Cadeler A/S (CADLR) Earnings Call Transcript & Summary
November 20, 2025
Earnings Call Speaker Segments
Operator
operatorGood morning, and welcome to Cadeler's earnings presentation for the third quarter of 2025. With us today are Mikkel Gleerup, our Chief Executive Officer, and Peter Brogaard, our Chief Financial Officer. Please keep in mind that remarks from the presenters this morning will contain forward-looking statements. Actual results could differ materially from those contemplated. The risks and uncertainties that might cause Cadeler's results to differ materially from today's forward-looking statements include those set out in Cadeler's annual report on Form 20-F, which is on file with the United States Securities and Exchange Commission. Any forward-looking statements made this morning rest on assumptions as of today, and Cadeler undertakes no obligation to update these statements as a result of new information or future events. This morning's presentation includes both IFRS and certain non-IFRS financial measures. A reconciliation of non-IFRS financial measures to the nearest IFRS equivalent appears in Cadeler's annual report. The annual report and today's earnings presentation are available on Cadeler's website at cadeler.com/investor. We ask that you please hold all questions until the formal remarks are complete, at which time you will be given instructions for the question-and-answer session. As a reminder, this call is being recorded today. If you have any objections, please disconnect at this time.
Operator
operatorMikkel Gleerup, the floor is yours to start.
Mikkel Gleerup
executiveThanks a lot, and welcome to Cadeler's Q3 presentation. We appreciate everyone joining us on the call today. Joining me is Peter, as usual, and Peter will walk you through the financial part of the presentation. Just the standard disclaimer. We can say that for this quarter, the highlights of the third quarter of 2025, we can say that it has been financial performance in line with our expectations. During this quarter we also signed the third full-scope foundation T&I contract as well as two turbine installation T&I contracts. Three of our four newbuilds scheduled for delivery in 2025 have already been delivered, and we have the remaining newbuild, the Wind Mover, on track for delivery, and she is delivering on current expectation within the next couple of weeks. Utilization was very strong in the third quarter. We recorded 92% utilization. We believe that, as we have always said, that is a strong measure of our business. We are working across the globe in both US, in Europe, and in Asia. We are continuing with very strong execution. The Wind Ally is currently mobilizing for the Hornsea 3 foundation T&I project, and the Wind Keeper is now here in Denmark at the Fayard in Odense upgrading before she embarks on her long-term contract with Vestas.
Mikkel Gleerup
executiveTurning to the commercial highlights for the third quarter of 2025: those vessels have been out working, and we'll begin with the Wind Orca, which has been carrying out work for Vestas on the He Dreiht project. The Wind Osprey has completed an O&M campaign for Vestas and is now installing a wind turbine installation project on Baltic Power in Poland. Scylla has kept working on Revolution Wind in the US for Ørsted, and Wind Zaratan finished an O&M campaign in Asia and is now preparing for her upcoming assignments next year. The Wind Peak is likewise continuing installation at the Sofia wind farm owned by RWE, where we're working for Siemens Gamesa. Wind Maker is working on Greater Changhua in Asia for Ørsted. Wind Pace has essentially been running an O&M campaign ever since she was delivered from the yard, and she's working for GE Vernova. The Wind Keeper, as I mentioned, has reached Denmark on schedule and is right now carrying out a complex upgrade scope, and we do believe we'll see her on project in the first quarter of next year. Wind Ally was delivered from the yard seven weeks ahead of schedule and sailed straight to the next mobilization port, where she is mobilizing all her foundation mission equipment and getting ready for the Hornsea 3 foundation installation project.
Mikkel Gleerup
executiveCadeler has a substantial backlog in key markets — the US, Asia, and definitely Europe as well. We recently announced a very large foundation project with a client we can’t name, set for execution in 2029, and we’re very, very happy about that. I’d say it validates the concept we’re pursuing on the foundation side, where the biggest clients in our industry are coming to us for full T&I on foundation installation — near-term, mid-term, and longer-term too. We’ll keep working very, very diligently to secure more foundation work, and more WTG work as well. While doing that, we’ll also keep building our O&M vehicle in the next round. We expect the backlog to stay strong throughout the years we’re currently sailing through. The backlog has essentially grown since we listed the business, and today we stand at a backlog of almost €2.9 billion, with 78% of that having reached FID. We see that as a quality sign — that so much of our backlog has reached FID, and that we’re continuing to grow it. We’ve discussed before that we view 2027 and 2028 as years with somewhat more competition for projects, and also an expected lower utilization degree on the fleet.
Mikkel Gleerup
executiveNaturally, we're still putting in a great deal of effort to secure the strongest projects during these years, so that our fleet, our company, and our people can keep moving forward on this journey. Regarding the newbuilds: Wind Mover is set to be delivered in Q4 of this year. That will be the final delivery for this year. Once it's handed over, we'll have taken delivery of five vessels in total this year, including Wind Keeper, which was an extra delivery this year that wasn't anticipated at the start of the year. It's extremely close to completion, the sea trials are already finished, and as I mentioned earlier, we expect to deliver the vessel within the next couple of weeks. Wind Ace remains on track, and we anticipate that she will be floated out of the drydock in December 2025, with delivery still planned for the third quarter of 2026, though there are opportunities to potentially bring that forward if the market requires it in 2026. On Wind Apex, we're still looking at a delivery in Q2 2027, and we're following the plan there exactly as we are on the other vessels. Wind Keeper, as I said, has arrived at Fayard in Denmark, and we remain on schedule.
Mikkel Gleerup
executiveThe vessel is undergoing a substantial upgrade in scope, but from day one we must ensure it operates according to Cadeler standards. We're collaborating with one of our valued clients, Vestas, and we want Vestas to truly experience Cadeler on the Wind Keeper right from the start. O&M services will be the Wind Keeper's main scope, yet given her crane, her leg length, and her carrying capacity, she is also able to take on installation scopes. For us, it matters that we extract a great deal of value from this investment, and based on what we've seen so far, we believe that represents a very, very strong opportunity for us and for our client working together. At this point, I'll hand things over to Peter for the financial highlights of this quarter.
Peter Brøgaard Hansen
executiveThanks a lot, Mikkel. So, the financial highlights for Q3: this was an exceptionally strong quarter, showing high utilization and costs kept in check. Compared with a year ago, naturally, we've got three extra vessels operating: the two P-class ships, Wind Peak and Pace, plus Wind Maker. Revenue came in at €154.3 million. The equity ratio, even with the more leveraged balance sheet from deliveries and drawdowns on our facilities, remains a very solid 47.3%. Utilization was very high at 92.2%, which is really, really good for the quarter. Market cap is €1.4 billion, roughly three times the guided EBITDA for the year. EBITDA for the quarter was €109.1 million. Cash flow from operating activities was €214 million. As Mikkel explained, the backlog is at a record high of €2.9 billion. The three-month daily average turnover is €5.4 million. Looking at the P&L for Q3, yeah, again, it really shows there are more vessels in operation: Wind Peak, Wind Pace, Wind Maker. This is the picture we've seen quarter after quarter with very strong results. As soon as a vessel enters operations, our financials step up. Revenue was €154.2 million, driven by, of course, the high utilization, but also the additional vessels.
Peter Brøgaard Hansen
executiveWe've kept cost of sales in check: roughly €38,000 for the quarter, slightly higher than a year ago, but we also have two vessels running in the US with somewhat elevated daily opex, though that's still under the €14,000 per day threshold. SG&A is also higher, which ties to what we've been saying for a while — we're scaling the organization to match what we see today. There are more vessels in operation, plus the foundation projects coming up. EBITDA, as mentioned, came in at €109 million, over twice last year's figure. On the P&L for the nine months spanning 1st of Jan to 30th of September: it's largely the same picture. On top of that, you'll note the opex for the year stands at €34,000 per day, which again shows operations are under control. As we communicated around the first-half report, we've also collected those termination fees tied to ending a long-term agreement, including on the postponed Hornsea 4 project. Balance sheet: yes, it reflects the deliveries. So far this year we've taken three newbuilds and the Wind Keeper. As noted, the equity ratio remains at a very comfortable level.
Peter Brøgaard Hansen
executiveHere's a slide we've presented a few times before. It demonstrates clearly that our funding is adequate to complete the rest of the capex programme with Mover, along with the two remaining A-class vessels on the way: Mover in Q4 '25, Ace in '26, and Apex in '27. Our balance sheet is quite strong, and we have cash and liquidity on hand. Another point here is that we continue to see substantial backing from the banks. I'd say that reflects the strong support on-chain that has been evident over the last couple of years. Apex doesn't have committed financing yet, since delivery is in '27 — we'll begin arranging that financing in '26 and have it secured roughly one year ahead of delivery, so we don't incur excessive commitment fees on it. We're seeing the very same strong backing and interest from the banks when it comes to Apex as well. This is the financing overview. What's new here is that we had a Wind Keeper bridge facility, which we took on when we signed the agreement to acquire Wind Keeper. We now have a Wind Keeper syndicated facility replacing it. That wasn't completed by the end of Q3, but it is something that has occurred subsequently.
Peter Brøgaard Hansen
executiveRegarding our full-year outlook for '25: we're keeping the outlook we issued around the first-half year report, after the long-term agreement was terminated. Naturally, we're quite far into the year now, so not many uncertainties or adjustments remain. What can still fluctuate, though, is how much of the T&I scope on Hornsea 3 lands in '25, '26, '27. That's something that may shift a little. We're maintaining the guidance from the half-year report. Over to you, Mikkel.
Mikkel Gleerup
executiveThanks, Peter. Regarding how things look commercially for the business, I believe what we can share about our take on the market — we field plenty of questions about this, and understandably so — is that a recalibration is indeed underway. Momentum remains strong, particularly in the inner years and the outer years, though in between there's a stretch where it's weaker. What does that mean exactly? Let me start with the inner years. It's fair to say that right now several projects exist that currently lack either an installation solution or an O&M solution, and those projects are still searching the market. In '26, and in '27 as well, securing a solution is growing increasingly difficult — especially when that solution involves a single vessel handling everything. Naturally, if you're open to piecing it together bit by bit, a solution can still be found. That will be the next step. At present, I'd say '26 is close to impossible, and by '27 it's increasingly something you must assemble in order to deliver a complete solution to clients.
Mikkel Gleerup
executiveIn the intermediate years — the latter half of '27 as well as '28 — we're observing that a number of projects are being pushed later. So utilization during that stretch comes in below what was anticipated. We continue to see a substantial buildout in '29 and beyond. As we've just demonstrated to the market too, we've secured a large contract for '29, and in fact we're seeing some developers who want to lock in their capacity for that window — the '29, 2030, 2031 period — sooner rather than later so they don't miss out on capacity in those years. Naturally, much still hinges on the upcoming auctions, such as Auction Round 7 and Auction Round 8, yet we do see government backing as well. In Denmark, for instance, support has been provided on two of the offshore projects, making them more and more appealing to the market. As a result, we also expect bidding in Denmark to succeed around the auction. We think it's essential to note as well that even with the revised targets, a sizable offshore wind buildout is still ahead of us this decade.
Mikkel Gleerup
executiveStarting in the next decade, we do anticipate that the curve is going to steepen, and more will be built out as we move into that period. As we note at the bottom here, we do expect a vessel undersupply toward the end of the decade and into the start of the following one. When it comes to capacity and what we observe in the market versus what others observe, the reality we see differs depending on whom you ask. We've attempted to show here what the various consultants and analysts examining the market say, when they look at the worldwide market excluding China, about what will be installed before 2031. Whichever line you take here, there is a significant increase from where we stand today to where we will be once we are into the next decade. I think Cadeler's focus is to grab the right projects, the best projects, and make sure we are running as high a utilization profile on all our vessels as possible. I think that we, with the plan we have laid out, also for the middle years, the '27, '28 years, are on a mission now to close these years in as fast as possible with the best projects possible in these years.
Mikkel Gleerup
executiveThere's no question that competition in '28 is stronger than we anticipated, because of auction rounds that were missed and because projects have been pushed to the right — yet that doesn't mean opportunity is absent. I think that's the key point we want to get across: opportunities do exist, we're competing hard for them, and we'll keep doing so. Europe is going to remain the leader in the outbuild, but we're also seeing APAC keep up its outbuild, and Korea in particular is entering that market, on top of what we've already seen in Taiwan and Japan. Just recently, a European developer also signed a development agreement in a different Asian country, though we don't think that will make a difference within this decade. We continue to hold the industry's largest fleet, and we believe clients prefer that fleet along with the flexibility, predictability, and affordability it provides them. We remain active in a broad range of tenders spanning all the years ahead, and we're fighting as hard as we can to ensure we deliver the best value and the best projects to our investors.
Mikkel Gleerup
executiveThat's the reason we show up at work, and it's the reason we battle every day. We genuinely think the offering we're able to put in front of our clients carries real value, and it's also something that will create value for us and for our investors. We've also demonstrated on this slide that supply has declined since the last time we spoke with investors in a group setting. The contract between Maersk and Equinor covering the Maersk offshore wind vessel was terminated, so as things stand right now, we don't regard that vessel as part of the supply in the market, and as a result supply has come down. On the key investment highlights, as I mentioned already, we have the largest, most versatile and flexible fleet. That opens up a great deal for our clients, whether in terms of cross-utilization, efficiency, or de-risking projects. We find that every one of these points is something we're discussing with clients right now for current projects, for projects in the near, the mid, and the long term. We're active across all of those timelines. Our team is highly experienced, and we've taken a conservative approach to growing it, which is also why we're confident that the team is right-sized for what we see ahead of us now.
Mikkel Gleerup
executiveOur ties with clients—and with industry contacts broadly—are solid, and we think our position is very, very strong when it comes to negotiating projects with those clients. We think our global platform is resilient. We think we can spread risk across more units, and so we're in a good spot both operationally and, let's say, on market risk. We're also seeing that the O&M market is taking a larger share of the fleet, whether through campaigns on turbines or ad hoc service work required for main component replacements on products already installed in the market. We're seeing an undersupply of capable vessels, especially on foundations in 2029 and WTG vessels from 2030. That's something already becoming visible now, because we're basically bidding some of those projects already. As I said, we also see very strong growth in demand for O&M services. All in all, given the reality of the middle years—the second half of '27 and '28—we believe we're in a market that, in the short term, will be very, very strong and very, very busy, where every single vessel day will be captured.
Mikkel Gleerup
executiveSo we're moving into a stretch where work and utilization are both more balanced, and then we're entering a market that's picking up again in '29, based on the projects we can see out there right now. Our track record in the capital markets is strong, and we're supported by an order backlog that's at a record high of €2.9 billion. That backlog, we believe, gives us a lot of earnings visibility. As I read in some of the reports that came out this morning, more than €700 million of it falls within the next 12 months, and in terms of what's covered for the next 12 months, we're also in a very, very good position. I'd say from that standpoint: very strong near-term, slightly weaker in the middle term, and then a pick-up again over the longer term. That's what we have for you today — from here, we're happy to take questions.
Operator
operatorThank you. At this point, we’d like to invite any analysts who want to ask a question to click the raise hand button, which is located on the black bar at the bottom of your screen. You can take yourself out of the queue whenever you like by lowering your hand. Once your turn comes, you’ll hear your name called and get a prompt to be promoted. Please accept it, wait a moment, and after you’ve been promoted, you can unmute yourself and ask your question. We also encourage you to turn your video on. We’ll wait a moment so the queue can form. Our first question comes from Martin Huseby Karlsen from DNB. Please unmute your line and ask your question. Thank you. I think you did a pretty good job discussing 2028 as a transition year, but I’m curious to hear a little more about your confidence level for ’29 and ’30 when it comes to higher volumes. Is that tied specifically to certain events out there, or is it generally dependent on more government and political support for offshore wind in Europe? Thanks.
Mikkel Gleerup
executiveYes. Thanks, Martin. That's a good question. I'd say our confidence is based mainly on how many projects we're currently bidding on, and also on how ready our clients are to commit to those bids when they're able to lock in capacity. Obviously, take something like the UK Round 7 auction — I'm aware that for some in the market the budget came in below expectations, but I still think that budget allows a meaningful number of projects to get approved. From our side, it's about being in the right projects, and also a broader belief coming from the projects now tendering in those years and their willingness to commit to them. We've formed an overall view of what we're seeing, and particularly on '29 on foundations, that there is or will potentially be a situation where not everyone can be served that year.
Martin Huseby Karlsen
analystAlright. So, as a follow-up, when it comes to how Cadeler is positioned over the next — let's say the next couple of years — regarding backlog, '28 perhaps appears somewhat challenging, but once you reach '29 and '30, and there's a fair amount of uncertainty across the industry overall, could you speak a bit to how you see it, or to what you hear from clients about your positioning — having a large fleet of vessels and also being capable of doing both foundations and turbines, compared with some of those single- or two-vessel companies out there?
Mikkel Gleerup
executiveI believe clients place a lot of value on that—having a certain level of predictability and safety on the supply side—because even in a year such as '28, when some developers have just one project to carry out, it matters enormously that the project proceeds as planned. That's what we observe, and it also comes through strongly in our conversations with clients: much of it revolves around our capacity to deliver, our capacity to guarantee a vessel and possibly backup vessels should anything go wrong. That counts more than anything else. We're often asked how much we talk about price with clients. Honestly, I'd still say price isn't the main topic in our client discussions, though it's true that pressure is naturally greater in '28, since we're competing harder over fewer projects. That's a natural consequence. I think there are realities on both sides of that. First, it depends heavily on which developer we're speaking with, and second, on what type of project they're looking to execute.
Mikkel Gleerup
executiveEspecially when it comes to the foundation side, I'd call it a confidence in the delivery, and on the WTG side, it's also this whole question of how we can provide backing around the turbine OEM in case they run into problems, for instance. Those are, I believe, matters we're currently discussing. Thank you. You already touched on it a bit in your answer, which relates to my next question, but when it comes to pricing, at least seen from the outside, pricing has been pretty solid for '26 and '27 execution. Then you recently announced work for '29 and '30, which likewise appeared to carry good pricing. Could you help us make sense of that against the backdrop of '28 demand looking somewhat softer? Again, I think it depends heavily on where you're looking. In Asia, I think we're still seeing a tighter supply/demand balance even in '28 than in the rest of the world. In Europe, I'd say we're seeing that in '28, prices are under slightly more pressure, and you have to be sharper to secure projects there. In '28, I'd argue that price is what matters, because obviously if you have a project in 2028, you also know that more companies are able to do it for you than there are projects at present.
Mikkel Gleerup
executiveSo that creates, if not pressure pushing prices lower, then at minimum a leveling off of pricing, at least. I'd say this is really a holistic assessment criterion. As I've mentioned previously, assessing it purely on a day-rate basis is difficult — I can't say to you that it dropped from this figure to that one — but I believe it's more about the broader perspective on the project. That doesn't mean it's no longer something appealing for us to pursue.
Martin Huseby Karlsen
analystThanks. I'll hand it back to you. Appreciate it.
Mikkel Gleerup
executiveThanks, Martin.
Operator
operatorThanks. We’ll take the next question from Jamie Franklin at Jefferies. Please unmute your line and go ahead with your question.
Jamie Franklin
analystHello, and thanks for taking my questions. First, looking just at 4Q: you said, quite clearly, that Hornsea 3 is likely the largest swing factor determining where you land inside the full-year guidance range. Could you give us a little more detail on the scope of work currently underway on Hornsea 3, and then, as you head into 2026, what is your present expectation regarding the timing of the first monopile installation, please? My second question is for Peter. On 4Q cash flow, can you offer any indication of what to expect regarding working capital? There was a fairly solid inflow in 3Q — should we look for that again in 4Q? Likewise on capex, what are the main components to expect in 4Q? Is it simply the final instalment of Wind Mover, or will there also be some Wind Keeper upgrade capex? Thanks.
Peter Brøgaard Hansen
executiveStarting with the final question, thanks, Jamie. Q4 capex is, naturally, the Mover, and after that I believe it's mission equipment on Wind Ally. And then, naturally, what also arrives each quarter is those capitalized borrowing costs. For those two combined, it'll be roughly €320 million, in that neighborhood. Mostly that comes from the Mover. Working capital: naturally, Q3 is somewhat of an unusual quarter when it comes to working capital, since it drops considerably because we got termination fees from a long-term agreement cancellation that sat as an asset at the half-year mark at the end of June, and the cash came in during Q3. That represented an inflow. If you strip that out, the picture in Q4 is largely the same as what we saw in Q3 — modest working capital growth, or the same level. That's what we're observing. The transport and installation scope we're carrying out in 2026, that's naturally the planning and engineering, but we're also beginning the transportation scope in Q4. That's what we see there. First monopile — perhaps you can take that one,
Mikkel Gleerup
executiveMikkel, I can respond that we aren't permitted to say, since Ørsted has that under its announcement criteria, to speak — we're not allowed to point you toward when the first pile goes into the water. What I can tell you is that on Hornsea 3 we are fully on plan, and at this stage we're meeting all our scheduled deliveries on target and within budget, which is very, very pleasing, because naturally at this point we've delivered a lot of the engineering scopes we'd been working on for many years. That covers the transportation frames for the secondary steel, the transportation frames for the piles, the mission equipment for the vessel, and the vessel is mobilizing right now. Simultaneously, we're getting two ports ready — the Port of Tyne for secondary steel, where the Wind Orca will operate from, and Teesworks, where the Wind Ally will work from, loading out piles. Plenty is happening, and right now we consider ourselves in full execution on Hornsea 3. Naturally, the Ally arrives in the first quarter next year and begins preparing for pile installation, but the precise dates and targets and all of that is not something we're permitted to discuss publicly.
Jamie Franklin
analystGot it. Thanks.
Operator
operatorThanks. We'll now take our next question from Daniel Haugland at ABG Sundal Collier. Please unmute your line and go ahead with your question. Hi, guys. Good to see you, and congratulations on a good report. I've got a couple of questions. The first one concerns the contract — the €500 million contract that you announced recently. Could you give any indication of a rough percentage split of how much relates to the T&I services and how much is the installation? That's the first one.
Mikkel Gleerup
executiveSadly, no. That piece sits inside a client auction, so we aren't permitted to break it out any further than we have so far. Once we clear certain milestones, we'll do so, but right now that isn't allowed. Okay. That's fine. My second question, then: since you're now ramping revenue from foundations into 2026, will you eventually begin segment reporting that separates the two different ones, or will you simply keep going the way you've been reporting already?
Peter Brøgaard Hansen
executiveWe don't intend to present segment reporting on that. All right. Then regarding the commercial outlook, I notice you still anticipate vessel undersupply toward the end of the decade. I was wondering whether you could elaborate a bit more on that, Mikkel, since, as you mentioned, demand appears to be shifting to the right. Do you expect anything to happen on the supply side as well, or are you simply saying that demand will continue growing enough in, say, 2029 and '30 to still produce an undersupply?
Mikkel Gleerup
executiveLike I told Martin when he raised that same point, the confidence we have comes from the projects we're bidding on, and from clients who are ready to back up their words with cash on their own projects. For us, that's a solid signal that these are projects they're at least placing bets on. On the undersupply question, I think we've noted for several quarters now that in our view most of the analysts have the supply side wrong, on both the WTG and the foundation installation, and that the supply side is being counted on too heavily. How that plays out will be shown by the future, I think. As we've said before on our side, regardless of whether there's oversupply or undersupply, our belief is that the best assets in the industry generate so much efficiency on a project that going with the best asset will always be the best solution. When it comes to fall height, we believe our position is good with the assets we hold. Not on every single project worldwide, but for, let's say, a standard utility-scale offshore wind project, we believe there is a strong benefit and a strong efficiency gain from taking the best asset for that project.
Mikkel Gleerup
executiveMy view is that it's a mix of those factors — broadly, we believe most analysts are slightly off on the supply side, and we also believe clients are far more, shall we say, active and committing when it comes to 2029, 2030, and 2031, plus what I mentioned regarding fall height. Okay. That's great. Thank you. That was everything from me. Thank you.
Operator
operatorThank you. The next question comes from Andreas Grimstvedt at SB1 Markets. Please unmute your line and go ahead with your question. Andreas, we can't hear you at the moment. Apologies — it looks like we're running into some technical difficulties. That was the last question for today, so if you'd like to hand back to Mikkel Gleerup for any closing remarks.
Mikkel Gleerup
executiveYes. Thank you. I just want to express appreciation for your joining this quarterly presentation. We're eager to return to you with the fourth quarter and the year presentation, plus further details about Hornsea 3, since by then we'll have plenty of exciting material to show you. Stay tuned for that. It will be interesting. Many exciting developments are underway right now, and we're looking forward to announcing delivery of the Wind Mover in the not-so-distant future as well. Thank you very much for tuning in, and reach out to us if any follow-up questions would be better handled on a one-to-one basis. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Cadeler A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Cadeler A/S earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Cadeler A/S or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.