing on — the strain we're encountering in our margins, it relates to bringing on that many individuals amid that level of turnover. Our efficiencies are solid; we're producing this product with the profit we anticipated. But you've got numerous individuals sitting in training sessions, and you have numerous individuals moving through overhead as a result. So I want to say we've performed quite well in handling what I consider a highly demanding climate, and we simply must continue swinging the ax at this thing. Robb, would you like to contribute anything?

Robb LeMasters

executive
#39

No, I believe you put that nicely. We're taking it in — we moved ahead of the sector, in my view, regarding CapEx to get the capacity built. And last year we attempted the same approach, essentially swarming the workforce problem. So we got out in front of it, and other companies in our industry are doing so too, but that's roughly the way BWXT handles things, which is simply tackle the issue fast; and now we're working our way through. As Rex mentioned, utilization at our top component sites is up nearly 400 basis points year-over-year. But we're working through that, and we will throughout the year. So we're holding to our guidance, which demonstrates that we can bring in all that workforce and still keep progressing. So I think we'll come out the other side of this and be quite strong.

Chase Jacobson

executive
#40

Appreciate everyone being here today; over the next several days we'll be talking with a lot of you, and we'll be seeing a lot of you during the months ahead. Should anything else come up, don't hesitate to get in touch at investors@bwxt.com. Thank you.

Operator

operator
#41

Everyone, that wraps up the call for today. Thanks to each of you for being here. You're welcome to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete BWX Technologies, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to BWX Technologies, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in BWX Technologies, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.