Operator
operatorAppreciation for holding, everyone. This is the conference operator speaking. We welcome you to Capital Power's conference call covering third quarter 2021 results. Please note that everyone joining is in listen-only mode, and today's call, October 27, 2021, is being recorded. At this point I'll hand things over to Mr. Randy Mah, Director of Investor Relations. Please proceed.
Randy Mah
executiveGood morning, everyone, and thanks for being with us today as we go over Capital Power's results for the third quarter of 2021, which came out earlier this morning. You can find our Q3 report along with the presentation for this conference call posted on our website, CapitalPower.com. With me on the call today are Brian Vaasjo, our President and CEO, and Sandra Haskins, Senior Vice President Finance and CFO. We'll begin with some opening comments, and after that we'll open the lines so you can ask your questions. Before we get started, I want to remind everyone that some of the statements made on this call about future events are forward-looking in nature and rest on certain assumptions and analysis made by the company. Actual results could differ materially from what the company expects because of various risks and uncertainties tied to our business. Please see the cautionary statement on forward-looking information on Slide 2. During today's discussion, we'll refer to various non-GAAP financial measures as noted on Slide 3. These measures are not defined financial measures under GAAP and don't have standardized meanings prescribed by GAAP, and as a result, they're unlikely to be comparable to similar measures used by other enterprises. They are provided to complement the GAAP measures, which are included in the analysis of the company's results from management's perspective.
Randy Mah
executiveYou can locate the reconciliations from these non-GAAP financial measures to the closest GAAP measures in our MD&A for the third quarter of 2021. Having said that, I'll now hand things over to Brian Vaasjo, who will begin his remarks on Slide 4.
Brian Vaasjo
executiveThanks, Randy, and good morning. I'll begin with the third-quarter highlights and then discuss what we expect for 2021. On the whole, third-quarter results came in as we had anticipated. The unplanned outage at Genesee 2 is going to last longer than we first thought, and we now expect that unit back in service at the end of November 2021. Progress continues across our 7 renewable development projects, and I'll go into more detail on those later. In brief, though, we are encountering cost pressures at our 2 Alberta solar projects. In addition, the completion date for our 3 North Carolina projects has been pushed out because of delays in the interconnection process. Given our strong financial position, our performance and our positive outlook, we are suspending our Dividend Re-investment Plan, or DRIP, starting with the fourth quarter 2021 dividend. During the second quarter, we raised our 2021 financial guidance, mainly because of the favorable Alberta power outlook. That outlook is unchanged, since the market remains robust. Even with the longer Genesee 2 outage, we remain on track to deliver annual financial results in line with our revised, higher guidance. If you turn to Slide 5, as you'll remember, Genesee 2 had a forced outage in mid-July brought on by a generator failure, and insurance covers the physical damage.
Brian Vaasjo
executiveRepairs are underway on the unit to swap out the generator. And as I said earlier, we expect it back in service at the close of next month. We keep using our Clover Bar peaking facility to backstop Genesee 2 whenever that's appropriate. Once 60 days have passed, the revenue loss becomes eligible for business interruption insurance. Sandra will address the accounting effects of the Genesee 2 outage when she speaks. I'll hand the call to Sandra now.
Sandra Haskins
executiveThanks, Brian. I'll begin by reviewing the Alberta power market, which is on Slide 6. We're still seeing strong prices, with an average power price of $100 per megawatt hour in the third quarter, driven by hot temperatures, facility outages, and weather-adjusted demand growth of approximately 4% year over year in the third quarter. That strong average power price was more than double the $44 per megawatt hour average in the third quarter of 2020. During the third quarter, our trading desk captured an average realized price of $75 per megawatt hour, which was 27% higher than the $59 per megawatt hour seen a year ago. The market outlook for the rest of this year remains strong, with a forward price of $99 per megawatt hour for the fourth quarter. As forward prices have strengthened, we've added to our hedge positions for 2022 through 2024 since the second quarter. Our Alberta baseload generation is now 67% hedged for 2022, at an average contract price in the mid-$60 per megawatt hour range. For 2023, we're 38% hedged at a contract price in the mid-$50 per megawatt hour. And for 2024, we're 21% hedged in the mid-$50 per megawatt hour.
Sandra Haskins
executiveThat's versus forward prices right now of $91 per megawatt hour for 2022, $73 for 2023, and $62 in 2024. Beyond the baseload assets, we have roughly 500 megawatts of gas peaking and wind facilities that can capture upside from stronger power prices and price volatility in 2022. Turning to Slide 7, I'll go through our financial results for the third quarter. As Brian said, financial results came in line with our expectations. Consolidated revenues and other income totaled $377 million in the third quarter, down 17% from a year ago, mostly because of unrealized changes in fair value of commodity derivatives and emission credits. If you exclude the mark-to-market impacts, consolidated revenues and other income are up 7%, driven by strong performance from the Alberta commercial facilities. Adjusted EBITDA came to $286 million in the third quarter, a slight increase of 1% compared to a year ago. We generated $206 million in AFFO, which was 7% lower than a year ago. The decline in AFFO came from lower AFFO contributions from the U.S. contracted facilities and higher sustaining CapEx tied to maintenance work done for the Genesee 2 outage that was originally scheduled for the fourth quarter. Moving to Slide 8, I'll discuss the accounting treatment of the Genesee 2 outage and the associated insurance recovery.
Sandra Haskins
executiveWe had roughly $25 million in capital costs during the third quarter, and of that amount, $23 million — net of a $2 million deductible — was accrued for recovery via insurance. That net recovery appears on the third quarter income statement within the gains on disposal and other transactions line rather than being applied against the capital cost. In AFFO, the net effect we see is the $2 million deductible, whereas adjusted EBITDA carries no impact. Operationally, business interruption coverage kicks in 60 days following the onset of the outage, which puts it at mid-September. We did not record any business interruption accrual in the third quarter, largely because the final claim amount — which will factor in mitigation across the portfolio — won't be fully known until the unit is back in service. On Slide 9 you can see our third quarter year-to-date results. Adjusted EBITDA came in at $830 million, a 13% increase from $735 million in the same period of 2020. The primary factor behind that rise was stronger Alberta power prices, with our realized power price at $75 per megawatt hour versus $59 per megawatt hour a year earlier. Reduced corporate expenses also helped lift adjusted EBITDA, chiefly from acceleration of coal compensation revenue.
Sandra Haskins
executiveAdjusted funds from operations came in at $456 million, which is 5% higher than the $436 million recorded a year earlier. Broadly speaking, our main financial metrics are showing robust performance so far this year. As Brian noted, given both our strong financial results and our outlook, the DRIP has been suspended. In addition, we tapped the capital markets during this year, bringing in $288 million of equity along with US$150 million of debt, which is set to fund later this month. Thanks to these successful financings, our financing risk has been lowered, as has the requirement for extra equity to support current growth projects. With that, I'll hand the call back to Brian.
Brian Vaasjo
executiveThanks, Sandra. Moving to Slide 10, I'll walk through how we performed over the first 9 months of the year against our 2021 targets. For the year to date, facility availability averaged 90%. The extended outage at Genesee 2 is going to affect our annual results, and at year-end we expect to come in below our 93% availability target. Sustaining CapEx came to $99 million across the first 9 months, versus an annual target of $80 million to $90 million. The main reasons we've gone past that annual figure are the Genesee 2 outage and an unplanned order purchase at the Arlington facility made during the planned outage in the second quarter — and that latter item will push us above our sustaining CapEx target for the full year. Nine months in, adjusted EBITDA came in at $830 million, and on our present outlook we anticipate full year results in line with the midpoint of the revised guidance of approximately $1.1 billion. AFFO generated this year totaled $456 million, and for the full year we expect results modestly above the midpoint of the revised guidance range of $570 million to $620 million. On Slide 11, I'll give a status update on our growth projects. We're continuing to make progress on roughly $1.7 billion of growth projects currently under development.
Brian Vaasjo
executiveThis covers building 7 renewable projects as well as repowering Genesee 1 and 2. In Alberta, Whitla Wind 2 and 3 remain within budget and on track to reach commercial operations later this year. At the Strathmore and Enchant Solar projects in Alberta, costs have risen because transportation expenses have gone up significantly and supply chain pressures have added costs. For Strathmore Solar, the updated estimated project cost is $57 million, versus $53 million in the budget. While the project costs were — Enchant Solar now stands at $119 million, against a $102 million budget. We have 3 solar projects in North Carolina whose original commercial operations date was Q4 2022. Because of delays in the interconnection process, however, commercial operation is now expected in Q4 2023 or Q1 2024. Construction began in the third quarter on the repowering of Genesee 1 and 2. There are no changes to the budget or the target operations date of late 2023 for Genesee 1, and 2024 for Genesee 2. As for our $500 million committed capital growth target, we keep exploring opportunities, with potential growth announcements later this year. To wrap up, I'll comment on other activities that we have going on as outlined on Slide 12.
Brian Vaasjo
executiveCOVID-19 is still being handled effectively, and it hasn't affected how we run things. Our intention to construct the biggest commercial-scale carbon nanotube manufacturing plant in the world at the Genesee Carbon Conversion Centre remains on a slower timeline for development. We're still working our way through the regulatory registration process for our carbon nanotubes, which is required before we can operate commercially. When it comes to Island Generation, we remain of the view that this facility is necessary to guarantee a secure and dependable electricity supply for Vancouver Island and Metro Vancouver. Right now we're in negotiations with BC Hydro on a medium-term agreement, ahead of the existing PPA's expiry in April of next year. Last, the CCS pre-feed study is close to being finished. And on the whole, the project appears more and more encouraging. We intend to share further details about our decarbonization strategies at our Investor Day. With that, I'll hand the call back to Randy.
Randy Mah
executiveAlright, thank you, Brian. Prior to opening things up for your questions, I want to share that our Annual Investor Day event is scheduled for the morning of December 2. Our hope is to hold it as a live event in Toronto, though once again this year it will be a virtual event. Further details about the event will be shared shortly, and we hope you can join us virtually on December 2. All right, Shree <<inaudible>>, we can begin taking questions.
Operator
operatorThank you. We'll now start the question-and-answer portion. <<operator_script>> Our first question is from Maurice Choy at RBC Capital Markets. Please go ahead.
Maurice Choy
analystThank you, and good morning. I'd like to start with a question about the repowering project. I was hoping to hear your latest thinking on it. Of course, you've probably heard that a peer of yours decided to put their project on hold, which underscores some of the possible regulatory and financial headwinds facing new gas, repowering included. How would you describe those risks, and what plans do you have in place if they do materialize?
Brian Vaasjo
executiveOkay, so I suppose getting to the heart of what you're asking — if we consider our forecast regarding how stable the regulations will be, and especially the future of the 0.37 stringency, we've once again received assurances from the Alberta government. As you're aware, the Premier has given direction that 0.37 is going to stay in place. The province has a lot of confidence in its equivalency when viewed from the federal standpoint. So we really don't anticipate any shift on that front. As for our peers' choice to essentially halt progress on 1 project and close down 2 other facilities, we would have to acknowledge that the closure of those 2 other facilities is actually happening somewhat earlier than we had expected they would be shut down. And when it comes to moving ahead with a new facility, I think if you look back to the time that facility was announced, what has transpired since then is that — and if you consider the STACK in the Alberta market, it would have ranked among the most efficient natural gas combined cycles in the province. After that, Genesee sought repowering. And there has been another announcement in Alberta, the Cascade Project, which is moving forward.
Brian Vaasjo
executiveSo suddenly there's 2,500 megawatts of capacity in the queue that's far, far more efficient. So that project not moving ahead didn't surprise us at all — we didn't think, given those other results, that it would be economic even under our outlook. So not a big surprise. And again, with the Alberta government constantly reassuring us that the 0.37 will hold, we remain positive. Now, the second part of your question is what happens if it changed, or what happens if there was a — well, a change to the 0.37. In our projections for repowering Genesee 1 and 2, we actually have it declining after 2030. At some point, it will reach 0. And it's fully within our economics that, over a reasonable period of time post 2030, it will get there. So at worst, it's a timing difference. The shorter-term impact, of course, is that it will affect power prices in the province to a degree, given how dominant natural gas generation is. So the economics of Genesee 1 and 2 would continue to be very solid.
Maurice Choy
analystAppreciate it. I’d like to ask one more thing along those lines. You mentioned a handful of cost pressures affecting certain Alberta solar projects of yours. Are there any pressures—or comparable pressures—tied to the $997 million budget for this project?
Brian Vaasjo
executiveNo. I mean, there are a few extremely slight cost pressures showing up, but none of them shifts the cost picture for the project in any meaningful way.
Maurice Choy
analystThank you. One last item on our outlook. You referenced the midpoint for EBITDA within the guidance range. At the same time, you noted that sustaining CapEx will probably come in above the $80 million to $90 million range. So even with that elevated sustaining CapEx, AFFO is still anticipated to land not merely at the midpoint but somewhat above it. What is driving that upside in AFFO?
Sandra Haskins
executiveThere are a few items in that. Financing costs are coming in lower for this year. So that's part of the below-the-line items, but really it's strong performance in Alberta pushing cash flow higher. So timing differences exist, along with some below-the-line items, and those affect that differential, if you will.
Maurice Choy
analystAll right, thanks a lot.
Operator
operatorOur following question is from Patrick Kenny at National Bank Financial. You have the floor.
Patrick Kenny
analystThank you. Good morning. Brian, I just want to follow up on the Genesee investment. I'm curious whether there's any update on the carbon sequestration opportunity you have at that site, and when you might have more clarity on the level of government support, both provincially and federally? And I guess, when do you think you might be in a position to sanction the opportunity?
Brian Vaasjo
executiveRegarding the CCS opportunity, we remain engaged with it and are, in fact, growing more bullish. On the development side, our pre-feed study is nearly complete. Overall, the results have been positive, with a modest rise in capital costs, while operating costs and the amount of power required are both coming down. So on balance, that is where things stand. The project economics are getting better. Naturally, we then proceed to a feed study, which we anticipate running through next year. The earliest point at which we would sanction the project — and since we would need government support, along with a clear signal of that support, before we would move to approving the project and proceeding — we would expect that to come late next year or early in 2023. As for government activity, the Alberta government is advancing the hub concept and is examining various parties to deliver carbon sequestration hubs. Based on what we have observed and the parties we have spoken with, that is progressing quite nicely. The other area is the federal government, and from our standpoint talks keep going well with the Canadian Infrastructure Bank, and the — putting in place something along the lines of 45Q was flagged by the federal government before the election as something they would be pursuing.
Brian Vaasjo
executiveWe therefore look forward to learning what comes next regarding that development. Numerous parties have been giving them feedback on how it ought to be structured. Still, once we assemble all the components, our view remains that CCS is certainly economical for Capital Power on top of Genesee 1 and 2.
Patrick Kenny
analystGreat, thanks for that context. And then, perhaps regarding C2CNT as well, do you still anticipate receiving board approval for the carbon conversion project by yearend, and could you give us an update on how the technology keeps proving out since the most recent update?
Brian Vaasjo
executiveConsidering when the Board could realistically grant approval for that project, it wouldn't occur prior to the close of this year. As for how the technology is progressing, work carries on, and the real development effort keeps advancing quite favorably. Testing of the carbon nanotubes in relation to cement has been proceeding, though at a slow pace, and in a strongly positive direction. I would describe us as being 3 quarters, or 2/3rds, of the way through. The obstacle we've encountered — and I believe I've mentioned this previously — is that a remarkably lengthy regulatory procedure exists for securing approval of each individual carbon nanotube as a new material, and that demands thorough analysis and description of not just the process but also the mediums, such as for distribution, inside a material, and so forth. So we must be nearly finished, for instance, with our cement exploration and development. At that stage, we then commence what is essentially a process of at least 1 year to obtain approval. And we can plainly construct a Genesee carbon-conversion facility during that period. Thus, as long as the exact product hasn't been finalized, this simply keeps causing us delay in constructing the Carbon Conversion Centre.
Brian Vaasjo
executiveThat gives you a broad picture of what we're examining and where we anticipate the project heading.
Patrick Kenny
analystUnderstood — that's useful, thanks Brian. Then one final question from me, perhaps directed at Sandra, regarding the DRIP suspension. Would you characterize this as a more lasting halt — meaning that even if, for instance, you locked in the $500 million of committed capital projects for 2021 within the coming couple of months, you still wouldn't have to reactivate the DRIP at that stage? Or is it instead a shorter-term switch-off, lasting only until you manage to secure a couple of additional developments?
Sandra Haskins
executiveI see this more as a sustained turn off of the DRIP at this point, Pat. So when you look at the capital that we raised, the equity we raised this year, as well as the contributions that we'll receive from the DRIP, it does equate to the amount of equity that we indicated we would need for the $1.7 billion of projects that are currently under development. So we've achieved that, to the extent that we have growth. We're seeing strong cash flows, very strong credit metrics, feel that we would be able to fund development. If there was an acquisition of any size, that would need equity, we would probably look to approach the market with an offering for that. So, go forward with a bit of a story with respect to it. So at this point in time, don't see the need for incremental funding or incremental equity from that, in that regard. So see it as being a sustained turn off of the DRIP.
Patrick Kenny
analystAll right, that's excellent. I'll rejoin the queue now. Thanks.
Operator
operatorOur following question is from Rob Hope at Scotiabank. Your line is open.
Robert Hope
analystHi, everybody. On your view of the gas market and how you handle that exposure, could you remind us where things stand with gas procurement, and how you see rising gas prices affecting operations for the remainder of this year and on into 2022?
Sandra Haskins
executiveRegarding 2022 — the remainder of this year — as well as stretching into 2023 and considerably into 2024, a substantial share of our gas has been hedged, or essentially all of it over the near term. There's been considerable volatility, as you pointed out, and we've largely removed that risk by hedging it out materially. So we're focused on optimizing our fuel and the coal burn as the mine plan gets optimized while we wind down in 2023 — looking to lock down those positions and close out that exposure.
Robert Hope
analystOkay, thank you for that. Then, just to get a bit more perspective on the situation. We are observing certain cost pressures when it comes to renewable power development projects. As you consider that next phase of growth, whether it involves that $500 million, how are you approaching bids for those projects, given the possibility that additional or sustained cost pressures could emerge?
Brian Vaasjo
executiveSo when we evaluate the different projects, that certainly factors in. The biggest cost pressure right now, without question, is on solar. Wind doesn't face the same kind of cost pressure. There is a bit, but it's not the case — again, producing solar or manufacturing solar panels and so forth is mostly done in Asia at this point. So it takes a hit from both rising commodity prices and transportation costs, which are far higher than they used to be. So when we go into projects and think about cycle-time, we're careful on the solar side, and we definitely take into account where costs are headed. But I'd say that with what's happening today, we're beginning to see the curves come down. We're beginning to see transportation costs tick down. We're beginning to see some of the commodity costs, or the forwards, come down. So we expect this to be a fairly short-term swing in pricing and transportation costs. So how far out a project's procurement is can definitely affect how cautious we are in the bidding process.
Robert Hope
analystThat’s great. I appreciate it.
Operator
operatorMark Jarvi from CIBC Capital Markets has the next question. Go ahead, please.
Mark Jarvi
analystThanks. Morning, everyone. Perhaps returning to the Genesee repowering, could you share anything about how much of the costs have been locked in so far?
Brian Vaasjo
executiveI’m not able to give you one. I’m simply making an attempt here. No figure comes to mind. That said, we’ll discuss it thoroughly at Investor day, so we’ll make a point of addressing that piece too—unless you’d prefer that we get back to you with a number.
Mark Jarvi
analystNo, I'm just — I'd figure at this stage, with those big lead items, you're sort of committed already, having put $100 million into the quarter. Is what's left just continuing labor expense and balancing the plant? I'm just wondering where you might still carry some exposure to variable costs or items that aren't fully priced in yet?
Brian Vaasjo
executiveThere would still, of course, be some material that's being procured. But the major elements have certainly been procured, and the costs for those have been established, so I don't see much in the way of forward cost pressures on those materials.
Mark Jarvi
analystUnderstood. Now, circling back to those Alberta solar projects and the higher costs — any thoughts on how much that dents returns, whether they still clear your hurdle rates, and whether they end up as assets you'd consider for the sell-down strategy if the returns look somewhat compromised?
Brian Vaasjo
executiveWhen we evaluate projects and work through them, we keep in mind the possible sell-down approach tied to each one. That said, looking at those 2 projects, both had some headroom on returns above our hurdle rates, given how they're developing now and where we expect them to land on cost. They'd come in, I'd say, modestly under our hurdles, but certainly above our WACC. So they're not — no erosion or shareholder value is tied to those projects, as they stand today.
Mark Jarvi
analystUnderstood — that's useful, Brian. Then one more thing on Island Generation, mainly the medium-term remarks, but also, I think, drawing attention in the MD&A to the book value you're carrying at <<inaudible>> and a few of the policy shifts BC Hydro is examining around the timing of gas-fired generation. If those assumptions hold, could you land a 3 or 4 year contract? And at that stage, Ireland likely has to be decommissioned and shut down — is that roughly what they're trying to lay out for us there?
Brian Vaasjo
executiveA lot of this really hinges, clearly, on what happens with BC Hydro and how matters develop broadly regarding electricity supply or capacity on Vancouver Island. We remain firmly of the belief—and nothing presented so far indicates otherwise—that our stance is right about the necessity of Island Generation to meet Vancouver Island's capacity needs. This view of ours is in fact backed by what BC Hydro has put out. Their plans include no capacity additions for the island, or on it, before 2033. That need over the longer horizon therefore persists, so our perspective hasn't shifted much. The BC government's recent signals concerning the phasing out of natural gas, and similar matters—that is a position that remains open for comment, and we figure that as the resource plan process at BC Hydro unfolds, things will become evident, and we are confident that within those plans they anticipate brownouts occurring in BC, or on Vancouver Island, since capacity is lacking. That amounts to poor planning, and it isn't obvious to the people living on Vancouver Island.
Brian Vaasjo
executiveWe still believe that, ultimately, a 10-year contract is where we'll land, even though various viewpoints are emerging from the government. Our view remains that sound planning will win out in the end. A 10-year contract will happen, despite the most recent signal from the BC government about shifting away from natural gas for power generation, which would come with an 8-year contract. So we remain quite optimistic about the backend. And certainly, the absence of reliability that we see with those undersea lines, I think, is growing very clear. And one thing that, I suppose, is now widely known is that the work BC Hydro is performing on the lines does not add any capacity whatsoever. It only enhances reliability. So, once more, the requirement for more capacity, or the capacity of Island Generation, remains just as it has always been.
Mark Jarvi
analystThanks for that background, Brain. Perhaps just a single brief question in addition. And should you receive that IRP—or the revised or final IRP gets submitted during this year—at that moment, do you believe you'd be able to listen, will they come to the table and reach an agreement, or would negotiations stretch us into mid-2022 before an actual resolution on Island Generation is achieved?
Brian Vaasjo
executiveRegarding the medium-term contract, that ultimately becomes a negotiation process that could very well stretch into next year. Much depends simply on how those talks proceed. I'd characterize the discussions as positive, though they're infrequent at present. So we'll see how things develop. As you can appreciate, we're prepared to move forward in negotiations at whatever pace. We aren't the ones setting that pace. As for whether any further expansion happens, that won't occur until the IRP is approved or modified by the BCUC, which probably isn't expected until at least a year from now. So that's the point at which a further extension to be negotiated might begin taking shape.
Mark Jarvi
analystUnderstood. That covers everything on my end. Appreciate you answering my question.
Operator
operatorOur following question is from John Mould at TD Securities. You have the floor.
John Mould
analystThanks. Morning, everyone. Perhaps I'll begin with that $500 million goal for growth in Canada — we're 10 months into the year, and I'm not sure an announcement can come before year-end. What's made it difficult, I suppose, to get nearer to that target? Is it that you're staying very strict about your return targets? Is it that opportunities have turned more competitive than you'd hoped? Have you come across some gas-fired deals that could have made sense but showed some kind of hesitation because of ESG considerations? Could you give us some color on the growth targets?
Brian Vaasjo
executiveJohn, we tend to stay firm on our hurdle rates. Because we're nearing year-end and so forth, we don't loosen them. As we've said all along, that target exists out there—if we reach it, wonderful. If we don't, it simply means no opportunities looked right for Capital Power. That has occurred previously, when we fell short of the $500 million target. From where we sit, that's acceptable. Over the longer term, our average has been $700 million annually, despite that $500 million target. So it balances out, and last year came in well above $1 billion—almost $1.7 billion, in terms of meeting that $500 million target. So we're not bothered, and we feel no pressure that we must go do something. As for what we've observed, we've reached second rounds on both renewables and natural gas opportunities, so the market exists. But that deal flow certainly doesn't. On the natural gas side, there have definitely been fewer opportunities than we've historically seen in a calendar year, and similarly, from a renewable M&A standpoint, opportunities have been fewer.
Brian Vaasjo
executiveOn the development side, we remain quite busy, and honestly, that's where I expect a substantial share of our future growth to originate—through actual development opportunities rather than M&A-type ones. It's simply a function of how the market is evolving and where we can create value, which is on the development side—particularly in wind or solar—and not on the M&A side.
John Mould
analystAll right, that's helpful, thanks for the background. Maybe we can return to the Genesee repowering and CCUS plans. The federal government campaigned on net-zero electricity by 2035. So if that goes forward, it implies there most likely will need to be CCUS in place of Genesee for it to run beyond that. And you've noted that the CCUS initiative of that project needs government support. So if that support isn't the magnitude that you're hoping for, do you see a path to recovering some of those costs in the power market over the long-term, given the lack of any real technological alternative to gas, absent some revolution in long-term storage or commercialized small nuclear? How are you thinking about the repowering project overall in a case where the CCUS funding picture doesn't pan out the way, you and really industry overall in Alberta is holding.
Brian Vaasjo
executiveWhat I'm saying is that if you set CCUS aside, the reality is the technology isn't available, and neither are the policies outside of Alberta, that would make it technically feasible at all to get rid of natural gas by 2035. You've seen the recent study from the ISO in Ontario, which concludes that being off natural gas by 2030 is simply not practical in any way, shape, or form. And then consider what it might look like and when you could actually be off natural gas. I believe you'll find that this work will indicate that probably beyond 2035 is feasible in Ontario, where natural gas makes up a considerably smaller share of the total energy mix. So in Alberta, it's simply not practical when you look at government statements about being — even off coal by 2030. In Canada, through the equivalency agreements, there is acceptance of that, and there will be coal plants running in Canada past 2030. So once again, there's a practical dimension to any of these statements. And there appear to have been productive discussions, not just in Alberta but throughout Canada, regarding what is truly a practical solution, aggressive solutions going forward from a carbon mitigation standpoint.
Brian Vaasjo
executiveYet the right approach differs from one province to another, and up to now the federal government has honored that. That is once more the reason the agreement allowing the tier program in Alberta stands and will remain in place, since it must meet federal objectives in a manner that differs for Alberta and fits Alberta, much as equivalency agreements exist in most other provinces.
John Mould
analystAlright, thank you very much for providing all of that background. Then perhaps just one accounting point of clarification for Sandra regarding the Genesee 2 outage. Specifically on the timing of the business interruption insurance and what the final claim amounts to before that unit comes back into service. Do you anticipate being able to include that amount in your 2021 AFFO, or could it be that this remains unresolved by the point when you report your Q4 results?
Sandra Haskins
executiveWe think we can reflect this from an accounting standpoint. The amount needs to be reasonably certain. If that holds true, then you're able to accrue the full expected figure or some portion of it. That said, at this stage the insurers have confirmed this is a recoverable event, so that's step one. Step two is simply settling on the amount. The tricky parts there involve modeling what your results would have looked like absent an outage and comparing that against what you actually delivered. It also examines things at a portfolio level, so it's not merely the loss tied to the asset — to the degree that other assets in your portfolio can capture some offsetting benefit from the outage occurring, that factors in. So it's a challenging modeling exercise, but we've already begun it on our end, and so has the insurer. We see it moving along fairly well. Our expectation, then, is that by the time we reach year-end, we'll be positioned to accrue it, much like we did on the property side during this quarter.
John Mould
analystAll right, that's good. I'll stop right here. Thanks so much.
Operator
operatorOur following question is from Ben Pham at BMO Capital Markets. You have the floor.
Ben Pham
analystHi, thank you. Good morning. I had a couple more follow-up questions. Regarding the gas price, you said you're hedged in the near term. I'm wondering whether you've revised your longer-term gas price assumptions here when modeling Genesee 1 and 2 or any better facilities in the province?
Sandra Haskins
executiveSo yes, as we model power and gas prices, those get updated constantly whenever the fundamentals shift. So like other third parties, we see natural gas prices staying higher for the next year or two before they begin to decline. But we do see that it's probably higher than it would have been at the start of the year, even out at the back end of the plan. But that's something we keep refreshing in our modeling.
Ben Pham
analystAll right. So at some point you're factoring in $2 — are there any other models?
Sandra Haskins
executiveThere was a moment when we were looking at natural gas at just above $2, I believe, as we headed into this year. Yeah.
Ben Pham
analystSo then, would it be fair to assume that when you're projecting those gaps, you generally rely on outside parties to do so?
Sandra Haskins
executiveYeah, we definitely review a number of forecasts from third parties, and we also develop our own internal perspective on that, but the main thing is looking at forwards along with other fundamental forecasts from third parties.
Ben Pham
analystAll right. And regarding a few of those UK-derived <<inaudible>>, I’ve gotten a handful of questions from other people that, I mean, with a project such as Strathmore, you’ve already put a lot of CapEx into it. But with something like Enchant, you’ve spent only around $6 million or so. You’ve got the contract on that. I mean, technically, can you actually walk away and shelve that project, or is it pretty much too white, given <<inaudible>> the contract?
Brian Vaasjo
executiveSure, walking away is absolutely an option, though there are penalties that come with that. So even setting aside walking, or even setting aside those penalties, deciding to shelve that project would be a difficult call for us. Put simply, as I mentioned, it still sits above our WACC. You could push it back, you could take other steps to soften some of the cost exposure, but no, in our view it remains a viable project.
Ben Pham
analystAlright, fine, thanks a lot.
Operator
operatorOur next question is from Andrew Kuske at Credit Suisse. You have the floor.
Andrew Kuske
analystThanks. Morning. I suppose what this really centers on is the Alberta electricity market, and it's now approaching 11 months since the new market design took effect. Could you shed some light on how conversations with counterparties have shifted, both among those already involved and in terms of how well they grasp the market? Perhaps the things you were explaining to them 12 months back that they weren't entirely convinced about — what has the sentiment been from customers, and how willing are they to sign longer-term contracts within the province, or to accept greater spot exposure?
Brian Vaasjo
executiveSo Andrew, the dynamic here is quite fascinating. What makes it fascinating is that, if you consider players who’ve operated in Alberta for many years, the real novelty isn’t what’s happening right now—this actually takes us back to how the power market looked before 2014, going into 2015. So these are people who, once again, were at ease hedging their positions and so forth. They’re also examining the future balance of supply and demand and anticipating where electricity prices will head. This feels more like a return to normal, compared with the past several years. Those folks keep watching hedging opportunities, they keep watching the forward market, but also, once more, their perspectives on supply and demand—I believe everyone is aware that a substantial amount of supply will be entering the market around the middle of this decade. And so, once again, looking ahead, they form their own expectations. New entrants to the market—people who are only recently seeking power supply in Alberta—I’d say they remain rather hesitant, seeing higher electricity prices, especially given the more recent considerably lower power prices, and they’re trying to work out a bit more of what’s happening. But those with experience, once again, do recognize that this is a comparatively straightforward market, grounded in supply and demand economics, along with inputs like natural gas prices and the rising carbon tax.
Andrew Kuske
analystAlright, thanks for that. Then perhaps regarding the carbon tax—and honestly the credits market broadly—any insights you can share, or a sense of how things look market-wise across different jurisdictions, would be appreciated. But really it's about the appetite among certain customers, or even your own, to essentially purchase credits on the market, or effectively take part in activities that will yield more offsets rather than simply paying carbon taxes directly. I realize this all gets quite technical, but whatever color you can offer would be helpful.
Brian Vaasjo
executiveIf you look back a couple of years and talk about Alberta specifically, the market was very active back then—lots of trading was happening, and plenty of projects and developers were seeking people to back longer-term carbon sales contracts. A lot of that activity has slowed considerably, simply because there's a bit more uncertainty now. And what happens is, if you compare the posted price of carbon today with the market price, there's typically a discount, and it ranges from 10% to 25% depending on when the trades may have occurred. So the market, I'd say, is somewhat more uncertain at this point. And again, because of that, we're seeing somewhat less activity when it comes to people developing carbon credits. But also when it comes to people being willing to necessarily purchase them, because nobody today is going to pay $120 for a carbon credit—a couple of years out, that's just not where people feel comfortable in terms of paying for carbon credits. So again, there is a discount in the market, and as time moves on, higher prices are being realized.
Brian Vaasjo
executiveMy view is that you're going to see the market return through a growing number of activities tied to efforts to find methods for generating carbon credits and to profit from them.
Andrew Kuske
analystAll right, thanks — that’s really useful.
Operator
operatorOur following question is from Naji Baydoun at IA Capital Markets. You have the floor.
Naji Baydoun
analystHello, and good morning. I'd like to revisit a couple of items, beginning with the DRIP, if I may — could you provide a little additional detail on why suspending it at this point made sense, given how long it had been in place? The way I see it, the question is whether this truly signals that development is slowing, perhaps compared with what you were able to source last year, or whether it's more that you anticipate asset sales or other financing avenues covering future funding requirements?
Sandra Haskins
executiveAppreciate it. Look, if you go back to mid-2020, when we switched the DRIP on, at that moment the forward prices we see now weren't visible to us, and we were pushing ahead with quite a few renewable projects plus repowering. So we definitely wanted to be raising equity ahead of that spending to keep our credit metrics intact. Take our FFO to debt with S&P — there's a 17% threshold you have to hit, even during an extended construction period such as repowering. In the past, you might have seen a look-through period during construction where they'd let you dip under your threshold and factor in what the construction would do. That's certainly not what they look for now. So we understood keeping our credit metrics was crucial as we started that construction. And coming through the middle of last year, with Alberta power prices for 2022 and 2023 still well below today's levels, including the DRIP to build up that equity was the prudent call.
Sandra Haskins
executiveWe also talked about the other ways we could cover the equity portion of those projects, and we decided to go with an offering. And as of now, with the DRIP switched off, it will bring in roughly $80 million of funding alongside the $288 million offering. That falls within the equity amount we believed we required. And since cash flows and cash generated internally are considerably stronger than we expected, we simply don't have that need. Our current FFO to debt sits comfortably above 20%. So we're keeping plenty of cushion. So at this point, no further equity is needed for the growth we have, and we even have enough balance sheet strength that if we pursued incremental funding, we don't foresee needing to tap equity to accomplish that. So, leaving the DRIP on was simply dilutive at this stage. So there was simply no reason to turn it on, and it has nothing to do with plans for asset sales or anything else. It's more that the internally generated cash flow is so strong that it removes our need to keep the DRIP in place.
Naji Baydoun
analystAll right, understood—that's helpful context. Thanks, Sandra. Perhaps we could return to Island Generation briefly: Brian, I realize you mentioned that, because of <<inaudible>>, no new capacity build is being contemplated. Still, suppose the re-contracting talks fail to unfold as hoped, or the deal ends up being merely a shorter-term contract—has there been any dialogue with them regarding bringing new generation capacity online sooner as a replacement for Island Generation?
Brian Vaasjo
executiveSo the IRP makes it very clear they aren't considering installing anything — batteries or otherwise — and by the way, battery technology obviously can't match what Island Generation can do, running for 6 months. A battery simply can't do that. So their plan is just to take away Island capacity. I mean, they hold some hopes about lower demand in the province — well, across the province — but conservation efforts on Vancouver Island. On the other hand, they have great expectations around electrification of vehicles and other things. So I don't see demand on Vancouver Island declining. Yet the capacity they historically required, they're willing to abandon. And that's why I'm suggesting that in their detailed modeling, which hasn't seen the light of day yet — we would expect they fully anticipate increased outages on Vancouver Island, whenever there are constraints or problems on the transmission system, and periods of high heat or extreme cold or dry years from a hydro-perspective, all of which create strains on Vancouver Island. I mean, we just don't get it. We simply don't understand how you'd plan for a significant increase in outages.
Brian Vaasjo
executiveRegardless, there's no route of any kind, in any manner, to substitute Island Generation at any point before 2033 — and none exists.
Naji Baydoun
analystAll right, got it. I mean, it seems like eventually something will have to break, in one way or another. So we'll hold off for further specifics on that over the coming months. Thank you.
Operator
operatorThat wraps up our question-and-answer portion. I'll now hand the conference back to Mr. Randy Mah for any closing remarks.
Randy Mah
executiveAll right, since nobody has anything further, that brings this conference call to a close. Thanks once more for being with us today and for the interest you've shown in Capital Power. Have a great day, everybody.
Operator
operatorThat brings us to the end of today's conference call. Your lines can now be disconnected. We appreciate you joining us, and we hope the rest of your day is a pleasant one.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Capital Power Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Capital Power Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capital Power Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.