Thanks, and good morning, everyone. I want to welcome all of you to today's call. The news release that announces Capstone's 2020 second quarter financial results can be found on our website, and for those of you logged into the webcast, we'll be advancing some slides; joining us on the call are Darren Pylot, President and CEO; Raman Randhawa, our Chief Financial Officer; Brad Mercer, Senior Vice President Exploration and Operations; Jason Howe, Senior Vice President Corporate Development; and Mike Wickersham, General Manager of Pinto Valley Mine. After our brief remarks, we'll open things up for questions. Anything said on the call today will include forward-looking information. That information, by its nature, carries risks and uncertainties, and actual results could differ materially from the views expressed today. For more information about these risks and uncertainties, please refer to Capstone's relevant filings on SEDAR. Lastly, I'll simply note that every amount we discuss today is in U.S. dollars unless otherwise specified. With that, I'll hand the call over to Darren Pylot.

Darren Pylot

executive
#2

Good morning, everyone, and thanks, Jerrold. We're very pleased to share the strong second-quarter results we delivered, considering the current levels of copper and silver prices. It seems nearly every day brings an article about what lies ahead for Green Metals as the globe transitions toward a low-carbon-footprint economy. I'm excited that Capstone is positioned as a responsible, growing producer of both copper and silver. Our growth progress has continued despite COVID-19 restrictions. In fact, during the past six months, those challenges have made our company stronger in a very positive manner, since everyone had to pull together to protect the health of our employees and our business. We've stayed on schedule to hit 20% production growth while cutting costs by 10% beginning next year, and I'm proud of that — it's a commitment we gave the market at the start of this year. If you aren't logged into the webcast, we're on Slide 4 now. In Q2 overall, we turned out 38.5 million pounds of copper at a C1 cash cost of $1.87 per pound; we restored the production and cost guidance we originally issued for the year, and as noted, COVID-19 has so far not had a significant adverse effect on production or costs at either of our operations. So far this year, output has landed squarely within the range we originally laid out, which means we still see ourselves closing out the year at 140 to 155 million pounds of copper, with C1 costs running between $1.85 and $2 per pound. Let's turn now to Slide #5. Back in early April, Cozamin scaled production down so we could comply with the decree from the Mexican government, and since then it has safely returned to running at full capacity as of June 1. Even while operating with just 30% of our workforce during that scaled-down stretch, Cozamin delivered a solid quarter, which let Capstone meet its targets for the first half of 2020. Also important, Cozamin helped out the community around Zacatecas by giving medical supplies and hospital beds to the state and government when they were needed. Our liquidity went from $112 million at the close of March to a little more than $136 million by the end of June, and Raman will give the specifics on the steps we took in the quarter that made our balance sheet stronger while he's speaking. Moving to Slide #6, the second quarter was also quite strong for Pinto Valley. The site kept pushing mill throughput to its maximum, at roughly 54,000 tonnes per day. We also concentrated on flotation performance to spot bottlenecks while the operation runs at high throughput rates. During the quarter, recovery came in at roughly 85% on average, compared with 82.5% in Q1. At $10.86 per tonne milled, property cost is moving downward thanks to better throughput and the savings we told you about earlier this year. To be specific, Q2 runs about 3% below last year's comparable quarter, 2019, and 6% under the equivalent quarter in 2018. That declining trend is still intact. The bulk of Phase 1 work is complete now — including 3 secondary screens, each carrying 20% extra capacity, along with a new secondary crusher that provides 50% more power and a new ball mill shell with added capacity. With all of this in place, we now anticipate reliable mill throughput of 57,000 tonnes per day. Phase 2 of the PV3 optimization project is going to pinpoint further chances to de-bottleneck throughput while also optimizing how the flotation plant performs. The goal there is reaching as much as 70,000 tonnes kilotons on a daily mill rate, together with 85% copper recovery or better. Keep in mind that we hit those performance levels back in December of last year, so our feeling is that it can be optimized — following those PV3 improvements, this rate can be optimized on a daily basis. A release for that study is planned for some point in this year's last quarter. So with that said, I'll pass things to Mike, who will give you a more detailed update on Pinto Valley.

Mike Wickersham

executive
#3

Thanks, Darren. It has definitely been a hectic month for the processing plant tied to our Phase 1 work now in progress; during quarter 4 we will keep going with 6 new tertiary crusher screens being installed, one more secondary crusher will also go in, and the second ball mill shell is scheduled for replacement in quarter 1 of next year. If you turn to Slide 7, you will find photos of these Phase 1 installations that are being finished or were finished in quarter 2, and I am genuinely pleased by this progress; it has carried on in spite of the global pandemic and volatile commodity prices, since Pinto Valley is dedicated to making these targeted investments now to get Pinto Valley assets ready for better reliability, greater capacity and reduced unit costs, so that we can consistently produce strong cash flow in the years ahead; beyond the work in our processing operations, we have also been getting ready for higher production at the mine by growing haulage capacity, adding 4 trucks of the 240-ton class, one extra dozer and an ultra-class loader to our mine fleets. Now to Slide 8. Earlier this week, we announced a plan to boost capital production at Pinto Valley after a successful commercial demonstration phase with jetty resources that lets us recover additional copper from our high grade wastes. The operation will take advantage of historic waste dumps and new material, adding 300 million to 350 million pounds of low cost cathode across the next 2 decades; this is an opportunity to further lower unit costs at Pinto Valley. It creates and sustains new jobs in Gila County and delivers economic benefits in a socially and environmentally responsible manner that comes with this SXEW cathode copper production. As you can see on the estimated production profile graph, cathode could account for 10% to 12% on average of Pinto Valley's total copper production, which is a nice boost given that the copper is recovered from waste currently outside our technical report. We believe this enhanced leaching technology may create further upside, with options to review cut-off grades that raise copper production for both the mill and capital operations as well. Once mining of our PV3 pit shell reserves is done, remember, another 1 billion tons of resource at 0.3% copper still remains, and this new leaching technology may now become a component of our PV4 pit shell study that is due for release next year. On to Slide 9. So Pinto Valley is a 120,000 tonne per day mining operation with a 60,000 tonne per day mill and has a 25 million pound per year SXEW plant tied to it; replacing an operation like this would cost well over $1 billion. We have a 20-year mine life in front of us in the PV3 pit shell, with 1 billion tonnes of resources at similar grade still sitting behind that. Pinto Valley is going to be here for generations ahead. And on this slide, you can see our plan for unlocking value for every stakeholder by building a copper business that is both sustainable and competitive. So at this point, I'll pass the call to Brad, and he'll walk through some exciting developments at Cozamin.

Bradley Mercer

executive
#4

Thanks, Mike. We've moved to Slide 10 now. Back in June, we put out a revised mineral resource estimate for Cozamin, and total measured and indicated tonnage rose by 66%. That's remarkable resource expansion delivered since 2018 on an exploration budget of just $10 million. At this point we're in the process of updating the mineral reserves along with the technical report, and those results should come out in roughly one month. Turning to Slide 11, this shows Cozamin's mill performance between mid-February and June, and the reason we include this slide is to underscore the strong metallurgy we anticipate once Cozamin transitions from a blended ore source to feeding exclusively copper-silver ore. That's the picture we'll be seeing from 2021 onward in the new reserve contained in the technical report when it's published. Take note of the orange box covering 2 distinct mill campaigns processing only copper-silver ore at 3,800 and 4,100 tonnes per day, respectively; we achieved 96% copper and 85% silver recoveries. Those numbers are outstanding for any mine, and while I'm sure some operation out there may exist, I'm not aware of any that can deliver recoveries and flotation like that. On Slide 12, twice during my time at Capstone, Cozamin appeared to be a sunset operation, but we prioritized our targets and worked through the technical obstacles to test them, and in 2016 to 17 the obstacle was the limited underground workings available to drill from and, to a significant degree, restricted surface access owing to the infrastructure, our tailings pond. We resolved both problems, though, by drifting in the mine and by permitting on the surface, respectively. So notice the jump in resources from 2017 to 2018 on the graph. Then in early 2019, we began to suspect that the Mala Noche Footwall Zone had been cut off at depth. Trusting our grasp of this mineralized system and our exploration model, we stepped out and drilled 4 holes 200 meters above what we'd considered a barren zone, and that zone came back with grade and expanded well beyond even what we had expected. So essentially that becomes the foundation of the new reserve moving forward. Note the next step up in resources from that 2019 work to 2020, which was accomplished through, I believe, a breakthrough in our understanding of the geology and the exploration model. Now in 2020, armed with an even stronger grasp of our model, we still see targets, both up and down dip, and more importantly we now believe along strike to the Southeast. I'll return to this shortly; we also see some hanging wall veins that we'd assumed had limited potential now opening up, and those will need testing in the future gain as well. Even with all that, we’ve barely begun to test the many other structures across the property, which you can readily trace by drawing the connections from one historical working to the next over hundreds of years. Now let’s go to Slide 13. If you’ve been to Verify, this will look familiar: it’s a 2D depiction of the key targets I referred to before. In the near term, we’re drilling again to tidy up the boundaries of the existing resource and to fill the gaps left behind when operations slowed during the COVID shutdown. Those are the thick arrows shown on the diagram. But the target that truly gets me excited sits along strike. Look at the oval in the bottom right-hand corner. As we currently understand the system, our model is a set of high-grade lenses stacked vertically inside separate geological blocks. Therefore, once you enter a new geological domain, you must determine whether to search upward or downward for the copper zone; southeast of the current resource, we are now testing a new domain where we know the system exists at a high level in very sparse drilling, but it is zinc dominated. So we’re looking deeper for the key elevation where we anticipate the change from relatively low-grade zinc-silver ore into very high-grade copper mineralization. That is the same mineralization we are mining at present. I’ll now hand the call back to Raman so he can go through the financial details.

Raman Randhawa

executive
#5

Thanks, Brad. I am genuinely enthusiastic about what Pinto Valley and Cozamin can generate in future cash flow through organic growth efforts, particularly with copper prices on the rise. As Darren said, let's move to Slide 14 of the presentation. Darren noted that during Q2 we turned out 38.5 million pounds of copper, which is 3 million pounds above Q1, even with COVID-19 production restrictions at Cozamin. Our C1 cash cost came in at $1.87 per pound, 10% below Q1, thanks to the greater output. Turning to net income. Net income of $4.3 million, or $0.01 a share, gained from a non-cash provisional pricing adjustment worth $13.6 million. Bear in mind that our reported adjusted EBITDA of roughly $13 million leaves out a favorable provisional pricing adjustment of $13.6 that was mentioned, in order to align with how our bank covenant is calculated. Operating cash flow of $45 million, or $0.11 per share, got a positive boost from higher production rates and from receiving $27 million in customer advances on future off take, which strengthens our liquidity and brings down our net debt to EBITDA ratio. These offtake advances are not tied to the Q2 copper price; instead they apply to future deliveries of concentrate volumes, so we carry full exposure to higher spot copper prices. We anticipate delivering the bulk of the concentrate tied to these up take advances during Q3, with the remainder in Q4. Because of the positive $27 million working capital adjustment in Q2, we will see a reversing effect on operating cash flow of about $22 million in Q3 and $5 million in Q4. Throughout Q2, we carried out a set of management actions aimed at further strengthening liquidity and managing compliance with banking covenants, among them the off take advances already noted. Beyond that, we have hedged at opportunistic foreign exchange rates, entered interest rate swaps, and signed a fixed fuel price contract. As of June 30, our liquidity stands at $136 million, including $86 million in cash, which brought net debt down from $188 million to $164 million and cut our net debt to EBITDA ratio to 2.54. With that, we have the balance sheet needed to fund capital investments for the 2021 production growth profile. I will now hand things to Jason for an update on Santo Domingo.

Jason Howe

executive
#6

Thanks, Raman. Slide 15 shows that Santo Domingo sits within a mining district in Region 3 Chile that keeps expanding. Low altitude, nearby infrastructure and proximity to the coast all work in the project's favor. Santo Domingo holds all of its permits, and during Q2 we began a small set of early works so that our environmental impact assessment stays valid. That work sits inside our 2020 budget and is slated to wrap up in Q4. Interest and activity around the project through the strategic sales process picked up in Q2. We have drawn considerable interest in sharing our mutually developing offset infrastructure, which carries an approximate value of $500 million. The Santa Domingo port would rank among the few ports in the area capable of handling Capesize vessels, giving the region added optionality; such an arrangement would cut upfront project capital costs and operational risks substantially while improving project economics. Discussions and negotiations continue to move forward, and we'll share an update as soon as we're able. Earlier this year we also published a PEA covering cobalt production, with a chance to establish a vertically integrated cobalt business in Chile at low cost. Full details are in our February 19 news release; with that I'll hand it back to Darren, who will discuss our upcoming catalyst for the second half of the year.

Darren Pylot

executive
#7

Thanks, Jason. For everyone, we’re now on Slide #16. Looking forward, Pinto Valley and Cozamin are both still on course for standout years in 2021. Together, our growth plans will give Capstone 20% more production and 10% lower costs, and they’re arriving as copper prices rise. In the second half of this year, as I said earlier, we finished a set of upgrades and installations for Phase 1 of our PV3 optimization. The rest of Phase 1 will be finished, as Mike discussed, near the end of the quarter and into Q1 of next year, when the second ball mill shell is delivered and installed. Phase 2 of that PV3 optimization study will carry on through this quarter, and we expect to publish the report’s results by at least Q4 of this year. Remember that Phase 2 is meant to maximize copper recovery and the downstream bottlenecks we have identified. Work also continues on the PV4 expansion study, and that report is now expected, because of COVID, at the end of this year or in the first quarter of next year. At Cozamin, as Brad mentioned, we will release the updated reserves and mine plan very soon, this quarter, and we’re very excited, as you can hear from Brad. We’re very excited about the step-out drill targets and new exploration targets, and we look forward to finishing the one-way ramp on schedule in December. We remain in discussions regarding Santa Domingo’s strategic process and are very encouraged by the strong price environment for copper, gold, and iron ore. As Jason mentioned, we’ll update you on the market and the strategic process as soon as we have significant news there. Next slide. So 2021 is now less than 6 months away, and it will clearly be a transformational year for Capstone, given the large increase in cash flow and growth we expect. So in closing, as I look further ahead into 2021 and beyond, through all of Capstone’s quality assets, we offer significant exposure to green metals such as copper, silver, and cobalt, all with incredible demand potential. With that, operator, we’re now ready to take questions.

Orest Wowkodaw

analyst
#8

I'm still on Slide 8, actually, and something about the Pinto Valley production profile there caught my attention, so I had a question — not regarding the cathode. But does this also represent an update to the concentrate production schedule for life of mine?

Darren Pylot

executive
#9

Mike, perhaps you'd like to handle that one?

Mike Wickersham

executive
#10

Yes, absolutely. What we really wanted to emphasize here is the contribution coming from our copper in cathode, and it's also worth pointing out that this year we're at a pretty low ore grade, roughly 0.306, I believe that's what we're budgeted for. But over the next several years under the 5-year plan, we're at 0.33. So you're going to see more copper coming out from concentrate. And this graph really shows just how strongly this new cathode opportunity contributes compared with that production from the mill.

Orest Wowkodaw

analyst
#11

So would you say this is essentially a reset of the old sulfide mine plan when it comes to the grade profile? And what throughput is this assuming? Is that at the life-of-mine rate of 56 tons or 57 tons per day?

Mike Wickersham

executive
#12

Right now we're in that 56,000 to 57,000 ton per day range. Our PV3 Phase 2 optimization study isn't finished yet. That study is the one that will pin down how quickly and how far we can push mill rates above that 60,000 ton per day level.

Orest Wowkodaw

analyst
#13

All right, so the PV3 study would, in theory, actually raise this profile with higher —

Mike Wickersham

executive
#14

Yes, precisely. That study still holds considerable upside.

Orest Wowkodaw

analyst
#15

All right. So would you say this is more of a transitional kind of production schedule for Life of Mine?

Mike Wickersham

executive
#16

Yeah, that's right, and that's why I think you're seeing that we will revise our 43101 technical report right after we finish this PV3 Phase 2 optimization study. When that work is complete, we'll understand far better what the future holds.

Orest Wowkodaw

analyst
#17

All right, great.

Darren Pylot

executive
#18

Orest, this is Darren, with a follow-up. I realize the technical report that the analysts have is fairly out of date compared with where we stand today, given the enhancements to the mine plan and the optimization of plant throughput. So next year we're going to release a new technical support. And as Mike said, this really amounts to a transition view on production until we get there.

Dalton Baretto

analyst
#19

I’d like to pick up on what Orest mentioned there. Obviously, there is potential in this mine slide you’re showing on Figure 8, and there’s a lot happening at Pinto Valley. You have the lead product, PV3 Phase 1, Phase 2, PV4. So I want to be very clear about what gets included where and what the baseline is. The PV3 optimization study will include both Phase 1 and Phase 2, correct? And give us some scope on what Phase 2 involves in terms of the projects, the CapEx, the timing, that kind of thing.

Mike Wickersham

executive
#20

Darren, if you’re okay, I’ll take that one too. So what we see is PV3 Phase 2, the study due out in the fourth quarter, will help us understand the downstream bottlenecks that are required for us to get to about, on a daily basis, 70,000 ton per day run rates that we enjoyed in December, and deliver average performance across months or quarters that exceeds 60,000. So we’re looking at debottlenecking in our tailings operations, making sure we have filter plant capacity, making sure we have the mine capacity, all those kinds of things. So that isn’t ready yet; we have an idea of what we think the CapEx might be, but we’re not ready to release that until the study is complete.

Dalton Baretto

analyst
#21

All right, but will the PV3 study, when it finishes, follow along those same lines, with PV4 demonstrating the upside? Or does all of that come on top of this?

Mike Wickersham

executive
#22

So PV3 Phase 2 is additional. Please continue.

Darren Pylot

executive
#23

No, that's fine. PV3 Phase 2 is incremental — as we said, it's a series of smaller CapEx projects with relatively short-term payback. PV4, by contrast, is about uncovering the operation's full potential at throughput rates significantly higher than what we're discussing for PV3. So that's the distinction: the PV3 studies focus more on optimizing what we already have through low CapEx projects with quick paybacks, while PV4 addresses what the operation's maximum potential is.

Dalton Baretto

analyst
#24

All right, great. And maybe I could just ask a couple more things. On Cozamin, I understand that next year the plan is simply to concentrate on the copper silver zones. But considering how the silver price has moved so far, and copper has recovered as well, do you intend to begin that more or less right away and start mining those copper silver zones this year? Could that happen?

Mike Wickersham

executive
#25

Darren, if that's all right, I'll handle that question. We are mining the copper silver zone at present, but we also — since we have the mill capacity, we also top up the mill whenever possible with lower grade, lower margin zinc and lower grade silver ore. The moment we — mining isn't the issue. Hauling is the issue. So that ramp needs to be opened up, and it remains on schedule to open in December. The moment that ramp opens, we can raise output by roughly 30% ton each, and then we're off to the races. So yes, we won't be waiting for 2021. If the ramp can be opened early, we'll begin raising production right away, and I think you may see a ramp up over a few weeks, but not much longer than that. We hold a substantial inventory of developed access into the ore body, more than we've ever had, about a year. So that's already lined up, and we're taking steps to bring more equipment into drill and blast; we don't see the mine being the bottleneck at all. And I believe we are fully on schedule.

Dalton Baretto

analyst
#26

All right, great. And perhaps just one final question for Darren. With any luck, we've made it through the toughest of COVID's effects on the copper price, and silver is soaring right now. Your share price has performed really strongly. How are you thinking strategically about the business at this point?

Darren Pylot

executive
#27

Well, when it comes to silver and gold, for that matter, we have, as you said, the resource we've released at Cozamin, Dalton, considerably more silver than before. And we're bringing out that new reserve and mine plan, as Brad mentioned, over the coming month. So that will give us a solid picture, and the market a solid picture, of the new mine plan at Cozamin. As Brad mentioned in his presentation, and if anyone is a tenant verify, we do have some very substantial new targets that need immediate testing so we can grasp the potential upside of copper and silver in targets not yet tested; so we have drills on some of those targets right now, and we will report on them as we get results. But we want a solid picture of the deposit before we understand what we want to do with our silver. Still, we do recognize the prices. We discuss it often, and we will be making some decisions around that. And also, the gold at Santo Domingo. We have a substantial amount of gold. It doesn't provide a lot of — when you compare it with the copper and the iron, it isn't a lot of revenue; so we could use that as a financing mechanism. There are 300,000 ounces of gold there that could potentially be streamed as well.

Stefan Ioannou

analyst
#28

It's Stefan Ioannou here. Are you able to hear me?

Darren Pylot

executive
#29

Yes, please go ahead, Stephan.

Stefan Ioannou

analyst
#30

All right, great. I don't want to keep going over the same ground, but regarding the study schedule for Pinto Valley, I just want to be really clear: later this year we'll see the PV3 optimization study, and then at some point early next year we'll actually get an updated 43101 mine plan, which will cover the PV3 optimization as well as the cathode production items. And then at some later point beyond that, we'll see some kind of additional PV4 expansion evaluation?

Darren Pylot

executive
#31

Yes. You may have that a bit mixed up. It's possible you'll get the technical report — you might get PV4 ahead of the technical report. But yes, that's basically what will happen.

Stefan Ioannou

analyst
#32

All right. All right, that's good. And if I look ahead a bit to PV4, is any work happening behind the scenes, just considering some of the larger infrastructure questions such as tailings or water and that kind of thing? Is that effort underway at this point? Or could you shed any light on roughly where your thinking sits on that?

Darren Pylot

executive
#33

Yes, Stephan, and that is basically what separates the 2. PV3 relies on infrastructure already in place, existing tailings, and getting the most out of it, optimizing it through lower CapEx projects that remove downstream bottlenecks, as Mike mentioned; so we've now got crushing and grinding sorted out. Fine, so how does that impact flotation, and tailings, and so forth. Existing tailings. And taking the constraints off everything with new tailings, a considerably bigger mill, the entire operation freed up, and drawing on all those billion tons of resources that aren't in the mine plan at present and giving both us and the market a picture of how that would look as a PV4 study.

Stefan Ioannou

analyst
#34

Maybe I'll just put it a different way, then. Obviously you're using the resource to drive the PV4 plan, but when we think about that, should we be thinking about the tailings location, sort of? Is that kind of one of the critical paths to making that happen?

Darren Pylot

executive
#35

Absolutely. We have a new location, potentially on our property or on it, and how that would affect things going forward when it comes to permitting. And all of that is being looked at. And yes, that's how you should look at it.

Oscar Cabrera

analyst
#36

I just want to clarify something about your all-in sustaining costs. When I look at the presentation covering the SX/EW increase, you quote $1.40 to $1.50. Then in today's presentation, you have $2.00 a pound. So does that difference between the 2 come from the royalty you have to pay on your partner? Or is there something else in there?

Raman Randhawa

executive
#37

Oscar, it includes some capital as well that's required to build the infrastructure or to upgrade the infrastructure. So sustaining capital is part of it.

Darren Pylot

executive
#38

And it also takes in the partner payment that weren't — under CA, we aren't permitted to reveal those figures at this point; it works. But that's included too, Oscar.

Oscar Cabrera

analyst
#39

All right, and then the next thing — what kind of increase in capacity utilization can this new technology give you? Could you use the whole 25 million pounds? Are you still in testing on it? Is it scalable?

Darren Pylot

executive
#40

Jerrold is probably the best person to take that question. It's his pet project.

Jerrold Annett

executive
#41

I didn't quite hear the question. Could you repeat that?

Oscar Cabrera

analyst
#42

Yes, absolutely. With the chart you presented showing the rise in SX/EW output, what capacity utilization do you intend to run at? Are you still testing, or is it scalable?

Jerrold Annett

executive
#43

Well, 25 million pounds is what the electrowinning plant is capable of, and at present we're using just 20% of that. So it's very scalable. If leaching rates can be raised enough to push the electrowinning plant, then I believe it will be 7 or 8 years before capacity of 25 million pounds becomes a concern at this point. So over the next 7 or 8 years, we're scaling up from 5 million pounds to 25 million pounds.

Oscar Cabrera

analyst
#44

All right, that's useful. And then there are some exciting opportunities at both Pinto Valley and Cozamin. There is a — and in your opening remarks and through the presentation, you mentioned the potential for partnerships at Santo Domingo. You'd sort of touched on those on earlier calls. I'm just wondering whether you have any updates on that and how it can add value for your shareholders?

Craig Hutchison

analyst
#45

Hi, guys. Are you able to hear me?

Darren Pylot

executive
#46

Yes, I can hear you.

Craig Hutchison

analyst
#47

All right, one thing I wanted to ask about is the recoveries over at Cozamin. They really are <<inaudible>>.

Darren Pylot

executive
#48

Operator, I'm unable to hear him.

Bradley Mercer

executive
#49

He stepped away just now.

Jerrold Annett

executive
#50

I believe some technical problem came up all at once, but I'll use this moment to express appreciation to everyone joining this call for spending their time with us, and we're quite enthusiastic about the future here at Capstone Mining. And should you have any inquiries, please don't hesitate to contact any of us. And we hope everyone remains in good health and takes pleasure in the summer.

Operator

operator
#51

This concludes this conference call. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Capstone Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Capstone Copper Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capstone Copper Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.