Capacit'e Infraprojects Limited (CAPACITE) Earnings Call Transcript & Summary
November 5, 2026
Earnings Call Speaker Segments
Operator
operatorGood day, ladies and gentlemen, and welcome to the Q2 and H1 FY '27 conference call of Capacit'e Infrastructure Projects Limited. <<operator_script>> Before we start, a quick disclaimer. The presentation that Capacit'e Infraprojects Limited has uploaded on the stock exchange and on their website, along with the discussions held during this call, contains or may contain certain forward-looking statements regarding the business prospects and profitability of Capacit'e Infraprojects Limited, and these are subject to several risks and uncertainties, and actual results could differ materially from those in such forward-looking statements. I now hand the conference over to Mr. Rohit Katyal, Executive Chairman, Capacit'e Infra. Thank you, and over to you, Mr. Katyal.
Rohit Katyal
executiveHello everyone, and thanks for being with us today. I'd like to welcome each of you warmly, on behalf of Capacit'e, to our Q2 H1 FY '27 earnings conference call. With me on the line are Mr. Rajesh Das, our CFO; Mr. Alok Mehrotra; Mr. Nishith Pujary; along with the Investor Relations team from Marathon Capital. I hope you've all had a chance to go through our financial results. Both the presentation and the press release have been submitted to the stock exchanges and can also be found on our website. I'm happy to report that we've posted yet another robust quarter, with quarterly revenue reaching an all-time high of INR 771 crores — a 19% Y-on-Y increase, even with the seasonal headwinds. This outcome demonstrates how strong our execution capabilities are, the dedication of our teams, and the trust our clients keep showing in us. Underpinning this growth is a robust and well-diversified order book of INR 13,000 crores as of September 30, 2026, which gives us excellent revenue visibility over the years ahead. So far in FY '27, we have won fresh orders totaling INR 2,487 crores, which strengthens our market position and lays a solid groundwork for continued growth. With our strong client relationships, rising execution intensity and a healthy pipeline of opportunities, we are well placed to take advantage of the mounting demand throughout the construction sector.
Rohit Katyal
executiveWe've also stayed focused on making our balance sheet stronger and boosting how efficiently we operate. With a healthy leverage profile and better working capital performance, we have the flexibility to chase growth opportunities while keeping financial discipline and creating long-term value for shareholders. Looking ahead, our priorities are unchanged: speeding up execution, winning quality orders, improving operational efficiencies and delivering growth that is both sustainable and profitable. I'll now move to the key updates for the quarter. This quarter we posted our highest quarterly revenue ever, driven by a major ramp-up in project execution across key sites. Elevated commodity prices are still putting some pressure on margins, but the impact was largely offset through contractual escalation clauses built into our projects for key raw material. As execution scales up further and commodity prices steady, we remain fairly confident about improving profitability over the medium term. Better working capital efficiency brought an 11-day reduction in the working capital cycle versus Q1 FY '27. The company added Mahindra Lifespace Developers Limited as a new client, which further strengthens our customer portfolio. As I mentioned earlier, the order book stood at INR 13,013 crores as of September 30, 2026, with a balanced mix of 54% from public sector and 46% from private sector projects.
Rohit Katyal
executiveWhen you factor in the orders already booked in FY '27 along with a robust pipeline of identified bids, our confidence in exceeding the FY '27 order inflow target remains intact. Having said that, I'd like to walk you through how we performed operationally and financially during the quarter. Revenue from operations in Q2 FY '27 came in at INR 771 crores, a rise of 19% year-on-year. For H1 FY '27, revenue from operations reached INR 1,400 crores, marking a 13% year-on-year increase. EBITDA in Q2 FY '27 was INR 119 crores, which is 10% higher year-on-year. The EBITDA margin in Q2 FY '27 came in at 15.5%. EBITDA for H1 FY '27 amounted to INR 218 crores, up by 4%. EBITDA margin for H1 FY '27 was 15.6%. PAT in Q2 FY '27 came to INR 48 crores, versus INR 51 crores in Q2 FY '26. The PAT margin in Q2 FY '27 was 6.1%. For H1 FY, PAT was INR 87 crores, compared with INR 98 crores in H1 FY '26. PAT margin for H1 FY '27 came in at 6.2%. With that, I'll open the floor for questions.
Operator
operator<<operator_script>> Our first question is from Rajesh Jain of RK Capital.
Rajesh Jain
analystI have a question mainly about the contract assets file. When I look at your balance sheet, under non-current assets, contract assets stand at INR 279 crores; under current assets, contract assets are INR 1,179 crores; and trade receivables on top of that come to INR 1,182 crores. Put together, that totals INR 2,640 crores, which works out to 95% of your previous 12 months revenue. What I'd like to understand about these contract assets is whether all of it is retention money and unbuilt revenue, or whether something else is included. How much of it is retention money, and how much is unbuilt revenue?
Rohit Katyal
executiveRetention money stands at INR 170 crores, and point one is that it has held stable even while revenue grew. Second, we need to reduce contract assets by INR 217.62 crores to account for negative contract assets. So the total contract assets will come to — and please note this breakdown — INR 1,188 relates to work in process, which is essentially milestone payments that have been billed. If you look, the revenue increase only shows that WIPs, even with a higher top line, are being converted into sales and debtors, and those debtors are being collected. Collections for the corresponding six months also bear that out. Debtors overall, after ECL provisioning, came in at INR 1,300.27 crores on a consolidated basis. Most importantly, working capital days have dropped by 11 days quarter-on-quarter. As we said on the last conference call, this trend will continue, and you will see the committed reduction for the full financial year.
Rajesh Jain
analystAlright, one thing I want to get clear on. What figure should I treat as your total receivables? Because you've got receivables and then unbilled receivables, correct? If I combine those two together, would that number come out at roughly INR 2,300 crores, INR 2,400 crores, or something else?
Rohit Katyal
executiveOn a net basis, that comes to INR 2,400 crores.
Rajesh Jain
analystSo this should come in at about 85% to 90% of what you brought in during the prior 12 months, correct?
Rohit Katyal
executiveHowever, that needs to be viewed against how revenue builds across this fiscal year. It ought to come in at roughly 77% to 78% for the entire year.
Rajesh Jain
analystHow old are the contract assets? Specifically, what portion falls in the zero-to-three-month bucket, what portion in the three-to-six-month bucket, and what portion is more than six months old?
Rohit Katyal
executiveYou can simply send an email, and we’ll share it with you. That said, the debtors stand at INR 1,300 crores, correct? That works out to roughly 120 days, and it includes milestone billings that have already been completed and will be received across the next two quarters. So that represents the overall debtor level, and it needs to be measured against the revenue projections for the current financial year rather than the prior year.
Rajesh Jain
analystSir, when I look at your peers, their contract assets seem to sit at about 18% to 20% of revenue. So I just want to get a handle on this — I mean, why is it that once we recognize revenue in our books, we aren't able to bill the client? I understand the reason is certification delays, right — maybe you aren't getting the go-ahead to raise the invoice. So what I'd like to understand is why it takes our clients so long to certify the work, and why that isn't the case with similar peers like Ahluwalia or other peers.
Rohit Katyal
executiveSo what I’ll say is, let the Ahluwalia results come out, and I won’t be able to comment on that. My closest competitors, like PSP, sit at 78%. I don’t know where 19% or 20% came from. Ahluwalia last year was 58%. We were at 87%, and we’re giving guidance of about 78% for the current year. In the same sector, others such as metal engineering are above the top line — that is 108%. There are many companies, but I have yet to see any company with 19% to 20% that you mentioned. On contract assets, you have to add other assets as well; under whatever classification the assets are lying, that has to be totaled up, all right — we have the calculations available with us. So your information, my friend, is incorrect. Nowhere in the industry does anyone have contract assets — meaning including WIP, retention monies, certified debtors, and non-certified debtors — of 20%. The market leader in this last year was Ahluwalia at 56. Everyone else having a rating is above, close to 72% to 73% of the top line, and we hope to achieve close to 77% to 78% in the current financial year.
Rajesh Jain
analystAlright, sir, broadly speaking — leaving aside the specifics of your situation, sir...
Operator
operatorMr. Jain, please go back into the question queue. Our next question comes from Dhananjay Mishra at Centrum Broking.
Dhananjay Mishra
analystGood morning, sir. Could you discuss how each project contributed during the current quarter — NBCC, Signature Global, Mahada, and Raymonds as well — and also the recently awarded ones like Turankara or Mahindra: from which quarter will they start contributing in terms of numbers? That's out of the certified sales for the first six months.
Rohit Katyal
executiveFor the first six months, certified sales for CIDCO came to INR 178 crores. That figure could move up or down by INR 1 crores or INR 2 crores. Maharan stood at INR 123 crores. Leisure Valley reached INR 95 crores. Raymonds posted INR 100 crores, while Downtown came in at INR 111 crores. Those were the primary projects. Beyond those, M3M recorded INR 60 crores, Godrej Mahalakshmi INR 50 crores, IOCL Andheri INR 40 crores, and so forth. Looking at the consolidated basis, MCGM Bhandup contributed 63 crores and the Maldives project INR 169 crores.
Dhananjay Mishra
analystAnd when could that begin — I mean, as a follow-up, <<inaudible>> will Mahindra Life start in Q1 of next year, or will it begin in Q4?
Rohit Katyal
executiveI think we should begin recognizing that revenue starting in quarter 1 of the next financial year. If it kicks off by quarter 4, that ought to be welcome news for everybody.
Dhananjay Mishra
analystAll right, and my second question, since the new project is coming in, can we expect the run rate for the next two quarters to be INR 800 crores plus for this financial year? And ultimately, as we're aiming for INR 4,000 crores in FY '28, we'll be hitting a quarterly run rate of INR 1,000 crores by Q1 or Q2 next year.
Rohit Katyal
executiveWe're going to do that. In the previous month alone, we've already gone past INR 260 crores. So we're well placed to exceed a run rate of INR 300 crores by quarter 4. And that's why we're projecting INR 4,000 crores for the next financial year. That's the first point. Second, our target for the current quarter is quite strong as well. But we need to factor in the NGT issues that may come up, and those are becoming stricter with each passing year. So I can't predict where the NGT will stand for Delhi NCR this coming winter. Still, we have definitely built in INR 45 crores to INR 50 crores of revenue loss. Overall, we've set a specific target for the year, and right now we see no reason why we won't hit it.
Dhananjay Mishra
analystThere's a nationwide water problem. So when it comes to the water our construction projects need — could you foresee a situation where some government temporarily halts construction activity because water levels are low? What's your view on that?
Rohit Katyal
executiveSince our company focuses on construction in urban areas, we haven’t encountered any difficulties or had to deal with problems caused by reduced rainfall. Right now, we don’t expect any issues of that kind. Still, should anything severe occur, we’ll make sure all our stakeholders are kept informed.
Dhananjay Mishra
analystSo the NGT issue is only going to come up in the NCR, right — not in Mumbai?
Rohit Katyal
executiveNo, NCR is the one that NGT applies to.
Operator
operatorWe’ll now take the next question, coming from Tanmay Jain at Dolat Capital.
Tanmay Jain
analystCongratulations on the results. Sir, my first question concerns the labor supply we may encounter, particularly around the UP elections coming up in the final quarter of this financial year. Could you please expand on that? And if you can, quantify how execution capabilities could be affected by it?
Rohit Katyal
executiveIf you caught what I said during the previous quarterly earnings call, I mentioned that in India we can't operate beyond 10 months in any year — ongoing elections, NGT matters, and problems that can't be blamed on the company or, honestly, on anyone at all. So these are force measures. Force measures is the only way I can describe them. Right now, I'm not seeing any impact. Availability at present remains pretty robust, all right? And we're putting every measure in place to keep our workmen through the elections. Revenue for quarter 1 of this year dipped as a result of the Bengal elections. And based on whatever lessons have emerged, I think every major construction company is attempting to do that so a similar situation is avoided in quarter 4 of the current financial year.
Analyst
analystAlright. Sir, my next question concerns aluminum prices. If we look at it, aluminum prices have returned to where they were before. And judging by what the global aluminum companies have said, it appears they'll hover around these levels or perhaps decline. So, for us as a procurer, are these price levels still elevated, or might we see any chance of a reversal on the provisions in the quarters ahead?
Rohit Katyal
executiveLook, right now steel prices — they were INR 47,000 three months back — are today sitting at roughly INR 62,000 per metric ton. Aluminum prices have softened, though they remain above where they stood before the war. Aluminum formwork has moved from INR 10,500 per square meter up to INR 14,500, which works out to a 40% increase. Sure, a correction will happen; for future procurement it ought to settle at INR 12,000, INR 12,500. But as things stand, I can't say whether we'll get back to the prewar level. That's the first point. Second, higher aluminum prices don't hit our profitability, since for us — and for the company as a whole — this is short-term CapEx. Under the company's depreciation policy, it gets written down across the 5-, 6-year period. The only thing affected is cash flow. So where we previously spent INR 1 crores to procure aluminum formwork, today that figure is INR 1.4 crores. And the dollar's appreciation hasn't eased the cost either. So I see no impact on profitability — a slight or negligible impact on overall cash flow from operations at the close of the financial year.
Rohit Katyal
executiveOn top of that, no effect is showing up for us at this point. So the situation is one we’ll need to monitor. It would be too — for me to state what effect this INR 2,000 per square meter on aluminum will have would be premature. Sure, electrical items are going to get more affordable, but they need a couple of months.
Analyst
analystSo how much CapEx have we spent on procuring aluminum formwork during H1?
Rohit Katyal
executiveOur total formwork purchases have come to INR 127 crores.
Analyst
analystAnd what about the balance we didn’t include?
Rohit Katyal
executiveLet me correct that — my apologies. The formwork purchase comes to INR 64.2 crores, while plant and machinery purchases total INR 10.57 crores. Given how strong the order pipeline is, I genuinely believe the full budgeted procurement of INR 135 crores to INR 140 crores will be needed and will get done during this financial year. That covers the balance of H2.
Analyst
analystAnd sir, am I right in understanding that, at the prices we're at now, these levels remain above what our escalation clauses call for?
Rohit Katyal
executiveThat gap stood at 5% or 6% during quarter 1, and as I mentioned last quarter as well, it has since narrowed to roughly 2% — the process takes 6 to 9 months. Government wholesale price indices don't follow the same path as international markets.
Analyst
analystGot it. Got it, sir. Sir, only one final question. Sir, I'd simply like a broad picture of how asset turnover functions in our business. For example, suppose we're aiming at roughly INR 4,000 crores of revenue in FY '28. So basically, what I want to grasp is how CapEx needs line up with revenue growth. Could you just give a brief answer on that?
Rohit Katyal
executiveWhat we spend on CapEx tracks directly with the orders we take in and the number of projects we kick off from one quarter to the next. That said, we held our <<inaudible>> fixed assets turnover ratio, which came in at 4.7% for the quarter ending 30 2026.
Analyst
analystAll right, so my assumption is that to reach the INR 4,000 crore milestone, we'll need more CapEx and, basically, that affects our PAT margin. That was my concern.
Rohit Katyal
executiveSir, I believe our PAT margin leads the industry. Our cash PAT margin, too, remains inside the target band of 10.5% to 11.5%. Cash flow for last year, once adjustments were made, came in positive. That was after we repaid INR 101 crores of term loans. Right now, on a consolidated basis, our fixed asset revenue turnover ratio stands at 4.7. I see no reason why, on INR 4,000 crores, it would not be comfortably above 5 — again, a number that leads the industry. So, you see, what matters most to us is the cash flow from operations. We must make sure that once our term loans are repaid or financial adjustments are made in the cash flow, the company is left with positive cash flow. That is very important. Profit, as I said, owing to geopolitical issues, you saw a further dip in quarter 1. Quarter 2 was better. And I am sure that if the geopolitical situation improves, we will see a higher PAT number going forward. Still, whatever targets we have set for the whole financial year, I see no reason, material or otherwise, at the moment to change them.
Operator
operatorOur next question comes from Vasudev Ganatra at Nuvama.
Vasudev Ganatra
analystNice work on those results. Could you update us on where things currently stand with the Mahada CIDCO project and the Signature Global projects?
Rohit Katyal
executiveSo Mahada — of the 34 rehab towers, we've already been handed 25. At the JV level, the rehab portion in total will come to roughly INR 6,500 crores. So if you divide that, and with about 9 towers still to be received, we have a clear work front of approximately INR 4,200 crores to INR 4,300 crores when it comes to the rehab towers. Price variation is included in that figure. On the residential side, we've begun filing on sector 8 and 9, which are the residential towers. Sector 10 will be handed over by the department by December at the latest. So we can expect a serious ramp-up of revenue in the current financial year. We've already seen a ramp-up this financial year, but a very meaningful one can be expected in the next financial year. And just to add, 35% would be our share. On the second part of CIDCO, I'm happy to share that additional scope of work will be added to the operational order book in the current month or so. And therefore, we expect revenues from new locations starting from quarter 1 of the next financial year.
Rohit Katyal
executiveSo we're going to see meaningful revenue coming through from the CIDCO project. Third point: Signature Global will take a hit this quarter because of the NGT issues. Other than that, we're running at roughly INR 15 crores a month, around that level. And where we stand is that Phase 1 — that's titanium, leaving aside the NGT impact — we should be able to reach INR 18 crores to INR 19 crores per month starting from quarter 4 of this financial year.
Vasudev Ganatra
analystRegarding Mahada CIDCO, could you share what the quarterly run rate stands at currently? And what figure are you anticipating for Q4 and beyond that?
Rohit Katyal
executiveYes. Regarding CIDCO, for <<inaudible>> we're at INR 177 crores, which works out to roughly INR 30 crores monthly as a run rate. We're looking for that run rate to grow 35% to 40% across quarter 3 and quarter 4. In quarter 1 of the coming financial year — as I mentioned, additional scope has come in, and that should lift revenue considerably. So for next year, I do expect the run rate to be no lower than INR 50 crores per month, meaning INR 150 crores each quarter and INR 600 crores annually. Turning to Mahada, revenue for the first 6 months came to INR 124 crores. Once more, we anticipate a 25% rise over the rest of the financial year, and it ought to go up by more than 40% versus the present level in the next financial year.
Vasudev Ganatra
analystThat's quite useful. And sir, my second question: you said water supply isn't a problem for us and that even commodity prices are declining. So the INR 10 crore provision we made in Q1 and also in Q4 — should we expect that to reverse in the second half?
Rohit Katyal
executiveI can't really comment on that, because I'd want to see the markets settle down and the geopolitical picture ease up — oil is at INR 115 one day, INR 90 the next, and then it hits INR 72. So right now it's far too volatile, and even the dollar price isn't helping. So the thing is, we ought to give it another quarter. If the price variation in government contracts can align with actual market inflation, then you'll see some reversal taking place in quarter 4. Unfortunately, if that doesn't happen, then it won't happen. But we shouldn't try to predict the market — that's very, very dangerous. What I can say at the moment is that the green shoots are this: in quarter 2, the escalation, which was much lower in Q1 according to the Office of Economic Adviser, has gone up and the gap has narrowed down substantially. And that's why you're seeing the improvement in profitability. If this gap diminishes in quarter 3, I'll be in a better position to answer that question on the next earnings conference call.
Operator
operatorWe’ll take our next question from Parth Thakkar, who is on the line from JM Financial.
Parth Thakkar
analystI'll start with the order inflow pipeline. Are there any projects where we've submitted a bid and the results are still pending?
Rohit Katyal
executiveYeah, quite a few. So right now we're in the middle of active bid negotiations worth INR 3,270 crores. That bid pipeline is really robust, and we don't see any reason we won't be able to exceed the annual target we shared with all of you.
Parth Thakkar
analystCould you go over the guidance for FY '27 once more?
Rohit Katyal
executiveRegarding FY '27, the initial guidance stood at INR 4,500 crores. As I speak with you today, I believe we've reached roughly INR 2,500 crores or thereabouts. So the guidance for financial year '27 was INR 4,500 crores. We've already gone past INR 2,500 crores, give or take. And given the bid pipeline and the bids we've submitted, we're quite confident that we will comfortably exceed the full-year guidance.
Parth Thakkar
analystIt would be at that same level of...
Rohit Katyal
executiveRegarding the margin profile, we've provided guidance for the full year, and right now we're going to keep that guidance as it stands. Should commodity prices and escalation improve — as I said when answering the earlier question — if escalation lines up with the rise in cost prices, then we'll revisit it in quarter 4 of this financial year. For the time being, though, the existing guidance stays in place.
Operator
operatorNow we'll take a question from Deepak Poddar, who's calling in from Sapphire Capital.
Deepak Poddar
analystTo pick up where we left off on the margin question: what's the guidance for this year's margin — FY '27, the EBITDA margin?
Rohit Katyal
executiveWe actually provided guidance during quarter 1 itself — 15.5% to 16.5% at the EBITDA level. And on cash PAT, we gave a range of 10.5% to 11.25%, roughly speaking, and we're still holding to that level.
Deepak Poddar
analystSo where does that land — 10.5% to 11%?
Rohit Katyal
executiveCash, and profit in cash terms.
Deepak Poddar
analystAll right, all right, all right, understood. So, in an ideal scenario — and I mean, that was true last year as well, when your EBITDA margin came in at roughly 16%, 16%, 16.3% — so ideally, if you're aiming for 20% top-line growth while holding EBITDA margins at a similar level, then ideally the bottom line too, should we be looking at something like 20% growth in your bottom line?
Rohit Katyal
executiveTo answer directly, yes — our bottom line has been expanding at a CAGR of 40% or more. As a matter of practice and company policy, you'll notice that we always walk you all through the consolidated figures, all right? And when we say consolidated, that covers situations where the company has joint ventures and overseas projects such as the one in Maldives, where the margin profile is clearly lower than what we see on projects executed on a stand-alone basis, since we are only counting our share of profit, okay? So I don't see anything changing on that front. If anything, with the Maldives project wrapping up in the current financial year, you should see a bit of an uptick in the margin profile in the next financial year.
Deepak Poddar
analystRight, and the reason I raised that question is that during the first half, on a Y-o-Y basis, your bottom line looks pretty much the same. We haven't seen any growth at all in the first half. That's why I was asking whether, for the entire year, we should expect revenue growth roughly in line with PAT growth?
Rohit Katyal
executiveDuring the past year, we benefited from recovering some bad debt tied to the sale of noncore assets. That point was also covered on last year's conference call. We have <<inaudible>> assets held for sale worth INR 48 crores in the current financial year as well. We're making every effort to realize the value of those assets during the current financial year. Should we succeed, you'll see the margin profile tick up once again. But keep in mind, this stems from money that was stuck, perhaps five years back, and the company has worked very hard to get it realized. Speaking from the standpoint of the operating current order book, the EBITDA guidance for the current year is 15.5% to 16.5%. That's unchanged from what we said previously. PAT will be at similar levels too. If other income comes through, you'll clearly see profit margins step up.
Deepak Poddar
analystGot it. On the provisioning side — I mean, over the last two quarters, we set aside roughly INR 20 crores, correct, on account of volatility in commodity prices. So did we make any provision this quarter, and that...
Rohit Katyal
executiveNo, nothing has been provided by us this quarter.
Deepak Poddar
analystIs there any sort of reversal we might see in the quarters ahead?
Rohit Katyal
executiveYes, I just answered that. You'd only see reversals if commodity prices stabilize completely across this quarter, and if we start to see some of the benefits from the green shoots that are visible today. So because of that, no provisioning has been taken in the current quarter. But we have to allow the markets some time to stabilize. And once stability shows up, we can provide guidance on that reversal for quarter 4 only when we meet for quarter 3.
Operator
operatorOur next question comes from Rahul Kumar, who's on the line from Vaikarya Fund.
Rahul Kumar
analystRegarding the full-year guidance and how we execute against it, that 20% growth figure we're guiding toward for FY '27 — are you building any disruption in the NCR region into that?
Rohit Katyal
executiveI just responded to that. But to give you a clearer picture, nobody can forecast what will happen with NGT this year. In the prior year, we took a shutdown period of 15, 20 days. But the initial details coming through — such as a full ban running from 5th November to 20th November — by itself removes 15 days. So last year it was Graph 1, 2, 3, 4. The complete suspension used to occur in Graph 4. Now we are assuming Graph 2, 3, and the complete suspension has taken place. So we will have to wait and see how it plays out. I am as keen as you are to know that, but I will not be able to provide a firm number on it. If the disruption is 15 days or so, there is no problem at all. If it is 20 days, we will still manage from the other projects. However, if it is 45 days, I cannot give a number for that.
Rahul Kumar
analystGot it. So with 1H revenue at INR 1,400 crores, what portion of that came from NCR?
Rohit Katyal
executiveI don't have that breakdown available right now. If you send an email, perhaps we can try to address your question to some degree.
Rahul Kumar
analystAlright. The second question concerns margins more. I think you've already covered a great deal. But would it be reasonable to say that, assuming commodity prices stay at present levels, these are the lowest margins we've witnessed so far, and hopefully things ought to get better from this point onward?
Rohit Katyal
executiveLet me say again that assuming commodity prices hold steady and the escalation clauses in the government tender correspond to those rises, then yes, you will see improvement starting in quarter 4. However, if the prices of the main commodities swing so wildly that between quarter 1 and 2 you see a 35% gap, then giving a prediction becomes very difficult. At the moment, though, they are stable. Some downward trends are showing up in the main commodity prices. Most of the -- 100% of the private sector is full pass-through. But with government, it hinges on the price variation, which is derived from the WPI and commodity-based indices. Those have caught up much better in quarter 2. If they catch up in quarter 3, then yes, on the quarter 3 earnings call, I can give you a firm answer. But if it is not stable, then predicting something over which I have no control will be very difficult.
Rahul Kumar
analystAnd which commodities have you noticed inflating more than the overall cost escalation?
Rohit Katyal
executiveSteel prices have gone up, right? And prices for all electrical items have risen too—though those came down a bit thanks to the CPW circular and the formula designed to bring them to current levels. So those are the two main factors driving the impact. The war sent prices skyrocketing, and the 20% escalation has been partly absorbed, but not the whole increase. When I say increase, it obviously means production costs go up. So if quarter 3 catches up and matches this rise in finishing items, electrical items, electrical items, and so on, then I'll be able to give you a clearer answer on the next conference call.
Rahul Kumar
analystRight, so essentially when it comes to those public sector projects...
Operator
operatorMy apologies for cutting in, sir — would you mind going back to the question queue? Our next question comes from Diwakar Rana of Prudent Equity on the line.
Diwakar Rana
analystI'd like to understand the long-term plan for growing our margin, since across the last 11 quarters we haven't seen any profit growth. We used to run a 15% margin. Now we're running 15%. And in this quarter, your depreciation expense has also risen from 29% to 35%. So what's the long-term strategy for raising that margin and delivering some profit growth on a quarterly basis?
Rohit Katyal
executiveCompared to the prior quarter, profit has gone up. That said, as a matter of strategy, I noted a moment ago that the company keeps pursuing profitable orders — ones that either fit the profit profile we have now or do better than it. And the mix of orders we hold makes that plain: those orders, which must be delivered across a span of 3, 3.5, 4 years, when you put them together, do point to the margin profile we have consistently committed to — 15.5% to 16.5% as EBITDA, which is again a market-leading EBITDA level, or the PAT level at present levels, since we are still waiting for commodity prices to settle. As soon as that stability arrives, I can provide guidance on the increase. On an absolute basis, though, we are well on track for very good growth in the current year and the next financial year. So the company's long-term strategy is unchanged. Our focus will stay on our core strength. We will not digress into new infrastructure segments. Building and building construction, factories included, will be our domain of growth. And there will be some geographic expansion into Tier 2 and Tier 3 cities. We will be qualified for international projects once we have completed the Maldives.
Rohit Katyal
executiveSo that's basically how the company's strategy works — what was set in motion in 2024 is going to keep going, and nothing is going to change for the foreseeable future.
Diwakar Rana
analystAnd sir, regarding the debt, I notice it has gone up somewhat. So how do you expect debt to look in this financial year and the next one?
Rohit Katyal
executiveEven with the growth, debt will stay at this level. We've put roughly INR 80 crores into CapEx, and most of that has been funded through term loans. Each month, repayment comes to around INR 10 crores. So I see — I firmly believe that by the 31st — as of March 31st, there may be a modest decrease, but we expect a meaningful buildup in the cash position. As a result, net debt ought to decline or stay consistent with the figures from March 31st, '26. That's our belief.
Diwakar Rana
analystAlso, sir, I’d like to get a sense of how depreciation expense will trend from here. In this quarter, we recorded roughly INR 35 crores. So since you mentioned that you’ll be carrying out INR 135 crores of CapEx, how should we think about depreciation?
Rohit Katyal
executiveDepreciation moves in lockstep with the CapEx we incur... The key thing is that aluminum formwork, which makes up most of what we procure, gets written off across a 7-year span. And given that the project execution period, previously 4.5 years, is now shrinking to 3 years, that depreciation will only speed up. So as things stand, the only thing I can tell you is that it will stay at the current level. What matters more to us is lifting the top line and in that way reducing the fixed cost as a percentage of the top line, which improves profitability, EBITDA, or whatever parameters you happen to be looking at.
Operator
operatorOur next question comes from Amit at RoboCapital.
Analyst
analystSir, I’d just like to confirm once more our FY ’28 revenue guidance of INR 4,000 crores. I hope — I mean, I came onto the call after a couple of quarters. I just want to have that reconfirmed.
Rohit Katyal
executiveYeah. As of right now, our guidance stays the same. FY '28 at INR 4,000 crores.
Parikshit Gupta
analystOkay, so what's your expectation for our order inflow in H2 of this year, and then next year, FY '28?
Rohit Katyal
executiveRegarding H2 of the current period — we think <<inaudible>> will exceed the full-year targets quite comfortably. So that's one: the target set was INR 4,500 crores for new order inflows, and with the orders already booked plus what we're negotiating this month and next, we do believe we may revise the order inflow guidance in the next quarter. The bid pipeline is extremely strong. And so we see no reason why a 25% rise in the order book shouldn't occur in the next financial year, in line with our top line guidance.
Operator
operatorOur next question comes from Parikshit Gupta at Fair Value Capital.
Tanmay Jain
analystSince I've only been following the company for a short while, I hope you'll excuse how basic my questions are. My first one concerns the mix between public and private work. I do realize that management's goal is to secure profitability and cash flows rather than the sponsor, but do you have any plans to shift toward a larger share of private projects going forward?
Rohit Katyal
executiveWe've kept saying a healthy blend will stay around 55%, 45%, 50-50. It's dynamic. If another INR 1,000 crores arrives from the private sector, that could tip private sector to 45%, and government — you might see some government projects come in and the mix shift once more. But ideally, we'd like government at 55% and private sector at 45%. The reason is simply that government projects are key. Project values run higher since there's no sharing as there is in the private sector. So that mix is what we'll aim to hold. What was the second question?
Rohit Gupta
analystAll right, apologies — no, no, no. Right. The second question concerns the promoter pledge. My understanding is that management previously guided that this could be finished by the close of FY '27. So I simply wanted to check whether there have been any updates on that, or any changes to the figures guided earlier?
Rohit Katyal
executiveNothing has changed on that front. This year we've cut the pledge by INR 35 lakhs. At present, just 50 lakhs of shares remain pledged in connection with the company's limits with State Bank of India — a project-specific limit. That limit started at INR 608 crores and has since dropped to INR 140 crores. So we've set a guidance date of 31st March 2027, and we're working toward it. That said, this pledge isn't for the promoter or anything like that. It relates to the company's working capital limits, which the company is drawing on. So it can be regarded as a very, very safe pledge, unlike the earlier pledges that went to NBFCs — those have all been cleared — and the company won't provide any pledge to any NBFC in the foreseeable future for working capital limits the company enjoys.
Operator
operatorMoving on, we have a question from Tanmay Jain, who is calling in from Dolat Capital.
Analyst
analystSir, just a couple of quick questions. First, regarding the monthly run rate on the NBCC project and the IIT Bombay project.
Rohit Katyal
executiveRegarding NBCC, we've gone past an INR 60 crores run rate. That said, the NGT effect will be felt in November. Even so, during the active stretch when there's no NGT impact, we'll be doing roughly INR 65 crores to INR 70 crores each month.
Analyst
analystAnd as for Bombay...
Rohit Katyal
executiveAt IIT Bombay, just one site has been turned over to us — INR 70 crores handed over out of INR 550 crores. That is all we are able to execute right now. The client is making every effort to secure certain permissions for tree cutting. Once those come through, we can then give the overall run rate. Still, we do believe the client will be able to hand over the full frontage by 31st March '27. If that happens, we would then need to finish the project within 24 months, which means a run rate of roughly INR 60 crores per quarter, excluding escalation.
Operator
operatorIs there anything else you'd like to ask?
Analyst
analystYes. Just one final question. Sir, since NBCC is planning the Gi land for the project, is there any chance we're looking at that opportunity, or...
Rohit Katyal
executiveWe keep placing bids continuously for CPWD and NBCC in the central government, along with the other PSUs. So with NBCC, plenty of projects are coming up. I don't have a list of the specific one you referred to. But bids will be going to NBC month-on-month. And based on which geography we're present in, we'll submit our bids. So for instance, when bids were invited for J&K, we hold back since that isn't our geography at this point in time. But yes, we will look at projects in the Delhi NCR area, perhaps even 150, 200 kilometers from Delhi NCR, and we'll be looking at the Mumbai MMR area. NBCC and CWT — those are the locations we're focused on.
Analyst
analystAll right, sir. And for the CPWD, we'll be rebuilding for the RV headquarters general Mumbai, correct?
Rohit Katyal
executiveWe will be.
Operator
operatorOur next question comes from Rohit Gupta, who is calling in from RKG Online.
Analyst
analystGood morning. Sir, about that CIDCO project—the company’s L1 bid is better. Could you explain why the profit on that project is taking so long?
Rohit Katyal
executiveThe board meeting has taken place, and we understand that it has been cleared at that meeting. Hopefully, within the next 10 days, we should be able to share some good news with you.
Analyst
analystSir, my next question is this: could you please walk us through the reasoning behind the appointment of CEOs?
Rohit Katyal
executiveYes, absolutely. We think that with Rahul involved, or any other member for that matter, nobody is super human. Projects are becoming increasingly complex. So because of that, we've appointed CEOs to lead each BU. These BUs have been split into 4: BU1, BU2, BU, B4. And every BU head or CEO has been given a mandate covering a minimum revenue and profit after tax — or what we call in construction power contribution — on a quarter-on-quarter basis and for the year. So we believe this structure delivered a better quarter 2 for us, and we don't see any reason why that upward trend would not carry on. That was the sole reason for making a strategic shift away from a conventional CEO toward four BU heads or CEOs.
Operator
operatorMayank Kothari is next with a question.
Analyst
analystI'd just like to get a sense of how much recovery has come through in the first half from the aging — from those old debtors we had? And what do you expect by year-end — how much will we recover?
Rohit Katyal
executiveSo we've managed to get the property registered under our name. We're holding INR 48 crores worth of properties for sale in H2 of this financial year, and that's the target. During the first half of the first half, the actual cash flow came to roughly INR 5 crores to INR 6 crores. But that should increase next quarter, or plus whatever has been recovered — maybe INR 52 crores to INR 54 crores in total recovery. Of course, this depends on the pricing we can get for the properties held for sale.
Analyst
analystAnd what's the final figure we'll end up with, say, by FY '28?
Rohit Katyal
executiveSo I mentioned that INR 200 crores that was tied up — or perhaps INR 350 crores back in 2020 — and out of INR 150 crores, we've already brought in close to INR 200 crores. We're holding assets valued at roughly INR 50 crores, which will stay as they are — meaning after this collection, only INR 100 crores will still be outstanding, and against that we already have certain properties, plus we're on the verge of wrapping up some settlement agreements. Once that takes place, we'll let you know. But what I'd like to say is that we've managed to safeguard the company's commercial interest regarding the funds that were stuck and provisioned across all these financial years.
Operator
operatorLadies and gentlemen, we'll treat that as the final question. At this point, I'm handing the conference back to Mr. Rohit Katyal for his closing remarks.
Rohit Katyal
executiveWe appreciate everyone being with us today and for the trust and backing you keep showing in Capacit'e. We trust that we've responded to your questions and offered helpful perspective on how we performed and our growth outlook. Given a solid order book, good momentum in execution and a strong pipeline of projects, our confidence in what lies ahead remains high. If you need any information, don't hesitate to contact our Investor Relations team. With the festive season upon us, I wish you and your families a very happy Diwali and a prosperous new year. Thanks again, and we hope to connect with you once more next quarter. Have a wonderful day and holidays.
Operator
operatorThanks a lot, sir. That brings this conference call to a close on behalf of Capacit'e Infraprojects Limited. We appreciate everyone for participating, and at this point you can go ahead and hang up your lines. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Capacit'e Infraprojects Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Capacit'e Infraprojects Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capacit'e Infraprojects Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.