Capstone Copper Corp. (CS) Earnings Call Transcript & Summary
April 29, 2020
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone, and thanks for joining the Capstone Mining Corp. conference call on our first quarter 2020 results. Right now, all lines are muted so you can only listen. <<operator_script>>. Today is Wednesday, April 29, 2020, and this call is being recorded. I'll now hand things over to Jerrold Annett, Vice President, Strategy and Capital Markets. Jerrold, please go ahead.
Jerrold Annett
executiveThanks, and good morning, everyone. I want to welcome all of you to today's call. The news release that announces Capstone's financial results for the 2020 first quarter is now available on our website. If you're logged into the webcast, we'll be advancing slides, and those are also available on our website. Joining us on the call are Darren Pylot, President and CEO; Raman Randhawa, Chief Financial Officer; Brad Mercer, Senior Vice President, Exploration and Operations; and Mike Wickersham, General Manager of Pinto Valley Mine. After our brief remarks, there will be a chance for questions. Comments made today on the call will contain forward-looking information. By its nature, this information is subject to risks and uncertainties, and actual results may differ materially from the views expressed today. For further information on these risks and uncertainties, please see Capstone's relevant filings on SEDAR. And finally, I'll just note that all amounts we discuss today will be in U.S. dollars unless otherwise specified. Now, I'll turn the call over to Darren Pylot.
Darren Pylot
executiveThanks, Jerrold, and good morning to all of you. If you aren't logged into the webcast, we are now on Slide 4 of the presentation. For the first quarter overall, we turned out 35.5 million pounds of copper at a C1 cash cost of $2.05 per pound. Consolidated production landed at the low end of the 2020 guidance we gave in January of 140 million to 155 million pounds, and costs came in a bit above our guidance range of $1.85 to $2 per pound. Looking ahead, Pinto Valley's production and costs should improve substantially. Under the mine plan, we expect grades and recoveries to rise, and we have recently secured a significantly lower diesel price. We'll go into more detail on this later in the call, and I'll walk you through an overview of our business activity for the quarter. Now let's move to Slide number 5. I take real pride in how Capstone responded to the COVID-19 pandemic. We moved quickly and effectively, and I believe this experience has made the company stronger in a very positive way. From a business health standpoint, the sharp decline in copper price during Q1 is a good reminder of how important it is to keep a low cost structure. Since late 2018, Capstone has been proactively reducing costs, and as a result we came into 2020 in a very strong financial position.
Darren Pylot
executiveEarlier this month, we said we'd trimmed $32 million from discretionary capital and exploration spending, and we're still on schedule for the 2021 growth targets we've set. Worth noting: both Pinto Valley and Cozamin are set for standout years in 2021. Together, that gives Capstone 20% production growth and a 10% cost reduction. On April 7th, we began a safe ramp down at Cozamin to comply with a Mexican government decree, which was later extended to May the 30th. Under that decree, normal operations can restart on May 18th in municipalities with low COVID-19 transmission risk. Right now, Zacatecas has among the fewest cases in Mexico. So we're taking steps today to get ready for a ramp up to full production by May 18. Slide 6 gives a quick summary of what we've done in response to the recent sharp fall in copper prices. Those lower prices mean roughly $50 million less in expected annual revenues. How did we respond? Along with the $32 million in cuts to discretionary capital and exploration spending, we're locking in spot diesel prices at about 45% below our budget, which provides $8 million in savings.
Darren Pylot
executiveOn top of that, we hedged 50% of our Mexican Peso exposure, made the most of favorable interest rate swaps, and reduced contractor headcount at site. Those actions have delivered an extra $22 million in operating cost savings for the remainder of this year. Taken together, these cost cuts have fully offset the effect of weaker copper prices. Raman will share more on that later in the call. Turning now to a site-by-site update — please move to Slide 7 for Cozamin. Last week, and also back in January, we published high-grade drill results from Cozamin's infill and expansion program, and they rank among the best we've ever seen at that mine. Intersections of 3%, 4%, and even above 7% copper, together with 130 grams per tonne silver, across wide intervals are genuinely exciting. Personally, I can't wait to see what this all means for our mine plan in the years ahead, since there's potential upside to our grade profile. That program now stands at 85% complete and is three months ahead of schedule, with the updated reserves and resources <<inaudible>>. The reserves and resources estimate remains on track for release late this year. If you missed last Thursday's 3D verify webcast, hosted by Brad Mercer, our Senior Vice President of Exploration, discussing the significance of these drill results and the upside potential, please visit our website under events and webcasts to watch a replay.
Darren Pylot
executiveI'm happy to report that Cozamin is a one-way ramp, and the 50% increase in production remains on schedule to be finished by the close of this year. Thus far in 2020, we finished the raisebore 52 days early. We've upgraded the underground electrical substation and installed an extra underground maintenance shop, lifting our maintenance capacity by 50%. Turning to Pinto Valley on Slide number 8. During Q1, Pinto Valley kept probing the operational throughput limits, reaching 28 days above 60,000 tonnes per day, averaging 55,000 tonnes per day for the quarter. That's roughly 5% above the three year average from 2017 to '19, and it's just below our 2021 target of 56,000 to 57,000 tonnes per day. With these results, we're quite confident we're on track to hit our throughput growth targets based on this performance. The first of two secondary crushers and three screen decks are onsite and slated for installation in July. Moving on now to Slide number 9. In February, we published the results of an updated technical report for Santo Domingo, which set out the chance to build a low cost, vertically integrated cobalt business.
Darren Pylot
executiveBeyond our base case copper iron gold project, as the slide shows, both scenarios look compelling, supported by a high grade above 0.8% copper equivalent across those initial five years of mine life. With the cobalt opportunity now identified, fresh doors also open for our strategic process, since we are seeing robust investment interest in ethically sourced cobalt projects within the mining family jurisdiction. At this point I'll hand the call to Raman for a brief update on our financial results.
Raman Randhawa
executiveThanks, Darren. Now let's look at Slide 10 in the deck. During Q1, we turned out 35.5 million pounds of copper, and that landed at the bottom of the 140 to 155 million pounds we originally guided for the full 2020 year, because grades came in lower at Pinto Valley. On top of that, copper sales came to 30.4 million pounds, also weaker, given how shipments were timed at Pinto Valley. Consequently, operating cash flow took a hit of roughly $10 million, equal to $0.02 to $0.03 per share, from one fewer shipment at Pinto Valley plus concentrate inventory building up over the quarter. Switching to adjusted EBITDA, the $11.1 million figure carries a positive adjustment of $9.8 million for unrealized provisional pricing, so we line up with our covenant calculations going forward. On the cost side, as a company we've made additional moves that cut operating costs by $22 million for the rest of the year. That list of operating cost reductions consists of the following: $8 million from locking in a low-price fuel contract for the supplier, $4 million from hedging Mexican foreign exchange, $3 million from contractor reductions, $2 million from renegotiated ocean freight costs, and $1 million from interest rate swaps.
Raman Randhawa
executiveOn cost, the chart at right illustrates how our consolidated C1 costs should fall by $0.25 per pound to under $1.80 per pound as we move through this year. At Pinto Valley, C1 costs should decline to below $2 per pound as the mine plan sequences back into 0.31% copper grade with the higher recoveries that go with it, which works out to a $0.20 per pound cost reduction. Meanwhile, the lower input costs I noted earlier added up to more than $0.25 per pound at Pinto Valley. That takes me to our next slide, Slide 11. As I said, we have a number of operating cost items that are coming in well below our 2020 budget levels. Given the market volatility, we took the opportunity to lock in record low input costs, such as diesel, foreign exchange and interest rates. In my view, the diesel contract is the most impactful move, since it represents around 10% of our operating cost at Pinto Valley. Our budgeted price per gallon was $2.35 a gallon, and right now we're locking in a price of approximately $1.35 per gallon, which delivers $8 million of savings for the balance of the year. The chart on the bottom right shows how the actions we have taken with respect to our operating and capital plans drop our AISC, or all in sustaining costs, to average below $2.20 a pound for the balance of the year.
Raman Randhawa
executiveThat marks a substantial decrease versus where we began the year — a drop of $0.30 to $0.40 for each pound. Now, on the balance sheet. Before COVID-19, Capstone entered this period in a robust financial condition, with a modest ratio of net debt to EBITDA. In this setting of weaker copper prices, we have implemented measures totaling $54 million across capital and operating costs so that we can produce cash flow ahead of growth capital. At present, we face no liquidity issues. By March 31st, liquidity available to us stood at $112 million. During April, as a precaution for working capital needs, we pulled an extra $30 million from the revolver. Because copper prices are lower, our EBITDA has taken a hit, and that has pushed our net debt to EBITDA up to $2.61. Should copper average $2.25 per pound, covenant relief would become necessary for us. Acting proactively, we have begun talks with our lead banks about obtaining covenant relief for 2020, and the early signals suggest the banks were supportive through this volatile stretch. With that, I'll hand things back to Darren.
Darren Pylot
executiveThanks, Raman. Now we're at Slide 12. Capstone has a big year ahead in 2021. Our expansion to 180 million pounds of copper, with a C1 cost of $1.70 per pound, remains on track for next year. That 20% production gain combined with a 10% cost reduction ought to deliver 100% EBITDA growth for the company, assuming copper trades at $2.50 per pound. Moving to Slide 13. At Cozamin we're ahead of schedule on the raisebore development, sitting at 85% complete, and our drilling program is three months ahead. The drilling completed so far will be used to update reserves and resources, with a target of doubling mine life, expected in Q4 of this year. Drilling will pick back up once the government decree is lifted, and the deposit remains open. In the second half of 2020, Phase 1 of our PV3 optimization will involve installing the first of two secondary crushers and screen decks in July. Phase 2 of the optimization work will carry on through the rest of this year, and as a reminder, this initiative will assess a number of debottlenecking steps, targeting low CapEx and quick payback at the operation. Preliminary work on the PV4 expansion is ongoing, though at a slower pace because of COVID-19 restrictions.
Darren Pylot
executiveWe now expect that report in the first half of next year. At Cozamin, with the one-way ramp completion still on schedule for the end of this year, we anticipate post-expansion output rising to 50 million to 55 million pounds of copper and 1.5 million ounces of silver by next year. We had built some good momentum on the Santo Domingo strategic process; however, international travel restrictions from COVID-19 have caused that process to be paused, and it is expected to pick back up once travel resumes. Next slide. To conclude, we are well positioned to withstand the near-term effects of COVID-19. We have kept several levers available to strengthen our liquidity should that become necessary. Swift action to secure favorable input costs, including a 12 month contract for low diesel prices, has lowered our cost structure so that we can produce cash flow. Importantly, our 2021 growth plans remain on track despite the pandemic's challenge this year. We look forward to safely ramping Cozamin up to full production on May 18th, and we will stay vigilant with our strict hygienic protocols. We will keep assessing the rapidly evolving COVID situation and reinstate revised guidance at the appropriate time.
Darren Pylot
executiveHaving said that, we can now begin taking questions.
Operator
operatorWe'll now take our opening question, and it's from Orest Wowkodaw at Scotiabank. Your line is open.
Orest Wowkodaw
analystHello, and good morning. How soon do you expect those reduced costs to show up at Pinto Valley, particularly on the fuel side? Does that begin immediately, or does it take a while to kick in? My second question concerns the covenants. Could you remind us what those covenants are? And with copper priced where it is now, at what point do you think you would technically breach them? Thank you.
Darren Pylot
executiveAppreciate that, Orest. I'll hand things to Raman, because he was the one overseeing the walking in of that diesel contract and, of course, he also has the covenants right there with him. So that question goes to Raman.
Raman Randhawa
executiveSo, when it comes to fuel — as you're aware, oil markets swing a lot. Last week, spot prices — basically, the prices we're discussing are what we're actually paying. That means you essentially see those oil savings directly in the second quarter. Now, regarding the covenants: our covenants are three to one <<inaudible>> on a secured leverage ratio, and the total leverage ratio can be 4 — the key one is three to one. So everything hinges on the copper price. You mentioned $2.25. Right now we're at $2.35. That probably affects our covenants breaching at 3, but around $2.45 we're fine for a quarter. So I think we're talking proactively with the banks ahead of this, rather than betting on the copper price. That's the strategy there.
Orest Wowkodaw
analystMy apologies. But is it your suggestion that it could be tripped as early as Q2? Am I getting that correctly?
Raman Randhawa
executiveYeah, I mean, at present, when you look at net debt to EBITDA, that figure stands at $2.61. So, I think it could trip at $2.35, depending on where copper prices go.
Orest Wowkodaw
analystAll right. Beyond the roughly $50 million still available under the credit facility, are there any additional liquidity sources you can tap?
Darren Pylot
executiveYes. Orest, beyond those, there are other options, and we’ve said this before — obviously, at Cozamin we have a silver stream that is available to us and currently untapped, so a silver stream is indeed something we can use. And also, our biggest shareholders are highly supportive as well. But the immediate liquidity on the balance sheet comes from what we hold under the revolving facility.
Orest Wowkodaw
analystAlright, thanks so much.
Operator
operatorThe following question is from Stefan Ioannou at Cormark. Your line is open.
Stefan Ioannou
analystI believe Orest addressed my primary question regarding the covenants. But I'm just wondering about the delayed shipment, or the absence of — the final shipment at Pinto Valley that was missed during the quarter, was that merely a typical timing matter? Or might we infer between the lines that, with COVID and all else, you're experiencing delays and generally having trouble getting concentrate out of the mine?
Darren Pylot
executiveNo, that was simply a routine matter — ordinary shipping logistics. We aren't encountering any problems with trucking, and there are no difficulties with logistics for reaching the port. Every bit of our sales at present is going offshore, and in Asia they are clamoring intensely for the product. So getting the concentrate out to our buyers poses no trouble whatsoever. And one more remark regarding the covenant: I want to emphasize that we foresee no problems obtaining temporary covenant relief, given that our reduction at Cozamin doubles next year, and the grade profile at Pinto Valley rises as well. Thus, even with copper prices where they are now, beyond the coming two quarters, as conditions shift substantially. So we want to be very clear that the banks truly have no concerns about reviewing our covenants and possibly granting us brief relief founded on the next quarter or two.
Stefan Ioannou
analystAll right, thank you so much — that's great.
Operator
operatorThe next question is from Daniel McConvey at Rossport Investments. Your line is open.
Daniel McConvey
analystMorning, everyone. I have a few questions. Perhaps the first one is for Mike. Specifically on Pinto Valley, you've got reductions in fuel cost and certain other costs there. This isn't a new operation, so how do you feel about sustaining those lower costs this year and, let's say, next year? And are there any sorts of things that will return and create some offsets in 2021?
Mike Wickersham
executiveYes. Thanks for that question. So what I'd say is that in the last year, we came in roughly $15 million under budget. And we plan to build on that result. And what I'm seeing at the moment is that we're benefiting from cheaper diesel prices. We've got a solid project, lower costs for grinding media. We're also cutting PH and attempting to raise our mass pull in the flotation plant, and that helps us save money online. I think the one piece that isn't sustainable is this — when diesel prices rebound, as they will someday, we'll see diesel prices climb again. But what will structurally reset our operating costs and processing is the investment in new crushers and new screens that are more reliable and use less maintenance, labor and maintenance downtime, because we're not maintaining those older pieces of equipment the way you described. So I don't see us getting a sharp uptick back up in our unit costs, with the exception of taking advantage of these commodity prices that are low for something like diesel.
Daniel McConvey
analystAll right, thank you. For the second question, focusing on COVID, I’ll begin with you, Mike, regarding your operation and then Cozamin. If you had to — with social distancing, should an outbreak occur — how hard would it be to maintain your operations while, so to speak, keeping everyone separated? I mean, it’s quite a — at Pinto Valley, I believe there’s plenty of space, but less so at Cozamin. What thinking have you done about distancing? How would you arrange things differently if you had to coexist with COVID for about a year?
Mike Wickersham
executiveYes. Darren, is it all right if I handle this one for Pinto before you?
Darren Pylot
executiveSure, Mike — go ahead with Pinto.
Mike Wickersham
executiveSure. What I'd say is that all of us are gaining a tremendous amount of knowledge as we navigate through this COVID pandemic. Social distancing is going to have to be incorporated into our standard procedures. It has changed how we train haul truck operators, for instance. You don't want two individuals sitting in the cab for 12 hours a day, in close quarters with each other. So we're moving toward something innovative, such as using small amounts of targeted training to teach people how to functionally operate the machine. And then we videotape them to observe their skills and provide feedback that way, without needing someone in the cab. There will still be some people who likely work from a remote setting rather than in the office. And for those who are in the office, we'll be doing all the things that I believe all of us are doing around spacing our office spaces a bit further apart, whether we need automatic doors or even better, copper covered handles on doors, which are microbial toxic to microbes and viruses. We'll be doing many of the things we're doing today on a long-term basis. And one thing I think we'll be doing in the operation is we'll be seeing mask use much more frequently, when we are in close proximity with one another, and we can avoid that close contact.
Mike Wickersham
executiveAs a result, some of the shifts we're making are structural and, in certain respects, permanent.
Darren Pylot
executiveBrad, perhaps you could offer a few brief remarks about how we’re handling COVID and the classes we’re taking at Cozamin.
Brad Mercer
executiveThanks, Darren. Every one of the same safeguards Mike just described for Pinto Valley is in place with us too. Let me also say this about the underground mine — Daniel, I believe you've visited it — it's a large operation. The working zones are spread far apart. Nobody is working shoulder to shoulder. In fact, were you to take a tour there, you would seldom come across people. They are distributed throughout the whole site. For getting personnel into the mine, our buses seat one person in every other row so they stay separated. What matters most from here on, I think, is that we keep enforcing our tight lunch room rules, since that is genuinely where people gather, so as to cap how many are in the lunch room. And for the admin areas, we would likely set up a rotation with a certain number of staff in the office one week and a certain number the following week, meaning they work from home. On the whole, not many people at Cozamin work shoulder to shoulder. We simply need to identify the bottlenecks and the spots where people might try to socialize.
Operator
operatorOur next question is from Oscar Cabrera of CIBC. Your line is open.
Oscar Cabrera
analystThanks, operator. Good morning, all. First off, I hope everyone and their families are doing well and staying healthy. Darren, regarding Pinto Valley, could you possibly comment on the grade profile you see for the rest of this year? And also on C1 cash costs dropping — presumably that has a lot more to do with production on a per-pound basis than with cost. So could you at least give us an idea of what that profile looks like, and going into 2021, please?
Darren Pylot
executiveSure. I'll hand things over to Mike. But real quick, I'll just mention that if the average grade is that — I believe it's just above 0.3% for the year, and we came in below that during the first quarter — then the next three quarters will need to average above it to return to that average. So that's the big-picture macro take on the grade profile. It improves from the first quarter across the next three to reach the average. And we aren't altering our grade versus what we've forecasted. But Mike, if you'd like to add anything on that or on the cost side, please go ahead.
Mike Wickersham
executiveAbsolutely, Darren — thank you. And Oscar, thanks for raising that. Yes, you've got it right. By the time this year wraps up, we'll be back on track with our ore grade. I really don't foresee any issues there whatsoever. During the first quarter, we did a bit of resequencing in the Castle Dome portion of the pit. That won't have any impact on the plan as a whole for this year. What I'd tell Oscar is that in the prior year, we came in 12% over budget on total waste moved. In terms of waste coming out of the mine, we shifted roughly the equivalent of an extra month and a half of material. That sort of productivity improvement opened up additional options and flexibility for us throughout 2020. So 2020 is the year when our grades are low. With COVID on top of it, this will be a genuine test for us. What we gain from it, though, is improved grades across the remainder of the five year plan, and we'll have used the time to upgrade that processing equipment on the component we discussed — the crushers and screens. So 2021 will be a strong year, and we'll close out 2020 on budget where grade is concerned.
Oscar Cabrera
analystMike, if I could just follow up on that, you mentioned the various adjustments being made at your mill. What sort of impact do you anticipate that having on recovery? Put another way, how ought we to be thinking about recoveries over the remainder of the year?
Mike Wickersham
executiveYes. What I’m seeing is that certain parts of the pitfall contain some oxide copper, and those areas were first exposed ten years ago or more. So that does have some effect on recovery. But the biggest opportunity we have is to pull the concentrate produced by the rougher cells harder, in a mass-pull sense. And to do that, we need to debottleneck some pumps and some central <<inaudible>> pipes. Still, that is where we are focused for the next major recovery gain. So I don’t believe recovery will be a problem across the year as we put that plan into practice.
Oscar Cabrera
analystFinally, regarding that $35 million of deferred capital spending — how should we think about the timing of when it comes back? Does it return in 2021, or is there a portion of that deferral that might be dropped altogether?
Darren Pylot
executiveMike, would you like to say something about that?
Mike Wickersham
executiveYes, certainly. In certain instances, we have indeed removed some capital. And anywhere possible, we've cut back on scope. We're being quite forceful about securing only the minimum scope required to achieve the goal, and then genuinely attempting to examine those costs as efficiently as we can. A number of the capital items have been deferred. For instance, a ball mill we had planned to replace this year has been moved to next year. So that expense stays the same. One of our crushers — the third one we intended to install this year — is now going to be delayed somewhat as well. But we'll keep genuinely testing our CapEx plan and attempt to remove anything we possibly can. Again, I believe we're going to see a very, very strong 2021, with the investments delivering better production, better throughput, better recovery over the course of 2020. So we're set up for 2021.
Oscar Cabrera
analystAppreciate it, everybody. And wishing you all the best.
Operator
operatorThat brings us to the end of the question-and-answer session. Mr. Pylot, the floor is yours again.
Darren Pylot
executiveAll right, thanks so much, everyone, for being with us on today's call. And as Oscar said again, please do take care of yourselves and your families. Thanks for spending time with us today, and as always, feel free to reach out to us with any additional questions you might have. Have a great day, everybody. Thank you.
Operator
operatorThanks for joining us, everyone — that brings us to the end of today's conference call. You're welcome to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Capstone Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Capstone Copper Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capstone Copper Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.