Chase Jacobson

executive
#1

Thanks, Kathleen. Good evening, everyone, and welcome to the call today. With me are Rex Geveden, our President and CEO, and Robb LeMasters, our Senior Vice President and CFO. During this call, we'll be referring to the second quarter 2024 earnings presentation, which you can find in the Investors section of the BWXT website. We'll also be covering certain matters that are forward-looking statements. Such statements carry risks and uncertainties, including the ones outlined in the safe harbor provision contained in the investor materials as well as the company's SEC filings. We'll often be talking about non-GAAP financial measures, and those are reconciled to GAAP measures in the appendix of the earnings presentation, which is available on the intersection of the BWXT website. At this point, I'd like to hand the call over to Rex.

Rex Geveden

executive
#2

Thanks, Chase, and good evening, everyone. Earlier today we posted solid second quarter results, and they came in above what we had anticipated. Organic revenue rose 11%, adjusted EBITDA climbed 18%, and adjusted earnings per share were up 26%. Our business lines executed well, and we caught some favorable timing on a number of items during the first half, which produced that outperformance. Given how we have performed so far this year, we feel confident enough to raise the bottom end of our adjusted earnings per share outlook, which now sits at a range of $3.10 to $3.20, and to restate our operational guidance for the full year calling for mid-single-digit growth in both revenue and adjusted EBITDA. Across the past several months, demand momentum has stayed positive in our global security, clean energy and medical markets. Federal and state governments, as we see it, are putting priority on regulatory clarity and funding so that investment in nuclear power grows as a dependable clean energy alternative, and private industry demand is adding to that; it stretches from utilities and major power consumers wanting more nuclear capacity on the grid to pharmaceutical companies putting money into radiotherapeutics as the first line of attack against complex cancers. With BWXT's nuclear technical depth, its unique licenses and its differentiated infrastructure spanning various industry segments, we are well positioned to assist our customers in reaching their goals throughout project life cycles. At our core, we serve as a supplier and partner to those customers, able to handle everything from concept development and engineering in early design stages through manufacturing of critical components and, in the end, delivering services that maximize the utilization and lifespan of their assets. That gives us substantial visibility into the long-term potential of the markets we serve and opens decadal life cycle opportunities for BWXT. Now I'll turn to a discussion of segment results and market outlook. Government Operations delivered a solid quarter, with revenue growth of 10% and adjusted EBITDA growth of 13%, both ahead of our expectations and driven by the continued ramp on newer special materials and microreactor projects as well as solid volumes in our naval propulsion business. Operationally, our naval nuclear propulsion business performed well in the quarter. As we covered in detail last quarter, the lower tempo of work tied to the ordering lull for the Ford class aircraft carrier will stay with us through at least 2025 and potentially 2026, but we are seeking and finding ways to keep our plants operating at level loads. We remain intensely focused on operational equipment effectiveness initiatives and on driving process improvements throughout the organization to mitigate these headwinds, and we expect to finalize our next pricing agreement in the coming months. At the same time, we continue to invest in our businesses to ensure sufficient capacity for execution of program schedules and to improve our competitive positioning. Take, for instance, the second quarter, when we carried out a major and effective upgrade of facilities and process lines at our nuclear fuel services plant, done to meet rising demand; investments of that kind may produce small near-term pressure on margins, yet we undertake them so that product quality and production capacity improve. Also, inside Government Operations, we're quite enthusiastic regarding the contract win and the rapid move onto the Pantex plant located in Amarillo, Texas. Since July 13, BWXT has been heading a joint venture that will oversee that vital site through a 20-year contract, which strengthens even more our standing as a leader in the NNSA arena. Over in the microreactors business line, our defense-related efforts, Pele on land along with DRACO in space, are coming along nicely. Meanwhile, on the commercial side, we keep collaborating with the Wyoming Energy Authority to evaluate whether microreactors can feasibly be deployed in Wyoming, drawing on our banner work that is mostly funded through the Department of Energy's Advanced Reactor Development Program. On a connected note, during early June, the Army together with the Defense Innovation Unit released an RFP seeking procurement of a microreactor able to produce 3 to 10 megawatts of power for U.S. Army bases; we think the robust group of partners we've chosen, our Pele experience, and our existential component and fuel manufacturing facilities position us favorably for this extraordinary opportunity. On the whole, long-term demand trends across our Government Operations segment look favorable; we stay confident about the segment's medium-term outlook calling for mid-single-digit revenue and adjusted EBITDA growth, since modest expansion in our naval nuclear propulsion business gets a boost from genuine growth in microreactors, special materials and technical services. Now to Commercial Operations. Revenue for the segment rose 17% organically while adjusted EBITDA rose 42%. Interest in commercial nuclear power is flourishing, coming from industry, utilities and government buyers. Through the quarter, we obtained full notice to proceed on manufacturing the reactor pressure vessel for GE Hitachi's BWRX-300 small modular reactor project situated at Ontario Power Generation's Darlington site. Being the first SMR project in the Western Hemisphere, it's a strategically significant project for BWXT and likewise a key reference point for power plant developers weighing the build-out of SMRs. In addition, during June, the Department of Energy said it would supply as much as $900 million in funding to drive SMR development. After that came Dominion Energy issuing an RFP aimed at finding a technology partner to construct an SMR at the North Anna Power Station in Virginia. Dominion now belongs to a growing roster of domestic and international utilities showing interest in constructing small modular reactors. We approach the SMR market possessing deep nuclear design capabilities and as a merchant manufacturer holding the largest nuclear equipment assembly facility in North America; when it comes to the CANDU market, we enjoyed a solid quarter, propelled by continuing life extension projects and robust field services growth weighted toward outage projects, which typically deliver somewhat higher margins. We've begun initial efforts related to extending the operational life of Ontario Power Generation's Pickering units 5 through 8, and that work is going to represent a significant portion of bookings and earnings for this segment across the project's upcoming 10-year life cycle. Moving on to BWXT Medical. For the first half of 2024, revenue is on track with what we anticipated for the entire year — roughly 25% growth. I remain happy with how we're progressing when it comes to growing and delivering on our current diagnostics portfolio, as well as broadening our offerings in important cancer therapeutics. To be specific, during the past couple of months, BWXT has strengthened its top commercial standing in high-quality actinium-225, a therapeutic isotope that's being used in more than 25 clinical trials aimed at treating various types of cancer. In June, we filed a drug master file with the FDA covering our actinium-225 active pharmaceutical ingredient; at this point we're the sole commercial organization holding an active drug master file for this critically important medical isotope; that allows pharmaceutical companies to cite our product while moving drugs through clinical trials or getting ready to submit new drug applications. Also, in July, we disclosed a partnership with NorthStar in which BWXT is going to supply processing and purification services to create radium-226 targets that NorthStar's electron accelerator will use to generate actinium-225. This collaboration underscores our picks and shovels approach, through which we support the ecosystem with a complete range of services, covering sourcing starter material, target design, irradiation, processing the irradiated material and waste stream management.

Rex Geveden

executive
#3

For NorthStar specifically, our first step is building those radium-226 targets, which are tough to make, though eventually this might grow into an additional irradiation and production source alongside the actinium work we already do in Vancouver. On the diagnostics side, we keep pushing forward with our tech-99 development and commercialization plan. Test generators have been produced successfully, and we're still engaging with the FDA at the pace we laid out before, while seeing obvious customer backing for what we offer. With the FDA decision date drawing nearer and becoming clearer, we've been out marketing actively and running samples of our product by customers so we can lock in supply agreements and commitments for meaningful spot volumes once those become available; our market entry has been designed to be methodical, ensuring a smooth launch with volumes ramping up gradually across 2025 and reaching a full annual run rate of contracted volumes in 2026 and beyond. Last, since BWXT Medical is moving its emphasis from development toward a more operational and commercial stage, we're bringing in executive talent. I'm happy to share that Vittorio Puppo is joining BWXT this month. His operational and commercial expertise runs deep, with the bulk of a career spanning more than 30 years spent in nuclear medicine at companies such as Amersham, Bracco and Medtronic, among others. Back in 2022, I put Dr. Jonathan Cirtain in charge of this business, tasked with leading development and regulatory approval for the technetium-99 and generator product as well as laying the groundwork for a therapeutic growth strategy. His progress has been remarkable in building out the product portfolio, nearly doubling sales and pushing the business to positive EBITDA. He'll now come back onto my direct staff and take up again his position as Chief Development Officer, keeping his attention on BWXT Medical together with Vittorio while also growing the broader BWXT product portfolio, which includes microreactors, advanced fuels, special materials and other exciting new product lines. All in all, it was a strong quarter, and we keep positioning BWXT to capture and overweight share of business across these exciting and growing nuclear market segments. Given how we've performed year-to-date, we're narrowing the guidance range for 2024 adjusted earnings per share. Firm demand signals are coming from our government and private customers alike, and their appetite to use nuclear solutions for their challenges keeps climbing steadily. BWXT possesses world-class manufacturing, processing and services capabilities, supported by our highly credentialed and experienced workforce and unique infrastructure, which lets us take advantage of the many compelling nuclear opportunities we see ahead. With that, I'll hand the call over to Robb now.

Robb LeMasters

executive
#4

Thanks, Rex, and good evening, everyone. To get started, I'll walk through some company-wide financial results, and those are on Slide 4 of the presentation. For the second quarter, revenue was $681 million, up 11% organically, and both segments grew at a healthy pace. Adjusted EBITDA was $126 million, an 18% gain over the same period a year ago, with each segment up by double digits, although the year-ago second quarter made for a softer comparison. Corporate EBITDA that isn't allocated to a segment was basically level with the second quarter of 2023, which lines up with the full-year outlook we had. On an adjusted basis, earnings per share were $0.82. That's up 26% versus the $0.65 we posted in the same quarter last year. If you look at the EPS bridge on Slide 5, most of the improvement came from operations, while lower interest and a lower tax rate each added a small amount. For the quarter, our adjusted effective tax rate was 22.7%. The reason it's under the 23.5% we had previously guided for the full year is mainly a catch-up tied to recently enacted Canadian tax legislation, which reduces the statutory tax rate for nuclear manufacturers through 2034. Given that, we now expect our full year tax rate to land below 23.5%. During the quarter, free cash flow came in at $36 million, which represents a slight decrease compared with the $41 million we recorded in the second quarter of 2023. That somewhat softer cash flow was a result of greater working capital requirements tied to the rollout of multiple new projects in every one of our segments. Looking at the first six months of the year, free cash flow reached $38 million, which marks a substantial gain versus the $2 million that was used during the same period in 2023. Capital expenditures totaled $30 million for the quarter, and $61 million on a year-to-date basis. Our expectation remains that CapEx will be in line with the $151 million we spent last year, with the increase during the back half of 2024 mainly attributable to the expansion of our commercial nuclear facility located in Cambridge, Ontario, along with certain other growth investments we have selected. Turning to Slide 6 for the segment results: Government Operations posted second-quarter revenue of $541 million, up 10%, with growth coming from naval nuclear components, long-lead materials, U-Metal and microreactors. Adjusted EBITDA for this segment climbed 13% to $108 million, as stronger revenue was paired with solid operational execution. Segment EBITDA margin came in at 20.0%, versus 19.4% a year earlier in the same quarter. Although this is an improvement over Q2 2023, GO's EBITDA margin continues to be held back, both by spending on new capabilities — including the fuels modernization optimization project Rex mentioned previously — and by quicker expansion in development-stage work streams that carry margins until they transition into more programs. Right now, we see the GO segment's EBITDA margin results from the first half of 2024 as a solid stand-in for the full year, assuming these items keep going. In the end, that ought to produce modest adjusted EBITDA growth for the segment year over year, matching what we guided to previously. Moving on to Commercial Operations. Revenue rose 17%, powered by robust expansion in commercial nuclear power along with ongoing growth at BWXT Medical. Segment adjusted EBITDA increased by nearly $7 million to hit $22.5 million, reflecting higher revenue, strong execution, beneficial contract items, and mix in our commercial nuclear power business. Keep in mind that outage schedules and the related field services work make our commercial nuclear power business seasonally stronger during the second and fourth quarters, and that gave an outsized boost to second quarter results. Consequently, commercial EBITDA margin came in at 15.9%, compared with 13.1% a year ago. For 2024, we still anticipate Commercial Operations revenue growth ranging from high single digits to low double digits, along with EBITDA margins that are higher than 2023. Now moving to guidance on Slide 7; we are reaffirming our operational guidance metrics while narrowing the adjusted EPS guidance range for the year. For the whole company, we're projecting growth in the mid-single digits for both revenue and adjusted EBITDA. That puts us at no less than $2.6 billion in revenue and roughly $500 million in adjusted EBITDA. Our adjusted earnings per share should now come in somewhere between $3.10 and $3.20. Looking at the EPS bridge on Slide 8, interest expense and the tax rate are both a bit lower than we thought, and our view of operations for the year hasn't really changed in any meaningful way, because the timing shifted between the first half and the second half compared with how we'd originally thought our quarterly earnings cadence would unfold. We're now expecting earnings per share to be spread more evenly across the year — the first half and second half should look alike, and the upcoming 2 quarters should come in around the same level. Last, we're restating our projection of robust growth in free cash flow. Our forecast is $225 million to $250 million in free cash flow, fueled by growth in EBITDA, improved management of working capital and a disciplined stance on capital expenditures. To wrap up, this was a strong quarter that came in above what we had anticipated, which lowers the risk around our full year EPS guidance. We continue to concentrate on seizing growth chances throughout our business lines, going after new opportunities and blunting macro headwinds like rising labor costs via operational excellence and better planning. With that, we're ready to take your questions.

Scott Deuschle

analyst
#5

Rex, considering how it's priced, would you say actinium is already driving significant growth for BWXT Medical, or does it remain quite minor at this point?

Rex Geveden

executive
#6

Revenue-wise, it accounts for a rather modest share, yet it's scaling up quickly and could become significant before too long, I'd say.

Scott Deuschle

analyst
#7

All right. So for actinium to really matter, does commercialization of drugs using it have to happen? Or could it still matter simply because so many Phase III trials exist?

Rex Geveden

executive
#8

You might view it as possibly resembling lutetium's situation, in that there is revenue during the clinical trial stage, and as we mentioned in the script, more than 25 clinical trials existed at that point; so there's activity there. Yes. However, genuine expansion happens once drugs win approval and enter manufacturing; and we have — we've disclosed earlier deals with Bayer and Fusion for that kind of supply. So we're handling clinical trial work while expecting to take a significant part in producing the drugs.

Scott Deuschle

analyst
#9

All right. And when it comes to lutetium, Rex, will you be in a position to submit that DMF shortly too?

Robb LeMasters

executive
#10

Indeed, I can address that, since I believe an update was provided by me during the prior year. That remains one of our initiatives that is being introduced, and we anticipate it in the coming year, meaning it is roughly 2 months away. We are preparing the build-out and working through how the processing will function, among other things. And once more, our expectation is that we will have 2 irradiation sources available for this purpose. So the filing will happen in the coming year, Scott.

Scott Deuschle

analyst
#11

All right. Then, Rex, perhaps I've got the wrong read on this, but the level of assurance you appear to show in your prepared remarks regarding what tech-99's prospects look like comes across as quite strong. So I suppose my question is whether you're noticing any developments related to securing FDA approval that are fueling that assurance? Or could I simply be reading too much into it?

Rex Geveden

executive
#12

No. I'd say our assurance is solid here, Scott. What we've done is — we've essentially been refining the formulary, if you will, and the quality of the product is truly outstanding. So we're aware that we possess a commercially viable product. We've been checking off our somewhat of a task list alongside the FDA, and communication with them follows a typical cadence; and I believe what has us most enthusiastic is the commercial momentum, since we have highly committed prospective buyers navigating what lies ahead together with us; so I'm definitely optimistic about this.

Bob Labick

analyst
#13

Bob Labick here. Let me stay on the isotope topic for a moment, specifically moly-99 — clearly your confidence keeps building, as does the timing, and the outline you provided suggested a ramp across 2025. So what news comes next? Do you have an approval timeline you can share, or how should we think about upcoming steps, starting with moly?

Rex Geveden

executive
#14

Sure. Bob, I'd simply say keep watching; we remain on the path I described in the remarks, and we expect developments to unfold that way. Regarding '25, I believe we'll be somewhat cautious in our approach, since production and logistics for tech are complex — the market understands this well. Even so, we'll ramp up carefully and deliver a viable product to the market.

Robb LeMasters

executive
#15

Right. Perhaps I could add one thing—what we're attempting to set out is that 2024, like I mentioned during the prior quarter, genuinely is when we intend to be commercial and prepared to serve customers. In fact, during this year, as Rex mentioned, we're holding discussions about agreements. So according to certain signals, we're already commercial and set to proceed, provided the FDA gives its clearance before long; and afterward, as 2025 unfolds, we're also attempting to signal that we won't be an instant blockbuster. Our approach will be to enter the industry gradually, and we intend to keep our spending in check. I believe I've mentioned previously that we have methods for essentially doing one run, then scaling to a second and third run as time goes on; and that will gradually ramp up as we observe customers who are genuinely pleased with the product and getting the logistics in place, and so on. And in the end, it turns into a significant driver during 2026, which is what our guidance has consistently pointed to. So that was, in financial terms, the crawl-before-you-walk remarks—not a major element for 2024. Honestly, every scenario for 2025 lets us proceed in an extremely judicious fashion and keeps it from truly shifting the needle much upward or downward for '25 when it comes to profit. And 2026 is genuinely the point where you'll witness some strong economics.

Bob Labick

analyst
#16

Alright, great. Moving on now to TSG. Nice work on landing the Pantex award. From what I gather, no protest was filed on that one. So could you lay out a timeline for how the ramp-up goes, when it begins affecting the P&L, and also give us an update on Hanford Tanks — maybe the schedule, or whatever news we might get on that front?

Rex Geveden

executive
#17

Sure, Bob, I'll handle that question. On these calls before, I believe we've explained that with technical services contracts, there's a transition window during which you're working alongside the incumbent, lasting 3 or 4 months. That's the stage we're in right now. You're right about the protest — it didn't hold things up, and we got on site to kick off the transition in the middle of July. As for that transition window, I'm not sure — whether it's 3 months or 4 months slips my mind, though my sense is 4 months. Fees don't accrue during it. You pick up a few small benefits from absorbing costs in that stretch, but no fee is earned. So figure on it beginning to show a small impact in what we'd call the fourth quarter, then reaching full run rate for Pantex in 2025. Regarding Hanford — let me just recap the situation there briefly — we captured that contract a couple of years back. A protest followed. Judge Horn and the Federal Claims Court returned it to DOE so corrective action could be taken, since both bids had issues. We put together new proposals, submitted them, and got picked once more. That selection drew another protest, which now sits with the court. So the Federal Court of Appeals has it, and we'll find out how it lands. My expectation, though, is that it gets resolved in roughly the coming quarter.

Pete Skibitski

analyst
#18

Rex, regarding the DIU RFP, I was hoping you might be able to walk us through how it's structured. Is this essentially an LRIP solicitation covering a single unit, or does it involve several? Also, have you determined whether the Army has actually allocated budget for any of these units within their fit up?

Rex Geveden

executive
#19

Sure, Pete. From what we can see in the RFP, the plan appears to be choosing possibly two separate contractors. There will be a study stage of some sort, followed eventually by a deployment stage; and the goal they had in mind was getting these two kinds of microreactors operational and in position before the decade wraps up. My understanding is the overall buy covers as many as five reactors per type. So one way to look at it is — I'd call that quite a significant opportunity on our end. On the Army question, whether that money has shown up yet, I can't say.

Pete Skibitski

analyst
#20

All right. All right. Still, that seems like an opportunity worth perhaps $0.5 billion or greater for your company, from the sound of it.

Rex Geveden

executive
#21

Correct. At this point, I'd rather not attach a figure to it, certainly, but it is — yes, it is significant. Our hope had always been to reach something like an LRIP stage with these microreactors. This will certainly look like that, and then ideally we'd establish a rhythm of full production as we progress further along. You're aware that our ambition has always been to duplicate our franchise business across other domains using other technologies, and this represents that step — the following step.

Peter Arment

analyst
#22

Solid quarter. Rex, you brought up the GE Hitachi SMR work. How should we think about the revenue timeline and how it's affected by that?

Rex Geveden

executive
#23

Sure. Over the last several calls, I believe we've described a pattern: the first unit gets built, and ideally Ontario Power Generation signs on for units 2 through 4 down the road at some point; we pictured those units spaced apart by 18 months, 2 years, roughly that. Then we put a ballpark revenue figure of approximately $100 million on each of those small modular reactors for BWXT. That figure would cover the reactor pressure vessel and possibly additional components. So picture those efforts — design and manufacturing — taking place across a few years, with that $100 million distributed over, say, 2, 3 years — 2, 3, 4 years — and then the next one stacking on top of that. I'm not sure if you — Robb, anything you'd like to add?

Robb LeMasters

executive
#24

Yeah, that's correct. We've discussed these various possibilities. Clearly, other providers have chosen us as well. Usually, whenever you're picked, it's somewhere in the range of, say, $50 million to $100 million of content, and that depends on what the mission happens to be in that case. After that, as we've typically put it, you're sort of distributing that, let's say, $100 million across roughly a 3-, perhaps 4-year period. And with any luck, it simply continues stacking up in blocks of that kind as they place more orders and pass it along to us as the merchant manufacturer.

Peter Arment

analyst
#25

Peter, thanks. On the Pickering refurbishment — yes, it does sound like early work is getting underway. Could you speak to either the capacity or the meaningful headcount you'll need to support everything you're doing with Darlington, Bruce, and now Pickering?

Rex Geveden

executive
#26

Yes, Peter. That's clearly why we're expanding the Cambridge facility, in line with what we announced a few months back, last quarter. We're ramping that workforce quite aggressively at the moment, since we still have meaningful work on the Bruce refurbishments. That includes, by the way, steam generator manufacturing and feeder manufacturing. We'll have comparable work scopes at Pickering, and they overlap to some degree. And to make things even tougher for us on the capacity side, they also overlap with the small modular reactor at Darlington. So that's why we're doing the build-out; we're recruiting hard and having good success with it. I'd say our talent acquisition process is really dialed in. So we expect to meet the labor need, and we also expect that, with the capacity expansion we completed, we can handle all these competing priorities and the customer needs.

Josh Korn

analyst
#27

Josh Korn here, filling in for David. I was hoping you might give us an update on where things stand with the carrier Virginia and Columbia build schedules, and whether there's any effect on the government ops outlook for the next 2 years.

Rex Geveden

executive
#28

Sure. I'd say there isn't really anything fresh on that front. As we've consistently stated, under the shipbuilding schedule the lull in forward ordering would stretch into 2026. Historically, it had fallen in '24 and '25. So our business forecast is built around that shipbuilding schedule. That being said — and this is something we always note — the authorizers and appropriators haven't finished their work, so we'll see how it plays out. There's a bit of chatter regarding long-lead materials in advanced procurement, so we'll see where that leads; but as of now, our forecast follows the shipbuilding schedule, and we anticipate finding ways to grow outside of it so we can hit our medium-term guidance numbers, and we have a lot of confidence that we can do that.

Andre Madrid

analyst
#29

To build on what was just asked, but in a more detailed way, there's been quite a bit of talk about the Virginia class potentially being reduced by one in the appropriations bill. It looks as though some emergency funding could be restored. That said, do you believe this possibility is genuinely realistic over the next few years? And if it does happen, would it be a one-time thing? Or might we truly see the Navy make a step change?

Rex Geveden

executive
#30

Yes, at this stage it's speculative. And I think if it does come to pass, it's something we can handle, but we keep building 2 Virginias a year, and our hope is that, that continues.

Robb LeMasters

executive
#31

Right. The particular item you're referring to might be that single occurrence in the budgets submitted earlier this year. During the previous call, I believe we discussed that shifting from a rate of 2 annually down to 1 — in reality, when you examine the funding profile, even under that circumstance we still obtain advanced procurement funds that hold us level; so although the shipyards could be impacted somewhat by that, it wouldn't shock me if they make up the difference. Let me clarify: if your question concerns only this year, that ordering pattern looks pretty favorable for us. I simply want that to be clear. After that point, I haven't picked up much discussion; as a matter of fact, regarding the 2 per year beyond that, I think many folks are attempting to accelerate things so the industry can manage close to 2.3, since, as you're aware, the AUKUS program will soon be right behind it. So if you're able to increase output further, honestly, I believe the U.S., U.K. and Australia would purchase more.

Rex Geveden

executive
#32

Andre, one more thing I'd tack on as a small addition to the point Robb made, which was spot on. Lawmakers are especially focused on keeping the supplier base solid for building submarines and carriers. So what you're seeing is that the legislature leans toward backing long-lead materials and leans toward backing the supply chain, even with throughput problems at shipyards; that's how it's gone historically.

Andre Madrid

analyst
#33

That's useful, and I have one more question about it. You brought up AUKUS, I realize. The narrowing down among the various vendors is approaching very quickly, I know. So is there any sort of news regarding when that will happen? I realize the Australians have basically been indicating exactly that, though whether you folks are hearing anything additional is unclear to me. Perhaps you could just tell us where things stand regarding your feelings on that possible rivalry.

Rex Geveden

executive
#34

Sure. Truthfully, we aren't hearing a great deal. At this stage, we simply lack a great amount of insight regarding it.

Robb LeMasters

executive
#35

Correct, and there are two components to this, as you're aware. First, with Virginia, the Australians are looking at the first 3 to 5, and there isn't a down select away from us, so to speak, correct? It's simply the quantity they're after. So if 3 is what they want, those 3 will be built by us. If 5 is what they want, we'll build those 5, right? So those are Virginia-class. Honestly, that represents the work ahead across the next decade. So that lands with us. There is no down select away from BWXT. Regarding the future platform, be it SSN-AUKUS, our hope is to have a role there. So a down select does exist, as you put it. Some appetite is there, and we've been transparent that we've been in communication with our customers. They indicate — you definitely get some scope on that one. What that scope looks like and how large it is for BWXT is somewhat TBD. Yet even there, we've leaned in to say that yes, we see scope there.

Michael Ciarmoli

analyst
#36

Good numbers. Robb — either you or Rex, I believe one of you mentioned level loading the plants given the CVN slowdown. Clearly, microreactors are scaling up. Still, what should we expect for margins? You lowered government guidance a bit for this year. This quarter brought strong sequential growth, yet margins slipped from the prior quarter. So assuming CVN truly unfolds that way, ought we adjust our outlook to be somewhat warier about government ops EBITDA margins, considering the nature of the work moving through those facilities?

Rex Geveden

executive
#37

Sure. Michael, I'll take that first, then hand things to Robb for extra detail. That margin squeeze we're seeing isn't really tied to operations within the naval nuclear propulsion program. What's actually happening is a mix issue stemming from extremely fast expansion in our — mainly our advanced technologies group; we have microreactor programs there. We've discussed this before. Those are cost-plus fixed-fee arrangements during early phases where risk sits with the government. As a result, the fee and margin — it weighs on the business somewhat until we reach production programs. Other elements play in too, a heavier R&D burden in that unit, plus the Advanced Reactor Development Program, an 80 to 20 cost share alongside the government. The government covers $0.80 on the dollar, which is excellent for us. It lets us push forward our commercial goals in microreactors, yet a cost comes along as that program expands. So I view it as a mix matter rather than operational margin pressure. I believe that covers most of it. Now let me hand it to Robb for anything further.

Robb LeMasters

executive
#38

Right. Well, Rex, you made that point. Let me just try to set the baseline here. Regarding GO margins for 2024, Michael, we've consistently stated there's no revision at all to the guidance we've provided. It'll come in slightly lower since, as you're aware, we had a one-time item during Q4 of last year that carried high margin. So once you take that out, you're essentially level beneath that for '24 compared with '23. That's the first thing — no adjustment to GO margin — and we included all of that guidance in the earnings script. Second, regarding what we observed even during the quarter, echoing Rex's comment, the underlying NOG margin — that's the essential manufacturing margin — it truly was — we're working through all the inefficiencies that showed up over the last couple of quarters. But I reviewed it recently, and those margins have actually risen year-over-year on an underlying footing. And like Rex mentioned, since you're experiencing this sort of growth acceleration in the more — shall we say — immature development programs, which is precisely what you witnessed, correct, an exceptionally robust revenue quarter in Q2, you're simply merging in those reduced margins. Then last, to sort of build on what this all signifies looking 2 or 3 years ahead, if you truly had the situation you described where CVN gets pushed out, the way I see it is those margins from the more development-focused programs will begin to sort of mature, correct? So that becomes a tailwind beneath the business 2 or 3 years from now. And that's the point when you begin to see, oh, that starts merging exactly like every one of our other established programs. The final thing I'd mention is we've gotten quite skilled at finding methods to expand EBITDA in '24 and '25, and we're hoping to keep expanding that even if that tide recedes. I believe we've discovered various approaches, whether it's the growth we're about to witness in the TSG business, whether it's maturing other programs, whether it's acquiring enrichment franchises. I think looking that far ahead, I'm not worried about finding various approaches to keep fighting that circumstance, and we'll collaborate with the government and trust they'll fill that in as well.

Ron Epstein

analyst
#39

Rex, during the comments you had ready for us, you came across as fairly optimistic regarding terrestrial nuclear, so to speak. Could you share a bit more detail on that? In terms of what's coming in on that front, what are you being told and what are you observing?

Rex Geveden

executive
#40

Yeah. Yeah. You're referring to the microreactors, Ron?

Ron Epstein

analyst
#41

Yes.

Rex Geveden

executive
#42

Yes. Yeah, we feel good about it. That RFP I mentioned during the call — the Defense Innovation Unit put it out, and what they're after is microreactors producing somewhere between 3 and 10 megawatts, installed at a couple of Army bases before this decade wraps up, with orders as large as 5 units apiece. So my read is that we're seeing these microreactors move out of the prototyping stage and into what I'd call LRIP — low-rate initial production — and that's really, really encouraging. From there, the next milestone is full rate production, where ideally we'd be delivering a couple each year, the way we do with the Navy reactors, and we could populate Army bases or serve whatever need the military has. So yeah, I'd say it's a pretty exciting step, and in certain respects, it's come surprisingly soon.

Ron Epstein

analyst
#43

And if I could just ask a quick follow-up to that, how fundamentally different are these from what you already operate on a submarine?

Rex Geveden

executive
#44

Well, the technology is not the same. What you have on a submarine is pressurized water reactor technology, and that's where it came from, out of the Rickover program. Even though it has evolved quite dramatically over the decades, it remains that same sort of architecture; for the case we're discussing here, involving these microreactors headed to military bases, for the most part, those are — those would be high temperature gas reactors. So the cooling is different, the moderation is different, and the fuel types differ; and I believe, notably, these things have — these things will use high-assay, low-enriched uranium, typically TRISO-style fuel. So regardless of which specific design gets picked, there's a very compelling fuel opportunity in front of us. And that TRISO fuel, as we've said on earlier calls, is fuel that is inherently safe because it's — because you trap the fission products right at the fuel grain level, and on top of that, these reactors are engineered with what are called negative reactivity coefficients, so at a certain temperature it shuts itself down, making the technology materially different and certainly different in how safety is handled on those systems.

Thomas Meric

analyst
#45

Only a handful from my side. Let me begin with tech-99. Rex, you brought up a few initial discussions. What I'd like to know is whether you can shed a bit more light on what those talks center on — things like terms, volume, scaling up, quality, price, or anything else that stands out from that first marketing effort.

Rex Geveden

executive
#46

Yes, every one of those things. We're — we are providing, of course providing the specifics of how good the product is to prospective buyers and having them test that material, and that is certainly producing conversations about commercial terms. Robb LeMasters has been collaborating with Jonathan Cirtain in that business, in that specific area; so I'll turn it over to Robb to see if he wants to add anything there.

Robb LeMasters

executive
#47

Absolutely. So in North America, there are essentially 5 distributors covering that market, and that's the region where our initial launch will happen. So we intend to go after them. Those individuals are known to us. Their radio pharmacies' locations are known to us. We've sort of been researching that over the last couple of years. And the thrilling part is that you can now make contact and genuinely swap contracts and discuss when they'd like to receive shipment, what — and begin evaluating whether it genuinely is a drop-in substitute. So when you're actually able to turn up and carry out that business development work under real conditions, what we're observing is that the others — that each of those 5, honestly, are expressing, yes, we'd be delighted to have a third supplier. As you're aware, there are 2 others and our product is differentiated. And at the very least, it simply boosts their capacity to have a few separate vendors. I believe we'll cut fairly deeply into the incumbents' position there, but we're glad to appear and demonstrate that our product will be dependable, will arrive on schedule. We'll deliver all the advantages we've been promoting to each of you. And I think what we're hearing from customers is, yes, that sort of makes sense to us. So we're talking through term, price, logistics, all of it, correct, and preparing ourselves so that we can then move swiftly into the market once that occurs.

Thomas Meric

analyst
#48

That's useful. Regarding microreactors, I'm wondering whether you can provide any timeline specifically for Project Pele — is there a testing campaign schedule that we should keep in mind and monitor?

Rex Geveden

executive
#49

Sure. The development stage is currently underway, with design being finalized and the supply chain being put to work. Reactor assembly will take place in Lynchburg, Virginia, at our advanced technology center; after that, we'll send it to Idaho, where the intention is to conduct a testing campaign at Idaho National Laboratory. That would continue into the middle portion of the decade. So everything there will take shape across the coming few years.

Chase Jacobson

executive
#50

Absolutely. I appreciate all of you taking an interest in BWXT and coming on to ask your questions. We’re eager to meet and talk with a lot of you by phone and face-to-face in the coming days and weeks. Should anything come up, you’re able to get in touch with us at investors.bwxt.com. Thanks so much.

Operator

operator
#51

Everyone, that wraps up our session for today. Thanks to each of you for being here. You're welcome to leave the line now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete BWX Technologies, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to BWX Technologies, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in BWX Technologies, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.