Cadeler A/S (CADLR) Earnings Call Transcript & Summary

May 20, 2026

Oslo Bors NO Industrials Construction and Engineering earnings 33 min

What were the key takeaways from Cadeler A/S's May 20, 2026 earnings call?

In Q1 2026, Cadeler A/S reported revenue of EUR 124.7 million, significantly up from EUR 65.5 million in the same quarter last year, reflecting a robust operational performance. The company maintained its full-year guidance, indicating a strong outlook for 2026 and 2027, supported by a solid backlog of EUR 2.7 billion. Despite a net loss of EUR 7 million due to increased borrowing costs, management expressed confidence in the execution of ongoing projects and the delivery of new vessels, which are expected to drive future revenue growth.

What topics did Cadeler A/S cover?

  • Revenue Growth: Cadeler's revenue surged to EUR 124.7 million in Q1 2026, up from EUR 65.5 million YoY, demonstrating robust operational execution. Management stated, "It goes for all the lines, both revenue and the cost lines. It was as expected and regarded as a solid start to the year."
  • Backlog and Earnings Visibility: The company reported a strong backlog of EUR 2.7 billion, which provides solid earnings visibility. Mikkel Gleerup noted, "We believe that this provides a very solid earnings visibility for the company."
  • Utilization Rates: Adjusted utilization was reported at 77.7%, with expectations for improvement in upcoming quarters. Gleerup confirmed, "We expect that utilization is coming up in the following quarters of this year."
  • Net Profit and Borrowing Costs: The company reported a net loss of EUR 7 million, impacted by increased interest on bank facilities. CFO Peter Hansen stated, "We are now in the territory where we have delivered 10 vessels fleet and only 2 risks under construction."
  • Private Placement Success: Cadeler successfully executed a private placement raising EUR 175 million, which management believes will enhance their fleet capabilities. Gleerup remarked, "We were massively oversubscribed on the deal and is really grateful for the support we see in the market."

What were Cadeler A/S's May 20, 2026 results?

  • Revenue: EUR 124.7 million (vs EUR 65.5 million last year, +90.5% YoY)
  • Net Profit: EUR -7 million (impacted by interest costs)
  • Backlog: EUR 2.7 billion (strong earnings visibility)
  • Adjusted Utilization: 77.7% (satisfactory performance)
  • EBITDA: EUR 47 million (vs EUR 23.7 million last year)
  • Daily Average Turnover: EUR 10.7 million (three months average)

Cadeler A/S's strong revenue growth and solid backlog position the company well for future performance, despite current net losses due to interest costs. Investors should monitor utilization rates and the successful execution of upcoming projects as key catalysts for stock performance, while also being aware of risks associated with rising borrowing costs.

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and welcome to the Q1 2026 earnings presentation for Cadeler. With us today are Mikkel Gleerup, our Chief Executive Officer, and Peter Brogaard, our Chief Financial Officer. I'd like to remind you that remarks from the presenters this morning will contain forward-looking statements. Actual results could differ materially from those contemplated. The risks and uncertainties that might cause Cadeler's results to differ materially from today's forward-looking statements include those detailed in Cadeler's annual report on Form 20-F, which is on file with the United States Securities and Exchange Commission. Any forward-looking statements made this morning rest on assumptions as of today, and Cadeler undertakes no obligation to update these statements as a result of new information or future events. This morning's presentation includes both IFRS and certain non-IFRS financial measures. A reconciliation of non-IFRS financial measures to the nearest IFRS equivalent is provided in Cadeler's annual report. The annual report and today's earnings presentation are available on Cadeler's website at cadeler.com/investor. We ask that you please hold all questions until the formal remarks are complete, at which time you will be given instructions for the question-and-answer session. As a reminder, this call is being recorded today. If you have any objections, please disconnect at this time. Mikkel Gleerup, you may begin.

Mikkel Gleerup

executive
#2

Thanks a lot, and hello everyone, and thank you for being with us for this Q1 2026 presentation from Cadeler. To kick off the presentation, really a quarter that has gone exactly as expected. Financial performance in line with our expectations, continuing a robust backlog of work standing currently at €2.7 billion, which we believe provides a very solid earnings visibility for the company. Newbuild program on track. We named the second A-class vessel in April, and she is about to deliver in the next couple of months, as per the schedule. The second, or the third, rather, A-class vessel is delivering next year, and it's also on the schedule. We have continued with solid execution across the globe, and I'm also very pleased to say that Wind Ally and Wind Orca are fully mobilized and first complete monopile foundation has been installed on Hornsea 3, which is very, very important and a very important milestone for 2026, and we have a little bit extra on that further in the presentation. Very strong utilization, vessels operating across the world, and then Nexra has secured utilization on multiple projects in APAC. On the utilization, I would like just to quickly say that, obviously, we have many vessels that have been shifting between projects, a lot of mobilization in the first quarter of the year, which has also been exactly as expected.

Mikkel Gleerup

executive
#3

When it comes to commercial highlights, our vessels keep carrying out work on projects right across the fleet — it was genuinely a very, very, very busy quarter when it came to handling ships finishing projects, kicking off new ones, and bringing in other vessels to take over projects because of a lot of different factors — but on the whole, I'd also describe it as a quarter in which we managed to back our clients and do whatever was required to assist them with the projects they're involved in right now. It's also a real pleasure to see that Wind Keeper has begun operating, the test bed, and is performing on the project, the test bed, at this very moment. Next slide, please. On Hornsea 3, as I mentioned, truly, from concept through to delivery, we've fielded a great many questions across the past 4 years, during which we've been working toward executing Hornsea 3. A lot of planning is at last paying off, and it's very satisfying to be able to report that we now have proof of concept on the project, with the first full monopile installed, and with all the secondary components also fitted on it, commissioned, and handed over to the client.

Mikkel Gleerup

executive
#4

As of today, we actually have 8 monopiles in the water. 7 full secondary steel sets are installed, and 5 monopiles are fully commissioned out there. The project really is proceeding according to plan. The equipment we've invested in and are using on this project is performing as we expected, and we're now gradually increasing the pace on the project to reach the speed we want to be at, and to really ensure a smooth installation on this very, very important project — both for us at Cadeler, but certainly also for our client. We're very, very pleased to say that we have proof of concept and that we're now delivering the full T&I foundation project. We still have a very significant backlog across key markets. A €2.7 billion backlog, as I've already mentioned, gives very solid earnings visibility. We keep operating in the US, in Europe, and in APAC, and are really pursuing a lot of different opportunities for future years. As we also said this quarter, we've carried out a private placement for investment in additional jackups for the future, and also for a rock dumping installation vessel, which we believe will all strengthen our portfolio and our capacity to support clients going forward.

Mikkel Gleerup

executive
#5

There are also projects that aren't in the backlog yet, but we're actively working on them right now, and projects that will get added to the backlog once they come to fruition. Overall, I'd say that since the start of the year we've been reaffirmed in our view that we're looking at a very, very busy '26 and '27. As we've said as well, '28 is a different year, but we remain where we stood when we did the annual report. For 2029, we're currently working on some very, very interesting prospects. When we look into the new decade, we're also seeing very interesting projects and also a lot of projects that are currently in what we call category high. That's really the category where we're already working intensively with the clients now, and where we believe our vessels will be busy at the beginning of the next decade. On the backlog, 82% of the backlog has reached FID. We think that's a very, very solid number and it also gives us the earnings visibility that we really need as a company. We also see the start of Nexra and the foundation of Nexra beginning to deliver contracts in Taiwan, which is, of course, very pleasing.

Mikkel Gleerup

executive
#6

Our goals for Nexra remain ambitious, and we still see the plus 11, 12 MW segment as Nexra's primary market — one where we think we're well positioned to compete for the main component replacements on the industry's larger turbine sets. We also hold preferred supplier agreements that aren't part of the backlog, and right now we're in negotiations with those clients about installation during 2028. On the newbuild side, for the Wind Ace we're expecting delivery early in the third quarter of this year. The material work is essentially finished, though some tests remain scheduled for the vessel between now and delivery, and we feel we're in a very, very strong position to hand over this vessel on schedule and within budget. We held the naming ceremony this year, and we were proud that Mrs. Vestas named the vessel for us. As for the Wind Apex, which we also discussed in the annual report, delivery is expected in Q2 '27, and we've been in talks with the yard about managing an early delivery of this vessel, since we're working with a client for the Wind Apex right after it returns to Europe, where it will likely begin a job for a client here in Europe.

Mikkel Gleerup

executive
#7

Just a handful of photos from the naming ceremony for Wind Ace — a really big day for us as a team. That's our second foundation installation vessel delivered, and once it leaves the shipyard, the vessel will head back to Europe for complete mobilization ahead of the East Anglia TWO project, which we're kicking off next year. Of course, we're already beginning to take the learnings from the Hornsea 3 project and put them into practice on EA2, so we can make sure our clients get the best possible product from Cadeler. Turning to the financial highlights, I'll now hand things over to you, Peter.

Peter Brogaard Hansen

executive
#8

Thanks a lot. So for Q1 '26, we posted revenue of €124.7 million, versus 65.5 last year. Equity ratio came in at 47.6%, and adjusted utilization was 77.7%, which we consider satisfactory. We make that utilization adjustment for transit from the yard and scheduled dry docks, and in Q1 we also had sailor time not on hire — that's really what should be expected. Market cap stands at €2.3 billion. EBITDA reached €47 million, compared with €23.7 million. Net profit was minus €7 million, hit — as we also communicated in the annual report — by interest on our bank facilities. We're now at a point where we've delivered 10 — we have 10 10 vessels in the fleet, with just a few still under construction. So a larger share of borrowing costs flows through the P&L than was the case in earlier quarters. Backlog, as Mikkel mentioned, a strong €2.7 billion. Three-month daily average turnover of €7.7 million. We've adjusted for the private placement done on the 26th of March. Looking at the P&L, I think it's worth stressing that it's exactly as planned and by us, and fully in line with our own expectations. That applies to every line, on both the revenue and the cost side.

Peter Brogaard Hansen

executive
#9

Things went according to plan, and we see this as a solid opening to the year. Naturally, revenue is higher than a year ago since we now have 3 additional vessels in operation. Cost of sales also rises as a result of the larger fleet — climbing, of course, by a relatively greater degree than revenue, since 3 vessels were in transit. We had ships moving between projects, and we also experienced delayed revenue recognition on Wind Ally within the Hornsea 3 project. I believe it's worth clarifying that, under IFRS, revenue recognition on a project cannot begin until installation starts. Wind Ally has been mobilizing for Hornsea 3 during Q1, yet no revenue has been booked. That will come later. Naturally, we do earn revenue on the contract during mobilization, but it cannot be brought into revenue in the P&L. SG&A was higher versus last year, though again a modest rise, which once more reflects the picture we've described in earlier quarters: we built up the organization early to support a bigger fleet as well as a foundation project. That now demonstrates the scalability of our organization.

Peter Brogaard Hansen

executive
#10

The early investments are now paying off. Finance net is considerably higher compared with last year, but because of that, more is being allocated to the P&L rather than to CapEx on the vessels. OpEx per day stands at €40,837 per day, which is a little bit higher than it will be for the remainder of the year, owing to mobilization on Ally and sailor time, and there were some smaller one-off expenses within OpEx in Q1. Balance sheet — a strong balance sheet, of course — equity has increased through the capital raise we completed on the 26th of March, which also lifted the equity ratio from 44% to 48%. The CapEx program is a slide we have shown previously to demonstrate that we are able to finance the fleet expansion we have planned. As you can see, we have secured committed financing for A-class, Wind Ace, and we are in advanced discussions with the banks to launch the Apex financing in Q2, here in Q2 '26, with signing expected early Q3 for the vessel that is delivered next year. Altogether, we have €641 million of available funding for that, and a bit of the outstanding installments, giving net funding of €218 million. In this waterfall, we have not included the cash we hold on the balance sheet and the available facilities we have not drawn on.

Peter Brogaard Hansen

executive
#11

Cash and available liquidity as of March 31 stood at €221 million, and available liquidity rises to €369 million. Naturally, that should also handle the payment of the first installment on the T-class vessels, once they are signed and ordered, plus the scour rock installation vessel we announced in connection with the private placement. Beyond that, we apply our hedging policy, which we follow strictly: 50% of US dollar exposure is hedged, and 50% of interest exposure is hedged for the first 5 years of the credit facilities. That covers the financial overview. If we turn to what has happened since the annual report, we extended the RCF B, which had been set to terminate in June '26. We extended it by 18 months, through '27. We are in advanced negotiation regarding the accordion on the corporate loan we hold with HSBC, €80 million. We expect to sign it here in Q2. The purpose behind this is to keep a reasonable buffer when we look at available liquidity — we are 100% certain we can make it through the coming years and the CapEx program with current financing. The full-year outlook stays the same. It is unchanged, and nothing we have observed in the Q1 performance or through today falls outside the plan.

Peter Brogaard Hansen

executive
#12

So naturally, we're keeping our outlook for the year as it is. As for how the year is timed, that may have caught some by surprise, but our planning has always assumed a somewhat softer Q1 on revenue and income, with Q2, Q3 and Q4 then coming in as larger quarters for both revenue and income, and overall, the full-year outlook hasn't changed. Back to you, Mikkel.

Mikkel Gleerup

executive
#13

Thank you very much, Peter. Regarding the market outlook, this is somewhat a repeat of what we discussed around the annual report, but what we're adding here is our belief that recent geopolitical tensions are increasingly pointing toward greater demand for energy that is produced locally, for energy security, and for affordability. We believe offshore wind will play a massive role in the whole outbuild of, at least, the European energy system, and we can already start to see those trends coming our way. Also, with auctions in Europe that have momentum as one of the award criteria, where we see that coming fast to the grid, with a certain supply chain, is something that is given a positive impact on the award criteria, and that's something we like to see because it's also something that is playing both in the direction of us as a company, but also for our clients. We do believe that, as I said already, that we are in a very strong situation at the moment, with two very strong years ahead of us here, '26 and '27, a '28 that is, as we talked about during the annual report presentation, and then a '29 where we see a lot of interesting stuff that we are currently discussing with clients.

Mikkel Gleerup

executive
#14

So as we move into the following decade, I believe the volume of projects we observe across those years—whether you're reviewing the different consultant reports or whether we're speaking with clients—we can see a very, very substantial quantity of projects that will need to be installed as we head into that next decade. That's what we're working to get ready for, alongside our clients, to ensure that we, at a minimum, have an answer to what our clients require from us. We're also seeing that projects which earlier on were uncertain or projects that had been delayed are now returning with a firm timeline and will also be put out to tender in the various rounds we're seeing throughout Europe. Overall, I think we're heading into positive territory, with the utilities as well saying that it appears to be a very strong comeback also when it comes to Europe over the coming years. I think that, all things considered, Auction Round 8 as well continues to move forward and remains something whose impact we are waiting to see, but I think it's really something where we believe there are some clients lined up to take an award in the UK Round 8.

Mikkel Gleerup

executive
#15

Moving to the next one, please. Our view on supply and demand remains the same as what we laid out in the earlier presentations. It's shaped by things such as rising outbuild, which we've observed from the North Sea Summit and the various tender rounds taking place across Europe. I think it also matters that not everything is as it appears, and I think we saw examples of that yesterday, when announcements out of Germany were perhaps overinterpreted by some and then were corrected later that same day, and I think that's the situation we're in with offshore wind. Very small changes create a lot of noise, but at times it's important to read the fine print in these announcements. In our view the supply and demand imbalance is definitely there, both on average, but also if we look especially at the coming decade, and also, as I said, driven by new projects that are arriving, but also driven to a certain degree by demand from other areas, in particular O&M, which takes some supply away, but also by some of the vessels that are simply dropping out of the market because of age. That is something we see very, very clearly.

Mikkel Gleerup

executive
#16

We completed a successful private placement, raising roughly €175 million, and we think that genuinely opens up the opportunity for us to move forward with the two proposed T-class newbuilds as well as the acquisition of a scour protection vessel. What was the reason behind it? We've talked with many investors since then, and thank you for all the backing from the investors. The deal was massively oversubscribed, and we're really grateful for the support we're seeing in the market. We have faith in a structural undersupply of vessels, and we believe that, with the delivery window we've chosen, we'll be ready for a very strong market uptake when these vessels are delivered, and we can see already today that our clients are approaching us for these vessels since they offer something nobody else can provide at this stage. We believe that the experience we have in delivering vessels, and also the relationships we've built with the entire supply chain on the vessels, and with the shipyards too, have given us access to a very, very competitive pricing model on these vessels, which is, of course, incredibly important when you have to live with them for 25 years after delivery.

Mikkel Gleerup

executive
#17

We're also examining the scour protection asset, which we've already talked about, and to us it's genuinely a strategic enabler — though it's also a area where, to a very large extent, we'll be our own client. This product will be offered to our clients as part of foundation installation, and we also think that will de-risk our foundation projects too, since we won't become solely dependent on other companies providing this service to us or to our clients. All in all, we believe that's a better strategy both for us and for our clients. I'd also like to say in this forum that the decision to enter that area was taken together with our clients. There was a desire for us to play a role in this space, and so we also expect that we'll soon be able to announce utilization on such a vessel once the whole process toward the vessel has been finalized. I think that, all in all, the additional assets will let us continue to be flexible and have an integrated solution for our clients, which will, all in all, let Cadeler get a higher than fair share of the market, but also something we believe drives a premium when we're executing a project, because we're able to give the kind of flexibility, but also redundancy, that we believe is pretty unique for our industry.

Mikkel Gleerup

executive
#18

Regarding how the market appears, in this presentation we are simply displaying the overall market picture, without making any deductions concerning capability or efficiency, but we have included the two T-class vessels as possible ships to be built in addition to the fleet, and are once again demonstrating that we are the biggest company of our type in the industry, with a very, very solid asset base that is in very, very high demand from clients. Overall, as Peter said and as I said, a quarter that performed as we expected, and we have kept building the company for a future that we believe will be very, very busy. Key investment highlights, as we already discussed, the largest and most capable, versatile fleet, which really means redundancy for the client, and redundancy matters a lot. If we look at where clients historically had issues on their project, it is really when redundancy is absent. That brings me to the next point, strong relationships with our clients. I would argue that we have very, very strong relations. We are constantly in touch with our clients to make sure they receive the service from us that they expect, and we are always trying to be proactive and to help when something is not going to plan.

Mikkel Gleerup

executive
#19

We hold a top spot in the industry. As I mentioned, we think that will produce a market share above what would be considered fair. We operate on a global basis, we're able to work anywhere, and we now also have experience working in each region where offshore wind currently has a part to play. We have faith in a structural undersupply along with rising market demand, and overall, we're constructing the fleet to manage that and to ensure we deliver maximum value back to our investors. A very strong track record and backlog, and a backlog we'll keep building through the quarters ahead. Having said that, I think we're ready to move into the Q&A.

Operator

operator
#20

Thanks. Right now, we’d like any analysts who want to ask a question to click the Raise Hand button — it’s on the black bar at the bottom of your screen. You can take yourself out of the queue whenever you want by lowering your hand. Once your turn comes, you’ll hear your name called and get a prompt to be promoted. Please accept it, give it a moment, and after you’ve been promoted, you can unmute and ask your question. We’d also encourage you to turn your video on. We’ll pause for a moment so the queue can form. Our first question comes from Jamie Franklin at Jefferies. Please unmute your line and ask your question.

Jamie Franklin

analyst
#21

Hi, everyone. Thanks for taking my questions. First, I just wanted to ask about utilization and how we should think about the rest of the year. Is it reasonable to expect a roughly similar pattern to what we saw in 2025, with utilization climbing by a similar sort of magnitude in 2Q and 3Q? And maybe, since we're now halfway through the second quarter, can you provide a bit more clarity on the kind of utilization range we might see, or on whether any specific factors would cause 2Q vessel utilization to be lower year on year?

Mikkel Gleerup

executive
#22

I'd agree with your first point: we anticipate utilization rising over the coming quarters of this year, and that's reinforced by the fact that we're holding our guidance, with Q1 coming in as expected. We're fully aligned with that. It's also fair to say that Q1 was shaped to a large degree by vessels being repositioned, sitting in dry dock, and getting ready for projects — that work is now behind us, and only a small amount of it remains for the rest of the year. So we expect utilization to be robust through the remainder of the year.

Jamie Franklin

analyst
#23

Thanks. So when we think about cash flow for the rest of 2026, my understanding is that most of what's left in CapEx for this year is clearly coming in Q3, along with the last payment on Wind Ace. I just wanted to check that, and also ask whether there's any other CapEx we should be factoring in for the remainder of this year, please.

Peter Brogaard Hansen

executive
#24

Right, so Wind Ace is certainly one of them, and then we’ve got an installment this year on Wind Apex of roughly €90 million. After that, we’re expecting to sign another contract for the T-class vessels during this year as well, and on that one we’ll also have to make the first installment. The exact figure isn’t known yet, but it could probably come to around €110 million or so for both vessels. Those are, of course, the main pieces of our CapEx. There’s some on Wind Keeper too that would be financed, though most of it landed in Q1. Very little remains for the rest of the year on that one, and then, yes, there will also be something on the foundation project. That’s the rundown of it.

Jamie Franklin

analyst
#25

That's quite useful. Lastly, you mentioned Wind Apex and the possibility of delivering early. During the previous results, you indicated it might come as much as 1 month ahead of schedule. Is that still roughly the timeline you have in mind? Would early delivery bring any extra costs for the yard? And if it does, should the client be covering those?

Mikkel Gleerup

executive
#26

Yes, that’s right. We expect Wind Apex to be delivered around late April, at the very beginning of May, and that has already been confirmed and signed with the shipyards. There’s a small related cost involved, and that is part of the project negotiation with the client. Yes, that’s correct.

Jamie Franklin

analyst
#27

That’s really useful. I’ll pass it along now. Thank you, everyone.

Mikkel Gleerup

executive
#28

Thanks.

Operator

operator
#29

Thanks, Jamie. Just a reminder — if anyone else wants to raise a hand, please use the Raise Hand feature located at the bottom of your Zoom screen. It looks like there are no further questions right now. Many thanks for joining us. At this point I'll turn things back over to Mikkel Gleerup for any closing remarks.

Mikkel Gleerup

executive
#30

I appreciate you all joining this Q1 presentation. We're anticipating a year that'll largely be shaped by execution as well as the assets we've talked about since the private placement. Thank you for the backing of every investor supporting us. We're expecting 2026 to be a very strong year. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Cadeler A/S transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Cadeler A/S earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Cadeler A/S or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.