Good morning, everyone, and welcome to Central Asia Metals' Half 1 2025 Interim Financial Results call. We're going to begin on the results summary slide, and I'll walk you through a few of the production and finance highlights. Let's move to the next slide, please. Thank you. Next one. I'll begin with an overview of production and financial highlights. As you can see on the right-hand side of your slide, we produced 6,218 tonnes of copper from our Kounrad operation in Kazakhstan, and from our Sasa lead zinc mine in Macedonia, we produced 8,692 tonnes of zinc and 12,613 tonnes of lead. All of this was achieved in a very safe manner. We're very pleased to report 0 lost time injuries for the first half. These operations delivered a good financial performance. We generated revenue of $99.5 million and EBITDA of $39.9 million, a margin of 40%. Importantly, today we announced a dividend of 4.5p, supplemented by a $10 million share buyback program, which commences today. That keeps our cash returns to shareholders consistent and comparable with the half 1 2024. We have a strong balance sheet and positive cash flow, $47.7 million in the bank, and that will be boosted by returns received related to the New World Resources transaction — both the break fee and the sale of shares in that company.

Gavin Ferrar

executive
#2

Kounrad continues to hold its place on the cost curve, and at Sasa the capital projects are essentially finished for the year. That sets the stage for the financials, which Louise will now take you through.

Louise Wrathall

executive
#3

Thanks, Gavin. And if we move on to — yes, market conditions slide, thank you. So yes, if we take just a minute to look at the market conditions that provide the backdrop for the results we're announcing this morning. On commodity markets, we experienced a great deal of volatility in the middle of the period, driven mainly by the Trump trade wars. All things considered across the full 6 months, and comparing that with H1 2024, the average copper price we received rose 3%, the average zinc price went up 1%, and the lead price we received fell 7%. On treatment charges, at the moment it's a good time to be a miner rather than a smelter. And as I think we've said before, our treatment charge contracts run from April to April. What we're seeing is a reduction in treatment charge this year versus last year of around about 40%. And for the first half of this year, that translated into a reduction in treatment charges of around about $3 million. Turning to foreign exchange, some good news for us and bad news for us at Kazakh tenge, which weakened by about 10% period-on-period, and that helps us when we come to report our costs in U.S.

Louise Wrathall

executive
#4

That's in dollars. Conversely, the Macedonian denar — which is pegged to the euro — strengthened against the U.S. dollar. That works against us when it comes to U.S. dollar costs at the Sasa operation. So turning now to the income statement. As Gavin said, revenue came in at $99.5 million. That was quite close to the revenue for the first half of last year, only 2% lower. And it reflects reduced sales volumes across all the metals, though it got a positive impact from the lower treatment charges I just referred to. Cost of sales rose 14%, or roughly $7 million. There are many factors involved there, really, and plenty of them tied to the Sasa operation. We saw an increase in the revenue royalty we pay in North Macedonia on the metal we produce, known as the concession fee. It went up from 2% to 4% starting in January. And that came to over $2 million in fees, versus $1.2 million last year. We also saw higher wages at both operations, though at Kounrad that was largely offset by a weaker tenge. There were the currency effects I just mentioned of the weaker dollar against the Macedonian denar.

Louise Wrathall

executive
#5

There's also some extra depreciation, since we've now begun using the dry stack tailings plant and landform that we finished in the first half, and on top of that we paid over $2 million more for the silver we purchase under our silver streaming commitment. On the higher revenue figure, we see that essentially offset, though it does play a part in raising cost of sales. Turning to our admin costs, they appear to have risen quite sharply, by 24%. But that comes to — it works out at just under $3 million. And really, all of it ties to our business development activities, with $2.3 million of that extra BD cost connected to the New World Resources attempt to acquire that company. We also put $1.1 million into exploration, for both CAML X and Sasa, and that was up from roughly $0.3 million in the first half of last year. We also disposed of Copper Bay, and we incurred fees of $0.4 million for that during the year as well. So overall, taking revenue and costs together, we've announced this morning EBITDA of $39.9 million at a margin of 40%.

Louise Wrathall

executive
#6

Turning to profit after tax, noncash share-based payments have hit it fairly hard—we altered how we account for those last year, treating them effectively as cash settled instead of equity settled. Foreign exchange produced a $1.8 million swing for us. On top of that, our effective tax rate appears higher. The main reason is steady taxable profit in Kazakhstan, where CIT stands at 20%. Now looking at costs across the two operations. Kounrad delivered a really strong cost result in the first half, with our C1 cost base falling by $0.6 million in absolute terms. The Kazakh tenge devaluation largely drove that, along with some reduced variable input costs—chiefly reagents—and that covered both how much of them we used and what they cost. C1 costs per pound went up by $0.01, purely because copper output was slightly lower than in the first half of last year. We awarded our workforce an 8.5% wage increase, tied to inflation figures, though the tenge's devaluation over the period has mostly offset it. So overall, Kounrad's reported margin came in at 72%, identical to H1 last year.

Louise Wrathall

executive
#7

Now on Sasa. At Sasa, our run of mine costs went up in the first half of this year, from roughly $60 a tonne last year to around $65 a tonne this year. That works out to roughly an 8% increase. We've already gone over some of the reasons behind that. The dollar was weaker. Salaries and pay rises also went up. We also took on some higher costs related to the new tailings disposal method. So we had a full period of running the paste backfill plant, and we also started operating the dry stack tailings plant and the landform too. On top of that, our electricity costs came in higher than in the first half of last year by just under $1 million. Looking at our C1 cost base, though, it was actually up only 3%, from $31 million to $32 million, and the lower treatment charges I mentioned earlier had a positive effect on that. And for the first half of 2025, we've reported an EBITDA margin of 26% for Sasa. On capital expenditure for the period, we spent $7.4 million. Of that amount, $6.3 million was sustaining CapEx across both operations — $4.2 million at Sasa and $2.1 million at Kounrad.

Louise Wrathall

executive
#8

That's above what Kounrad typically runs, though a solid anode and cathode replacement program set us back roughly $1.1 million at that site. As we mentioned before, I believe, there's material known as Dump 15 that we intend to relocate farther from a railway line, which would let us leach it without difficulty. We incurred extra expense relocating the material in Dump 15, and that work has been finished since the period end. At Sasa, our capital projects are essentially wrapped up. We put $1.1 million into them, which really went toward completing the dry stack tailings plant and the landform too. We continue to expect an additional $11 million to $14 million of CapEx during this year. The raise boring program only got underway in the first half of the year, and it will continue through the second half. An extension to the landform is something we plan to begin this year. We also still need to purchase further underground equipment and carry out more underground development. Taking everything together, we are reaffirming our CapEx forecast and guidance for the year of $18 million to $21 million.

Louise Wrathall

executive
#9

Turning to our balance sheet, there are just a few points I'd like to highlight for you. Property, plant and equipment appears to have risen substantially even after depreciation, and that largely mirrors the U.S. dollar's weakness against the Macedonian denar. Our group cash balance stands at $48 million, which takes in cash as well as $0.3 million of restricted cash. It leaves out $1.8 million that, through the audit process, we determined was cash in transit. We had included that amount in the cash figure reported with the Q2 production numbers. So it has been adjusted for these results. It's worth noting that after the period end, we sold the shares we had acquired in New World Resources as part of efforts to advance that transaction. Those shares went for $18.7 million. We also got a break fee of $1.6 million. So that, together with the cash in transit, has strengthened our cash position. On bank overdrafts, we had drawn one up to $6.6 million as of 30th of June. That has come down a great deal by now, to roughly $1 million at present. One small item worth flagging: we had a line on the balance sheet for assets classified as held-for-sale.

Louise Wrathall

executive
#10

That was Copper Bay. It's now carried at nil for the June 30 position, since we divested Copper Bay in April. My last slide. Turning to cash flow and free cash flow: operations brought in $34 million during the first half of 2025. Dividends paid came to $20.6 million — that was the 2024 final dividend. On taxes, income tax plus withholding tax totaled $16.3 million, which is $8.1 million more than in the first half of last year. CapEx accounted for $7.4 million, the spend we've discussed, and we also put $16.7 million into purchasing those New World Resources shares during the first half. We drew $5.9 million on our overdraft. So cash at period end stood at $47.7 million. On free cash flow, adjusted free cash flow is reported at $16.2 million. To reiterate, after the period end we've collected the USD 18.7 million in cash from the share sale, the $1.6 million break fee, and $1.8 million of cash in transit. Back to Gavin, who'll take you through operations.

Gavin Ferrar

executive
#11

Thanks, Louise. So we'll start with Kounrad. The highlights there are really just another steady, dependable showing from Kounrad across the period, with 6,218 tonnes of copper produced. And that puts us on track to hit our guidance of 13,000 to 14,000 tonnes for the year. As I mentioned, steady as you go. So there isn't a huge amount to report just yet. The solar plant, though, if you recall, we built and commissioned that back in November '23. It's now supplying roughly 17% of our power needs at Kounrad. So it's really beginning to pay for itself, with electricity costs rising there. And we actually received — sorry, achieved a record in May, when we generated 22% of our electricity requirement from that little plant of ours. So that's all gone pretty well. But as I said, steady as she goes at Kounrad, producing really well. And if we look at the next slide, we — as Louise said, that relocation of Dump 15 is now fully complete. And we've had some additional CapEx. Part of the reason for that is simply to sustain production and keep the plant fully invested, so that we can extend it all the way to 2034 and potentially beyond.

Gavin Ferrar

executive
#12

Looking at the leach curve down at the bottom, the Western Dumps are performing better, and the Eastern Dumps have outperformed too across their life. So everything there supports the original forecast of 79,000 tonnes, which we still hold. We now refer to that as the minimum recoverable, given how both the West and Eastern Dumps have outperformed. That could prompt us to consider extending that license's life at some stage as well. But a fair amount of work remains around that. Sustainability activity is still a solid part of our business. We believe supporting local communities matters, and we do so via the foundations along with some other donations. Most importantly, though, we've recorded 0 LTIs — lost time injuries — at Kounrad since May 2018, which is an simply amazing achievement when you consider the various hazards that exist around mining projects and assets. Some of our newer activities include a biodiversity management plan that has been put in place at Kounrad. And we've also instituted a big safety and occupational health assessment there as well. As I said, local communities remain important. And through cultural, medical, educational and youth initiatives, we continue supporting the local communities around Kounrad.

Gavin Ferrar

executive
#13

Moving on to Sasa. As mentioned earlier, we produced 8,692 tonnes of zinc and 12,613 tonnes of lead. Looking at the table on the right-hand side, I'm pleased to report that ore mine tonnages have actually risen 8%. And if you remember from our last presentation to you, that was one of the key targets we set ourselves, to get back up to roughly that 800,000 tonne level. That's what we've been aiming for. Unfortunately, you'll notice grades for both zinc and lead are lower. That's because we're still experiencing a few teething problems with the new mining methods, which is causing a bit of dilution. We're also encountering variable geology at depth in the mine, and we'll discuss that on the next slide. But you would have seen this was evident through H1, with both lead and zinc production down when we announced back in July. So we've modestly reduced our guidance and are currently on track to achieve that guidance. If we go to the next slide. So what we've done at Sasa, because of these issues, is effectively implement a full strategic review.

Gavin Ferrar

executive
#14

We began this around the middle of H1, essentially to take a look at the entire operation at Sasa. Our expectation was that the ore body would narrow at depth — and that's among the reasons we're implementing these new mining methods. But what we did run into, and hadn't anticipated, was a significant degree of variability, in terms of both geometry and grade, as we progressed into the mine's lower levels. As I mentioned earlier, the new mining methods brought a bit of dilution. As we become more proficient at those, that will come down. But we truly need a better understanding of that ore body. So more holes are being drilled. We're building additional drill platforms and making sure we understand the ore body so that we can plan ahead and use these mining methods to their fullest capabilities. We're also tightening up grade control, and we're reviewing every aspect of the mine. That covers mining, processing, laboratories, admin, the works. And we've also — alongside a lot of internal initiatives that we've come up with, we've also brought in some external consultants to provide a fresh pair of eyes over the operation as well and assist us.

Gavin Ferrar

executive
#15

So we're essentially putting together a set of recommendations, and we've already begun putting some of those recommendations into practice. We'll keep at that through H2, aiming to sort of lift that performance at the Sasa operation. On sustainability, once again, we had 0 LTIs for the half, which is a good outcome for Sasa — far more complicated than Kounrad, underground operations, plenty of moving equipment and a full, more mechanical-looking plant, plus 2 new plants as well. So a really good result from the team on site there. As Louise mentioned, we've now finished our dry stack tailings plant, and during the first half we placed roughly 60% of our tailings either onto that dry stacked landform or back underground as cemented paste. And that's moving us some distance toward our target of 70% that we're aiming to reach by 2026. We've tested an emergency alarm system connected to the wet tailings facility, TSF 4. That was partly driven by the GISTM conformance we announced around this time last year, plus some local regulations as well, and it's gone really well. And we've also carried on with educational support both on-site and in the communities around us, as well as launching a small kick-starter program for businesses in the region to formulate some longer-term sustainable programs there.

Gavin Ferrar

executive
#16

On the exploration side, as you're aware, there are 2 programs currently running. The first is our investment in Aberdeen Minerals up in Scotland, where they're examining the Arthrath nickel copper cobalt project and are presently drilling what we refer to as Phase 2b, which follows up on Phase 2a. Phase 2a essentially confirmed the geological hypothesis that mineralization existed at depth. At this point it's really about pursuing that mineralization and trying to bulk it up into — and steer us toward resource development there. We anticipate deciding whether to put a further GBP 2 million into the business by the end of the year, and that decision will rest on the results from the Phase 2b drilling program. Early-stage exploration in Kazakhstan: we have 4 licenses active there. A lot of surface work has been done, both geophysics and geochemical surveys, which are complete on 2 of the licenses and in progress on the remaining 2. Hopefully those will let us make decisions about whether to drill these licenses in 2026. So good progress in Kazakhstan as well. We've also established an entity in Kazakhstan to look at more advanced projects beyond these early-stage exploration ones too.

Gavin Ferrar

executive
#17

Also, some quite compelling projects are entering that pipeline. Right. Then moving to capital allocation, where, as I noted earlier today, a few modifications exist. So we have the 4.5p dividend, and that is being offset by the $10 million share buyback. Total cash returns come to roughly $21 million, which is comparable with a number of earlier periods in which these dividends have been paid. That takes the total shareholder returns we have announced to more than $400 million since IPO. In time, we aim to return to our dividend policy of 30% to 50% of free cash flow. Yet we stay dedicated to returning capital to shareholders while the company also seeks a future growth opportunity. So there is a slight change there, but similar returns, with the ultimate aim of returning to policy and positioning the company for future growth. So to sum up, as I said, Kounrad remains on track to hit its full year guidance. Sasa remains on track to hit guidance, though challenges exist there, which, as I said, we are essentially seeking to address across this half, along with better productivity and production at Sasa. On capital allocation, I have just covered that.

Gavin Ferrar

executive
#18

At both projects, sustaining CapEx is now in place, since the actual capital projects have been finished. Shareholders received that 4.5p dividend this morning, along with the $10 million buyback, which is running right now. And we continue to seek a material growth opportunity. Now, the New World Resources work during the first half, which many of you, I'm sure, watched closely, essentially confirms a few things. As a business, I think we can spot these opportunities outside of the usual auction processes or similar channels. We can finance them, and we also received really positive feedback from our major shareholders when that potential transaction was announced, because we viewed it as accretive and a good thing to do. And then the timing of our withdrawal shows that discipline, that fiscal discipline, which we've always demonstrated as a business. Our balance sheet stays flexible, with a strong cash position, as Louise walked you through earlier. And that will let us access debt and finance growth going forward. So with that, I'll stop and invite questions from the floor. Thank you very much.

Operator

operator
#19

Starting off, we've got a question coming from Will Dalby at Berenberg.

William Dalby

analyst
#20

Yeah. I've just got a few questions for myself. Perhaps I'll begin with Sasa, since I'd like to get a little more detail given that review you did with outside consultants. What's the right way for us to look at the mine plan there at this point? Is it a case of adjusting and resetting things lower when it comes to grades and mining rates? Or is it more about waiting to see how those improvement measures play out? To put it more precisely, what grades and mining rates should we anticipate from Sasa going forward? That's my first one.

Gavin Ferrar

executive
#21

Yes. Thank you, Will. I think the mining rate — as we've shown — it's certainly possible to return to roughly that 800,000 level using the new mining methods, and potentially even higher. But what we're really trying to do, I think, is pinpoint the areas where improvement is achievable, not just in mining but in processing as well, all the way through to the laboratory and the other processes we have on the operation. So we figured it was worth taking a look at everything involved. Obviously, we'll prioritize those items toward production first, then roll out the remainder at the right times. On grade, yes, we have faced somewhat — we've been facing somewhat lower grades, along with an ore body that varies a great deal. So we simply need to make sure we understand that better, and that will sharpen the dilution metrics I mentioned earlier, as well as our planning going forward. So we'll run additional mine plans and various other work in the background, just to confirm we still have a solid handle on the asset. But right now, I think what we're attempting to do is hold to the existing plan and make all of these improvements so that we can get the metal out of the ground within that guidance range.

William Dalby

analyst
#22

And then, secondly, just regarding Copper Bay. So I'm curious — I'd just like to hear how you understand the development progress there, given the contingent payment structure — when are you modeling those payments coming in?

Gavin Ferrar

executive
#23

Honestly, I think what we passed along was a project with all its permits in place and a complete DFS. At this point, it's entirely the call of the new owners whether they'll change any part of that project or simply begin building. My sense is they're likely still assembling their team and putting a construction crew in place. So the ideal result there would probably be — if you consider typical build timelines for these kinds of things — it'll probably take them 18 months to 24 months to build. And after that comes ramp-up. And as you remember, the milestones on those payments tie to copper actually produced. So we have to wait until they've produced that quantity of copper. So it could easily be 3 years plus.

William Dalby

analyst
#24

And then I think just the last one, and then I'll free up the line, is around the dividend buyback decision. Obviously, the shares have had a bit of a negative reaction this morning. Kind of reading into that, potentially there could be some of the commentary around returning or looking to return to the dividend policy of 30% to 50%. I just wonder whether you could maybe give a bit more color on your rationale behind opting for the buyback. I know the buyback plus the lower dividend sort of nets out sort of the run rate that you've had in recent periods. But yes, I think it would just maybe be helpful to have a little bit more color there.

Gavin Ferrar

executive
#25

Honestly, the level of the dividend has been a major topic of discussion at the Board over the — the past several occasions when we've considered it. What we need to do, I think, is balance shareholder returns against our strategic ambitions too. And one of the key areas where we felt the share buyback gave us a bit more flexibility was exactly that. So we implemented the share buyback. and ensure those shareholder returns stay consistent. But if a large transaction needed financing, we'd then have the option to direct that cash toward it. It simply gives us somewhat more flexibility. Still, I'd say the overall philosophy stays pretty much the same regarding both shareholder returns and, absent a material transaction, the option either to keep that buyback going. And should something arise, we can pause it or place it in a band in some way. So I think it simply provides far more flexibility around our capital returns program for shareholders.

Operator

operator
#26

Following that, we'll take a question from Julio Mondragon of BMO Capital Markets.

Julio Mondragon

analyst
#27

Sorry — just a couple of questions from me. About that operational review the outside consultants did, which you mentioned to Will a moment ago: what are the main findings? What I mean is, what needs to get better at Sasa? And is there any meaningful CapEx or OpEx tied to those improvements? Or how should we expect the results of them to show up?

Gavin Ferrar

executive
#28

Alright, so I guess the first thing I'd say is that it involves two things combined: an internal review that's been done, and the external review as well. And really, the recommendations bring together the results of both. Let me take your second question first. There isn't any material CapEx tied to this. What we're really after, I think, is a great deal of incremental improvement in how we go about operating so that we hit the tonnages we're aiming for, get throughput through the mill at something like the optimized rate too, and as a result produce as much metal as possible. So that's the overall philosophy, I'd say. One area that may need a bit more understanding, as I mentioned, is the geology, which has actually proven to be — the deeper we drill, the more it differs from what we originally interpreted. So we need to examine that quite carefully and just make sure we have a better handle on the geology and the lower levels of the mine, so that we can, a, plan ahead properly and b, apply the right mining method for the geometry and width of the ore body that we're facing.

Julio Mondragon

analyst
#29

Thanks, and if I could squeeze in one more question. On the operational cost side, how do you see things shaping up for the remainder of the year — specifically in H2 '25, and then as we move into 2026? Also, at both of your operations, how much exposure do you have to the domestic currency?

Gavin Ferrar

executive
#30

Okay, on cost, I can share a bit. We're aiming to — I would like to be able to say we'll bring those costs down, especially at Sasa, but I think there's still work ahead of us on that front. So we are definitely trying to find savings wherever possible and to make improvements at Sasa as fast as we can, though rolling out some of these programs could take somewhat longer. As for 2026, I believe that's when we will begin to see — and again, I'm open to being corrected on this — but my sense is that's the point when we start looking at improvements, with late '25 and early '26 really being when those start to come through. On the proportions of exposure to local currency, do you have those numbers?

Louise Wrathall

executive
#31

Roughly 60% to 70% of that sits in Kazakhstan. So it's a big number, effectively. It'll be quite a substantial figure, likely even greater in Macedonia, since many of those costs are denominated in either denar or euro. Of course, in Kazakhstan we've seen the tenge keep depreciating through the second half. That should work in our favor. But sadly, with the denar and the euro we've seen the reverse. So those have kept appreciating against the dollar through the second half. One more thing worth mentioning is the dry stack tailings plant and landform — we operated it for our portion of the first half. And clearly, through the second half we'll be operating it across the entire 6-month period too. On electricity, we're hopeful it may come down and that we can capture some savings there. Many of the remaining items, though, will be largely locked in. To build on what Gavin mentioned regarding the strategic review now underway, drawing on both our internal ideas and outside consultants, it targets gains in productivity as well as in cost. So productivity isn't the only thing under examination.

Operator

operator
#32

And now we have another question, this one coming from Laura Chan at RBC Capital Markets.

Laura Chan

analyst
#33

My question concerns the New World acquisition, and I suppose, since it didn't go through successfully, I'd just like to hear your thinking on what was learned going forward and on acquiring something else — and what might you have done differently?

Gavin Ferrar

executive
#34

Thanks, Laura. Obviously, everyone here is quite unhappy about how that turned out. Still, in the end, what we faced was another party with extremely large resources and a total resolve to buy this asset no matter the cost. So is there anything we could have done another way? In this instance, probably not, since in the end everything was always going to hinge on price. We reached a stage where, viewing it from multiple perspectives — the cost of acquiring it, the execution risks for the project, CapEx risks, several other factors — it was beginning to reach a point where it stopped making sense for our shareholders. That was the call we made at the time: we judged it a rational decision to walk away. And I think the — but what it showed, as I mentioned earlier, is our capacity to spot, fund and then bring something to the market that made a positive difference to our business. So I think we'll draw considerable reassurance from that as we go forward. And as we rebuild that business development pipeline, we have a reasonably clear picture, thanks to the engagement we had with our shareholders during the process, of where their sensitivities are, where our own sensitivities are and, as a result, how to shape the next one when it appears.

Operator

operator
#35

Thank you. And since it seems there are no more questions right now, I'd like to turn the call back to you, Mr. Ferrar, for any closing remarks or anything else you'd like to add.

Gavin Ferrar

executive
#36

Thank you. I really appreciate everyone who joined us this morning. You can find the presentations on our website. I believe there will be — this presentation will also be posted at some point. We're grateful for your ongoing support and interest in the business. Many thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Central Asia Metals plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Central Asia Metals plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Central Asia Metals plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.