Good morning, everyone, and thank you for joining the Champion Iron conference call covering fourth-quarter and full-year results for fiscal 2023. Right now, every line has been placed in listen-only mode. After the presentation, there will be a question-and-answer session. Should you need immediate help at any point during this call, just press star zero to reach the operator. Today is Wednesday, May 31st, 2023, and this call is being recorded. I'll now hand the conference over to Michael Marcotte, Senior Vice President of Corporate Development and Capital Markets. The floor is yours, sir.

Michael Marcotte

executive
#2

Thanks, operator, and thanks to everyone for being on this call about our fourth quarter and fiscal 2023 results. Before we begin, I'd like to point everyone to our website at championiron.com, where the presentation we'll be discussing today is available under the Events and Presentation section. I should also note that we'll be making forward-looking statements throughout this call, and more information about our risks and forward-looking statements can be found in our MD&A, which is also on our website. I'd also like to point out that all figures discussed on today's call will be in Canadian dollars, unless otherwise stated. With that said, let me introduce the people on the call in the room with us. David Cataford, our CEO, will be going over the formal presentation today and the Q&A. Closing remarks will be given by our Chairman, Michael O'Keeffe. We also have other executives in the room, including Alexandre Belleau, our COO, and Donald Tremblay, our CFO. With that, I'll turn it over to David.

David Cataford

executive
#3

Hello, and thank you, Michael. I appreciate everyone joining us today. It's a real pleasure to walk through the results for the quarter we just closed. When we turn to the quarter's highlights, one item stands out: as we've noted before, the bulk of our mining equipment has now been delivered and put together. The benefits are beginning to show, and we were able to shift significantly more material at the mine, which let us keep advancing the ramp-up and turn out nearly 3.1 million tons in the quarter. That marks yet another record for us, and we remain firmly on schedule to hit our full nameplate capacity run rate by August of this year. I'm also pleased that our capital return strategy continues, and following yesterday's board meeting we declared a dividend of CAD 0.10. On the sustainability side, one more highlight is that we have had no major environmental issues since 2018. Every investment made at site — and the ones we keep making annually — helps us keep the operation environmentally safe and maintain an excellent environmental record. I want to call out the fantastic work the teams have done, especially given the end of COVID and a fairly heavy construction year with the Phase II ramp-up and the completion of all that work, which helped us achieve a very strong safety record.

David Cataford

executive
#4

Our teams performed an outstanding job ensuring everyone remained safe at the site. On the community and sustainability front, a notable moment over the recent weeks was welcoming three Quebec ministers to our site: the Minister of Economy, the Minister of First Nations, and the Minister of Employment as well. Hosting one of our bigger shareholders on site—the Government of Quebec—is terrific, and we're glad to keep their backing as well. It was interesting hearing their viewpoints and letting them witness the excellent work underway at Bloom Lake. Regarding ESG, I'm also very proud that we have released and published our 2022 Sustainability Report, in which we align with the GRI, SASB, and TCFD. Our team has done a tremendous job ensuring we properly disclose all the strong ESG work we're carrying out, which gives us a very strong rating relative to certain peers and lets us publish a very solid environmental and ESG record. Turning to the market, you likely noticed the iron ore price rally during January, February, and March.

David Cataford

executive
#5

The P62 rose roughly 27%, while the P65 gained 23%. Freight rates also dropped around 12%, we observed. Freight is currently priced fairly well, even though these were winter months, when costs at Bloom Lake are typically higher for us. As you will notice, we achieved a fairly favorable freight rate over the quarter. Moving to our actual operations, as noted, a key highlight is that output reached nearly 3.1 million tons, extending our ramp-up toward achieving a full nameplate capacity run rate by August this year, along with the fact that we moved an additional 1 million tons at the mine. You can observe that the mining equipment delivered and assembled is ramping up too, and we are well positioned to move the material needed to reach our nameplate capacity. The mine is in healthy shape. You likely noticed our strip ratio rose slightly as well. We are now essentially aligned with the targets for the year. We did accumulate a small backlog during the past quarter, but that can be smoothed out over the coming years.

David Cataford

executive
#6

We genuinely believe the mine is in really solid condition to ensure we can keep up our ramp-up and then deliver our full nameplate capacity afterward. Regarding Phase II, as we said, the ramp-up is ongoing. What we ran into involved the delivery of mining equipment plus some work that had to be completed on the crushing facilities. Going back a few years, it's worth pointing out that during our early quarters of Phase I, we faced greater difficulty on the crushing side. As you'll recall, we had a chute that wasn't performing. We weren't delivering the tons, and the team found a fix quickly, put that fix in place, and we haven't discussed it since because it's behind us now. We're doing the same thing now with Phase II on the crushing facility for Phase II. We did experience some hiccups over the past quarters. The team has come up with the solutions needed to resolve this, has implemented most of them, and is continuing to implement the rest during this quarter now so we can hit our full nameplate capacity.

David Cataford

executive
#7

The last remaining element was logistics. We do rely on some third-party logistics providers, whether on the rail side or at the port. What we can say about this is that the new stacker reclaimer is now operational — not at full capacity, but it is operational at the Port de Sept-Îles. I was there last week, and it's a very impressive piece of equipment to be able to see in operation, the largest stacker reclaimer in the eastern part of North America. Very great equipment that is just finalizing the ramp-up now. We had three locomotives that had to be delivered. These locomotives are now in Matane, just across the river from Sept-Îles, and will be delivered in the coming days. With all these elements, we're still pretty confident that we'll be able to reach full nameplate capacity run rate by August of this year. In terms of financial highlights, well, we generated quite a lot of revenue in the past quarter, which allows us to continue working on our growth strategies and at the same time allowed us to declare a CAD 0.10 dividend, continuing our capital return strategy with our shareholders. If we turn over to cost in terms of the financial elements, you can see that our costs have pretty much peaked now in this past quarter.

David Cataford

executive
#8

So realistically, we began to see some advantages tied to the greater output that was generated at the site, but we still had inventory that had been bought at higher prices, and that inventory was sold during the quarter. That explains why you're seeing a negative on that side and why our costs went up a little versus the prior quarter. As the ramp-up continues and as you've also observed diesel prices come down, we really do believe we can bring our costs below where you see them now and return them to the level we had anticipated over the next few months. We're very confident that we can keep bringing our costs down over the coming months. On provisional price adjustment, we did record a positive provisional price adjustment. We had projected roughly $130 per ton, delivered tons came in at about $136, which produced a positive provisional price of approximately $3.4 per ton. One thing worth noting, however, is that at quarter end, on the 31st of March, we had booked tons at $140 per ton, and since then the price has come down. We can expect a negative provisional price adjustment in the following quarter. Bear in mind that a portion of those tons that weren't sold are heading to the Japanese market, so they'll be subject to backward-looking, so that impact won't be as large as it would be if all of our tons were subject to forward-looking.

David Cataford

executive
#9

Regarding the average realized selling price, as we said, the freight rate—even though it was the pricier stretch, meaning January, February, and March, when ice premiums tend to be larger and shipping costs tend to run higher—we still secured every one of our vessels at roughly $28 per ton on average. Looking at the Canadian net realized price, we got to approximately CAD 150. On the cash side, your company is in really solid shape at the moment. We basically doubled our cash during the prior quarter, moving from CAD 166 million up to roughly CAD 327 million as of the 31st of March. That growth in cash, and factoring in working capital as well, has landed us in a net cash position—we shifted from net debt to net cash. As you can see, the company is healthy enough to keep up our dividend strategy while also letting us carry on with our growth strategy at the same time. Turning our attention to growth, a key highlight from the last quarter is that the board has approved an additional CAD 52 million in spending for the DRPF project.

David Cataford

executive
#10

With that, we remain on track for our August 2025 timeline to produce the first tons of 69% material. As a reminder to everyone, the goal here is to be capable of processing half of Bloom Lake's tonnage — basically the entire Phase II volume — by constructing a facility adjacent to Phase II, or as an expansion of that project, and raising the grade of 7.5 million tons up to 69%, which would let us sell into the DR market. Why does this matter? Right now, the DR market ranks among the fastest-growing markets anywhere in the world. The number of projects announced and under construction for the coming years exceeds everything built over the past 20 years. It's interesting to note that so many facilities are being built that a deficit exists — or a targeted deficit — of over 100 million tons by 2030. Each month brings announcements of additional DRI projects, yet no new supply appears. This dynamic is fascinating to watch, because we believe the premiums we forecasted for the DR market are conservative, and we believe this project will be extremely accretive for all of our shareholders.

David Cataford

executive
#11

There's another angle here that's worth noting too — pulling off the energy transition calls for a substantial amount of steel. Among the metals needed for virtually any pathway that turns higher-emitting energy sources into clean ones, steel stands out as essentially the only one. Research indicates that by 2050, an extra 3.5 billion tons of steel will be needed solely to decarbonize the power sector. Here's another interesting point: in most developed economies, governments tend to play a fairly substantial role when it comes to power generation. It's hard to picture those additional 3.5 billion tons being used to decarbonize energy while relying on dirty steel. In all likelihood, greener steel will be needed to construct that infrastructure, so that the energy transition doesn't wind up being hypocritical. This could also drive additional demand for cleaner steel from various government entities worldwide and from different energy suppliers. And just as a reminder, the interesting piece is that the tons we produce enable the steel industry to decarbonize. To the degree that, for this project to decarbonize the power sector, while over seven billion tons of CO2 emissions would be generated if we followed the typical steelmaking route — if we go the DRI EAF route and use tons from Bloom Lake to supply it, nearly half of the CO2 emissions could be cut in this steelmaking to decarbonize the world.

David Cataford

executive
#12

It's always intriguing to pursue decarbonization in other locations. Another key point is that Bloom Lake holds one of the lowest CO2 intensity iron ores among high-grade deposits globally. I'm very proud to say that the investments made at the site have positioned us as a leader when it comes to CO2 emissions per ton of iron ore produced. Lastly, I believe it's worth noting that for our two other main projects — the Kami project and the pelletizing facility in Pointe-Noire — feasibility studies are ongoing, and we remain on track to deliver results by the end of this calendar year. Even as we finalize the ramp-up of Phase II and work on our DRPF project, we continue advancing the other growth opportunities within our company so we can create more value for our shareholders going forward. With that said, I'd like to thank all of our staff and the teams for delivering the results you now see in the document, and I'm more than happy to take any questions or comments from the people on the group.

Operator

operator
#13

Thank you, sir. Ladies and gentlemen, we're now going to start the question and answer portion. Should you wish to pose a question, kindly press star and then one on your telephone keypad. In case your question has already been answered and you'd like to leave the queue, kindly press star and then two. If you happen to be on a speakerphone, please pick up your handset prior to pressing any keys. Please hold for a moment while we get your first question. Your first question is going to come from Orest Wowkodaw at Scotiabank. Please go ahead, sir.

Orest Wowkodaw

analyst
#14

Hello, good morning, and thank you for the invitation to join the call. Earlier you mentioned that Phase II would hit its targeted nameplate capacity around August of this year. Does that figure also cover the capability to ship at that volume — at the 15 million ton level? There is, after all, some disclosure in the release regarding locomotive delays, which I take it are causing a mismatch between production and sales. I'm just wondering how long you anticipate that mismatch persisting past August, if it persists at all?

David Cataford

executive
#15

Yeah, thanks, Orest, for that question. Our perspective is that this gets resolved by August. The stacker reclaimer ought to have been running, yet it isn't fully running at this point, and we didn't get the locomotives that were meant to show up — that's the reason this was disclosed, let's say at the end of the 31st of March of last year. Now, I think the good part is that the locals are only a few days out from the site. They're completely operational. Getting them to the right level at the and integrated into the site is going to take just a few weeks, but that ought to wrap up before the end of June. The stacker reclaimer is operational now. I watched it working last week, so I can tell you it's fully operational, but right now it isn't running at its full target. That's being ramped up gradually too. We genuinely believe that by the month of August, that'll be sorted out, and we'll have no disconnect between the mine and the logistics.

Orest Wowkodaw

analyst
#16

Oh, all right. That works well. I just want to follow up regarding the Direct Reduction Pellet Feed Project. At the time you released the feasibility results, you said that a final investment decision depended on obtaining extra power as well as non-dilutive funding. Could you update us on each of those — where do they currently stand?

David Cataford

executive
#17

Thanks for the question. Donald, our CFO, is wrapping up the work needed so we can have the non-dilutive financing package in place. It will be comparable to what you saw for the Phase II, so we may not have to draw any of it at all. We do think we'll likely be able to cover this from cash flow, but we want to stay on the conservative side and ensure all the funds are available should we need them during construction. We don't see any hurdles to delivering that. Looking at the power allocation, in Quebec they took a short pause so they could prioritize the different projects. That was announced by the Minister of Economy. They've also issued a list to ensure that when power is allocated, it needs to support decarbonization, it has to be productive, and it has to bring significant returns for Quebec, while also connecting with local communities and First Nations. Fortunately, we satisfy all four of those criteria. Regarding the timeframe the government has announced for a power allocation, they did say that the end of June, start of July, is when the first round of power allocations would happen.

David Cataford

executive
#18

We ought to be in a position to bring the market up to date on that during the next investor call. We're fairly confident about securing the power we need in order to carry out this project. That's the reason the board has allocated an additional CAD 52 million so we can hold to our August 2025 timeline.

Orest Wowkodaw

analyst
#19

All right, that's great. As a quick follow-up, is that CAD 52 million essentially what you're committing between now and the end of June? And of the original CAD 10 million, how much was spent during the quarter that just ended?

David Cataford

executive
#20

The amount spent so far is pretty small. Our allocation approach means we commit more money than we end up spending, and board approval is required before we're able to commit anything. Very little went out the door during the past quarter, though we have committed to some engineering. With the CAD 52 million, we're now going to lock in certain long lead items and let our suppliers begin building them, so they arrive on site at the proper time to meet that 2025 target. That CAD 52 million gives us room to go well past the summer, ensuring there's enough time to secure the power as well as complete the non-dilutive funding. That's the position we're in on that project at the moment.

Orest Wowkodaw

analyst
#21

Much appreciated.

David Cataford

executive
#22

Thanks, Orest.

Operator

operator
#23

We now move to Lucas Pipes from B. Riley Securities for the next question. Lucas, the floor is yours.

Lucas Pipes

analyst
#24

Thanks so much for taking my question. Morning, everyone. I'd like to ask a bit about the DR-grade market, and I was wondering whether you could size that market up as it stands today. You said there's quite a lot of DRI and HBI capacity being developed right now, and I was hoping you might share some figures on that. What are you seeing under construction at present? Thanks a lot for your color on that.

David Cataford

executive
#25

Appreciate the question. What we're observing at the moment is a substantial number of projects that have announced either some DRI facilities or EAFs and are currently focused on locking in DRI supply. The intriguing part is that a great deal of momentum is coming from Germany. A great deal of momentum is also coming from the Middle East. In Oman alone, a considerable amount has been announced — more than 10 million tons — and that is presently under study in the DR market. Keep in mind, the merchant market today stands at roughly about 30 million tons, so an additional 10 million tons on its own is pretty significant for the market. Producing a single ton of DRI typically calls for over 1.5 tons of high-grade iron ore. A lot of demand is genuinely on the way. If we look at the concrete projects, we could go offline, if you'd like, and walk through a list of all the various projects currently under construction. The primary regions where they're examining this, I'd say, are Europe and the Middle East, and we're also seeing it in China as well. Those are the key hubs where we're seeing the additional DR material being announced.

David Cataford

executive
#26

The fresh capacity that's being built right now is approximately 100 million tons — or at least that's what has been announced — and it will begin construction in the near term, around 100 million tons. In terms of DR grade, that comes to 2.5x the present merchant market.

Lucas Pipes

analyst
#27

Thanks, that’s quite useful, and I appreciate you putting those numbers in context. If I can follow up—and please forgive my lack of knowledge here—but take the Pilbara, for instance, where you have regions with lower-grade iron ore. What would be required to beneficiate that material so it reaches DR grade? Is that something that can be done technically, or does it simply not make economic sense? I’d value your view on that.

David Cataford

executive
#28

If we step back a bit and consider, say, the past decade, averaging the premium — only for the high grade, for that 65% material — it was sufficient to justify sanctioning projects, provided they made sense. That is at least how I see it. When premiums come in around roughly $20 per ton U.S. for beneficiation, that more than offsets the possible infrastructure expense needed to carry this out. Taking a step back, if you consider processing material that is extremely fine when it comes to liberation and carries a substantial amount of contaminants, whether this would ever actually happen is not clear. Should you want to produce high grade, tailings facilities must be permitted. Those tailings facilities have to be constructed. You also face a different set of logistics, since you then must use a considerable volume of water, and using water means you need water treatment plants, plus you also have to take the water out of your material. We are very lucky that in the Labrador Trough, particularly the area we operate from, liberation is very coarse, meaning our concentrate is essentially sand.

David Cataford

executive
#29

In the surrounding areas, the material is sand-sized. Taking the water out of sand is relatively straightforward. But once you're dealing with a powder-like substance — which is essentially what will be needed in the Pilbara — removing that moisture becomes a lot more complex. Dewatering a powder costs more, consumes more energy, and is considerably harder to do. Overall, if you factor in the tailings requirements, the power needed to grind the material down and then process it, plus the added logistical complexity involved, upgrading Pilbara material to a high grade looks like a tougher proposition. And even supposing you could upgrade it to a high grade, that's still blast furnace material — it's uncertain whether they could ever reach DR grade at all. The Labrador Trough, I mean, is a distinctive kind of material that lets us produce a coarse DR grade product, and I believe that's essential for us to earn returns going forward. Looking at the contaminants we don't have — when you add alumina and silica together — it's also not clear they'd be capable of removing those during concentration. You'd still end up with elevated alumina and elevated silica in your product.

Lucas Pipes

analyst
#30

That's quite useful. Geology isn't something you can alter. One quick follow-up. You've got some peers in the region. Are they putting money in too, or would you say you're somewhat unusual in pushing against the tide? Maybe just given the wider macro headwinds on the iron ore side. I'd appreciate your view on that.

David Cataford

executive
#31

Yeah, it's tough to identify many opportunities for growth in that area. If we consider one of our neighbors that operates its own rail line in Quebec, logistics basically hold them back, and no investments have shown up so far that could grow that segment. No capacity gains have appeared lately or over recent years. Where things will stand down the road isn't clear, but bear in mind there's a fair amount of headroom should they decide to expand, since it really does look like the right area for producing this kind of material. Looking across the border at the other project, no expansions have really been observed as of yet. Might some come later? Possibly. Once again, what I think matters most to emphasize is that we foresee a 100 million ton deficit over the years ahead, and even with some expansions, there's plenty of headroom to take additional tons from this region.

Lucas Pipes

analyst
#32

That added detail and viewpoint is really appreciated—thanks once more, and all the best.

David Cataford

executive
#33

Much appreciated, sir.

Operator

operator
#34

Craig Hutchison from TD Securities is up next with a question. The floor is yours, sir.

Craig Hutchison

analyst
#35

Morning, everyone.

David Cataford

executive
#36

Hi there, Craig.

Craig Hutchison

analyst
#37

When it comes to the pricing you could eventually get for the DR premium, can you picture a situation in which you'd be able to obtain some form of carbon pricing premium in addition to the pricing you've already factored into your feasibility study?

David Cataford

executive
#38

That's a good question, Craig. At the moment, nothing we've done has been priced around that, but if you step back for a moment and consider how much CO₂ reduction a project such as ours would let steelmakers gain, for the DRPF project we're currently working on, it's roughly 5 million tons of CO₂ emissions. You can apply whatever carbon price you like to that — at a EUR 100 carbon price, you'd be looking at a pretty meaningful increase in market potential, I mean EUR 500 million. Would we capture 100% of that? I'm sure we wouldn't. That does create a significant upside scenario for 7.5 million tons. I mean, you could picture us getting just a third of that, and that alone amounts to a EUR 20 increase on the revenues we've included in that feasibility study. There's a great deal of potential in the future. We've kept all of that as upside, but I do agree there's a lot of potential upside ahead tied to carbon.

Craig Hutchison

analyst
#39

Appreciate it. Considering the level of demand you're observing for DR material, can you picture a situation — perhaps within the coming year or thereabouts — in which you might be able to kick off that second expansion and bring the whole of Bloom Lake up to DR material?

David Cataford

executive
#40

Yes, absolutely. If we consider what Bloom Lake could become, the ore is identical and the facilities are comparable. That second DR pellet feed project might need somewhat additional filtration, though it's certainly something sitting in the back of our minds, since in terms of generating shareholder value, I truly believe that upgrading our material to 69% is how we'll deliver the greatest value to shareholders. At present, the team is concentrating only on wrapping up the various items required to reach a final investment decision on the first one. The second is certainly at the back of our minds, and we'll begin work on it quite soon, as I genuinely feel that represents the next major opportunity we have.

Craig Hutchison

analyst
#41

Okay, great. Perhaps one final question for you. Just regarding freight, you mention the freight market. Are you locking in any vessels or any kind of future contracts at these prices, or perhaps certain volumes that you are securing?

David Cataford

executive
#42

Well, thank you for that question, Craig. We're certainly making an effort to secure some pricing at this point. There's a modest amount of potential upside on the pricing side, but honestly, locking in rates when the C3 sits around CAD 19 or CAD 20 strikes me as a very good move. Over the last few quarters, the market showed reluctance when it came to securing pricing over a longer horizon, though we've now observed a bit of a shift in that regard, and we're collaborating with a number of our freight suppliers so that we can lock in certain prices. Not a great deal has been completed as of yet. Providing the market with an update on that is difficult. We're in talks — fairly advanced talks — with plenty of groups so that we can secure some vessels both in the near term and over the medium-term horizon.

Craig Hutchison

analyst
#43

Excellent. Appreciate it, everyone.

David Cataford

executive
#44

Appreciate that, Craig.

Operator

operator
#45

Ladies and gentlemen, repeating our earlier note: if you'd like to pose a question, just press star one at this time. Brian MacArthur of Raymond James has our next question. The line is yours.

Brian MacArthur

analyst
#46

Morning. To build on what Craig asked, it's clear you're sounding a lot more upbeat about upgrading — 69, and perhaps that second 7.5 million tons. I don't want to jump too far ahead, but does any of this shift how you're thinking over the longer term about where Bloom Lake III could land relative to Kami or the pellet plant?

David Cataford

executive
#47

Appreciate that, Brian. If we consider Bloom Lake III or Kami down the road, the material types are comparable. These rank among the highest grade ore bodies globally. Kami stands as one of the finest undeveloped iron ore deposits anywhere in the world. Plenty of discussion centers on Simandou, yet that material still targets blast furnaces. It isn't the answer for decarbonizing steel production. Kami clearly represents strong potential for us. Regarding what comes next, my sense is that the DR pellet feed from Phase I could run somewhat ahead of the pelletizing facility located in Sept-Îles. That said, it doesn't alter the reality that we bought Canada's best site for developing a pellet plant. My belief is that at some stage this will get built. I do think the market is going to require DR pellets, and we'll possess enough DR material to capture those premiums. Over the nearer term, looking at our existing DR pellet feed project, my view is that worldwide pelletizing capacity is sufficient for us to sell it as DR pellet feed.

David Cataford

executive
#48

Keep in mind that's yet another edge for us when we examine the Bloom Lake material: we're able to sell it as DR pellet feed, and because the moisture content is very low, we can handle it quite easily. We don't run into the problem of a powder-like product that either has to be pelletized or turns into a headache for our customers when they unload it at their ports and then must deal with the dust tied to that kind of material. I genuinely believe that, first, DR pellet feed is the strongest project. Kami is also becoming very compelling, since it too can produce DR-quality material, and the pelletizing facility represents an excellent option for our shareholders, though it may arrive a few years later.

Brian MacArthur

analyst
#49

Okay, so would you kind of describe Bloom Lake Phase III — that's what I'm calling it — and Kami as comparable? Does either one hold a relative edge over the other, in terms of capital intensity?

David Cataford

executive
#50

At this point, we are clearly further along with Kami than we are with Bloom Lake Phase III. Tailings facilities present a difficulty for Bloom Lake Phase III, along with the need to ensure all the sites are integrated. Being located on a brownfield site is a benefit it holds. In my view, Kami certainly carries certain advantages too that Bloom Lake Phase III lacks. If you look back several years, in the back of our minds we believed Phase III was clearly the project that made more sense compared with Kami. As we now move the Kami feasibility study forward and gain a better understanding of Bloom Lake Phase III, I think the two are closer together and fall within the same range, and perhaps Kami may even carry some advantages that Bloom Lake Phase III does not. Looking ahead a few years, depending on where demand sits, it's possible both end up being developed. I believe what we are really focused on today is the DR pellet feed, obtaining the results from all our feasibility studies, evaluating the market, and ensuring capital allocation is diligent over the coming years, yeah.

Brian MacArthur

analyst
#51

Much appreciated, David.

David Cataford

executive
#52

Thanks, Brian.

Operator

operator
#53

That brings us to the end of the questions from the phone lines. At this point, I'll hand the conference back over to Mr. Michael O'Keeffe, who may have some closing remarks.

Michael O'Keeffe

executive
#54

Thank you so much. David, I appreciate that thorough rundown. It's fascinating, since so much of what we talk about as a company concerns what lies ahead, and what lies ahead is green steel. There's been plenty of noise in the market lately, and, you know, coming from Vale, and how everybody is racing to try to make the feed that will supply these electric arc furnaces, you know. Either we've got it badly wrong, which I doubt, or, you know, the rest of the world is shifting in a direction different from where we believe it's headed. Electric arc furnaces represent the future. If you just think back to what built the Pilbara, it was really the expansion of blast furnaces in China. As David told us today, you know, the world won't put up with steel made in blast furnaces. You know, either carbon capture has to be there or some other change in how steel gets produced with blast furnaces. It's going to be very hard to see that, you know, as we go forward. I believe our theory is completely right, and the fact that David and I both go out to visit customers.

Michael O'Keeffe

executive
#55

We speak with steel mills regarding what lies ahead for them. We observe expansion in electric arc furnaces. You know, we dig in ourselves when examining these matters. We grasp it since it’s our capital—that’s, you know, and your capital—that is being invested in this company’s future growth. We’re quite distinctive in this respect, in that ore available to us can undergo beneficiation. Through that beneficiation process we can reach 69% Fe, which is distinctive. We’re fortunate in that, yet it’s no shock that we’ve acquired Bloom Lake and all the surrounding territory, including Kami. Whatever else might come our way, we’ll fold it into that region because, A, we possess the product. B, we have infrastructure at the port, rail, and berth, and the people also are experienced in how we move this material from 30% in the ground to a 69% pellet feed material. That is quite distinctive. You know, as far as we’re concerned, we view it as our future. Now, if I reflect on that briefly and consider it today, we discussed the market being 30 million tons.

Michael O'Keeffe

executive
#56

Electric arc furnace capacity keeps rising, yet there's nothing to feed it. Folks will say, "Oh, we'll just use scrap." But guess what? A lot of nations are slapping embargoes on scrap, scrap is becoming harder and harder to source, and scrap prices are soaring sky-high. Scrap simply won't be able to fill that gap. The answer is either blister or a DRI pellet. DRI pellet is produced where we operate, while blister comes out of blast furnaces. The logic there is fairly straightforward. Taking today's figures, consider our own costs — FOB costs, for instance. Roughly 57 during the last quarter. David and his team, Alex and the group, are focused on how we get those costs lower, but the reductions they deliver will be in the region of $3, $4, $5. Here's the big opportunity from our perspective: right now, the 62 material compared with the 65 carries a premium of roughly $15. Comparing the 65 with the 69, the premium is roughly $25. So you're looking at $40 U.S. that we could add to what comes out of the Pilbara, for instance.

Michael O'Keeffe

executive
#57

Subtract that from the 57, and we land at $17 U.S. per ton, FOB. That figure is compelling, since it shows you exactly how much upside this material holds. It leaves out any carbon advantages we might achieve — none of that capture is included. The material itself, the infrastructure, and what lies ahead for this material place us in an extremely favorable position as we move forward. Now, if you look back at the operations and consider — I believe for us, and well, for you as investors, the proof is in the pudding. We commissioned Bloom Lake in March 2018. Just five years afterward, we've succeeded in bringing Phase II online — Phase I, Phase II — and running this operation in a manner where we're achieving the recoveries and the grade we're after. I think that alone is impressive when you factor in that during that stretch, we dealt with COVID. When you factor in that during that stretch, we've paid over CAD 200 million in dividends. We paid out CAD 210 million to repurchase the Government's stake in Bloom Lake. We spent another CAD 700-something million on infrastructure upgrades, and we accomplished all of it from cash flow.

Michael O'Keeffe

executive
#58

The most recent equity raise we did was 2017, at CAD 0.90. Honestly, I have to give credit to David and his team — they did a truly outstanding job getting us to where we are. What I'd want everyone to take from this is the one-of-a-kind position we're in right now, with the ability to seize this electric arc furnace growth in a way nobody else can. Thanks to all of you for investing and for your patience in getting us here over five years. Five years, I'd say, is fairly fast, but the coming five years will be really thrilling. The items Brian mentioned — which projects do we take on next? That's a wonderful position to be in. Without question, near term we're going to be moving our tons to 69. There's Kami, there are all our other tenements, and there's further potential for consolidation. All I'll say is keep watching, and we'll keep building value for your company. Thank you, everyone.

Operator

operator
#59

Everyone, that brings this morning's conference call to a close. We appreciate all of you for joining us, and please go ahead and disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.