operatorGood morning. I'm Anis, and I'll be serving as your Conference Operator for today's session. Right now, I'd like to extend a welcome to each of you joining the Capstone Mining Q4 2020 Results Conference Call. Every line has been muted so that background noise won't interfere. Following the speakers' remarks, a question and answer session will take place. Should you wish to pose a question at that point, just press star and then the number one on your telephone keypad. To take your question back, please press star and then number two. Thank you. Mr. Annett, the conference is now yours to begin.
Jerrold Annett
executiveThank you, and good morning to all of you. I want to welcome each person joining us on today's call. The press release that announces Capstone's financial results for the 2020 fourth quarter and the year-end is now posted on our website. If you're logged in to the webcast, we'll be moving the slides forward. Joining us are Darren Pylot, President and CEO, Raman Randhawa, Chief Financial Officer, Brad Mercer, Chief Operating Officer, and Mike Wickersham, who serves as General Manager of our Pinto Valley Mine. After a few short remarks from us, there will be a chance to ask questions. Statements we make on today's call will include forward-looking information. By its very nature, that information carries risks and uncertainties, and actual results could differ materially from the views we express today. To learn more about those risks and uncertainties, please refer to Capstone's relevant filings on SEDAR. Last, I'll simply mention that every amount we discuss today is in US dollars unless stated otherwise. I'll now hand the call over to Darren Pylot.
Darren Pylot
executiveThanks, Jerrold, and morning to everyone. First off, I'd like to draw your attention to the photograph on the opening slide of page four in this deck. It captures a blast at Pinto Valley Mine, carried out with a third-party specialist in blast fragmentation. At that operation, we've managed to raise the share of half-inch fines in the run of mine from roughly 25% — the level we had a year back — to above 40% as of today. The payoff is reduced costs, fewer maintenance requirements, and less downtime in the crushing circuit, plus stronger mill performance overall. Moving on to slide five, it hardly needs saying what a difficult year 2020 turned out to be. Speaking for Capstone, I feel tremendous gratitude for the way our people stepped up, delivering safe production that came in above our initial 2020 guidance and beat our cost targets. We did that while pushing our growth initiatives forward, which have now put the company in a position to gain from today's elevated copper prices. Consolidated copper output for Q4 reached 44.4 million pounds, at a C1 cash cost of $1.68 per pound. Pinto Valley's Q4 production totaled 34.1 million pounds with a C1 cash cost of $2 per pound, helped by solid mill results. Throughput averaged 57,000 tons per day, more than 10% above the 2019 average, and this was really the first quarter to feel the full effect of the phase one optimization work we finished earlier in the year.
Darren Pylot
executiveAs you'll remember, the first phase was mainly about removing bottlenecks at the front end of our mill, and we believe the present run rate can be maintained. This year's phase two optimization efforts will be aimed at achieving higher copper recovery and boosting the capacity of our tailings thickeners. At Cozamin, we delivered another excellent quarter, producing 10.3 million pounds of copper at a first quartile C1 cost of $0.63 per pound. The one-way ramp was finished in December and has since exceeded what we expected in terms of haulage efficiencies. As guided, we anticipate hitting the target of 3,800 tons per day by April. Moving now to slide number six, we enjoyed a terrific year. Even with all the difficulties the pandemic created for everyone in 2020, we managed to set new safety records across our operations. We recently broadened Wendy King's Senior Vice President role so that she leads our ESG strategy. During Q3, we issued an interim ESG sustainability report, and a full report for 2020 will come out in June of this year. In December, we announced a $150 million silver stream covering 50% of Cozamin silver, which closed last week and left Capstone with a net cash position. Our balance sheet and the cash flow we expect from operations give us the chance to speed up organic growth projects at Cozamin, Pinto Valley, and Santo Domingo.
Darren Pylot
executiveThis puts us in a position where we can negotiate with strength in our partnerships with Santo Domingo, as we aim to secure the most favorable partnership arrangement possible for our shareholders. I take real pride in the way Capstone has taken up the challenge of trialing new technologies that could have a significant impact on operational, environmental, and safety performance. Cost efficiencies will be driven by innovation, and it opens up fresh growth possibilities throughout all of our operations. Two strong illustrations of the advanced technologies that recover copper from waste streams are found at Pinto Valley: the Jetti catalytic leaching technology, which we have implemented successfully, and the Eriez HydroFloat coarse particle flotation, which we tested in a pilot plant in December. Over the coming 18 years, we anticipate that the leach technology will make it possible to recover in excess of 300 million pounds of copper from waste tons. Eriez HydroFloat could raise yearly output by somewhere between 9 million pounds and 12 million pounds each year from material that would otherwise have been sent to the tailings. The photo on the right shows a close-up of 300-micron coarse particles recovered during our pilot plant testing, and you can see how we have floated very fine-grain chalcopyrite, even though it remains attached to coarse particle gangue minerals.
Darren Pylot
executiveThat lets us get back sulfides that the grinding step didn't fully liberate. Look at those tiny chalcopyrite specks sitting on the coarse gangue mineral. Quite simply, our conventional flotation circuit can't do this, since the coarse gangue particles stuck to them are too heavy. Last month at Cozamin, we announced a new mine plan using paste backfill technology that incorporates 50% of the tailings, which get mixed with cement and sent underground to form concentrate pillars, enabling maximized copper extraction at this high-grade mine. Along the same lines of recovering metals from waste streams, at Santo Domingo we announced a PEA for cobalt production that begins by recovering cobalt-laden pyrite from a tailing stream. The process we've selected is a series of off-the-shelf technologies offering an efficient pathway to recover nearly 80% of the cobalt contained in the ore body. This cobalt project excites us because, once in production, Santo Domingo would rank among the world's largest and lowest cost producers of battery-grade cobalt sulfate. Regarding the last bullet on the slide, we're in late-stage negotiations with Puerto Ventanas and hope to have an update on this very shortly.
Darren Pylot
executiveI will now hand things over to Raman.
Raman Randhawa
executiveThanks, Darren. Moving to slide seven, this page focuses on how Capstone's finances were transformed over the year that ended December 31st, 2020. The results from the fourth quarter show just how strong Capstone's potential is for earnings and cash flow in a copper market that is rising. We closed out the year with Q4 adjusted EBITDA of $63.5 million, along with cash flow from operations of $67.4 million. Net debt has come down to $125 million, or 0.88x, as at year-end. After year-end, when the Cozamin silver stream closed for $150 million, we moved into a net cash position of $25 million, and the chart at the bottom right would reflect a negative net debt to EBITDA ratio. That is clearly a substantial improvement compared with the past six to nine months. As a reminder to everyone, higher copper or silver prices alone did not produce this. The turnaround in our balance sheet ultimately stemmed from exploration excellence at Cozamin, which led to a competitive bid process for the silver stream, and from strong operational performance at both mines during 2020. In 2021, we expect to be debt-free, and we have removed a historic interest charge of roughly $15 million per year, or $0.08 per pound.
Raman Randhawa
executiveMoving on to page eight. Our balance sheet is in a strong position to finance growth at both Pinto Valley and Cozamin. We're enthusiastic about the remaining PV3 optimization projects, including Eriez HydroFloat, pending a feasibility study and board approval by mid-year. This project is another excellent illustration of a high-return capital investment that also enhances and supports our ESG strategy through reduced power and water use per ton of copper produced. Regarding capital allocation, our approach is to invest organically while delivering double-digit returns. That covers Santo Domingo, which carries an attractive IRR of up to 29%. We'll discuss Santo Domingo further on a later slide. The table at the bottom right captures what excites me most, where we anticipate at least $1 billion in cumulative operating cash flow in a $4 copper environment across the coming few years. A quick sensitivity for a $0.50 shift in the copper price comes to roughly $67 million per operating cash flow, over the next three years. We're plainly thrilled to be delivering into growth at a moment when copper prices are so robust. Commodity prices, oil included, are rising. Recently, some of you might raise questions with us about cost inflation. As of now, nothing notable has appeared for key inputs at our sites.
Raman Randhawa
executiveFor key inputs, we've locked in contracts. The only potential changes would be certain increases tied to raw materials indexes for some products, or higher fuel surcharges. Luckily, we hedged roughly 70% of diesel consumption at Pinto Valley for both 2021 and 2022 last year. With spot pricing where it is now, fuel savings at Pinto Valley will come to $4 million this year. On top of that, because copper supply markets are low, we're actually getting all-time low spot TC/RCs, which currently sit between $20 and $30 a ton as well. At this point I'll pass it to Brad Mercer.
Brad Mercer
executiveThanks, Raman. Morning, everyone. A quick reminder that we're on slide nine now. This slide addresses stewardship of natural resources, and we're putting investment into approaches that maximize recovery of valuable green metals such as copper and cobalt. Darren discussed a number of these projects earlier. We'll go into a bit more detail here. I'd also note that with broader deployment of Jetti catalytic leaching, we can examine initiatives aimed at improving metallurgical and environmental performance too. As an example, greater use of water from brownfield mining districts near us, around PVM, could in fact reduce our freshwater requirements. We're also bringing in a new project known as pyrite agglomeration, which has the potential to recover as much as four million pounds of copper that otherwise would have been sent to tailings. This stream is rich in pyrite, and once agglomerated with our run of mine dump leach, it will supply a valuable source of free acid as the pyrite breaks down. That will boost the copper leaching. Diverting this mill stream from our tailing storage also strengthens our long-term environmental performance, and that's another key advantage of the project. The PFS for the pyrite agglomeration project is being studied this year, with an eye toward adoption in 2022.
Brad Mercer
executiveWe expect the capital needed for this to come in under $10 million, and it satisfies the internal rate of return hurdle Raman mentioned a moment ago. Turning to slide 10. This is a somewhat complex illustration. What it presents is the mill's flow sheet prior to and following Eriez and pyrite agglomeration. Eventually both projects will be subject to PFS or feasibility level studies, and they could come online as early as mid-2022. The flow sheet on the left represents our existing conventional flotation circuit, and as you can see, 150 million pounds of copper comes into the circuit, and roughly 127 million pounds gets recovered into concentrate. That works out to 85% recovery. As a result, about 23 million pounds of copper reports to the tailings impoundment. Were we to have Eriez and pyrite agglomeration operating today, our estimate is that just 10 million pounds of copper would report to tailings. That would mean overall recovery rising to 93%. When you consider the incremental cost of recovering another 13 million pounds, it is quite low, as you would expect, since that recovery takes place at the end of the process. This additional production requires no extra mining, no extra crushing, and no extra grinding cost.
Brad Mercer
executiveWe think the capital for Eriez will come in around $70 million as a preliminary estimate. At that level, it would satisfy our objectives for return on capital. As I said earlier, pyrite agglomeration accounts for under $10 million. Let's go to slide 11. For Cozamin, 2020 was a pivotal year. As we've shown, it's a genuinely tier 1 asset, and it now has over a 10-year mine life ahead with exploration still ongoing. With greater production and first quartile costs, even including the silver stream that closed last week. This remains a flagship operation. I think we should go on to slide 12. Over the coming 10 years, we believe cumulative cash flow will be larger than it was across the prior 14 years. We aim to build on that through Impact 23 growth projects designed to extend mine life and cut costs. That work should begin now and occupy us for the next two years, and it will be documented in a technical report at some point in 2023. In the end, we believe Cozamin will stay our crown jewel asset well into the 2030s. Let's move to slide 13. We presented this figure last month when we announced the new technical report.
Brad Mercer
executiveI believe it's worth demonstrating once more that we've established a new standard for both greater throughput and better grades. To test what mining rates Cozamin might achieve using just the one-way ramp, we've occasionally run ramp-only production haulage exceeding 4,000 tons per day this year. Combine that with our hoisting capacity of 2,000 tons a day, and it tells me logistics won't stand in the way of reaching 3,780 tons a day, which is the target we've set for 2021. Anticipating that we'll be able to hit higher mining and haulage rates, we've begun investing in our mill by reconfiguring the ends of each ball mill, and that change by itself is expected to deliver roughly 60% more grinding capacity. We'll also carry out further minor investment in crushing and dewatering during the year. That's all from me. Now back to Darren.
Darren Pylot
executiveThanks, Brad. Moving to slide 14 now. Looking at the copper and iron price environment as it stands today, if I make the assumption that we stream the gold to help with construction — so excluding gold revenue — then were Santo Domingo producing right now, year one would generate $1 billion of free cash flow on a 100% basis at prevailing metal prices. Initial capital gets paid back quickly, thanks to the very high grades we see at the start of the mine plan. That comes to roughly 0.9% copper equivalent across the first five years, and above 1% average copper equivalent during the first two years. For an open-pit mine in Chile, at low altitude, with infrastructure nearby and also close to the port, those grades are very high. The fast payback and low CapEx intensity explain why we acquired this asset almost 10 years ago. Through the low copper price cycle, we kept this project advancing slowly and preserved all the optionality we hold to this day. Put differently, we can now negotiate partnerships from a position of strength. That time was well spent on detailed engineering and trade-off studies, permitting, and the cobalt PEA, which once in production would put Chile on the map as a major global producer of ethically sourced cobalt.
Darren Pylot
executiveMoving to the next slide, please. Slide 15 shows the path we're taking toward construction at Santo Domingo. You might have noticed that unlike earlier presentations, we've taken out the specific figures and percentages. The reason is that with today's copper prices and a balance sheet carrying no debt, Capstone holds a much stronger negotiating position than was the case last year. At this point we're assessing two possible scenarios: one involving 50% of Santo Domingo, and the other keeping the 70% ownership stake we currently hold. As Raman mentioned before, with copper at $4, we anticipate $1 billion in after-tax cash flow generated by our existing operations across the coming three years. That larger 70% figure is a level we feel very good about. What matters most here is that we continue to hold a turnkey fixed price proposal from POSCO, and the port and rail agreement we've been working on with Puerto Ventanas will likewise cut the risk on this project substantially, lowering the CapEx tied to Capstone by as much as $400 million. Next slide, please. Looking at 2021, current copper prices give us a chance to reach a debt-free position much sooner than we had anticipated, and that puts us in an extremely strong position as we prepare to finance Santo Domingo. Come 2022, we expect sustainable output exceeding 200 million pounds of copper annually.
Darren Pylot
executiveWith Santo Domingo entering production in 2024, we will achieve transformational growth in copper output of 80%-110%, depending on which ownership scenario we pursue. At Pinto Valley, as we mentioned earlier, our near-term priority is boosting copper recovery, since that represents the lowest-cost path and the highest return for raising production. These projects are expected to be captured in an updated technical report that will be delivered in the second half of this year. At Cozamin, the mine is ramping up as expected, and we remain actively drilling the Mala Noche Footwall West target. Development of the west cross cuts will begin later this quarter, which will enable efficient underground drilling later in the year. Next year, excuse me. An exploration update, including updates from our greenfield exploration opportunities, will be released before the end of Q1. Now for slide 18, which is the last slide of the presentation. 2022 and 2023 continue to be busy years for us. PV4 aims to show the ultimate potential of Pinto Valley as it brings forward 1 billion tons of resource at similar grades that what we're mining now, that sit outside of current reserves currently. To accomplish this, we believe an expanded leach strategy with higher mill feed grades is the right one for us.
Darren Pylot
executiveWe believe that our mill from the 1970s, once the upgrades and modifications we're making right now are complete, is going to run just like a brand-new facility. Building a new one isn't necessary. At Cozamin, come 2023, we'll be delivering the results from Impact 23, and as Brad mentioned, that program is aimed at stretching the mine life and overall performance nicely into the 2030s. During 2022, we anticipate constructing Santo Domingo while also completing the cobalt feasibility study, with permitting already in progress. Keep in mind that in the cobalt PEA we released in February of 2020, the cobalt operation began 2 years following the mill operation, and none of the cobalt potential was lost. By 2024, I can promise you that the entire Capstone team is committed to delivering Santo Domingo for our shareholders. For our company, this would be transformational, since even 50% ownership would raise production by 80%, with C1 costs falling to $1.20 per pound. At 70%, our output would more than double from where we stand today, and at even lower costs. To put this into perspective, the gap between owning 70% of Santo Domingo and 50% is 65 million pounds of production at first quartile costs. That's roughly the same cash flow potential we expect from Cozamin in 2024.
Darren Pylot
executiveWe appreciate everyone being here today. As many of you are aware, I started this business over 15 years ago, and my enthusiasm for what lies ahead at Capstone has never been greater than it is at this moment. With that said, we're now open to questions from the floor.
Operator
operatorThanks. Women and gentlemen, we’re starting the question-and-answer portion now. If you’d like to ask something, press star then one on your touchtone phone. A three-tone prompt will confirm your request. We’ll take questions in the sequence they arrive. If you want to cancel your request, press star then two. When on a speakerphone, lift the handset before you press any keys. Please hold a moment before the first question. Our first question is from Dalton Baretto of Canaccord. Go ahead, please.
Dalton Baretto
analystThanks. Morning, Darren and everyone. Congratulations on closing out a strong year. I'd like to begin with a question on Pinto Valley. The mill is performing very well at this point, and the HydroFloat this year could deliver a 6%-8% recovery improvement. So the first part of my question: how does that, together with where copper prices sit right now, feed into how you're thinking about PV4? And the second part: is the BHP land next door still in play, and how does that enter into your PV4 calculations? Thank you.
Darren Pylot
executiveThanks, Dalton. I’ll have Brad take the first part of that question, and once Brad is done, I’ll address the second part.
Brad Mercer
executiveRegarding PV4, first, let me remind everyone that we'll finish PV3 with a study at year-end, and then a fuller PV4 study arrives in 2022. Let me also remind everyone that we have a billion tons of material at a similar grade to what's in the current 2039 life of mine plan. PV4 would push the mine life well into the 50s, with a comparable copper output range of 150 million to 170 million pounds annually. Jetti technology is expected to play a very integral role in that and in helping us figure out the optimal leach float cutoff. We want to show that the economics will be much better if we strip a lot of this material and leach it instead of floating it. We believe our 25 million pound per year SXEW plant would probably need expansion to handle the added copper production. I don't think that would be a major CapEx item, but it's one we'd be examining. Central to this, and to being able to announce it in a reserve, we have just started a very large-scale column leach study to establish the optimal Jetti-assisted leach versus the mill flotation.
Brad Mercer
executiveWe will obtain the recovery curves for Jetti. At a minimum, that requires nine months starting today. Those cells need to be loaded, and we'll be doing that essentially within the next month. Our mill might be quite old, but as Darren already mentioned, we have invested heavily in it regarding the crushing and grinding circuits. We have also put money into the pit for throughput. We anticipate our mill will keep performing as though it were new. Building a new mill isn't something we'd do. We would simply keep strengthening the technology we already have. One point I believe is certain here, Dalton, is that PV will undergo dramatic change in the near term, and as a catalyst, the PV3 report will come out this year and the PV4 report the following year.
Darren Pylot
executiveThanks, Brad. Turning to the latter part of what you asked, Dalton, regarding the district consolidation — clearly, that represents a huge opportunity for us. As we've said previously, we are the sole producing mine in a district surrounded by substantial copper resources. Once combined, it could rank among the biggest copper mining operations anywhere in North America. On the specifics, naturally, since we're under CA, we aren't able to comment on those details. What I can tell you is that discussions are happening far more often right now than at any point in our history. I'd also add that, as Capstone's CEO, my two leading priorities for this year are: first, getting this consolidation defined, and second, optimizing and advancing the construction and partnership at Santo Domingo. Getting this completed as quickly as we can matters greatly to the company and greatly to me in my role as CEO.
Dalton Baretto
analystIf that land were available to you, would you go ahead and expand the mill?
Darren Pylot
executiveSo, as Brad mentioned, we’d bring in the Jetti solution, figure out what the cutoff grade would be, and then work out the best approach to mining it. We’re running various scenarios, and there’ll be more details to come.
Dalton Baretto
analystAll right, thank you. Perhaps I could turn to Santo now. Given where copper and iron ore prices stand at present, are the offers coming in through the process leaning toward the entire asset, or does it remain largely a joint venture structure that parties are considering?
Darren Pylot
executiveAs I mentioned before, we have considered selling the asset anywhere from 0% to 100%. In our view, a fully permitted Tier 1 asset located at low altitude in one of the world's best mining jurisdictions is not something you would want to part with, particularly given the current price environment. We think we hold one of the only projects that can be permitted to move ahead, and that is precisely why we want it. We recognize that high commodity prices bring cost inflation along with them. The faster we can advance this project, the stronger our position to combat inflation, since we know it is coming. It arrives in every cycle, and past experience tells us that. Because of its location and the engineering work completed over the 10-year period since we acquired it, we believe this project carries lower risk, and we would like to own as much of it as we possibly can.
Dalton Baretto
analystAll right, so for my final question, perhaps a quick follow-up on what you were just saying. In this process, how much of a burden is the Korea Resources stake? Are they simply allowing you to proceed, or must you keep them informed and carry them along as things move forward?
Darren Pylot
executiveKorea Resources Corporation has proven to be an excellent partner — they stand right beside us in all our efforts, completely aligned and working together as a single process.
Dalton Baretto
analystPerfect. I’m finished on my side, everyone. Thanks.
Darren Pylot
executiveI appreciate that.
Operator
operatorThanks. Our following question is from Orest at Scotiabank. Orest, the floor is yours.
Orest Wowkodaw
analystHello there, and good morning. I have a few more questions for you regarding Santo Domingo. Clearly, this represents what I see as a shift in course at Santo Domingo. Would I be right in thinking that your current view of the most probable outcome is that you will hold 50% or more of Santo Domingo? And does that therefore mean, given where this is likely heading, that you are now the operator 100%?
Darren Pylot
executiveOrest, this is Darren. Appreciate the question. What I believe we're expressing is that we now have additional alternatives and greater potential. We're able to consider various partners at this point. That doesn't imply we must serve as the operator, yet we do have a turnkey offer from POSCO — a fixed contract covering both the mill and the mine. We could act as the operator. We are structured to do so, or alternatively we wouldn't be the operator should another party bring more experience, a bigger balance sheet, or similar advantages. That remains entirely fluid and flexible. Given how fast copper prices have risen so dramatically, combined with our balance sheet, we can afford to examine different options and let ourselves select the best return for our shareholders — that's how I'd like to respond to that.
Orest Wowkodaw
analystAll right. Earlier, during the Cozamin stream, you mentioned that the two assets currently producing would not be tapped to finance Santo Domingo. If you move to a higher ownership scenario, does that remain true?
Darren Pylot
executiveAbsolutely, first and foremost, those assets have to return capital into all of these projects — the higher-return, lower-CapEx ones we've discussed, both at Pinto Valley with PV3 and PV4 and Impact 23 at Cozamin. Without question, that's what the operation prioritizes. That hasn't changed. Raman, I'm not sure whether you'd like to add anything there.
Raman Randhawa
executiveThat remark also assumed a copper price of $3. At $4, you'd see a modest amount of extra cash flow. We'd put cash generated by our operating assets back into those same operating assets, and then, with prices higher, we could project finance Santo Domingo at various levels.
Orest Wowkodaw
analystAlright, and then one last item—what’s the strongest guidance you can offer about when we’ll finally have some clarity on the way ahead for Santo Domingo regarding the partnership financing and the entire structure here?
Darren Pylot
executiveWe've set ourselves an internal target — our hope is to have everything wrapped up by the middle of this year, which would let us move forward with whatever scenario in the back half of the year.
Orest Wowkodaw
analystSo does that mean you've made quite a bit of progress on the talks with possible partners and on working out what the pieces here would be?
Darren Pylot
executiveYeah. We've made progress. As I mentioned, we're talking with various parties about different possibilities. That's been the case and still is. In the current environment, we've simply unlocked a few additional choices for ourselves as we move ahead.
Orest Wowkodaw
analystAll right, and one last thing: if you do choose to move forward with Santo Domingo, might you think about hedging — setting up copper hedges — to guard against some of the exposure over the construction period on the assets you already have?
Darren Pylot
executiveIf we went the route of project financing—non-recourse, done at the asset level—then in copper price conditions like these, using that structure as protection, as you pointed out, wouldn't strike me as unreasonable. First Quantum has done exactly that, and we've watched other companies end up having to do the same. Given the ownership stake we hold, my expectation is that we would follow suit.
Orest Wowkodaw
analystAlright, Darren — appreciate it.
Darren Pylot
executiveAppreciate it.
Operator
operatorThanks. Our next question comes from Stefan at Cormark. Stefan, your line is open now.
Stefan Ioannou
analystThanks. Yeah, I appreciate it, guys. And maybe just regarding Santo Domingo too, since construction is expected to kick off in the second half of this year. I understand Santo Domingo is fully permitted, technically. I know you've maintained them in good standing over the years, but are there any underlying amendments or updates, sort of, that are needed and that we should keep in the back of our minds, or is everything fully current?
Darren Pylot
executiveYeah. Stefan, Darren here. No, all of it is completely current. Like we've mentioned previously, we won't begin committing significant capital until both the project and the financing are defined. That is not going to happen. If it happened tomorrow, we could break ground tomorrow. Everything is fully ready and can move ahead at a moment's notice, but obviously we won't make any major capital decisions unless the project is fully defined, optimized, and financed, with the financing plan in place.
Stefan Ioannou
analystAll right, and now let's pivot to a totally different topic — the Donovan 2 VMS prospect. Could you bring us up to speed on that? Are you still only intending to drill it sometime this year, or has your thinking changed?
Darren Pylot
executiveBrad would be glad to take that question. I’ll let him respond.
Brad Mercer
executiveApologies, Stefan — I'm laughing here, since, well, tomorrow is when we ought to be drilling it.
Stefan Ioannou
analystAlright, that's good—excellent, actually. We'll keep watching for updates. Appreciate it, everyone.
Darren Pylot
executiveI appreciate it.
Operator
operatorThanks. Our last question comes from Craig at TD. Craig, your line is open now.
Craig Hutchison
analystAll right, I appreciate you taking my question. You folks said there isn't much cost pressure in the operations you already run, though you're somewhat worried about the launch at Santo Domingo and steering clear of cost creep. Should we be concerned, and could you give us an update on those cost estimates? Do you believe the feasibility study you released a couple of years ago remains valid at roughly $1.5 billion? Clearly, steel prices have shot up dramatically over the last six months. What are your thoughts on worries about cost escalation and any possible updates on that front.
Darren Pylot
executiveYes, Craig. This is Darren once more. I mentioned a bit before that we must figure on both inflation and creeping expenses. As you pointed out, those input costs are climbing. For copper, that is clearly a positive, but steel prices and similar items are rising too. We fully anticipate that will occur. Our most recent checks have not shown it so far, yet we are aware it will be present as we move forward. Like I said before, our optimal approach is to fine-tune this project and begin work on it promptly rather than delaying, so we can lead the way and stay ahead of that inflation, if you will, to the greatest extent we can, given the certainty that some of it will definitely be there.
Craig Hutchison
analystAlright.
Darren Pylot
executiveSo, are we—is there—
Raman Randhawa
executiveIs there anything more you wanted to add, Craig?
Darren Pylot
executiveAnything more from you, Craig? I think our connection dropped somewhat. Are there further questions, or operator, can you hear us?
Raman Randhawa
executiveI'm doing well. It looks like it's showing up. Craig, are you still on the line?
Craig Hutchison
analystYes, that’s me. I’m all set, everyone.
Darren Pylot
executiveAll right, thank you, Craig.
Operator
operatorThanks. It looks like we don’t have any more questions. Please go ahead.
Darren Pylot
executiveAlright, everyone. Appreciate it, operator. Thanks once more for being with us, folks. Like I said, my excitement about Capstone's prospects has never been higher. Keep watching, and please don't hold back — as always, reach out to us whenever you have further questions. Keep staying safe and well, of course. Thanks.
Operator
operatorEveryone, that brings today’s conference call to an end. We appreciate you taking part, and we ask that you kindly disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Capstone Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Capstone Copper Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capstone Copper Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.