Cameco Corporation (CCO) Earnings Call Transcript & Summary

July 27, 2022

Toronto Stock Exchange CA Energy Oil, Gas and Consumable Fuels earnings 87 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone holding. I'm the conference operator, and I'd like to welcome you to Cameco Corporation's Second Quarter 2022 Conference Call. Just a reminder that everyone is in listen-only mode today and this conference is being recorded. Following the presentation, there will be a chance for you to ask questions. <<operator_script>> At this point I'll hand the conference over to Rachelle Girard, Vice President Investor Relations, and Treasury and Tax. Please go ahead.

Rachelle Girard

executive
#2

Thank you, operator, and good morning, everyone. Welcome to Cameco's second quarter conference call. I'd like to acknowledge that we're speaking from our corporate office, which sits on Treaty 6 territory — the traditional territory of the Cree people and the Homeland of the Métis. Today's call will focus on the trends we're seeing in the market and on our strategy. As always, our goal is to be open and transparent in our communications. So if you have detailed questions about our quarterly financial results, or if your questions aren't addressed on this call, we'll be happy to follow up with you afterward. There are a few ways to contact us. You can reach out to the contacts provided in our news release. You can submit a question through the contact tab on our website, or you can use the Ask a Question form at the bottom of the webcast screen, and we'll be happy to follow up after this call. With us today on the call are Tim Gitzel, President and CEO; Grant Isaac, Senior Vice President and CFO; Brian Riley, Senior Vice President and Chief Operating Officer; Alice Wong, Senior Vice President and Chief Corporate Officer; and Sean Quinn, Senior Vice President, Chief Legal Officer, and Corporate Secretary.

Rachelle Girard

executive
#3

I'll now pass things along to Tim, who will discuss our sector's long-term fundamentals, what's happening in the market right now, and how Cameco plans to create value over the long haul. Following that, we'll take your questions. Those of you who joined this conference call via the event page on our website have slides available that will be shown throughout the call. Also, for your reference, you can download a PDF of our quarterly investor handout on our website at cameco.com. This conference call today is open to everyone in the investment community, the media included. During the Q&A session, kindly keep yourself to two questions, then rejoin the queue. Please be aware that forward-looking information will be included in this conference call, which rests on a number of assumptions, and actual results could differ materially. For more information on the factors that could cause these different results and on the assumptions we have made, please refer to our annual information form and MD&A. With that, I'll hand things over to Tim.

Tim Gitzel

executive
#4

All right, thanks, Rachelle, and good morning to everybody. We're glad you could be with us on today's call. Hopefully you're finding a little downtime to enjoy the summer. I'd like to open by looking back at a piece UxC published not long ago. I have two reasons for doing so. First, it emphasized several themes we've been voicing for quite a while regarding the fundamentals of the uranium market. In a world that more and more acknowledges the significant part nuclear energy is going to play. Demand for uranium fuel keeps rising while inventories keep falling. And in a market splitting in two because of geopolitical worries, Western capacity is falling behind. None of those themes is new. But the second reason I bring it up is that, in our view, the essay's conclusion delivered the wrong message. Its words were, "let's just hope nuclear fuel supply availability does not derail nuclear energy's latest promising advance". That statement suggests the duty of sustaining nuclear power's expanding momentum belongs to the supply side of the industry. We think that duty is assigned to the wrong place. The fact is, a straightforward fix exists for the supply challenge that's approaching. The essay ought to have wrapped up by hammering home that both the responsibility and the solution for that approaching supply challenge belong to the demand side.

Tim Gitzel

executive
#5

Utilities must realize the moment has come to use their purchasing leverage to prevent a supply crunch that, as they put it, might derail the most recent encouraging step forward for nuclear energy. That applies throughout the entire fuel cycle, from uranium production through conversion and enrichment. Anyone who has worked in this business knows a responsible producer won't put money into added capacity absent visibility into a long-term profitable commitment that establishes a lasting home for that fuel. The strategic, deliberate choices Cameco has made over the last ten years illustrate this well. Guided by the signals our customers have provided, we've followed a balanced and disciplined path. Our move to advance to the next stage of our supply discipline, which is already substantially in progress, responds directly to purchasing decisions made by some genuinely forward-looking utilities. Those utilities seek visibility into the future supply required to run their reactors and to guarantee that electricity from nuclear power stays reliably available. Their contracting choices gave us the signals and the certainty required to start raising output, though additional action is necessary. Under our present plans, we will not return to full productive capacity.

Tim Gitzel

executive
#6

Because of this, the company is still operating in a mode of supply discipline, and that leaves us exceptionally well placed in a market that is shifting quickly. We'll keep making prudent supply choices that align with the signals coming from our customers. Let's examine the market fundamentals in somewhat greater depth, beginning with demand. We've discussed previously how nuclear energy's advantages have moved plainly into view, with a durability propelled by the responsibility to hit net zero carbon targets that governments and companies worldwide have established. With net zero targets now covering 90% of the world's economy, attention is shifting toward the difficult task of addressing energy poverty, energy replacement and energy growth in a clean and dependable way. On top of that challenge is resolving the energy crisis that some regions have experienced, while moving away from dependence on Russian energy without endangering net zero commitments. It is therefore no surprise that worries about energy security have grown louder and sit at the top of the list for numerous governments, generating added pressure for them to revisit their energy policy choices. Decision-makers in policy and business across the globe are acknowledging that energy policy has to reconcile the goal of attaining a clean energy profile with the requirement for affordability and security.

Tim Gitzel

executive
#7

Excessive reliance on intermittent, weather-dependent renewables has pushed certain jurisdictions into power shortfalls and surging energy costs, or into dependence on Russian supply. The encouraging part for us is that as they seek to regain balance or move away from Russia, a great many are choosing nuclear. Nuclear sits well at the heart of the policy triangle, delivering safe, reliable, affordable, carbon-free baseload electricity while also providing energy security and independence—which explains why, on top of everything I mentioned last quarter, this quarter brought numerous supportive initiatives and announcements, all detailed in our MD&A. It is fair to say that governments and companies are embracing nuclear with an appetite I doubt I have witnessed in my forty years in this industry. So it is simple to conclude that the demand outlook is durable and extremely bright. Supply, however, tells a very different story. We have stated for a while now that we consider the uranium market as exposed to a supply shock as at any point in its history, thanks to persistently low prices. Those low prices have produced rising supply, growing concentration by origin, and an expanding supply gap.

Tim Gitzel

executive
#8

And in contrast to earlier times, we lack the same inventory of secondary supplies available to close that gap. Having spent years relying on those one-time sources, secondary supply capability is now set to fall considerably in the years ahead, and productive capacity is not positioned to react. Raising the difficulty of bridging that gap to an entirely different level, with the war in Ukraine continuing, uncertainty keeps building regarding whether we can keep depending on nuclear fuel supplies that originate in or are transported out of Russia — whether because of sanctions or because of conflicts with company values. At present, the worldwide nuclear sector depends on Russia for roughly 14% of its uranium concentrates supply, 27% of conversion supply, and 39% of enrichment capacity. Utilities must now weigh and plan for a range of possible scenarios, from a sudden halt to Russian supply to a gradual phase out. The market faced one such scenario in late June. Changes to Canadian sanctions led the owner of a Canadian shipping vessel to determine that loading and delivering enriched uranium product scheduled for pickup at St.

Tim Gitzel

executive
#9

Petersburg. Now, an exemption from the Canadian government has taken care of this matter for the time being, but it does show how shaky it is to depend on Russia or Russian ports for supply. That's among the reasons that, in the last quarter, we made the call to steer clear of Russian rail lines and ports when moving our share of Incas production to our Blind River facility. Rather, we are pushing back our deliveries from Kazakhstan as we collaborate with our partner to make shipping possible through the Trans Caspian route. We don't yet have a confirmed date for when the first shipment might go ahead. Even so, we can offset the risk through inventory, long-term purchase commitments and product loans, should that be needed. It's still early days, yet we are already observing some utilities starting to pivot toward procurement strategies that weigh origin risk more carefully. They are going through their fuel supply chains to figure out where vulnerabilities exist. Consequently, we have for the moment seen their attention move away from securing uranium toward the more pressing need in their supply chain for enrichment and conversion services, where Russian capacity has a far larger part to play. So let there be no doubt. We expect uranium will follow. After all, it is the product that all services are applied to.

Tim Gitzel

executive
#10

Since the start of the year, over 45 million pounds of fresh uranium contracts have joined our portfolio, making 2022 a contracting success already, and our pipeline of contract talks remains substantial and keeps expanding. That said, right now we are likewise directing our efforts toward locking in the record-high conversion prices through long-term agreements within our fuel services segment. And given the additional uranium demand we anticipate lying ahead, we will keep practicing strategic patience. Value is, as always, the main thing driving our contracting work. We aim to use the uncommitted in-ground inventory we hold today so that we can benefit from the further market gains we expect down the road. So let me say a bit more about Cameco and what we have been doing. As a commercial supplier, the choices we make have put the company in a unique position to seize on a conclusion that grows harder to deny by the day: nuclear power has to be a vital component of the clean energy transition, and all the more so in a world where origins matter. Backed by proven Tier 1 assets, strategic Tier 2 assets, and an emphasis on vertical integration, we have pursued a balanced, disciplined path in executing our strategy of capturing value across the full cycle.

Tim Gitzel

executive
#11

Like I mentioned earlier regarding contracting, we’ve stayed balanced and disciplined when it comes to layering and volumes where that makes sense for us, and in cultivating a diversified customer base. We’re applying that same balanced, disciplined mindset to our supply decisions. The upcoming stage of our supply discipline—which covers not just McArthur River and Key Lake but, beginning in 2024, Cigar Lake as well—is aligned with our contract portfolio and with where we believe the market transition stands right now. Even though we’ve encountered significant pricing pressure stemming from geopolitical uncertainty, our production plans will stay unchanged. We won’t get ahead of demand with supply. We require solid long-term contract homes within our portfolio, and we need to see additional improvement in the uranium market before we alter our production plans. And I believe we’ve demonstrated that our word can be relied on when we say we’ll stay disciplined. Lastly, while we’re on the subject of balance, we’ve displayed balanced financial discipline. We’ll maintain our conservative financial management to support our ongoing balanced and disciplined contracting and supply decisions. That said, we’ll put capital to work where it makes sense—raising our ownership stake in Cigar Lake from 50% to just over 54% made sense, and I can tell you, we’ll gladly take those pounds any day.

Tim Gitzel

executive
#12

Cigar Lake ranks among the finest, most productive Tier 1 production assets anywhere in the world. It’s a mine that’s proven, permitted, and fully licensed, located in a stable jurisdiction, and it runs with enormous involvement and backing from our Indigenous partner communities nearby. And naturally, we understand it extremely well, since we’re the operator. At the McArthur River Mine and Key Lake mill, we’re carrying on with the shift out of care and maintenance toward operational readiness. Employees and long-term contractors at these sites now total roughly 670, and we’re aiming for around 850 ahead of production getting underway later this year. Our operational readiness work is moving from construction into early-stage commissioning of the mining and milling circuits at McArthur River and Key Lake. At the Key Lake mill, key automation and digitization projects are being connected into infrastructure that already exists. Beyond that, asset condition assessments, along with the repair and reassembly of every piece of equipment that follows them, are now wrapping up. That said, our work schedule at the Key Lake mill has slipped somewhat. We’ve run into difficulties regarding the supply of critical materials, equipment, and skills. On top of that, following four years in care and maintenance, we’ve hit some commissioning issues of the usual kind.

Tim Gitzel

executive
#13

While we continue working to bring both existing and new assets online safely and methodically, paired with upgraded operating systems, we've made adjustments to our timeline. This reflects the slower ramp-up at the mill, and we now expect first production to be pushed back to later in the fourth quarter of this year. Consequently, under our revised plan, we're looking at as much as two million pounds of production for this year. For the demand side of our industry, this serves as another useful reminder of how difficult it can be to bring new supply online in today's environment. That said, the slower ramp-up at the Key Lake mill has been offset by Cigar Lake. At Cigar Lake, we've managed to catch up on both development work and production, and we're expecting 18 million pounds on a 100% basis. So, thanks to the extra production from Cigar Lake along with the risk mitigation measures we have in place, we expect to meet all of our commitments, which means there's no need to rush things at McArthur River and Key Lake. This is just one of the benefits of being a multi-asset, multi-jurisdictional producer — it's what makes us a stable, reliable, long-term source of supply, ensuring the reliability of our customers' reactor fleets.

Tim Gitzel

executive
#14

And so, what have these disciplined steps produced for us? A strong balance sheet, plus the capacity to manage risk ourselves. At the close of the second quarter, once again, our net debt stands in negative territory, with $1.4 billion of cash on hand, roughly one billion in long-term debt, and a one billion undrawn credit facility. On top of that, there is the $778 million that the CRA owes us, which isn't factored into those figures. When the McArthur River Key Lake operation comes back into production, we anticipate starting to see a meaningful uplift in our financial results. Once output reaches a sensible level, operational readiness costs will stop being expensed to cost of sales, and we'll be able to draw more of our committed sales from pounds produced at lower cost. As we observed once more this quarter, the stronger prices in markets that are currently improving are starting to come through in our existing contract portfolio, and with unencumbered pounds sitting in the ground as inventory, higher prices will also open the chance to layer in fresh long-term commitments — commitments featuring suitable pricing mechanisms that will support the long-term operation of our productive capacity. We have likewise kept drawing on some of our long-term purchases; we established these arrangements as a way of mitigating risk.

Tim Gitzel

executive
#15

We'll offset this activity by making purchases on the spot market. Because of that, we anticipate keeping the financial wherewithal to carry out our strategy—seizing long-term value while also managing risk well, including risk stemming from the worldwide macroeconomic and geopolitical uncertainty that we see at present. So what is the upshot of all of this for Cameco? Well, the upshot is that we are optimistic. We're optimistic regarding demand growth for nuclear power, in both its traditional and nontraditional forms. We're optimistic regarding demand growth for uranium and for downstream fuel services. And we're optimistic regarding the incumbency opportunity that Cameco has to capture long-term value. So we will keep executing the next phase of our supply discipline strategy. And even more importantly, we will keep doing what we said we would do. We have operating and idle Tier 1 assets that are licensed, permitted, long lived, and are proven operations with expansion capacity. There are fully permitted and proven Tier 2 assets that do not make sense at today's prices, but when you consider them against the backdrop of a looming supply and origin gap, a potential pathway exists for them to add value for us down the road. Still, we will remain very disciplined in how we evaluate that front.

Tim Gitzel

executive
#16

And just to remind everyone, our interest goes beyond mining alone. We're vertically integrated throughout the nuclear fuel cycle, spanning refining, conversion, and fuel fabrication. As utilities seek to secure access to nuclear fuel supplies in jurisdictions that are stable, reliable, and politically dependable, we'll also continue building our fuel services contract book. And we're looking to broaden our reach. For instance, through our fuel manufacturing capabilities and our investment in global laser enrichment, we're exploring the fabrication of new fuels, including High Assay Low-Enriched Uranium, or HALEU. And the benefits of chemical being involved with ventures like this are clear to see. Thanks to a reputation as a reliable fuel supplier and a long history of cooperating with the U.S. government on various projects. The technology has the opportunity to participate in the growing commercial opportunity for enrichment capacity in the U.S. That's why GLE was able to navigate the regulatory process in the U.S. and gain access to the DOE tails material. And that's why utilities like Constellation Energy and Duke Energy are willing to sign letters of intent to collaborate with GLE to help diversify the U.S. nuclear fuel supply chain, including measures to support GLE's deployment of Silex Laser Enrichment Technology in the U.S.

Tim Gitzel

executive
#17

We're likewise involved in small modular reactor development, and we've signed several nonbinding agreements aimed at moving their commercialization and deployment forward in Canada and globally. We also have a stake in Nuclear Sustainability Services — the back end of the fuel cycle — which includes helping with the responsible cleanup of enrichment facilities that are no longer operating. Such opportunities fit with our pledge to run our business in a responsible and sustainable way and to grow our contribution to solutions for global climate change. At Cameco, our decisions are deliberate. We are a responsible, commercially motivated supplier holding a diversified asset portfolio, among it a Tier 1 production portfolio that ranks with the finest anywhere. We're dedicated to operating sustainably — protecting, engaging and supporting the development of our people and their communities — and to safeguarding the environment, which we've done for more than 30 years. Our strategy, encompassing contracting discipline, supply discipline and financial discipline, will let us realize our vision — the vision of energizing a clean air world — and in doing so deliver long-term value in a market where demand keeps rising for safe, secure, reliable and affordable clean energy. So thank you for your interest today.

Tim Gitzel

executive
#18

We're glad to answer whatever questions you may have.

Operator

operator
#19

Thanks. <<operator_script>>. Andrew Wong from RBC Capital Markets has our first question. Go ahead, please.

Andrew Wong

analyst
#20

Morning. The uranium market seems to be getting better, and Tim, as you mentioned in your prepared remarks, the length and staying power of this upturn appear to be longer lasting, and we have McArthur restarting. So your cash flows are poised to get significantly better over the next few years. Could you perhaps discuss your capital allocation plans for the next few years? Where do you expect to spend some of that cash as it comes in?

Tim Gitzel

executive
#21

Morning, Andrew. Appreciate the question. You nailed it—you stuck to the script there. The market is looking much stronger for us. We clearly believe there's a durability that will persist. We're seeing plenty of countries. It's remarkable—if you read the press—observing the nations that are turning to Nuclear, examining Nuclear, returning to Nuclear. I think Germany and others in Europe were really battling their energy situation. So we believe, on that front, we see 54 reactors under construction. We see many countries ready to build. We see considerable momentum behind SMRs. So the demand side looks quite strong. The supply side looks tighter. We're definitely pleased to hold some world class Tier 1 assets, Cigar Lake, Chunk of JB, Kyiv and now McCarthy, Key that we're just bringing back on. So we think we're in pretty good shape—conversions looking really, really good. So, we do believe our financials will improve over time. And you've heard us discuss capital allocation before and just how we think about it. But Grant is sitting beside me. Grant, why don't you take everyone through, maybe you'd like to say a little about the market and then about our capital allocation plans.

Grant Isaac

executive
#22

On the market, let me reinforce the point you raised: our view on uranium and nuclear fuel was bullish. Before all these remarkable tailwinds appeared, nobody could reasonably say the picture isn't even stronger now — that Cameco's outlook isn't better than it was just last quarter. Take slide 3 from today's investor presentation, or simply go through slides 7 through 9 of our MD&A. Look at the list of headline news from our industry — all of it positive. So, Andrew, I couldn't agree more that the recovery in our cash flow and earnings has only just begun. We positioned ourselves for these market moments to build that long tail of sticky revenues, earnings, and cash flow, and that forms the foundation of how we allocate capital. For us, it's important to keep in mind that we remain in supply discipline; as good as the news is, we need to see it turn into those procurement decisions that call for the production we have. And we aren't there yet. Our plan remains to ramp up McArthur, though not to full capacity. Our plan at the time, in 2020, is for us to bring Cigar back.

Grant Isaac

executive
#23

As Tim mentioned at the start, we simply found that UxC checked every box yet reached a completely incorrect conclusion. It's the purchasing strength of the utilities that will guarantee Western capacity exists to satisfy Western demand and a bifurcated market. So we need to watch that keep growing — we've been building it at 45 million pounds year-to-date, and Cameco's committed forward sales represent more than 60% of the long-term business reported in the market this year. That's an extraordinary achievement for a single company — 90 million pounds on an annualized basis. I'm not claiming that's even the level we aspire to. I merely want to stress to anyone who might argue it's just five million pounds in quarter two: it's 45 million pounds year-to-date and above 60% of the long-term market so far. And as that business grows, it will give us the chance to go back and reconsider our supply discipline decisions, and as we reconsider them, we might end up making different choices regarding our production plans going forward. That could then hint that perhaps our present conservative financial management should yield to two things: first, are there growth opportunities Cameco needs, where we can capitalize on a bifurcated market that calls for additional Western capacity.

Grant Isaac

executive
#24

So we'll examine that, and clearly if we can persuade our owners that it's sensible, then we'd proceed with it. Otherwise we might end up in a situation where those sticky long-term cash flows generated by building that contrast would cover any growth ambitions. In that case, we'd need to conclude that it's likely time to give some value back to our owners, since we don't need to hold onto the conservative financial position. All of this depends on that continued build, which in turn depends on more procurements in the market calling for patents. So right now, we remain supplied discipline, and that's the right position to be in. But I'd simply say we are just extraordinarily well positioned for what's happening in the market.

Andrew Wong

analyst
#25

Alright, thanks for all of that. So perhaps we could just change topics and turn to Inkai. Would you be able to elaborate a bit more on what drove the choice to hold back shipments from there? Is the main reason that you aren't able to take delivery of the material owing to sanctions or restrictions, or is it instead about mitigating risk and perhaps simply not wanting to ship via Russia for ethical, moral, or other grounds? Thanks.

Tim Gitzel

executive
#26

Yeah, Andrew, it's a little bit of each of those things. Definitely, part of it is that right now we don't want to be shipping our material via Russian rail lines or ports — that goes against who we are as a company and what we value. So we're reviewing the alternatives, and we're looking at that Trans-Caspian route, which you've heard Grant and others mention. At this point we don't have any final decision on whether that option will be open to us, or on timing. We're aware it was used at some point in the past, but as things stand it isn't available for our material. So I believe they're working on that, Sean — I don't know if Sean Quinn is here; he handles Kazakhstan and transport. Sean, do you want to add anything?

Sean Quinn

executive
#27

I'd say that's essentially what the MD&A covers. We're separated from our partner and JV Inkai — sorry, we're doing this with our partner's backing, since the add-on at JV Inkai is working to secure a sizable shipment along the Trans-Caspian route. We should have more details on that within the coming few weeks. And when the material arrives, no sanctions apply to Kazakh material of any kind. So there's nothing to worry about on that front.

Tim Gitzel

executive
#28

Grant.

Grant Isaac

executive
#29

Yes, I'd like to add something here too, Tim. Looking at it from the market side, I believe we simply have to put this in the right context, and the context is that this amounts to additional supply discipline. Granted, that discipline is being imposed on the industry. Still, the way to think about this matter is as greater supply discipline across the industry, together with more doubt regarding whether primary production will be available. If you look at it through Cameco's lens, we already have risk mitigation measures in place to handle this. We have production outside Kazakhstan running. Naturally, it runs at supply-disciplined rates, and on top of that we hold idled assets, yet we also own other assets beyond that jurisdiction, and we keep an inventory for moments exactly like this one, with that inventory sitting in Western markets. We also have access to long-term purchase commitments we've signed that we could pull forward as of today to get hold of material, and we hold licensed facilities that would let us borrow pounds should the need arise. So from Cameco's standpoint, this risk is quite simple for us to manage. That isn't true for the whole industry, which depends enormously on substantial volumes of material flowing out of Central Asia and reaching Western facilities in 2022.

Grant Isaac

executive
#30

So that's simply one more risk on the supply side, and it ought to be viewed through the lens of greater supply discipline — the kind that's essentially compelled by logistics and transportation problems — yet it should be considered within the same framework all of us use when we think about supply discipline.

Andrew Wong

analyst
#31

That's excellent. I really appreciate it.

Tim Gitzel

executive
#32

Appreciate it, Andrew.

Operator

operator
#33

Our following question comes from Gordon Johnson at GLJ Research. You have the floor.

Gordon Johnson

analyst
#34

Hey everyone. Thanks for taking my questions. And I think the first one I had was already answered. I suppose when it comes to the contracts, pricing on those contracts has been pretty robust. I'm just referring to UxC contract pricing, which has risen from $42.50 in February to roughly $50.50 in June. During the first quarter conference call, you guys pointed out that UxC said there was about 60 million worth of contracting, 40 million of which is yours. Now they're saying there is roughly 72 million of contracting. First question, can you tell us how much of that contracting belongs to you and whether you have benefited from this rise in contracted pricing? And then I have a few follow ups?

Tim Gitzel

executive
#35

Yes, thank you, Gordon. Grant already addressed that point with the first question, I believe, but let's continue.

Grant Isaac

executive
#36

Yeah, if you look at the term activity that UxC reported, it's 72 million pounds year-to-date, and 45 of that is ours. So we account for more than 60% of the term business that's been reported, which is obviously a really strong result for us. What that proves is exactly what we've been saying all along — that we have some incumbent advantages in this space. We're a proven, reliable producer, a multi-asset, integrated supplier with, by the way, genuine ESG performance that we can point to, and that matters for procurement decisions today, and we can benefit from a market that's increasingly bifurcating. We'd also note that the terms and conditions we're able to, I'd say, secure in this market are beating the prices that get reported, which tells us that, while we're drawing on incumbent advantages, there may be some more forced sellers out there who are willing to discount their material just to lock up the volumes. But that's fine. I mean, you'd expect that in a bifurcated market. All I know is that our origins are pretty coveted, and we're going to stay very disciplined about placing them into contracts that make sense for us — we now have roughly 170 million pounds under long-term contract commitments, looking ahead.

Grant Isaac

executive
#37

For the coming five-year span, we're looking at roughly 22 million pounds annually on average. That's the extended tail of revenue, cash flow, and earnings we've been describing. So we end up creating a remarkable advantage for people. They can capture the upside that exists only in the commodity and resource sector, while we're able to secure it across a stretch of time that resembles infrastructure-type returns more closely. That gives an investor the best of both worlds.

Gordon Johnson

analyst
#38

All right, and a quick follow-up on my end — I'm looking at enrichment SWU prices along with conversion prices, and they've risen quite a bit, if you just glance at the chart covering the last year. But spot U308 prices really haven't kept pace. So, Grant, specifically, when do you expect spot prices to catch up — or do you expect that at all — and do you also anticipate signing more contracts as those spot prices possibly climb? Thanks for the questions, and congratulations on the results.

Tim Gitzel

executive
#39

Much appreciated, Gordon.

Grant Isaac

executive
#40

Thanks, Gordon. I’d like to step back for a moment and remind everyone listening that although uranium is frequently viewed as a commodity, it would be a mistake to think you can just load uranium oxide into a reactor core as if you were tipping it from a dump truck. This is not the coal model. After you have the U308, a very lengthy process begins, involving several critically important services, before you end up with what is often a highly bespoke fuel bundle designed to satisfy specific requirements. And indeed, the specific position within any single Nuclear power plant. We have frequently overlooked this, because the service side of the industry, particularly enrichment and conversion, had been supplied so abundantly for many years that prices were consequently low. And I would say fuel buyers felt very at ease with the services they had obtained, and all of that shifted on February 24th when Russia invaded Ukraine. It pushed those services back into the spotlight, along with Russia’s 40% of worldwide enrichment supply and its almost 30% of worldwide conversion supply. For utilities, that meant going from a very relaxed perspective on their forward service commitments to abruptly reassessing where those services were coming from.

Grant Isaac

executive
#41

So, a lot of the attention has shifted away from uranium downstream toward enrichment and conversion. So it's no surprise that we've effectively seen enrichment prices double, and we've seen conversion prices more than double. In fact, conversion is at historic levels. Conversion prices have never been this high before. And that reflects this focus on new service areas that exclude Russia, and that's a big challenge. But ultimately, you need the product — these are just services, and they have to be applied to the product, and the product is uranium, and there's no substitute. We've never seen a D link cycle, for the reason that ultimately you need the uranium. Just like in 2021, at the start of 2022, there was a lot of focus on uranium; now it has shifted downstream, but it has to come back, because you need the uranium to plug into those services you've procured. So we expect to see that. But sort of a shock on the uranium side — it could take a bit longer for utilities to put in place all of that replacement service business; we're seeing obviously the benefits on the conversion side, we can be strategically patient on the uranium side and the leverage for when that demand comes into the market.

Grant Isaac

executive
#42

Regarding your last question, yes, without a doubt. We anticipate being positioned to benefit from a uranium market that begins reflecting the expense needed for Western production capacity to satisfy Western demand.

Operator

operator
#43

Up next, we have a question from Orest Wowkodaw of Scotiabank. Please proceed.

Orest Wowkodaw

analyst
#44

Morning, everyone. I hope you're all doing well. And incidentally, many thanks for putting out your results about 30 minutes ahead of the usual time — that's much appreciated, thank you.

Tim Gitzel

executive
#45

I appreciate that.

Orest Wowkodaw

analyst
#46

What I really want to ask about is the current state of the market. I mean, during the previous quarter, you mentioned that utilities were redirecting their purchasing toward enrichment and conversion. And after that, we didn't see any additional pounds come into your book. So three months have passed, and clearly you've added another five million pounds to the book. But could you give us some sense of where that process stands as far as utilities go? Are utilities beginning to return to buying uranium, or are we still in the fairly early stages of working out conversion and enrichment?

Tim Gitzel

executive
#47

Appreciate the question, Orest, and thanks for the acknowledgment. I was definitely glad to be up at 3:30 this morning, I think, to share the results. Grant, I'll hand it over to you to address some questions on the market.

Grant Isaac

executive
#48

Yes. Orest, I'd agree with your observation — utilities are largely working to swap out their dependence on Russian enrichment and conversion supply in favor of sources outside Russia. That's a huge area of focus in the market at the moment, and it's exactly what has pushed prices up so sharply for those two services. It's also what has drawn enormous interest to the global laser enrichment project that we're involved in, for instance. So activity downstream is really robust. And I'd say that's holding back some of the pure uranium demand that's bound to arrive eventually. Utilities typically proceed this way: they begin at the reactor level, tally the fuel bundles on hand, then go to the fabricators and evaluate the unprocessed material available, after which they approach the enrichers, then conversion, and finally zero in on the uranium needed to fill out that chain. So it's fair to say the market has shifted some attention away from uranium compared with what we witnessed during 2021 and the start of 2022 — prompted, clearly, by certain developments in Kazakhstan early in the year — but this is merely a postponement. That demand will return, and it's more apt to return in a lumpier pattern.

Grant Isaac

executive
#49

So the emphasis right now is undeniably a bit further downstream, though it will return upstream—it has to. Eventually the product has to be purchased so it can plug into that service chain. But I don't want to create the impression that nobody is seeking uranium. We aren't sitting at 45 million pounds year-to-date because uranium demand is absent. So relative to the last couple of years, demand for uranium is quite substantial. Relative to replacement rate—no, we aren't there yet. That's why we remain in supply discipline mode; it makes sense for us to signal that procurement on the uranium side is simply not sufficient yet. But let me offer another leading indicator that we've discussed—we frequently mention our pipeline. And to give you some sense of how much activity exists there. It is a fact that from origination through to execution, we have more pounds under discussion than at any point since the Fukushima window. So as something of a leading indicator, I'd say demand exists. It isn't yet at replacement rates, but it is there.

Grant Isaac

executive
#50

And when services get swapped out and utilities feel sure they’ve secured their enrichment without Russia, and they’ve secured conversion too, then uranium demand could arrive in a much more concentrated way than it would have before February 24th. That’s how we see it. We have leverage to that shift, and we believe this is exactly the right area for us to be in.

Orest Wowkodaw

analyst
#51

Thanks, Grant. Then, as a separate follow-up, how are you thinking right now about Inkai from an asset standpoint? I mean, obviously we've seen a number of Western companies exit Russian assets. From a risk perspective, how do you currently view Kazakhstan and, specifically, Inkai?

Tim Gitzel

executive
#52

Orest, we're clearly monitoring that situation very closely. As a matter of fact, I paid a visit to the country a month ago. Inkai is obviously a significant asset for us, and we're keeping an eye on the political circumstances there. That said, at present it continues to be a solid jurisdiction in which to operate, and we're pleased with our partnership and our joint venture — things are going well. We do have some concern about the transportation issue and moving our material out of there. So we'll simply keep watching that investment extremely closely, and for the time being we're glad to be there.

Orest Wowkodaw

analyst
#53

All right, thanks.

Operator

operator
#54

Our next question comes from Lawson Winder at Bank of America Securities. You may proceed.

Lawson Winder

analyst
#55

Good morning, and thanks for having me — it's great to hear from everyone today. I'd like to ask about the conversion business and get a clearer sense of what the potential upside could be there, even if volumes were to stay roughly flat. With the disclosures you've provided, there isn't really hard evidence, and the size of the contract book isn't all that clear either — so just looking at conversion, what's the average price in your current contract book? Could you perhaps share those levels with us? That way we can reconcile it against spot, which now sits above $30 per kilogram. And maybe also help us think through the potential to grow the EBITDA contribution coming from conversion. Thank you.

Tim Gitzel

executive
#56

Grant, could you go over the conversion market at this point?

Grant Isaac

executive
#57

Lawson, thanks for raising that, and as you’re aware, this isn’t a segment we’ve been highlighting much over the years. It had become an overlooked area of the business. And we were cautioning people that as stockpiles got depleted, one of the consequences of that drawdown is it frequently surfaced as UF6 — material that’s already been converted. With those inventories reduced, you need replacement, and that calls for new conversion. We began to see the fundamentals pick up, and then, naturally, the Russian invasion of Ukraine made things worse. So there’s far more focus on the conversion space than we’re used to, which is a positive. But on our disclosures — you’re correct — we combine our fuel services division into a single segment and we don’t break out precisely what’s happening in conversion. Still, I’d point out that, each year, we report what our book looks like: we have 49 million kilograms of conversion sold under long-term contract. As with uranium, that provides a long tail of revenue, cash flow and earnings supporting the whole fuel services group. Conversion is sold almost entirely on a fixed price basis.

Grant Isaac

executive
#58

So conversion prices are at levels never seen before, yet keep in mind that conversion carries greater capability—more idle productive capacity able to return to the market—than, I'd argue, uranium or enrichment have. So we have to keep that in mind. What I'm referring to is the U.S. conversion business and the planned restart at the Condradine plant. The facility in France is still ramping up. There's an idle plant in the UK. All of that tells us these prices are excellent and now is the moment to lock them in. So expect the fuel services division's performance to stay very robust, supported by that historic pricing, as more and more conversion gets layered in. But we'll always face the challenge that disclosure doesn't reach down to the full conversion level. Still, I'd say the historic proportion—fuel services at between 15% and 20% of our EBITDA, with uranium making up the rest—that split will probably rebalance significantly given these historic prices. So we expect to lock in really strong performance on a multi-year basis. Take these strong spot moves and lock them in for the long term.

Grant Isaac

executive
#59

We are quite optimistic about the conversion business, and it is simply essential to the nuclear fuel cycle as well as to Western capacity—which is to say, Western demand.

Lawson Winder

analyst
#60

Perhaps a brief add-on regarding that, and your remarks about the contract being largely fixed-price. Do you foresee, or do you have any wish, to move somewhat toward pricing tied to an index for that business? Then the follow-up I truly wanted to ask concerns labor at McArthur and McClean Lake. And maybe just clarify whether the collective bargaining agreement expiring at McArthur plays any part in the ramp-up being slower than anticipated. And then, when you consider renegotiating that contract, which lapses at year end, what would be a sensible expectation in today's inflationary climate for something like wage increases, drawing on what you know about prior inflationary periods? Thank you.

Tim Gitzel

executive
#61

Lawson: Let me handle the second part of that, and then I'll hand it over to Grant for the fixed versus variable pricing discussion. But without question, we have an excellent workforce, and at McArthur River we're bringing them back — we had gotten down to a minimal number over the last couple of years. They've returned, and we've been fortunate to have a competitive advantage in that more than 50% of our employees come from the north, which shapes their mindset; many have come back, and many are new. So they're busy getting that asset ready to go. McArthur is ready to go — just some final touches needed — with a bit of a delay at Key Lake. But that's a normal bargaining process, and I won't preempt it or predict what will happen. Both sides will negotiate in good faith, and we've had a strong relationship with our union up there. So that agreement expires at the end of the year, and they'll monitor it to see how things unfold. So, Grant, would you like to discuss conversion pricing — term versus spot?

Grant Isaac

executive
#62

Correct. It’s comparable to how we view uranium, and I’d add that the enrichers regard the enrichment segment the same way—and that’s certainly how we’ll regard it once we’re participating there. It depends on where capacity stands. And since conversion has visibility into extra Western capacity returning within the next few years, this really is a favorable moment to secure those prices on a fixed basis ahead of that capacity’s return. So I’d say that, at present, this pricing backdrop is highly advantageous for locking in that value. And as Condradine returns and ramps up, as the French facility is anticipated to ramp up, and as choices are made regarding the Springfields facility in the UK—now is not when we’d want to be indexed to that output, to that production coming back. So we’re very pleased with how the conversion market has moved. We’re very pleased to be the sole operating conversion plant in North America at present, and capturing value across the full cycle means we’re positioned to benefit at moments exactly like this.

Lawson Winder

analyst
#63

All right, and thank you so much. Those answers were really useful.

Tim Gitzel

executive
#64

Much appreciated, Lawson.

Operator

operator
#65

Our following question comes from Alexander Pearce at BMO. You have the floor.

Alexander Pearce

analyst
#66

Thanks. I'd like to circle back to that possible Trans-Caspian option for the Inkai product. Could you give a bit more detail about exactly what the current obstacles are and where they sit? Is the bigger issue securing the appropriate agreements within Kazakhstan to redirect that product, or is it more about putting those arrangements in place via Azerbaijan and so on through to Canada? Thanks.

Tim Gitzel

executive
#67

Absolutely. Thank you, Alex. I'll have Sean Quinn address that point.

Sean Quinn

executive
#68

Yes, JV Inkai is handling that together with Kazatomprom, and there are plenty of logistics challenges. The route itself would involve the port of Assabah (Ph) by rail, then onward to Baku, in Azerbaijan, and from there by rail to the port of Podi (Ph) on the Black Sea, where it would be loaded onto a vessel — so you're stitching all of those segments together. That means a great deal of logistics and supply work. Beyond that, there are regulatory obstacles to clear as well, tied to the approvals required from the different governments along the route, and in particular they need permission to transit through Azerbaijan; they hold approval for a certain quantity this year that will cover a shipment to us, and they are in the process of putting it all together. It will take, I believe, a few more weeks of work to accomplish that, and we hope to learn more as we get into the month of August.

Alexander Pearce

analyst
#69

Thanks. So, to sort of boil that down, I mean it sounds like this isn't really a matter of — it comes across more as a win issue?

Sean Quinn

executive
#70

My view is still that it's somewhat a matter of if and when, and I'll be glad once we truly witness the shipment being loaded onto a vessel at the port of Podi.

Alexander Pearce

analyst
#71

All right, thanks.

Tim Gitzel

executive
#72

Appreciate that, Alex.

Operator

operator
#73

Greg Barnes of TD Securities has the next question. Go ahead, please.

Greg Barnes

analyst
#74

Yes, thanks. Grant, is there some specific trigger that lets you raise your stake in GLE to 75% from the level you hold at present?

Grant Isaac

executive
#75

Sean is also able to address that, since he is — thank you, Greg. Good to speak with you. Sean, go ahead, you're the GLE trigger guy.

Sean Quinn

executive
#76

Yes. Hi, Greg — you're coming through a little muffled there.

Grant Isaac

executive
#77

Is there any trigger that would cause us to raise the percentage we hold in GLE?

Sean Quinn

executive
#78

All right, absolutely — there is a trigger tied to timing, and we hold an option that becomes effective around the close of this year. After that, it simply comes down to whether we choose to exercise it.

Greg Barnes

analyst
#79

Okay. So circling back to conversion with Grant, from what you said on the prior quarterly call, it sounded like Port Hope won’t have additional capacity. And you’re quite heavily contracted. So capitalizing on these higher prices is more of a longer-term matter for you? When would those higher prices start to apply in your contract? If you’re able to pin that down?

Grant Isaac

executive
#80

Well, that's already beginning to take shape. As you're aware, the shift in conversion has been in progress for a couple of years now. And our aim is never to behave in that more classic commodity way, where you spot a strong spot price and then ramp up output to capitalize on it. At Cameco, that isn't our motivation — when spot prices are strong, we actually steer clear of that; we don't set our sights on the spot market. What we want is for that tightness to last long enough that we can lock in multiyear value. And that's exactly what we're doing. So as this conversion market keeps rising, we just keep layering in, recognizing that these prices will draw idle production back into the market. So instead of letting our own production plans run away with us, the aim is to maximize the margin on our existing productive capacity. While it really is the only game in town in North America, and then lock those in on a multi-term basis. So you're already seeing that pick up, and it will simply keep building — that's the classic following capture we have in our contract portfolio, so that it's not just a couple of weeks at the top of a spike, but locked in on a multiyear basis.

Grant Isaac

executive
#81

That segment should therefore deliver for an extended period and carry real staying power; even in the event that productive capacity returns elsewhere, we will have secured that value over a considerably longer horizon.

Greg Barnes

analyst
#82

All right, thanks very much.

Tim Gitzel

executive
#83

Appreciate that, Greg.

Operator

operator
#84

Brian MacArthur from Raymond James has our next question. Go right ahead.

Brian MacArthur

analyst
#85

Morning. I just want to follow up about conversion. If I recall correctly, you previously had some kind of arrangement with Springfield — is there any option to legacy saying, since you usually keep backup plans for security of supply, given that you really only have one facility and conversion? Do you have anything less there than, say, bringing that back — that you have options on alternative supply there, or anything else in this whole conversion market?

Tim Gitzel

executive
#86

At this stage, no, Brian. We don't. I believe we exited Sean — what year was that?

Sean Quinn

executive
#87

2014.

Tim Gitzel

executive
#88

2014, right. And Brian, we exited that entirely. So right now there’s no option there at all, and honestly I doubt that plant could even run if someone wanted it to. But the short answer is no — we don’t.

Brian MacArthur

analyst
#89

All right, and then second, as with most of the sector right now, everyone's dealing with inflation — getting things restarted is harder. Everyone discusses incentive pricing. And if we're going to see a bifurcated market, and that's part of your marketing strategy, and you comment that the utilities aren't there and it isn't economic at present — how much do you figure that price has risen since you launched this strategy? I mean, back in the old days, folks said $45 or $50 was perhaps the level that made sense. But restarting things isn't easy. Getting Greenfield into production isn't easy. Nothing in the Western world is getting cheaper. I mean, how much do you think that inflationary effect has hit the industry, and how does that fit with your strategy about actually even signing contracts right now? Because one could argue the price may need to go a lot higher going forward, particularly as you note it keeps getting delayed while utilities concentrate on near-term issues and enrichment.

Tim Gitzel

executive
#90

Yes, Brian. From your reports and plenty of others covering other companies, we're definitely observing the effective inflation on CapEx. It's somewhat of an epidemic, and then the supply chain keeps hitting everyone. On labor, as I mentioned, we're a bit fortunate here. Some homegrown labor comes back to us. But Grant, would you like to address that inflationary effect?

Grant Isaac

executive
#91

Yes, I do. Brian, that’s a good point you’re making, but let me re-frame it a little bit, because I’d put it in a different context. I’d just simply say that as the world is bifurcating and origins—origins are mattering more—when we speak about a Western cost curve and we say that, in order for Western capacity to meet Western demand, we’re going to have to see investment. And it is a fact that the Western cost curve on the uranium side is more expensive. We’re inclusive of things like inflation and regulatory hurdles and ESG requirements in the Western. So we bake all of that in when we say the incentive price on the Western cost curve versus a global cost curve that excludes Russia and makes other origins more difficult to obtain. It’s already factoring that in. So we agree with you that one of the kind of exciting pieces for us is that that strike price for the last marginal pound of Western supply is probably higher. Now, it’s not our supply, because we don’t need to invest in Greenfield to get it. I mean, we’re still in supply discipline mode.

Grant Isaac

executive
#92

Our Brownfield assets are giving us additional output. We've secured further Brownfield expansion capacity well before we'd ever need to consider that final Western Greenfield pound that has to reach the market. Brian, we're a bit greedy and willing to hold out for that price too. Selling out completely isn't our goal. As you mentioned, and we hear this frequently, some ask why we haven't contracted more, while others ask why we're contracting at all. We believe we sit roughly in the middle — precisely where we ought to be. At this moment, we don't want to be fully sold out. We're not simply chasing volume to restore all our supply at name plate production, since we believe prices must shift and account for the need for Western supply — the need for Western supply in an inflationary market, the need for Western supply with a proven ESG track record. And we're patient enough to await those prices. So we share your view; we simply incorporate it into a different perspective on where that Western cost curve is headed.

Brian MacArthur

analyst
#93

So would that come out at 25%, given that when you launched this two or three years back, you were thinking about a strategy that was 50% bigger?

Grant Isaac

executive
#94

Okay, Brian — we wouldn’t argue with people in the industry who say Western supply is probably — if global supply is the last marginal ton on a cost-curve basis, before the market split into two tiers, it was somewhere around the mid-70s. We also wouldn’t argue with those who’ve said the price likely needs to be $20 a pound above that; we’ve seen that analysis from some folks, and we wouldn’t disagree with it. It makes sense once you factor it in. I’d point to Trade Tech and what those folks are doing — they’re working on the production cost indicator, and bear in mind they’re talking about roughly the next five years, but if you extend that logic and thinking across the next 10 years, which is really a more suitable timeframe, you can quickly land in that range. And we wouldn’t argue with that analysis. Now, the good news for us is that we can get there, and we can grow into it through Brownfield leverage. We don’t have to launch a Greenfield capital program in order to get there and be exposed to it. But we think those are useful markers to keep in mind.

Brian MacArthur

analyst
#95

Perhaps we could squeeze in one additional question specifically about GLE. Clearly, it's highly strategic, yet what stands most in the way of progress? I mean, the constellation exists. Everyone wants to see this advance more quickly. At this point, is it technical, regulatory, or financial — what would you describe as the actual bottleneck right now?

Tim Gitzel

executive
#96

Most likely, that would be a yes. Sean, though, please go ahead.

Sean Quinn

executive
#97

My sense is that confidence is building on the technical front. The major obstacles, I'd place in the financial category—essentially, procurement, returning to what Grant and Tim brought up at the start. Once the market is ready and there's genuine demand for production of enrichment services, we'll examine—along with natural uranium, which is the facility's first output—we will be in a position to move that project forward.

Tim Gitzel

executive
#98

That's the wonderful part of it, Brian—you've heard us mention this before: because of the triple threat, we're able to use it to re-enrich those DOE tails, and we have an agreement in place with the DOE. We can also use it purely for enrichment, which the world—especially the Western world—badly needs right now. And then, naturally, everyone is caught up in the HALEU rush these days because of the Russians. Everybody assumed the Russians would supply the first 10 years of HALEU, and that possibility is gone. So there are definitely forces driving this technology now—a great deal of interest from both government and private parties—and we're quite near the future for GLE.

Brian MacArthur

analyst
#99

Excellent. I really appreciate you taking the time to respond to everything I asked.

Tim Gitzel

executive
#100

Appreciate that, Brian.

Operator

operator
#101

Our following question comes from Paul Rubenstein, who is a private investor. You have the floor.

Analyst

analyst
#102

Morning, and thanks. Actually, GLE was the very topic I had in mind, so you got there first. That said, could you walk us through a bit more of what’s really happening at Paducah and at Wilmington? Are we still waiting on the DOE, and if the DOE doesn’t come through, what’s your plan for moving ahead? Is there some sort of timeline — are we talking a year from now, five-years, 10-years — where do things stand? And one final item: is the Silex technology proven at this point, or is that still somewhat experimental?

Tim Gitzel

executive
#103

Appreciate that, Paul, for asking about GLE. I'll hand it over to Sean Quinn.

Sean Quinn

executive
#104

Alright, I'll begin on the back end side. With this technology, we've moved well beyond the experimental phase. Scale-up and development of the technology are ongoing. The work is split between the Silex site and the Lucas site in Australia, just outside Sydney, where refinement of the laser portion of the technology continues. Then there's the other end of the process — the separator systems, which are being developed further in Wilmington — and over the next several months we'll be looking at bringing all of that back together. So on the technology side, development continues. And commercially, we're eager to see what emerges from the many U.S. government initiatives addressing the bifurcation of the market, the present dependence on Russian enrichment and conversion services, and the need to build a supply of value supporting the advanced SMR industry as a whole. As I mentioned, there are a number of legislative initiatives under consideration that would offer financial support, and we are pursuing those. So really it comes back to procurement demand — we're waiting to see that develop — and together with that U.S. government support, it will set the pace of commercialization.

Sean Quinn

executive
#105

And I want to mention — sorry, I should add to that point that we remain on schedule to deliver the two, we're on schedule to honor what we promised the Department of Energy under the <<inaudible>> reprocessing agreement that Tim brought up a little earlier. I ought to point that out as well.

Analyst

analyst
#106

What quantity of U308, expressed in pounds, would that roughly correspond to?

Sean Quinn

executive
#107

When Paducah is operational, my recollection is that annual U308-equivalent output will be roughly 5 million. And we're looking at a 45-year life there. On the sales side, yes — I want to be very clear about that.

Analyst

analyst
#108

On the long-term strategy side, it seems you're heading in the direction of a bundled offering. When it comes to contracting, instead of signing up only for U308, or only for conversion, or only for enrichment, utilities would step in and handle the entire package as one — and I'm not putting that very well.

Tim Gitzel

executive
#109

Absolutely — I’ll have our chief salesman address that. The packaging of component parts. We do get that question.

Sean Quinn

executive
#110

Yes, Paul — that's a fair question. I wouldn't frame it as moving toward it. That's where we've always stood. Keep in mind, with Bruce Power, we supply fabricated fuel bundles to Bruce Power. So we handle everything across the entire chain, and vertical integration has always been our model. It will remain our model, and we have ambitions to go further with vertical integration where it makes sense. What we're contending with now is a long-standing preference among many of our customers — the utilities — to purchase on a components basis. The rationale behind that preference is having line of sight into what's happening with each individual component, as opposed to simply buying a fuel bundle — something you can think of as a battery that goes into their kettle to boil water, spin turbines, and generate carbon free electricity. That said, some markets are used to purchasing just a fuel bundle. Consider that Eastern European Crescent, which has leaned heavily on Russia and is now seeking to break away. Those buyers have no experience purchasing components. What they want is that finished fuel bundle, so at present you should expect to see more partnering among the Cameco's of the world, the Urankos of the world, and the Westing houses of the world, so that Western supply can be offered directly to the utility.

Sean Quinn

executive
#111

So for us, if it makes sense and we're able to drive value across those components, we'd bundle them and go with integrated sales. If we can capture more value by selling on a component basis—because maybe one component has higher price conversion at historical levels—we'll do that as well. So we've always been vertically integrated. We always will be, but our focus is on value and packaging it up or componentizing it to drive value. We'll make those decisions on a case-by-case basis.

Analyst

analyst
#112

Alright.

Tim Gitzel

executive
#113

Much appreciated, Paul.

Analyst

analyst
#114

Appreciate it.

Operator

operator
#115

Kit King (Ph) from S&P Global has the next question. Go ahead, please.

Kip Keen

analyst
#116

Hello, and thank you for taking my question. I'd like to return to the situation at Key Lake regarding the delay. If I recall correctly, earlier this year you anticipated five million pounds, and now that figure stands at up to two million. I'm curious about what the main factor behind that delay is. You brought up critical materials along with some other items. Could you elaborate on those?

Tim Gitzel

executive
#117

Absolutely, Kit — appreciate the question. I'll turn that one over to Brian Riley, our Chief Operating Officer, to address it.

Brian Riley

unknown
#118

Okay, thank you Tim. And, well, there are a number of important factors here. Let me take a step back, to the degree that our operational readiness program is currently transitioning. We're moving out of a construction stage and into early-stage commissioning, and I'd like to distinguish the mill from the mine, since that matters too. At the Key Lake mill, we've finished the first circuit where early-stage commissioning is concerned, and adjustments have been necessary, with those adjustments really stemming from two causes. First, this is a Brownfield site — a Brownfield site that spent the last four years in care and maintenance. So we're dealing with certain mechanical problems, though none that we're unable to solve. Some adjustments have been required on our part. The second cause centers on the modifications we've implemented, and the modifications we've implemented are significant. We've brought in a variety of automation and digitization projects that genuinely altered how the mill is operated, and we've also upgraded the operating system. So those are the main causes, and before someone actually finishes the commissioning phase, it's hard to grasp what those problems are. So adjustments have been needed at the mill, and as a result we've had to re-forecast.

Brian Riley

unknown
#119

And since I've got the microphone, I'd like to talk about the mine as well. The mine is on a different path — we're in good shape there and on track. There are two ore sources we'll feed to the mill whenever it's needed, and we have 4 million pounds of inventory sitting at the mine's base. So right now we're commissioning the underground processing circuits. We also have roughly 30 million pounds of frozen inventory, reachable from 10 different production areas, and that gives us ore supply for the next 2 years. So the mine is in good shape; at the mill we've made some adjustments, and we've disclosed those adjustments, but the objective has stayed the same throughout the whole process. We'll commission the mine and the mill safely, in an orderly and systematic way. And we're getting these assets ready for the next 30 years.

Tim Gitzel

executive
#120

Yes, Kit, I’d just like to add something to what Brian said, because otherwise I’m going to hear about it. If I don’t mention it, our Cigar Lake team will bring it up — things are going very well there. We had forecast production of 15 million pounds at that operation. Now we’ve changed that figure to 18. They’ve caught up on some development work. So being a company with multiple facilities and multiple mines has its advantages, and we’re seeing that in this case.

Kip Keen

analyst
#121

And then the last question, which is somewhat related: suppose market conditions get better and that encourages you to increase production next year, the year after, or whenever conditions might justify it? Could you remind me approximately how fast, how hard, or what the timeline would look like for adding to your production capacity — Cigar Lake or McArthur and the Key Lake mill — just to give me a sense of the kind of lead time that is involved there?

Tim Gitzel

executive
#122

As Grant mentioned, right now we're practicing supply discipline. So in 2024 we're actually planning to take Cigar Lake down to 15 million pounds. Obviously, we can move between 15 and 18, though not without much difficulty. At McArthur, we hold license approval to go up to 25 million pounds. Our 2024 plan is to be at 13 million pounds — sorry, 15 million; I believe you have it backwards. And so, for us to raise output at McArthur, a bit of work would be required. I don't think there's much CapEx at all, so we can move up. That gives us flexibility at our two sites. And as Grant said, we'll watch and we'll wait for the market. We're seeing signals from the market that we need to lift production, and if our view on sales going forward supports that, we'll adjust our production, but for now we're in supply discipline. We're going to stay there until further notice.

Analyst

analyst
#123

Much appreciated.

Operator

operator
#124

The next person to ask something is Justin Huhn from Uranium Empire.

Justin Huhn

analyst
#125

Morning, and thanks for the helpful detail. Appreciate you taking my question. Could you briefly address the Port Hope facility—historically, what has total capacity production been compared with nameplate capacity, as a percentage, say across the last 3 to 5 years? At present, are you running at full capacity, and do you expect to be? And if we expect conversion to come back—on my mid 2023 figure—with French operations running fairly near full capacity, and the UK facility you mentioned also idled, are you looking at expanding capacity, or Port Hope, for conversion?

Grant Isaac

executive
#126

Hi, Justin. Good to talk with you. Thanks for the question. And once more, the emphasis here is on conversion, which isn’t what we’re used to. It’s wonderful to see, by the way, so I’m glad to discuss it. Port Hope has in fact faced the reverse problem — not running at full capacity but running far below it, since the conversion market was simply so underpriced for so many years. It holds a license for 12,500 tons of capacity per year. We have never operated it at that level — we have never reached that nameplate. In the past, during the last sort of price spike, we did run it for several months at a rate that, annualized, would have amounted to full nameplate production. But then the conversion market simply collapsed for the reasons I’ve discussed at such length — so much supply arriving in the market, already converted material appearing, as UF6 conversion price dropped below $5 a kgU for a period of time. Consequently, supply discipline and conversion actually got underway. A few years before getting uranium, it started with the SFL. Those Springfield facilities in the UK shutting down in 2014, when we canceled our entire converting deal there, and then of course, we started toggling production back at Port Hope, after which the Condradine facility went into care and maintenance.

Grant Isaac

executive
#127

And then obviously, I believe ramping up in France presented challenges, and that occurred while inventories were being reduced. And all at once conversion was needed again, so the fundamentals of conversion had already been getting better. And then February 24th arrives, along with the necessity of removing Russia from the conversion space. But as I mentioned before, at this moment what matters is examining historical conversion prices, examining how to maximize margins, while keeping in mind that certain facilities are ready to return and not pre-empting demand with supply. I mean, at this moment, Condradine is intending to come back, and I believe at that point even discussing enlarging that French facility can operate at 15,000 or its nameplate is 15,000 tons and it has expectations of reaching that. So I am referring to the UK facility, Springfield as a site matters greatly to the UK nuclear infrastructure, as the UF6 production sites, I believe there are certain difficulties. But once conversion reaches historical prices, clearly that generates incentives to at least take a look at it. So we simply must be very disciplined in that regard and we are pleased with our position in Port Hope. But I would say the market is indicating that it requires conversion.

Grant Isaac

executive
#128

But until we actually see procurement happening, we're simply not going to react to "well, folks claim they want it, so let's ramp up production." No — in this business, the way you demonstrate it is through the strength of procurement. So we'd need to witness that pickup meaningfully before we'd even consider any additional increases at Port Hope. So right now conversion is tight, and the sole way to ease that is to start procuring more. That, in turn, will drive the production decisions that would raise it. So I think that's how to think about that portion of the fuel cycle.

Justin Huhn

analyst
#129

Thanks, that's a really helpful answer, and I appreciate it. I just want to ask one quick follow-up about the conversion and enrichment markets. We're already hearing that a few Western enrichers have seen a big jump in their tails assays. Utilities are looking for conversion and enrichment first, which makes a lot of sense. Over the past several years — really, over the past decade — they've been able to buy UF6 hand over fist from enrichers, from underfeeding, from sales or enrichment, and at least in the West, that availability looks like it's declining, if not disappearing, very, very quickly. Can you put a finer point on the expected timeframes for utilities to get their heads around available conversion and enrichment capacity, say out in the middle of this decade, and to seek out further U308 procurement going forward? Do you expect that to happen in significantly higher volume as soon as even this year?

Grant Isaac

executive
#130

Yes. Let me break that down into a few pieces. First, of course, there's the initial demand outlook — the uplift that stems purely from fundamentals, correct. That means the growing emphasis on clean energy, on energy security, and on energy affordability. We see that showing up as demand in the near term through reactor programs being preserved. Over the medium term, reactor programs are securing life extensions. And over the long term, it's new builds — not only large reactors, but advanced reactors and small modular reactors as well. So that demand uplift is what drives the need for uranium all the way through to fuel fabrication. Then on top of that, you have the bifurcated market challenge, which I believe sits at the core of your question. The sole route for the Western market to bridge the Russian replacement challenge in the near term, while waiting for extra capacity to be installed at Western enrichers, is overfeeding. So the only method to extract more from an enrichment plant already at capacity is to feed it additional uranium. That means additional uranium demand will arise from that overfeed. So that's roughly a near-to-medium-term boost to uranium demand.

Grant Isaac

executive
#131

But I don't think most people are really focused on that overfeed piece — we are, but I don't believe enough of them are paying attention to it. And then keep in mind there's a third uplift in demand: everyone's inventory is going to rise because of the higher commitments. So you can see our purchases will increase this year since we have more commitments. We have more commitments. We need to carry more inventory; Cameco will need to buy more, but that's going to happen throughout the supply chain. The converters, the enrichers, the fabricators — everybody's working capital is going to go up. And by the way, for utilities going through a supply crisis, inventory tends to be pro-cyclical. We will actually see demand come in — the one-time demand for inventory at probably higher inventory targets than they had ahead of time. So I think you are absolutely right to layer in these components and say that the only way for us to effectively do this is demand going up right across the fuel cycle. But actually there are going to be some shorter-term pressures that are required in order to exclude Russia on a very rapid base, until such a time as there is more enrichment capacity.

Grant Isaac

executive
#132

Looking ahead to 2028, in that stretch before you've really brought additional enrichment capacity online, what that tells us is that a surge in uranium demand tied purely to overfeed will need to arrive to carry things through that exclusionary process. So I believe you're framing it correctly. I'd simply put it in terms of that buildup. You've got the fundamental demand, you've got the exclusionary demand, and then you've got the inventory demand, and once you total all of those up, it accounts for why we're bullish.

Justin Huhn

analyst
#133

That's wonderful. I really appreciate it, everyone.

Tim Gitzel

executive
#134

Thanks for that, Justin.

Operator

operator
#135

That brings the Q&A portion to an end. Tim Gitzel, I'll hand things back to you for any closing comments you'd like to make.

Tim Gitzel

executive
#136

Thank you very much, operator. With that, I simply want to express my appreciation to everyone who was with us today. As always, we value your interest, your support, and the excellent questions you bring. Let me close with just a few remarks today. Our world right now confronts some rather significant challenges, including — and we have discussed these — decarbonization and electrification, all while safeguarding energy affordability and security without compromising the ambitious net zero targets that have been established. Considerable uncertainty exists across the global energy landscape, and many nations are being forced to take a hard look at where their fuel should come from. Now more than ever, the world seeks a fuel supply that is stable, reliable, and politically dependable. In my view, we are seeing a fundamental shift that will change how countries approach their energy needs in the years ahead. And I believe anyone who examines the global issues before us seriously would conclude that there is no solution without nuclear. So we see substantial opportunity ahead of us, with demand for safe, reliable, affordable, and carbon free baseload electricity arising from across the globe. That comes as a responsible commercial supplier, with a strong balance sheet, long lived Tier 1 assets, a proven operating track record, and line-of-sight to return to our Tier 1 cost structure.

Tim Gitzel

executive
#137

We think our position is exceptionally strong for reacting to the shifting dynamics of the market. The future we see for nuclear power generation excites us, the fundamentals of nuclear fuel supplies excite us, and the prospects for our company excite us. We will keep doing what we said we would do — executing our strategy and staying consistent with our values. We will do that in a way we believe will make our business sustainable over the long term. And the health and safety of our workers, their families, and their communities will remain our priority. So thank you, everyone — stay safe and healthy, and have a nice summer.

Operator

operator
#138

That brings us to the end of today's conference call. You're free to disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Cameco Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Cameco Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Cameco Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.