operatorGood morning, everyone. I'm Colon, and I'll be serving as your conference operator for today. Right now, I'd like to extend a welcome to all of you joining the Capstone Mining Q2 2021 Results Conference Call. Every line has been muted so that background noise doesn't come through. Following the speakers' remarks, we'll open things up for a question-and-answer session. <<operator_script>> Thank you. Mr. Annett, the conference is now yours to begin.
Jerrold Annett
executiveGood morning, and welcome to everyone joining us today. I'd like to point out that the news release and regulatory filings that announce Capstone's financial and operational results for the second quarter of 2021 can be found on our website and on SEDAR. For those of you logged into the webcast, we'll be moving through slides of today's presentation, and that presentation is also posted on our website. With me on the call today are Darren Pylot, our President and CEO; Raman Randhawa, our Chief Financial Officer; and Brad Mercer, our Chief Operating Officer. After we make a few brief remarks, there will be a chance to ask questions. I should note that comments made on today's call will include forward-looking information as that term is defined under applicable securities laws. By its very nature, such information carries risks and uncertainties, and actual results could differ materially from the views expressed today. To learn more about these risks and uncertainties affecting our business, please refer to Capstone's most recent filings, which you can find on our website and on SEDAR. And lastly, I'll just mention that every amount we discuss today is in U.S. dollars unless otherwise specified. I'll now hand the call over to Darren Pylot.
Darren Pylot
executiveThanks, Jerrold, and good morning, everyone. I'd like to begin on the cover page of this presentation, which shows our tailings thickeners at Pinto Valley. Over the past several months, the focus has been on finishing phase two of our PV3 optimization project, with most of this year's work concentrated at the backend of our operation. These upgrades will enhance reliable throughput and water recovery capability, which in turn will reduce water consumption. Moving to Slide Number 6, I'd like to highlight our 2020 sustainability report, which we published recently and which can be downloaded from the responsibilities section of our website. This marks Capstone's 5th annual sustainability report. It follows the summary report for the period of 2018 to June 2020 that we published last year. The report was prepared in accordance with the core option of the global reporting initiative standards, and it discusses how our approach and long-standing commitment to sustainable mining practices continue to guide our vision of a responsible copper-focused mining company capable of generating value for all of our stakeholders. Our cross-functional ESG committee is currently developing our long-term ESG strategy to formalize our contributions to the United Nations Sustainable Development Goals, and we expect to incorporate this strategy into our 2021 sustainability report to be published next year.
Darren Pylot
executiveWe take a lot of pride in that accomplishment and want to praise our ESG team for how hard they've worked. We're eager to see that effort show up in our upcoming results and in our ESG reporting efforts down the road. Turning to Slide 7 now. In Q2 of this year, we produced £43.3 million of copper at a task cost of $1.91 per pound, helped by a record production quarter at our closing in mind and a solid quarter at Pinto Valley. That came amid meaningful planned downtime while we concentrate on phase two PV3 optimization work. At this point, however, the major work is finished. With that in hand, we anticipate a strong second half of the year. I'm quite happy with closing these performance, since it marked the first full quarter at expanded production rates of 3,800 tonnes per day, and the mine delivered the highest quarterly production is history of £13.8 million of copper in the quarter at $1 per pound cash costs, which sits at the low end of our cost guidance. Moving now to Slide Number 8. Q2 financial performance was yet another record setting quarter in cash flows history, with 128 million in adjusted EBITDA and 110 million in adjusted after tax operating cash flow.
Darren Pylot
executiveOur cash position is now much higher, reaching 172 million by the end of the quarter, and looking back to a year ago really shows how much has changed in twelve months. Over the past 12-months, we've put an additional $336 million of cash on the balance sheet, which works out to $1.03 per share. Moving to Slide Number 9. As I said earlier, Capstone had a record quarter. None of this would have been achievable without the investments we made in our future through the difficult years of 2019 and 2020. Today both of our mines are running at optimized levels, and the timing is excellent given the $4 copper environment. At Santa Domingo, infrastructure sharing, capital reduction and financing discussions are all advancing well, and we anticipate making an announcement about this in the third quarter. Let's turn to Slide Number 10. Q2 EBITDA came in at 128 million, surpassing the street consensus of 100 million, and first half tax operating cash flow of 205 million highlights our ability to generate cash as we move toward a permanent and transformational growth phase, with Santa Domingo construction set for next year. Slide 11 helps put this in perspective. The chart here displays this year's operating cash flow performance through June 30th alongside our historical quarterly results.
Darren Pylot
executiveRaman, the floor is yours now.
Raman Randhawa
executiveThanks, Jerrold. Moving to Slide 12 now. Cash balances rose from one quarter to the next by 127 million, reaching 172 million as of June 30th. We hold an undrawn corporate revolver of 225 million, so current liquidity sits at just under 400 million and keeps growing with copper priced at $4. I take real pride in how effectively we convert operating cash flow into balance sheet cash. That stems from holding corporate G&A down and from having no debt interest to pay, since we've carried no debt from early Q1 onward. Year to date EBITDA stands at 247 million; treat that, at roughly 500 million, as a solid gauge of our financing capacity as we look toward Santo Domingo. On top of that, input costs are working in our favor, thanks to steps taken during COVID-19 back in 2020. At Pinto Valley, for instance, we locked in diesel prices covering most of our planned consumption for 2021 and 2022, which produced realized savings of about two million in the first half of 2021. And at present prices, we anticipate realized savings of roughly five million through the end of 2022.
Raman Randhawa
executiveFor reference, we've hedged fuel at $1.76 per gallon for this year, and spot is currently sitting at roughly $2.35 per gallon. On top of that, we've hedged the Mexican peso at MXN23 to the U.S. dollar, and that has delivered an extra $3 million in gains for 2021. Moving to Slide 13. Our initial 2021 total capital guidance of 128 million, issued back in January, rests on a $2.75 copper price environment. It also assumed we held 70% of Santo Domingo, as opposed to the 100% ownership we have now. Full ownership added nine million, plus another 11 million tied to a handful of carryover items, kicking off exploration drilling at Brownfield, and the choice to green light the cobalt fees pre-feasibility study, which has now moved into phase two. An increase of 22 million will be spent at Pinto Valley this year, covering one-time optimization investments in water management and tailings as well as accelerated stripping, which you saw in Q2. And there's additional expense-rate capital connected to pushing the PV4 study forward and a booster station for Jedi assisted dumped leech production. All told, this higher spend comes from a position of strength, as we look ahead to investing further in our business for growth and sustainability.
Raman Randhawa
executiveThe capital we invested earlier, when copper was below $3 during PV3 optimization, along with the close in ramp, is now delivering substantial returns and fits nicely with their emphasis on projects requiring little capital yet yielding high returns. We're now on slide 14. Ahead of a financing deal and a construction decision at Santo Domingo, we asked the project team to refresh the initial capital estimate. As you might remember, that initial capital estimate traces back to the original 2018 feasibility study, which got another update in 2022 aimed at capital certainty. The reduced capital estimate has gone up by just a 35 million increase, mostly tied to labor and materials, among them higher steel prices and cost inflation, plus revised process plan and mine equipment quotations. All told, the capital increase comes to roughly 10%, as one would anticipate, but it's largely offset by a shift in the assumed U.S. dollar — Chilean peso exchange rate, from 600 to 700; spot Chilean Peso sits near 760 right now, and we could hedge that in our favor once a construction decision is made. Refreshing the capital estimate gives extra assurance ahead of the construction decision. I'll now hand things to Brad for a review of the operations.
Brad Mercer
executiveThank you, Raman, and good morning to everyone. For those listening, we're on Slide 15 now. It was a really busy quarter at Pinto Valley, with phase two of the PV3 civilization work resulting in substantial planned downtime. Mill throughput came in at an average of just under 50,000 tonnes per day, which was comparable to Q3 of 2020, when most of the phase one optimization work was carried out. We did experience some minor production effects from workforce shortages, since road closures and evacuations occurred because of wildfires discovered in the area. High recoveries of nearly 89% for copper and better head grades of 0.33 in the quarter helped produce an overall strong result given the reduced online time in the middle. PV4 study work is progressing well, with the Jetti catalytic column leach test getting underway over the next nine to 12 months. An internal feasibility study for areas hydro flow is continuing, as more engineering work is required to align this technology with a tailings management strategy that we plan to incorporate within the PV4 expansion. Another project priority is agglomeration, a low CapEx project with potentially high impact and strong environmental benefits, since it would divert a stream of acid generating minerals away from the tailings storage facility.
Brad Mercer
executiveThe flotation tailings stream, which contains pyrite and chalcopyrite, is going to be agglomerated with dump leach feeds, and that would reduce sulfuric acid purchases while boosting copper cathode output by recovering additional copper from the tailings. Now to Slide 16. At Pinto Valley, ball mill number three was swapped out safely this year in 30% less time than it took to replace ball mill four last year. That was a remarkable achievement, and clarity demonstrates how focused the operations are on continuous improvement. Phase two optimization has centered mainly on upgrades to tailings thickeners and the associated tailings infrastructure. Those upgrades will permit greater recycled water rates as well as higher throughputs. We've also begun research on the leach flotation circuit through July and anticipate ramping up production in the second half of 2021. Moly prices are up $8 per pound to more than $18 per pound this year, which makes it an appealing byproduct right now. Onto Slide 17. The Cozamin ramp-up is finished, with the mill averaging above 3,800 tonnes per day. You'll remember that was the goal in the tech report in Q2. Grades came in at an average of 1.86% during the quarter. And with those higher grades, we saw copper recovery improve slightly, to 96.3.
Brad Mercer
executiveDuring the quarter, the mine generated record cash flow of 46 million, which was an outstanding performance. This team makes us very proud. Dry stack tailings and paste backfill facility construction is underway and proceeding on schedule. Long lead item purchasing has been finished. The operation's first full year will be 2023, with construction concluding in 2022. We are excited now to get this plant installed, since it will maximize extraction of high grade ore from this world class asset. At Cozamin, exploration has concentrated on the West Mala Noche Footwall Zone using two surface rigs, and we are developing two West exploration drifts plus cross cuts, which are also progressing well. After these are finished, they will enable easier infill drilling from underground in early 2022. Moving now to Slide 18. In our view, the Santa Domingo cobalt project could become one of the lowest cost cobalt producers outside of the Democratic Republic of Congo. The 20 million cobalt fees of prefeasibility study announced in Q1 is advancing on schedule and has entered Phase two. A geochemical model was created to quantify pyrite-cobalt distribution across the ore body, and it guided drill hole locations for the term drill program, from which additional samples will be collected for further plant optimization testing.
Brad Mercer
executiveWork on the drilling program got underway in May 2021, and the samples from it are going to be used by us to build a three-dimensional geometallurgical model for pyrite-cobalt flotation. At the same time, engineering work is set to carry on so that the cobalt plant is brought in line with the existing PEA, along with a complete FS study during 2022. Capstone anticipates giving the market an update during Q1 of 2022 covering metallurgical work, process flow sheet design, and revised cobalt reserves and resources. So with all of that said, I'll hand things back over to Darren.
Darren Pylot
executiveThanks, Brad. We’ve added Slide Number 19. The mining tax situation in Chile has been a major focus for a lot of investors and for our shareholders. Santa Domingo benefits from a 15-year tax stability agreement, and that agreement begins after commercial production starts. That’s clearly an important advantage, and the many partners and prospective partners we’re talking with have recognized it as such. We consider Chile one of the top mining jurisdictions for investment, and we expect it to remain that way. Now to Slide 20. We’ve been carrying out our plan to become a £200 million copper producer by next year, and with Stan Domingo under construction, we’ll have more than 100% production growth by 2024, with lower costs ahead in the future. The PV3 optimization investments we’ve made at Pinto Valley to raise output, enhance metallurgical and environmental performance, and reduce costs have been producing excellent results. Now that the project is complete, we expect sustainable operations going forward. I’m excited about the real potential at Pinto Valley being unlocked in the upcoming PV4 study, which is due out next year. Slide 21. Innovation is essential to unlocking tremendous value for us at Capstone, and we intend to apply a number of technologies, including Jetti catalytic leaching to increase copper cathode output from low-grade material and areas of coarse particle flotation to raise proper recovery by 6% or more.
Darren Pylot
executiveAt Cozamin, I'm happy to report that the paste backfill plant and the dry sack tailings plant are both proceeding on schedule and within budget. As we aim to extend the mine's life well into the 2030s, this project is going to provide optionality for the mine. I'm also glad that our dry stack tailings plant pace backs are on schedule, since it too will help guarantee solid operational performance and lengthen the mine's life. At Santa Domingo, the project is moving quickly at present, and together with the port deal, our attention is on rail and other infrastructure sharing agreements so that we can reduce the capital outlay and also lower risk. In the months ahead, we anticipate announcing both a strategic partnership and financing for Santa Domingo, which will keep us on-track toward delivering transformational growth for our shareholders. Our cash balance is building, so we are in a strong position to carry out this project. Before we open the call for questions, and on Slide 22, we want to acknowledge and thank all the emergency response crews and volunteers who worked tirelessly to bring under control the wildfires that broke out in Arizona last month. And in particular, the telegraph and mescal incidents, which led to evacuations in neighboring communities and briefly disrupted communications and supplies to our Pinto Valley mine.
Darren Pylot
executiveAt Pinto Valley, the safety of our people and our infrastructure has never been in question, and for that we remain deeply thankful. Our team takes real pride in the essential part it plays in preventing disasters and responding to emergencies. We also restate our firm and unchanging pledge to stand behind the communities where we work — protecting their wellbeing and the health of the surroundings — since this is something we all share. With that said, let's open it up to whatever questions anyone might have.
Operator
operatorThank you. Ladies and gentlemen, we are now starting the question-and-answer portion. <<operator_script>> Our first question is from Orest Wowkodaw of Scotia Bank. Please go ahead.
Orest Wowkodaw
analystGood morning. Regarding the Santo Domingo process, your release mentions a decision about partnership and financing coming in the third quarter, so we're clearly nearing the end on that. I'm just wondering at this point: have you figured out what the final structure will be? I recall that when we spoke three months ago, there were several tracks for ownership of Capstone — 50%, 70%, and 100% options. I understand everything is finalized, but could you give us a sense of which track is the most likely result right now?
Darren Pylot
executiveYes. Thank you, Orest. Darren speaking. As you might expect, COVID has made things somewhat frustrating, and then Chile raised some concerns regarding taxes and royalties. So we have had to figure out how that will unfold going forward, and getting clarity on our solid footing under the DL 600 and our tax stability agreement has meant additional work for us during this process. But I suppose there is not much I can share about the structure, obviously. What I can say, though, is that Capstone wants to hold as large a stake in the project as possible, given our balance sheet and financing capacity in this $4 copper market, and we regard this project as a Tier-1 asset. So we would like to own as much as we can, and that dual track process should give you some guidance.
Orest Wowkodaw
analystIs there a scenario in which Capstone could move forward independently at 100%?
Darren Pylot
executiveAt this moment, that scenario isn't something we're considering. No—our preference is to have a partner. Right, no. Having one there is what we want, and we feel very strongly that a partner will be in place.
Orest Wowkodaw
analystAll right, that's where I'll stop. Thanks, Darren.
Operator
operatorDalton Baretto from Canaccord has the next question in the queue. Dalton, the floor is yours.
Dalton Baretto
analystThanks. Morning, Darren and everyone. I'd like to continue from the point where you stopped. So, Darren, you mentioned that you want to be involved in as much of this project as possible. But how much you actually get from the project probably depends on who the partner is, correct? And whether that partner is a mining company or, as we've discussed, something like an off day partner. I'm curious whether having a different mining company construct the project is now entirely ruled out, given that you want to hold as large a share of the project as you can?
Darren Pylot
executiveSo at this point, until we get it finalized, nothing is off the table, right? Because we haven't finalized it. But I will say that, again, as I said about the Auris (Ph), we'd like as much of a project as we can with that, but also including a minority partner in there, at least.
Dalton Baretto
analystAll right. Then, looking ahead on the financing side, with copper prices where they are, are you thinking about hedging across the construction period?
Darren Pylot
executiveIs your question asking whether we're thinking about hedging copper while construction is underway?
Dalton Baretto
analystYou've got it right. Yes.
Darren Pylot
executiveSure. Well, nothing is off the table. And then, of course, we take a look at the copper price and grasp how that shapes the project as it moves ahead. And depending on the capital contribution to Capstone and the balance sheet risks, as you know, it is certainly on the table. Not fully there yet, depending once more on how much of the capital contribution we actually have to commit based on who our partners are. But yes, absolutely it will be up for consideration to insulate the balance sheet and keep it strong.
Dalton Baretto
analystUnderstood. All right. So perhaps shifting topics a bit. We've discussed before some of those regional opportunities near Pinto Valley, and I'm just wondering where things stand on that front and how you're viewing them in relation to PV4, or conversely how you view PV4 in light of those opportunities?
Darren Pylot
executiveYes, that's an excellent question. So PV4 — as Brad said during the call — the technical report is set to be finished in Q4 of next year. That timing stems largely from how long the Jetti column tests take; you need nine to 12 months of testing before anything can be called a reserve there. And we expect at least half of the ways we would script from PV4 to hopefully come back as ore through this process, which would let our stripping costs be significantly lower than what you normally get at a mine. So that's the PV4 tech report, and that sec report will cover everything on our property, and only with us — only with our own infrastructure and resources and reserves. And then of course, as you mentioned, there's the regional opportunity on top of that, and we keep making extremely good progress discussing synergies with our neighbors around us. So we feel good about potential partnerships with our neighbors, and that is advancing month by month, week by week, and we feel good about being able to significantly consolidate in the district in kind of a near-term future.
Dalton Baretto
analystUnderstood. Then perhaps just one final question from my side. Is there any concern regarding water rights when you consider the PV4 expansion?
Darren Pylot
executiveWater is always a worry, of course, in the climates where we run operations — Arizona, Mexico and Chile. It's clearly top of mind, and from an ESG standpoint too, conserving and recycling as much of it as we possibly can matters enormously. So it will forever rank among our biggest risks and the main things we keep our attention on. That said, as things stand right now, we do have enough water to run where we currently are, and also at the pace we are digging around PV4.
Dalton Baretto
analystThat answers it perfectly—appreciate it, Darren.
Darren Pylot
executiveThanks, Dalton.
Operator
operatorStefan Ioannou of Cormark Securities is our next questioner. The floor is yours.
Stefan Ioannou
analystAppreciate it, everyone. I’m just a bit curious about how the entire Jetti concept has been progressing, starting from PV3 and then, naturally, moving toward the more fully detailed PV4. I believe there was some discussion regarding a PV3 study being released late this year, so just to give the market an update, what exactly does that situation look like now? Does that remain the plan? We basically viewed a PV4 study in late 2022 as the next major technical report at Pinto Valley, correct?
Darren Pylot
executiveYes, Stefan, that's correct. Our initial plan had been to fold several of the PV3 optimization projects we've finished into the report around the end of this year. But since so much time had passed without issuing one, we chose to release the update sooner instead — that's the report that just came out. So at this point we likely won't publish another until the end of next year, and that one will bring in the completed PV3 optimized projects, plus fold Jetti and other items into the PV4 study, so we'd have a single report at the end of next year.
Stefan Ioannou
analystAll right, thanks. Then, just to finish up — clearly, that entire dry tech stack tailings project is moving forward. As for the remaining Impact 23 initiatives, are those still proceeding in the way that was laid out earlier?
Darren Pylot
executiveStefan, here's what I'll do with that one: I'll hand it over to Brad, since he's got the finer detail on it. Good question, though.
Brad Mercer
executiveYes, certainly. We keep seeing floor for extensions to the zone or toward the west. We've brought in — help us train on getting better drove of last procedures, higher tons per meter. That's going well. The other one is we're testing a number ore sorting technologies. Bench scale testing looks very, very promising. Because if you will recall, there is about seven million tonnes of resources that are not in reserves, we think the best test to get those in reserves are to target through a ore sorting. So we wouldn't sort everything that — ore body, we would select the more problematic higher dilution areas that are not currently in reserves, send them to the bottom of the mind near the shaft, stored them there and bring them up the shaft. That is the concept. We are we are well into testing the two technologies and we will be making this decision, probably in the next budget year.
Stefan Ioannou
analystAll right, great. Perhaps just a final administrative question from my side. With copper prices having climbed as they have, I’ll ask you to set me straight if I’ve got this wrong, but there are some payables tied to the Domingo sale, simply because the copper price has performed so strongly. Will that be showing up in the coming quarter or thereabouts, or where do things stand on that?
Darren Pylot
executiveGiven the copper price and our current position, we anticipate receiving the remaining payments by year-end—15 million, as I understand it, tied to the copper price. So we look forward to having that extra capital on the balance sheet, and we're glad the mentor mine keeps thriving amid these strong copper prices.
Stefan Ioannou
analystAll right, that's good to know. Thanks a lot, everyone. I appreciate that.
Operator
operatorCraig Hutchison with TD Securities has the next question — go right ahead.
Craig Hutchison
analystMorning, everyone. Regarding Pinto Valley, at the beginning of this year you were aiming for roughly 56,000 or 57,000 tonnes per day across the year, and then moving into next year, a range of 60,000 to 63,000 tonnes per day. Does that still hold? Do you think you'll be above 60,000 tonnes per day as you head into next year?
Darren Pylot
executiveHi Craig, Darren here. That's right. You observed that we posted Q4 and Q1 of this year — we actually ran Q4 of last year and Q1 of this year at 56, 57, and we can run the mine and the operation at six years or even above. Then, naturally, moving into PV3, and the bulk of the optimization effort took place during the quarter just ended. Our rates fell, but since most of the maintenance is now behind us, we were back at that 56,000 and expect to hold that for the rest of this year. With some work on our backend and tailings, we expect the outfits at 60 or higher next year, as we said.
Craig Hutchison
analystAll right, thanks. And regarding the EriezHydroFloat spending — should we assume there’s nothing in this year and the next, or is spending more likely in 2023?
Darren Pylot
executiveYes, that's right. We may end up doing additional engineering work within our PV4 study, though most of it would land after that study is released. With the PV4 capital, we found that the technology performs very well at Pinto Valley—it improves recovery. Still, we have to work out the remaining pieces so everything fits together. On its own, it isn't viable. Therefore it must be included in the PV4 capital and study. As a result, you won't see that spending until after 2022.
Craig Hutchison
analystAll right, thanks. Earlier you brought up in your remarks that you've been talking with your neighbors near Pinto Valley about CMGs. Is there a chance you're exploring some kind of partnership to capture part of those extra resources in the Pinto area?
Darren Pylot
executiveThere are quite a few synergies, honestly. Around the area there's excess water that our neighbors need to treat, and we could potentially take that on and use it on our dumpling leaches, recovering that copper responsibly. Some of our neighbors have additional copper resources they would never mine themselves. So there are lots of synergies, and it makes sense for all of us to help each other out to produce a sustainable, environmentally friendly operation going forward. And we do have the willingness of our partners — of our neighbors — to engage in that. So there are a lot of synergies from water to copper to Brownfield infrastructure as well.
Craig Hutchison
analystI’ve got one final question, and it’s about Santo Domingo. With the financing and the partnership talks, should we expect that you’ll have off-take agreements signed during Q3?
Darren Pylot
executiveI wouldn't take that for granted. What I mean is, we're quite — we're extremely lucky that not just Santo Domingo, but every bit of our concentrate is presently tied up under long-term off-take agreements and unencumbered, and all of it is exceptionally clean, free of any deleterious elements. So that's a strong asset to hold when you're bringing in a possible partner. So yes, it's on the table, but I wouldn't assume it's automatically going to be included in any deal.
Craig Hutchison
analystAlright, got it. Appreciate it, everyone.
Operator
operatorThe following question is from an independent research analyst whose name we couldn't make out. John (Ph), the floor is yours.
John Tumazos
analystThanks a lot. On the subject of dividends for shareholders, should we be thinking about that three to five years out, once Santa Domingo has moved through commissioning, is hitting its tons per day metrics and has the feasibility study done, or could it come together sooner than that?
Darren Pylot
executiveThanks, John — that's a really solid question, and the strong copper price environment is something we think about a great deal. The short answer is that you're correct. As long as we're converting $1 into $3 or $4 through these high-return projects — at first mainly around Pinto Valley and Cozamin, though as you pointed out, the big transformational asset down the road is Santo Domingo — then we'd like to see that asset get built, and our capital will stay dedicated to it until we know how much allocation it requires. After that, we have the Tier 1 asset generating very strong cash flows through every part of the copper price cycle. At that point, as you mentioned, we would look to establish a dividend policy and return meaningful cash to our patient shareholders. So that is exactly the thinking at present, just as you've laid it out.
Analyst
analystAppreciate it, and best of luck to everyone.
Operator
operatorThat concludes the question-and-answer portion. Darren, I'll hand things over to you for any closing comments.
Darren Pylot
executiveAlright, thanks to the operator, and thanks to all of you for being with us on today's call. Our Q3 results will come out in October. I'm looking forward to bringing you up to date on our progress at that point. Until then, please feel free to reach out to us whenever you have further questions. Also, keep following the guidance of your local health officials so that you stay healthy and safe. Have a wonderful day, everyone.
Operator
operatorThat wraps up today’s conference call, everyone. We appreciate your participation, and we ask that you please disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Capstone Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Capstone Copper Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capstone Copper Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.