Champion Iron Limited (CIA) Earnings Call Transcript & Summary
July 29, 2021
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone, and welcome to the Champion Iron Limited conference call on first quarter results for fiscal year 2022. <<operator_script>> Today is Thursday, July 29, 2021, and this call is being recorded. At this point I'd like to hand the conference over to Mr. Michael Marcotte, Vice President of Investor Relations. Please go ahead.
Michael Marcotte
executiveThank you, operator, and good morning to all of you — and for anyone calling in from Australia, good evening. I want to express my appreciation to each of you for being here today as we go over the results from the first quarter of fiscal year 2022. I'd also like to point those on the call toward a presentation that management will be using as a reference, and it's available on our website at www.championiron.com in the Events and Presentations section. I should also remind everyone listening that certain matters we'll be covering on this call may contain forward-looking statements. Please take a look at the disclaimer at the start of the presentation, since we'll be referencing it throughout this call. If you need further detail regarding forward-looking statements, risks, and assumptions, please review our latest MD&A, which you can also find on our website. In addition, please be aware that every amount we refer to is in Canadian dollars, unless we say otherwise. With me today on this call are Michael O’Keeffe, our Executive Chairman; David Cataford, our CEO; Natacha Garoute, our CFO; and Alexandre Belleau, our COO. I'll now hand things over to Michael O’Keeffe for a brief introduction, and following that, he'll pass it to David Cataford for the more formal part of the presentation.
Michael Marcotte
executiveMichael, you have the floor.
William O'Keeffe
executiveThank you, Michael. And honestly, I just want to say what a pleasure it is to be back in Montréal with the team. I headed off to Australia in February of 2020, expecting to be gone for 4 weeks over the March spring break. Then 18 months went by, and here I am again. The world really has been flipped on its head, and we're confronting fresh challenges as we move ahead. When you think about some of the trauma folks have endured through all this — on a personal level, but in business terms too — it's been pretty severe. So with that acting as a headwind we've been battling, it's been remarkable to see the results in front of us today and what Dave and his team have managed to pull off during this COVID period. The first thing we did — or rather, what I did together with David — was head up to the site and take a look around. The way they screen people at the site, the system that's in place there, is remarkable. I actually went through that same system myself. And now I can really appreciate how they've managed to capture and handle the entire COVID process up there, with our own labs doing the testing, temperatures being checked, et cetera, et cetera.
William O'Keeffe
executiveThat let us keep running during this stretch and still move ahead with Phase 2. There are more than 1,000 people at the site, and throughout the entire pandemic we have had to provide them with housing, keep them there, and feed them. So credit to David and his team for that — my appreciation is genuinely different now. For me, it was also seeing what has changed in the 18 months I have been away: the scale of the mine, the development within it, how efficiently we are achieving record production. That speaks to Phase 2 — and Phase 1, and how we have handled those consistent recoveries. The operating team on site has been outstanding. Phase 2 is being built at the same time. So as you can see, given the shutdowns we have had and with Phase 2 coming on, our C1 costs have risen somewhat, but nothing that worries us unduly or that we cannot manage. I also examined the work at the tailings and the infrastructure going in, and I can tell you this project will be delivered on time and on budget.
William O'Keeffe
executiveSeeing that is pretty unusual, particularly in mining, and above all in iron ore and when new developments are taking place. We also took a flight to the port to see for ourselves what was going on there. In the past, that was a constant worry for me — how we would get that ready in step with our work at the site. And the last time we launched Phase 1, David had to dispatch a group of engineers down there to assist with it. That is not going to happen now, since the Board has installed new management at the port, and they appear set to deliver on schedule. It is a government project. So whether it stays within budget, I can't say, though we may yet be pleasantly surprised. Still, it looks fantastic, and that port will let us move the extra tonnages. Another positive is the land acquisition and the tenements we have managed to secure during the last 12 months — that means the Kami Project joining our books, which sits close by and is a fantastic opportunity, plus the Fancamp tenements, which lay right at the center of our Champion tenements and are now part of our stable.
William O'Keeffe
executiveAnd David has also renegotiated the royalties, and I’ll let him speak to that. A great result: $400 million of EBITDA. I mean, if you look at that annualized $1.6 billion, you can all do the calculation. And when you look at our market cap, it’s amazing. There’s a lot of headroom for us to be able to go up. And that will only happen if we continue performing, which we’ve been able to do. Also, hats-off to Natacha and her team in Finance. That’s also been a great year for us, and the fact that she was able to restructure the debt and bring our interest payments down and expand that facility, which we haven’t had to use. Also, the paying off of $60 million of prefs, which you might remember, we used to acquire the government’s at 30-odd 6% to -- of the Bloom Lake project. And that was the best money I think we ever spent. I remember, David, negotiating over $1 million difference on the -- it was something like $210 million versus $211 million. And he was kicking the tires because he left that $1 million on the table. I’d say, David, that’s worth $1.3 billion today.
William O'Keeffe
executiveSo that million you left on the table wasn't a bad one. But look, credit to the entire team, though I'll let David continue and fill in the gaps. And also, we'll move into the Q&A session after that.
David Cataford
executiveYes. Thank you, Michael. And thank you to everyone for joining today's call. We're really excited to share the results for this quarter. I think if you look at the quarter's highlights, delivering nearly 2 million tonnes during a shutdown quarter while at the same time wrapping up the union contract negotiation — those are fantastic results for us. That lets us take full advantage of the current iron ore price environment, and it also lets us keep growing on our processes to make sure that everything we're putting in place now with Phase 1 can also carry over into Phase 2 once it's up and running. Looking at sustainability and health and safety, the important thing to note, I think, is that, as Michael mentioned, we've handled COVID extremely well at site. Our laboratory is still in place even though roughly 60% of our workforce has been fully vaccinated or at least has 1 dose of vaccine. But we're continuing to work with our teams there on the vaccination initiatives and also monitoring and continuing our testing facility to keep everybody safe at Bloom Lake. On the environmental side, we've also carried on with the revegetation program that we began a few years ago.
David Cataford
executiveAs you know, each summer we begin revegetating parts of the mine we don't plan to use in the future, to ensure the site is kept in pristine condition. Moving on to the industry overview. Looking at what we observed last quarter, I believe the real game changer is seeing that most steel mills have come out with clear targets for how much CO2 reduction they intend to achieve in the years ahead. Since 2014, our strategy has always been to consolidate high-grade resources in one of the best mining jurisdictions anywhere in the world. We've managed to do that. And now we are fully benefiting from the transition underway in the steel industry. Most steel companies have clear targets for 2030 on CO2 reductions and are working on various plans, whether hydrogen, plasma, or different technologies, to be able to cut CO2 emissions in the steelmaking business. But one clear solution that is known today, and the simplest one, is to use higher-grade iron ore to be able to produce steel. And we can fully benefit from that transition because we produce exclusively high-grade iron ore at Bloom Lake. We've seen the premiums for the higher-grade type material increase this quarter to record highs, close to USD 35, USD 36 per tonne going from the P62 to the P65.
David Cataford
executiveYou can see, then, that our material grading 66% and 68%, along with the new potential material at 69%, gains from even stronger premiums in today's market and going forward too. It's quite interesting to observe what we've managed to build up on the resource and production front in a setting that keeps tilting further toward this higher-grade material. Turning to operations, it was a very solid quarter. As we noted, this was a quarter with a major shutdown as we worked on Phase 2 and renegotiated our union contract, and even so we still reached close to 2 million tonnes of production during the quarter. One thing I'd point to as a highlight is that we achieved very high iron recovery even at the current head grade, which sits nearer our longer-term average for the mine, and we had a very steady quarter given all the activity taking place at site. The team's accomplishments this quarter make us very proud. Looking at the financial results, producing a large volume of tonnes in a high price environment lets us bring in a substantial amount of revenue — more than $0.5 billion of revenue for the quarter; EBITDA above $400 million, which also works out to an EPS of roughly $0.44 per share.
David Cataford
executiveSo the results have been fantastic, and really that's come from pairing the strong pricing environment with the excellent operational performance we managed to deliver. Looking at the average realized selling price, I think the one thing that's a bit different this quarter — if you recall, in the last quarter there was some congestion at certain European ports, and that created delays for some vessels that showed up at the port in Sept-Îles, which meant roughly 6 vessels departed the port in March. Subject to provisional pricing, those vessels arrived in June. We had originally forecast around USD 180 per tonne, and we ended up selling at a realized price of roughly $230. So on this slide, when you look at the provisional price adjustment of approximately $25 per tonne, that really reflects the stronger iron ore pricing environment under which those tonnes were delivered to the clients. Looking at the — this quarter, we still have roughly 1.16 million tonnes of material that is subject to provisional price. And as you can see, we're anticipating a price of roughly USD 245 per tonne. The reason is that many of the vessels at the close of this quarter will be delivered into July and August, and fewer into September.
David Cataford
executiveLooking at these months, the forward curve was higher. That explains the price you see here for the expected settlement price at the close of next quarter. We'll be able to report on that when we talk together in October. Turning to positive cash operation — cash operating margin, sorry — once again, we posted a record cash operating margin of roughly 73.7%, with EBITDA margins above 74% too. So the quarter delivered very impressive results. One particularly interesting element this quarter is that we've begun our strategy of returning capital to shareholders. Our strategy has always come in steps. The first step was really to pay all the outstanding dividends on the preferred shares, which we've done ever since we put these preferred shares in place. As you remember, we put these preferred shares in place to buy back the government's 36.8% ownership in Blue Lake. So the partnership with the Caisse has been very beneficial for us and for them. We have a fantastic relationship with Caisse de dépôt, but we have started redeeming these preferred shares in order to begin returning capital to shareholders. We've redeemed the first $60 million of the preferred shares and are now working to be able to redeem the remaining $125 million in preferred shares.
David Cataford
executiveWhat makes this so beneficial for our shareholders? The dividend rate right now sits at 9.25%. And as I mentioned, since it's a dividend, there are no tax benefits tied to that cost of capital. So the obvious plan for us was to clean up the balance sheet and redeem those preferred shares while we finish Phase 2. When we first kicked off Phase 2, we didn't anticipate being able to redeem them this fast. Our expectation was that we could begin paying back the preferred shares once Phase 2 was up and running. But as you can see now, we've already started, and given where iron ore prices stand today, we're well positioned to redeem them fully during the next quarter. Looking at how cash moved over the quarter, one thing worth pointing out is really a shift in working capital. That isn't some kind of long-term new strategy. It's simply that a few vessels were still outstanding at quarter-end and we hadn't yet received provisional pricing on them — or pardon me, the initial payment for those vessels. So we've since managed to recover the majority of the cash tied to those vessels.
David Cataford
executiveThis comes down more to scheduling than to any real strategic choice. Still, it's clear your company sits in a strong spot given the cash it holds. We've put nearly $120 million into Phase 2, closed the Kami acquisition with the $15 million purchase price paid, and redeemed $60 million in preferred shares. The balance sheet therefore looks very healthy. That is precisely why we can show net cash positive of roughly $340 million following just about 3 years of operations. Truly excellent results. Considering how good the assets are at site, once Phase 2 is operating there will be more than $4.5 billion invested there, supporting a nameplate capacity above 15 million tonnes annually of a material among the most sought-out anywhere in the world. Phase 2 stands out as another highlight this quarter. As you can see, a great deal of construction is underway globally. Materials and equipment cost more today than they did a few years back. Even so, we remain on track to complete our Phase 2 expansion within schedule and within budget.
David Cataford
executiveIt really shows what the team can accomplish on site — not just carrying out the construction work, but doing so without disrupting current operations. So the team has done a fantastic job in being able to advance the project. As you know, the summer work is where we're going to spend a bulk of the remaining CapEx. So that brings us till about October. And we're well on track to be able to be on budget on all these different elements. Now as Michael mentioned, we visited the site. It's pretty interesting to see all the conveyors being installed outside. The mill is being finalized as well. We installed the gear just a few years ago, putting the gear guard in as well -- a few weeks ago, sorry, installing the gear guard very soon. Most of the recovery circuit has been installed. We're now working on the separation circuit with all of the screens, but very interesting to see all that work being completed. And we've also started hiring workers for the Phase 2 that we're training inside of our Phase 1 right now. It's not just important for us to deliver the project on time, on budget, but the key for us is really to have a very efficient ramp-up to make sure we can get to that nameplate capacity in a very short period.
David Cataford
executiveThat entire effort is happening concurrently on-site, and it's genuinely thrilling to watch. As Michael also mentioned, one particularly noteworthy aspect of this quarter was that despite the elevated price conditions, we succeeded in locking down nearly 300 million tonnes of resources amid all of our claims surrounding the Quinto area, and we also repurchased a 1.5% royalty that applied across all of the old Champion tenements. That genuinely sets us up well for future growth, because if you look at that cluster there, a few kilometers south of Bloom Lake, it's roughly the same size as what you see at Simandou, yet located in a far superior jurisdiction and additionally able to draw on potential hydroelectric power, so we can produce very clean iron ore in one of the finest mining jurisdictions anywhere in the world. So we've truly positioned that whole district to serve the high-grade market going forward, should there be a need to develop additional tonnes in the region. I believe the last highlight is a heartfelt thank you to every one of our staff, all of our workers, everyone at site and at head office who made this achievable.
David Cataford
executiveTo reiterate, we've reached a new collective agreement with our employees, and there was no interruption to work. We visited the site last week, and 2 weeks ago as well, and spoke with every employee. Everyone is completely driven to ensure this succeeds. Those of you who have been to Bloom Lake before are aware that the caliber of our people and their dedication stand out as among our biggest advantages. And I can assure you that everyone — even throughout this entire challenging year of COVID — is 100% committed to making certain we not only keep performing but also move strongly ahead with our growth strategy going forward. So thank you, all. I'll now hand things over to the Q&A portion of the call.
Operator
operator<<operator_script>> Our initial question is from Gordon Lawson at Paradigm Capital.
Gordon Lawson
analystGreat quarter, congratulations. I'd like to start with a question about the cold pelletizing research. Should that work out, is there a target percentage of production you have in mind for this process? And what role do Phase 2 and Phase 3 play in that?
David Cataford
executiveGordon, thanks for asking. With cold pelletizing, given the potential we see, it would be a less expensive route to pellet production, and a fired pellet generates roughly 15% of the CO2 emissions. That means around an 85% cut in the CO2 emissions tied to that technology. So as you can appreciate, once the test work is complete, there is a chance we could turn out as much as the entire 16 million tonnes of Bloom Lake material this way. But again, what matters to us is making sure we also diversify our products. So would we reach the full 16 million tonnes? Probably not. We have some very good clients at present that need the material we have so they can raise their productivity and bring down their CO2 emissions. So part of the Phase 2 material could be made through cold pelletizing. So overall, we would be capable of producing 100% cold pellets. But realistically, we will likely just have a blend of the current tonnes to keep supplying our existing clients with the high-grade fines that we do produce.
Gordon Lawson
analystAll right, that's great. My follow-up, then: the rate of mining for waste as well as ore came in far above what we'd anticipated. Could you give more detail on the fleet as it stands today, and what portion of that ties to the Phase 2 ramp-up?
David Cataford
executiveYes. So for Phase 1 by itself, our strip ratio right now sits at approximately 0.5. That means when you look at numbers such as 0.83, what we're doing is moving material in order to get ready for Phase 2. As Michael said, over the past 2 years the pits have been developed considerably, and we want to be certain we're prepared for Phase 2. If we look back to 2018, when Phase 1 began, there were a few quarters where our result came in slightly lower than we would have liked, since the mine was constrained. Our ramp up turned out much better than the feasibility study had planned, because the plant was performing so well. We don't want that situation to occur a second time. So at this point we want to ensure the mine is completely ready to take advantage of every single tonne that Phase 2's plant is able to process.
Gordon Lawson
analystAll right, that's great. And if I could squeeze in one more question. You shared a lot of detail in the MD&A, which we really appreciated, about the realized premium for the quarter — do you anticipate those figures carrying into this quarter and going forward? If you wouldn't mind expanding a bit on what you're seeing in the market, please.
David Cataford
executiveYes. Thanks for that question, Gordon. If you look at the prior quarter, I think it was somewhat unusual, in that we had provisioned roughly $182 for price and then realized approximately $230. That works out to an increase of around $50 per tonne across about 1 million tonnes of material that landed in the course of the quarter. So that was a fairly unique situation. As a result, we don't really expect a provisional price that high going forward, though you never can tell how far the premium for high-grade material might climb. What I think matters for us to point out is that we capture the full benefit of the entire P65 premium, and on top of that P65 premium we also gain when you consider our 66 material as well as our DR grade type material. So we're positioned very well to capture the full benefit of the high-grade premium currently present in that market.
Operator
operatorAlex Jackson from RBC Capital Markets has the next question.
Alex Jackson
analystI guess I'd just like to ask whether you might spend a moment discussing how you're weighing capital returns against your growth efforts, perhaps including Phase 3 at Kami and a few of the exploration activities you have underway.
William O'Keeffe
executiveMuch appreciated, Alex, for posing that. The Board is examining this matter, and we will be sitting down with management at the end of August to talk through the entire issue. Although it is good to keep focusing on growth and expansion, it is also the moment to think about the shareholders who have stuck with us over a long period, plus the current ones, since the capacity to pay dividends now exists, and that is what we are weighing up. I have consistently maintained that following the second quarter of this year, we should — assuming we still had robustness in the market — be well placed to pay dividends. So that is a possibility. But when you think about it, we will manage without having to draw down on our debt in order to finish Phase 2. That is outstanding. We will repay the prefs. We have been doubled to acquire all the ground around us. So that has been an outstanding effort. But we — given the forecast we are putting in, we should have significant cash in our accounts at the end of each quarter going forward. So I would suggest that — we do not give forward-looking statements, but I would suggest that shareholders could look to a dividend in the second half of this year.
David Cataford
executiveYes. And Alex, perhaps to round that out, I think what has always mattered for us is putting the company in the right — in the right position. And at this point we've locked in a substantial amount of resources and also tidied up some of our tenements, plus bought back the royalty, so that we're well placed for growth. As Michael said, we need that proper balance between returning capital to our shareholders and keeping ourselves in a position where, if we find the right home for these tonnes and the right potential partners, there's still potential to keep growing in terms of the high-grade tonnes into the market. But the first step was to begin returning capital to shareholders, which we did this quarter by buying back a portion of the preferred shares. And we're going to keep pursuing that strategy and then work on the dividend strategy, as Michael mentioned.
William O'Keeffe
executiveSo overall, through all of that, we'll reach a point where we feel comfortable with both the cash on hand and the cash being returned to shareholders. And should the market become consistent, that will continue on an ongoing basis. As for the further phases, plenty of parties are interested in the material. But it comes down to what price they're willing to pay, because, as David said, throughout this process — the scale of our tenements beyond Bloom Lake, the scale of Simandou — what we have is all of the infrastructure. The port, then, is being built as a government initiative. There's ample capacity on the rail for us to consider a Phase 3. The government is examining bringing additional power to the region. And an agreement has been signed between Newfoundland and Québec regarding how they are proceeding with the power arrangement. So the government, as you're aware, has backed us from the very beginning. They gain considerably from this, not just directly through the money they've earned, but also via third parties and further employment and manufacturing in the region. So we're a showcase for the government, and we keep honoring that, just as they do with us.
William O'Keeffe
executiveSo as we move ahead, you can expect additional initiatives to come from them.
Alex Jackson
analystThanks, that's really useful. I've got just one more question. Looking at your cash costs for the quarter, they came in a bit above what I'd anticipated, and a bit above where they've been in some earlier quarters. I was wondering what was behind that. And was any of it structural, or is it mostly one-offs?
David Cataford
executiveYes. Thanks for that question, Alex. So if you look at iron ore pricing, it's quite interesting from our perspective — it lifts our revenues. But when we purchase replacement equipment for maintenance and when we deal with the workforce, costs go up somewhat. We had a major shutdown this quarter, including certain elements we hadn't tackled in some time, which naturally arise after several years of operation. And we also chose to carry out full maintenance at our crushing facility too, so that we can take full advantage of present pricing. The last thing we want right now is to underperform against the margins we have. I mean, with a 74% EBITDA margin, in a market like this we're prepared to perhaps spend a bit more on maintenance cost, while making sure we can deliver every single tonne. So I don't believe there's a structural shift in our operating costs. But with prices higher and higher, we'll do everything possible to produce every single tonne that Bloom Lake can deliver.
Operator
operatorThe following question is from Daniel Sampieri at Scotiabank.
Daniel Sampieri
analystCongratulations on the strong quarter. I just want to follow up on that last question regarding costs. Now that other miners have started reporting results, a lot of them have mentioned inflation potentially pushing their costs higher. I know you touched on this briefly, but could you perhaps get into specifics about any inflationary pressures you're observing and exactly which inputs those might be within your cost structure?
David Cataford
executiveYes. Thanks for that question, Daniel. I think one key point worth noting is that we make one of the finest commodities for living in that kind of environment, where equipment costs and maintenance parts costs run a bit higher, since we produce the iron ore that we typically purchase back into different equipment we install at the site. So I don't see anything particularly structural when it comes to our cost. And as you'll recall, the real game changer for us arrives when Phase 2 is up and running and we're able to bring our overall cost down through economies of scale. So at present, what has mattered for us is carrying on that maintenance strategy and making sure we get operations running as efficiently as we can. In how we negotiated our union contract as well, we handed a one-off pretty decent bonus to every single worker to recognize that they've done an incredible job over the past years. But we were very diligent about structural increases to make sure we can keep those costs in line going forward at Bloom Lake.
David Cataford
executiveI think that with each choice we make, we're ensuring we're able to run efficiently when prices are high, while at the same time safeguarding the company over the longer term.
William O'Keeffe
executiveAnd Daniel, in this day and age, I can sympathize with the other mining companies. And that is just to get good people is very difficult, and there's big numbers being offered to executives. So we're mindful of that. And we want to make sure that we retain our people. And if it costs us a little bit more, so be it. But -- because the cost of not having them is -- far outweighs that.
Operator
operatorAlexander Pearce from BMO has the next question.
Alexander Pearce
analystMy question actually builds a bit further on those cost questions from earlier. You said you're currently hiring for Phase 2. I was wondering if you could speak about the labor market. Also, has COVID had an effect on the hiring process as well?
David Cataford
executiveYes, thank you for that question, Alexander. What matters most to us, I believe, is that we have genuinely begun building a brand people in Quebec trust. When we announced the 400 potential jobs for Phase 2, we received 12,000 CVs. So our challenge has been working through all of those and making sure we pick the right individuals. But I must say, in this current difficult market, it has been very good to see so much interest from people wanting to come work at Bloom Lake. So I think our main focus is making sure we have the proper training personnel and systems in place so that everybody is ready for that Phase 2 start-up and ramp-up. But we have seen a pretty good demand of — or offer of people who want to come to Bloom Lake and be able to participate in the success of the project.
Operator
operatorCraig Hutchison from TD Bank has the next question.
Craig Hutchison
analystYou brought up at the start some early worries regarding how the port was coming along. I believe you also mentioned being fairly impressed by the headway that's been achieved. Could you perhaps describe where things stand when it comes to building up production capacity at the port? And if you happen to be ahead of schedule at the site on the production side, are there any workarounds at the port that could help get the 15 million to 16 million tonnes shipped out?
David Cataford
executiveYes. Thanks for that question, Craig. So I believe you have a pretty solid understanding of us at this point. We are doing all we can to implement the workaround, as you said, involving the port and, most importantly, the set-down area. Some work is underway at the moment to ensure we can have something of a transition until that new stacker reclaimer is able to arrive. And there are a few possible approaches for raising throughput from the operations as they stand. At present, the current car number is committed to our operations. And this equipment can feed the full tonnage of our Phase 1 and Phase 2. So it really comes down to the workaround on the stacker reclaimers to ensure those tonnes can transit properly. Getting those in will likely carry a somewhat higher cost. But if we can deliver the project ahead of schedule, you can be sure we will do everything possible to make sure those tonnes get onto a vessel and reach our clients.
Craig Hutchison
analystAnd when is the stacker reclaimer scheduled to come in?
David Cataford
executiveThe stacker reclaimer is scheduled to arrive around the close of calendar 2022.
Operator
operatorThe next question is from Lucas Pipes at B. Riley Securities.
Lucas Pipes
analystLet me start with something that relates more to how our capital is structured. Looking at the high-yield market, the rates available there are incredibly attractive. Would you consider that, particularly as you work to balance growth against capital returns?
David Cataford
executiveYes. Thanks for that question, Lucas. If you take a look at the balance sheet as it stands today, I mean, we will probably complete Phase 2 without pulling even one dollar from the debt facility. The first $20 million has already been paid back. Most of the preferred shares are being repaid as well. So once the project wraps up, we'll be sitting with no more than roughly $180 million available under the debt facility. The cost of capital on that comes to approximately 3%. So given what we've now arranged together with the strong partners we have, we don't believe the high-yield market is where we should be at this point. As we consider our other possible growth, we'll be in a position to take another look. But looking at what we need today and what's already in place, we're quite pleased with the partners we have.
Lucas Pipes
analystThat's really useful. So if we were to take on somewhat more debt and then fund a dividend from that, is that something you wouldn't look at right now?
William O'Keeffe
executiveNo, absolutely not — the Board would never support something like that, I can guarantee it. Still, it's fascinating to reflect on our starting point when we first set out to raise capital. Honestly, we'd have accepted anything just to secure converts, or we'd have taken bonds, whatever was available. In the end, though, we wound up with debt above 10%. And now, hearing David describe what we've managed to accomplish across the last 4 years — 3 to 4 years from when production began — and comparing what debt was costing us then to his statement that you're at $180 million at 3%, that is music to my ears. So I doubt we'll ever return to the situation we had at the outset.
Lucas Pipes
analystNo, that's extremely helpful. And yes, you and the whole team did a terrific job — really, really impressive. Sort of moving to the industry side for my second question: what's the outlook for the second half in terms of demand, and also on ocean freight rates, since there's been some movement there. Could you speak to how that might affect netbacks? I'd appreciate hearing your thinking on what we should expect.
David Cataford
executiveAbsolutely. Lucas, I appreciate the follow-up. Looking at the market right now, the great thing for us is that no matter how things unfold, demand for the high grade is only going to rise. That puts us in a very strong position when it comes to premiums. If we consider potential shipping, rates have gone up a bit. Still quite comfortable given where iron ore prices sit today. Looking at historical trends, we would have even expected shipping to be significantly higher than it is now. And we can lock in some fairly attractive premiums to ensure material from Sept-Îles reaches our clients. As for our longer-term strategy, we want to position ourselves to sell more into Europe and potentially the U.S., so we can lower that shipping variable down the road and deliver tonnes closer to home. So overall, at present, we remain pretty comfortable with the shipping environment as it stands. And we're developing strategies to reduce our exposure in the years ahead.
Operator
operatorDalton Baretto from Canaccord has the next question.
Dalton Baretto
analystMy apologies—is this coming through clearly at this point?
David Cataford
executiveYes. I appreciate the…
William O'Keeffe
executiveAbsolutely.
Dalton Baretto
analystAs I mentioned, congratulations first of all on a fantastic quarter. And apologies if I’ve missed this — I joined the call somewhat late. But what’s the current thinking on Kami at this point? What’s the timing for the study? Could you give us a sense of how you’re thinking about integrating it into Bloom Lake? And when is the earliest you could begin work on that?
David Cataford
executiveYes. Thanks for the question, Dalton. So we have a dedicated team working on completing the feasibility study for that project. As you can appreciate, we closed that transaction not too long ago. So we've just put the team together, making sure we have the right partners in place to deliver this and to ensure we have a Champion-ready study when it comes out. What do I mean by Champion-ready? That what we state in that study, we can actually deliver. I think that's been one of our strengths. Phase 1, we delivered on time, on budget. Phase 2, even if we delivered that feasibility study in 2019, today we're working on that project and well on track to deliver on time, on budget. We want to make sure Kami is the same. So we'll be able to come back to the market probably mid-next year with the results of that feasibility study, which will be perfect timing because Phase 2 will be delivered and then we'll be able to reevaluate where the market is and what's the best time frame to be able to bring Kami into production. So probably next year, we'll be able to come back to the market on this one.
Dalton Baretto
analystAll right, thanks. Maybe I can ask one broader question here. If I consider what you own up in Québec and Labrador, and then consider the ground you hold beyond Bloom Lake and Kami, and then consider that the Chinese are turning to regions such as West Africa so they can diversify away from Australia — does that present an opportunity for you folks?
David Cataford
executiveWell, if some folks would rather put their money into the world's best mining jurisdiction, where the iron ore tonnes rank among the lowest for CO2 emissions globally, then I'd say there are some excellent opportunities there. Because when you consider how large our holdings are, as you rightly pointed out, it goes head-to-head with the entire Simandou story. So from our perspective, that's exactly why securing the buyback of that royalty at this moment mattered so much, along with getting Lac Lamêlée, which sat right in the middle of that hub. But it's fascinating to observe how fantastic Quebec has been when it comes to infrastructure investment, which a project of that scale will potentially require, though we are definitely open to talking with various groups if they'd like to put money into these tenements.
William O'Keeffe
executiveYes. And on top of that, consider the low political risk David mentioned, plus the infrastructure already available here versus Simandou — they've got two major problems. The African government, in my view, won't offer any money to back that project. It would be intriguing to learn where their electricity would come from. So I just don't see hydropower being used in Africa. That only compounds the emissions concerns tied to that project, when you compare it with hydropower located here alongside existing infrastructure. So people really ought to look at this and conclude, "You're working with a party that has operational experience in this region." So with government backing, minimal political risk, and abundant infrastructure plus ample hydropower, I really don't think there's anything better.
Dalton Baretto
analystYes. To me, this makes a great deal of strategic sense. So does that mean — and I’m not certain whether you’ll respond to this — does that mean you held discussions about this?
William O'Keeffe
executiveWe keep hearing the same question: how do we obtain extra capacity that's secure? There's been a huge dependence on Australia as well as Brazil. Brazil, as you're aware, has faced enormous tailings difficulties. On many occasions they've declared force majeure against various contracts, something the market doesn't see. We do see it, since they approach us as a substitute because they're after that high-grade material. So that's Brazil, given the considerable infrastructure troubles they've had and the huge health problems everyone has read about. What's interesting regarding Australia is that not only are relations with China so poor, but they're also battling grade. If you look at Rio's results, the sole topic is how do we hold grade, how do we hold production. So going forward, once more, the environmental challenges originating in Australia — higher alumina and so on and so forth — have created difficulties for them. So Canada isn't a bad destination: Québec and the Labrador Trough. So I'd say every road leads there. But it's curious what motivates people at times, why you'd go to Africa. Is that a genuine threat? Is it — well, we know they're investing an enormous sum there, since they're putting in a couple of billion dollars simply to dig a tunnel for a rail line.
William O'Keeffe
executiveThat essentially accounted for nearly all of what they spent developing the mine. So the reasoning is clear to me, and I understand how you'd arrive at where we are. That's the reason we're locking up all these tenements—because as a company, we view this as what lies ahead.
Operator
operatorScott Taylor from Pembroke has the next question for you.
Anthony Taylor
analystI was curious, Michael — since you travel all over the world — whether you could share your general view on supply and demand for the basic P62 over the coming 12 to 18 months, setting aside the market's appetite for the premium product, which we've already covered. Subject to all the many variables, how do you see the outlook for the basic P62 price over that 12 to 18 month horizon?
William O'Keeffe
executiveThanks, Scott. So look, I'm optimistic about every commodity, and I've felt that way for quite a while. Even back in December 2015, when David and I got that call from the monitor telling us we'd won the bid for iron ore at the Bloom Lake iron ore project — that very day, iron ore was priced at $38 a tonne. I mean, moments like that make you pause and swallow hard, wondering whether we'd gotten it right. Yet even then, if you go back to 2010 and 2011, the mining sector went through an enormous consolidation, with Rio, BHP and other firms acquiring all of those mid-tier companies. They paid huge sums for them. Take coal assets such as Macarthur Coal, where Peabody spent billions of dollars — in the end their plate was so full they couldn't digest what they'd already taken on. So by absorbing those mid-tier companies, which are the ones developing new opportunities, that will come to a halt. And the big players stop too, because their boards are already tightening the screws on management and firing management over those expenditures they'd made. So you had a stretch across the last decade where you're just silent. Nothing was developed.
William O'Keeffe
executiveTo get concrete, consider copper, rare earths, tin—really any commodity—but take iron ore as an example. My view on iron ore was bullish the whole time, since nothing new was being developed and China kept growing. All you needed was to watch the expansion they were discussing—even at 6% or 7% in China, you could see it progressing pretty strongly. So we reached a stage where a shortfall was inevitable. Well, it has begun to show up now. What magnified it in iron ore was Vale and the collapse of their dam, which truly set things off. Still, it was bound to occur, because I had faith in the demand that was on its way. Beyond that, consider COVID. Every government across the globe is scrambling to put together stimulus packages. The first item in all of that is infrastructure. Infrastructure means roads and bridges, which means steel. So that adds further amplification. We are seeing it for high-grade material, or even for 62—let's discuss 62, since you raised it—as much as $200 a tonne. It has slipped somewhat under that level at present.
William O'Keeffe
executiveBut my goodness, set that against $38 a tonne when the consensus was that it would drop below that level. So, I was over in Australia not long ago. Now I'm back here. Yet wherever I travel, the pattern is identical. I drove from North Queensland all the way to Sydney. What would typically take a couple of days ended up taking far longer, since at every point along the route there were roadworks, new bridges under construction, bypasses, and so on. So you take that, and then you come to where we are in Montréal. Even out in the countryside, workers are impossible to find because everyone is — construction is happening everywhere. New towers are going up here. Stimulus is driving all of it. So once this kind of momentum gets rolling, it persists. And over the next 2 years, 2 to 3 years, I foresee quite buoyant iron ore prices. And I foresee it across all commodities, given how much stimulus is being injected there. So after that, people begin reaching for luxury goods. So go out and buy yourself a few Porsche and Bugattis and the like, because they're going to be worth a lot more as you go forward. And I mean we're seeing that. Just look at diamonds.
William O'Keeffe
executiveThe cost of diamonds is rising. Individuals are browsing and putting money into those kinds of items. Digital platforms are getting set up. So the world is transforming. But simply — that's a lengthy way of responding to your question regarding the 62. Yet when I discuss matters, I prefer to expand on the foundation of — it's fine and good and I see it across 2 or 3 years, but you need to grasp what is occurring and what is driving it, which we devote considerable time to.
Operator
operatorStefan Ioannou from Cormark has the next question.
Stefan Ioannou
analystI also want to say sorry for getting on the call late. And if you already covered this, we can simply catch up afterward online. But I was just wondering — during the quarter, it's great to see the performance. I'm just wondering where things stand with the DR pellet feed and "super-high grade" production and sales. Is that still continuing through Q2 and going forward? Or maybe just a quick update on that.
David Cataford
executiveAbsolutely, and thank you for asking. So when we consider the DR material, demand has been coming in fairly strongly. As you're aware, though, we're essentially sold out for this year. That makes it critical that we take care of our existing customers. Our goal was really to position Bloom Lake so it can move toward 68% once Phase 2 is operational. At present, therefore, we aren't selling any tonnes into the DR market. Delivery will be able to happen much more alongside our Phase 2 project. Should we manage to generate more tonnes than the roughly 8 million tonne per year run rate we currently have, we will certainly examine supplying that market, since premiums are quite attractive right now. At the moment, however, we regrettably have no tonnes remaining that we could sell into that market.
Operator
operator<<operator_script>> There are no additional questions at this point. Michael O’Keeffe, I’m handing the call back to you.
William O'Keeffe
executiveWell, thank you all for taking the time to listen as we present these results and bring you up to date on how your company is doing. It's been amazing. We keep setting targets and then beating them, which is fantastic. We're focused on growth. But importantly, the team at site led by Alex, finance; with Natacha; and David, the overall team leader; and for me as Chairman of the company, it's been a wonderful experience in the early days with shareholders that were with us from day 1, know every step that we've been through. So they can appreciate what we've achieved to get to where we are. And we're very conscious of building the company the way we have, not forgetting where we came from and understanding that every dollar is important to us as are our shareholders. And we thank you very much for your support and hopefully be rewarded a lot more than just the capital gains that you have. So thanks to everyone. David, do you like to finish?
David Cataford
executiveNo. I appreciate the nice comments. Thank you to everybody for joining this call. I look forward to discussing the upcoming results in October. Thanks to all of you. Have a wonderful day.
William O'Keeffe
executive<<foreign_lang>>
Operator
operatorThat brings today’s conference call to a close, everyone. We appreciate your joining us, and we ask that you disconnect your lines at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.