Good morning. I'm Kelsey, and I'll be the conference operator for today. Right now, I'd like to welcome all of you to the Capstone Mining Q3 2021 Financial Results Conference Call. Every line has been muted so that background noises won't come through. Once the speakers have finished their remarks, we'll hold a question-and-answer session. <<operator_script>>. Thank you. Mr. Annett, the conference is yours to begin.

Jerrold Annett

executive
#2

Thanks, and good afternoon, everyone. Welcome to today's call. I'd like to point out that the news release and regulatory filings that announce Capstone's 2021 third quarter financial and operational results can be found on our website and on SEDAR. If you're logged into the webcast, we'll be moving through the slides of today's presentation, and that presentation is also available in the Investors section of our website. Joining me today are our President and CEO, Darren Pylot; our Chief Financial Officer, Raman Randhawa; our Chief Operating Officer, Brad Mercer; and our Senior Vice President, Risk, ESG and General Counsel, Wendy King. After our brief remarks, there will be a chance to ask questions. I'd like to note that comments made on the call today will contain forward-looking information within the meaning of applicable securities laws. By its nature, this information is subject to risks and uncertainties, and actual results may differ materially from the views expressed today. For further information on these risks and uncertainties pertaining to our business, please see Capstone's most recent filings, which are available on our website and on SEDAR. And finally, I'll just note that all amounts we will discuss today are in U.S. dollars, unless otherwise specified.

Jerrold Annett

executive
#3

At this point, I'll hand things over to Darren Pylot.

Darren Pylot

executive
#4

Thank you, Jerrold, and good morning, everyone. I want to open by recognizing the exceptional efforts of our Pinto Valley team in reducing the impact of severe weather throughout the third quarter, and in the assistance they gave local officials in the neighboring communities of Globe and Miami. As the title slide illustrates, we are making communities stronger by constructing resilient operations around them, and that matters greatly to our success over the long term. The June wildfires that we talked about on our last conference call scorched vast stretches of wildland near Pinto Valley, leaving behind scarred patches of hard, compacted soil that water cannot penetrate. Then came record monsoon rainfall in July and August, which triggered serious flooding and mudslides in the nearby communities of Globe and Miami. Our Pinto Valley team coordinated with local authorities and took an active part in remediation work aimed at helping contain the damage. They exceeded expectations by restoring vulnerable areas within the Tonto National Forest to head off future emergencies. And I want to praise them, because they gave their own time and effort to help the communities, all while finishing the PV3 expansion project and turning in a solid quarter at Pinto Valley in spite of these disruptions.

Darren Pylot

executive
#5

Climate change action is something we remain dedicated to, and sustainability along with ESG plays a strategic role in our long-term business plan. Later on this call, Wendy will talk about how we keep moving our sustainability programs forward so the business can thrive and reach its objectives. If we move to Slide number 6, the third quarter was solid, with consolidated copper production reaching 44.4 million pounds and cash costs of $1.96 per payable pound, helped by yet another record production quarter at Cozamin, where the benefits of the mine expansion keep paying off by letting us drive daily throughput at the mill to record levels. That mine turned out 14.1 million pounds of copper at a cash cost of $0.93 per payable pound of copper. On the whole, Pinto Valley delivered a solid quarter given the tough weather conditions it dealt with, producing 30.3 million pounds of copper at a cash cost of $2.44 per payable pound. Productivity and costs took a hit during the first half of the quarter, when heavy monsoon rains brought wet conditions that slowed mining and milling rates. A number of our workers had to contend with evacuations and road closures in and around nearby communities, which resulted in high absenteeism. Even so, our team bounced back fast, and by mid-August we had returned to target milling rates.

Darren Pylot

executive
#6

From September through today, we've been averaging more than 60,000 tons a day, since the PV3 optimization effort is finished and that investment is now paying off for us, along with all the maintenance work we completed in Q2 and Q3. So on a year-to-date basis, we've turned out more than 135 million pounds of copper at a cash cost of $1.85 per payable pound, which tells us we're firmly on track toward our annual guidance of 175 million to 190 million pounds of copper at a cash cost ranging from $1.75 to $1.90 per payable pound. Turning to Slide 7. During the first nine months of this year, we brought in a record operating cash flow figure of $272 million. That exceeds any full 12-month stretch in Capstone's operating history. Since Q4 should be our strongest operational quarter and copper currently sits well above $4 a pound, we expect to close out the year on a strong note. This cash generation leaves us well positioned to carry out our internal growth projects at Pinto Valley and Cozamin and also to move the Santo Domingo project in Chile forward. On Slide 8, during Q3 we kept strengthening our cash position and ended September with $208 million in cash and short-term investments.

Darren Pylot

executive
#7

That represents a rise of $36.7 million from the prior quarter. Adjusted net income came to $35.3 million, equal to $0.09 per share. Operating cash flow before working capital changes totaled $67 million in this quarter. At this point, I'll hand things over to Raman, who will walk through these financial measures in greater detail.

Raman Randhawa

executive
#8

Thanks, Darren. Moving to Slide 9 now. Adjusted EBITDA for Q3 came in at $72 million. That number took a hit from $10 million in realized losses tied to provisional price adjustments, and also from a timing lag on sales of 3.3 million pounds of copper, which drags EBITDA down by roughly $6 million more. We anticipate recovering that delayed sales volume during Q4. On top of that, extreme monsoon rains and area flooding at Pinto Valley cut production by an estimated 10%, which also pushed up unit cost. If you look at the chart on the right, Q2 saw us benefit from copper prices on the rise, which produced a positive provisional pricing adjustment. That actually came through as a realized copper price of $5.02, or $0.62 per pound above the Q2 LME average of $4.40. In Q3, weaker copper prices led to negative provisional price adjustments, and the effect was realized prices of $4.04 for Capstone — roughly $0.21 per pound beneath the LME average of $4.25 — paired with a softer sales quarter of 39.6 million pounds, as I mentioned. Setting that quarter aside, EBITDA year to date stands at $319 million across just nine months of operations, which is well above any annualized EBITDA figure in Capstone's history.

Raman Randhawa

executive
#9

Now if you go to Slide 10, like Darren said before, our cash position rose by $36 million from the prior quarter, reaching $208 million as of September 30th. We still have $225 million available on our corporate revolver that's undrawn, so that puts us above $430 million in current liquidity as we grow in this environment where copper is at $4.50. Capstone is doing a good job of turning cash flow from operations into cash on the balance sheet. That's happened because we keep our corporate G&A the lowest in the industry and we maintain a balance sheet that carries no debt. The chart on the right side is one I really like, since it shows our cumulative operating cash flow from our two operating assets across the coming three years, building to roughly $1.2 billion at $4.50 copper. Moving to Slide 11, over the last year we generated $371 million in free cash flow from operations and stream transactions, and that positions the company well for reinvesting capital. At Capstone we've put a formal capital allocation process in place that identifies investment opportunities, measures them against our investment criteria, and then runs them through a stage gate process for approval or rejection. The organic growth pipeline we have, on top of the transformational Santo Domingo project, gets me excited. We've also assessed quite a few projects with low capital and high returns, with quick payback, at our two operating mines.

Raman Randhawa

executive
#10

In 2021 to date, we brought the one-way ramp at Cozamin online during Q1. That took under $5 million of capital investment, lifted production rates by 33%, and has already delivered an incremental return year-to-date of $25 million — 500% over nine months. More recently, in Q3, we rolled out our PV3 optimization projects at Pinto Valley. Next slide. The PV3 optimization projects were aimed at debottlenecking the process plants to reach throughput rates 10% higher, at 58,000 tons per day, for investments of $31 million across 2020 and 2021. That targeted throughput rate has been surpassed from September through today. One of the next low-capital projects up for an investment decision at Pinto Valley is pyrite agglomeration. It targets a boost in leach copper production along with output of sulfuric acid, which will cut future acid purchases, for an investment of under $10 million. A decision on investing in this project will come by year-end. The PV4 study is meant to capitalize on roughly 1 billion tons of resources that are not currently in reserves, it is advancing well, and we expect to publish an updated technical report on PV4 in 2020. These low-capital, quick-payback projects assist in lowering unit costs at Pinto Valley mainly by growing the denominator, that is.

Raman Randhawa

executive
#11

Moving to copper output, and Slide 13. Regarding cost inflation, our emphasis has consistently been a strategy of containing costs. During 2019, we took $27.5 million of cost out of the business. In today's operating climate, we've taken proactive steps to manage our major input costs, and as a result, cost inflation has been very minimal so far. At Pinto Valley during 2020, we locked in diesel purchase prices, which has delivered $3.3 million in savings year-to-date. The projection is to save an extra $10 million relative to current spot prices through the rest of 2021 and 2022. We also restarted the moly plant at Pinto Valley, with output anticipated to ramp up during 2021, which will boost byproduct credits next year. We also got into foreign exchange pesos, which have generated $2 million of savings year-to-date. On the closing slides you'll notice that although copper prices are up 58%, our cost per pound has in fact come down 3% overall after accounting for a silver stream, and that gives a gross margin expansion to 54% straight to our shareholders. Now, I'll hand it to Brad.

Brad Mercer

executive
#12

Thanks, Raman, and good afternoon, everyone. So you should be looking at Slide 14 now, and the key takeaway I'd highlight is that this really demonstrates an innovation success we've achieved at Pinto Valley among our priority projects. That's the blast fragmentation technology we've put in place at Pinto Valley, and through it we're delivering 10% higher throughput — and doing so sustainably. Each blast is now producing 38% fines on average, compared with 25% previously, and that enables higher crushing and milling rates and, clearly, lowers costs. We ran a program in which we brought in smart drills that build a blastability index from rock hardness and the torque on the drill. From that, we created a selective blast pattern designed to maximize fines generation. Then we track fines content in the feed with conveyor cam technology. Turning to Slide 15, Cozamin surpassed the record result we posted in Q2, and production this quarter came in at 14.1 million pounds, which is a new record. Mill throughput averaged 3,854 tons per day, above the targeted run rate of 3,780 tons per day that you know from the technical report.

Brad Mercer

executive
#13

The dry stack tailings and paste backfill facility is being built according to plan, and we expect to finish it at the end of 2022. Turning to exploration at Cozamin, we'll be optimized in 2022 once the West exploration drift and the related cross cuts are complete. That lets us target drilling more efficiently from underground, with holes that are much shorter. It brings exploration costs down and improves targeting. I'm also excited about ore sorting. Trial results indicate it could have a very significant impact at Cozamin — significant resource contained in the narrow veins could be targeted for potential conversion to mineral reserves, if we adopt this technology — or sorry, at the moment we're assuming we are adopting this technology. On to Slide 16. Continuing with ore sorting, our best bulk sample test results saw a 31% mass rejection with only 1% to 2% metal loss. The copper head grade was upgraded from 1.7% copper to 2.25%. The next critical steps are to pick one of the two tested technologies, determine the optimal location for the sorting unit and calculate the ancillary capital and operating costs involved in the handling. The most likely location would be underground to minimize hauling rock to surface.

Brad Mercer

executive
#14

Moving to Slide 17, the cobalt feasibility efforts are coming along nicely. For geometallurgical testing, we have drilled 7,600 meters of PQ size core, and drilling continues so that a bigger sample mass can be produced for pilot scale testing. During Q3, our technical team went to facilities in Europe to learn about sulphide oxidation-leach and processing technologies. We anticipate completing the prefeasibility engineering work in the first half of 2022 and publishing a technical report in the second half of 2022, which will feature an updated copper iron mineral resource drawing on the recent drilling as well as a first ever cobalt mineral reserve. This project is unique and exciting and would establish Capstone as a leading producer of ethically sourced, low cost, battery grade cobalt. I will now hand things over to Wendy King.

Wendy King

executive
#15

Thanks, Brad. If we move to Slide 18, we keep putting money into our sustainability programs and initiatives so our operations are protected against weather. At Pinto Valley, we're evaluating a storm water protection system by restoring and upgrading the mine's water catchment and distribution. Keeping clean water out of at-risk areas can boost water collection in wet seasons, which secures processing water in dry seasons, and that minimizes how severe weather affects our operations. Along with that, the PV3 project has lifted our ESG performance through greater recovery of process water in the recently upgraded tailings thickness. At Cozamin, construction of the new paste backfill and filtered dry stack tailings operation is progressing well. Switching Cozamin to dry stack technology will bring leading responsible tailings management to the mine, while also shrinking the mine footprint and improving processing water recovery. Here at our corporate office, we've reinforced our ESG team and we keep developing our sustainability vision and strategy, which includes the new Responsible Sourcing Project, and I look forward to unveiling those initiatives in 2022. The copper we produce is essential for carbon-neutral energy and clean technologies. We are committed to being part of the solution by tackling climate change and environmental issues, while creating value for all our stakeholders.

Wendy King

executive
#16

Moving to Slide 19, I want to express appreciation to our dedicated employees for looking after their communities and the environment. During August, the Pinto Valley crew assisted in repairing highway 60, reconnecting the Globe and Miami communities after flash floods had washed the road away. In September, our people collaborated with the Tonto National Forest on remediation efforts at the abandoned Blue Gate mine, following the destruction of soil stabilization materials by fire. In each case, our team coordinated closely with local authorities, strengthening that feeling of a close community where everyone looks out for one another. Many thanks to the Pinto Valley team for their commitment to our communities. Darren, back to you.

Darren Pylot

executive
#17

Thanks, Wendy. We're now on Slide 20. I want to take a moment to look back on what has been a remarkable year for Capstone: copper prices came in 60% higher year over year, copper production rose 20%, and costs fell 3%. That combination delivered a 300% increase in EBITDA. Looking ahead, I'm confident in our ability to keep delivering competitive results, expand our business, and make the communities where we operate stronger. With that, operator, we're ready to take questions from the floor.

Operator

operator
#18

Our next question is from Orest Wowkodaw at Scotiabank.

Orest Wowkodaw

analyst
#19

Darren, could you bring us up to speed on where the Santo Domingo partnership financing process stands right now? Obviously, it has run longer than you anticipated last quarter, but what is the current status?

Darren Pylot

executive
#20

Yes. Thanks, Orest — I appreciate that question. You've basically put your finger right on it. All of this sits within the current environment, and by that I simply mean things are taking more time to complete. The conversations we're having are with the very same parties as before. So nothing has shifted. There are various reasons — COVID, travel, a number of factors — and as you're seeing everywhere else around the globe, it just feels like everything is moving more slowly, and that's really all I can say about where we stand. But nothing has decelerated. We remain engaged, and there's still strong interest from those same parties we've been talking with for a couple of quarters. So we share your frustration that we haven't managed to close something out yet, but I feel confident we're headed in the right direction, and again, it has simply been slower.

Orest Wowkodaw

analyst
#21

Perhaps, to follow up on that, have you figured out which scenario — meaning the ownership one — is the path going forward, or does that remain current? You used the term parties; does that suggest you're speaking — that discussions are still underway with several possible partners, or have you reduced it to a single partner under a single scenario, with all of us simply awaiting the safe documentation and due diligence?

Darren Pylot

executive
#22

Well, I’d put it this way: since there’s a process underway, you can never be sure whether it’s a single party involved — so there may be more than one party, with various options. But what I can say is that Capstone is interested in keeping as large a share of the project as possible, given what Raman mentioned about the robust cash flow we’re producing in this copper market, and given the solid balance sheet we have, together with the Tax Stability Agreement under our DL 600 — that, in our view, makes this one of the best unbuilt projects anywhere in the world. So yes, we want to hold on to as much as we can.

Orest Wowkodaw

analyst
#23

One final question about this. Are you expecting a resolution to this before the year is out?

Darren Pylot

executive
#24

I'm very hopeful. I'd rather not commit to dates, since disappointing our investors, shareholders, and stakeholders is the last thing I want. Still, we expect to wrap this up entirely by year-end. I simply don't want to pin myself to a date that isn't fully within my control.

Operator

operator
#25

Stefan Ioannou from Cormark has the next question.

Stefan Ioannou

analyst
#26

I'll go in a completely different direction here. Great presentation. Most of what I wanted to ask has been covered. Maybe just on the geology side — I know some drilling took place at the Donovan project down in Mexico. Has anything at all happened there, or…?

Darren Pylot

executive
#27

Thanks, Stefan. You can always be relied on for the geology question, and I appreciate that. I'll let Brad Mercer take that one, since he's also on the geology side.

Brad Mercer

executive
#28

Yes. We ran our drill program, got the results back, and made the decision to stop moving forward with that project.

Stefan Ioannou

analyst
#29

And I suppose with Cozamin itself, there remains a great deal of exploration upside that your team is quite enthusiastic about. So, should we expect some kind of update on the geology at that site before long, or…?

Brad Mercer

executive
#30

Sure, we're putting a lot of holes in the ground, and the results so far have pleased us — an update will be coming. I don't believe we've reached the point yet where we can release a fresh resource model, but that's on the way, most likely at some point in 2022; by then, I think we'd have a critical mass of results. The process we're mining there has us very excited, since in 2022 we'll be able to greatly boost the number of hits, because the drill holes are going to be far shorter. So obviously, we can speed the program up toward a new resource.

Operator

operator
#31

Craig Hutchison of TD Bank has the next question.

Craig Hutchison

analyst
#32

During earlier presentations, you discussed what consolidation opportunities might exist in the Pinto Valley area and nearby. Could you share any updates on those discussions?

Darren Pylot

executive
#33

Yes, Craig, hello, and good afternoon to you too. Appreciate the question. Right. We keep making our ties and conversations with our neighbors stronger. We hold strategic meetings and keep looking into things, though nothing is material enough that we'd take it to market. That said, I'd say the interest and the collaboration have never been stronger than they are today, when it comes to those discussions and those agreements we've been going back and forth on.

Craig Hutchison

analyst
#34

I’m just trying to get a general sense of what you’re looking for there—is it buying more land packages, more resource potential? Sorry.

Darren Pylot

executive
#35

The way I'd frame it is resource sharing. As the sole producing mine in that district, we bring plenty to the table — the need for disturbed ground, the need for disturbed water, extra water sources that we could clean. Copper is obviously all around, and we have the processing mill. So I think what we're looking at is mutual assistance so that we all become a greener, more sustainable operation for every stakeholder, employee and community around us. Everybody comes out ahead.

Craig Hutchison

analyst
#36

And on Pinto Valley specifically, throughput is now back up to around 60,000 tons a day. Is that roughly the new sustainable design capacity you think you can achieve once all the optimization work completed so far is finished?

Darren Pylot

executive
#37

At this point, I'd say we're comfortable with the very high 50s on an annual basis. And we're striving — the capital and the work needed to sustain above 60 at the mill has been completed, I believe. There are some other operational items we need to synchronize with that mill so we can actually annualize at 60,000 and above, but I think the mill is capable and can get there, as we've demonstrated here — we came out of some adverse weather in the third quarter. So we wanted to catch up, and we've pushed it above 60,000 for the last couple of months, and we've been able to do that fairly easily. So we feel confident that this number is achievable over a year, though we haven't done it yet.

Operator

operator
#38

Our following question is from Dalton Baretto at Canaccord.

Dalton Baretto

analyst
#39

I actually wanted to ask about what Craig has done regarding the regional consolidation around Pinto, but maybe I can follow up on that instead. And just to get your take on where copper prices stand and given the district that's located there — and Darren, you mentioned you have the infrastructure, so looking a bit further out, are there other ore sources you could leverage from all the historical mines and that kind of thing?

Darren Pylot

executive
#40

What I’d say is that we’re examining opportunities much nearer to Dalton, in the areas where we run properties and where you’ve been. We haven’t really moved beyond that into the other regions. At the moment, we don’t see much low hanging fruit in those areas compared with what sits right around us, which is considerably more attractive. That’s what we’re concentrating on at present.

Dalton Baretto

analyst
#41

All right, thanks. Stepping back for a broader view: you've got that PV4 study coming late next year, though what it will actually show remains unclear right now. Your balance sheet is essentially bulletproof. Right now you're throwing off enormous amounts of cash. You'll bring in a partner on Santo. So is M&A starting to show up on your radar again?

Darren Pylot

executive
#42

Well, I mean, we can't talk about M&A on a case-by-case basis, but as a public company it's a continuing thing. We believe there's a great deal of growth for us to deliver within the portfolio, and you just brought it up, right — we have one more possible expansion plus an additional 1 billion tons of copper resources at Pinto Valley that we hope to move into a resource or into a reserve. And we have a world class project at Pinto Valley — at Santo Domingo, sorry. So there's plenty to consider, somewhat of an internal focus. But in this copper market, obviously, everyone wants to grow and everyone is seeking more great jurisdictions, like those where we run at Capstone, and so we're always open for business, so to speak, though we are definitely concentrated on delivering the projects we've committed to our shareholders.

Dalton Baretto

analyst
#43

Thanks, that's helpful. Perhaps one final question — and I'm not even sure it's fair to put to you, Darren. But regarding the Onni Group, your biggest shareholders: where do things stand with them at this point, considering the level of your share price and the performance you've delivered? From what you hear in your discussions, do they remain committed for the long haul as shareholders?

Darren Pylot

executive
#44

Okay, thank you for that, Dalton. As you noted, our relationship with Onni is excellent—they’ve been a shareholder for a very long time, and they’re closely aligned with the strategy we’re outlining on this call today to our shareholders. They are fully on board with it. And I think the clearest way to demonstrate that to you, or to anyone, is this: they purchased shares very recently at these copper prices, and they have been buyers. So if that doesn’t show they’re aligned with Capstone and that they believe in a higher share price for Capstone, then I’m not sure what would. That’s the best way I can respond to that.

Operator

operator
#45

Chris Beer from RBC has the next question.

Chris Beer

analyst
#46

Hey everyone. One more geology question, picking up from Stefan’s. I sort of recall that with the further access, some larger targets get provided, like possibly — I think a downfall to block to the East. Is that still six to nine months out from drilling, or is it something nearer rather than only the — nothing alongside reserves to resources or resources to reserves at better grade, but I’m just curious about those bigger targets?

Darren Pylot

executive
#47

Okay, so we had actually put together a new target over on the West side, and our drilling capacity is limited, so we felt that the West — well, the East target had us pretty enthusiastic. Results were arriving with more zinc dominance than copper dominance. Then we did a reinterpretation and figured out that the Footwall Zone was open toward the West. So we began testing it, and what we found was quite a surprise, since not only is the Footwoll Zone open in that direction, we also came to see that the main Mala Noche Vein was open down dip. So since we had the ability to drill a copper dominated target instead of one more zinc dominated, and thereby get two birds with one stone, we moved our priorities from the East over to the West. Once the West side is, I guess, exhausted, we'll go back to the East. And the sole reason we aren't still drilling in the East right now is that it also needs underground development. And there's a limit to how much underground development you can ascribe to an operating mine. Stay tuned for results in ‘22.

Operator

operator
#48

That brings us to the end of the question-and-answer portion. You may go ahead.

Darren Pylot

executive
#49

Alright, thanks to the operator, and thanks to all of you for those questions and for being with us today. We anticipate having those final results for you in February 2022. I'm looking forward to bringing you an update on how things are progressing at that point. Until then, as ever, feel free to reach out to us whenever you have further questions. And please continue following the guidance of your local health officials so you stay healthy and stay safe. Thanks once more, everyone, and have a good day. Bye-bye.

Operator

operator
#50

That brings today’s conference call to a close, ladies and gentlemen. We appreciate everyone taking part, and we ask that you kindly disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Capstone Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Capstone Copper Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capstone Copper Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.