Capital Power Corporation (CPX) Earnings Call Transcript & Summary

August 2, 2023

Toronto Stock Exchange CA Utilities Independent Power and Renewable Electricity Producers earnings 66 min

Earnings Call Speaker Segments

Operator

operator
#1

Appreciation for holding on. I’m the conference operator. Welcome to Capital Power’s conference call on results for the second quarter of 2023. Just a reminder that everyone joining is in listen-only mode, and today’s call, August 2, 2023, is being recorded. At this point I’ll hand things over to Mr. Randy Mah, Director of Investor Relations. Please proceed.

Randy Mah

executive
#2

Good morning, and thank you for being with us today as we go over Capital Power's second quarter 2023 results, which came out earlier this morning. The second quarter report and the presentation for this conference call are available on our website at capitalpower.com. With me this morning are Avik Dey, President and CEO; and Sandra Haskins, Senior Vice President, Finance and CFO. We'll begin with opening comments and then open the lines for your questions. Before we begin, I'd like to remind everyone that certain statements about future events made on the call are forward-looking in nature and are based on certain assumptions and analysis made by the company. Actual results could differ materially from the company's expectations due to various risks and uncertainties associated with our business. Please refer to the cautionary statement on forward-looking information on Slide 2. In today's discussion, we will be referring to various non-GAAP financial measures and ratios as noted on Slide 3. These measures are not defined financial measures according to GAAP and do not have standardized meanings prescribed by GAAP and therefore are unlikely to be comparable to similar measures used by other enterprises. These measures are provided to complement the GAAP measures, which are provided in the analysis of the company's results from management's perspective.

Randy Mah

executive
#3

You can locate the reconciliations between these non-GAAP financial measures and the closest GAAP measures in our second quarter 2023 MD&A. Before handing things to Avik, I'd like to recognize that Capital Power's head office in Edmonton sits on the traditional and contemporary homeland of many indigenous peoples of the Treaty 6 region and the Metis Nation of Alberta Region 4. We recognize the diverse indigenous communities present in these areas, whose presence keeps enriching the community and our lives, as we continue learning more about the indigenous history of the lands where we live and work. Okay. Now to Avik for his remarks, which begin on Slide 4.

Avik Dey

executive
#4

Thanks, Randy, and good morning. I’ve now been in the CEO role at the organization for three months, and I’m thankful for the warm reception and eager involvement of my colleagues across North America. I’ve also had the chance to meet a number of you in the analyst community, and I look forward to getting acquainted with those I haven’t met yet down the road. A few months ago, in my introductory remarks to my colleagues, I talked about Capital Power setting out on an evolution, not a revolution. A determined emphasis on providing reliable, affordable, and sustainable power generation solutions has been the foundation of the company’s success over the years. Historically, this strategy has rested on a belief that owning and optimizing critical natural gas generation, building new renewables capacity, and delivering low carbon solutions through batteries and applying decarbonization technology to our existing fleet would produce attractive growth. That was, is, and will remain the bedrock of our forward strategy. In the second quarter, an untimely outage had a negative impact on us. We also had a number of developments, and all of them are firmly aligned with our long-term strategy and approach. In the slides ahead, Sandra and I will now discuss these updates.

Avik Dey

executive
#5

To start, the Genesee 1&2 repowering project is a significant and high-impact initiative for our company. In our June 29th news release, we laid out an update regarding a rise in costs and a delay to the schedule. Even with that update, the project remains highly attractive, since repowering will substantially enhance performance and lower emissions. Next, our midlife natural gas strategy keeps producing results, with a long-term contract awarded at East Windsor and a contract extension at York Energy Center, and Capital Power has now locked in extensions and/or expansions at all three of our gas generation facilities in Ontario. That comes on top of two new battery storage awards at our existing plant sites. Together with our current capacity, the company will hold more than 1500 megawatts of capacity in Ontario. On the renewable side, we are continuing to grow solar. We signed a 25-year PPA for our Maple Leaf Solar project in North Carolina, and we have well-positioned solar projects that we are bidding into competition. To boost our competitiveness and support our solar development growth pipeline, we have secured a strategic sourcing solar module contract with First Solar. Notably, this solar PPA, together with the newly awarded Ontario contracts, has lengthened the average remaining contract term of our contracted facilities.

Avik Dey

executive
#6

And finally, our commitment to reducing carbon emissions from our natural gas fleet remains unwavering. We keep pushing forward with decarbonization solutions through the Genesee Carbon Capture Project. Let's dig into the specifics. This stands as a prime illustration of how we lead in the energy transition. The Genesee 1 & 2 repowering project ranks among the biggest commercial-scale efforts of this type. That Repowering Project adds 500 megawatts of incremental capacity, bringing total capacity to 1,388 megawatts — a 63% increase. Beyond that, the pro forma site will gain from an extended useful life for the asset and will produce long-term growth in cash flow. Three powered units are set to see better emission intensity, improved performance, and stronger competitiveness. It will employ best in class natural gas combined cycle technology, carrying a heat rate advantage over every current and announced natural gas facility, which places it low on the merit curve. In late June, we shared an update regarding the Genesee 1 & 2 Repowering projects' scheduling costs stemming from construction delays, and we have revised the commissioning timelines. As the slide shows, simple cycle commissioning will get underway in December of this year for Unit 1 and in March, 2024 for Unit 2.

Avik Dey

executive
#7

Next, combined cycle commissioning for Unit 1 gets underway in April 2024, with Unit 2 following in June 2024. Our plan is to keep co-firing natural gas alongside coal so we stay aligned with the 2024 Repowering Commission schedule, which also safeguards reliability and affordability for the Alberta power grid. Moving to Slide 6, I'll discuss the cost of the Genesee Repowering project. The project's revised budget now stands at 1.35 billion. That represents a net increase of $73 million over the 1.277 billion figure we shared at our Investor Day last December, a number that covered both Repowering and the battery storage addition. What has changed between then and now: a 268 million rise stemming from cost escalations and higher labor costs on the Repowering project. Regarding batteries, we came up with an innovative alternative approach for meeting the MSSC limit, and it secured conditional AESO approval, which lets us save the 195 million by cancelling the battery storage. The upshot is a $73 million increase from the 1.277 billion we communicated at Investor Day in 2022 to the 1.35 billion we communicated at the end of June. On the equipment side, most materials are now on site, and given the progress achieved so far on Unit 1, we have largely locked down the project scope, since what we learn from Unit 1 will carry over to Unit 2.

Avik Dey

executive
#8

That said, industry-wide shortages of skilled labor have put pressure on project costs. We're tackling this by offering competitive packages for attracting and retaining workers, which will lock in the resources required to see the project through to completion. We're also continuing to collaborate with our contractors to get the most out of labor productivity and to tackle absenteeism, and we think this will be effective in limiting any further increases in labor costs on the project. Even with the higher project costs, returns remain strong. Moving to Slide 7 in Ontario, we've taken an active role in ISO's expedited call for new power generation and capacity in high priority areas to help address ISO's forecasted shortfall. We succeeded on five projects bid that will add roughly 350 megawatts of capacity to our Ontario operations, with commercial operations beginning in 2025 for all projects. The successful projects include a 106 megawatt natural gas expansion at our East Windsor facility and battery storage projects at both York Energy and Goreway. The combined costs of these three projects are estimated at 655 million. Contract terms run approximately 15-years for the East Windsor expansion and approximately 22-years for the battery storage projects.

Avik Dey

executive
#9

Beyond that, we completed capacity upgrades of 40 and 38 megawatts at Goreway and York Energy, which led to contract extensions. On the whole, what we have achieved in Ontario keeps confirming that our midlife natural gas strategy works — buying well positioned assets in markets with strong fundamentals, improving, upgrading and expanding the facility, and extending its contracts. On top of that, putting battery storage at existing natural gas sites shows how strategically valuable these sites are and how our incumbent market position can support low carbon growth. Turning to Slide 8, we see appealing solar growth opportunities in North Carolina. As I said earlier, we signed a 25-year fixed price renewable PPA for our Maple Leaf solar project with Duke covering a hundred percent of the output. The project cost is approximately 219 million, with expected commercial operations in the fourth quarter of 2026. We also have three well positioned solar projects totaling 160 megawatts that we are bidding into Duke’s 2023 solar procurement RFP in September. To back our U.S. solar development pipeline totaling nearly 2.4 gigawatts, we have placed our first order for one gigawatt of responsibly produced ultralow carbon solar modules. That will help make the solar projects more competitive, since using US made products will qualify for domestic content under the Inflation reduction Act.

Avik Dey

executive
#10

Moving to Slide 9, we're decarbonizing Genesee through the Genesee carbon capture project. Our technical assessment is now finished, and that includes the feed study, which came back with positive results. We're still pushing forward on the commercial and financing pieces of the carbon capture project. Talks with government entities remain productive, and there's strong backing for this project to move ahead with decarbonizing Alberta's grid. Supportive funding is also available via various programs. Conversations are continuing regarding a carbon assurance mechanism so our project is de-risked against future government carbon legislation. Once that carbon assurance mechanism has been negotiated, a final investment decision will be made. We'll give an update on FID timing as soon as there's a material update in the commercial negotiation. Moving to Slide 10, this morning we announced a 10th consecutive year of dividend growth, with a 6% dividend increase effective for the third quarter 2023 dividend. Across the past decade, we've delivered annual compounded dividend growth of approximately 7%, and our guidance for dividend growth remains at 6% per year out to 2025. I'll now hand things over to Sandra to talk about our second quarter results and the 2023 outlook.

Sandra Haskins

executive
#11

Thanks, Avik. Beginning on Slide 11, I'll go over the financial highlights for the second quarter of 2023. Broadly speaking, second quarter financial results got a boost from a full quarter of MCV, which was acquired in September of 2022. That benefit was partly offset by weaker results in the Alberta commercial segment, stemming from the coincidental unplanned outages at Genesee and Clover Bar, which left us short during stretches when Alberta power prices were high — something I'll go into in greater detail on the next slide — along with reduced generation from our U.S. assets because of mild temperatures and low wind resources. We reported adjusted EBITDA of $327 million, which rose 3% year-over-year. AFFO of $151 million for the quarter fell 16% from a year ago, as the strong adjusted EBITDA results were partly offset by higher current income taxes, which are based on 2022 results, and higher sustaining CapEx. As we've shown over time, our hedging program — backed by the reliable performance of our fleet — has proven highly effective at reducing risk and creating incremental value. That said, in early June, a culmination of events left the portfolio short during high price days, including the highest settle day of the year, which lowered the overall portfolio captured price.

Sandra Haskins

executive
#12

The graph shows how much power Genesee 1&2 generated in June — that's the green area — and the blue area shows what the Alberta pool paid each day that month. As the chart points out, both Genesee 1&2 had unplanned outages between June 5th and 10th. Normally when Genesee is down, our Clover Bar peaking units step in to cover the position. But during that stretch, just one of the three units was available. Meanwhile, Alberta was hitting record high temperatures, which pushed demand up, and tight supply from weak wind output plus outages at competitor plants all helped send power prices higher, as the blue bars show. To cover the hedge position, our trading desk ended up purchasing power at elevated spot prices. All told, that produced a negative impact of 20 million to 25 million on second quarter results. Greater renewable penetration and the broader supply shortfall in the market are going to keep driving volatility until new supply arrives. In June, prices included five hours at the floor and 11 hours at the cap, with daily settles running from $26 per megawatt hour — the lowest in 2023 — to $548 per megawatt hour, the highest in the year, which made it the highest June settle ever.

Sandra Haskins

executive
#13

Ill-timed outages can lead to losses, as we saw in June, but the same volatility pushes prices higher, and that lets us enter hedges at elevated levels. Across the rest of the year, the negative effects of that event are more than made up for by the higher prices our hedging strategy captures. Moving to Slide 13, I'll go through our financial results for the first half of the year. Those results show strong performance in the Alberta commercial segment, where the average realized power price came in at $91 versus $84 per megawatt hour in Q2 of 2022. Adjusted EBITDA reached 728 million, a rise of 9%, and got an additional boost from six months of contribution from NCV. AFFO came to 361 million, down 5% year-over-year, reflecting the impact of higher current income taxes. Now on Slide 14, I'll discuss our Alberta power and natural gas hedge positions as they stood on June 30, 2023. Since the close of the first quarter, our power hedge volumes for 2024 through 2026 have grown. For 2024, the figure rose from 8,000 to 8,500 gigawatt hours, and for 2025 it went from 6,500 to 7,000 gigawatt hours. In 2026, hedge volumes increased from 4,000 to 5,500 gigawatt hours.

Sandra Haskins

executive
#14

For 2024, the weighted average hedge price sits at mid $70 per megawatt hour, and it's low $70 for 2025 and 2026. As another way to manage price risk, the hedge positions include long duration origination contracts. On the left, the graph illustrates how large those hedges are in relative terms, with long duration ones stretching into years where forward power prices will be lower. Since Q1, our natural gas hedge volumes of 70,000 and 60,000 TJs for 2024 and 2025 have stayed the same. And for 2026, we've raised our natural gas hedge volumes from 35,000 to 45,000 TJs. Compared with current forwards, natural gas volumes have been hedged at favorable prices. Turning to Slide 15, as Avik mentioned, five Ontario project bids have been successful for us to fund the equity requirements of the projects. We are activating our drip effective with the third quarter dividend in October. Based on the participation level we experienced when the drip was last used in 2021, we expect to raise approximately 75 million to 80 million per year. We view the drip as a cost-effective vehicle, as it is best suited to raise the smaller size of equity required over a timeframe that aligns with the CapEx spend profile.

Sandra Haskins

executive
#15

Moving to Slide 16, I'll wrap up our comments by going over how we performed across the six months against our 2023 targets. Facility availability averaged 94% during the first half of the year, and we remain on track to hit the 94% availability goal. Sustaining CapEx came in at 73 million for the first six months and is tracking toward its 2023 targets of 135 million to 145 million. Our 2023 financial targets include adjusted EBITDA of 1.455 billion to 1.515 billion and AFFO of 805 million to 865 million. At present we are trending above the mid points of the annual financial guidance ranges. Thanks to Maple Leaf Solar and the Ontario Growth Projects, we have surpassed our 600 million committed growth targets per capital. Cash from the drip will give us a cushion to pursue additional growth, since we keep seeing a pipeline of solid opportunities that fit our strategy. All in all, the outlook for 2023 remains strong. I'll now hand the call back to Randy.

Randy Mah

executive
#16

Alright, thanks Sandra. With that, we're ready to move on to questions.

Operator

operator
#17

Absolutely. We're going to move into the Q&A portion at this point. <<operator_script>> Our initial question is from David Quezada of Raymond James. The floor is yours.

David Quezada

analyst
#18

Perhaps I could begin with a somewhat wider strategic question. You've clearly performed very strongly of late when it comes to growth opportunities in your main hubs. I'm just wondering: as you review your fleet, do any assets strike you as non-core at present, or are there cases in which asset recycling might be an option?

Avik Dey

executive
#19

Appreciate the question. I'd say we're still in the process of evaluating the portfolio. Historically, asset rationalization hasn't really been something we've done, but going forward, as we consider where growth can come from, we'll keep examining ways to optimize that portfolio. Early on, I'm quite encouraged by our core positions — especially those around Alberta, Ontario, Miso, the desert Southwest and TVA — and in all of those regions we see meaningful opportunities to grow around our critical natural gas assets. That means not only expanding near those key assets, but also, you know, building out renewable capacity.

David Quezada

analyst
#20

And then perhaps just one more question from my side. I'm curious whether you could share any current views regarding the possibilities at Midland Cogen, what potential growth might look like there and, I suppose, across that region — how are you approaching expansion in renewables? Particularly, I guess, following your move to secure panels from First Solar.

Avik Dey

executive
#21

So I think we're finishing up the complete integration of MCV into Capital Power, and Miso keeps being a really appealing market for our business. We're also examining growth possibilities in that region as we bring the team in and merge it with our own business development work. So the answer is definitely yes — we're reviewing and assessing opportunities in that area.

Operator

operator
#22

Our following question is from Robert Hope at Scotiabank. You have the floor.

Robert Hope

analyst
#23

I've got a question about how the Alberta power market is structured. So the MSSC — the most severe single contingency limit — stayed at 466, and because of that, you were able to drop the battery project there. But when you look ahead to 2025 and 2026, could you walk us through your thinking on what other market changes might let you get Genesee above 500 megawatts per unit, and would those be different solutions or something along the lines of the fast net demand response that the ISO has proposed?

Sandra Haskins

executive
#24

Appreciate the question. Yes. ISO made an announcement just last night about plans to conduct a review of the market and its characteristics. So we'll be taking part in that. And I think the emphasis there is going to be on examining more closely what the build out of renewables implies and how quickly renewables are penetrating the market and creating a need to look at some of the products that you have mentioned. So expect that over the next few weeks, we will be going through their report in detail and participating in those discussions with the as o on market design and the tweaks that might be needed to make sure we have a reliable and affordable system here in Alberta going forward.

Robert Hope

analyst
#25

Taking a step back to look at this more broadly and conceptually — with Genesee 1&2 going offline in June, and Clover but not Bar unable to provide backup — as you move ahead, those two Genesee units are going to make up a bigger share of your merchant exposure in Alberta. Given that you'll have two larger units facing possible downside scenarios like the one we saw in June, have you given any thought to whether your hedging policy might change?

Sandra Haskins

executive
#26

Yeah, so regarding the hedging strategy, we plan to keep things as they are. As you know, one thing we've been doing is expanding our C&I business so that more longer-term hedges are in place, which would still let us step into hedges for the rest of that portfolio. So I'd say we don't really see a need to alter our hedging strategy itself from what it is and has been previously, even given the incremental megawatts that come from repowering.

Operator

operator
#27

Patrick Kenny of National Bank Financial has the next question. You have the floor.

Patrick Kenny

analyst
#28

Regarding the returns you anticipate from the new development projects, can you share a blended IRR or a cash flow build multiple for the roughly 600 million of growth CapEx in Ontario? And also, on the Maple Leaf solar contract, what return would you expect on both an unlevered and a levered basis, net of tax equity?

Sandra Haskins

executive
#29

Okay, starting with Ontario and that $655 million: on an unlevered basis, those assets are expected to meet the hurdle rates we have contracted for, and we anticipate roughly 20% equity funding to arrive at the levered basis. Turning to actual contributions, on a combined basis we see all of those projects adding somewhere between $55 million and $60 million in adjusted EBITDA, and roughly $65 million to $70 million in AFFO. With Maple Leaf Solar, it does clear our contracted levered hurdle rate, which assumes tax equity funding will be used for that project. Our contracted hurdle sits in that 7% range on a levered basis.

Patrick Kenny

analyst
#30

So 7%, and with the equity being raised today through the drip at, say, a 20% free cash flow yield — I realize growth can be somewhat lumpy as you move along here, but I suppose the question is: why not hold off on sanctioning some of this growth until you're better positioned to fully fund these lower-returning projects from internal sources rather than issuing dilutive equity?

Sandra Haskins

executive
#31

I'd say the equity we're raising relates to the Ontario projects, which are accretive in terms of the incremental cash flow they provide as well as the contract extensions. So we now have contracts running out into the 2040s, where previously our contract length was 2032. So that equity is meant to fund those projects, the expansion projects as well as the up rates, and at a fairly low amount of equity. So we're not looking to fund Maple Leaf Solar through an equity raise, consistent with how we've addressed all of our projects in the U.S. We've built them and constructed them on our balance sheet. And then tax equity is the main financing mechanism there over and above our cash flow.

Patrick Kenny

analyst
#32

Turning now, if I could, to the CCS project. The timing looks somewhat less clear here regarding the FID date — I recall you had earlier aimed at October. Could you give us a little more detail on what is slowing things down in the commercial negotiation process? And perhaps also how much slack exists in the FID schedule so that you can remain on track for that 2027 in-service date?

Avik Dey

executive
#33

Regarding CCS, during my initial three months, I've been tremendously impressed and thrilled to dive deeply into all the technical efforts that have gone into getting the capture solution to a stage where it's essentially ready to proceed. So commercially, we currently have three parallel discussions underway: one involving CIB regarding a loan, another involving CIF regarding backing from the CIF program, and then the most significant and substantive discussion concerning the carbon assurance mechanism with Canada Growth Fund via PSP. We're continuing to hold discussions on all three of those, but as of today we lack a firm date for when those negotiations will be finished in a way that lets us move forward on the capture side toward FID. Regarding the 2027 in-service date, we aren't able to provide a comment on that right now, since the FID decision was, or was initially expected to be, in October of this year, and we don't know whether we'll reach that point given where we stand on the commercial piece — which is the reason that in our guidance we indicated we would offer an update once we'd made material progress commercially. So we remain tremendously enthusiastic about this project.

Avik Dey

executive
#34

Like I said earlier, the parts we can control in this situation, and the amount of headway we've made on the technical fix, are genuinely exciting. So we're still working alongside the government to land on that fix. And every message we've gotten so far has been extremely encouraging, so we'll keep pressing forward.

Patrick Kenny

analyst
#35

And I know you brought up Avik — the pre-feed study has wrapped up. But I'm curious how this recent cost overrun on the Repowering project, and in particular the pressure around labor costs, might shift your capital cost outlook for the CCS project. Should we expect a similar revision of 20 plus percent to the prior $2.3 billion budget, and if so, how would those cost challenges on CCS affect that project's overall returns as well?

Avik Dey

executive
#36

We've clearly taken lessons from what happened with G1&2 repowering before, and I think it's worth pointing out that our FID on G1&2 repowering came in 2020, right as the pandemic was starting. What we didn't anticipate was the shortage of labor, along with the rise in labor costs that would follow, given the point we were at in the pandemic. On this particular project, having recognized that gap as an issue, we've been working actively to mitigate it together with our contractors. Right now we don't have final figures, since we aren't moving to FID at this time, but I'd say all of those things carry some degree of ambiguity. Still, we keep tracking them. The first priority is to get a commercial arrangement finalized. We will not take a project to FID if it fails to meet our return thresholds. And I think the way we settle on a carbon assurance mechanism, and how that connects to capital cost and the risk borne by us and the other parties involved in this project, will all be folded into that negotiation.

Operator

operator
#37

Our following question is from Maurice Choy at RBC Capital markets. You have the floor.

Maurice Choy

analyst
#38

Thank you, and good morning. Perhaps we could begin with the topic of returns. Avik, you said that the returns on repowering projects remain, quote unquote, strong. Although you're not giving a point estimate, might you provide a rough range for what that figure could be? Clearly, the company felt comfortable providing an estimate of lever returns above 20% back at the 2021 Investor Day. So, what are your thoughts on that?

Sandra Haskins

executive
#39

Sure, Maurice, I can address that. You may remember that during Investor Day, we stated that with actual financing, the project delivered a levered return above 35%. That estimate was prepared alongside an assumption of 195 million in spending on the battery. The battery existed purely to satisfy the MSSC requirements. No other value was assigned to it in our valuation—for instance, as a possible ancillary revenue source. So the economics you should examine involve simply comparing the 1.35 billion we announced in June against the 1.277 we had at Investor Day, which represents the all-in cost, battery included. That means you are seeing roughly a 6% or 7% cost increase over that base. Returns therefore remain above the 30-something percent levered figure. Essentially, things are still relatively in line. As a Brownfield project with this level of added generation and carbon tax avoidance, it remains very deep in the money.

Maurice Choy

analyst
#40

Thanks for that, Sandra. And perhaps to follow up on that point, and someone said earlier that you won’t take FID on the CCS project until it hits your return threshold. How would you, you know, weigh your requirements and then the return expectations for a CCS project against this repowering project, obviously a different kind of work, different risk. Would you expect it to come in above 30 plus percent?

Sandra Haskins

executive
#41

No, a CCS project delivering that kind of return isn’t what you’d be looking at. So, as we’ve kind of said, until those commercial agreements and constructs are in place and we understand the risk that will drive the return levels we’d consider, but see it more in line with our merchant hurdle return. So as we said, it’s somewhere in the low double digits, sort of the return that would be consistent with a merchant project.

Maurice Choy

analyst
#42

Now moving to the topic of funding — and to clear up something from an earlier remark, Sandra: once the Ontario projects have their financing in place, do you intend to pause the drip, or might you leave it running in order to cover that $600 million of growth capital?

Sandra Haskins

executive
#43

Right, so as you're aware, there are several levers available to us on the financing side, and we remain quite flexible. At this stage, our view is that the drip across the development timeline for those projects would cover that equity requirement. What we do over the next two years will shape how we set that drip. So it's possible that additional development projects would make it sensible to keep the drip going, though on the other hand, other growth-side developments could emerge that lead to different financing approaches, which may or may not mean the drip needs to continue. So there's no real timeline, in our view — we stay flexible and nimble in how we fund our projects, and we have the chance to evaluate several different paths for funding our growth.

Maurice Choy

analyst
#44

And maybe you could wrap up by talking about your goal to get off coal — clearly that's now been pushed beyond the end of 2023. Any thoughts on when you'll actually be off coal, or how much of this is about preserving flexibility with your coal units in case you don't make the move to combined cycle?

Sandra Haskins

executive
#45

Right, so if we moved away from coal and ran solely on gas during 2024, you'd observe the units operating at a significantly reduced level, along with worries about reliability and affordability. Therefore, we'll keep operating those units the way they do now — base load through blending — and that will carry on until we reach the commissioning timelines for the combined cycle. So there will be a year-over-year reduction in the coal we burn in 2024. As you're aware, Genesee 3 has been fully converted at this point and no longer uses coal, but the remaining units will keep optimizing between the two fuels until that combined cycle commissioning begins.

Maurice Choy

analyst
#46

Would it be accurate to say that combining the co-blending unit with the single cycle might actually give you greater capacity than what you have at present?

Sandra Haskins

executive
#47

Up until those units essentially get to commissioning, things would stay roughly where they are now, and once that happens you'd get more megawatts. So the step up would come as commissioning takes place — you wouldn't see it earlier than that.

Operator

operator
#48

Mark Jarvi from CIBC Capital Markets has the next question. You may proceed.

Mark Jarvi

analyst
#49

Turning back to the talks with the team growth fund about carbon insurance — is this simply taking longer, or do you genuinely feel you may not land a contract that fits your requirements? And are those talks being hindered at all by your position that a higher carbon price is needed to offset the higher cost to build?

Avik Dey

executive
#50

So, I'd say I've now been in this position for three months. We've held quite a few discussions with every party that's involved in the project. And at each stage, the feedback keeps being positive, along with encouragement to move the carbon assurance mechanism forward. So the mechanism's cost has not been the problem. I think it's — as was announced in the federal budget early in the year, the appetite to put something in place exists, it's just progressing toward the commercial arrangement and how you actually negotiate and structure whether that's a CCFD or something else in its place, which is taking longer. So, I stay optimistic that we'll get there. It's simply taking longer.

Mark Jarvi

analyst
#51

If you’re able to tell us about something other than a contract for difference, what alternative structures might you be open to?

Avik Dey

executive
#52

I’m not able to say anything about that at the moment. I believe discussions are underway regarding ways to replicate how the CCFD is structured. I think the central principle in this discussion has been, and remains, how to guarantee policy certainty regarding the value of carbon after 2030. So, in working to address that, the CCFD represented the clearest and most straightforward approach to getting it done. That said, I think alternatives exist, and we’ve observed examples in other nations involving various structures that could bring us to the same outcome, though we are only beginning to look into those at this point.

Mark Jarvi

analyst
#53

And prior to your arrival at the company — I believe this was at the most recent investor day — someone remarked that Capital Power might become a leader in CCS, particularly if you establish yourselves as an early mover through the Genesee project. Where do you come down on that, in terms of how aggressively the organization pushes into carbon capture, and to what extent do you engage with other groups or at other assets throughout your portfolio?

Avik Dey

executive
#54

Well, I think carbon capture and sequestration could be a solution, especially for electricity markets that depend on thermal generation for dispatchable power in many of those locations. So in Alberta, without question, it ought to be a crucial element of the early stages of decarbonization. So I remain excited about it. I have personally been involved in the carbon capture and sequestration business since 2014 and continue to see the genuine benefit that gives Alberta in decarbonizing on an optimal timeline. So we are exploring options to do that, and we will continue to. We were recently granted funding to explore that in Michigan in and around MCV. So, I continue to be excited. But I would say we are also looking at other technologies. However, we are a leader on CCS as applied to thermal generation today. And I think we, in spite of this delay that we are communicating, I think we are still well out in front of anyone else looking to be able to put a shovel into the ground on a material and large scale decarbonization project.

Mark Jarvi

analyst
#55

And then there's some indication that perhaps renewable values—whether that's operating portfolios or development pipelines—have softened somewhat. So I suppose the question is really about the risk-return trade-off between developing assets and buying portfolios. How do you view that for renewables? And as a contrast to that, what are you seeing when it comes to the M&A market for mid-life gas assets? Have valuations shifted at all over the last 12 months?

Sandra Haskins

executive
#56

Mark, on the renewable side, I think what we'd keep doing is pursuing development, since buying a portfolio is a more competitive space for us, and we tend to be able to add value in development that a portfolio doesn't give us. So we would consider portfolios, but our experience has kind of pushed us toward the view that we're stronger on the development side than we are at competing in that market. We're still seeing quite a few opportunities on the M&A side when it comes to Midlife Natural Gas. So we keep evaluating the ones that fit our strategy, and I'd say interest in those opportunities is mixed but has gone up. Valuations are certainly far higher than they would have been if you look back, you know, four or five-years, when sentiment toward natural gas was much weaker, and you're seeing recognition in many markets that natural gas is valued for longer than people originally expected. Because of that, there's somewhat more interest, or interest that's more widespread, but we still see ourselves as very competitive as an operator and as someone who can bring a fair bit of value to those sites through our operating expertise, so that we stay competitive in that M&A sector.

Operator

operator
#57

Our following question is from John Mould at TD Cowen. You have the floor.

John Mould

analyst
#58

Alright, thank you. I believe the majority of my questions have now been addressed, though perhaps I could just touch briefly on the M&A remarks. I'm simply curious about your broader thinking regarding M&A, particularly in light of the secured pipeline you already have established. What are you observing when it comes to development returns compared with what returns on M&A investments might look like? And also, where do you stand concerning your funding requirements, and the fact that you've reactivated the drip in order to fund some of your equity needs for your projects? I suppose the question is whether M&A fits into the potential investment picture at this moment?

Sandra Haskins

executive
#59

Yes. I'd say, John, that M&A remains something we're interested in, and considering how much is going on for us on the development side — our internal capacity for carrying out repowering, plus now adding several projects in Ontario — that pushes us to concentrate somewhat on M&A, since those opportunities are considerably more accretive and do tend to deliver stronger returns. So we've always more or less balanced our renewables buildout against carrying out the midlife natural gas work, which is very supportive to the dividend within our overall strategy. So, as I said, the drip is a cost-effective method of funding for us right now for the development in Ontario, but we keep looking at M&A through partnerships. We do have the ability to bring partners into assets we already own. I've spoken before about, you know, the renewable portfolio being one where we could secure a partner on it and use those funds to keep growing. So I think that simply having that flexibility and those opportunities before us lets us keep looking at those opportunities and be able to execute in the near term, should an opportunity arise that we feel is on strategy and meaningful for the organization, but we stay very disciplined when it comes to assessing those opportunities.

John Mould

analyst
#60

Then perhaps just a single follow-up about your pipeline — a big portion of it, or at least a healthy share, is battery storage. At this point, are those mainly opportunities you're looking to pair with assets you already have, whether on the renewable side or the gas side, or, I suppose, pair with other greenfield renewable development initiatives, or are you considering standalone storage opportunities?

Sandra Haskins

executive
#61

A standalone battery is not something we're looking at. That's right. What we'd be examining is combining it with other assets and leveraging existing sites so that we get greater value, or incremental value, compared with standalone batteries.

Operator

operator
#62

Ben Pham from BMO has the next question. Please proceed.

Ben Pham

analyst
#63

I'd like to begin with a few of your remarks about the funding side. And I suppose you've added roughly a billion of CapEx. It appears that 20% of that will be funded through the drip program, at least through 2025. Could you walk through the other components, the 80%, I assume there's some freak out from there. So investment tax credit? And another question I had regarding some of your comments is, did you say that your AFFO guidance or AFFO expectation is going to be higher than the EBITDA contribution? Just double check my notes.

Sandra Haskins

executive
#64

To pick up on your funding question, Ben — yes, you've got it right that the projects in development when the year began were being fully financed from cash flow we generate internally. So we've added the 655 million in Ontario, and during construction we'll draw on cash flow as well as the proceeds from the <<inaudible>>. For Maple Leaf Solar, tax equity will be the primary piece there, along with cash flow we generate internally. Halkirk 2 is the other development project, and it now qualifies for 30% ITCs in Canada, which would be paid at COD. That means we'd get it at the end of next year. So we're looking at internally generated cash flow, and we'd draw on our credit facilities — a billion available to us — to fund construction, then look at terming out the debt on those development projects.

Ben Pham

analyst
#65

Also, I wanted to verify what I wrote down regarding EBITDA and AFFO. Did I get it backwards, or did I perhaps hear it wrong?

Sandra Haskins

executive
#66

For both adjusted EBITDA and AFFO, we anticipate landing above the midpoint.

Ben Pham

analyst
#67

So on AFFO, are you putting that at 6.5 to seven, with EBITDA coming in below that level?

Sandra Haskins

executive
#68

In Ontario — no, AFFO would come in lower, and that's due to the sustaining CapEx piece.

Ben Pham

analyst
#69

You also brought up future growth opportunities and the idea of potentially extending the dividend reinvestment program. But my guess is that this decision has more to do with timing — specifically, how soon new projects come along. Is that right, in a sense? And then could you perhaps rank the funding opportunities outside of the DRIP? I did hear partnership mentioned, but is there anything else you would consider?

Sandra Haskins

executive
#70

It really comes down to the specific opportunity we're funding. For us, when we're looking at something large like what you saw with MCV, it makes a lot of sense to bring in a partner. Having a partner with a lower cost of capital than ours adds incremental value, and then we get the operating fee for that. So I think that's a good example of where we'd consider a partnership, and also just the sell down of our renewables. We've always kept looking at the chance to bring in a partner, whether it's on a number of assets or an entire portfolio of assets, depending on what our financing needs are. We see that as a way to generate cash flow without having to access the equity market. But we continue to look at whether or not you use a bot deal for a large M&A opportunity as well. At this point, though, we think we've got plenty of other options to fund that as well, and we still have high internally generated cash flow over the next couple years as we continue to see prices remain relatively robust throughout the next number of years.

Sandra Haskins

executive
#71

Again, that will hinge on the opportunity in front of us. And to revisit your question about AFFO to EBITDA, I actually had that reversed. AFFO comes out higher thanks to the ITCs and tax benefits in Ontario. So whereas we'd normally expect the relationship to run the opposite way, your AFFO is elevated because of the tax credits we'd be getting on those battery projects.

Ben Pham

analyst
#72

And maybe that's the final point too, on the funding side. Could you remind us again about the balance sheet — specifically, where EBITDA might peak during this construction period, and what level you'd be comfortable reaching at that peak?

Sandra Haskins

executive
#73

My apologies — are you asking about EBITDA, or about the credit facilities?

Ben Pham

analyst
#74

Are you asking about debt to EBITDA, or FFO to debt?

Sandra Haskins

executive
#75

On FFO to debt, yes — we still have quite a bit of room in that metric for this year. Our FFO to debt sits in the high 20% range, while the threshold is 20%. That's the reason there's no equity requirement for us this year, but looking ahead, you'll begin to see it move back closer to that 20% level; we always keep some cushion so we stay above it. So we remain comfortably above it. With a 20% threshold, which is the three-year average FFO to debt requirement, we're a couple percent above that even at the low point. And as I said, at the moment, during periods of strong cash flow, we're actually nearer to 30%.

Operator

operator
#76

Our following question is from Andrew Kuske at Credit Suisse. You have the floor.

Andrew Kuske

analyst
#77

I suppose this is really a wide-ranging question about the overall condition of the Alberta Power market and, sort of, where you fit within it. What we're definitely observing is far more hours at reduced pricing, yet also considerably more hours at extremely high pricing. And if you examine the forwards along with certain materials in your presentation, you know, we have situations where forwards sit around the low seventies, carbon prices are climbing, natural gas prices are higher — so all things considered, how do you view the market structure's average pricing relative to market volatility going forward?

Sandra Haskins

executive
#78

Yes, thank you Andrew. And I believe that's exactly where our hedging strategy helps, since we can secure prices at favorable levels that more or less carry you through the downturn. So if you consider what took place in June, when volatility caught us on the wrong side, securing prices or holding hedge prices means that afterward in the month, when you've got really strong renewables on the system creating those stretches of low prices, you're in fact collecting your hedge price. So I think we have, we've always lessened volatility by way of our hedging program, but as you point out, we are now seeing far more dramatic hedging, or price dynamics. So I think for us, where our strategy is more or less to maximize our capacity factors and to be capable of running at those hedge prices and simply capturing those peaks with your peaking units is still a solid, solid strategy that will keep working for us. You know, if you consider the Alberta market and, as I mentioned, the ISO now taking a chance to examine the impacts of renewables, they are witnessing the consequences of those in the growth, or the pace of growth, that renewables have experienced.

Sandra Haskins

executive
#79

So I'd expect that inside the energy-only market framework, they're going to want to fine-tune it simply to ensure the market functions properly. Still, the dynamic is definitely different. Another contributor to that volatility isn't only renewables — it's also the shortage of dependable, efficient baseload units, and that gets sorted out down the road as new supply arrives with added capacity from Genesee and the cascade project, both of which are anticipated in the nearer term. As a result, you ought to see the price escalation needed for low capacity factor units begin to ease off.

Andrew Kuske

analyst
#80

Alright, thanks for that. And perhaps to expand a bit on the Alberta power market and what makes it appealing — I’m not sure whether you have any remarks about that recent deal we saw, in which EDF divested part of a wind farm in Alberta, to a private equity purchaser or an infrastructure fund buyer. Do you have any views or observations regarding, you know, simply the market dynamics as well as any valuation context?

Sandra Haskins

executive
#81

When it comes to valuation, I can’t really give you any context there.

Avik Dey

executive
#82

On that point, what I'd say is that with the energy-only market, we keep seeing more interest and more activity in Alberta. And to build on what Sandra said, the greater volatility we're seeing in the market — driven by rising demand, more renewable penetration, and more temperature swings — that volatility adds weight to a medium- to long-term view of increased demand and higher pricing. So I believe that's what's driving the interest in the market. We keep seeing more players come in, looking at Greenfield as well as M&A opportunities. And given that market construct, support for merchant assets is probably greater than what we've seen historically in this market.

Operator

operator
#83

Our following question is from Naji Baydoun of IA Capital Markets. You have the floor.

Naji Baydoun

analyst
#84

I’d like to return briefly to growth and how it’s funded. So, between the Ontario projects and Maple Leaf, total investments of roughly $1 billion are expected over the next couple of years. I suppose, when you consider the North Carolina solar projects you may be bidding on or other developments coming down the pipeline, is the drip sufficient? Does it provide enough capacity to finance incremental growth, or how are you thinking about other projects that might be coming down the pipeline?

Sandra Haskins

executive
#85

Yes, we've got sufficient capacity to consider a project such as Maple Leaf Solar. Again, that's another project that would be financed through tax equity at COD, and our credit facilities give us substantial room. Right now the drip is incremental to what we truly require, and by activating it at this moment we're effectively getting ahead of our financing needs. So capacity exists for those projects, since a substantial portion of tax equity would be providing the financing for those U.S. renewable development opportunities.

Naji Baydoun

analyst
#86

Are you asking that about the remaining trio of solar projects in North Carolina as well?

Sandra Haskins

executive
#87

That's right, yes.

Naji Baydoun

analyst
#88

And is that genuinely where the upside is going to come from, or are there perhaps other markets you're targeting for Greenfield development?

Sandra Haskins

executive
#89

We've always taken an opportunistic approach when it comes to other markets, but quite a few sites we hold sit in that North Carolina region and are prepared on the interconnection side. So when it comes to the sites nearest to being construction-ready, those tend to fall in that area. That said, additional opportunities exist, and we'd keep evaluating them too.

Avik Dey

executive
#90

Right now our pipeline sits at 2.4 gigawatts, spanning more than 30 identified, incited projects located throughout the U.S. in markets we've spent several years assessing. So when we landed that initial gigawatt-scale solar contract, it was really made against our wrist view of that pipeline.

Naji Baydoun

analyst
#91

And perhaps one final question, returning to Alberta and your remark about appetite for additional merchant assets. From where you sit with Genesee—the repowering, and then development perhaps leaning more toward the U.S.—do you feel a need, or do you see further opportunities, to pursue merchant assets in Alberta, or are you reasonably content with the remainder of your portfolio in the province?

Avik Dey

executive
#92

My answer to that would be that Alberta gives us a really solid commercial portfolio. In that market we hold an incumbency advantage, which means we're constantly plugged into what's trading and where the Greenfield opportunities sit, and that's going to keep going. So it isn't a pipeline we're able to switch off, nor would we want to — we'll keep seeking ways to optimize there — but in these other locations we see a huge opportunity for growth.

Operator

operator
#93

Our following question is from Robert Hope at Scotiabank.

Robert Hope

analyst
#94

Yes. I just want to clarify something about Ontario EBITDA and FFOs. When we look at EBITDA-locked FFO, you mentioned tax benefits would be there. Are those sort of front-loaded, or how should we think about the shape of FFO versus EBITDA in that case?

Sandra Haskins

executive
#95

With regard to battery storage and other renewables too, the investment tax credits, or the tax benefits, come in at COD, which means they are weighted toward the beginning. So the figures I would have given you are five-year averages, and as you point out, there would be shape to that.

Operator

operator
#96

That brings the Q&A portion to an end. I'd now like to hand the conference back to Mr. Randy Mah for his closing remarks.

Randy Mah

executive
#97

All right. With no further questions, we'll bring this conference call to a close. Thank you once more for being with us and for the interest you've shown in Capital Power. Have a good day, everyone.

Operator

operator
#98

That wraps up the conference call for today. Lines can now be disconnected. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Capital Power Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Capital Power Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capital Power Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.