Champion Iron Limited (CIA) Earnings Call Transcript & Summary
October 26, 2023
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone, and thank you for joining us for the conference call on our second quarter results for the 2024 financial year. After the presentation, there will be a question-and-answer session. <<operator_script>> Today is Thursday, October 26, 2023, and this call is being recorded. I'll now hand the conference over to Michael Marcotte. Please go ahead.
Michael Marcotte
executiveThanks, operator, and thanks to everyone for being with us today on this call to go over our Q2 results. Before we begin, I'd like to point people to our website at championiron.com, where the presentation we'll be using today is available under the Events and Presentations section. I'd also like to remind everyone that forward-looking statements will be made throughout this call. And if you'd like to read more about these, you can find them in our MD&A, which is also available on our website. With me today is our CEO, David Cataford, who will be giving the formal presentation. Also with me is Alexander Belleau, our COO; and Donald Tremblay, our CFO. Following David's formal presentation, we'll hold a Q&A session. With that, I'll hand things over to David.
David Cataford
executiveThanks, Michael, and thank you all for joining the call. It's a real pleasure to talk about the second quarter of fiscal year 2024. There are two key highlights from this quarter. First, we keep making progress in boosting output at our site — reaching approximately 30 days at full nameplate capacity across the operations. So operations are starting to settle down, and we can fine-tune the last pieces to get to full nameplate capacity. Second, we've managed to bring our costs down to about CAD 74 delivered in the vessel in Cecil. Last quarter we noted that we believed costs had topped out, and I'm glad to say that with better operations, our costs are beginning to decline. Turning to sustainability, producing tons matters, but producing clean tons matters greatly, and I'm also pleased to report that all the investment and effort we've put into health and safety has now enabled us to surpass 500,000 hours worked with no recordable injury. So there's been a strong focus on improving our safety results, and we're seeing those efforts now deliver returns.
David Cataford
executiveRegarding our community engagement efforts, I'm pleased to report that we have formed a relationship with a major First Nations festival in North America. This is located right in Mani-Utenam. Working alongside the Mani-Utenam community, we were glad to announce a partnership spanning 10 years with the festival, allowing us both to attend and to provide financial backing for their excellent event. We also observed our second year of the official holiday marking the National Day of truth and reconciliation. We held meaningful activities both at site and at the head office so we could deepen our understanding of our partners, and we brought in excellent speakers to talk about history as well as the promising future of collaborating with First Nation communities. In our view, it is crucial that we keep strengthening that relationship. As you are aware, permitting has grown increasingly complicated, and operating on lands that belong to traditional First Nation territories is likewise more challenging. So we are glad to have one of the strongest partnerships with First Nations, which enables us to pursue our growth strategy. Turning to the market, regarding the iron ore price, it has remained fairly steady over the last quarter.
David Cataford
executiveP62 and P65 have been pretty steady. The premium for the higher grade has narrowed to roughly 10% at present, and that is unusual when you look back at the historical data from when the index started. Three main factors can account for this. First, steel output from Europe hasn't completely bounced back. Crude steel production and P iron production are both around 10% under the prior year. Second, we haven't seen meaningful environmental restrictions coming from China. That tends to influence the premium, and steel margins in China have also been rather depressed, which usually leads to smaller premiums for high grade and smaller discounts for low grade. Our view is that this isn't a long-term situation. In the near term, though, it has pushed the premium down. Keep in mind the price remains quite healthy. It hovered between $125 and $130 per tonne over the quarter. On production, we hit a record 3.45 million tonnes in the quarter. A few things made us fall short of nameplate capacity in that period, chiefly a conveyor that suffered a fairly major failure, which we managed to fix, and that incident mostly impacted the Phase II concentrator for several days in the quarter.
David Cataford
executiveAs we noted in the highlights section, we're glad to say that we've been running at roughly nameplate capacity for a run rate of around 30 days. That means we've managed to resolve the majority of the hiccups tied to these various elements. Our approach — and what we've done from the start — is to be very conservative when it comes to maintenance, and to make sure that whenever a hiccup like that arises, we fix it permanently. We don't simply apply a small patch and then restart the operation. So it takes somewhat more time, but it lets us fix the issue and then move on to the next hiccup. That way, eventually, we'll be able to run a stable operation. On the operations side, I'd also like to draw your attention to another great record we hit during the quarter. We mentioned when we started up Phase I that there was a challenge in securing all the mining equipment, getting that equipment up and ready, and having workers able to operate it. We set a record of about 17 million tonnes moved at the mine in the past quarter.
David Cataford
executiveAt this point, we can see that every piece of mining equipment is operational. The operators are in place, and we're setting records for material moved at the mine. So we're quite pleased with how operations are ramping up. And with a more stable operation now, we'll be able to fine-tune the remaining elements — namely iron ore recovery and the maintenance side — so that we can reach stable nameplate capacity for the coming years and let us begin work on our debottlenecking projects to improve tonnage from Bloom Lake. On financial highlights, one note: roughly $155 million of EBITDA for the quarter. And second, as we said, the iron ore — sorry, the cash cost came down during the quarter. Turning to cash cost, the main factors that let us lower the cost are, first, volume. We've always said that a more stable and higher volume lets us dilute all of our fixed costs. We also saw operational improvements at the mine since we have our own operators. Obviously, we don't need as many contractors, and that lowers long-term costs.
David Cataford
executiveThe teams have also done an excellent job enhancing operations on the mining side. We’ve seen some gains in logistics costs too, which helped us reduce the cost from $81 to approximately $74 per ton. Regarding provisional price adjustments, the quarter was fairly smooth in that respect. Roughly 1.4 million tons on the water were expected to be delivered at $121 per tonne. We ended up selling them at $122. That means a very minor provisional price effect, a positive USD 1.6 million, which works out to about $0.50 per ton. At the end of September, we had anticipated a settlement price of roughly $126 per tonne for the 1.3 million tonnes on the water. Looking at current prices, they’ve ranged between $125 and $130. So if this trend holds, provisional price should be fairly smooth again next quarter. Turning to our realized price, our realized selling price, you’ll notice we achieved a slight premium over the P65 index during the quarter. That again reflects our ability to sell material at the higher premium.
David Cataford
executiveNaturally, that’s going to change down the road once we begin offering a 69% material within the coming few years. For the time being, though, we’re still able to achieve a premium relative to the P65. Turning to cash, our cash position rose by slightly more than $65 million in the quarter. Working capital moved favorably by roughly $40 million. We also produced a substantial amount of cash from operations. On the spending side, we put money into our operations, primarily the tailings dikes and the mine garage, all of which were planned items. And, as you’re aware, sustaining costs are usually elevated for us over the summer months, since that’s when all of our tailings work and our dike work gets done. What effect does that have on the balance sheet? As you can see, our balance sheet stands in a fairly strong position. We hold net cash of approximately $27 million. Additionally, we have around $170 million on the ground at Bloom Lake when you factor in the 1.6 million tonnes presently located at Bloom Lake. At this point, we genuinely feel that the logistics side appears balanced with our production.
David Cataford
executiveThe rail line has gotten better, though we're still in a difficult operating position when it comes to reducing the stockpiled inventory at the site. Our sense is that over the coming quarters we can begin drawing that material down, and we estimate it will take approximately 12 months to work through it once that process starts. So the material will remain at the site for a brief period. The encouraging part, I'd say, is that we believe the rail is now capable of moving all the tonnage being produced. That should give us a healthier balance between what we produce and what we sell. Looking at the results, the cash we generated along with our balance sheet, that's what enabled us to declare our fifth consecutive semiannual dividend of $0.10 per share. So we're very pleased to keep up our capital return strategy with shareholders. Turning to the market side, in terms of demand for our product and the higher-grade products, what's interesting is that for a few years now we've been saying we expect the market will need more green steel, and users will be able, or willing, to pay for this material down the road.
David Cataford
executiveContracts are beginning to get announced at this point. The segments where we monitor a greater number of these green steel premiums — autos and the auto supply sector, energy, and home appliances — appear to be the areas where we're observing the biggest premiums for green steel. Pricing goes from approximately USD 40 per tonne for material made with DRI all the way up to EUR 200 to EUR 300 per ton for certain users out of Europe. So we genuinely believe there is — or there are some folks who are prepared to pay those premiums for this kind of material. And if you consider the sort of consumers who want this, at the moment, it's usually users that aren't heavily affected by steel's price, but who can market their products afterward by saying it's a greener product. So we have companies such as BMW in mind, which can easily pass the premium along to customers in order to market this type of material. So these contracts are starting to come in, and I believe the timing is perfect, because as this market develops in just under 2 years, we'll be in a position to deliver our 69% material that ought to fetch a very high premium.
David Cataford
executiveAlso in the quarter, we announced our new 43-101. So keeping the definition drilling going at Bloom Lake mattered to us, so that we can get the most tonnes going forward. Our mine life remains 18 years, but what we reported last quarter is that our resources at Bloom Lake have improved a lot — measured and indicated resources went up by 40%, and inferred resources rose by 360%. The reason this matters now, rather than converting them into reserves, is to be sure we design the proper mine plans so those tons can be accessed down the road and we can potentially keep operating for decades beyond the current 18-year mine life. So we're very pleased with what we've achieved on the resources at Bloom Lake. On our growth projects, the feasibility studies remain on schedule for delivery in the months ahead. So I'm very happy with the progress and with the team's work, and we'll report to the market once the results are in for the Kami project and for the pelletizing facility in Point all.
David Cataford
executiveNow moving to the next growth project—the most advanced one, the RPF. We've got cumulative spending to date of just under $30 million, and we're continuing to advance the detailed engineering and ordering our long lead items to make sure we hit that calendar H2 2025 commissioning date. At this moment, we haven't yet taken a final investment decision. The 2 elements we're still working on are securing the energy block so we can operate this plant, and also finalizing the debt package with our current financial partners so we have all the cash in the bank to finalize the project. So things are moving ahead smoothly. We still expect a delivery time in line with what we've mentioned in the past, and we're just working to finalize those elements so we can come back to our board for a final investment decision. With that being said, I'd like to thank our team and all the supporting teams that have helped us achieve those results. I think they've done a fantastic job making sure we can produce clean tons and that we're able to eventually stabilize our operations so that we can start working on all of our debottlenecking project to continue creating value for our shareholders.
David Cataford
executiveWith that said, I'll hand things over to the Q&A part of the call.
Operator
operatorThank you. Ladies and gentlemen, the question-and-answer session will now begin. <<operator_script>> Our first question is from Orest Wowkodaw at Scotiabank.
Orest Wowkodaw
analystI have a couple of quick clarifications. Now that you've hit that full production rate, or full capacity I suppose, for 30 days here — should we be thinking that Q4, sorry, calendar Q4, is now a quarter at the full run rate? Or do you still expect some give and take around the ramp-up? And my second question concerns shipments. Did I get it right that you're not anticipating any inventory destocking in calendar Q4?
David Cataford
executiveYes. Thanks for that question, Orest. So, if you consider the rail capacity as it stands today — we've said before that with regard to both the port and the rail, those figures needed to get better so they could align with what's being produced at the site. Our sense is that at the port, most of the hiccups are now behind them, and the new stacker reclaimers are up and running. The car dumper is doing quite well. Every one of the sidings they installed was completed during the past quarter. They needed to wrap up the repair work. As you may recall, 8 to 10 months ago a significant electrical problem occurred that led to some downtime. They had worked around it over the past 10 months, but it still required fixing. So that consumed some time in the quarter. Now that all of it is behind us, though, we believe the port is capable of delivering all the tons we bring to it. Turning to the rail, the situation is somewhat different. They are ramping back up after the forest fires. There are also certain operational issues — they had to carry out major shutdowns on that rail, which they normally do in the summer, but those were postponed because of the forest fires, and their ramp-up on the rail is still being finalized.
David Cataford
executiveSo near term, during Q4, I don’t think we’ll manage to draw down tonnes from the 1.6 million stockpile located at site. After that, though, we really believe we can begin reducing those tonnes, and that ought to accelerate quite a bit once you get to next summer, next year. That’s roughly how we view the material there. And your other question was...
Orest Wowkodaw
analystI’d just like to ask whether you now expect this calendar quarter to be...
David Cataford
executiveLooking at operations today, we still have to make adjustments to the cover before we can hit full nameplate capacity. There are also a few startup-related items that remain and need resolving. I mean, nothing is showing up at the moment, but I'm certain we haven't eliminated 100% of the problems that could arise. So providing guidance on whether we can reach full nameplate this quarter is difficult. We know the mills are capable of handling it. We know the mining operations are running in line, but there may still be minor hiccups to address on the maintenance front so the site is robust enough to achieve full nameplate capacity.
Orest Wowkodaw
analystLet me just ask a quick follow-up here. Your remarks on rail capacity caught me a bit off guard, particularly since Rio Tinto had IOC guidance — and again, they're dealing with their own problems. So it surprises me that you aren't able to capitalize on some of that spare rail capacity when IOC isn't producing.
David Cataford
executiveThat caught me off guard too, and rest assured we are applying every bit of pressure needed so we can get those tonnes down. So — but my thinking aligns with yours, Orest.
Operator
operatorAlexander Pearce from BMO has the next question.
Alexander Pearce
analystDuring the quarter, cash costs are visibly declining, as you can see. Sustaining costs, meanwhile, ran perhaps slightly above what had been anticipated. It appears a substantial portion of sustaining CapEx landed in there. Therefore, I was wondering whether you might break out what that sustaining CapEx figure actually contained. My understanding is it came to roughly $60 million, and perhaps also what a more normalized level should look like on a quarter-by-quarter basis going forward?
David Cataford
executiveYes. Thank you. As you're aware, at the moment — and you'll likely see this for yourself in the next few weeks when you visit the site — we're putting up the extension to the garage. So that's one of the mining garages. That's one item that makes up part of sustaining, along with all the work being carried out on the tailings and the die. So that's usually only during the summer months. So we ought to see those sustaining costs decline as we move further into winter, but that's mainly what explains the — those 2 elements really account for the bulk of sustaining in the quarter.
Alexander Pearce
analystSo should we really be looking at the last few quarters, perhaps, for a more normalized level? After this?
David Cataford
executiveRight, it should — well, I mean, during the winter months it usually declines. Next summer, well, you'll see that rise too, because as you know, during the first years of the Phase II operation we were building out the new tailings facility and the waste dump. So there wasn't — our feasibility study had some higher investments at the start, and that ultimately drops to a much lower sustaining cost once we finalize those infrastructures.
Alexander Pearce
analystGreat. And then perhaps I could ask a second question as a follow-up. Of course, there are strikes happening in the Seaway nearby. None of that is affecting your operations at all, correct?
David Cataford
executiveThat's right.
Operator
operatorOur next question is from Gordon Lawson at Paradigm.
Gordon Lawson
analystMy main question was already addressed. So I just want to follow up regarding the feasibility studies. I've been noting in my writing that I expect both Kami and the pellet plant studies to come out by year-end. I'm wondering whether that target date is still viable.
David Cataford
executiveYes. So we are pushing to complete the primary study for us, and the one that matters most for us to deliver is really the Kami feasibility study. Will it come out at the end of this calendar year or at the start of January? So that will hinge on whether we can lock down all the different numbers by then, but it is coming as expected within that time frame. For the pellet plant feasibility, all the same thing, we are moving forward with the engineering firms. The one element that makes it a little bit more complex is how do we handle the whole energy portion. It is the first time in Quebec that energy is not sort of automatic. So we are working with the engineering firms to be able to have something they are comfortable to sign and make sure that we have the right report to be able to get out to the market and deliver to the market. So that is the one element that might have a little issue on the timing mainly for the pellet plant. But the one that we are really focusing to finalize is the Kami feasibility side.
Gordon Lawson
analystAll right, and to build on that point. Could you go into more detail about the kinds of options we should anticipate with Kami, since there's discussion around the DR fees and the like? I'm just curious what your review is aiming to find here?
David Cataford
executiveCorrect, Kami will be DR grade. That reflects all the testing we've completed and verified. For us, that's also the reason this has taken longer than a standard feasibility study update — we want to be certain we're bringing the right product to market. Our belief is that this DR material will command a fairly strong premium. We haven't seen large-scale projects being announced. I mean, aside from Valley, which said they'll be producing a whole lot more, but we are seeing quality out of Brazil decline. So we want to be sure we're a unique kind of niche product — the highest-grade DR-grade material available in the market. That's what we're aiming for with the Kami project.
Gordon Lawson
analystThat also applies to what comes out of the pellet plant. It is DR grade.
David Cataford
executiveRight, so that facility would receive DR-grade feed and turn it into pellets, meaning the output would be DR pellet — that's right.
Operator
operatorStefan Ioannou from Cormark Securities is up next with a question.
Stefan Ioannou
analystPerhaps returning to the rail topic, just some housekeeping. David, I believe you said it would take roughly 12 months to draw down or bring inventory to a more normal level. Should we view that as 12 months starting now, or 12 months after calendar Q4, when you actually begin reducing it?
David Cataford
executiveYeah, you really do need to look at it. Well, I mean — I don't own a crystal ball, so everything hinges on the pace at which the materials ramp up. But being realistic, it would be — bringing down more tons is harder during the winter months, as you know. But once destocking begins, that's the point when we think it's going to take about a year to bring the material down... If it happens faster, we'll be very happy, and we'll apply pressure for it to go faster. But that — under the current sort of scenario, that's what I would expect.
Stefan Ioannou
analystAnd turning to the study that's underway for the direct feed at Bloom Lake — you said commissioning is targeted for the second half of 2025. But clearly that hinges above all on a sanctioning decision, and that decision itself partly rests on power, or a power agreement. Could you give us some visibility into where that power generation stands, and what we should expect on that front in terms of sanctioning — the timing of sanctioning?
David Cataford
executiveYes. So once every piece is in place, we can bring it to the Board. As you can imagine, we've already given the green light to more than $60 million in spending on this project. So I think it's fairly evident that, barring some significant shift, the project would move forward, subject to power allocation and the financing package with our partners. What we're able to say — and if you look at the public press coming out of Quebec — is that 11 companies have been told by the government that they have their power. It's simply not public information yet. So once that list is made public, we should be in a position to update the market regarding the time frame for our project.
Operator
operatorOur following question is from Craig Hutchison at TD.
Craig Hutchison
analystYou brought up a pretty broad spread on pricing between where the market sits today and DRI material. I believe you mentioned $40 up to 200 — I think that was EUR 200. Could you talk a bit about what your marketing approach is for future offtake of the DR material? And what sort of interest are you getting from potential uptake partners at this point?
David Cataford
executiveYes. So clearly, we're going to focus on those who sell it at 200 or 300 years more. And when you consider the broad range of varieties, since not everyone defines green or greener steel the same way. If you look at that $40 mark, that's more people who mentioned they will produce some steel with HBI. So there are different paths to get there. What we're aiming at is markets that want to deliver steel below 1 ton of CO2 per ton of steel. That's where we see the current premiums appear to sit, and that's why we're targeting much more Europe, Middle East and Japan, when we look at our potential clients to sell this type of material. So you are correct, it's a wide range. It's starting now. So it's the beginning of something. We do know Fast Markets is working on delivering an index for this type of material. Now again, are we going to be on that index because we'll be that niche material that is at the higher grade of the DR, which will allow our clients to buy some lower-grade material. So I think to start, it's probably going to be more a case-by-case element, and we'll be able to follow that index to see if that makes sense for us in the future.
David Cataford
executiveAlso, will it work much like the P65 we have now, where we sell off that index at a premium? Or is this simply a different pricing setup that we're still talking through with all of our clients over there?
Craig Hutchison
analystAll right, so at this point those markets are, I suppose, quite small right now — those really niche products. Is that a fair way to put it when we're talking about total demand in tonnes?
David Cataford
executiveI'd say maybe at this point, but if you look at 2024 and 2025, once all of those electric arc furnaces are delivered, we'll find ourselves in a different territory, because at the moment I agree with what you're saying, even though we are seeing material that previously qualified for DR grade has declined. So we've seen less material available that fits that quality. But I genuinely believe that as those tons get delivered, that's the point when I see a potential uptick in demand for that material.
Operator
operatorThe next question is from Lucas Pipes at B. Riley Securities.
Lucas Pipes
analystStarting with the strategic angle: you hold a collection of growth projects, which is fairly unusual. I'm curious how much thought is going into partnerships, JVs, and similar arrangements. And if those are regional in nature, where would interest be strongest? What's your own appetite? I'd welcome your thinking on all of that.
David Cataford
executiveCould you put that another way for me? Sorry, I didn’t quite get it.
Lucas Pipes
analystYeah, let me step back and take a broader question. You've got a portfolio of growth projects, and steelmakers globally are clearly examining decarbonization opportunities. I can see there's interest from certain steelmakers in taking part in some of your projects. So I wanted to get a sense of your appetite for joint ventures and at what stage that could make sense.
David Cataford
executiveYes. So, regarding how we’ve pursued growth, the pieces I believe we ought to handle ourselves—since they’ll generate substantial value for our shareholders—are the DRPF at Bloom Lake and the debottlenecking of BlueLine. Those are projects and capital outlays that, in my view, will be highly accretive for our shareholders and suitable for a company of our size. When we consider projects such as any or the pellet plant—well, on the pellet plant, we’ve already stated that we’ll be—we are conducting the study with a large deal manufacturer, because they do have interest in this type of material, and we’ve had others come to us and say, hey, if things don’t work out with that group, we would definitely like to step in. So we do believe there is interest in taking the joint venture route, and the same applies to Kami. We believe Kami is an excellent project for our shareholders, but perhaps somewhat large relative to where our company stands today. So we believe the right approach would be with a strategic partner.
David Cataford
executiveAnd once more, there's been a good deal of interest in that project too. So how we think about our growth is this: anything we consider digestible — things like the DR pellet feed projects and debottlenecking — we can handle ourselves, while for the bigger projects, we'll be exploring joint ventures.
Lucas Pipes
analystAnd here's a follow-up in that same area. There are plenty of things to weigh when it comes to consolidation within the North American steel industry. Has any of that shifted your discussions, whether viewed strategically — as you just brought up — or commercially? I'd welcome your perspective on whether consolidation in the North American steel industry carries any knock-on effect.
David Cataford
executiveYes. Thanks for that question. At the moment, it hasn't really had an impact, since we aren't selling those to the U.S. right now. Once we reach the DR pellet feed materials, opportunities will emerge there. So we'll watch how that develops. But the bulk of the demand we've been receiving really comes from Europe, the Middle East and Japan. So we do believe that's where the tonnes can be delivered initially, and we'll watch how the U.S. market and Canadian market develop to see whether opportunities exist there. But that consolidation hasn't really affected our plans for the short term.
Lucas Pipes
analystThank you so much for your color to you and the team, and continued best of luck.
Operator
operator<<operator_script>> Brian MacArthur from Raymond James has the next question.
Brian MacArthur
analystI want to ask a bit more about how you might structure contracts around your 69 material. Like we talked about before, this market could expand really fast. There's a broad spread on pricing. Are you planning to sign long-term agreements? My sense is that's how many customers prefer to operate. Or will you lean toward shorter deals based on volume? Would you move to a base price plus an escalation clause? Have you worked through that yet? And how do you expect that to play out, given how much growth this industry could potentially see?
David Cataford
executiveYes. What matters to us at this point is that we're holding talks with the groups that make the most sense to us. One is on shipping, since the very last thing we want is a great price contract that then becomes complicated when it comes to getting the tonnes in, and we end up getting hit by shipping costs. So for us, it's important to see where we can deliver 180,000 tonne vessels and get the full benefit from that kind of material. Second, we don't want to place all of our tons in one spot, because obviously we see considerable risk in doing that. So we want it spread across a few regions. And we want to be sure there are larger companies that can lock in the right contracts for green steel, because we feel those are the ones able to pay the highest amount for our material. So when we look at the strategy at present, it's really about identifying the right locations on the logistics side, making sure the clients can benefit from the premium, and then sitting down to discuss the potential price. I'd say at this point, half of the potentials are actual clients and the other half would be new clients.
David Cataford
executiveThat's how we've been reading the market at this point, but where does it stop? Since this is a new product, we'll be locking in volume. Still, I believe the pricing approach will need some flexibility, and we'll likely target an initial 3-year perspective on pricing—not a set price, but rather a formula fixed for those first 3 years, and then we'll watch how it develops going forward.
Operator
operatorThat brings us to the end of the question-and-answer portion. You may go ahead.
David Cataford
executiveWell, I appreciate all of you joining the call today. It's a real pleasure to talk through the Q2 fiscal year 2024 results. I'm looking forward to our discussion next quarter. That one should be exciting, since that's when results from our feasibility studies will begin coming in, and we'll keep making our operations better. So once more, thank you to every shareholder for your backing, and we'll keep working hard to maximize the value of your shareholding. Many thanks, and we'll talk soon. Have a great day.
Operator
operatorThat wraps up today's conference call, everyone. We appreciate your taking part, and we'd ask you to disconnect your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.