Champion Iron Limited (CIA) Earnings Call Transcript & Summary
January 27, 2022
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone, and thanks for joining the Champion Iron Limited conference call on the third quarter results of fiscal year 2022. <<operator_script>> Today is Thursday, January 27, 2022, and this call is being recorded. I'll now hand things over to Mr. Michael Marcotte. Please go ahead.
Michael Marcotte
executiveThanks, operator, and thanks to everyone for being on the call. It's 8:30 here in Montreal — just past midnight in Sydney for those keen to hear how Q3 turned out. We're quite pleased to bring you some fresh milestones today. Before we begin, I want to point out a few forward-looking statements, which you'll find in our MD&A, along with certain risk factors. All the documents are posted on our website at championiron.com, including the presentation we'll be using today. On the call with me are David Cataford, our CEO; Michael O'Keeffe, our Executive Chairman; Natacha Garoute, our Chief Financial Officer; and Alexandre Belleau, our Chief Operating Officer. With that, I'll hand things over to David Cataford for the formal portion of the presentation, and then we can open the line for Q&A at the end. David?
David Cataford
executiveThanks, Michael. Hello, everyone. Appreciate you being on the call. It's a real pleasure to share the results with you this morning. First off, I'd say one of the standout achievements is how our teams handled the hurdles and obstacles posed by this pandemic — and by that Omicron surge we saw at the outset — and they did so in remarkable fashion. What I mean is, we're reporting record production during a shutdown month, and this isn't just any ordinary shutdown month. As you'll recall, this is the shutdown month in which we carried out the major tie-in linking Phase 1 and Phase 2 — essentially joining all the crushing facilities from Phase 1 over to Phase 2. So the team did a tremendous job planning this with great precision, making certain they delivered precisely according to plan, and that let us achieve record production throughout this shutdown quarter. We also handled the pricing environment really effectively, securing solid margins, and that means today — even while we're constructing Phase 2, which doubles our output — it lets us, in the middle of construction and a pandemic, declare our first-ever dividend of $0.10 per share.
David Cataford
executiveIt’s a real honor to make this announcement today. Moving to health, safety, and environment, I believe one thing that truly distinguishes us is the tangible steps we take in communities to ensure we’re working alongside our host communities. A key example: the First Nations group of Uashat Mak Mani-Utenam reached out to us, saying they were deeply worried about the Omicron variant, and they requested our assistance with the vaccination campaign. So over the Christmas period and the holidays, we were able to send some of our nurses and some workers into the community to support the vaccination campaign being carried out with the First Nations. Another thing we’ve done in the community—and I think this is a historic first—is that we are the first mining company in Canada to officially recognize the First Nations truth and reconciliation holiday as an official holiday at Champion. That was something our host communities told us was very important to them. We’ve been working with them since the past 30th of September to make this a reality today, which will allow all of our employees to understand a little better the past—and the difficult past—that the First Nation groups have lived through.
David Cataford
executiveWe're also carrying on with the First Nation group as a partner, and they remain among the biggest employers of First Nations people in this area. Moving to the industry overview and iron ore prices, you likely noticed quite a bit of volatility during the last quarter. Opinions differed widely on what level iron ore would settle at. Still, taking the price as it stands now, we've returned to a setting where iron ore sits at roughly $170 per tonne for our material. That comes on the back of some disruption we saw coming out of Brazil. There was plenty of coverage in the press. But realistically, the tonnage actually impacted turned out far smaller than people first expected. Even so, that brief interruption was enough to push iron ore prices sharply higher again. So it's clear the market remains quite tight. On the iron ore side, we aren't seeing any new projects getting sanctioned, though there's a great deal of activity on the steel side. As a result, we believe the iron ore price environment is a very favorable one for us. And once the Winter Olympics in China wrap up next month, the general signal we're hearing from most of our customers is that China will lift the bulk of the restrictions placed on steel production, and that will let China produce more steel.
David Cataford
executiveMeanwhile, steel output outside China is also climbing, with those operations running at full capacity. Looking at how our own operations have performed, consistency is probably the word that fits best. Even through challenging and difficult periods, the teams have kept production remarkably stable. So once again, during a quarter that included a shutdown, the teams navigated through those various circumstances and delivered more than 2 million tonnes of high-grade iron ore. That is an impressive outcome from the teams, who continue to do a fantastic job. I would also point out that Fe recovery has held very steady since we hit the levels from our feasibility study, and the same applies to ore mined and hauled. You may notice the strip ratio is somewhat higher than in prior years. It will stay around these levels as we get ready for our Phase 2 project and make the transition toward Phase 2. Those strong operational results also gave us excellent financial results. We produced a substantial amount of cash, which allows us to announce our inaugural dividend.
David Cataford
executiveWhen you consider the provisional price adjustment, we were able to keep the effect small despite those highly volatile prices. That's largely because of how our contracts are set up. As you're aware, certain contracts with Japanese customers look backward, while those with the rest of the world look forward. That structure meant that during the quarter, the provisional impact came in negative at roughly $6 million, or USD 3.3 per tonne. And looking at where our vessels were booked, or what we expect to receive by quarter's end, it was approximately USD 142 per tonne for the tonnage currently still on the water. But realistically, with iron ore prices where they stand now, we're nearer USD 170 per tonne. So once more, we booked those in a quite conservative manner, and we'll see how this plays out at the close of the quarter. On realized price, as noted, given the blend of Japanese customers and customers elsewhere in the world, we achieved a gross realized price of USD 155 per tonne, which comes to about $25 above the P65 average for that quarter.
David Cataford
executiveWe're really pleased with what we're seeing so far. On the cash side, as you can tell, this quarter is when we put the largest amount into our Phase 2 project. That was always the plan — it isn't a surprise. We'd been signaling that toward the end of building the project, that's the point where spending peaks. The teams have done an excellent job on the construction front, keeping us on track for our April startup. So despite plenty of supply chain difficulties we've been hearing about and labor issues around the world, what we've managed to do at Champion is work our way through all of that. The majority of parts are on site already so we can finish the piping and electrical work there, and we remain on schedule to deliver the project in April. Looking at our balance sheet, it's still set up for growth. That's pretty impressive when you step back for a moment. In April, Phase 2 starts up. More than USD 4.5 billion will have been invested in the ground at Bloom Lake, and we'll be sitting in a net cash position.
David Cataford
executiveSo the company is really well positioned to keep up its growth path. And it's not just that growth path we're continuing — our capital return strategy is carrying on as well. We've been at work for a good while now on putting a dividend policy in place here at Champion. What we've now announced is a dividend of $0.10 per share. Again, that's quite impressive. And if you look back to November 2020, when the Phase 2 project was announced, we never imagined we'd be able to announce an inaugural dividend after repaying all of the preferred shares from the Caisse de dépôt and building Phase 2 from our own cash flow. But the team has steered things very well through this environment of high iron ore prices, which has let us keep advancing our Phase 2 growth project using our own cash flow and today, announce our inaugural dividend of $0.10 per share. On the growth projects side, well, as you know, one of the -- or the most important project we have underway is Phase 2. As we said a bit earlier, the project is on track when it comes to timing. We're very proud of that, because with the Omicron variant and other kinds of difficult periods, the teams have managed to get through them, and that lets us be able to announce today that our project is still tracking favorably for the April startup.
David Cataford
executivePhase 2 isn’t our sole growth initiative. A feasibility study is also underway that would let us draw 8 million tonnes from Bloom Lake and raise that material to 69% Fe. What’s the rationale? You’ve likely observed globally that what was merely discussed a few years back is now becoming reality, with an increasing number of electric arc furnaces receiving approval worldwide. We’re seeing that in North Korea, in Canada. We’re seeing it in Europe, and even in China. Right now, quite a lot of electric arc furnaces are under construction in China, and Japanese clients are also beginning to invest in electric arc furnaces. So this isn’t merely literature we’re reading. On the ground, we’re genuinely witnessing a shift toward electric arc furnaces, yet no new DRI supply is appearing, and there is so much scrap available worldwide to feed these electric arc furnaces. Therefore, we believe the flotation plant is a very strong potential project for Champion, and we’ll return to the market once this feasibility study’s results are available in mid-2022.
David Cataford
executiveWe are still working on the Kami feasibility study as well. So it remains on track for delivery within this calendar year. And when it is finished, we will be able to return to the market regarding the various components of that study. But realistically, I believe the key takeaway here is that global demand is moving toward higher grades. And with the resource base we hold, the projects we have lined up, and the green power available here in Québec, we are very well positioned to fully capture this growth in demand for our type of material. And when we talk about demand, well, you could see that the — most people analyzing what actual DRI demand will be, this is among the markets set to expand the most worldwide. Plenty of people mention lithium, graphite, cobalt as materials capable of decarbonizing the planet. Well, that is all fine and good for electric cars, but the significance of steel, as we will be able to note, is going to be absolutely instrumental in this transition.
David Cataford
executiveAnd DRI is among the materials that will be needed most for the transition. As we said, we aren't seeing a lot of different -- a lot of projects being sanctioned around the world, and very few regions worldwide can actually pull this off at attractive costs while using green technologies. We're very well positioned here in Québec and Canada, since in the ground we have material that converts easily into DRI, or that can easily be upgraded to DRI, and all the infrastructure needed to transition toward that is in place. So we're very excited about what lies ahead for the DRI market, and we want to be sure your company is well positioned to benefit fully from this. And when we discuss the various materials needed for decarbonization, it's interesting, because literature is now beginning to appear. A few years ago, people were very excited talking about lithium and commodities of that sort. But when you consider what is truly needed to transition into a low-CO2 world, well, the #1 metal required for this is steel. Whatever solution we choose to decarbonize the world, we need steel.
David Cataford
executiveTherefore, it isn't just steel that we'll require—we'll also need green steel in order to accomplish this. So once more, our view is that Champion is positioned extremely well for what lies ahead, and that's the reason we chose to establish a capital return strategy enabling us to steer through varying conditions, while at the same time letting us keep up our growth trajectory, since we believe that represents the most accretive portion for our shareholders. So again, many thanks to our staff for all the efforts and all the work they've put in to deliver these results that I'm able to present today, and I'll now hand things over to the question portion of the meeting.
Operator
operator<<operator_script>> The initial question is from Orest Wowkodaw at Scotiabank.
Orest Wowkodaw
analystI have a couple of questions if I may. First, I was genuinely and positively surprised by your price realization on iron ore during the quarter. It sounds as though some of those backward-looking Japanese contracts really had a helpful impact on that. I'm just wondering how we ought to think about the current quarter if that is going to unwind, given the volatility in iron ore pricing — do you expect it to flip from a positive adjustment into a negative adjustment in the coming quarter?
David Cataford
executiveSo normally, somewhere between 30% and 40% of the tonnes we sell go into Japan. And that isn't really a seasonal thing or something tied to one quarter. They purchase tonnes throughout the entire year. So, as you can imagine, those tonnes look backward, and that will hold true in every quarter as well.
Orest Wowkodaw
analystSo — but considering how far the iron ore price has shifted, does that positive adjustment now become a negative one for the current quarter?
David Cataford
executiveWell, the vessels haven't been fully priced yet. And they're not all received at this point. So answering that question 1 month or 2 months into a quarter is a bit difficult. Once we get to the next results, we'll be able to work through that. But realistically, what we're seeing is that, again, demand out of Japan is stable. Quarter-to-quarter, it's stable. And that's what we are forecasting. But again, when you look at the price we forecasted, our material for this quarter — or at least the tonnes still on the water for provisional pricing — was set at roughly USD 142 per tonne, and the current environment is about $170. So I think that probably balances out what you've been asking in your question.
Orest Wowkodaw
analystAlright, it's good to see that dividend — it came sooner than I had anticipated. The company hasn't put out any sort of framework for shareholder returns, though. I'm just curious about how we ought to think about the way the board will approach capital returns going forward. And also what would drive that, and the size of the dividend?
David Cataford
executiveI think one key point to get across is that we still see ourselves as a growth vehicle. So the biggest shareholder accretion will come through growth, but we also said early on that we want the right balance between returning capital and growth. So at this point, together with the board, we'll be looking at a lot of different scenarios. We wanted to ensure that the dividend level we're paying right now made sense during the construction period. We stress tested that against many different iron ore scenarios, and we felt this was a good number for the first inaugural dividend. This will be reviewed every 6 months, and we'll be able to come back to the market on it. But I think it's important to note that the company's main focus right now — Phase 2, the flotation, the DRI — is still oriented towards growth.
Orest Wowkodaw
analystOkay, and if I could, just one quick accounting question. The release mentions that the Bloom Lake expansion is reaching commercial production at the end of the calendar year. Does that mean, in terms of EPS and EBITDA, for example, that you don't plan to recognize that incremental production until the end of the calendar year?
David Cataford
executiveNo — the real point here, which ties back to the feasibility study, is the timing of when we expect to hit commercial production, and that's a gradual ramp-up. So starting in April, we'll begin producing tonnes, and our plan is not to stockpile any of them. Looking back at Phase 1, reaching sellable quality took us roughly 17 hours. With Phase 2 it may run a few hours longer, but we expect to be able to sell every tonne that Phase 2 produces. So what you should see is a gradual ramp-up beginning in April and continuing all the way to commercial production.
Orest Wowkodaw
analystAll right. But will the accounting pick up a few additional tonnes starting from day one?
David Cataford
executiveThat's right.
Operator
operatorOur following question is from Alexander Jackson of RBC Capital Markets.
Alex Jackson
analystI'm just wondering what you're observing on the inflation front when it comes to operating costs or sustaining capital in calendar 2022?
David Cataford
executiveYeah, thanks for asking. Basically, we’re sitting in a really good spot, because when inflation comes in and we end up paying more for spare parts or more for various pieces of equipment, that’s typically driven by the steel price. So when steel prices rise, well, normally you’ll also see iron ore climbing right alongside it. So inflation — obviously we aren’t insulated from the rest of the world, and we’re experiencing it too. But we’re in a very strong position since we’re a commodity tied directly to that inflation, and we ought to gain from those higher costs down the road.
Alex Jackson
analystUnderstood. Then one final question from my side. Could you share any early specifics regarding the feasibility study for the DR plant that you expect to release around mid-2022?
David Cataford
executiveYeah. So at the moment, the team is continuing to develop the core assumptions for that plant, collaborating with the engineering firms to ensure we land on, once again, a conservative figure the way we did for Phase 1 and Phase 2 — that's how Champion does things. We want to be certain that whatever number we put forward is one we can actually deliver. So that's what the team is focused on right now, and it'll be easier to answer that question by the middle of this year.
Operator
operatorMoving on, our following question is from Gordon Lawson of Paradigm Capital.
Gordon Lawson
analystCongrats on yet another great quarter. You already mentioned this in your MD&A. Your realized premium came in well above what was expected. Could you say more about how the market looks right now and what you anticipate over the next few quarters, plus the premium level you expect for the different direct reduction quality concentrates you're discussing producing?
David Cataford
executiveYes. Thank you for that question, Gordon. We remain some distance away from our DR feed material. So if we were to sanction the project, building it would take on the order of roughly 2.5 years. As a result, we are not including any premiums tied to that material for this calendar year. When we consider the overall market for high grade, the spread looks quite healthy at present. We are seeing spreads on the order of USD 25 to USD 30 per tonne. We regard that as sustainable, since no new high-grade material is actually entering the market. And as companies begin sanctioning additional electric arc furnaces, or even start moving closer toward their 2030 targets, well, they will need to secure higher grade-type material, because that is the only known route for them to reach their results. So overall, when I look at premiums for the P65 material, we believe they will be very healthy in the years ahead. At the moment, we are delivering -- if you look at the average for the year, we are delivering slightly above the P65 index, but that is consistent with the P66 material that we produce.
David Cataford
executiveWhat drove the realized price so high last quarter? It really comes down to the strong mix we have across our Japanese clients and the rest of the world — we've got some contracts that look backward and others that look forward, and that combination lets us smooth out the volatility and keep our realized price more stable.
Gordon Lawson
analystAlright. So, with the Kami feasibility study due soon — I mean, if you look at a few of those Bloomberg estimates, it seems like some people expect Kami could potentially ramp up as early as fiscal 2025. Could you give us any sense of the timeline on permitting and first production, assuming the board gives approval in the near term?
David Cataford
executiveYeah. What's favorable regarding Kami is that this is a project already holding its permits. So it isn't some brand-new operation situated in an area unfamiliar with mining. On top of that, the project received strong backing from the various communities, including the indigenous ones. As such, permitting shouldn't be the lengthiest phase for this project, in our view. That said, this needs to be assessed after the project is complete. Still, realistically, looking at the schedule, by the close of this year we'll have the feasibility study in hand, and we'll then weigh it against other potential options we hold. Fiscal year 2025 strikes us as quite an aggressive timeline for delivering a brand-new mine in today's environment. So that question becomes easier to answer once the feasibility study exists, since the timeline will be incorporated into it. But I'd likely place it somewhat further out than what you're viewing as fiscal year 2025.
Operator
operatorThe following question is from Alexander Pearce of BMO.
Alexander Pearce
analystThis ties back to something asked earlier. You said you're aiming for commercial production on Phase 2 by year-end, and I was hoping you could spell out a little more about when you think the system will reach that full capacity, and whether any of those higher-grade projects on your radar would affect that eventual figure?
David Cataford
executiveYes. We don’t believe the DR grade material is going to have a significant effect on that figure. In realistic terms, this technology achieves a very high recovery rate. So once we are actually carrying out this process, we are not losing much material. And that process would take place in a separate building, so we do not anticipate any interaction between the current operations and the others. On the ramp-up side, well, we have allowed 6 months to get to commercial production, so that is the basis I will use for the answer at the moment. This is a step-by-step increase, and if we can perform better, obviously we will not hold back. The teams will do everything possible to get that plant operating and to deliver that nameplate capacity as fast as we can. But as for commercial production at present, what we have allowed is 6 months, and when you compare that with comparable operations around the world, it remains a fairly aggressive target relative to what we have observed. And not necessarily in feasibility studies, but in what we have observed in actual results.
Operator
operatorAnd our next question is from Lucas Pipes at B. Riley Securities.
Lucas Pipes
analystI'll start with a question about the growth projects. What I'd like to understand is whether, looking at development timing, they are mutually exclusive — would you look at advancing Kami and DRI grade concurrently, or would you put them in sequence? That's my first question.
David Cataford
executiveYeah. At the moment, we don’t really view those projects as needing to happen one after another. They’re 2 separate projects, and each would have different staff available to carry them out. A company can do plenty of things simultaneously. So from our perspective, the key next step is getting Phase 2 up and running, delivered, and producing as expected. And after we have the results for the flotation plant and for the Kami project, answering that question will be a bit easier. But realistically, we don’t need to complete one before we can begin the next one now.
Lucas Pipes
analystUnderstood. Understood. And to take that answer and extend it to a wider level, so to speak. Once you factor in capital returns and what you hope to do there, and then perhaps what else the region offers. What's your — what's your tactical take on that? Kami plus CRI plus greater capital returns, plus possibly M&A? Or would you say, look, our #1 and 2 priority really is the organic growth we have here. I'd appreciate hearing your perspective on that.
David Cataford
executiveYes. Appreciate the question. There are a few things we still have available to us, so to speak, when we consider growth — in the sense that, if you look back at the old feasibility studies for Bloom Lake from before the acquisition, the resource there was nearly twice what we have now. So one can also envision a Phase III right at Bloom Lake. That will, of course, be assessed by our teams. There are other, smaller projects too that we could pursue at Bloom Lake to potentially remove bottlenecks in the existing operations and push output somewhat above our present 15 million tonne per year project. So I would say that over the coming 3, 4 years, we have plenty of growth projects in the pipeline capable of raising the company's value considerably. So we want to take those on and, at the same time, keep evaluating our capital return strategy.
Lucas Pipes
analystThanks, that's really useful, I appreciate it. One quick follow-up about the dividend: for modeling purposes, would it be helpful to model it as flat going forward from here? How would you approach that?
David Cataford
executiveOkay, regarding how we're returning capital, we've now laid out our first dividend. I'll leave it to you to model that on your own. But realistically, our inaugural dividend has been put in place. That's something we take a lot of pride in, and every 6 months we'll be in a position to assess what stance makes the most sense for us. What matters to note, though, is that we stress test that figure across a wide range of scenarios. And what we've set at present is a figure we feel good about for this inaugural dividend.
Lucas Pipes
analystGot it — that's really useful. Thanks a lot for all the detail, and best of luck carrying it out.
David Cataford
executiveThanks, Lucas.
Operator
operator<<operator_script>> Our following question is from Cormark Securities' Stefan Ioannou.
Stefan Ioannou
analystStrong quarter. I'm just wondering about Phase 2 here — it sounds like roughly $105 million remains to be spent. Is it reasonable to think a decent chunk of that still goes toward things tied more to the port? And I recall in the past, given the ramp-up with the Bloom Lake site being finished around April and then ramping through the end of the year, is that partly just a reflection of the port getting up to speed too? Or maybe you could just update us on the port itself — that's really what I'm after.
David Cataford
executiveYeah, the port work is progressing really nicely. We're extremely proud of the SFPPN team. I'd say they're also handling these tough conditions quite well. They've put together a tremendous group of people capable of delivering these projects, since—as you'll recall—this isn't only the $130 million currently being invested at the port. They're also wrapping up a $180 million investment project that has gone very smoothly. So SFPPN has scaled up considerably since the early days. We don't believe this will be the factor that slows us down during Bloom Lake's ramp-up period; that ramp-up is really tied more to the on-site work itself—to delivering the plant, commissioning it, and bringing all the various equipment up to the correct nameplate capacity. And at the same time, ramping up the mine with the new equipment we're receiving. The good news, I think, is that we placed the equipment orders at the right moment, which means most of it has already arrived at site and can be commissioned over the coming weeks.
David Cataford
executiveAs a result, we observe all elements advancing together so that we can get to that commercial production.
Operator
operatorDalton Baretto with Canaccord has the following question for you.
Dalton Baretto
analystI think most of what I wanted to ask has already been covered, and I'm sorry if I missed this one. But I have 2 questions about that DRI product at 69%. First, when it comes to sanctioning the project, will that be purely an economic call? Or would you want to see firm commitments from customers in hand before you sanction it?
David Cataford
executiveWell, after we approve that project, we'll actually need to restrain demand from people who want those tonnes. So we already understand this is material the current market will require. But once more, we view it as becoming more and more important down the road. So we wouldn't really need to have firm contracts tied to it, since we see the DRI market as one that's going to expand over the years ahead.
Dalton Baretto
analystThat makes sense to me. So on Kami, then — as part of the feasibility work, is your intent to make some or all of that material into a DRI product?
David Cataford
executiveThat's right. Our position is essentially that we'll distinguish ourselves since we're among the very few projects capable of generating DRI at operating costs that attractive, thanks to the kind of power available to us at this site and the nature of the material located in the ground. That's also a key factor in why we're taking another look at the feasibility study done by the prior owner: they had assumed 65% for their concentrate, and we'd like to get closer to 69%. We genuinely believe this is the area that will deliver the greatest accretion for all of our shareholders.
Dalton Baretto
analystThat makes sense. And then perhaps let me push you a bit further: when you consider your wider land package and think about ways to unlock value there—joint ventures and so on—is this something of a selling point, or is there any reason beyond economic ones that would prevent you from producing a 69% product from that broader land package?
David Cataford
executiveNo, nothing tied to our land package stands in the way, as far as we can tell. One key point to keep in mind: plenty of folks bring up the Simandou project over in Africa. Well, within our own land package, we actually hold roughly as many resources — or potential resources — as what you see at Simandou. We hold more than 8 billion tonnes of resources, only a few kilometers from Bloom Lake. So there's substantial growth potential with this kind of material. And — but nothing connected to that land package would prevent us from producing 69% material.
Operator
operatorThat brings us to the end of the question-and-answer session. Please go ahead.
Michael Marcotte
executiveThanks, operator. Right now, I’ll pass things along to Chairman Michael O’Keeffe for some closing comments.
William O'Keeffe
executiveThanks, Michael. My message is quite straightforward, and thank you very much. First of all, for the team to manage and navigate through COVID and again deliver a record quarter for production — to me, that is an outstanding achievement. And to manage a board and oversee a company like this one is an amazing effort. I'm sure all of you investors have looked across the board, and many times people hadn't met expectations. One of the big areas is also developing new projects, but actually bringing this project on in 2018, and our Phase 2 being on time and on budget, which is very, very rare for resource companies to be able to achieve. We're not quite there yet on the Phase 2, but it's looking very good. I think most people had us penciled in for midyear for decommissioning the plant, and we're now looking at April, so all going well. But just to let you know the process that everyone has to go through, and especially Alex at site, is living this on a day-to-day basis. And that's a fly in, fly out. So you can imagine the logistics, if we churn up the plane of 70 people, and you have to turn 50 of them back where it will really put them in that period of time.
William O'Keeffe
executiveLook, that's a remarkable accomplishment, and honestly it was pretty impressive. That said, consider how steel prices have been climbing. We're going out with quotes on railcars — sure, we signed agreements, but pricing conditions applied to those as well. So that shift is showing up now, and we'll find a way to handle it, running the port alongside SFPPN. As David mentioned, a really solid team is in place there at this point, yet the reason that group ended up down there is that Champion was supervising SFPPN at a broad level to bring about the management change and also restructure how that port ought to operate, since none of us wanted to relive what we went through in 2018, and we essentially commissioned it on their behalf. But look, with all those pieces now in position, things get a bit simpler for us. Even so, it remains a tremendous management feat. And look, I want to express thanks to shareholders as well for their patience. It's been — to me it feels very fast, though from the outside it may look somewhat slower while dividends arrive, but the board concluded there was sufficient cash and we felt confident enough.
William O'Keeffe
executiveAnd also — as you may recall, our debt carries certain covenants that prevented us from taking specific actions, including paying a dividend, until there was certainty surrounding Phase 2. Well, all of that has now been satisfied, and we can stand here and discuss making a dividend, I suppose, while thanking everyone for their patience as well as the support and confidence they've shown in backing us as a team. Also, as you know, it's a proud day for us, as David mentioned, First Nations — we're the first mining company to recognize First Nations and call for a public holiday. I think that's also typical of the team that while they're working hard, their respect for the community is very high. So again, I'd just like to simply thank everyone. We're looking at — through the conversation and a lot of talk about growth and what we're doing. I see David's directly looking at this high-grade product will set this company in another stratosphere, because as really, there might be 1 mine in Brazil that can achieve this sort of feed. And everyone in the world is going to be chasing it, and they'll be knocking on our door for it.
William O'Keeffe
executiveOn top of that, we're surrounded by enormous resources. What really strikes a chord with me is hearing David describe Simandou — everyone and their brother rushing out there, the Chinese included, to get it done. We've now got the infrastructure that's needed, and the power required is staggering to me; they mention $15 billion. My sense is that's merely a fraction of what's needed, given the infrastructure in place and the government backing — I know where I'd be headed. But day-to-day operations are going very well, returns are solid, the dividend has begun to come through, we're about to double capacity, and we're eyeing an improved product plus future growth that's fantastic. So thank you, everyone, and I look forward to speaking at the close of the financial year.
Operator
operatorThat brings today’s conference call to a close, everyone. We’re very grateful that you joined us, and we ask you to please disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.