Hello, everyone. I'm Silvia, and I'll be serving as your conference operator for today. Right now, I'd like to welcome all of you to the Capstone Mining Q3 2020 Results Conference Call. Please be aware that every line has been muted so that background noise won't cause any interference. Following the speakers' remarks, we'll open things up for a question-and-answer session. <<operator_script>> Thank you. Mr. Annett, the conference is now yours to begin.

Jerrold Annett

executive
#2

Good morning, everyone, and thanks for joining us on the call today. The news release with Capstone's 2020 third quarter financial results is up on our website, and if you're logged into the webcast, we'll be moving through some slides. Joining us are Darren Pylot, President and CEO; Raman Randhawa, Chief Financial Officer; Brad Mercer, Senior Vice President Exploration and Operations; Jason Howe, Senior Vice President Corporate Development; and Mike Wickersham, General Manager of Pinto Valley Mine. After a few brief remarks from us, we'll open things up for questions. Anything said on today's call will include forward-looking information. By its nature, that information carries risks and uncertainties, and actual results could differ materially from the views expressed today. For more detail on those risks and uncertainties, please refer to Capstone's relevant filings on SEDAR. And last, just a note that unless we say otherwise, all amounts discussed today are in US dollars. With that, I'll hand the call over to Darren Pylot.

Darren Pylot

executive
#3

Thanks, Jerrold, and good morning, everyone. First off, I want to draw attention to the front page of the presentation, which features Abel Gonzalez, our General Manager at Cozamin. Given the best overall cost performance in the history of that mine's operations, his photo belongs right there on the cover — great work at Cozamin. Turning to Slide 4, I'm really pleased with what we delivered in Q3: 38.5 million pounds of copper at a C1 cost of $1.82 per pound, which keeps us solidly on track toward our annual guidance. At Pinto Valley, the numbers reflect a quarter in which we concentrated on moving Phase 1 of our PV3 optimization forward, along with planned downtime in July to install the first of two secondary crushers and the first of two new ball mill shells. On top of that, July gave us a chance to catch up on maintenance that had been deferred from the spring because of COVID-19 restrictions that limited contractor access to our site. C1 costs at Pinto Valley came in at $2.38 per pound, reflecting the higher level of contractor activity we had during July. Following those upgrades, operating performance has been very strong, with September throughput of nearly 58,000 tons a day at 86.5% recovery.

Darren Pylot

executive
#4

At Cozamin, as I said earlier, the mine delivered an outstanding quarter — 10.6 million pounds of copper at a C1 cost of only $0.36 per pound. What stands out to me about those results is that they were achieved before the mine expansion, which will factor in higher grade as well as more tonnage from the new mine plan beginning next year, after our one-way ramp is finished in early December of this year. Moving to Slide number 5, we are observing some highly encouraging trends when it comes to Capstone's safety performance. I credit this to our values and action program, put in place in 2018, which launched a committed, positive, and open safety culture that every employee shares, from the top down. Our focus has been on bolstering management, particularly in key risk areas. During this year, we brought on a Director of Environment Health and Safety, along with a Director of Technical Services whose focus is tailings and water at our sites. Across both of our operations, a leading-indicator system has been put in place, letting management examine data and seek out risk mitigation steps that prevent safety or environmental incidents. We are also turning to technology as a way to enhance safety.

Darren Pylot

executive
#5

Take Pinto Valley as one illustration: there, a system for tracking fatigue has been under trial, letting us watch operators of mining equipment for indications of tiredness. Capstone is also set to issue a sustainability report covering 2020 during the next year, and until then, an interim report on performance data covering 2018 through June 30, 2020 has just been released and can be found on our website. Turning to Slide 6 now, Capstone has had an exceptionally fruitful year, which the roster of goals and objectives we have finished makes clear. A central theme is our readiness to experiment with new technologies and form new partnerships. Thanks to this, I think we have uncovered remarkable value over the year. At Cozamin, the one-way ramp remains on schedule for completion in early December, and results from the pillar extraction PFS will come out in January. Then, in the coming year at Pinto Valley, Phase 2 of the PV3 optimization effort will be finished. Shortly, Mike Wickersham will lay out our present intentions regarding what lies ahead for Pinto Valley. Our approach has developed since last year, since we have stayed open to the possibilities innovation offers us.

Darren Pylot

executive
#6

I find it really interesting how quickly technology has been advancing in mining. Down the road, that could mean the 50 year old Pinto Valley operation ends up running like a brand new mine, without requiring a high level of CapEx. For PV4 expansion, our strategy at this point is to seek out ways to upgrade and grow the mill we already have rather than constructing a brand new one. Turning to Santa Domingo, in my view there has never been a better moment to bring in the right strategic partner and to fully finance this project. Our goal is to announce that partner during the first half of 2021, with construction also beginning in the second half of 2021. With that, I'll hand things over to Raman.

Raman Randhawa

executive
#7

Thanks, Darren. Moving to Slide 7 now. Adjusted EBITDA came in strong at 51.6 million, with cash flow from operations at 27.7 million. Net debt is currently 163 million, and our ratio of net debt to EBITDA has fallen sharply, from 2.54 to 1.62 times — a substantial gain over the last three quarters. There's another point on this slide I'd like to highlight that frequently gets missed. It's the way efficient cash flow from operations creates equity for shareholders, thanks to our pure leading lowest G&A and interest per pound — to be specific, we're at $0.09 per pound on G&A and $0.08 interest paid on debt. That gives us the ability to fund a robust exploration program and cover optimization projects without hesitation. Over the past year, these two examples have delivered enormous value for shareholders. On Slide 8, we're definitely pleased to see today's optimism around higher copper prices. Even so, we'll remain lean and focused on paying down debt and growing the value of our assets. Our focus is on low capital, quick payback, high return capital investments, which we fund internally through cash flows. Beyond that, we're unlocking the steps needed to financially de-risk the capital required to fund our targeted share of roughly 50% of Santo Domingo.

Raman Randhawa

executive
#8

This slide's table makes clear that, assuming copper at $3, we anticipate no less than 100 million in EBITDA growth between 2021 and 2023. A $0.25 shift in the copper price moves EBITDA by roughly 50 million annually on average. So it's a great feeling to be leading our growth right as copper prices are getting better. With that, I'll turn things over to Mike Wickersham.

Mike Wickersham

executive
#9

Thanks, Raman. Moving to Slide 9, there's a photo of Umut Erol on it. He serves as our Metallurgical Superintendent at Pinto Valley, and he's leading a coarse particle flotation pilot plant trial that gets underway in November. Slide 10 shows how our strategy aims to capture the best of both worlds — higher throughput and higher recovery. We're confident we can get there, since we've achieved it before, and most recently in September, when the mills ran nearly 58,000 tons per day at 86.4% recovery — a very strong result. Across the next four years, copper grades should come in roughly 10% above what we've seen this year. The ore is also expected to be softer and more amenable to higher milling rates, with lower oxidation, which means we're positioning the mill for strong performance, and the optimization program now well underway should add to that. Ultimately, our target is reliable, sustainable throughput of 60,000 tons to 63,000 tons per calendar day, with recovery of 85% to 90% in the float plan during the 2022 to 2023 timeframe. Reaching that will require us to finish the Phase 1 and Phase 2 work laid out on the slide.

Mike Wickersham

executive
#10

So the projects that have just been approved now cover $10 million for conveyer upgrades, mill auto controls, cyclone upgrades on the ball mills, and tailings thickener upgrades, and every one of those is scheduled for completion by the third quarter of 2021. On top of that, a third-party consultant has been brought on to review the plan we have for boosting tailings safety and capacity as we increase the rates in the mill. In light of the pilot plant trial work that is currently underway and the work being done on tailings management, our PV3 optimization study is now going to come out in the first half of 2021. You heard Darren earlier talk about how innovation is driving the strategy change for Pinto Valley. That has proven to be the case, as you may have picked up so far, with our catalytic leaching technology, which was pioneered and announced in July, and also a course particle floatation technology that is set to start pilot testing next month, in November. Those, together with a great many other initiatives, are generating some genuine excitement about what is possible at Pinto Valley. Now, on Slide 11, it is easy to see how we are moving toward optimizing, or debottlenecking, all the way from the beginning through to the end of the value chain. Each step we take needs to carry a high IRR, internal rate of return, and it also has to be consistent with our strategy for better environmental and safety performance.

Mike Wickersham

executive
#11

On Slide 12, you'll find a fuller breakdown of the possible per-course particle flotation technology supplied by Eriez. That technology is known as HydroFloat. Lab testing of samples from our flotation circuit at Pinto Valley indicates that we might cut lost copper by close to 50%, and taken as a whole, that means total copper recovery at the float plant could rise by 6%. If this pilot plant succeeds, we'll be able to move ahead with our coarser grinding approach, and doing so makes it possible to get higher throughput from the mills, use less power for each ton of ore processed, consume less water per ton, and it also helps us achieve more stable tailings. After we receive the HydroFloat pilot plant test results, we'll put together a full financial analysis. That analysis needs to take into account recovery gains as well as other benefits, and we expect those to appear very attractive. As for CapEx on this HydroFloat project, we could make an early estimate in the area of 50 million, drawing on the installation at Newcrest's Cadia operation. Moving to Slide 13, as we've indicated, 2020 can be described as a year of innovation. And that is going to shape what Pinto Valley looks like going forward. We will fold this into our optimization study for PV3 optimization, which is due to be delivered in the first half of 2021.

Mike Wickersham

executive
#12

Additionally, a technical report update for Pinto Valley is going to come in the second half of 2021, as that optimization study gets finished. The PV4 expansion study — supported by 1 billion tons of resources at a similar grade — is now expected in 2022. The reason for that timing is that it now includes column leach test work that must be carried out to assess expanding production from our dump fleet rather than pursuing a new mill option or a substantially larger one. That reflects how well our Jetti catalyst project has done. We will also run scenarios involving higher mill cutoff grades to ensure we optimize the PV4 expansion opportunity. So we have been extremely busy. We are very excited about what lies ahead for Pinto Valley. With that, I will turn it over to Brad Mercer.

Brad Mercer

executive
#13

Hi, everyone. Thanks, Mike. I'm looking at Slide 3 right now, and I'm one of the smiling faces in it. In that photo, going from left to right, you see Abel, who is the GM of Cozamin, then Darren Pylot, our President and CEO, and then me, Brad Mercer. It's a great photo, since all three of us are really pleased with the impressive quarter we just reported. If you go to Slide 15, you'll see our C1 cost came in at $0.36 a pound, which is the lowest C1 cost we've ever recorded, and it was helped along by strong production, more tons, better grade, reduced operating cost per ton, and a very nice boost from high byproduct silver prices. Moving on to Slide 16, we'd like to stress that we are just 31 vertical meters from finishing the one-way ramp, and it remains on schedule — in fact slightly ahead of schedule — and it should now be done in early December. As we've mentioned previously, this will not only debottleneck the mine but also make it a safer operation with a simpler traffic pattern. Work is continuing at a good pace on the PFS for pillar extraction, and that will include an analysis of a paste backfill solution together with the dry stack filter tailing solution we are currently designing for Cozamin.

Brad Mercer

executive
#14

That strategy lines up extremely well with the best environmental practices in the industry for tailings management, and we expect to release it in January. We also have other mine optimization work underway, such as enhancing stope dilution and adding ore passes—or what we refer to as truckless headings. There's also a substantial chance to unlock considerable value at Cozamin by focusing on converting part of the nearly 300 million pounds of copper and 30 million ounces of silver sitting in resources that aren't yet in reserves. A study aimed at speeding up that conversion rate will get started in 2021. On the exploration side, we're moving at full speed with our new 80-Hole drill program, which is aimed at expanding both Vein 10 and Vein 20 toward the southeast. And we'll be ready to begin a 1000 meter exploration drift in early January, giving us more platforms and better underground access to target that area. We're also increasing drilling along the southeast perimeter of the existing reserve and anticipate adding more reserves to clean up that zone. Results from the initial phase of this work will be part of an updated technical report in January.

Brad Mercer

executive
#15

And, consistent with what we've done before, we'll share exploration updates as results arrive. With that, I'll hand things back to Darren for an update on Santa Domingo. Thank you.

Darren Pylot

executive
#16

Thanks Mike and Brad — huge growth possibilities exist at both of our operations. So at this point, everyone, we're on Slide 18. As I mentioned before, sentiment has improved a great deal for copper, iron and cobalt, and there is a scarcity of permitted projects that are ready for construction. Santa Domingo, situated in the middle of one of the most prolific mining districts anywhere in the world, really stands out. The MOU with Puerto Ventanas covering rail and port facilities included a 90-day window to explore mutual synergies and regional benefits. And that is expected to wrap up by the end of this year. On Page 19, we lay out a pathway to fully finance this project that involves a gold stream project financing and a strategic partner. We showed this slide back in September. But I wanted to repeat that our strategy is to build Santo Domingo without drawing on funds from current operations and without diluting equity shareholders. Moving to Slide 20, Capstone is about to enter the first year of high growth. By 2022, we will be a 200 million pound per year producer with C1 cost in the $1.50 range. By 2023 at $3 copper our EBITDA is expected to be 170% higher than it is this year.

Darren Pylot

executive
#17

And Santo Domingo is truly the unpredictable element here, and for Capstone it will be transformational. As the last slide shows, output of 375 million pounds by 2024 is more than 150% above what we're seeing this year, and that ought to drive a meaningful re-rating of our valuation. So with that, operator, we're ready to take questions from the audience.

Operator

operator
#18

Much appreciated, sir. <<operator_script>> Our first question comes from Dalton Baretto of Canaccord. The line is yours.

Dalton Baretto

analyst
#19

Thanks, guys. Morning, Darren and team — rough day to be putting out your numbers on. From what I hear, your thinking has shifted quite a lot when it comes to the optimization work at Pinto Valley, so I have a couple of questions for you, first on PV3 and then on PV4. To start with the Eriez course ore technology: it comes with some fairly solid benefits and pretty reasonable CapEx. How long has Cadia Valley had that in use, and what sort of results are they getting? And part of what I'm asking is whether royalties have to be paid to areas the way they are to Jetti?

Darren Pylot

executive
#20

Appreciate that, Dalton. Mike, why don't you take this one, since you've worked most closely with the folks at Eriez. Go ahead, Mike.

Mike Wickersham

executive
#21

Thanks, and I appreciate the question, Dalton. Yes, a few things shifted slightly in our PV3 optimization, largely because we chose to take a closer look at this coarse particle flotation technology. We looked at other ways to feed finer material into the ball mill. Those economics didn't appeal to us as much as what we're seeing now with the chance to reinforce our approach of being a coarse float mill. That's really the driver behind it. We want to be certain we get those numbers right, get the technology right, and keep the capital footprint low. As for Jetti, we do have a royalty payment in place with our partner at Jetti. We're still producing copper at very low unit costs, and we're quickly growing how many pounds of cathode we produce each year. It's performing very well.

Dalton Baretto

analyst
#22

So my question was this: Eriez, if you roll out this course or these locations, is there a royalty you have to pay them?

Mike Wickersham

executive
#23

Apologies, Dalton — I heard you incorrectly. As things stand, our lab-scale testing is finished. Next, we will begin testing at the pilot scale. Currently there is no commercial agreement or negotiation, and we are not considering any form of royalty. We need to confirm the technology performs in our float plant and delivers the recovery and throughput improvements we anticipate, and after that we will discuss commercial terms.

Dalton Baretto

analyst
#24

Do you happen to know whether Newcrest is paying a royalty over at Cadia Valley? I'm asking only because, in fact, that shifts the cost picture.

Mike Wickersham

executive
#25

Whether a royalty formed part of Cadia's deal is something I can't say. That question is one I'm unable to answer for you.

Dalton Baretto

analyst
#26

Alright.

Darren Pylot

executive
#27

Dalton, I’ll take that one. And Dalton, let me put it this way — I believe this, though I can’t promise it, but my view is that this is closer to purchasing a piece of equipment than to acquiring a technology. It’s a newer kind of equipment that performs different functions, but it isn’t — we would not anticipate paying royalties.

Dalton Baretto

analyst
#28

Thanks, Darren. Yeah, that was exactly what I was asking. So you aren't licensing the technology?

Darren Pylot

executive
#29

Right.

Dalton Baretto

analyst
#30

Is that equipment you're purchasing?

Darren Pylot

executive
#31

Correct—that's precisely right.

Dalton Baretto

analyst
#32

Alright. Alright. So perhaps we just pivot over to PV4 — again, the approach there is now entirely different, clearly. I get that constructing a fresh mill isn’t necessary. But suppose you do go ahead and enlarge the leach circuit, plus you’re handing Jetti a royalty, and the all-in cost lands around $2 per pound — I’m struggling to see exactly where that economic tradeoff sits?

Darren Pylot

executive
#33

Well, that's the thing. We have to put in the work. As you know, Jetti's success has been building—the longer you wait on something, the more time passes, the clearer the results you get. So over the next 12 to 18 months, we want to run this column testing to get a better understanding of the leaching process. And at the same time, figure out how high we can possibly push our cut off grades to the mill, which would let us spend far less CapEx on equipment in the mill, and understand that tradeoff. So exactly like you said, right, we recognize there's a licensing cost associated with Jetti, and then obviously there's a CapEx cost when you build a bigger, bigger, bigger mill. So that's precisely what we'll be doing—trading one against the other. But we believe a smaller mill with more leaching will be more economic and better for the operation.

Dalton Baretto

analyst
#34

All right, thanks. Then one final question from me regarding Santa Domingo — as I understand it, that 90-day window is still running. Has any preliminary feedback come in yet?

Darren Pylot

executive
#35

Yes, we meet with them once a week. And we operate — it's sort of a joint effort on our part to one — to think through what a final agreement would look like too. The actual 90 days is meant for them to carry out a market analysis regarding other potential customers on a multi-user port basis. So they are engaging with other potential users, and we speak with them each week, and we have an extremely good relationship and are collaborating to finalize it.

Dalton Baretto

analyst
#36

That covers everything on my end.

Operator

operator
#37

Thanks. Our following question comes from Orest Wowkodaw with Scotiabank. Go right ahead.

Orest Wowkodaw

analyst
#38

Hello, and good morning. I was hoping to get a little more detail on the costs at Pinto Valley — clearly, you're putting a fair amount of investment into upgrades at that site. And I noticed you raised the CapEx guidance for this year. From what I understood of the earlier remarks, you're aiming to lift throughput there to roughly 63,000 tons a day beginning in '22. And those mill upgrades would be complete by, I believe, the third quarter of '21. So how much extra capital — or, I suppose, what total capital does Pinto Valley require for 2021 to hit that target?

Darren Pylot

executive
#39

So on average, Orest, we're looking at roughly 40 to 50 million in sustaining capital, and then the additions get us to about the next phases in the MD&A. There's another 10 million of growth capital for the cyclones and the auto control system, which takes us into the 60s, and after that the next step is the 60 to 63, which is part of the PV3 optimization final study coming out early next year.

Orest Wowkodaw

analyst
#40

Could you help us frame this — should we expect your total CapEx to land around similar levels in '21, with most of it going into Pinto? Is that the right way to think about it?

Darren Pylot

executive
#41

That's more or less how I'd look at it. Cozamin still has the drive stack tailing, so that's something we intend to implement too. So there will be some capital in 2021 as well, and that will get underway.

Orest Wowkodaw

analyst
#42

Alright. And then on a separate note, could you bring us up to speed on where you’re leaning regarding a possible silver stream at Cozamin, and whether you’re actively involved in assessing that right now?

Darren Pylot

executive
#43

Yeah, Orest, I'd say we're aware that precious metal prices are elevated — both silver at Cozamin and at Santa Domingo. So I think it's fair to say we're taking a hard look at — what we're dealing with is from a position of strength, as you saw from the cost profile at Cozamin, there's no need for a silver stream on that basis, as well as our balance sheet. But if we can be opportunistic, and since it's a very coveted asset, if we can get something we like and it's accretive to shareholders, we would absolutely look at it. So yeah, we're taking a hard look right now.

Orest Wowkodaw

analyst
#44

And should we expect that you have to complete the current revised 43 to 101 at roughly the backfill pace before you would be better placed to potentially proceed with something like that, or is that not necessarily the case?

Darren Pylot

executive
#45

No, I'd say that isn't necessarily the case, since it depends on the size of the overall reserve — it isn't a big figure — and besides, it's fairly clearly established that were it to go in, you'd be able to recover pillars. So there isn't much risk either way.

Orest Wowkodaw

analyst
#46

All right, thanks so much.

Operator

operator
#47

Thanks. The following question comes from Raphael de Souza with CIBC. You may proceed.

Raphael de Souza

analyst
#48

Hello, and good morning — thanks for taking my questions. This is kind of a follow-up regarding the 2020 CapEx, and I was wondering: with this update, which initiatives have come back to the table?

Raman Randhawa

executive
#49

Raphael, this is Raman. Yeah, what I mean is that we've sped up capital spending — we reduced it from 90 to 60 and then raised it back to roughly 90 — and the main items involve stripping. So we had planned to scale back stripping somewhat, and now stripping will be 7 million higher, which keeps us on track to achieve that 10% higher grade next year and to the 0.33%, over the coming four years. And then there are haul trucks; we had bought some haul trucks that we're going to pay for this year, and we could have deferred PCRs, which are component replacements, along with some tailings work, and also a new loader. So rather than running those high cost shovels, we were able to bring in a loader that's more energy efficient, but also will defer some capital that would have been required on those shovels. So those are the big items when you add that up, and then a little bit more spend in MSD.

Raphael de Souza

analyst
#50

All right, thanks. And moving to stripping — I saw that Pinto Valley’s stripping came in a little higher this quarter; should we count on that carrying into Q4?

Raman Randhawa

executive
#51

Yes, I would agree with that. Probably the rates are the same as what you saw during the third quarter.

Raphael de Souza

analyst
#52

All right, thanks. That's my final question. So over at Cozamin, as you keep shifting further from the San Rafael zone, ought we to anticipate that grades will keep climbing ahead, at minimum through the fourth quarter?

Darren Pylot

executive
#53

Right, our plan is to phase out San Rafael production during the first month of Q1 of '21. As a result, head grade will see a mark jump, since we won't be blending with that lower grade zinc material.

Raphael de Souza

analyst
#54

All right, that covers everything on my end—thanks.

Operator

operator
#55

Thanks. The following question comes from Stefan Ioannou at Cormark. You may proceed.

Stefan Ioannou

analyst
#56

Much appreciated, everyone. So I suppose it's clear that the PV4 plant has shifted direction somewhat, and we're still in the early stages, but I was just wondering — is the mill holding at the same capacity while considerably more material gets placed on a heat leach pad? Do you have any idea how significantly that might affect your future tailings needs, in the sense that — I realize PV4 involved a new site and everything along those lines? Is that still being considered? And could you perhaps bring us up to date on that particular side of things?

Darren Pylot

executive
#57

Yeah. Stefan, I'd put it this way: the mill will be larger rather than the same size, and when we picture a mill above 100,000 tons a day — we believe it could be smaller at this point — but absolutely, we'll have to resolve the tailings issue using whatever land is available either on our site or as permanent land, and that's something we need to assess. As part of a PV4, though, we would certainly require additional space for tailings.

Stefan Ioannou

analyst
#58

All right, understood. And perhaps just a routine question directed at Mike. You brought it up — I’m not sure whether I caught it — regarding the expected CapEx figure for HydroFloat. Was it $50 million you said, Mike, or something else?

Mike Wickersham

executive
#59

Yes, that figure came in at 50.

Stefan Ioannou

analyst
#60

Fifty — all right, thank you so much. That’s excellent, everyone. Many thanks.

Operator

operator
#61

Thanks. <<operator_script>> Our following question comes from Craig Hutchinson of TD Bank. You may proceed.

Craig Hutchison

analyst
#62

Hey everyone, most of what I wanted to ask has already been covered. Still, on the Santo Domingo talks regarding strategic partners — has there been meaningful interest in off-take for the magnetite ore?

Darren Pylot

executive
#63

Sure, Craig — we've seen pretty significant interest across all the metal streams we produce. Copper is high quality, and there's been very strong interest in an off-take financing or agreement for it. Iron is a premium product, so there's also very good interest in purchasing the iron through an off-take. And clearly there's a lot of interest around cobalt, since it's associated with Chile and at a lower rate than the DRC, so there's very strong interest in off-take for every metal we produce there.

Craig Hutchison

analyst
#64

And do you still plan to remain the majority owner, or would you consider taking a minority stake in the asset instead?

Darren Pylot

executive
#65

Yeah, it’s a similar situation, right — if we had a strong partner with a track record of building mines and the ability to finance the project very quickly, we would absolutely want them to be the operator. And at the same time, with the copper price and the cash flow we’re generating from our existing operations, we could also envision being a 50% partner-operator. But whatever is best for the — the lowest risk for our shareholders, the best return for the project, and the best execution of building a mine is the way we would go forward on that.

Craig Hutchison

analyst
#66

All right, thank you. And I've got what's maybe a housekeeping item too, regarding taxes for the remainder of this year: at this stage are you in a fully cash taxable position, or should we still expect some deferred tax credits that you have available to offset?

Raman Randhawa

executive
#67

It really hinges on which jurisdiction you're in. In Mexico, we face full taxation at rates of 30% to 35%. Then there's a withholding tax we pay upon repatriating the funds. So that has nudged your taxes up somewhat this quarter. As for Pinto Valley, we hold a substantial amount — loss carryforwards total roughly 100 million, which means no taxes will be due at Pinto Valley for some time, across the coming couple of years.

Craig Hutchison

analyst
#68

All right, that's great. Appreciate it, everyone.

Operator

operator
#69

Thanks. That brings us to the end of the Q&A — there are no more questions right now. So I'll hand things back to Mr. Pylot.

Darren Pylot

executive
#70

Thanks a lot, operator, and thanks to all of you for your questions and for being with us today. Please keep being careful and stay safe and well, since COVID-19 remains a worry around the world. And as always, please feel free to reach out with any other questions or follow-up you might have once this call is over. Thank you so much.

Operator

operator
#71

Thank you, sir. Ladies and gentlemen, that brings today's conference call to a close. Thanks again for joining us. And now, please disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Capstone Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Capstone Copper Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capstone Copper Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.