operatorGood morning, everyone. I’m Anas, and I’ll be serving as your conference operator for today. Right now, I’d like to extend a welcome to all of you to the Capstone Mining Q1 2021 Results Conference Call. <<operator_script>> Mr. Annett, the floor is yours to begin your conference.
Jerrold Annett
executiveGood morning, and welcome to everyone joining the call today. The news release with Capstone's 2021 first quarter financial results can be found on our website. If you're logged into the webcast, we'll be moving through slides. Joining us are Darren Pylot, President and CEO; Raman Randhawa, Chief Financial Officer; and Brad Mercer, Chief Operating Officer. After a few brief remarks from us, we'll open things up for questions. What's said on today's call will include forward-looking information. By its nature, that information carries risks and uncertainties, and actual results could differ materially from the views expressed today. For more detail on those risks and uncertainties, please refer to Capstone's relevant filings on SEDAR. Lastly, I'll note that every amount we discuss today is in U.S. dollars, unless otherwise specified. I'll now hand the call over to Darren Pylot.
Darren Pylot
executiveThanks, Jerrold, and good morning, everyone. First off, I'd like to draw your attention to the front cover of the presentation, which shows that Santo Domingo is set to begin major construction late this year. By midyear, we anticipate announcing our strategic partnership and financing plan, which will pave the way for a 2-year construction period and full production in 2024. Now starting on Slide #6. In Q1 of this year, operating results were excellent, as we gained from a mix of robust production, reduced costs and stronger copper prices. Consolidated Q1 production of 47.8 million pounds of copper at a C1 cash cost of $1.70 per pound came in above our expectations, and I was especially happy to see cash costs under the $1.75 per pound low end of annual guidance. Moving to Slide #7 now. With 49 million pounds of copper sold at a C1 cost of $1.70 per pound and a realized copper price of $4.12 per pound, that really drove the 40% EBITDA beat against consensus — $119 million actual versus $85 million of consensus. I think this quarterly performance solidly puts Capstone in the mid-cap group of companies. And as our production profile rises another 10% next year and 100% overall over the next 3 years with Santo Domingo, we believe this company is transforming into the premier mid-cap copper company.
Darren Pylot
executiveA company that operates in top mining jurisdictions, with district growth optionality, and is powered by a debt-free balance sheet that has even lower cash costs once Santo Domingo is added to the portfolio. Beyond that, we've laid out the substantial EBITDA generation of over $400 million in this current environment of $4-plus copper prices, and that figure is based on the midpoint of our guidance for Cozamin and Pinto Valley, respectively. $119 million is a great number to start the year with. Now let's move on to Slide #8. This quarter delivered the highest operating cash flow in Capstone's 15-year history as a copper producer. As you can see on the chart, we began 2021 on the back of a strong finish to last year. Both operations saw higher grades and higher throughput, along with strong copper recovery and cost containment. Pinto Valley's performance was underpinned by the completion of our Phase 1 PV3 optimization to increase throughput up to the currently -- current levels of 58,000 tonnes per day in the quarter, and Cozamin ramped up production at 3,780 tonnes per day, which was the target within the completion of the one-way ramp that we did late last year. As we noted earlier, the performance was a glimpse of what is to expect moving forward.
Darren Pylot
executiveRaman, over to you at this point.
Raman Randhawa
executiveThanks, Darren. Slide 9 is where we're turning to now, and it highlights the financial transformation Capstone has undergone over the past year. The $4-plus copper price environment is certainly a powerful tailwind, but growth at Capstone has been supported by the key building blocks we concentrated on during the last 12 months, and those included the following. First, innovation and optimization at Pinto Valley, which delivered a sustainable throughput gain of 10%, bringing it to 58,000 tonnes per day. Second, exploration excellence at Cozamin, which extended the mine life to 10 years in the latest technical report, alongside the strongest production and cash flow profile in its 15-year history. Third, Silver Stream. The $150 million Silver Stream drove Capstone to a debt-free position and gives equity shareholders full leverage to copper prices now. And fourth, pushing forward the reduced capital strategy for Santo Domingo lowers the risk for Capstone as it advances a world-class project toward major construction. The operating results for the first quarter reflect Capstone's strong potential for earnings and operating cash flow generation in a rising copper price market. The Q1 2021 actual figures on a stand-alone basis come close to the full year 2022 actuals for EBITDA and OCF.
Raman Randhawa
executiveAll in all, what we delivered is a solid signal of what 2021 can be for us at full tilt. Adjusted EBITDA came in at $119 million for the quarter, alongside cash flow from operations of $245 million before working capital movements. Once you adjust operating cash flow for the $150 million from the Cozamin stream, that works out to $95 million. We paid off the entire $185 million of long-term debt during the quarter, which puts us in a net cash position of $45 million. After the quarter closed, Wheaton made its first draw of $30 million on the gold stream, so our net cash position rises from $45 million to $75 million. Moving now to Slide 10. The chart on the right shows how much after-tax operating cash flow we generate in a $4 copper price environment. Over the coming 3 years, that adds up to $1 billion cumulative. Bear in mind that our site sustaining capital each year is quite modest — $75 million combined across the 2 mines — plus some expansion capital currently directed at PV3 optimization, exploration and the paste fill plant at Cozamin. With no long-term debt on the balance sheet and the annual EBITDA Darren outlined earlier of more than $400 million, we have a strong footing to use our balance sheet and cash flows to fund our share of Santo Domingo at very attractive cost of capital options.
Raman Randhawa
executiveAt this point, I'll hand things over to Brad.
Bradley Mercer
executiveThanks, Raman, and good morning, everyone. For your reference, we're now on Slide 11. Darren and Raman already talked about the record operating cash flow and the strong balance sheet. I want to talk about some operational milestones now. At Pinto Valley, the Eriez HydroFloat engineering work is advancing very well, and we are expecting to green-light this approximately $70 million project for construction by midyear, and it should be operational after that by mid '22. Recall from our earlier calls, we expect an attractive payback on capital that's driven by a 6% increase on copper recovery. Moving on to Cozamin. The ramp-up to 3,780 tonnes per day has been met. It was the target previously announced in our technical report. I'll also add that the one-way ramp is proving to be a major debottleneck win as we thought it would be. For the mine, as we have seen several days in the past quarter, over 4,000 tonnes a day being hauled up that ramp, not -- without anything coming up the shaft while the shaft was down for maintenance. So with that, plus the 2,000 tonne per day capacity of the shaft, this tells me the mine will not have any logistical issues to grow production.
Bradley Mercer
executiveWhen it comes to growth at Cozamin, we've started work on the Impact23 initiatives, supported by continuing exploration — continuing exploration in the West Mala Noche Footwall Zone, where at present we're drilling from surface, but in 2022 we'll switch to underground drilling once an exploration drift is finished. Later this year, we'll provide an update on those initiatives. Turning to Santo Domingo: talks with strategic partners and a financing plan are quite far along, trade-off studies aimed at replacing the iron ore pipeline with the rail option are going very well, and feasibility work on the cobalt project has begun. It ranks among the top 3 cobalt projects outside of the DRC and has the potential to be one of the world's lowest cost. Let me point you to Slide 12. That slide always makes me smile, because it's amazing how far mining has advanced in such a short time thanks to new technologies. Pinto Valley, back in the 1970s, was designed for a daily throughput of 36,000 tonnes a day, using what I believe at the time were the biggest ball mills in the world. And today, nominal capacity is almost 2x higher, with the same motors and the same mills.
Bradley Mercer
executiveI'd say that's pretty impressive. Lately, we've achieved strong results with blast fragmentation technology, which has delivered a consistently finer feed size to our mills, and the effect is significant. Right now, from the pit, we're producing on average 35% to 40% fines at minus 1 — minus 0.5 inch, sorry — in our feed, compared with roughly 25% at minus 1.5 inch a year ago. That finer feed brings down our power cost, brings down our maintenance cost, and boosts ball mill throughput. Beyond that, as I noted, pairing Eriez HydroFloat with Jetti catalytic leach technologies will make sure Pinto Valley can get the most copper recovery possible out of a resource. In short, we believe we can achieve new mill-like throughput from an old mill built in the 1970s era, with the same holding true for cost and recovery. That raises the question: what might Pinto Valley ultimately look like down the road? We intend to answer that through our PV4 study, due out in 2022. We're finalizing our inputs for that study in early Q3. And notably, I'd point out, we have 1 billion tonnes of resource at a grade similar to the reserves but not presently counted in the reserves, so we expect to present a mine plan extending into the 2050s with a higher production profile than our current PV3 plan.
Bradley Mercer
executiveThe plan is to get as much leaching going as possible so we can fill the SX-EW plant, which has plenty of spare capacity, and that also helps cover the extra stripping we need in order to deepen the pit. It might additionally support running a higher cut-off grade at the mill. Basically, as you heard earlier, I believe the future looks very exciting for us at Pinto Valley and at Capstone. So that wraps up what I wanted to say, and I'll turn things back over to Darren. Thank you.
Darren Pylot
executiveThanks, Brad. Everyone, we're moving to Slide 13 now. Most of the catalysts on this slide have already been covered. The updated technical report for Pinto Valley coming in this year's second half is going to fold in the optimization work we've achieved so far. But really, as Brad mentioned, the true potential of the mine won't be revealed until the PV4 study arrives next year. That's the reason we acquired Pinto Valley back in 2013 — the enormous upside we identified for this operation, both on the property itself and within a prolific Arizona copper district. In my view, there's a chance for Capstone to bring this district together under a single umbrella, improving overall environmental performance while responsibly moving copper growth toward production. For Capstone, the near-term catalyst is announcing our strategic partner and the financing plan for Santo Domingo, which we expect by midyear. I realize many of you might be thinking Capstone is generating enough cash flow right now to build the entire project on our own, but our strategy remains unchanged. We won't proceed with any major capital expenditures until the ownership and financing plan is fully outlined and finalized. So regardless of which partnership structure is chosen, I'll add that Capstone will make sure the owner's team has the technical depth needed to execute the build of this transformational project, should Capstone stay the operator during construction.
Darren Pylot
executiveTurning to Slide 14, which is our final one. As you can see from the chart on the right, we have a plan for production growth of more than 100% across the coming 3 years, and that growth comes alongside meaningfully reduced costs. In my view, Capstone today stands as a premier mid-cap, high-growth business — one that embraces technology in order to drive a high return on capital. Thanks for being with us today. At this point we'll open the line for questions. Operator?
Operator
operator<<operator_script>> Our opening question is from Craig Hutchison at TD.
Craig Hutchison
analystStrong results today. A few questions about Pinto Valley. Regarding how Jetti technology is being used, have you begun deploying it in the field at this point? Or is it still essentially in the testing stage, in terms of some of those column leaching tests you were running before?
Darren Pylot
executiveCraig, I appreciate that question. No, we're actually deploying it out in the field as we speak, and it's been in use for the last year. What the testing aims to do is turn low-grade mineralized waste into a reserve through column leaching, and that testing will run over the coming 8 to 12 months. So it simply takes a long time. But should we see the results we anticipate, we could then convert a substantial portion of that waste into actual reserves — both at our waste dumps and in their pits. And Brad, you're on the line — I'm not sure whether you'd like to add anything further to that answer.
Bradley Mercer
executiveNo. I believe Darren has covered that quite thoroughly. Honestly — Craig, the whole thing really hinges on being in a position to declare a reserve.
Craig Hutchison
analystAll right. So on the timing for that — when do you think confidence will be more restored, later this year or perhaps early next year? Or...
Darren Pylot
executiveYeah. Which is exactly the reason…
Bradley Mercer
executiveTesting is proceeding...
Darren Pylot
executiveMy apologies. Please continue, Brad.
Bradley Mercer
executiveRight, so the column tests will likely need about eight months, and they're getting ready to load up again soon. That's the reason the PV4 study is arriving later in '22. We simply need the runway so that we can obtain solid results from the column test.
Craig Hutchison
analystAll right. Previously, you folks mentioned the possibility of bringing in extra resources — regional ones near Pinto Valley. Where do those efforts stand right now? Is anything sort of blocking you at this stage?
Darren Pylot
executiveCraig, Darren here again. There's nothing standing in our way. Every two weeks, we're holding active talks with our neighbors. The level of activity has never been higher than it is right now. So we see a genuine opportunity, more clearly than at any point, that consolidation could happen involving the brownfield resources — both the copper resources and the brownfield areas, plus the water resources in and around that area — and we believe that, since we're the only producing mine in the district, as far as we know. We're firmly of the view that a consolidation opportunity exists in those areas, and that it should happen sooner rather than later.
Craig Hutchison
analystRight, okay. And I believe you folks got a favorable draft record decision lately regarding the Pinto Valley expansion. In terms of the potential to apply it to your new areas that you're moving toward under the forestry services times, would any of this material be addressed there?
Darren Pylot
executiveI’d say — well, as you mentioned, a draft record of decision is out there publicly, and we’re currently in the 45-day public comment period, with the schedule as it stands calling for the final permit to be issued in the fall. And that — that covers only our PV3 mine plan and operations.
Craig Hutchison
analystAll right, and perhaps one final question from my side. Regarding Cozamin, all of you seemed quite enthusiastic about certain western and eastern extensions of the Mala Noche Footwall Zone. Is there any news on where things stand with that, and when should we expect our first sort of look at the new drill results?
Darren Pylot
executiveAbsolutely, Craig — Brad is the right person to take that question.
Bradley Mercer
executiveSo, we do have rigs working from surface. As you can imagine, drilling a single hole from surface takes some time. The results have been pleasing, and we're satisfied with how they're progressing. Once we've built up a critical mass of results, we'll put out a release later in the year. The major effort on that — sorry, Craig — the major effort on the exploration to the east is going to come next year underground, once we finish the drift.
Operator
operatorOur following question is from Dalton Baretto at Canaccord.
Dalton Baretto
analystNice work, and sorry if I overlooked this in what you said. I got dropped from the call twice. For Pinto Valley, what throughput rate are you averaging in April? Also, do you have any idea what you expect the average to be this year? Could it come in above 58,000 tonnes per day?
Darren Pylot
executiveYeah. Brad, I’ll have you share the precise figures, but we’re — sure, Brad, go ahead.
Bradley Mercer
executiveYes. So our main focus right now is getting throughput steady. I think we've achieved that at roughly 58,000 tonnes per day. In our view, the mill has room to run considerably above that level. In fact, it could go higher, likely beyond 60,000. At the moment, recovery is where our attention is, but running at 58,000 tonnes a day certainly isn't putting stress on the mill.
Dalton Baretto
analystAll right, that's great. And then, just talking about recovery, besides the coarse flotation technology, what remains to be implemented from a PV3 standpoint?
Darren Pylot
executiveNo, that's really where most of it comes from. I mean, we aren't doing a lot beyond that. The areas are honestly the main item — the big-ticket piece that we believe will significantly push that recovery up into the low 90s. Beyond that, it's — as I said, our approach is to get this old mill running like a new one through technology and a modest amount of capital, rather than writing a big check to spend a huge sum, and we're seeing those results starting at the front of the mining with blast fragmentation, upgrading the fine crushers in the screen decks, which are already complete, and now the final piece at the back end, which is the recovery. So we — as Brad mentioned, we think at some point within the next 12 months, we can raise recovery — sorry, raise throughput into the 60,000, low 60s, and hit that 90-plus percent recovery. And that will mean the full PV3 optimization is done.
Dalton Baretto
analystOkay, great. Next, I’d like to ask about the Santo Domingo JV process as it has moved forward. Could you share a bit more with us about it, specifically regarding the type of participants involved at present, whether you are leaning toward the higher end or the lower end of your ownership range? And also what the bid-ask looks like at the moment?
Darren Pylot
executiveOkay, Dalton, once more — we're pursuing two paths at the same time. As I mentioned, we kicked this process off some time back, and it has stretched out given COVID and the fluctuations in copper prices. So the two-track approach involves becoming a much smaller owner, which is the route we began with. Then, naturally, with copper prices where they are and given our balance sheet, we've also been in a position to include an option where we hold a bigger stake, in the neighborhood of 70%. So it's a two-track process. Which one wins out, I can't say. What I can say is that we genuinely believe, understand, and know that this fully permitted, large-scale project in Chile is a Tier 1 asset — particularly during the early years of copper production — and that we'd like to hold as large a share of it as possible. Even so, we will pursue the best deal for our shareholders — the one with the least risk and the greatest return — and that is our #1 obligation. That is what we're doing. So we're advancing on both of those paths, and we do anticipate having a clear picture reasonably soon — certainly by the next time we talk on this call, during the next quarter call.
Dalton Baretto
analystOkay, great. So perhaps just one final question from my side. You now carry no debt at all, which is the first time that's been true since 2013. On top of that, you're producing a huge amount of cash, and you have reasonable visibility into how Santo gets funded. At all are you considering deploying capital beyond Santo Domingo — whether that means returning capital or pursuing new projects?
Darren Pylot
executiveOkay, so as you just said, we have some capital on hand, and there are a couple of items for us to examine. There's the PV3 organization capital, which everyone understands well. Then we'll turn to the PV4 study we're going to release and get a sense of what the capital requirements look like there. Clearly, we'll spell out the ownership structure of Santo Domingo along with our capital commitments tied to it. That said, we believe those will be extremely conservative, since the fact that we consolidated Santo Domingo ownership at 0.3x NAV — that's the price we paid — doesn't imply we'd sell it to another party at such a low level. So between the proceeds from reducing our stake and the debt financing that could be placed on it, we expect minimal capital outlay. So yes, we think we'll have extra capital, and we'll figure out the best path for returning it to shareholders — whether by growing our operations or distributing it — and we'll be in a position to review that during the second half of this year.
Operator
operatorOur next question comes from Stefan Ioannou at Cormark Securities.
Stefan Ioannou
analystI realize you'd mentioned before a fairly modest initial program at Donovan for exploration. I'm wondering whether that's gotten underway yet, or whether it's something you've set aside for later this year. And are you currently seeing any other regional opportunities down in Mexico?
Darren Pylot
executiveThanks, Stefan. Brad, I’ll let you take that one.
Bradley Mercer
executiveCorrect. The drilling program has just wrapped up for us. We completed — the precise figure escapes me at the moment, though my recollection is roughly 2,000 meters in total. On the subject of additional opportunities, we're in constant conversation with neighboring parties. That covers a full spectrum, from drilling deeper targets beneath silver targets on their ground, right up to total mine. So talks, I'd characterize them as fairly ongoing, yet nothing further has been signed as of late.
Operator
operator<<operator_script>> At this point it looks like nothing else has come in from participants. Please go ahead.
Darren Pylot
executiveThanks, operator, and thanks to all of you for joining the call. We appreciate your support and your questions, as always, and please feel free to reach out to us with any follow-up questions you might have. Thanks, everyone. Have a good day.
Operator
operatorThat brings today’s conference call to an end, ladies and gentlemen. We appreciate your participation and ask that you kindly disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Capstone Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Capstone Copper Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capstone Copper Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.