Capstone Copper Corp. (CS) Earnings Call Transcript & Summary
February 12, 2020
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone, and thank you for joining the Capstone Mining Corp. conference call on our fourth quarter 2019 results. <<operator_script>> Today is Wednesday, February 12, 2020, and this call is being recorded. At this point I'll hand things over to Jerrold Annett, Vice President, Strategy and Capital Markets. Jerrold, please go ahead.
Jerrold Annett
executiveThanks, and good morning, everyone. I want to welcome all of you who have joined today's call. The press release with Capstone's financial results for the fourth quarter of 2019 has been posted on our website. And for those of you viewing the webcast, we'll be moving through slides, and those are posted on our site as well. Joining me are Darren Pylot, our President and CEO; Raman Randhawa, our Chief Financial Officer; Jason Howe, Vice President of Corporate Development; and Mike Wickersham, General Manager of Pinto Valley Mine. After a few short remarks from us, we'll open things up for questions. Anything said on today's call will include forward-looking information. By its very nature, such information carries risks and uncertainties, and actual outcomes could differ materially from what is expressed today. To learn more about these risks and uncertainties, please refer to Capstone's applicable filings on SEDAR. And last, I'll simply mention that every amount we talk about today is in U.S. dollars, unless we say otherwise. I'll now hand things over to Darren Pylot.
Darren Pylot
executiveThank you, Jerrold, and good morning to all of you. I'd like to begin by drawing attention to what this presentation is titled: Transition Completed to a New Capstone. Things have become more straightforward for us. Two operating mines—Pinto Valley and Cozamin—together produce 20% growth and a 10% cost reduction by 2021. Each offers enormous upside, and our focus is on bringing that to the surface through low-risk capital spending with fast payback. We've removed close to $30 million from our cost structure, and our balance sheet is strong enough to pursue the many organic growth opportunities now in front of us. If you aren't logged into the webcast, we are on Slide #4. On the whole, we finished the year above the midpoint of production guidance. And where C1 costs are concerned, we came in under the low end of guidance. Raman will go into more detail on these results later during the call. I'll walk you through the key advancements achieved at Pinto Valley and Cozamin in Q4 that put both mines in position for near-term growth. Turning to Slide 5 of the webcast. At Pinto Valley, we added some downtime in November to get maintenance work done and to carry out certain modifications at our fine crushing plant.
Darren Pylot
executiveThe reason we chose to do this is that it will allow an operational test to take place in December, which would drive throughput levels past the limits we previously understood. Once we look at where every bottleneck sits across the whole plan, we can then put together the projects or operational adjustments needed to optimize performance. December's results were excellent. We managed 18 days above 60,000 tonnes per day, set an all-time weekly average record of 63,500 tonnes per day, and also hit a record-breaking daily throughput rate of 70,300 tonnes per day. The ore we ran through all of this testing had the normal hardness and normal characteristics we typically see at Pinto Valley. So we are really confident that the data from the test we generate will generate the right projects for us as we aim to lock in that kind of performance at these higher levels. So as a result of the test work completed, we have launched a PV3 Optimization Study that will focus on a series of low-CapEx and quick-payback projects that together will let us maximize performance and cash flows at the operation. We expect to report the results in the second half of this year.
Darren Pylot
executiveWe've already kicked off phase 1 of this optimization, with the approved $15 million upgrade to the shell, which involves installing 2 secondary crushers, screen decks and 2 ball mill shells. This project, with a 1-year payback, is expected to deliver 56,000 to 50,000 (sic) 57,000 tonnes per day in 2021. On Slide 5, you'll find some detail on various ideas we're already exploring, such as blast fragmentation, new tertiary crushers and screens, Vertimills to boost grinding capacity, and additional concentrate capacity in the flotation plant. Turning to Slide 6. For Cozamin, 2019 was a transformational year. Thanks to the excellent work of our exploration team, we've announced some of the best drill results the mine has ever seen. Cozamin is a Tier 1 mine and a cornerstone cash flow asset for Capstone. As I've mentioned before, we've now operated it for over 13 years, and it seems the best is yet to come at this mine. We expect to release an updated mineral reserve and resource estimate and a technical report in Q4 of this year. Development of the 1-way ramp remains on schedule for completion by the end of this year, and the raisebore project is also progressing well and expected to be completed in early spring.
Darren Pylot
executiveI'll hand things over now to Jason, who will provide everyone with a short update on Santo Domingo.
Jason Howe
executiveThank you, Darren. Turning now to Slide 7. Our Santo Domingo project has all permits in place and is ready for shovels. Back in 2019, the Chilean authorities granted us every construction and environmental permit required, plus an approved mine closure plan. Local government and community backing for the project remains strong. The strategic effort to rightsize or monetize our ownership stake is continuing, and once we have more details, we'll share them. Before this quarter closes, we will submit an updated feasibility study that will contain the economic assessment for producing cobalt sulfate, which goes directly into battery manufacturing for electrical vehicles, energy storage and other high-growth applications. Among the notable developments to be covered in the news release over the coming weeks: we recently finished pilot plant and metallurgical test work that confirmed quality concentrate, with copper concentrate above 29% and iron concentrate above 66%. We secured an EPC fixed-price contract for the processing plant, along with firm quotes on mobile equipment. In addition, we reached a power purchase agreement with a major Chilean power company, and we have received indicative water offers from Chilean diesel operators. Now, regarding the coronavirus, novel COVID-19 — it is certainly affecting the global supply chain, as I'm sure everyone is aware, but Capstone's exposure at present is limited, since we have multiple offtake agreements in place with smelters and traders that give us the option to ship to Japan, Korea, the Philippines, and domestically to U.S.
Jason Howe
executivesmelters, or blend them in Mexico. At this point I'll hand things over to Raman, who will provide a quick update on our results.
Raman Randhawa
executiveThanks, Jason. Turning to Slide 8 now. Looking at Q4, our copper output came in at 35.4 million pounds, a bit under what we had expected, and the reason was downtime at Pinto Valley so we could move maintenance forward and run the operational test in December. We closed out the year on a strong note, with 153.4 million pounds of copper in total at a C1 cost of $1.78 per pound payable, which is below our cost guidance range of $1.80 to $2 per pound. Net income came to roughly $13 million, and it got a positive boost from higher revenue, since Q4 sales of 40 million pounds exceeded our production of 35 million pounds. On top of that, our results contained a positive tax recovery of $23 million, which came from recognizing a future tax asset for use at corporate tax pools. Our adjusted net loss removes the favorable effect of that future tax asset. On to the next slide, Slide 9. I'm proud to announce that the -- I'm proud to announce that Capstone has now taken $27.5 million of sustainable annualized costs out of the business relative to 2018 burn rates, which means we hit our target of $25 million to $30 million. Pinto Valley delivered another $2.5 million in Q4, taking their year-to-date total to $15 million and lowering their annual property costs from $230 million to an annual run rate of $215 million, which works out to a reduction in overall site operating costs of about $0.80 per tonne milled.
Raman Randhawa
executiveWe anticipate that our cost per tonne milled will go down even more in 2021 once the secondary crushers are upgraded, and that upgrade is going to boost throughput at the plant. If you look at 2018, Pinto Valley turned out roughly the same quantity of copper while spending $15 million less on OpEx, and that translated into an AISC that was $0.22 per pound lower. Slide 9 also shows that our G&A cost is now the lowest in the industry and leads the sector. At the start of 2019 we shifted to a lean, decentralized operating model, and that cut our G&A, excluding depreciation, from $18 million to $14 million, and for 2020 we're targeting something between $12 million and $30 million, which works out to $0.08 per pound. The focus for 2020 is going to be the capital investments at both mines, and those will in turn lift production by 20% while cutting our costs by a further 10%. With that, I'll hand it back to Darren, who will discuss the catalysts we have coming up for 2020.
Darren Pylot
executiveThanks, Raman. Moving to Slide #10 now. As we look toward 2020 at Pinto Valley, as I mentioned earlier, we've begun a Phase I study of the PV3 optimization, and installation is underway on the first of the 2 secondary crushers and screen decks — that first unit goes in late March or early April at the latest. For Phase 2 of the PV optimization, we'll review the results from that test work in December and pin down those low-capital projects or operational tweaks that can push performance even higher. At Pinto Valley right now, we're also busy finishing the PV4 expansion study for the 100,000 tonnes per day or plus case, and we'll announce it in the second half of 2020. At Cozamin, as I said, we expect a level of confidence that post-expansion production will rise to between 50 million and 55 million pounds of copper and 1.5 million ounces of silver by 2021 and beyond. That confidence keeps growing, since we remain on track to finish the 1-way ramp through the end of 2020. On the Cozamin drilling program, we're still aiming to release an updated mineral resource and reserve by the end of this year.
Darren Pylot
executiveAlso, the revised technical report for Santo Domingo—which Jason referred to, and which includes an economic evaluation of the cobalt opportunity—is almost finished. We anticipate releasing those results very soon. Moving to the next slide, to wrap up, we're quite enthusiastic about what lies ahead for Capstone. When we look at how we intend to grow, our approach centers on disciplined capital spending aimed at raising net asset value per share. We've been quite lucky to find projects requiring modest CapEx with outsized impact, such as the $5 million one-way ramp, which will deliver a 50% rise in copper and silver output at Cozamin beginning next year. The $15 million Phase 1 optimization project carries a 1-year payback and will set Pinto Valley up nicely next year—with greater throughput and reduced costs, as Raman noted. Phase 2 should produce a number of comparable high-impact projects, with the end objective of achieving sustainable performance as we discussed in the December test work. With that, we're ready to take questions.
Operator
operator<<operator_script>> Our initial question is from Dalton Baretto of Canaccord.
Dalton Baretto
analystI find this December experiment at Pinto Valley quite interesting — this optimization plan. Could you describe a bit what went right in December relative to how you normally operate? And then perhaps what has to be done for that run rate to be sustainable? And finally, maybe, just what investment is required, and how much of it, to reach 70,000 tonnes per day?
Mike Wickersham
executiveMike Wickersham here. Appreciate the question. I'd like to begin by noting that December really opened our eyes. Never before at this facility had we witnessed production rates of that magnitude. Two factors were responsible for unlocking that capacity: chiefly, improved fragmentation and blasting in the mine, combined with the value chain uptime and capacity that resulted from nailing the maintenance strategy in November. So when you pair the right funds being generated in the mine with availability and capacity in their existing equipment, you'll get more days resembling the ones we had when we set those records late in that month. The challenge before us is figuring out how to make the value chain perform reliably and more consistently, and that is precisely what our 2020 CapEx investment plan addresses. So looking ahead to 2020, we have a schedule for upgrading 2 of our secondary crushers, along with screen decks to accompany them. We're upgrading 2 of our ball mill shells, and that will place us in a position to run at those higher run rates more consistently, like what we enjoyed in December. This is a year for us to invest and build that capacity.
Dalton Baretto
analystAlright. So perhaps this is my final question. When it comes to the additional capital needed to reach 70,000 tonnes per day and go past that, what's your thinking? How much do you plan to put in? And where will that money be directed?
Mike Wickersham
executiveThanks. What we're going to do is use some time from now until the end of the second quarter to put that plan together and really get a handle on how we can free up more reliable capacity at that rate throughout the value chain. When we operated at those high rates in December, we discovered we have at least one good problem, and that is our concentrate handling was struggling to keep pace with the additional volume. That's one of the areas we know we need to concentrate on. We'll be putting that plan together over the next several months.
Dalton Baretto
analystAll right, that's helpful. Perhaps I could pivot and pose a single question regarding Santo Domingo. Considering all that has happened, beginning with Chile and now given the copper price, is your thinking on the JV process changing in any way?
Jason Howe
executiveDalton, that's not the case. Things keep moving forward just as they have been. Sure, we've dealt with some issues — the protest in Chile and now the coronavirus. Still, I believe we're sitting in a solid position at present, and over the next few weeks you'll get a sense of how far we've pushed the project over the last year. And like Darren mentioned too, with the cobalt opportunity, we're hopeful that it creates a few openings. We're also noticing considerably more interest in the project and in sharing infrastructure.
Operator
operatorThe next question is from Orest Wowkodaw of Scotiabank.
Orest Wowkodaw
analystI just want to follow up on what Dalton asked regarding Pinto Valley. Clearly, during the fourth quarter you had some maintenance downtime so that you could carry out a portion of this test work. Do you expect that to keep going through this year while you're working on this study? And I'm wondering whether we ought to think about or plan for particular maintenance shutdowns tied to this during the first half of the year. And then, building on that, I'm also curious whether there is any variability in the planned grade profile at Pinto this year.
Darren Pylot
executiveOrest, Darren here. The sole downtime we'd factor into the plan for this year would be installing those crushers and screen decks and, obviously, the 2 ball mill shell replacements. We've now scheduled deck downtime into our guidance and forecast. So provided that proceeds according to the plans we've built, you shouldn't expect any additional time. Of course, we haven't replaced those before, so obviously we need to do that in line with our guidance. But that's built in.
Orest Wowkodaw
analystAlright. But Darren, could you perhaps walk us through a bit more clearly whether all of that lands in Q1, or whether it's split across Q1 and Q2? It sounds like throughput will vary somewhat as the year progresses.
Mike Wickersham
executiveMike Wickersham here once more. As you can see, that work is distributed over the year. The first crusher gets installed around late March or early April, and a second unit should show up in perhaps September. The ball mill shells will also be scheduled with a gap of a couple of months between them, and the first one likely starts in June. It's worth noting that a general plant shutdown won't be needed while these installations proceed. These new crushers have an advantage: the installation process has very low impact, since they mount onto the existing pedestals used by our current crushers. So we'll operate at somewhat — slightly reduced rates during the installs, but a full plant outage is not required.
Orest Wowkodaw
analystAlright, what's the planned mining grade for Pinto Valley in this year? And will it fluctuate over the course of the year, or should we expect it to hold fairly steady?
Mike Wickersham
executiveFor this year, we anticipate a grade of slightly above 0.3% copper. Among the years covered by the 5-year plan, this will rank as one of the weakest. That is exactly why 2020 has me enthusiastic. We have this investment program running while we are getting through some of the pit's lower-grade material. Once we emerge from this, we will be in a very strong position.
Operator
operatorStefan Ioannou of Cormark Securities has the next question.
Stefan Ioannou
analystSort of a quick add-on to what Orest asked, on that final point. With the Q4 grade at Pinto Valley sitting at 0.3%, was that mostly just the current grade profile taking effect? Or did you plan around it, knowing November and December would bring downtime, so you didn't necessarily need to push your better grade through then?
Darren Pylot
executiveStefan, this is Darren. That was actually exactly what we expected, and it formed part of the mine plan and the sequencing for the year — for the year that wrapped up last year. And then, just to pick up on what Orest asked. Clearly, our budgeting — the throughput rate we've budgeted sits around 53,000 for this year. So if we — should we hit downtime that runs longer than we anticipated, what we hold in reserve, so to speak, is the confidence that we're now able to run the operation on days exceeding 60,000 tonnes per day. So that's something we have. That test work is something we can carry with us and draw on if needed. There's no doubt about it. We don't yet have the capacity to operate at 60,000 tonnes a day or more across the entire year, since we lack the flotation and grinding. But on individual days we can certainly do so in order to make up for, or push throughput past, what we're guiding and budgeting.
Operator
operator<<operator_script>> Craig Hutchison from TD Bank has the next question.
Craig Hutchison
analystMy question is about Cozamin. I was hoping for some clarity regarding zinc grades as we look ahead to this year and the following one. Clearly, the goal for next year is to move to thicker stopes with higher grades and more copper concentrate. Still, could you help us understand how zinc grades might shape up? Is it reasonable to expect run rates comparable to those we've seen previously?
Darren Pylot
executiveYes, Craig, this is Darren. I believe the main difference is that the zinc grade is coming in below our earlier expectation, since our recovery rates have been significantly better than anticipated. We had anticipated 48% to 50% recovery for zinc, and instead we are achieving between 65% and 70%, which lets us reduce the cut-off grade in the San Rafael zone and mine more zinc than expected. So that explains why the grade is lower, because we are recovering more. And we do expect that most of the zinc will be mined out by the end of this year, because, obviously, once we get into the expansion, we want to replace the zinc with the copper in the mill, so obviously a higher return on copper than zinc. So the plan is to mine as much of that as we can this year and then be mostly off of it going into next year.
Craig Hutchison
analystAll right, great. And then turning to Pinto Valley — I believe your outlook mentioned that the plan of operations permits are expected around mid-year. Are there any other permits still pending? Have you gotten the amended Aquifer Protection Permit back yet, or does that remain outstanding too?
Mike Wickersham
executiveMike here. I'd need to revisit that and verify it. As far as I recall, we've finished securing roughly 4 permits that fall outside the EIS. There could be one or two minor remaining matters involving agencies in Arizona, though everything is moving along without issues.
Craig Hutchison
analystAll right, so there's nothing significant going on?
Mike Wickersham
executiveNope. Our primary emphasis for this year is the EIS.
Operator
operatorThe following question is from Pierre Vaillancourt with Haywood.
Pierre Vaillancourt
analystI just need a quick clarification. Your goal is to reach 57,000 tonnes per day by 2021 — that's the objective you've stated. Given the success you've had, is there any potential upside to that?
Darren Pylot
executiveDarren here, Pierre. Replacing the mill shell and upgrading the crushing circuit will give us the right particle size to get the most out of those ball mills. If we could consistently average 57,000, 58,000 tonnes per day over a year — something we've never done, never even come close to — that would be a huge upgrade. From there, we can look at smaller-capital, higher-payback projects, like Vertimills and the grinding circuit, plus more flotation capacity in the — and grinding — sorry, and filtering in the flotation plant, and look to build on those results. But yes, there's definitely upside, and we believe we can achieve it through low-capital, high-return projects added on to the crushing one we already have.
Pierre Vaillancourt
analystAll right. So my understanding is that the $15 million upgrade you mentioned is the thing that takes you to 57,000 tonnes per day. And in what way does that show up in your unit costs and cash costs?
Darren Pylot
executiveSo, as we said at the beginning, we're expecting the operating cost to drop by another 10%, and that reflects the higher copper production.
Pierre Vaillancourt
analystAll right, so essentially, would it be fair to knock about 10% off the figure you just gave for this year?
Darren Pylot
executiveCorrect. Right. Every dollar we removed from the business this year versus last year can be sustained moving forward. None of that consisted of one-time costs. And we expect it to fall by another 10% from this year's baseline, given the higher throughput and, clearly, the additional copper production that comes with it.
Pierre Vaillancourt
analystYou're referring to a $27.5 million reduction in 2019. Do you have a target for 2020?
Raman Randhawa
executiveAs far as a public target goes, Pierre, we haven't established one yet. That said, we'll obviously keep examining costs further across our Pinto Valley operations. That fits within the 10% cut at Cozamin.
Operator
operatorThe next person to ask a question is Oscar Cabrera with CIBC.
Oscar Cabrera
analystGuys, just to jog my memory on that Environmental Impact Statement you're getting from the U.S. Forest Service — does it involve any increase in size or a shift in where the tailings dam sits? Or does it simply mean raising the height of the tailings dam walls?
Darren Pylot
executiveYes. Oscar, this is Darren. So we're simply examining the possibility of leasing extra land along one of the walls of our tailing dam, and we'll raise that — we'll build that land up higher to hold the tailings. And at one corner of our pit, that lets us push back in the best directions so we can take advantage of the ore. We're requesting some ground around one edge of our pit. Those are the only 2 changes. We aren't seeking to relocate tailings or build any plant equipment or anything else of that kind. It's merely adding a bit of ground around what we already have. So the public comment period has already been held. It's closed. We're now collecting those comments and awaiting a response from the Forest Services. So the large lift on EIS has been finished, which gives us a lot of confidence that we will have everything wrapped up by the end of this year.
Oscar Cabrera
analystAlright, that's useful. And with the situation as it stands and what occurred at one of your — at another company that has a development project, as you work through the questions, has anything raised concern for you, or would anything serve as a red flag that could lead one of these district judges to take a view different from the U.S. Forest Service's?
Darren Pylot
executiveWell, we don't have the complete picture yet, Oscar, and projects always draw some pushback. But what I can tell you is that more than 90% of the comments and support came in on the positive side, both during the town hall meetings and in response to the public comment period. So that's over 90% positive. And I'd note that other projects in Arizona have flipped, where over 90% would be negative. So obviously we employ 600-plus people. We're an operating mine, so it's much different than greenfield projects. And -- but that being said, we are obviously ready and expecting some opposition as there -- as with any mining project.
Oscar Cabrera
analystYeah. No, and it sounds like you're identifying debottlenecking at the mill — the mine doesn't appear to be a constraint for us. Regarding tailings capacity for PV3, what throughput figure are you assuming? And how many additional years would that give you — for the mine, if you proceed with PV3?
Mike Wickersham
executiveSo the goal of that December test, and then what comes out of the optimization work, is to let us use the ore in our PV3 pit shelf at a faster rate. We're permitted to put all of that material into our tailings facilities. What we're trying to achieve is getting it through the plant faster and with greater efficiency.
Operator
operatorAt this point, there are no more questions in the queue. Darren, I'll hand things back to you now for any closing comments you'd like to make.
Darren Pylot
executiveThanks so much, everyone, and I appreciate those questions. We’re grateful for your support. Once again, feel free to reach out to us if you have any further questions. Many thanks, and have a great day.
Operator
operatorThat wraps up this conference call on Capstone Mining Corp.'s results for the fourth quarter of 2019, everyone. We appreciate everyone joining in. You're free to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Capstone Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Capstone Copper Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capstone Copper Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.