operatorGood morning, everyone, and welcome to the Champion Iron Limited conference call on first-quarter results for fiscal year 2023. <<operator_script>> Today is July 28, 2022, and this call is being recorded. At this point I'd like to hand the conference over to Michael Marcotte, Senior Vice President, Corporate Development and Capital Markets. Please go ahead, sir.
Michael Marcotte
executiveThanks, operator, and thanks to everyone for being with us today as we go over the results for Q1 of fiscal 2023. In the room with me are David Cataford, our CEO, along with several other executives from our team. Before we begin, I want to draw your attention to the disclosures statement on the webcast presentation, which you can also find on our website at championiron.com under the Investor tab, Events and Presentation. As for forward-looking statements and the additional details on those, I would direct you to our MD&A, which is likewise available on our website. With that, I will hand things over to David Cataford, our CEO. And once the formal presentation wraps up, we will move into a Q&A session for people. With that in hand, I'll turn it to David.
David Cataford
executiveHello, everyone, and thanks for joining the call. I'm really pleased to walk you through the quarterly results with you right now. Looking at the quarter's highlights, the key one is that our Phase 2 project is ramping up — that expansion will let us double how much high-grade material we supply to the market. We also achieved an iron ore recovery of 80%. We'll explain why that figure has come down compared with earlier quarters. Total cash cost came in at roughly $74 per ton. We'll take you through that item as well as the current cash position and undrawn debt. So you'll see the company sits in a very healthy position to keep pursuing our growth initiatives. Turning to health, safety and environment, I'm glad to report another quarter with no serious injuries and no major environmental issues at site. Our site procedures are very robust, ensuring we keep everyone safe and also keep the environment safe as well.
David Cataford
executiveOn sustainability, I’m delighted to report that the Mysteel Green Iron Ore Supplier award came our way — the market is beginning to acknowledge that our material ranks among the highest grade globally and that it enables customers to cut emissions substantially. We’ve also done considerable work alongside our First Nations partners. Once again, we take real pride in being the top employer of First Nations people in the region and in continually deepening that connection with the Uashat mak Mani-utenam community. Moving to the iron ore market, you’ve likely noticed a drop of roughly 6% versus the prior quarter — some of that reflects short-term factors tied to China, including the lockdowns occurring there, plus the usual seasonal dip in steel usage across the region during this period — yet we view it as temporary, since demand for high-grade material remains strong. We expect that demand could rise over the weeks and months ahead. Iron ore prices have also rebounded in recent days, which we take as an encouraging signal that restocking may be underway in the region, with buyers returning for high-grade iron ore.
David Cataford
executiveDuring the quarter, we also observed the C3 freight index rise roughly 32%. Looking at today’s conditions, we’ve noticed that softening as well. The primary drivers behind that gain were greater seasonal shipments out of Brazil along with the elevated fuel prices we experienced. That said, we have again watched those prices ease over the latest days and weeks. Moving to operations, this was a record production quarter, largely because Phase 2 is ramping up. So I’m very proud to report that the ramp-up is running ahead of our original schedule. And as you can see, even while adding more tons and the mine’s shiftability, we still achieved our strip ratio. Thus, the strip ratio on the head grade matches the mine plan, and the mine sits in a very healthy position to deliver our Phase 2 tons. Shifting to the financials, we see EBITDA of roughly $95 million below consensus. Two major elements explain that gap: first, there is really a timing issue tied to one vessel that was meant to fall within the quarter.
David Cataford
executiveNormally in a quarter like this, the tonnage we sell ought to match the tonnage we produce. A vessel showed up late—only in the last few days following the quarter—so that explains approximately $15 million of the shortfall. On top of that, we incurred certain startup costs tied to Phase 2 that in earlier periods would likely have been capitalized, yet under current accounting principles we cannot do that. That adds up to roughly $20 million. All told, somewhat more than $35 million of the miss stems either from timing matters or from the Phase 2 ramp-up. As Phase 2 continues ramping, though, you'll see our costs come back into line with prior quarters. Turning to the transitional cost increase, one point worth emphasizing is that, measured against the prior quarter, this quarter's cash cost differed by approximately $14. Of that $14, about $3 relates to inflation, while the remainder is driven mostly by the Phase 2 project. The result is that we carry most of the fixed cost and most of the labor cost tied to Phase 2, yet we have only a fraction of the tons.
David Cataford
executiveOnce those tons begin increasing and Phase 2 reaches our nameplate capacity, you'll see those costs come back down nearer to the levels we saw in earlier quarters. So again, I believe it's worth emphasizing that these are transitional costs, tied mostly to Phase 2, and of that $14, roughly about $3 really relates to inflation. We remain very favorably positioned when we look at cash cost in the market, largely because we produce one of the highest quality materials in the world. That material carries a significant premium relative to discounts from other producers, and our quality has always been stable, which isn't necessarily the case in every jurisdiction around the world. So I'm very proud to say we've always hit our 66% material, and we're also on our journey to be able to produce higher grade iron ore so we can benefit from higher premiums in the future. If we look at our provisional price adjustment, you could see that in the past quarter, we had an expected settled price of about $185. We settled at $167 because the price decreased during the quarter.
David Cataford
executiveThe effect was approximately $6.4 per ton. The main reason is that iron ore prices weakened over the quarter, while we had booked at higher prices. Looking at the tonnage subject to provisional pricing this quarter, we have about 0.67 million tons on the water. At quarter-end, we had booked a settlement of $138 per ton. We'll be able to update the market next quarter when final results come in. Turning to the average realized price, I think there's been a slight disconnect between the P65 index and our material. First, I want to reassure everyone: we're not receiving any discounts on our material. We've achieved sellable quality — the high-grade quality of 66% — and are fully benefiting from that premium; the timing element during the quarter really explains the lower gross realized price. The main reason is that, as we just mentioned, at quarter-end there's just short of 700,000 tons on the water that we had to book at $138 per ton, which is below the quarter's P65 index.
David Cataford
executiveThat had an effect on the realized price we saw this quarter. Yet when you spread it across a full year, the key point to remember is that we receive the entire P65 index, and we will keep receiving the P65 index plus slightly more until we reach our 69% material, after which we will obtain a meaningful premium above that P65 index. Turning to the cash movement in the quarter, we ended it with approximately $190 million in the bank, and one item worth flagging here is the working capital change, since we paid out substantial tax amounts during the quarter. That stems largely from having to make our tax installments tied to last year's results. As you can see, those results came in softer than last year. So at present we hold a receivable of about $65 million from the different government entities when it comes to tax payments. That is really a matter of timing on the cash side. Another bigger item within the working capital change is that, with Phase 2 being brought online, we had to make certain prepayments to our rail supplier, and those are captured in this working capital as well.
David Cataford
executiveNone of this is recurring. It’s genuinely a timing item tied to our Phase 2. If you look at PP&E and advanced payments — in this bucket here — you’ll see roughly about $28 million tied to deposits, $14 million to our partner for the mining equipment, and $14 million for our port equipment — or not port equipment, sorry, but the port logistics group. And if you combine that with the capitalized interest we’re able to do on our debt during the construction period, there’s over $33 million of that element that’s associated deposits and interest. So if you also take out the amount that was invested in Phase 2, we’re roughly in line with the typical sustaining that we’ve had in the past during the early summer months. So when you look at the change in working capital, the dividend that was paid recently, and the sustaining and investment CapEx, that accounts for the change in cash that we have right now. When you look at our balance sheet, we’re still very well positioned for growth — close to $200 million of cash and also close to $400 million of undrawn facilities. So, very well positioned to be able to continue our growth project and again, very proud to have self-funded the Phase 2 project out of all of our cash flow.
David Cataford
executiveWhen it comes to major milestones, Phase 2 stands out as the quarter's biggest highlight, in my view. We're ramping up ahead of schedule, which the next slide will show. But one important point is that even with the market challenges we're facing at the moment, we were able to deliver the project and are now ramping up on the schedule we expected. If you look at the scheduled cumulative production we had, our numbers are based on the curve — the McNulty curve. That curve is a sort of theoretical one that examines most projects worldwide and identifies which ramp-up schedules are the best in the market. And as you can see, our actual cumulative production sits above even this most aggressive curve. So the team deserves real pride for what it has achieved in delivering an advanced ramp-up on Phase 2. Another important thing to highlight is that we've hit above nameplate capacity on a 24-hour basis and close to 90% of capacity on a 7-day basis. So we know the plant and the design work, we know the plant can handle the tons, and that we'll be able to meet our nameplate capacity.
David Cataford
executiveAt this point it's simply a matter of resolving all the different bugs tied to Phase 2 so that we can hit our nameplate capacity. Taking a bit of a step back and considering both the medium-term and longer-term picture, the same advantages we've had before still hold when it comes to green steel supply chain solutions linked to our material. In fact, we've seen this even speed up as various jurisdictions worldwide keep sanctioning Electric Arc Furnaces and keep pursuing their transition toward cutting CO2 emissions by about 40% by 2030. Once again, a reminder to the market that the sole route to get there today is purchasing higher grade type iron ore. And at present, looking at direct reduction grade material, we see no projects of scale being sanctioned anywhere around the world. That genuinely places us in a niche area where demand is rising significantly and no supply increase has been announced. As for catalysts, looking at the various growth initiatives we have, we're finalizing our feasibility study for the flotation plant that will let us produce 69% DR grade material. So this is progressing well and on plan, and we'll be able to come to market shortly with this feasibility study.
David Cataford
executiveRegarding Kami, we're continuing to move the feasibility study forward. Just as a reminder for everyone, our aim with Kami is to produce 69 or DR-grade material directly, and we're working toward delivering that feasibility study during the first half of calendar year 2023. We're also progressing the feasibility study for our pellet plant together with our partner. We see this as meaningful value accretion for our company—being able to deliver this pelletizing facility down the road as demand for DR-grade pellets keeps rising. And we believe this is the material required to make DRI and essentially produce steel from lower CO2 intensity Electric Arc Furnaces. On the green steel transition, we can see it is accelerating—announced and under construction EAF capacities around the world. We can see there is roughly 45 million tons per year of additional DR feed quality iron ore that will be needed to meet what has been announced and is under construction today. This isn't even forecasting what will have to be done by 2030 for the different groups to achieve their CO2 emissions. This is simply what has been announced today and is in construction today.
David Cataford
executiveTo give you a sense of scale, that's 45 million tons of additional DR-quality feed iron ore. In terms of DRI and DR feed-quality material today, that is more than double the merchant market. So you can see demand rising significantly over the next coming years, and we believe that will drive up the premium for this kind of material. As a closing note, I want to thank all of our staff and all of our partners for enabling such an incredible ramp-up of our Phase 2 project — again, underscoring the fact that we had a quarter with some transitional costs tied to the Phase 2 ramp-up, but we still feel that our project is very well positioned to compete on the cost curve around the market. And we do believe demand for the hard rate type material is going to fetch a significant premium in the future as well. So, very well positioned to keep delivering great results for our shareholders. So, thanks everyone, and we will now turn it over to questions.
Operator
operatorThanks. <<operator_script>> Craig Hutchison from TD Bank has our opening question. The line is yours.
Craig Hutchison
analystHello, good morning, everyone, and thanks for taking my question. My first one concerns the capital for Phase 2 — it came in quite a bit above what I had expected, judging from the spending through the end of March. Could you discuss what mainly drove that, and should we anticipate any further CapEx tied to finishing Phase 2 during the current quarter? Thanks.
David Cataford
executiveYes. Thanks for that question, Craig. So, regarding our Phase 2 project, we basically delivered it at the end of April, with most of the CapEx invested in order to finalize it. What we are doing at present — or what we did during July — was simply complete the commissioning of the recovery circuit. We therefore still needed to install the magnetic separation equipment and the reflux classifiers, and that work has now been completed. On the CapEx side, as you can observe, we have essentially spent all of it in order to get Phase 2 operational. Some costs remain — start-up costs, to ensure we can achieve our nameplate capacity — but the bulk of the CapEx associated with the actual construction of Phase 2 has been spent. And perhaps just as a reminder to everyone, the capital intensity for our Phase 2 tons remains below $70 per ton, and we contrast that with the market and other projects currently underway at closer to $200 per ton. So, as you can see, for our shareholders this represents tremendous value accretion and a tremendous opportunity to have that Phase 2 up and running.
Craig Hutchison
analystCould you give us a rough sense of magnitude for that figure in the current quarter as far as what's left on Phase 2? Is it $10 million? Is it $20 million? And then, perhaps as a follow-up: can you offer some idea of what sustaining CapEx looks like for the rest of the year on a quarterly run-rate basis?
David Cataford
executiveYes, and thanks for asking, Craig. As you're aware, we never provide guidance—that has always been our practice. Still, in practical terms, what we observe is that the bulk of the cost for building Phase 2 has already been incurred. During the summer months, we usually see somewhat elevated sustaining CapEx tied to <<inaudible>> along with all our work in the tailings area and on the mining side, since those months make it easier to carry out such investments. However, as in typical years, you'll find that sustaining CapEx drops considerably over the winter months.
Craig Hutchison
analystAlright, and maybe this is my final question. Regarding how Phase 2 is ramping up, could you give us some sense of how things are progressing there compared with the design?
David Cataford
executiveYes. So at the moment, we're at approximately 50% to 60% of nameplate capacity — that's the order of magnitude we're in — and we're working toward raising that up to full nameplate capacity. But the key highlight for the quarter, I think, is that we've shown the plant really can reach all of these numbers. So every piece of equipment — the mill, the conveyors, the filter plant, the recovery circuit — all of them have shown we're able to exceed nameplate capacity. So we're confident the plant will get to that nameplate level in the short term.
Craig Hutchison
analystOkay, thank you everyone.
Operator
operatorThanks. Our following question is from Lucas Pipes at B. Riley Securities. Go right ahead. Mr. Pipes, your line is now open.
David Cataford
executiveLucas, I believe your line is muted.
Lucas Pipes
analystApologies for that. Good morning. Thanks for having me. My question also concerns Phase 2, and congratulations on everything you have accomplished there so far. I'd like to ask about the timeline for getting to full nameplate capacity. Is that 3 months out? Or 4 months from now? And regarding the issues you're still resolving, could you tell us which ones are perhaps causing you the most difficulty today, or are they relatively minor? Thank you very much.
David Cataford
executiveYes. Thanks for the question, Lucas. So if we look at what we initially set in our feasibility study, we expect nameplate capacity before the end of this calendar year. But we'll do everything we can to beat that target. So when we look at the remaining elements to be able to deliver the project. So when the Phase 2 is running, it's running at nameplate capacity. So what we need to make sure now is that we increase the reliability of the plant. This is sort of typical with newer equipment, so we are just fixing the smaller bugs. I won't call it small potatoes because it does represent significant cash for our shareholders, but we manage that in a very diligent way and very proud in the way that the ramp up is being handled right now. But I don't see any major flaws or any significant technical elements associated to reaching nameplate capacity. It's really more debugging all the smaller elements and making sure that we get that reliability up there.
Lucas Pipes
analystThat is quite useful, thank you. My follow-up then concerns expenses in a wider sense. You noted during the quarter just reported that many of the costs stemmed from finishing Phase 2 and the fixed expense involved there, while the true inflation-driven piece was fairly modest — going forward, are worldwide inflationary pressures now coming through? Or do you anticipate further headwinds over the next few quarters? And if that is the case, might you put numbers on them? Also, a number of your competitors have discussed serious shortages of labor hitting output. Does that represent a headwind or difficulty for you as you work toward bringing Phase 2 fully up to speed? Many thanks.
David Cataford
executiveYes. Perhaps that’s down to the fact that we’ve been bringing those people on board. But realistically, we clearly do face labor challenges, though I’m quite confident that production won’t be affected by them. So we have an excellent labor force, with people who are highly engaged. Again, the head of the Quebec union came to visit our project this Monday, and he called just to say that morale was good and that people were happy — so not a typical message from a union representative. But I really do feel that we have a fantastic workforce that wants this to work well. So, on the labor side, I don’t really see any major issues at our site. When you look at inflationary pressure, most of it this quarter was tied to explosives and fuel prices, which haven’t necessarily risen compared with what we saw in the prior quarter. I don’t have a crystal ball, so I’m not sure where that will end up during the quarter. We aren’t hedged for fuel or explosives, so we’re exposed to market prices, but I haven’t seen that increase lately. So we don’t provide any guidance, but realistically, I think the cost, if fuel and explosives stay the same, should be pretty much in line on the inflationary portion.
David Cataford
executiveSpare parts remain a factor too, though once again, unlike the prior quarter, this one doesn’t include a major shutdown. So that shouldn’t have an impact on us in this quarter either.
Lucas Pipes
analystThat is quite useful. I truly value all the detail. Good luck to you, and I will hand things over.
David Cataford
executiveAppreciate that, Lucas.
Operator
operatorThanks. Our following question is from Gordon Lawson at Paradigm Capital. Go right ahead.
Gordon Lawson
analystMorning, everyone. Could you go into more detail about the premium realized on top of the 62% base product? Given the current demand picture around ESG concerns and the like, I think a lot of us had anticipated something higher. So was that just a one-off for the quarter? Do you expect it to improve substantially in the current quarter?
David Cataford
executiveYes. Thanks for that question, Gordon. So, looking at the market as it stands today, there's been a softening in metallurgical coal prices, and China has also had some production issues. As a result, a lot of blast furnaces are either idled or running at minimal capacity. Typically when that happens, they go after more lower grade materials just to keep the lights on, but we don't view that as a long-term trend. This is more of a short-term event that has put some pressure on the premium for the high grade. But because there is no new supply of this material, we do expect this would get resolved, and we do feel that the premium for high-grade material, especially eventually DR-grade material, is going to be very healthy in the future.
Gordon Lawson
analystRight, understood. That's completely clear. I realize you'd rather not provide guidance, but once Phase 2 has reached full ramp-up, and considering your historical cash costs, would you call $55 to $60 a reasonable assumption, even once biannual maintenance and similar items are factored in?
David Cataford
executiveYes, Gordon, I'll say this: we're going to make every effort to hold those expenses steady and bring them down to the greatest extent we can. What I think matters to point out is that demand for this material is exceptionally strong. And even now, given the premiums that we receive and the discounts that others receive, we sit in a very good spot on the cost curve. It's hard to give you a real answer until Phase 2 is complete and we can show some results, but we'll gladly bring you up to date the moment those results are in hand.
Gordon Lawson
analystAlright, thank you so much.
Operator
operatorThank you. Our next question is from Alex Jackson at RBC Capital. You have the floor.
Alex Jackson
analystYeah. Hey everyone. Appreciate you fitting me in. I've got one more about Phase 2 — I'm curious whether you could lay out any important milestones during the ramp-up that we ought to watch for, or expect updates on, across the coming 2 months or so? Thank you.
David Cataford
executiveYes. Thanks for asking, Alex. I'd say the next big step on our end is getting to commercial production. So at this point, we're focused on getting there and putting in the work to wrap that up. Beyond that, though, I don't see any other significant milestones, other than reaching commercial production and nameplate capacity here.
Alex Jackson
analystGot it. And turning to the growth projects, I’m curious — has any work begun on the feasibility study for Pointe-Noire, or is the team really just focused on the DR feed behind the Phase 2 ramp-up, with that coming a little later?
David Cataford
executiveYes, there's a separate dedicated team working on the pelletizing project for us. That generates substantial value for our company. I mean, with DR pellets, even if you've noticed the premium for the 65% index has softened, you can see that the price for DR pellets remains very healthy. And we truly view that as future value accretion for our shareholders. So we are definitely working on delivering that feasibility study, and it isn't sitting on the shelf. It's being worked on by a dedicated team right now, and again, in partnership with a major steel producer. So we've got a great team working on this.
Alex Jackson
analystGot it. Appreciate it, everyone. That's everything from my side.
Operator
operatorRaymond James's Brian MacArthur is up next with a question. Go right ahead.
Brian MacArthur
analystMorning, and thank you for the question. Since the world seems to be heading in the direction you describe — more EAF furnaces — that could mean substantial demand for higher-grade products. In the feasibility study you completed for the feed product, it came in at 69%, which is roughly half — half of what Bloom Lake produces. Is there any reason, given that it's improving, that you couldn't move to 100%? Are technical constraints the issue? Is capital the constraint, or is it simply the current mix of contracts that caps it at 50%, or is it just a matter of sequencing all your other projects down the road? If you could walk through the timing and the strategic thinking behind that going forward, and whether any of it has changed given how the market is developing?
David Cataford
executiveYes. Thanks for that question, Brian. So, whenever we consider what Bloom Lake is technically capable of, nothing prevents us from producing this DR-grade material at 100%. And that is our longer-term strategy, since we genuinely believe this is how we will set ourselves apart in the future. So, even if a new project emerges somewhere in the next 5 years to 10 years, at the 64%, 65% mark. Well, for us, sitting at 69% truly will distinguish us from everyone else and let us maximize profitability as well as maximize value for our shareholders. But realistically, what we want is to sequence that properly. And I think, as you mentioned, the main steps for us are to get that first plant up and running, then get the DR pellets so we can fully benefit from that premium, and then be able to factor in the 100% portion of Bloom Lake and DR. But we first want to do that 8 million ton per year plant, then the pelletizing facility, and after that we could potentially sequence the second plant.
Brian MacArthur
analystExcellent — I appreciate that, and it's quite useful.
Operator
operatorThanks. Our following question is from Jacques Wortman at Laurentian Bank. You have the floor.
Jacques Wortman
analystHello, and good morning everyone. From what I understand — though perhaps I have this incorrect — the Kami feasibility study was expected to wrap up during this calendar year's second half. Now it appears it may have shifted into the first half of next year. If I'm not mistaken about that, could you offer some detail on the reasons behind this change? Thank you.
David Cataford
executiveYes, that's right, Jacques. So we pushed it out a little. Can you guys hear me? We pushed it out somewhat to make sure we can fully get the DR grade material out of the Kami Project. So some test work was required. If you look at the original Kami Project, it was to produce 65%, and we wanted to make sure to be able to demonstrate the 69% with the Kami material. The availability of labs really forced us to push this out a little, not a significant move, but we wanted to make sure to get those full results, and come back to the market with the proper feasibility study and not have something that still had sort of holes in it. So that's why we have pushed it out slightly to next year.
Operator
operatorShall we take the next question?
David Cataford
executiveI trust that addresses what you were asking, Jacques?
Jacques Wortman
analystThat's right, it does. Thanks.
Operator
operatorThe following question is from Lucas Pipes at B. Riley Securities. You have the floor.
Lucas Pipes
analystHello again, and good morning. I appreciate your taking my follow-up question. I'd like to ask a bit more about the macro picture. You expressed confidence that the softness in China is more temporary in nature. I was hoping you might say more about that. Also, there have been reports of a consortium of Chinese buyers in the iron ore market. How, if at all, would that affect Champion? Thank you so much.
David Cataford
executiveYes. Thanks for the question. So for us, when we look ahead and see China building more than 55 electric arc furnaces at this point, yes, scrap is going to be available. But realistically, if they want to make high-grade steel from those facilities, they will need the pure metallics to ensure they can actually achieve the quality and the products they're after. So for us, even if a new buying consortium emerges, I don't think that's going to alter the sort of premium we're getting for the high-grade material, nor the demand we're getting for the higher grade type material. I think the main factor for us is really the fact that no new supply is coming into that DR grade market that will really set us apart in the future. So we obviously don't have a crystal ball. It's tough to factor what's going to happen in China. But right now, as we eventually see those lockdowns being softened, we do expect that there is going to be more production and more usage of steel, and that's going to favor potentially the high-grade material line.
Lucas Pipes
analystThanks again for the additional detail. Wishing you the best of luck. Thank you.
David Cataford
executiveAppreciate it, Lucas.
Operator
operatorThat brings us to the end of the question-and-answer session. You may proceed.
Michael Marcotte
executiveThanks, operator. And I think at this point, we're going to hand things over to our Executive Chairman, Michael O’Keeffe, for some closing remarks.
Michael O'Keeffe
executiveAll right. Thanks, Michael and David, for the presentation. Look, it has been a difficult quarter, and cost is what everybody is focused on. But looking back, I feel incredibly privileged as Chairman to have a team like ours. What I mean is that, having looked around the world, I have not seen a single $1 billion project or $1.5 billion project delivered on schedule and within budget throughout COVID. And we pulled that off. That took people such as Alex Belleau heading up to site, sitting down with the folks there, and steering the contractors through the entire process. We have had 2,000 people at site working on this project. It is — you have to pinch yourself. So what everyone is focused on today is that we have come through this. At no point did we have to raise equity during the process. We sit with solid cash and undrawn debt, which again is a remarkable feat for a company our size. I have not witnessed that occurring anywhere in the world today in mining assets. When you consider where we stand, obviously costs are elevated, but we are running and ramping up our production.
Michael O'Keeffe
executiveSo clearly those are going to be elevated. We, just like everybody else, are forced to bear increased fuel expenses and costs tied to our exposures. That is now widespread across the globe, given as well the troubles taking place in Russia, with Ukraine — all of that is creating a problem worldwide — plus the COVID situation in China. Now, with luck, matters will begin to stabilize and our costs will begin to decline as production ramps up. And I believe everyone, six months from now, will be asking, "Okay, where did all that come from?" So what we're focused on, and what David has talked about, is high-grade, plus moving closer and closer to DR feed type material, and also not being as dependent on China as everyone else is. So the strategy is in place. We have the right team. We have the right product. And our balance sheet is in good order. So look, thank you all for your support. And may this keep going for us in the sense of how well and efficiently we operate. Thank you all again for joining the call, and have a great day. Thank you very much.
Operator
operatorThank you. Everyone, that brings today's conference call to a close. We appreciate all of you joining us, and we ask that you please hang up your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.