Champion Iron Limited (CIA) Earnings Call Transcript & Summary
October 28, 2021
Earnings Call Speaker Segments
Michael Marcotte
executiveOnce more, operator, thank you, and thanks to all of you for being on this call about our Q2 fiscal 2022 results. Before starting, I want to direct everyone to the presentation we'll be using today, which can be found on our website at championiron.com in the Investors section. I'd also ask you to look at the disclaimer page and at our MD&A, which is likewise posted on our website, since members of our team may present forward-looking statements during this call. On the call with me today are Michael O'Keeffe, our Executive Chairman; David Cataford, our CEO; Natacha Garoute, our CFO; and Alexandre Belleau, our COO. With that, I'll hand things to David Cataford for the formal presentation portion of the call, and afterward we'll open it up for Q&A. David?
David Cataford
executiveYes. Thank you, Michael. And thank you, everyone, for making time this morning. I'm very glad to be here to talk through the results from the last quarter and also a handful of developments that took place just in the past month. The biggest takeaway for the quarter is that we continue running above nameplate capacity. We delivered another quarter in which slightly more than 2 million tonnes of high-grade iron ore was produced. That came at a time when we are moving rapidly on all of the phase 2 project. So as you can imagine, there are quite a lot of people on site working across different projects, various tie-ins linking phase 2 and phase 1, and dealing with the COVID situation, which remains ongoing here in Canada. Even so, we were able to produce more than 2 million tonnes in the quarter and also generate slightly above CAD 200 million of EBITDA for the quarter. On health and safety, as you're aware, we run a fully operational COVID lab at site, and that lets us keep everyone safe; at the same time, vaccination across our workforce is pretty much in line with what we see in the Quebec population, with close to about 80% of our workforce fully vaccinated, and that figure rises every week. I'm also pleased to report that no major environmental issues arose during the quarter, and no serious injuries were reported either, so we kept our expansion work moving, completed all of the sustaining capital work at site and delivered a 2 million tonne quarter in operations. All of it done safely by keeping everyone safe at site. Turning to sustainability and community relations here in Canada, a new holiday fell on the 30th of September, the National Day for Truth and Reconciliation. We took part in and helped fund one of the events that our main First Nation partners were putting on, which further strengthened our relationship with the community. We also appointed a new manager of First Nations, who works with the various groups in that community to help build new companies within it that can serve our mining operations and the mining operations in the region, again further strengthening our relationship with the First Nations group. Looking at the industry, the quarter was somewhat volatile, but what I think matters is that some of the volatility seen in China has been picked up in other steel producing markets; so we saw China announce that it wanted to cut its steel output to align with last year's results; but realistically, when you look at steel demand around the world, it has not declined. So even though China reduced its crude steel output by about 14% in the period, we saw markets outside China rise by about 12.6% year-on-year. So overall, we can see the demand remains regardless of how many tons China doesn't produce. That means steel output can be taken up by markets beyond China. What benefits us is that China is essentially our most distant customer. So producers in Europe, the Middle East, the US, and India are all located nearer to home, which lowers the freight impact we face when shipping into those regions. Another advantage of having additional tonnes outside China is this: even though China consumes a substantial amount of high grade material, markets elsewhere typically rely more on electric arc furnace production, and those operations use more high-grade iron ore. As a result, each tonne of steel made outside China helps a project such as the Bloom Lake mine. On operational results, as noted, we produced over 2 million tonnes of high-grade iron ore in the quarter, and I'd draw your attention to the strip ratio, which came in somewhat higher but consistent with what we forecast for our phase 2 project. What we're doing at site right now is ensuring the mine is prepared and able to support the phase 2 project, which we'll discuss in a few slides. Second, you'll notice the head grade has declined slightly; that matches our mine plan, so nothing in this figure came as a surprise. Also of note is that the investments we've made in site infrastructure have let us keep producing at a run rate of 8 million tonnes per year, even with a head grade below the prior period or last year. Our head grade is now nearer to where it will sit for the life of mine. And the modifications completed within the plant, along with the infrastructure around it, let us keep running above our nameplate capacity; on financial results, as noted, EBITDA of CAD 200 million, and we continue to hold significant margins. We'll be able to touch briefly on our all-in sustaining cost, which was somewhat higher during the period, mainly because of some nonrecurring work on the tailings infrastructure; but again, a very strong quarter with CAD 0.23 of EPS and CAD 200 million of EBITDA. Regarding the all-in sustaining cost, it was affected by a work project of roughly CAD 20 million on our tailings infrastructure. As you know, we're moving very quickly to advance our phase 2 project to double production at Bloom Lake. And in doing so, since we operate very conservatively, we reaudited all the tailings infrastructure at site. When we carried out that audit, we found a handful of dikes that hadn't been constructed according to the plans we had on file. We spotted this long before any potential problems tied to it arose, so there wasn't any near-term risk, but we chose to make sure we repaired all of that infrastructure so we'd be ready to keep pursuing our growth initiative and avoid potential trouble down the road. Taken together, that came to roughly CAD 20 million in spending; we can now report that aside from a single project that will wrap up in the coming weeks, every piece of work tied to that audit is done. Today, 100% of our site infrastructure on the tailings has been brought up to standard, and we don't view that as recurring work going forward. On provisional price, we recorded a modest negative adjustment at quarter end, approximately USD 10 million, tied to about USD 5 per tonne on the 2 million tonnes sold in the quarter.
David Cataford
executiveAs a reminder, the provisional price we recorded when last quarter closed stood at USD 246 per tonne, whereas the realized price turned out to be USD 237. That number is higher than the prior quarter's average. The explanation is that the bulk of the tonnes subject to provisional pricing reached our customers in July and the first part of August, so we were able to take full advantage of stronger iron ore prices instead of the levels seen in September. Now, regarding the provisional price recorded for the 800,000 tonnes that were on the water when this quarter ended — that is, the quarter finishing September 30 — we booked those tons at USD 141 per tonne. Looking at this slide, the P65 index came in at about USD 190 per tonne on average during the quarter, while our gross realized price is USD 175 per tonne. The main reason for that difference is the 800,000 tons still on the water, which were booked at a provisional price of USD 141 per tonne — below the USD 190 per tonne you see here — and that explains the gap between the quarter's P65 index and our gross realized price. I'd like to reassure everyone that there are no discounts on our high-grade material. We face no penalties, and we capture the full benefit of the P65 index. This is purely a timing matter, and demand for our material is very strong. Like we mentioned a little while ago, output came down somewhat from China while rising in the remaining steelmaking nations, which has pushed up demand even for the high-grade material, so as noted we aren't getting penalties and we get the entire P65 index benefit. Regarding stability, we brought this up at our AGM, but we managed to repurchase the preferred shares — all of them, at par — from the Caisse de depot. Over the quarter, we bought back CAD 125 million in preferred shares, which completely retired every preferred share that Caisse de depot held here in Quebec. Those shares carried a 9.25% coupon. By repaying this, we have meaningfully lowered our cost of capital, which lets us pursue future growth projects and our capital redistribution strategy. One further highlight for the quarter is that we secured a CAD 22 million grant from the Quebec government; this grant supports work we are doing to cut greenhouse gas emissions at site and also to reduce energy consumption at Bloom Lake. Roughly 70% of our energy comes from hydroelectric power. So what these initiatives are meant to do is keep us pushing on the remaining 30% of fossil fuel energy at the site. The company is fully dedicated to reducing CO2 emissions even further, and we've already cut emissions—or CO2 production—at the site by about 40%. Another interesting item on the slide: for next year's vessels, we've managed to secure a premium over the C3 index, and that allows us to bring down shipping costs for our major clients—for our major clients. Essentially, we booked a 20% premium over the C3 index, while our yearly average typically comes in around 25% above that C3. As a result, we're able to lower the cost of our vessels as we head into 2022. Turning to cash — our cash on hand increased by about CAD 100 million in the quarter. A few items worth noting: a working capital swing of roughly CAD 245 million, spending of approximately CAD 120 million on phase 2, and the CAD 125 we used to buy back preferred shares. That leaves the Company in a very strong financial position, which allows us to continue advancing our phase 2 expansion — doubling production at Bloom Lake — funded through our own cash flow, with no need to draw on any debt or add to the debt we already carry. So the balance sheet is in very good shape. Our net cash stands at roughly CAD 183 million, and phase 2 still has a little more than $200 million left to go. That means we can finish phase 2 entirely with the cash we already hold plus what we'll generate over the coming quarter. On the growth projects side, one standout is that detailed engineering is now 97% complete, so the risk of surprises is behind us. By now essentially the whole plan exists on paper. Deliveries are arriving at site, the work carries on, and things are progressing very nicely. Once more, despite the present COVID circumstances and considerable disruption, reports have come in from nearby operations in Canada indicating problems obtaining workers and equipment. At Bloom Lake we haven't faced that. I won't pretend there are no difficulties. Still, on the whole, we can manage those difficulties and continue both pushing our operations beyond nameplate capacity and moving our growth initiatives forward within schedule and budget. During the last quarter, over the last month, we completed several highly important items at the site. Looking at the slide to the right, an engineer might find it somewhat more impressive, but essentially what we did was raise a structure weighing 220,000 pounds to a height of roughly 37 meters. That structure is about 50 meters long, and it features a very intricate connection joining phase 1 and phase 2, allowing the crusher in phase 1 to feed the phase 2 plant. Of all the critical jobs we encountered at the site on our phase 2 project, this particular one was especially notable. We had told the market that the tie-in work would happen during the October shutdown this year. I'm happy to report that we completed that tie-in with zero issues. It was executed safely—no one was hurt, there was no environmental impact, and it came in within the time and budget we'd set aside for it. So with that project done, along with other essential work this quarter, we're pleased to announce that the phase 2 project schedule is moving up. We'd earlier indicated we planned to deliver phase 2 by mid-2022. Now, with those critical works complete and phase 2 accelerated, we expect start-up in early Q1 of fiscal year 2023. Essentially, sometime in April of next year, we'll be ready to deliver the phase 2 project. So I'm very proud of what the team achieved over the past quarter and this past month, which lets us move our expansion project ahead of schedule.
David Cataford
executiveLooking at where the market is headed, first, I'm very confident that the tons from phase 2 can be sold at a premium. Every one of the major steel producers globally has set targets for cutting CO2 emissions by 20% to 40% by 2030. To get there, we're observing modest investments and partnerships forming between iron ore companies and steel companies—projects of about CAD 1 million aimed at evaluating new technologies. But realistically, the only proven path to lowering CO2 emissions by 2030 is to use higher grade material. At first, we had anticipated that most of this DR-grade material, or high-grade material, would go toward electric arc furnaces; however, what we're seeing now is that even blast furnace operators are seeking higher grade material so they can cut their CO2 emissions by 2030. So demand for our kind of material is set to rise in the years ahead. Even if the price sees short-term volatility, we still expect the premium for high-grade material to stay strong in the coming years. Also very telling is the fact that we're conducting a feasibility study that would let us produce 69% or above 69% DR-grade pellet feed. We do see the market moving toward more pellets versus center product, and we want to ensure we're ready to serve that market. So the company is working on a feasibility study for a plant that could take roughly about 8 million tonnes of either phase 1 or phase 2 and process it into a 69% pellet feed material. It's a fairly simple plant. What we're looking at is just a grinding mill with some flotation columns and a bit of filtering afterward, so a fairly simple project. Flotation is a technology that is well-known around the world and specifically well-known in Quebec. So it's not a complicated technology to install or to operate either. So the team is working on that, and we'll be able to deliver the results of that feasibility study next year. And this will allow us to be ready for what we see as potential increased premiums in the high-grade market as the world moves closer to 2030 with the CO2 reduction targets of our clients. What's telling as well is when we look at who can actually produce this type of material, you can see that the bulk of the iron ore market sits between the 56% and 62% iron ore content. When we get into a territory of around 64% to 65%, you get around 1/3 of the material that's produced, which is typically more the high grade market, but closer to the 68%, 69% material, there are very few projects being done around the world. Another point worth noting is that, if you consider the ability of steel mills to pay for higher grade material, a 2% rise in iron ore for our clients works out to roughly USD 12 per tonne in operating cost savings. So this makes sense not just from a CO2 reduction standpoint but also on productivity grounds, and we can see that using higher grade material lowers their operating costs as well. So we can see that demand for this material will come not only from carbon credits or carbon taxes; it also lets our clients cut their operating costs. So they will have every incentive to use this high-grade material and to pay a premium for it. Lastly, one of the projects we are working on is a drill program we're doing together with Caterpillar. We're very pleased to announce that Caterpillar has picked Bloom Lake as its partner to complete and finalize this technology. They could have picked any project anywhere in the world, but given the skilled workforce we have at Bloom Lake, the high-quality equipment we have on site, and the partnership we have with Caterpillar, they chose our site to begin work on a drill-to-mill strategy. Essentially, what we're doing is using artificial intelligence and automation so the drill can learn about the way it's drilling, and this will let us have specific recipes for each hole in terms of the explosives we use. Why does this matter? It lets us reduce the CO2 emissions associated with blasting, and it also lets us use less explosives, which essentially will lower our operating costs associated with the drilling portion; so a very beneficial project for the site, and we're very happy that Caterpillar has chosen us to implement this technology on site. So all in all, very proud of what the team has been able to achieve in the past quarter; we have very strong operational results, very good news on our expansion project, which is going to be delivered ahead of schedule and on budget; so all in all, a very good quarter for us. And more than happy to answer any questions that you might have.
Michael Marcotte
executiveOperator, I think we can turn it over to question at this point.
Daniel Sampieri
analystI'd like to ask a follow-up about the faster development timeline for phase 2 that you brought up. So my understanding from what I heard is that you now anticipate it being finished and beginning to ramp up around May 2022, or in Q1 of fiscal '23. Is there some particular reason behind that, or is it simply overall execution? And should we anticipate any effect on capex from speeding this up, meaning any extra capex that would be needed?
David Cataford
executiveYes. Thanks for asking. As things stand, we aren't anticipating extra capex. If any does arise, it will be marginal. You heard correctly—we're examining how to accelerate the Phase 2 project in Q1, specifically early in the first quarter of fiscal 2023. That's a real accomplishment overall. Our team has outperformed the original plan in terms of productivity. And as you'll recall, another item we had to address was ensuring we don't merely generate tonnage at the site but can actually move it to market; so we collaborated closely with the port to devise innovative solutions that let us deliver that tonnage to market. We're now quite confident that both the mine and the port will be prepared to deliver those tonnes in late April of next year.
Gordon Lawson
analystCan you share more on your direct reduction production regarding potential volumes for phase 2, and where the product is drawing the greatest interest?
David Cataford
executiveYes. Thanks for your question, Gordon; so what we're seeing right now for the DR-grade type material, most demand is coming from the US, the Middle East and Europe and also from Japan; so we do expect in the future that China and India will also increase their demand; but right now, those are the markets where we are seeing the most excitement for this type of material. The reason I'm using the term excitement is because there are very few projects around the world that can actually produce this type of material, and it's very beneficial for our clients in terms of operating cost and CO2 reductions. What we're doing now is a feasibility study to be able to process 8 million tonnes per year of material that we're producing; so essentially half of the production of Bloom Lake once phase 2 is up and running, would it come from phase 1 or phase 2, that's still being discussed; but the first step that we're looking at is 8 million tonnes per year.
Gordon Lawson
analystAlso on the Kami project, are you planning to include different scenario analyses covering standard production versus direct reduction quality, and pellets as well if that research works out?
David Cataford
executiveYes. Appreciate the second question, Gordon. So with Kami, what we're examining is raising the grade of the material. That's one of the things we're doing. The feasibility study that the previous owner completed had the product at roughly 65% Fe. Our belief is the ore body can achieve considerably more than that, so that's what we're focused on; and in our view there will be a higher premium for the higher grade type material; and we split the 65 index from what we refer to as the higher DR-grade market; and we genuinely believe that going forward, there's a strong possibility of a greater premium for the 68%, 69% type material; so we want to ensure that Kami can deliver into that market in the future.
Gordon Lawson
analystAnd one more thing, if I could. So are you still turning out a couple hundred thousand tons of direct reduction every quarter?
David Cataford
executiveThis year we haven't made any DR material at all. That's not down to a lack of demand — we're completely sold out. As you'll recall, last year we got the chance to run a few vessels of that kind of material since some clients had shut down or cut back operations during COVID or in the first months of COVID. That gave us the ability to show not just at pilot scale but at full commercial scale that we can make that material. This year, though, those clients are running at close to 100%, so we were fully sold out. Looking ahead, when phase 2 comes into production, we'll be able to sell more into that DR-grade type market. And just to add a bit of color on our contracts as well, we typically don't have very long-term contracts when it comes to the quality we sell, and most of the clients we sell to today have hinted they'd be willing to consider higher grade type material down the road. So we're not locked-in to this 66% material long term. Should we see an opportunity in the future to produce higher grade material, we'll be able to serve that market.
Craig Hutchison
analystYou brought up the technology that would be used to produce the 69% DR material, and it's fairly straightforward, involving rougher flotation followed by regrinding. Is the capital investment also fairly minimal, or would this be a fairly significant capital investment?
David Cataford
executiveYes. Thanks for the question, Craig. When we consider a flotation plant of that kind, we're not talking about billions of dollars of investment. This sits at an order of magnitude of a few hundred million dollars. Obviously, once the feasibility study is done, we'll be able to tell the market the actual price; but it's fairly small capex compared to, let's say, a full expansion, because you're not investing at the mine, you're not investing in infrastructure. It's essentially just a box containing a grinding mill, flotation cells and some filtering capacity. And as you know, since we get power at very competitive prices, around CAD 0.045 per kilowatt hours. And there's plenty of available power here in Quebec; that significantly reduces the capex tied to a project like that.
Craig Hutchison
analystAlso, do you fellows still have the cold press pellets in mind that were talked about during the previous quarter?
David Cataford
executiveYeah. We are actively working at this moment to pilot that. So, as you're aware, the initial steps involved being able to deliver the lab results. We obtained fantastic results showing characteristics similar to a fired pellet from our pellets. And at present, the team is working on a project at pilot scale so we can supply our clients. We've received significant demand for this kind of material, and we also observed other companies beginning to announce that they are working on this cold brick heading technology. What's advantageous about ours is that it has a very strong tumbling factor, which lets us not only produce them but also ship them and have them arrive at our clients in one piece. So we are very dedicated to getting that scaled up, then.
Craig Hutchison
analystAll right. And would you guys put that into your feasibility study, or does it stand apart?
David Cataford
executiveThat comes after the 69 type material. So right now the team is working on it so that we can — I believe we'll hand over the 69% plant feasibility before we get the final results on the coal pelletizing. When that's done, we can keep working on it.
Craig Hutchison
analystAll right. And it's clearly good to see you accelerating construction on phase 2. Once the build is done, how long do you figure it'll take to reach full production?
David Cataford
executiveWe can show that once the results are delivered. But realistically, what we're doing is taking folks from operations and putting them on the phase 2 project already; this is part of the team that had already delivered the start-up and ramp up of phase 1. So we're putting every chance on our side to get a ramp up as quick as possible, though it's very difficult to say at this point. Our feasibility study has roughly about 6 months to reach commercial production, but we're hoping we could do a little bit better than that.
Craig Hutchison
analystAll right. Perhaps one final question from me, and it's really an accounting one. This quarter you saw a big working capital build-up. I understand part of that came from the boats shipped without the cash having come in yet. Would you expect a portion of that to reverse in the current quarter? And could you just explain why it got so large this quarter?
Natacha Garoute
executiveYes. Natacha here. Thank you for the question, and thank you for keeping an eye on our working capital. My expectation is that this won't carry on. The positive working capital injection in this quarter really came from the I accounts receivable last quarter; and during this quarter, we've collected all of those accounts receivable, and at this point they're closer to the normal level; and in addition, last quarter there was a big gap in Q1, I mean there was a large income tax payment. And now we're simply going back to the installment. So this positive working cap won't be something you see in Q3.
David Cataford
executiveAll right. Great. Let's keep going.
Alex Jackson
analystOn the topic of returning capital, I realize you folks have mentioned doing that previously. I'm simply wondering whether certain conditions need to be met before you announce anything on it? And is there perhaps some estimate of when those conditions could be satisfied, given that the phase 2 ramp-up, or the phase 2 commissioning, has been brought forward? Thank you.
David Cataford
executiveYeah. Appreciate the question, Alex; we've actually begun our capital return strategy already by repurchasing all the preferred equity the company held. That happened a few months back, and at this point we're entirely focused on completing our phase 2 project once it's finished. After that, as we've said before, we're developing a capital return strategy that will be announced in the near-term future.
Brian MacArthur
analystI'd like to return to the DR project for a moment. You mentioned the possibility of doing 8 million tonnes at the outset. Is that driven by the market? I just want to confirm there's nothing on the technical side that would stop you from selling all of it, the full 16 million tonnes from the expansion of the higher-grade material, if you were able to produce it?
David Cataford
executiveYes. Thanks for that question, Brian; so nothing technically would stand in the way of us producing 100% of that. So it will be market-driven, and our internal view is that demand for this is going to be very, very large in the future. So we do expect that we could potentially produce more of that DR-grade type material.
Lucas Pipes
analystI had another question about the DR-grade project. How soon do you think the feasibility study will be ready? And you mentioned capital intensity before—what return expectations would you have for this project?
David Cataford
executiveYes. Thanks for asking, Lucas. The team is working to finalize that feasibility study at roughly the third quarter of next calendar year, so once we deliver it, we'll be able to come back to the market with those numbers. But what's good about this project is that the capex isn't very high compared with, say, a Greenfield Project coming on. It's simply the addition of a new plant, and the operating cost tied to a project like this is fairly small too. So next year we expect to have a better view of the premiums associated with DR material as well, which will let us make a good decision on the next steps once the feasibility study is completed.
Lucas Pipes
analystRegarding those premiums, you've mentioned several times how robust demand seems to be across different markets worldwide. What's your view on how these premiums might change as time goes on? Do you figure they'll remain around where they are now, or keep climbing? What do you expect for these premiums down the road?
David Cataford
executiveThat hinges on what you believe will happen with carbon taxes. Yet when you consider the direction Europe, Canada and possibly the US are heading, carbon taxes aren't falling, they're in fact set to rise. And what our material and the 69% material offer is not just letting steel mills achieve greater productivity and bring down their operating costs, but also enabling them to cut their CO2 emissions, which I think will be among the key forces tying into the premium later on; so as those carbon taxes change, my belief is that this type of material will command a larger premium.
Lucas Pipes
analystThat's interesting. And this analysis would also make its way into the feasibility study.
David Cataford
executiveThat's right.
Daniel Sampieri
analystI just have one quick question about the Kami feasibility study. We saw that it got moved slightly to the second half of next year instead of the middle. Was there a particular reason behind that, or is the DR study taking priority?
David Cataford
executiveYes. Thanks for asking, Daniel. Basically, the team has really put all of their focus on Phase II. As we just announced, we were able to speed up the schedule on that. So the whole team was concentrated on finishing that detailed engineering and being able to accelerate that timeline with the board. That has now been delivered. So as you said, that has pushed the Kami back a little bit. But in my view, it is far more accretive for all shareholders to have Phase 2 up and running a little quicker, and to have a few months of delay on the Kami feasibility.
Yash Bhoola
analystI only have a couple of questions. First, I wanted to ask about the underlying assumptions behind your provisional price adjustment. For Q3 FY '22, I see you used an average expected price of CAD 141.5 a tonne. I noticed it's based on the P65 index forward price and the anticipated P65 premium. Could you go into a bit more detail on those values you've used in that assumption?
David Cataford
executiveThere isn't any real detail. I think you've got that right; we — at the end of the quarter, we have to use a forward price tied to the data available to us. So there are no assumptions on our side. We simply use the forward price and we — of when the — we expect the tonnes to be delivered at our clients; and that's how we settled that provisional price.
Yash Bhoola
analystFor my second question, if I could just go back to what was asked earlier about returning capital to shareholders. I realize you're clearly on schedule with your capital return plan, and that factors in the preferred shares as well. On the call we had last quarter, I noted the Chairman suggested there'd be no reason a dividend to shareholders couldn't happen in the following quarter. Beyond, say, the iron ore markets and that sort of thing, are there any particular details you can point to explaining why that didn't happen this quarter and has instead been deferred to later quarters?
David Cataford
executiveYes. Thank you for asking. Let me first make sure we return to what the chairman said last quarter. What Michael mentioned was that the team will begin work on a capital return strategy during the next quarter. That comes once the phase 2 project has moved forward a bit more, and once all of our tie-ins between phase 1 and Phase II are finished. Even so, there remain other steps we must get authorized with our financial partners before we could move toward a potential dividend, and that strategy still has to be defined. So the announcement was not that a dividend would come in the next quarter; it was that the team is working on it. What we're very proud of now is being able to announce that we're advancing the phase 2 schedule; it's going to be delivered ahead of time, and right now that's the most accretive project for all of our shareholders. I'd like to hand it over to Michael O'Keeffe for final remarks.
William O'Keeffe
executiveAbsolutely. Thank you, David, and thank you to the team. As Chairman of this company, I really couldn't ask for a better outcome from the team and from the way they've performed as a shareholder — as the major shareholder, I'm delighted with what we've achieved; and when you consider CAD 600 million of EBITDA already in a half year, on the way to CAD 1 billion. Our market cap sits at a little more than CAD 2 billion. It puzzles me that many investors, or people who might become shareholders, view things differently. It appears the world runs on whatever the state is pushing at the moment, whether that's green or whether that's power. I'm actually grinning as I look at how much U.K. gas prices have climbed, since I know that wind was supposed to supply 25% of their power generation, but when the wind isn't blowing that figure drops to 5%, and so they end up burning gas. Strange as it sounds, emotion is the force that runs the world; it's not about examining all the facts sitting behind us. David has talked about our shift toward going green — and we're already green. Last night the Board had a lively discussion on exactly this topic; and every Board, like every government, is fixated on just how green they can become and how many electric cars we can put on the road, yet no one has really worked through the process of getting there. My concern is this: I think some governments worldwide will end up bankrupting the globe by chasing certain unwise goals they've set, and reaching them is just not achievable. Look at the most recent announcement — Biden and all those wind farms along the US coastline, plus the amount of rare earth that would take — we aren't going to produce that over the coming 20 years. So it's — I simply wish folks would pause, examine things, and consider the facts that are genuinely occurring. Still, our workforce has been exceptional. And as I see it — David phones me in the evening, discussing the tie-in with me. Our COO is on site at the operations, keeping an eye on how everything develops. It all comes together without a hitch. The outside world never gets a view of what we witness, or of the way that team works through the process; and honestly, what they've accomplished is genuinely remarkable — reaching the point where we can discuss phase 2 delivery in April. Every forecast out there had us fortunate to receive it by June of next year, with no ramp-up before 2023. We're clearly far beyond that pace, so factor that into the EBITDA figures. I think the big unknown on everyone's mind is the direction of iron ore prices, and we remain focused on demand. Again, there's a great deal of movement globally, and it only takes some development in China for your Champion shares to drop by CAD 0.20 or CAD 0.30 at a time, overnight, pushed by sentiment, with no connection to the reality of what's actually taking place. That frustrates us immensely, but as a team we understand our business. We understand what we're producing. However, when you examine what's happening with our Phase 2 operations, we're having a hard time sourcing steel pipe, and we're scrambling to fulfill those orders so we're ready in April. So what does that indicate? It indicates that demand for steel remains extraordinarily strong. Yet suddenly the market has decided we're heading into some enormous demand void. Well, China is what's driving the sentiment. China has been reducing its steel output. They're concentrating on the Winter Olympics, as they typically do — but here's the thing: the demand China is losing is being taken up by the rest of the world. Demand is extremely strong coming from the US and India, and supply in those markets is improving too, so overall I expect the market ahead to be quite robust. Once again, there will be plenty of emotion that all of us simply have to cope with, yet that is just how the world works these days — the nature of communications, the herd mentality driving how many of these people make choices, and how they put out news based on what they think the world will do. So we will step back and take that as it comes; we'll continue pushing ahead with what we're doing. It's likely useful for me to add a few words backing up what David said about dividends. Reaching the position we needed at this point was essential, and that only came together a few nights ago, so discussing a dividend this quarter would be very hard given the commitment we made to the banks—and, as David noted, to our financial partners beyond just the banks: we first had to clear specific milestones, which we have now done, and at this stage we're able to turn our attention to it. Then David spoke: the team has concentrated on getting a phase 2 done early, and the value that adds for us is honestly hard to believe. Still, he wanted to thank all the longtime backers who have stuck with the company; in his view, they feel just as annoyed as we do about how the share price has been moving. Even so, the company is in really solid shape, and we are a strong group of people capable of producing very good returns for you. So, once more, thanks to every shareholder who has supported us, and he also wanted to thank his team publicly for the enormous work they put in to make what we have today possible.
Michael Marcotte
executiveThank you, operator. I think at this point, we can disconnect the call.
Operator
operatorLadies and gentlemen, that brings today's conference call to an end. Thank you for joining us, and please go ahead and disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.