Morning, everyone, and thanks for being with us. Welcome to the Capstone Copper Q2 2022 Results Conference Call. Every line is currently muted so we don't pick up any background noise. Following the speaker's remarks, we'll hold a question-and-answer session, and at that point you'll be given instructions on how to queue up. A reminder as well that today's call is being recorded. At this time I'll hand things over to Mr. Jerrold Annett, Senior Vice President of Strategy and Capital Market. Please go ahead, sir.

Jerrold Annett

executive
#2

Good morning, everyone, and welcome to Capstone Copper's Q2 2022 conference call. I want to let you know that the news release and regulatory filings that announce Capstone Copper's financial and operational results for the second quarter of 2022 can be found on our website and on CEDAR. For those of you logged into the webcast, we'll be advancing the slides of today's presentation, and that presentation is also available in the Investor's Section of our website. Joining me today are our CEO, John MacKenzie; our President and COO, Cashel Meagher; our Chief Financial Officer, Raman Randhawa; and our Senior Vice President Risk ESG and General Counsel, Wendy King. After our brief remarks, there will be a chance for questions. I should note that comments made on the call today will contain Forward-Looking Information within the meaning of applicable securities laws. By its nature, this information is subject to risks and uncertainties, and actual results may differ materially from the view expressed today. For more information on the risks and uncertainties pertaining to our business, please see Capstone's most recent filings, which are available on our website and on CEDAR. And finally, I'll just note that all amounts we will discuss today are in U.S. dollars unless otherwise specified. Now, I'll turn the call over to John MacKenzie.

John MacKenzie

executive
#3

Thanks, Jerrold, and good morning, everyone. Before I get into our Q2 results, I wanted to briefly touch on a few key themes during what has been a very volatile macro environment in the first half of the year. The second quarter proved more difficult for copper miners, with inflationary pressures across the industry as well as a sharp drop in copper prices, along with worries about global economic growth. Even with that backdrop, Capstone Copper is well positioned to deliver on our strategy, with stable operations, a strong balance sheet and good liquidity, as we get close to completing the ramp up of Mantos Blancos and to delivering our transformational Mantoverde development project. Our growth pipeline, driven by permitted projects and Brownfield expansions, is unique. It aligns well with robust medium- and long-term fundamentals for copper, fueled by supply side constraints as well as growing demand from the energy transition towards carbon neutrality. Turning to Slide 5, we produced just over 45,000 tonnes of copper at a C1 cash cost of $2.78 per pound in the second quarter. Q2 is our first full quarter of operating results at Capstone Copper after the combination with Mantos copper, which closed towards the end of Q1.

John MacKenzie

executive
#4

Higher input costs weighed heavily on our operating expenses for the quarter, with sulfuric acid in the cathode business standing out in particular, along with the seasonal dip in throughput at Pinto Valley. We are already seeing indications that prices for key inputs are moving downward, and Mantos Blancos has kept ramping up nicely. Better operating results should come through in the back half of the year. Because of that, we are reaffirming the nine-month production and cost guidance we issued in May. We also acted during the quarter to give our oxide business additional protection, since it currently faces higher costs stemming from elevated sulfuric acid prices. Consequently, all 100% of cathode production in H2, 2022 is now hedged at a weighted average price of roughly $3.70 per pound. Moving to the right side of the slide, I am very pleased to point out our 2021 sustainability reports, which demonstrate our strong dedication to excellence in ESG and to keeping the trust of our stakeholders, including employees, investors, communities, and the governments in the places where we operate. I would encourage everyone to read the reports whenever convenient. Slide 6 shows the drivers behind our 2022 operating costs and how cash costs respond to key input costs, especially our near-term exposure to sulfuric acid.

John MacKenzie

executive
#5

That exposure is going to come down over the next few years as we move our Chilean operations onto the higher grade, higher margin sulphides. As you might remember, the nine-month guidance we put out in May assumed sulfuric acid prices at $280 per tonne. And on the right hand side of the page you can see that a 10% move in pricing translates into roughly a $0.17 per pound shift in our cathode cash costs. Over recent weeks, sulfuric acid quotes for Q4 delivery have been trending in the lower $200 range, and we're seeing similar downward trends in freight rates, diesel prices, and also a weaker Chilean peso. If we turn to Slide 7, we can walk through our key catalysts for the next 24 months. I want to stress that our main focus is finalizing the Mantos Blancos ramp up during this quarter. Along with that, there's completion of the Mantoverde development project, which I'm happy to say is still on time and on budget, and also pushing forward the studies for an optimized plan to integrate the Mantoverde-Santo Domingo district. We've taken a highly disciplined approach when it comes to evaluating and developing our future growth pipeline. Before we sanction these projects, they'll need completed technical studies, compelling economics, balance sheet strength, and an assessment of the broader macro environment.

John MacKenzie

executive
#6

After conducting an in-depth assessment, we need roughly six additional months to examine and design the critical zones where we believe tremendous value can be unlocked by connecting Mantoverde with Santo Domingo. Our revised expectation is to issue the updated Santo Domingo feasibility study — incorporating our plan for integrating the district — during H2 of 2023. Then the feasibility study covering Santo Domingo's copper oxides comes in H1 of 2024, and the cobalt feasibility for Mantoverde Santo Domingo likewise lands in the first half of 2024. We're eager to share our Monteverde Santo Domingo district integration plan this November, offering a first glimpse of how we aim to build a world-class copper, iron and cobalt mining district in Chile's Atacama region, one anchored by two large scale low cost mines at Monteverde and Santo Domingo. As you can see, we also hold an excellent pipeline of high quality Brownfield's projects capable of delivering higher returns and pushing our unit costs down further. I'll now hand things to Raman for our financial results.

Raman Randhawa

executive
#7

Thanks, John. Moving to Slide 8 now. A standout in our Q2 financial results was adjusted EBITDA, which came in strong at roughly $115 million. As John mentioned before, copper prices fell sharply, and that produced negative provisional pricing adjustments affecting profits at numerous peers in base metals. In our case, provisional pricing losses of $58 million hit adjusted earnings per share, and that meant a realized copper price of $3.66 per pound — much lower than the LME average of $4.31 per pound. Here at Capstone, we moved quickly so we won't be exposed to particular abrupt copper price declines going forward. We're currently putting in place a plan aimed at cutting provisional price exposure, with the goal of reaching the LME average price for copper production. Now on Slide 9, which summarizes the strength of our balance sheet — a highlight being non-recourse project debt that amortizes across nine to 12 years after the Mantoverde development project is completed. Also adding flexibility is our revolving credit facility, recently expanded to $500 million from $225 million, plus a $100 million accordion. Our corporate revolving credit facility has been upsized to align with Capstone Copper's, and the low cost of capital along with the conditions give us greater financial flexibility.

Raman Randhawa

executive
#8

After the quarter closed, we did in fact make the balance sheet more efficient. Using money from the bigger revolver, we paid off the pricier Glencore debt facility. Our pro forma debt sits at $442 million, the same as it was on June 30. And net debt was minimal, just $92 million. We're now on Slide 10, which lays out our newly enlarged liquidity of roughly $720 million — that figure includes $350 million in cash and short-term investments as of June 30, plus the undrawn $368 million portion of the revolving credit facility we recently amended. There's added financial flexibility from the $100 million accordion I referenced, along with our $60 million cost overrun facility with partner Mitsubishi Materials Corp. That financial strength, combined with the EBITDA generation potential displayed on the right-hand side here, demonstrates how we can fund the next stage of growth. Mantoverde is genuinely our future flagship asset, one that doubles our EBITDA. On Slide 11, we again emphasize that the Mantoverde development projects are fully funded — which, as John said earlier, stays on track and on budget — through Mitsubishi Materials Corp's $275 million equity contribution and the $520 million non-recourse facility covering the $825 million of capital. As of June 30, we had drawn $320 million against the project debt facility.

Raman Randhawa

executive
#9

Construction is progressing nicely, with a little more than 50% of the initial CapEx incurred by quarter-end. Cashel will add some further detail on where we stand today. We're now turning to Slide 12. As John noted, we've kept our nine-month production and cost guidance unchanged, though given falling copper prices we deliberately trimmed capital guidance by $40 million, reflecting the following: $25 million tied to the Mantoverde development project, a timing-driven move from 2022 into 2023; $15 million in lower spending at Santo Domingo, mainly from scope-of-work revisions on the C17 bypass and pushing the cobalt study to 2023; and a $10 million cut in sustaining CapEx at Pinto Valley, with most expansion-related CapEx already spent by the close of 2022, especially at Mantoverde, making 2022 a meaningfully lower CapEx year on an annualized basis. On the Mantoverde development project, we intend to spend roughly $230 million during this year's second half, with the remaining $175 million in 2023. I'll now pass things to Cashel.

Cashel Meagher

executive
#10

Thanks, Raman. Moving to Slide 13 now. I'm glad to report that the Mantoverde operation keeps producing solid results. Acid consumption in the SXCW cathode business came in below what we had anticipated for the quarter, because of lower levels of asset-consuming minerals in New York. That gave us higher copper output and reduced costs, even with acid prices hitting record highs. C1 cash costs at Mantoverde ended up $0.30 per pound under our expectation. A few weeks back, I visited Mantoverde and came away very pleased with the momentum behind the MVDP project. By the close of July, overall project progress stood at roughly just over 60%, and construction progress of 25% is tracking on schedule and within budget for completion in late 2023. The mine is making a smooth transition to handle the added material movement needed to finish the MVDP project. As I noted, we are moving from 10 meter to 15 meter heights, and the first — the Three P&H 4100XP Shovel is set for energization, with commissioning planned for mid-August. On Slide 14, additional photos show the vertical landscape at Mantoverde transforming very rapidly. The project as a whole stays within budget and on schedule, with key milestones reached as the foundations of the crushing, grinding, coarse ore reclaim tunnel and flotation circuit near completion.

Cashel Meagher

executive
#11

Work on the truck shop and the thickener earthworks is almost finished, and we're well into building the tailings storage facility. According to our EPC contractor, progress is coming along steadily, and this type of contract locks in nearly two-thirds of the total capital costs, which come to $825 million. It's worth noting that every piece of critical equipment has either arrived or is headed to the site, and purchased materials and equipment are arriving there as we get ready for steel erection and equipment installation. Moving to Slide 15, the chance we have here, given how close the two ore bodies sit, is genuinely one of a kind. I frequently describe it as a symbiotic, mutually beneficial relationship in which each asset genuinely unlocks the other's potential. The map on this slide shows how our thinking on integration is developing. You can see how Santa Domingo gains from the desalination plant and the pipeline that already exist at Mantoverde — the chance to expand the current diesel plant for Santa Domingo, along with the ample capacity in the existing Mantoverde pipeline, are genuine cost savers. We're also exploring possible synergies, such as using electrical infrastructure along pipeline rights of way, and drawing on the existing Mantoverde workforce so that it is shared with Santa Domingo and risk there is reduced.

Cashel Meagher

executive
#12

We're looking at what we'd gain by putting the cobalt plant at Mantoverde rather than Santa Domingo — it makes the logistics better for byproduct sulfuric acid, since Mantoverde is expected to be the largest consumer of that acid. The map also shows a twin pipeline running both ways between Mantoverde and Santa Domingo that would unlock the oxide potential there. The cathode plant at Mantoverde isn't fully utilized, and that gives us a cheap way in to raise copper output from Santo Domingo. You'll get more detail in Q4 on all of these concepts when we release our district integration plan. We're clearly building a genuine world-class district play, and the trade-offs are being weighed right now as part of the value engineering work underway. Moving to Slide 16, Pinto Valley turned out 13.3 kilotons in a quarter that took a hit from a seasonal planned maintenance period and also had some unplanned interruptions at our process facility. Cash costs came in at $2.82 per pound versus our nine-month guidance of $2.45 to $2.60 per pound — they were higher because of the extra costs tied to the shutdown and the weaker production. At Pinto Valley we expect to land within guidance for the year, since we forecast grades rising through the second half of this year and costs coming down as a result.

Cashel Meagher

executive
#13

We're also getting some relief on particular cost items, like fuel and reduced freight charges for our concentrates, and as for PV4, the engineering and metallurgical work is coming along nicely for the PFS to be delivered in H1 of 2023. Now, moving to Slide 17, our Mexican operations posted good grades and throughput, which produced solid output results. We're feeling some inflationary pressure in consumables such as steel, diesel and explosives. The Paste fill and dry stack tailings project keeps making good progress and will help enable the mine's planned long-term sustainability. Completion of that project is anticipated in the fourth quarter. The slide makes it clear that steel erection and equipment installation are moving forward well, with just under $9 million spent during Q2. Spending on the project to-date stands at around 60% of the $55 million total. On exploration, drilling keeps delineating and expanding the Mala Noche West Vein, which supports the asset's overall prospectivity and will feed into an updated resource estimate next year. Now on Slide 18, with predictable mine performance and strong capital production, the Mantos Blancos operation remains on track to finish its ramp up in Q3, lifting average mill throughput from 11,000 tonnes per day to 20,000 tonnes per day.

Cashel Meagher

executive
#14

In the quarter, we paused operations for a while to fix some process bottlenecks that came up during our ramp up, and at this point the operation is nearly holding its design metrics, with recovery rates at target levels. We're confident that ramp up will be finished very soon and expect predictable high-margin results driven by high-grade copper sulphide production. On that basis, we restate the nine-month guidance for Mantos Blancos that we issued in May. I'll now hand things over to Wendy King for the sustainability review.

Wendy King

executive
#15

Thanks, Cashel. Moving to Slide 19. We're happy to share that the Mantos Blancos copper 2020 and 2021 sustainability report has been added to our website, put together in line with the GRI standards. Our ESG disclosure keeps getting better, and the combined Capstone Copper 2022 sustainability report is going to feature additional TCFD disclosures alongside the GRI and SASB disclosures we already provide. We're committed to acting on climate change through cutting our greenhouse gas emissions. We carried out a thorough review of the carbon footprint across our operations so we could set the baseline for Capstone Copper. Later this year, we'll be establishing science-based reduction targets and developing de-carbonization pathways consistent with the Paris Climate Agreement. Social programs carried on in Chile, focused on backing youth development in the Antofagasta region through training and leadership programs done jointly with local foundations, the Chilean Economic Development Agency and the municipality of Antofagasta. Beyond that, we keep working with the local fishing industry in the Atacama region via a number of economic development projects, among them our involvement in implementing a Marine Environmental Monitoring Plan. Lastly, Mantos Blancos and Mantoverde will officially begin copper Mark participation in Q3, 2022, and we're eager to share more about this initiative soon.

Wendy King

executive
#16

At this point, I'll turn things over to John.

John MacKenzie

executive
#17

Thanks, Wendy. Turning to Slide 20, we're making progress on our transformational discipline growth plan in the years ahead. This slide shows how we're proactively enhancing the asset quality of our portfolio by transforming the business toward lower cost sulphides as we ramp up to the Mantos Blancos concentrated debottlenecking projects and finish construction and ramp up of the Monteverde sulphide project in 2024. Including Santo Domingo, lower cost, high margin sulphides should account for more than 90% of our future total copper production. Developing the world-class Monteverde Santo Domingo integrated district is expected to bring companywide consolidated C1 costs to roughly $1.50 per pound. Then on Slide 21, with our nine months production and cost guidance reiterated, we expect to produce about 185,000 tonnes of copper within 12 months in 2022. We're staying focused on executing our near-term growth profile, increasing copper production by 45% to more than 250,000 tonnes by 2024. That comes with completion of the Monteverde development project, which remains on time and on budget. After that, we have a fully permitted transformational project, with tax stability agreements in place, to advance at Santo Domingo. Before the green-light decision on this, we've engineered in synergies with Monteverde and have mobilized our mine and Bill team to execute on this next leg of growth.

John MacKenzie

executive
#18

We'll be making the call on Santo Domingo construction in the first half of 2024. That said, we're now ready for questions.

Operator

operator
#19

Our first question today is from Orest Wowkodaw at Scotia Bank. Orest, the floor is yours.

Orest Wowkodaw

analyst
#20

Hello, good morning — it's great to see the strong progress at Monteverde. What I really want to ask about is how you're viewing Monteverde in relation to Santo Domingo. Specifically, since the Monteverde project is expected to wrap up by the end of next year, should we expect that you plan to go straight into developing Santo Domingo, or might we actually see a pause — if copper prices remain, let's say, on the relatively weak side?

John MacKenzie

executive
#21

Orest, thanks so much for that question — John MacKenzie speaking. I'll hand things over to Cashel, who can give you a more detailed answer on this. What I'd say first, though, is that we are plainly in the middle of carrying out the many technical studies on the different elements that feed into our projects. We're obviously examining the copper oxides and the cobalt, and I think that, to a considerable degree, when we decide on Santo Domingo depends on each of those technical studies being completed successfully. Clearly, we'll also be looking at where we stand with the Mantoverde ramp-up, the macroeconomic picture, timing, and the strength of our balance sheet when it comes to reaching a decision on that front. That said, I think I'd like to ask Cashel to give us more detail on that point.

Cashel Meagher

executive
#22

Yeah, thank you, John. And naturally, I'm in agreement with all the points you laid out, and without question the macroeconomic situation or the ability to secure financing is going to override every kind of decision-making process. So what's currently in progress on our side is a value engineering effort in which we're examining a range of adjustments — small tweaks to the flow sheet, to the grinding technology, and to various components — to make sure we arrive at the best possible process. And so we're making the most of this kind of pause while, at the same time, clearly setting out how we improve and optimize the value engineering. So, as you can see, we'll more or less have the iron copper circuit finalized in H1 of 2024, with a feasibility study to follow, and with the DL600 fully permitted and in hand, we could reach a decision. So that's the goal we're working toward right now — putting ourselves in that position where we can make that call. But the wider macro picture will either permit that or we'll discuss it in greater detail once we reach that stage. And following that, we see the cobalt and the oxide components of Santa Domingo as bolt-on pieces and as chances for us to modularize and maybe even raise funds separately from those other processes.

Cashel Meagher

executive
#23

Yeah, the cobalt assets in particular, naturally, for that separate financing. But that's roughly the picture we're seeing. So we'll position ourselves during H1, 2024 to start examining production toward the close of 2024. Taking that option isn't mandatory for us, though at minimum we'll have it available. I hope that addresses what you asked, Orest.

Orest Wowkodaw

analyst
#24

Thanks, Cashel. I just want to make sure I understand: your plan is to finish all the studies first — the cobalt study, the oxide, everything — and then reassess based on the macro picture. Is that fair?

Cashel Meagher

executive
#25

My thinking is that we'll finish the iron copper portion first. Before starting construction, cobalt or the oxide aren't strictly required, though it would help to understand how they'd affect the overall strength of the project and its returns. So having cobalt complete isn't mandatory. But it appears that roughly six months later, we'll have the oxide and cobalt pretty much in place. As you know, six months passes in the blink of an eye. So we'll probably have those results, or at least know which way they're trending.

Orest Wowkodaw

analyst
#26

And so, if copper pricing turns out to be soft, whatever the cause might be, should we then expect demobilization? My guess is that the crew now on site would be stood down and work halted until conditions get better, before you'd begin Santo Domingo?

Cashel Meagher

executive
#27

Honestly, at Santa Domingo things are pretty quiet at the moment. As John kind of noted, we're in the process of wrapping up the C17 bypass construction. So the bulk of the focused work at Santa Domingo was actually halted — the oxide evaluation and cobalt flow sheet optimization — though a bit of on-site work will still be needed to assist with delineating the oxide. So truly, not much is going on. The majority of what we're doing to advance the project involves feasibility work along with some metallurgical testing and flow sheet design.

Orest Wowkodaw

analyst
#28

Regarding Mantoverde, you're asking about the demobilization — is that right?

John MacKenzie

executive
#29

Absolutely.

Cashel Meagher

executive
#30

My apologies — please continue, John.

John MacKenzie

executive
#31

Sure, I can offer a thought on that. In a perfect world, we would relocate the construction crew. We have plenty of work to keep them occupied—<<inaudible>>—so they could pause for six months on other studies in the meantime. I'd say this isn't merely a matter of where the copper price sits for the pharma side; it's also an opportunity—<<inaudible>>—as you know, we managed to price the Mantoverde project back when inflation rates were low, <<inaudible>> were low. And I believe we secured quite favorable costs on Mantoverde. That's really something we'd tell you would slow down—<<inaudible>>—regarding both Santo Domingo and Mantoverde going forward. I think we've made some judgment calls about what the optimal timing would be for developing Santo Domingo. That will involve multiple parameters—one of which, obviously, is shifting our build teams over to Santo Domingo, while others involve global lead times for equipment and where costings stand at a given moment for various project elements.

Orest Wowkodaw

analyst
#32

All right, that’s great — thanks for the added detail. I’ve just got one quick question, if I could, for Raman about the sizable rise in depreciation and amortization this quarter, clearly reflecting a full quarter of the new assets. Is the $52 million we saw this quarter a good run rate now for the combined company, or, put another way, about $200 million a year? Is that a reasonable figure to keep using?

Raman Randhawa

executive
#33

Yeah, Orest, I figure that figure works well, since we sat at 22 prior to this and now, as Verde and Blancos come online, it runs a bit beyond their reserve life. So that's fine. And then of course it will step up after MVDP, though that's a 2024 item, as we've discussed.

Orest Wowkodaw

analyst
#34

All right, thanks.

Operator

operator
#35

Our following question is from Dalton Baretto at Canaccord. You have the floor.

Dalton Baretto

analyst
#36

Thanks, and good morning to you, John, along with the team. My question concerns the DL600 over at Santa Domingo. I'm just curious, really, about what the natural limits look like, and how you're approaching that while carrying out the Mantoverde integration study, and also whether it's possible to ring fence any of those synergies you mentioned under the DL600. Thank you.

John MacKenzie

executive
#37

Yes, thank you Dalton — that is an excellent question. I'll invite Raman to add a bit more on this as well. But, you know, we have a team working on all of these synergies, on every sub-element of the Monteverde, Santo Domingo district. And one of those teams is focused solely on precisely the question you raised, which is, how do we best optimize the usage of that DL600? And how do we ensure we achieve the best overall results for the business, with that as one of the input parameters in how we think about this? So it is certainly on our minds to examine, and obviously we are looking at it when we consider each element of the integrated operation. We are taking into account how one would also best utilize that DL600, in that context. Raman, is there anything you would add to that?

Raman Randhawa

executive
#38

No, I believe that's well put, John — I mean, Dalton, sorry — it relates to Santo Domingo, the ore body at that location, and the Santo Domingo kind of ground. So I mean, the more we're able to optimize Santo Domingo when it comes to processing facilities or other items, cobalt, SX-EW whatever else we need, the more you want kind of profit up there and less profit downstream, I guess down the road.

Dalton Baretto

analyst
#39

Thank you. I'm asking only because, you know, one of your slides seems to show quite a bit of infrastructure being shifted around to align with the learning. But perhaps, as a follow-up, and since we're on that subject, John, I would really like to hear your view on the proposed Chilean fiscal regime. How do you expect that to play out, and how does it stack up against the last time you went through this with Anglo?

John MacKenzie

executive
#40

Right, Dalton, as you’re aware, I’ve gone through this kind of process once before, back in 2010, in a quite similar situation where the government was looking to raise royalty rates. So I’d begin by noting that Chile has an admirable history of sound economic policies that draw investment into mining. The reason for that really comes down to their process: they have a thorough and fairly sturdy set of procedures involving debate and discussion, with input coming from every side of the political spectrum. That said, the proposal currently under debate in the Senate will, in my view, without question hurt future mining investment in Chile over the long term. The reason is that it fails to account for cost inflation and fails to account for the fact that many ore bodies to be developed in Chile going forward have lower grades and higher costs, since the royalty plan rests essentially entirely on copper prices. As you mentioned, we have DL600 in place, which gives us 15 years at Santo Domingo with no changes to the current tax or royalty regime.

John MacKenzie

executive
#41

And that is clearly a fairly significant safeguard for us, of course. Even so, we are in discussions with decision makers in Chile, and I would say that so far, the receptiveness they have demonstrated toward our concerns regarding the present proposal has been encouraging to us. And overall, you know, the world truly requires far more copper. I think everyone has essentially seen the projections concerning what electrification and renewable energy will demand going forward. And I think — it is very much a shared objective internally, that they would want a substantial share of that future copper supply to come from Chile. And so, I do believe there is alignment when it comes to ensuring that over the long-term, there is an economic environment conducive to further investments. So clearly, a process has been gone through, we are obviously participating in that process, and I think we continue to hold the view that Chile remains one of the better and more stable jurisdictions. But clearly, we need to see, with regard to the present proposal, changes that would ensure Chile maintains its competitiveness with other copper producing nations.

Dalton Baretto

analyst
#42

Thanks very much. Perhaps I can fit in just one more question before we finish. Could you say what Chilean peso exchange rate for Ausenco is built into your assumptions, and how much headroom exists at the levels we're seeing now?

John MacKenzie

executive
#43

Yeah, well — I think that works in their favor. You'll recall that on our side, we hedged the entire peso-related portion of our exposure on the project. So Ausenco quoted us some parts of the project in pesos and other parts in US dollars. Since our financing was being raised in U.S. dollars, we clearly didn't want any currency exposure at all. So we hedged out the whole exposure. Look, I don't know what underlying assumptions Ausenco actually had. I do know that when we were in negotiations with them, the rate was around 725 or thereabouts. And today it sits at roughly 900. So from their perspective, I think that's a fairly favorable move. But again, we don't have full insight into exactly how their currency management works.

Dalton Baretto

analyst
#44

Perfect, I’m all set on my end, everyone. Thanks so much.

Operator

operator
#45

Ralph Profiti from Eight Capital has the next question.

Ralph Profiti

analyst
#46

Good afternoon, and thanks for taking my questions. John, you sounded quite confident regarding the integrated district plan—that as Mantoverde and Santo Domingo grow more integrated, the permitting process for a broader operation is already, in a sense, covered within the current body of work, correct? And I'm just wondering: what risk is there that we could be facing a renewed or perhaps a more difficult and detailed process?

John MacKenzie

executive
#47

Yes, thanks Ralph, and that's a solid question. Right now, obviously, Monteverde is fully permitted for construction, and the feasibility we currently have for Santo Domingo is fully permitted as well. So to some degree, we're factoring that in when we consider the synergies, the opportunities, and the changes. And for each of those changes, we're evaluating what the implications would be on the permitting side. In Chile, there are several different levels of permitting: there's what's called a potent NCA, which is basically a notification, there's a DIA, which is a relatively short and quick environmental permitting process, and then there's an EIA, which is a far more detailed permitting process. And we examine each of these changes with an eye to what level of permitting change would be needed. I think at this stage, most of the immediate synergies in terms of simply using current infrastructure and using the existing project plans from Mantoverde in Santo Domingo, we don't believe there are really any material changes to the permitting requirements for that; clearly, when you start adding these elements as Cashel mentioned earlier, which involve the processing of the oxides, that is likely to carry additional permitting requirements, and likewise the processing of cobalt will carry additional permitting requirements.

John MacKenzie

executive
#48

To pick up on an earlier question, I believe it's possible to fully separate these projects, which we can advance under the permitting regime as it stands. There's the existing Santo Domingo project, which draws on infrastructure synergies, and essentially brings in the oxides and the cobalt, since the permitting processes for both of those projects are complete. It's our view that none of those projects fundamentally affect — in any way differently from the current project footprint — the situation. So our expectation, I think, is that although we'll have to go through certain permitting processes, we don't really see those as either complex or especially time consuming.

Ralph Profiti

analyst
#49

All right, that's excellent. To follow up, I was simply tracking Pinto Valley and where it sits on the all-in sustaining curve. I'm wondering whether we should expect a solid finish on grade much like what we saw in 2021. We're already seeing some relief on costs, and you've pushed back part of that sustaining CapEx and brought it down. I'm just wondering whether a strong finish on grades also helps get us back into that cash cost guidance for 2022. Thanks very much.

John MacKenzie

executive
#50

Absolutely, Ralph — that's another excellent question. I'll hand it over to Cashel so he can provide a fuller response.

Cashel Meagher

executive
#51

Yeah, grades are improving. We're not projecting them to be quite as robust as what we saw in 2021. But grades definitely do strengthen during the second half of this year. So obviously that helps the bottom line and helps bring the cost per pound down as well, with some of the inflationary pressures easing and some local cost initiatives being undertaken at the mine.

Ralph Profiti

analyst
#52

All right, that's good to know. Appreciate it, John. And thank you, Cashel.

Operator

operator
#53

The following question is from someone at Clarksons whose name we couldn't make out. Go right ahead.

Analyst

analyst
#54

Thanks. Morning, everyone, and I appreciate you taking my questions. I'd like to bring up consolidation in the industry, since you're clearly at the center of it with the merger. So it would be interesting to hear what you think about industry consolidation broadly, plus your own specific part in it and how that looks going forward. You had earlier spoken about consolidation in the vicinity of Pinto Valley. Any detail on that, or on the possible opportunities, would be welcome?

John MacKenzie

executive
#55

Yes, thank you for that. And definitely, I'll be asking Cashel to say a little more. Just on the Pinto Valley district consolidation, to go a bit further, but we absolutely view ourselves as a consolidator. I think the merger of Mantos and Capstone has created a company that's in a fairly rare position within the industry when it comes to scale, and probably a unique position when it comes to growth prospects. And we absolutely have opportunities to keep expanding each of these districts in which we operate. And clearly we've talked a great deal about Mantoverde and Santo Domingo. We keep seeing opportunity there for that to grow into a world-class mining district. And I think you're aware of the ideas we have around copper cities. But I'd like Cashel to comment a little more on our thinking, because we haven't really spoken as much about that district consolidation in Arizona, but I think we are extraordinarily well positioned there too, so Cashel, over to you.

Cashel Meagher

executive
#56

Yes, absolutely — it delivers benefits comparable to what you get at Mantoverde and Santo Domingo, anywhere you're able to take advantage of infrastructure that's already in place. And I'd argue what matters even more is talent — that's among the toughest challenges our industry faces right now: finding people who are trained, who bring experience, and who definitely have project construction under their belt. As for Pinto Valley specifically, that mine has been in operation for several decades, and there are existing resources nearby around consolidation — Freeport and BHP is on the table. As a matter of fact, we now have an exploration agreement in place with BHP, and what we're doing is assessing the resource's content and collaborating with them on an evaluation of what a mining district could look like, and having Pinto Valley situated there gives us a distinctive opportunity to consolidate that district, given the workforce, the permits already in hand, and of course familiarity with the area. So we view Copper Cities as a potential mirror image of the Pinto Valley operation, and we're continuing to work on what some of the synergies between the two might be, to bring costs down — bring operating costs down at Pinto Valley — and then to capitalize on that resource — Copper Cities — and that resource, again, is a very large, low-grade resource on the order of 0.3 copper, much like what we have remaining at Pinto Valley.

Cashel Meagher

executive
#57

We believe it's a big edge to essentially be the sole significant operator in that Globe Miami region, right there. So we meet with BHP every two weeks, and we also sit on a technical committee with Freeport in that area. And so we're actively working on those matters, and we're genuinely hopeful that over the coming several quarters we'll be able to share more updates about it.

Analyst

analyst
#58

All right, thanks, everyone — that's really helpful context.

Operator

operator
#59

That brings us to the end of the Q&A. I'll now hand things back over to Mr. MacKenzie for some closing comments.

John MacKenzie

executive
#60

I appreciate all of you being here with us today. The specific date when our Q3 results will come out is going to be announced over the next few quarters, and in the meantime, if anything else comes up that you'd like to ask about, don't hesitate to get in touch with either Jerrold or Katina. Enjoy the rest of your day. Many thanks to all of you.

Operator

operator
#61

That brings today’s conference call to a close, ladies and gentlemen. We want to thank each of you for taking part, and we ask that you please disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Capstone Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Capstone Copper Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capstone Copper Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.