Cameco Corporation (CCO) Earnings Call Transcript & Summary
July 31, 2025
Earnings Call Speaker Segments
Operator
operatorWe appreciate everyone joining us today. I'm the conference operator speaking. This is the Cameco Corporation call covering second quarter 2025 results, and we're glad to have you. Please note that everyone attending is in a listen-only mode, and this conference is being recorded. Once the introductory remarks finish, you'll have a chance to ask questions. If you'd like to enter the question queue, press star followed by one on your telephone keypad. If you require help at any point during this call, you can reach an operator by pressing star and zero. Those of you on the webcast, please hold your questions until the Q&A session, since the presentation may cover the information you're seeking. The Q&A session will wrap up at 9:00 A.M. Eastern. At this point I'll hand the conference over to Cory Kos, Vice President, Investor Relations. Cory, please go ahead.
Cory Kos
executiveThank you, Operator, and good morning to all of you. I'd like to welcome everyone to Cameco's Second Quarter Conference Call. I want to begin by acknowledging that a number of us are joining today from our corporate office, located in Saskatchewan on Treaty 6 territory — the traditional territory of the Cree people and the homeland of the Métis. We also have people dialing in today from Toronto, which sits on Treaty 13 territory and the traditional territory of many nations, among them the Mississaugas of the Credit, the Anishinaabe, the Chippewa, the Haudenosaunee, and the Wendat peoples, and which is now home to many diverse First Nations, Inuit, and Métis peoples. Joining us in Toronto are Tim Gitzel, President and CEO, along with Grant Isaac, Executive VP and CFO. From our Saskatoon headquarters, we have Heidi Shockey, Senior VP and Deputy CFO, and Rachelle Girard, Senior VP and Chief Corporate Officer. In a moment, I'll pass things to Tim, who will speak briefly about the positive momentum that keeps drawing more and more interest toward the nuclear markets, as well as the excellent financial performance through the first half of the year that has kept Cameco in a solid financial position. Following that, we'll open the line to your questions. Today's call will run approximately one hour, wrapping up at 9:00 A.M.
Cory Kos
executiveWe're on Eastern Time. Our aim is to communicate openly and transparently, but we also want to respect everyone's time, so we'd like to wrap up the call by 9:00 A.M. So if we don't reach your questions on this call, or if you'd like to follow up with detailed financial modeling questions regarding our first half results, we'll gladly answer any follow-up inquiries. There are several ways to get in touch with us if you have additional questions. You can contact the people listed in our news release. You can send a question via the Send Us a Message link in the Invest section of our website, or you can use the Ask a Question form at the bottom of the webcast screen, and we'll be glad to follow up after this call. If you're joining the conference call through our website event page, slides are available that will be shown during the call. Also, for your reference, our quarterly investor handout can be downloaded as a PDF file on our website at cameco.com. Today's conference call is open to everyone in the investment community, including the media. During the Q&A session, please keep yourself to two questions, then return to the queue.
Cory Kos
executiveThis conference call contains forward-looking information that rests on a range of assumptions, so actual results might differ materially. Please don't put undue reliance on those forward-looking statements. Our actual results may differ materially from them, and aside from what the law requires, we assume no obligation to update any forward-looking statements made today. Securities laws also require us to let you know that during today's discussion the company will reference a number of non-IFRS and other financial measures. Cameco believes these measures give investors a useful perspective on underlying business trends, and a full reconciliation of non-IFRS measures can be found at cameco.com/invest. For more detail on the factors that could cause different results, along with the assumptions we have made, please refer to our most recent annual information form and MD&A. I'll now hand things over to our President and CEO, Tim Gitzel.
Tim Gitzel
executiveThanks, Cory, and good morning to all of you. We're grateful that you've made time to be part of today's discussion. I hope each of you is doing well and has had a chance to spend some quality time with friends and family over the summer or the winter, depending on where you are in the world today. Things usually slow down in our industry during July and August, but given all the attention nuclear has been receiving, particularly over the past couple of months, we've had very little downtime. In fact, as Cory mentioned, Cory, Grant, and I are calling in from Toronto today, where we are once again meeting with government representatives to talk about nuclear power. We're excited to be working not only with our local provincial and Canadian governments, but with policymakers from the U.S. and from around the world. These kinds of discussions and the actions that they generate are critical to expanding nuclear energy in Canada and abroad and ensuring the industry is supported by a secure nuclear fuel cycle. Canada's significant uranium resources and nuclear service infrastructure not only make our country a key player in the global nuclear fuel supply chain, but it also positions Canada as a leader in enhancing global energy security and supporting clean energy solutions.
Tim Gitzel
executiveGiven that our business spans both the fuel cycle and reactor life cycle, we see Cameco as a key foundation underpinning the surge of fresh nuclear proposals unveiled over recent months. Over in Ontario, OPG has secured complete clearance to start building the first among 4 planned SMR units — potentially the first commercial grid-scale SMRs anywhere in North America. South of the border, renewed enthusiasm for nuclear power has led to proposals for 10 new reactors spread across multiple states, opening doors for Westinghouse Electric Company and its AP1000 reactor technology. Those North American announcements come on top of numerous others worldwide, among them 3 reactors in Poland, 2 reactors in the Czech Republic now cleared to commence construction, further interest from the U.K., and new nuclear being weighed in Sweden and Finland, just to cite a handful. This accelerating conversation about constructing safe, secure, and clean nuclear facilities is unfolding alongside helpful policy shifts from governments, together with broadly positive developments like the World Bank removing its long-standing prohibition on nuclear financing. As the demand landscape keeps strengthening and new build announcements multiply, clean electrons have stayed on the essential path toward tackling worldwide energy security worries.
Tim Gitzel
executiveIf nuclear power sits on the essential path toward producing those clean electrons, then Cameco—holding tier-one assets located in stable jurisdictions plus strategic investments spanning the whole nuclear fuel cycle—also stands as a vital piece of the essential path toward worldwide energy security. Watching the market start to appreciate Cameco's worth and what our Westinghouse investment could become is genuinely exciting. Before we begin today, I wanted to stress something we in this industry always emphasize: the value of keeping a long-term perspective. Short-term uncertainty may keep arising from geopolitical and trade-related events, yet our strategy has repeatedly shown it can withstand and work through challenges of that kind. Having our marketing, operational, and financial choices all aligned has proved a genuine strength as the nuclear fuel market turns its attention toward supply security. Above all, we have stayed disciplined and patient when it comes to marketing. We are steadily adding long-term agreements covering both uranium and conversion services, structured to shield us from softer market conditions while preserving exposure to the price gains required to underwrite future supply investments. When customers sign on to those agreements, that directly shapes how we plan our operations.
Tim Gitzel
executiveWe put money into supply so that fuel becomes available in line with demand. Historically, we have observed how supply that is unencumbered produces an overhang, causes contracting to slow, and hurts prices. As a matter of fact, merely the expectation that uncommitted supplies will be there — whether that expectation is credible or not — can bring momentum to a halt. Cameco will never front-run the market. To back our marketing efforts and support long-term operational planning, we are likewise committed to financial discipline and to keeping a strong balance sheet. That gives us the flexibility to invest when and where it is needed and lets us remain patient while the contracting cycle keeps evolving. The bottom line is that our actions are deliberate, our decisions are value-driven, and our strategy is built to deliver long-term success. When we observe that the risk to future supply far outweighs the risks to long-term demand, we are confident that we are on the right path with the right strategy. Even with long-term uranium prices holding near decade-long highs, we still are not seeing the level of long-term contracting that is needed to support both brownfield expansions and the new projects required to meet future demand. Utilities still have a significant amount of uranium to secure to meet their fuel needs through 2045.
Tim Gitzel
executiveAs we reach the midpoint of 2025, it looks like this may be another year in which utilities use more uranium than they secure through forward contracts. During the first six months, both spot and long-term contracting have declined compared with 2024, which pushes additional material into a stretch of substantial uncovered demand and even more uncertainty around supply. We do not anticipate a shift toward just-in-time delivery for nuclear fuel. In our market, long-term contracting is vital. It supports continued investment in supply, and it fits with the long-term economics of uranium mining as well as the processing time required to transport, convert, enrich, and fabricate a nuclear fuel bundle. Going forward, we think securing uranium will become a leading priority — a change that is not merely necessary but cannot be avoided. Turning briefly to Cameco's second quarter and first half results, our overall financial performance in the uranium, fuel services, and Westinghouse segments was strong and has raised our expectations for all of 2025. As we always emphasize, quarterly results will fluctuate, and what matters is our annual expectations. Apart from a modest increase in our expected annual average realized price, driven by higher market prices, the most notable change was in our full-year expectations from our Westinghouse investment.
Tim Gitzel
executiveOur forecast for the 49% stake we hold in Westinghouse's adjusted EBITDA is now a range of $525 million U.S. to $580 million U.S. The driver behind that is a $170 million U.S. bump in our portion of Westinghouse's second quarter revenue. That gain stemmed from Westinghouse taking part in building two nuclear reactors at the Dukovany Power Plant in the Czech Republic, a project I referenced earlier. Although every one of the nuclear project announcements made recently could benefit our core uranium and fuel services business, we think the Czech project especially signals substantial prospective growth opportunities ahead for Westinghouse. At our uranium operations, as anticipated, the timing of planned maintenance at the Key Lake Mill in this year's second quarter meant lower uranium production and a higher unit cost of sales than in the second quarter and the first six months of last year. Our expectation remains that McArthur River/Key Lake and Cigar Lake will each produce 18 million pounds this year on a 100% basis. That said, uranium mining is not easy. As we noted at the start of this year, our current uranium production plan presumes that ground freezing and development in new mining areas move forward as planned, that we keep access to sufficient skilled labor, and that new equipment is commissioned on schedule.
Tim Gitzel
executiveWhile keeping an eye on those risks, we'll make plans in line with them so that our commitments are met. Beyond the production sources that we run ourselves, JV Inkai in Kazakhstan is still on schedule to hit its target output of 8.3 million pounds on a 100% basis. Out of that volume, our purchase allocation this year comes to 3.7 million pounds, and shipments from JV Inkai should start in the second half of 2025. Just like our Canadian operations, there is no mining method or production source that is ever free of risk. To reach its yearly production target, JV Inkai needs to successfully handle sulfuric acid availability, procurement and supply chain risks, transportation challenges, construction delays, and inflationary pressures on production costs. Over at our fuel services division, our annual production outlook, which covers UF6 conversion, UO2 conversion, and heavy water reactor fuel bundles, is still on track for between 13 million and 14 million kgU of combined fuel services products. Turning to our financial position, we've stayed diligent about managing our liquidity and our capital structure so we can deliver on our strategy, seize opportunities, and self-manage risk. We're keeping a strong balance sheet, guided by our investment-grade rating and supported by strong cash flow generation.
Tim Gitzel
executiveLooking at our finances, we're in great shape: $716 million in cash and cash equivalents, $1 billion in total debt, and a $1 billion revolving credit facility that remains undrawn. For the nuclear industry, these are truly exciting times. Around the world, perceptions of nuclear energy are shifting, and nuclear power is now recognized as a vital piece of the answer to energy security and the clean energy transition. Given persistent geopolitical uncertainty and global trade dynamics that keep growing more complex, the value of getting nuclear fuel from trusted, experienced, and sustainable suppliers such as Cameco has never been clearer. This goes beyond fuel alone. It's about making possible a future energy system that is secure, reliable, and carbon-free. Thanks to our world-class tier-one fuel cycle assets and the strategic investments we've made across the reactor life cycle, we believe Cameco holds a unique position to help power that future. Before we open things up for Q&A, I'd like to call out a few changes to our Senior Management Team, effective September 1, which we announced this morning. Grant Isaac will be appointed Cameco's President and Chief Operating Officer, while our current Chief Operating Officer, Brian Reilly, will retire in 2026. Until then, Brian will take on the role of Senior Advisor, Operations so that his operational experience and knowledge are retained and passed along to the team in the months ahead.
Tim Gitzel
executiveHeidi Shockey, who right now serves as Senior Vice President and Deputy Chief Financial Officer, is going to take on the position of Senior Vice President and Chief Financial Officer. Leah Mooney, at present our Vice President of Safety, Health, and Environment, will step into the role of Senior Vice President and Chief Legal Officer. Sean Quinn, the Chief Legal Officer who is leaving that post and who is also set to retire in 2026, will move into the role of Senior Advisor, Special Projects, which lets us hold on to his expertise too. I will stay on as CEO and keep leading this company through the most exciting period that anyone in this industry has ever seen. Thanks to all of you for being with us today, whether you are on the line or joining through the webcast. We value your ongoing interest, and we will now take your questions.
Operator
operatorWe're going to start the Q&A portion now. To keep things moving, please keep it to one question plus one follow-up. If anything else comes up, feel free to get back in the queue. You can join the queue by pressing star, then one on your phone's keypad. A tone will confirm your request. If you're on a speakerphone, please lift the handset before hitting any keys. To pull your question, press star, then two. Those of you on the webcast can send questions in through the box at the bottom of the webcast frame. After the call, the Cameco Investor Relations team will get back to you via email. Again, anybody on the conference call who'd like to ask something can press star, one right now. Our first question comes from Orest Wowkodaw at Scotiabank Global Banking and Markets. Go ahead, please.
Orest Wowkodaw
analystMorning, thanks for the question on Westinghouse Electric Company. Clearly, since we made that acquisition, the global nuclear outlook has gotten a lot better. And yet the five-year CAGR guidance you've given for that business is still 6% to 10% — no change. Could you help us understand why? Is it simply that most of the, or is it more about timing, in the sense that you'd expect the bulk of the upside from new business to arrive after that five-year point? Anything else we ought to be considering there? I understand it leaves out the windfall IP settlements from the Koreans, but I'm just curious how we should think about that growth range given all these positive nuclear announcements.
Tim Gitzel
executiveThank you. Orest, this is Tim. We appreciate the question — it's a really good one. In just a moment, we'll hand things over to Grant. He serves on the board; he's one of our directors on the Westinghouse Electric Company board, so he knows that subject deeply. But before that, if you'll permit me, I'd like to say something about the news we received last night from one of the communities in the north. We've been battling forest fires up there, it seems endlessly since May. They just continue to arrive, one after another. There's an active wildfire situation and an evacuation that we learned about last night. Yesterday, at the Northern Village of Pinehouse. Pinehouse is a community very dear to us. Sadly, they had to evacuate the community last night. Our good friend, Mayor Mike Natomagan, and everyone living up there — you're in our thoughts today. At Cameco, we've been lucky that our sites have stayed safe through the wildfire season, although many of our employees, contractors, and partners have indeed been affected. We're certainly always mindful of the challenges they face and keep facing. I just want to tell our workers who are assisting in those communities: thank you for what you're doing.
Tim Gitzel
executiveOur thoughts are with all those up north, and here's hoping plenty of rain arrives very soon. Orest, I just wanted to open with that — apologies for cutting in. Grant, on the Westinghouse Electric Company question, I'll hand things over to you.
Grant Isaac
executiveThanks. Tim, Orest, you really did a nice job of answering your own question there. If you look at Westinghouse, it's clear that the core of the business responding to reactors being restarted and reactors undergoing subsequent license renewal — plus all the exciting business that generates for Westinghouse — leaves no doubt. Then you have the energy systems piece and the Dukovany units, which are really the first sign of that strong prospect for Westinghouse's technology, whether directly through the AP1000 or through the Korean offering, playing a critical part in growing nuclear power. All of it is very exciting. As for our forward guidance, it's built on that conservative approach Cameco always takes. What I mean is that many projects looking at new builds in energy systems haven't yet reached FID, and for us that's the critical moment when we start building it into the business plan. Whether it's the six reactors in Poland, the two in Bulgaria, Slovenia's evaluation, the 10 announced for the United States, or the evaluation of gigawatt-scale reactors in Canada — which could be up to as many as 14, depending on which assessment you look at — none of those have hit FID yet, and so they're not in the forward plan.
Grant Isaac
executiveOnce those items are in the forward plan, we would begin, I'd say, to see meaningful uplifts to that outlook. They simply aren't there at this point. Some of them, even as they approach FID, would fall beyond that five-year horizon. A wall of business is accumulating for Westinghouse, but from a highly conservative standpoint, we don't factor it in until matters reach final investment decision. If we did, the resulting upside growth rate would be truly absurd, and I think it would be irresponsible on our part to do that. We remain very pleased. In fact, perhaps my last remark on Westinghouse: the sole area of the business performing below the acquisition case is the portion that would have handled decommissioning on reactors being shut down. We're thrilled that this portion of the business has essentially been fully wrapped up, since no one is even contemplating doing that anymore. Thanks for your question, Orest.
Orest Wowkodaw
analystThanks. One quick follow-up: that $170 million U.S. IP windfall this quarter appears repeatable. How should we think about the potential cadence for seeing it again over the next couple of years? Should we now be building that into our estimates as annual upside additions?
Grant Isaac
executiveThat specific mechanism is relevant in markets where the Koreans are taking the lead on development. As the Koreans chase new build opportunities, Westinghouse gets involved in those projects via these sorts of upfront arrangements, through a scope of work that Westinghouse would carry out side by side with the Koreans, and then clearly through expansion of the business's core as fuel fabrication and the reactor contract for 80 years begin once the new build is complete. The Dukovany site is the first Korean project, but keep in mind that what the Koreans actually secured was a four-reactor plant in the Czech Republic, with two at Dukovany and two at Temelin. In fact, we anticipate additional news emerging from the Czechia new build project by itself over the next couple of years. Keep an eye on any other market the Koreans keep developing, since the structure would be quite similar.
Orest Wowkodaw
analystThat's great. I appreciate the additional detail.
Grant Isaac
executiveThanks, Orest.
Operator
operatorBrian Lee of Goldman Sachs has the next question. You can go ahead.
Brian Lee
analystHi folks, good morning. Appreciate you taking our questions, and congratulations on the solid execution. Perhaps a quick question about the model to begin with. We saw fairly substantial upside and robust results in EBITDA for the uranium segment. I believe low-cost inventory accounted for part of that. Could you walk us through how that drawdown worked during the quarter and what the trend line for that portion of the segment might look like going into the second half of the year?
Tim Gitzel
executiveGrant?
Grant Isaac
executiveSure, Brian — I’ll have Heidi come in on that. But before Heidi does, it’s really worth framing how that uranium segment performed as a massive incumbent advantage for Cameco. I’d like to remind everyone that when we faced a soft market previously, our response was to keep inventory in the ground and adopt supply discipline. I’d also remind everyone that we remain in supply discipline today — our tier one assets aren’t even operating at full production. The explanation for that is quite straightforward: demand on the uranium side has not yet appeared in a way that would justify it. What all of this means is that as we capture more and more demand and gain opportunities to truly develop that tier one production base, our cost structure will just keep getting better. More material produced from lower-cost sources will flow into our financials within the uranium segment. That’s a very positive result of holding as much standby capacity as we do — capacity that was deliberate, strategic, and a response to market conditions. I just wanted to give that strategic context. Heidi, would you like to address the dynamics?
Heidi Shockey
executiveSure. Thank you, Grant, and thanks for asking. Let me begin by noting that inventory levels do fluctuate. Even though we’re carrying somewhat less inventory this quarter, that simply reflects the timing of production and of our supply and other purchase commitments. On overall cost, I’d direct attention to our purchase pounds. Our outlook calls for roughly 11 or 12 million pounds to be bought during this year, while through the year to date we’ve bought only about 2 million. Considerable purchasing still lies ahead. As Grant mentioned, we are benefiting in the first half from low-cost production. Part of that will even out over the rest of the year. Looking at our outlook for where unit cost of sales should end up could be useful when you’re working on your model.
Brian Lee
analystNo, that’s really useful. Thanks for that, Heidi. On the second question—and I’ll hand it over—there’s obviously a great deal happening in the new nuclear development arena. You went through several of them by geography, and I think it’s well understood that you folks don’t want to get ahead of yourselves and include them in your figures before you’ve seen dirt turned and FID and so on and so forth. Could you give us a sense, though, of whether it’s by region or in particular areas where development has moved further along, and kind of what the gating factors are for some of this activity turning into projects that you’d contemplate adding to your official guidance? Maybe—I think previously you’ve spoken a bit about timing for some of the potential ones in Poland and Bulgaria. I believe another one was mentioned in Slovakia just recently, but perhaps a bit more color on the cadence and what developments you expect here when it comes to those reaching the finish line. Thanks, guys.
Tim Gitzel
executiveIt's Tim here, Brian — honestly, the sheer count of nations, businesses, and sectors now discussing nuclear is nearly too much to take in. As we work to reach those nations and businesses, I think we get pulled in a lot of different directions. Usually I'll hand it to Grant Isaac to describe what Westinghouse Electric Company is examining, since that's a separate picture altogether. The UK, France, Hungary, Czech Republic, China, India, Canada — a major participant — the U.S.: Grant Isaac and I were just down in Pittsburgh 2 weeks ago with the President of the United States and the Secretary of Energy, discussing new nuclear. He put his name to 4 executive orders demanding a quadrupling of nuclear power in the United States, 400 units by 2050. By 2030 he wants 10 AP1000s begun — a somewhat monumental task that we're going to attempt. You can look at Egypt, Turkey, and those nations, the 3 you named. I think of businesses: Google, Amazon, Microsoft, Meta, AWS. That's a load, no question. Plenty of interest in nuclear, plenty of projects advancing, and Westinghouse Electric Company squarely in the middle of it. Grant, I don't know whether you'd like to add anything.
Grant Isaac
executiveBrian, I believe your point about certain markets simply coming across as more traditional is correct, and they do appear to hold something of an edge. Take what is happening in Central and Eastern Europe, for instance — a region that has in fact always been deeply acquainted with nuclear power. It is a region where construction of nuclear never came to a halt. The difference is that they were putting up Russian reactors, and today they are seeking an alternative to those Russian reactors. As a result, those markets enjoy something close to an advantage, since you have state-owned utilities backed strongly by the state, which is the classic template for nuclear construction. Keep an eye on Poland. I think Bulgaria is genuinely keen to — there was the second announcement, but I think they are genuinely keen on reaching FID ahead of Poland. Keep watching that space closely, and watch Slovenia too. They simply possess that built-in edge that comes from a strong state orientation and a strong state focus on backing the grid. Other markets are genuinely beginning to develop new models. In the United States, look out for things such as multi-utility, multi-investor, multi-customer fleet models, rather than the single utility that comes forward and declares, "We're going to do it.
Grant Isaac
executiveOur plan is to reach gigawatt scale." We consistently do this as a two-pack. That's quite a large endeavor, and we'll accomplish it leveraging our rate base, for instance. In certain new markets, fresh models are being developed. I'd say that is requiring a bit of time. It isn't reducing enthusiasm at all, yet it is requiring a bit of time. Eventually, as you total these figures and reach dozens of planned gigawatt-scale reactors across what Westinghouse Electric Company and the Koreans are capable of, a common question arises: "Are we able to do it?" You didn't pose that, but had you offered a third question, I'm fairly certain that's the direction you'd take. I simply want to get ahead of it slightly by saying, "Yes, we can." The key to new build across the West and in areas such as Central and Eastern Europe is standardization and sequencing. What we observe repeatedly is utilities examining what the correct sequence is, examining a reactor that is already designed, already licensed, already constructed. They are able to go and examine it.
Grant Isaac
executiveThey're able to watch it in action. Standardizing and sequencing in this way will prove essential if we're to bring gigawatt-scale new build online successfully. Luckily, everyone appears to agree on securing those two essential elements.
Brian Lee
analystThanks for all that detail, everyone. I appreciate it.
Tim Gitzel
executiveBrian, I appreciate it, but I'll pass.
Operator
operatorLawson Winder from Bank of America has the next question. Go ahead, please.
Lawson Winder
analystMuch appreciated, operator. Morning to you, Tim and Grant. Congrats to all those taking on new positions as part of what's been announced today. If I may, I'd like to focus on what the release says regarding MacArthur. It included remarks suggesting somewhat sluggish progress during the first half of the year, plus possible jeopardy to guidance. Could you perhaps expand on the situation there, the spectrum of possible results, and the constraints across H2 that will in the end decide whether you can achieve that 18 million pounds guidance?
Tim Gitzel
executiveYes, Lawson — Tim here. Mining is not a simple business. We've repeated that countless times. Never let anybody convince you that mining is easy, since it isn't. In McArthur, we're moving into some fresh zones. We've talked about this in our MD&A and in certain other disclosures we've made. Any time you enter a new zone, there are possible new hazards. You've observed our ground freezing approach, and you're familiar with it. Before we can begin mining there, we must confirm it has frozen solid. That work is underway. Early on you heard me bring up labor availability, or at least touch on it indirectly. This year's fires have been tough on us. We lost some electricity, then got it restored. We lost communications, then got those restored too. Sadly, in certain communities where our employees reside, such as Pine House, when they're battling fires, we send those employees home so they can assist there. Skilled labor availability is consistently a difficult piece for us. We're currently commissioning some new equipment. I'm not offering any excuses. I'm simply stating that mining is hard. That's the work we do. Our production guidance for this year remains unchanged. On the whole, things are progressing well, but mining simply carries risk.
Tim Gitzel
executiveThat's about all I'm able to share with you on that, Lawson, I believe.
Lawson Winder
analystAppreciate you raising that — going through the specifics really does help. As a quick follow-up, I want to ask about GLE. In today's release you gave some disclosure indicating that first production is still expected in 2030. At the test loop facility, you've hit level six readiness. What I really wanted to ask about is GLE's selection for Department of Energy funding. Could you speak to that process, the potential upside, and what you expect that funding to look like? Might it come as grant money, or could it be a form of CapEx repayment? Any color on that would be really, really helpful. Thank you.
Tim Gitzel
executiveWe’re not at TRL level six at this point, though—Grant, please go ahead.
Grant Isaac
executiveGLE is now in the TRL6 evaluation stage. I want to remind everyone why this matters: we already know this technology works, since it enriches uranium. What ultimately has to be demonstrated is that it performs at the nuclear reliability level—that is, when you switch the machines on, they do exactly what they should be doing, at roughly that six sigma standard of nuclear reliability. That then becomes the foundation for getting into serious discussions about putting money into the technology and about contingent contracts, for instance, covering the output of a new nuclear technology. Really exciting. As Cameco, we remain genuinely dedicated to securing an entry point into the enrichment space. Everything on that front is progressing well. On your question about the DOE programs, I can offer a little color, though I probably can't give you much in the way of firm guidance. The DOE hasn't actually reached any decisions yet. I'd say the industry is growing somewhat frustrated that those decisions remain unmade. Regarding the mechanisms, there's some industry pushback about what those might look like. Let me offer just one illustration. The DOE had suggested that perhaps the optimal mechanism for supporting new Western fuel cycle technologies would be to effectively serve as the buyer of last resort—that is, if industry wasn't yet ready to back a new technology via a contingent contract, the DOE could step in and purchase that material when industry demand is absent.
Grant Isaac
executiveAt first glance, Lawson, that sounds like a really good concept, but at Cameco we simply aren't big supporters of it, since we have witnessed previously what occurs whenever the DOE holds surplus material. We have watched what takes place when they offload it onto the market in a manner that ignores the commercial timing of that market. The very last thing we would want to witness is the DOE accumulating inventory in advance of industry demand and then having to deal with the ambiguity of what will be done with it. Regarding your question, we along with others in the industry have been advocating for more direct support. We have been making points such as: if those of us in the West don't want to be standing there on January 1, 2028, scratching our heads and asking, "Where is all the Western capacity that we were supposed to be investing in?'" then the DOE ought to consider deploying some of the budget monies that have been allocated to those who are prepared to put their balance sheet to work through co-investments, the 50 to 50 cost share of the advanced reactor development program. That is an excellent model for something like GLE. The industry is prepared to put its balance sheet.
Grant Isaac
executiveThe government stands ready to back those early movers. There will be more updates on this area, though I'd frame it this way: it really boils down to the fact that the DOE simply hasn't reached any decisions as of yet. In the meantime, we keep assessing the matter based on technical capability as well as the commercial case. As with any other segment, we would never intend to get ahead of high-quality, industry-term demand by adding supply that lacked a home. We stay disciplined.
Lawson Winder
analystI appreciate that.
Tim Gitzel
executiveThanks, Lawson.
Operator
operatorOur following question is from Alexander Pearce of Bank of Montreal. You have the floor.
Alexander Pearce
analystGreat, thanks, and good morning everyone. My first question is really about inventories. Obviously, you've brought them down to just over GBP 7 million now. In the next quarter, you've flagged what I think is a maintenance shutdown at Cigar Lake, possible delays around McArthur, and Inkai deliveries coming later in the year as well. How comfortable do you feel with that level? Is that the new normal, or should we expect additional purchases this quarter to try to lift that number?
Tim Gitzel
executiveAppreciate that question, Alex. Over to you, Grant?
Grant Isaac
executiveYou should constantly be considering how we source for our contract portfolio. That's an activity we approach over a far longer horizon than simply the calendar year. The benefit of our approach — we don't produce anything unless we've built a home for it — is that we genuinely enjoy substantial visibility stretching well into the future regarding what our commitments are, when they fall due, and consequently the way we must source for them. We routinely discuss sourcing from production. Clearly, that's the method we favor. We hold inventory for those moments when delivery and production don't line up, or when production is at risk — that's precisely why we keep inventory on hand. We likewise make market purchases at moments when we believe uranium is inexpensive, and we buy forward when a counterparty is prepared to lock in a price. In those situations we behave like an extremely greedy utility. We always keep the right to pull those long-term purchases forward and take possession of them should we require them for nearer-term sourcing. We're able to purchase in the spot market for immediate delivery. That's simply one more instrument available to us. If the need arose, we have the capacity to borrow material from parties who hold material on account with us.
Grant Isaac
executiveSure, we can always have a discussion with the utility. What I'm getting at, Alex, is that we operate this company with risk mitigation in mind, so we never behave like a careless purchaser in the market—instead, we'll act as a highly strategic purchaser. We've observed some supply arriving while demand is absent, causing spot prices to decline. Honestly, if someone is willing to sell material at $70 despite all the tailwinds behind nuclear, despite the reality that the current uranium price still doesn't capture the fact that uranium is the product with no substitute, doesn't capture the fact that supply risks far exceed demand risks, doesn't capture the fact that restarts are proving extremely, extremely difficult in our sector, doesn't capture the fact that greenfield won't materialize within the timelines and budgets people are suggesting—if people want to let go of uranium today, we will be a highly strategic and deliberate purchaser. We do have pounds that we must acquire, but we'll always draw on those other sources in whatever manner makes the most sense for us, remaining very opportunistic and continuing to, I'd say, operate the finest trading book in the uranium space as we capitalize on those selling when we honestly believe they shouldn't be.
Alexander Pearce
analystThanks, Grant. Perhaps I could pick up where Orest left off with his question. Regarding the guidance range you gave for Westinghouse — that 6% to 10% — would it be fair to describe the top and bottom ends of that band as being driven more by when the current pipeline arrives? Clearly there is some flexibility around the timing of that, as opposed to the upper versus lower end reflecting a different count of reactors.
Grant Isaac
executiveYeah, I wouldn't claim there's much slack at the bottom end of that range. That bottom end genuinely mirrors the business's core, picking up fabrication reactor services thanks to restarts and the license renewals that follow. The core itself carries some potential upside too — items such as the conditions for restoring the Springfields conversion service in the U.K. That would in fact sit within the core of the business. The energy systems piece, which captures the new builds, holds considerably more upside if the reactors currently being evaluated reach FID. From our standpoint, we treat it as a floor. The ceiling really depends on capturing some of these stated interests in building new reactors and converting them into revealed interests through final investment decisions. We just keep being very, very excited about where Westinghouse is going and truly are grateful every day that we're part of this business.
Alexander Pearce
analystThanks, that’s great.
Tim Gitzel
executiveAppreciate that, Alex.
Operator
operatorOur following question is from Andrew Wong at RBC Capital Markets. You may proceed.
Andrew Wong
analystMorning, and thanks for the questions. Going back to the nuclear new build opportunity, there are clearly a lot of significant opportunities here for both the industry and Westinghouse. I have two questions. First, does the nuclear industry have the capacity right now to meet that potential build pipeline, whether that's in labor or heavy equipment or forging? And similarly for Westinghouse, there are a lot of opportunities here, potentially even if you look across all the projects, 20-plus AP1000 builds, or even going into the 30s if you include everything. Is there enough capacity for Westinghouse to meet that demand?
Grant Isaac
executiveYes, Andrew, a bit earlier I responded to what I believe may have been Brian's question, asking whether the industry has the capability to do this. Looking back at the '60s and '70s, when we were constructing 20 reactors, 25 reactors annually—it can be done. It can be done provided there's a truly strong commitment to standardization and sequencing. If we have the ability to create a long lead item platform, the ability to get the labor ready, the ability to sequence the construction programs, that means we can fulfill all of this promise. I'd simply say to those of you in Ontario, just look at the refurbishments of the CANDU reactors. OPG and Bruce Power are showing what happens when you standardize and sequence, and the achievement that's possible in the West. We can do it. It's really just a matter of getting started—and getting started in a smart, standardized, and sequenced way. As I told Brian, the great news about all this talk of nuclear new build is that everyone understands standardizing to a common design and sequencing properly is the key.
Grant Isaac
executiveIf we keep doing that, I can’t say what the upside case looks like, but it’s enormous.
Andrew Wong
analystAll right, thank you for that extra detail. Perhaps shifting to the uranium markets — could you give us a bit more insight into the contracting discussions you're having at present? Do we still see floors and ceilings in that $70 to $130 range? And on contracting activity broadly, it's understandable that volumes were low in H1 given the macro uncertainty. That has settled somewhat, but I'd say macro uncertainty is likely the environment we'll remain in for a good while. What needs to happen for contracting activity to accelerate?
Grant Isaac
executiveYes, Andrew. I have to say I'm surprised — we've been on this call for 49 minutes now, and yours is the first question anyone has asked about the uranium market. I appreciate it. You know what? I'm ready with an answer.
Tim Gitzel
executiveAs I mentioned briefly before, I want to emphasize again that when you examine how the uranium market is shaping up, some people tend to say, "Well, term contracting has been fairly weak so far this year, and even the spot market has been fairly weak year to date," and they view that as negative. I see it through a completely different lens. It simply means demand is being pushed back. It's getting deferred. It's building up into a future period when supply risks will be even greater. That indicates, or at least suggests, that pricing power is rising rather than falling. When I consider why the uranium market has been somewhat sluggish, the reasons still come back to the geopolitical bifurcation, or multiplication, of the market. More focus is being directed downstream at present than upstream. There's still greater worry about the origin of critical services compared with uranium. I believe some participants in the uranium space are actually doing themselves a disservice. We keep seeing new entrants or restarts that receive excessive promotion. Naturally, I'm not finding fault with anyone. I get why they pursue it. If you're a fuel buyer in that position and you're aware that enrichment is genuinely scarce, and at every moment you're hearing that the U.S.
Tim Gitzel
executiveYou might think that if huge volumes of uranium are about to be produced, or if these new projects are set to come online within the next two years, then it's reasonable to say, "Okay, perhaps I don't need to be concerned about uranium just yet." I would be concerned, but we haven't seen that fully play out in uranium. We stay patient, and in fact we remain genuinely optimistic that once demand begins to arrive and utilities figure out that the volumes they are seeking aren't available, or they discover that the duration or tenor of the material on offer isn't what they expected, we will find ourselves in a situation very much like the one we experienced in conversion. To me, that is the truly apt comparison. All of this means we stay patient. We stay disciplined. The market knows what we're after for market-related callers. We want floors that begin with sevens. We want ceilings escalated to $130. When term demand in the market has been this scarce, it means others are prepared to be more aggressive, but we are not among them. We construct a contract portfolio to shield us during softer moments like these, and we hold out so as to capture the value of our incumbent advantages.
Tim Gitzel
executiveOur outlook on how this will develop is more optimistic now than it was a year ago at this point. The more the contracting gets pushed back, the greater the demand that will arrive in the market in one burst. From a uranium contracting standpoint, we really like those kinds of moments.
Andrew Wong
analystPerfect — I appreciate it a lot.
Tim Gitzel
executiveAndrew, I appreciate you raising that.
Operator
operatorOur following question is from Mohamed Sidibe at National Bank Financial Inc. You have the floor.
Mohamed Sidibé
analystGood morning, Tim and Grant. I appreciate you both fielding my question. What I'd mainly like to ask about is the Inkai shipments we're anticipating during this year's second half. Would you be able to speak to how confident you feel about getting your share of that output in the second half, and perhaps specifically with regard to the transportation risk in that region? Thank you.
Grant Isaac
executiveYes. For quite a few years now, we've been pointing out that although the Trans-Caspian Corridor was functioning, predictability and certainty were really in short supply, and we simply never had assurance. Our partner, Kazatomprom, I'd say, has simply gotten progressively better at making use of that route. That has given us enough confidence to indicate that our deliveries tied to 2025 production, along with what remains of 2024 production, will begin moving in the second half of the year. Naturally, we'll provide an update in Q3 should that not happen. This ties back to what we discussed about sourcing. We have several avenues for meeting our commitments. Whenever delays arise from that region, we'll simply turn to other sources, and then we'll realize the complete economic value of that material. Broadly speaking, the Trans-Caspian route is growing somewhat more certain and somewhat more predictable, yet it's nowhere near producing from Cigar Lake and shipping it out of Northern Saskatchewan, which is arguably the most reliable uranium anywhere on the planet.
Mohamed Sidibé
analystAppreciate the response. Maybe I could ask a follow-up specifically about the core business at Springfields, and just in terms of the whole geopolitical situation in that region: have you seen sufficient progress in the European market that might get you considering a restart of Springfields, or moving in that direction?
Grant Isaac
executiveIt’s definitely a very constructive conversion space, and there’s certainly a lot of interest in additional Western conversion coming to market. Broadly, what we need to see is the bid-and-ask spread on new conversion capacity closing. What I mean by that isn’t necessarily the price. I’d say there are a lot of utilities willing to pay today’s conversion price, today’s long-term conversion price, and perhaps even a slight premium, in order to lock in new capacity. Utilities are smart. They’re saying, “We’re prepared to do this for three years.” We actually need a much longer contract than three years in order to do this. We’ve seen this game before. Utilities love to contract with new entrants, whether it’s the uranium space or conversion, and they love to sort of entice them with what look like premium contracts for a very short duration. Because once that capacity is in the market, it’s going to bid the price down. We just simply aren’t going to fall for it. If we’re bringing this capacity back, the capacity has to come back under a pricing and under a tenor that makes sense and captures full value. The bid-ask is not so much on the price side.
Grant Isaac
executiveThe real question is how firmly committed buyers are to that source over the long run, and that is the most robust underwriting requirement for bringing on new supply. Keep in mind that each additional day Springfield remains offline means more value flows straight to Port Hope. In the conversion space, we hold a fairly strong position.
Mohamed Sidibé
analystExcellent. I appreciate it.
Grant Isaac
executiveAppreciate it, Mole.
Operator
operatorAnita Soni from CIBC Capital Markets has our next question. You're up.
Anita Soni
analystI’m glad I managed to get included there right at the final moment.
Tim Gitzel
executiveAnita, we certainly weren't going to leave you out.
Anita Soni
analystI was thinking, "I'll need to call in an hour ahead of time for this." There are competing conference calls on my schedule this morning. First off, congratulations to Grant and Heidi on being promoted. It's great to see you, Tim, staying on in your position. Second, many of the questions have already been raised and answered, with great responses. The one detail I wanted to probe was the wildfire situation. Is it having an effect? Is it adding to that cautious wording you used regarding output at Cigar Lake and at McArthur River, or is it entirely unrelated? I'm just attempting to get a sense of how short-lived or long-lasting that caution of yours is — in other words, should we be factoring it in for 2026 as well as 2025?
Tim Gitzel
executiveYes, Anita. The fires aren't truly the main driver. What's really at play are the other items I brought up as we open up new mining zones. The freezing of the ground has to settle in. Then there are the labor problems, which tie in somewhat with the fires, since those come and go as workers tend to their own properties. We're bringing new equipment online. All of that is happening at the moment. Relative to those things, I'd describe the fires as marginal. We'll work past it. As I said, our guidance hasn't moved. For next year in particular, there's no impact from this. Right now, over this summer, we're simply working through a few of those issues. Should anything come up, we'll let you know, but we'll keep going the way we always have. I hope that's helpful.
Anita Soni
analystThanks. That wraps up what I wanted to ask.
Tim Gitzel
executiveMuch appreciated.
Operator
operatorBrian MacArthur from Raymond James has our final question. The floor is yours.
Brian MacArthur
analystMorning, and thank you for taking my question. I apologize — I'll keep it brief since I know we're at the end. My question relates back to what Lawson asked. It's just about GLE. Grant and Tim, you've both spoken about how difficult it is to do things. How confident would you be about getting GLE done by 2030? The second part of that is whether the thinking is still that you'll treat some secondary material first, or whether all of that has changed as we move forward. Any color would be great. Thanks.
Grant Isaac
executiveYeah, Brian — good that you made it in right at the end here. Regarding GLE, we're still working toward a path that's the fundamental agreement with the Department of Energy. By 2030, subject obviously to additional discussions with the DOE about timing, we'd be in a position to re-enrich the depleted UF6 tails that are, quite frankly, a legacy liability from the old gaseous diffusion plants, but once re-enriched, they're an important source of U.S. uranium — both uranium and conversion.
Tim Gitzel
executiveThat's what we'd intend to do, and it's our focus at the moment, since that's GLE's main obligation. GLE could go straight down the fairway with LEU to replace the Russians. GLE could also pursue higher assay enrichment to supply fuel for certain advanced reactor designs that need a high level of enrichment. For those other two cases, we'd need to see demand for that service. We'd need to see suitable contracting and suitable pricing to underwrite the investments needed for those two additional services. The DOE tails arrangement is an agreement we have with the DOE to produce two products we know really, really well — uranium and conversion — and that stays our focus. That's the path we remain on, subject to obviously verifying TRL-6 and then subject to putting in a strong investment case, because the uranium and UF6 market exists for that product.
Brian MacArthur
analystRight. Initially, that capacity would serve only the tails, and after that you'd gain extra capacity — it scales so you could handle the other work too, if you chose to.
Grant Isaac
executiveYes. I mean, Brian, the only factor that might alter that — and it sort of ties back to the earlier question regarding what the DOE is doing — is this: if the DOE comes to see that it genuinely prefers LEU over re-enriched tails, then through certain funding decisions the DOE has the means to back that. Obviously, we would welcome that, and we would act in line with it. Right now, their main emphasis is on tails re-enrichment.
Brian MacArthur
analystPerfect, I appreciate you fitting my question in at the close.
Grant Isaac
executiveYeah, thanks Brian. Good to speak with you.
Operator
operatorThat brings our Q&A portion to an end. I'll now hand things back to Tim Gitzel, who may offer some closing comments.
Tim Gitzel
executiveThank you, Operator, and thanks to everyone who joined us today. As Cory mentioned at the outset, if you have any detailed follow-up questions about our second quarter results, or any questions at all that we didn't get a chance to answer, just send them our way and we'll be glad to address them. We think the evolution of supportive government policies, the tangible actions of energy-intensive industries, and positive public conversations all point to the same conclusion. Nuclear energy is a critical solution for providing clean, constant, secure, and reliable power to electrify global economies. As a proven reliable supplier with decades of experience, Cameco, along with Westinghouse Electric Company, is uniquely positioned to power that safe, secure energy future. Thanks again, everybody, for joining us today. Stay safe and healthy, and have a great day. Thank you. This brings an end to today's conference call. You may now disconnect your line. Thank you for participating and have a pleasant day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Cameco Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Cameco Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research