Champion Iron Limited (CIA) Earnings Call Transcript & Summary

January 31, 2024

Australian Securities Exchange AU Materials Metals and Mining earnings 49 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and welcome to the Champion Third Quarter Results for Financial Year 2024 conference call. Right now, every line has been placed in listen-only mode. After the presentation, we'll hold a question-and-answer session <<operator_script>>. Today is Wednesday, January 31, 2024, and this call is being recorded. I'll now hand the conference over to Michael Marcotte, VP, Investor Relations. Please go ahead.

Michael Marcotte

executive
#2

Thanks, operator. And thanks to everyone for being with us today as we go over the Q3 results for financial 2024. Before we begin, I'd like to point people to our website, where the presentation we'll be using for this session is available under the investors tab and Events and Presentation. We will also be making forward-looking statements during this call. And for more information on forward-looking statements, you can also look at our MD&A, also available on our Web site. With me here today is our CEO, David Cataford; our COO, Alexandre Belleau; our CFO, Donald Tremblay. Our CEO, David, will make the formal portion of this call and then we will follow-up with Q&A as well towards the end. With that, I'll turn it over to David.

David Cataford

executive
#3

Hello, everyone, and thank you for joining us today. Now, looking at the highlights for the third quarter, the standout item, in my view, is that we succeeded in exceeding our nameplate capacity, delivering approximately 4 million tonnes over the quarter. That is a really significant accomplishment, and we will walk through what it means for us. Somewhat disappointing has been the rail operator's performance, which permitted us to sell only about 3.2 million tonnes. We will get into that subject in more detail later in this call. As we have consistently stated, smooth operation of those plants also gives us room to adjust the recovery circuit and lift our iron recovery. So another bright spot this quarter is that we reached 81.4% iron recovery, just below our 82% target. Still, we are confident we can get there as we keep running in a stable fashion and fine-tune that recovery circuit — and we now know the plant is capable of delivering beyond nameplate capacity. What does that imply for our cash costs?

David Cataford

executive
#4

Cash costs were moving the right way, from approximately $74 down to $73. So we've achieved a modest cost improvement, and we'll be able to walk through the various components involved in that. So we're quite pleased with the highlights we delivered in the quarter. Another thing that matters when you achieve record production is making sure those record tonnes are also clean tonnes. Looking at the quarter, we passed 500,000 hours worked without a recordable injury, and we also produced those tonnes with no significant environmental issues. So we're very proud to have turned out 4 million clean tonnes in the quarter. On the community side, I'd say it was also a very big quarter for the work we've done. We kept strengthening our partnership with the First Nations, delivering on various projects we're carrying out within the community. So we're very proud of what we've accomplished together with our partners from Uashat Mani-utenam. We also received a visit at Bloom Lake from the Minister of Natural Resources and Forrest, where we discussed our operations and how essential our material is for decarbonizing the steel industry and decarbonizing the world.

David Cataford

executive
#5

Now, back to operations. You likely noticed that during the quarter, P62 and P65 both rose modestly — roughly 12.5% and 11%, respectively. And we were able to capture the full benefit of that price increase during the quarter. The margin on P65 remains quite weak relative to historical levels, which again reflects soft steel production in Europe and insufficient environmental controls in China's steel sector. That said, the iron ore price has held up reasonably well this quarter, though higher shipping costs have offset some of that — partly due to what's happening in the Red Sea and partly from a rise in the C3 index, although we've seen that ease somewhat since. Turning to the disappointing part of the quarter — the rail operator — that area was more complicated this quarter. We're collaborating very closely with the rail operator to secure the contractual tonnes we agreed upon, but it has proven difficult and has somewhat delayed our expectation of when we can reduce our stockpile.

David Cataford

executive
#6

During the quarter, our stockpile at site grew by 800,000 tonnes, which puts us at roughly 2.4 million tonnes today. One encouraging piece is that Bloom Lake has given us substantial room to stockpile material, though this has driven up our site costs and added a great deal of complexity for us. So we keep working very closely with the rail operator so that the agreed tonnage can move down the rail. Turning to our operations, looking at the quarter's highlights, not only did we produce 4 million tonnes, but we also raised the material mined and moved at site. Our strip ratio went up, and despite producing at that high level, we have kept the mine healthy by moving all the waste tonnes we needed to move. We still carry a small backlog from the start of the ramp up, which we will be able to address over the coming quarters, but the mine is currently in a very healthy position. Another very important point is that even with record production during the quarter, every tonne we produced has been of high grade quality, which again demonstrates that Bloom Lake material is extremely good at helping our clients produce more and decarbonize, and we will be able to move through the next steps of our decarbonization portion.

David Cataford

executive
#7

How should we interpret that from a financial perspective? Earnings per share came in at roughly $0.24, with EBITDA near $250 million. That made for a strong quarter, giving us the cash generation needed to put ourselves in a solid position for our growth initiatives. On the cost side, we observed a modest downward trend, though they remain somewhat above the level we'd prefer. The quarter's key points center on stronger sales volumes. However, since we needed to move a substantial number of tonnes, we had to depend on certain contractors at the mine to accomplish that, which added somewhat to costs, and we also entered the winter season, when snow removal got underway and other factors consume somewhat more energy at site. Even so, we remain confident that once we can produce and ship that same quantity of tonnes while enhancing operations at Bloom Lake, we'll manage to get our costs under the $70 threshold. Regarding the provisional price adjustment: as you're aware, there's typically some noise in any given quarter. This quarter's adjustment was positive. Roughly 1.3 million tonnes were on the water when last quarter ended, and for that we had projected a price of approximately $126 per tonne.

David Cataford

executive
#8

We ended up realizing roughly $135, which resulted in $12.3 million of positive provincial price adjustment. Turning to the next quarter, we have approximately 1.8 million tonnes that remain subject to a provisional price, and the expected price at quarter-end was around $150 per tonne. Looking at our average realized selling price, it came in a bit above the P65 index because of timing elements during the quarter. That said, our freight and demurrage costs did rise on account of logistics issues, primarily rail, along with the higher C3 impact we mentioned a little earlier stemming from the Red Sea disruptions. Overall, as we noted, this has come down slightly in January. Going back to last quarter, that gave us a net realized price of about CAD157. What does that mean for our cash position? It let us not only pay our dividend but also invest in the mine and in our CapEx projects for the growth initiatives, and it enabled us to grow cash by just over $70 million during the quarter.

David Cataford

executive
#9

Looking at our balance sheet, we're in a really strong position for the growth steps ahead. There's approximately $400 million sitting in cash at the bank. When you factor in the inventory we hold at site, net of logistics and freight costs, that comes to a value of roughly $200 million after logistics and taxes at site — which brings our cash balance to about $600 million. So once more, we're very well positioned to keep pursuing our growth initiatives and create additional value for shareholders. You likely noticed during the last quarter that we kept working alongside our excellent partners at the different banks within our loan facility syndicate. We succeeded in obtaining a new term loan of approximately $230 million US, which let us pay down the revolving facility and leaves a full $400 million revolving credit facility accessible — again putting us in a very good position to advance our growth initiatives. Turning to the past quarter, regarding why we'd want to produce higher grade iron ore and why we might potentially take an FID on producing 69% iron at Bloom Lake: one of the key highlights during the quarter is the fact that at COP 28, we saw many governments acknowledge that to decarbonize, you can't focus only on electric vehicles — you also have to address various elements, and one of those is steel.

David Cataford

executive
#10

And multiple nations — Canada, Germany, the UK and the US among them — have each committed to buying green steel for building public infrastructure. The key benefit here is that this is somewhat less sensitive to price. When a government commits to using green steel, that steel becomes necessary for completing its infrastructure projects. So when you add this to all the agreements we saw last year between steel buyers — whether for car manufacturing or for various other businesses that need green steel — and then layer on these governments' commitments to purchase green steel for public infrastructure, everything we see is pointing the right way toward a healthy premium for green steel as well as for the inputs that go into it. The United States and Latin America have also announced steps to bring in a mechanism comparable to Europe's in terms of CBAM, the Carbon Border Adjustment Mechanism. So once again, this points in the same direction: producing low CO2 intensity material, as we do at Bloom Lake, matters, and so does being able to take part in a lower CO2 steel environment.

David Cataford

executive
#11

So once more, we're headed in the right direction to generate meaningful premiums for the higher-grade material that decarbonizes the world. What we witnessed during the most recent quarter left us very impressed and proud to have collaborated with various governments, demonstrating just how vital high-grade iron ore is for decarbonizing the world and also our own country here in Canada. This has positioned not only Quebec but Newfoundland as leaders when it comes to recognizing high-grade iron ore as critical and strategic. As a result, we now appear on the critical minerals list in Quebec as well as Newfoundland, which lets us highlight the significance we hold for different governments in delivering high-grade iron ore projects. It has also enabled us, together with Hydro Quebec and the Quebec Government, to be one of the only companies granted access to hydroelectric power blocks so we can carry out our Phase 2 modification to raise the grade to 69%. So turning to this project, we had indicated over previous quarters that specific elements needed to be accomplished before we could reach a final investment decision on the number two plant modification to lift it to 69%.

David Cataford

executive
#12

Looking at this project, the investment needed was approximately CAD470 million for us to take half of our tonnes and upgrade them to 69%, which would allow us to enter the electric arc furnace market as well as the green steel market. By having the power and also expanding our credit facility, ensuring our balance sheet is strong, and enabling us to carry out the project, we received the final investment decision from our Board yesterday and are now on track to deliver the project by the second half of calendar 2025. This will position Bloom Lake to produce one of the highest grade materials globally on half of our tonnes and to enter the DR market. As for other initiatives we are working on, we continue to advance our feasibility study for a Pelletizing Facility in Pointe Noire and also continue working with our partners that we have invested in binding solutions to produce a coal bonded pellet. We have now reached the pilot plant phase, where we are producing material that can be shipped to our various clients so they can test it in their steel making process.

David Cataford

executive
#13

That said, we're quite bullish about where the coal-bonded pelletizing work goes next. And as soon as additional data comes in from our customers regarding how it performed in their steel plants—or rather their steel capacity—we'll be in a position to return to the market and share the next steps on this project. Moving on—another highlight from last quarter was the completion of a feasibility study for the Kami Project. It's a substantial resource, located only a few kilometers from Bloom Lake, in Labrador—so within Newfoundland—in a jurisdiction that's highly mining friendly and has a lengthy record of backing iron ore operations. Looking at the study's highlights, it points to roughly 9 million tonnes per year of DR-grade pellet feed, above 67.5% Fe, with a 25-year mine life at present. The equipment involved is comparable to what we run at Bloom Lake, so it's proven technology capable of delivering this output. And another advantage is that we've been able to design a project whose CO2 intensity would be even lower than Bloom Lake's, which makes it a leader when it comes to CO2 intensity for DR-grade material.

David Cataford

executive
#14

Now looking at the economics: the project's initial CapEx comes in at just under roughly $3 billion, and the C1 cash cost for producing DR grade material would be below $60 delivered in the vessel at Pointe Noire. So the operating cost is very strong. And the CapEx needed to build this project offers a solid indication of what construction costs look like in a top tier jurisdiction. Once again, this highlights the significant advantages we enjoy at Bloom Lake and lets us keep a solid potential project in the pipeline capable of bringing additional DR grade to the market. The upcoming steps for this project involve continuing to work with parties that might need this material and would be interested in partnering in order to assess what comes next. So with our feasibility study now complete, we can carry on discussions with the different groups keen on partnering in this project, and once a potential partnership is secured, return to the market and explain the following steps.

David Cataford

executive
#15

When we consider how this project sits relative to high grade iron ore, or iron ore of DRI quality, the capital intensity comes in at approximately $331 per tonne. What I mean is, we have just completed a feasibility study during a period when inflation was at its peak. Still, I believe it mattered to use conservative figures that show what building a project would cost today, and to eventually be able to examine the various ways we might improve the project's economics. Overall, then, I'd call it an excellent quarter, one in which we achieved record output of clean tonnes at Bloom Lake, which lets us look ahead to the next stages of our growth initiatives. I think this puts us in a very strong position regarding everything within our control, and lets us work on the following steps, chiefly on the logistics front, so we can ensure that what happens at Bloom Lake aligns with our efforts to deliver all of these excellent tonnes to our customers going forward. So thank you all for joining the call. We will now hand things over to the Q&A portion.

Operator

operator
#16

Our initial question is from Alexander Pearce with BMO Capital Market.

Alexander Pearce

analyst
#17

David, turning to Kami for a moment, could you perhaps help us understand what premium you've built in for that project relative to the 65% iron ore price quote, and also how that product might differ right from the start compared with the DRPF project at Bloom Lake?

David Cataford

executive
#18

Thus, whenever we examine the premium applied for that, and whenever we examine the total price, the premium we applied came to roughly $34 per tonne. That figure was below what various independent reports indicated that premium would be, since one must bear in mind that this premium was assumed several years into the future, with a 25 year kind of perspective, and factoring in all the fresh output from green electric arc furnaces that will be arriving on the market, together with the possible supply gap that will exist. So that is the figure that was applied. A modest freight benefit is factored in too, relative to where things stand at present, because when considering the possible market for this, we are aiming far more at Europe, Middle East, US and Canada for its use, while also potentially continuing to ship tonnes to our excellent partners in Japan. That is how we construct the premium and the freight component.

Alexander Pearce

analyst
#19

You also said you're potentially on the lookout for further optimization opportunities there, but clearly the IRR is fairly low and the CapEx figure is pretty high. So perhaps, given those, the numbers we can see in the study right now — is the correct way to view this as a longer-term option that could dovetail with Bloom Lake further down the road, say, if final oil prices stay elevated? And then maybe the second part of this: how confident are you that rail capacity can ultimately reach a point where it can genuinely support those extra tonnes?

David Cataford

executive
#20

If you look at the study, I think the key takeaway is just how undervalued we are at Bloom Lake. When you consider the cost of building a new project for this DR grade type of material in a top tier jurisdiction, it's fairly expensive. That really shines a light on what we have at Bloom Lake, and it shows how important it is that we not only deliver this DRPF project for Phase 1, but eventually look at making 100% of Bloom Lake DR grade material. It also underscores the importance of working on the debottlenecking projects at Bloom Lake, because we do feel that's the portion that's most accretive for our shareholders. That said, looking ahead, if the market requires DR grade material, where are you going to get it from? The important thing for us in getting the study that came out is to be able to, one, position a very conservative price of CapEx to be able to build the project and then the economics. Well, obviously, if you use the three year trailing average for the iron ore price, you get an NPV over $2 billion.

David Cataford

executive
#21

I mean, the economics work. If you look at the trailing price—though as you know, most people tend to expect iron ore prices to fall going forward, since everyone assumes it's very easy to launch new projects and that those projects cost nothing to develop. In that kind of environment, clearly, the economics of the Kami Project aren't all that strong. Under that scenario, it makes Kami a solid option for later on. Should the market end up requiring a substantial amount of this DR grade type material down the road, well, then we could see—and governments are now committing to using green steel. Once that begins to be reflected in the premium price, we'll see where it settles, and that could put the economics of a project like Kami in a better position. When you have factors such as C-band, and then if the US and Latin America follow the same path as well, well then you've got Carbon Border Adjustment Mechanisms that likewise encourage the adoption of low CO2 intensity DR grade material. So where this ends up is something we'll be able to assess over the coming years. But I think what mattered for us was to present a conservative figure that demonstrates how significant Bloom Lake is within the current scope of our company and makes it a good option going forward.

David Cataford

executive
#22

Now looking at rail operations — that line, as you're aware, has a theoretical capacity of roughly 80 million tonnes annually. So rail isn't the problem; what really matters is the operation itself, and we have to keep collaborating with the rail operator to ramp up those tonnes, so that every ton we produce at Bloom Lake, along with the stockpile, can get down to our port and in time reach our clients.

Operator

operator
#23

The question that follows is from Orest Wowkodaw of Scotiabank.

Orest Wowkodaw

analyst
#24

Morning, and congratulations on getting the Phase 2 ramp up finished. My question is about how quickly we should expect inventory destocking to play out. The inventory figure has obviously climbed to 2.4 million tonnes now. Assuming you're running at full nameplate from here on, could you give us some guidance on how much capacity or rail capability exists to draw that inventory down? And it seems to me that with a number that high, it will probably now take longer than a couple of quarters. What should we expect on that front?

David Cataford

executive
#25

Perhaps just to frame where the run rate stands at Bloom Lake — we achieved a record of 4 million tonnes in the quarter, and that surfaced various things at the site that have to be adjusted so we can ultimately reach that level sustainably. So please don’t assume every quarter will deliver that figure, because — just as an example — all of our shutdowns were designed around passing a certain tonnage through our mills. But by reaching the kind of numbers we did last quarter, it has become clear that some equipment is wearing out somewhat earlier than the major shutdown. So we have to focus on the maintenance schedule and on the different pieces of equipment we have, to ensure we can achieve those kinds of numbers sustainably. That was our perspective on the debottlenecking project. As we have said for some time, we push the machine and then pull back a little, repair what needs repairing, and then take another possible step change down the road. So with that said, in the coming quarter we should not assume we will necessarily produce 4 million tonnes.

David Cataford

executive
#26

And as we collaborate with the rail operator so that the contractual tonnes we hold can be passed down, we genuinely believe we’ll be able to destock that inventory over the quarters ahead. Yet, to the point you raised, clearly the results we delivered in this quarter—adding 800,000 tonnes onto our stockpiles—have pushed out the timeline within which we think those tons can be brought down. That is creating significant problems for us. So costs at site have risen, and there are more complications for us as well; the upside is that we do have the room to carry it out, but even so, our primary focus is really on getting that rail aligned so that our tonnes can be passed down.

Orest Wowkodaw

analyst
#27

Could you give us a bit more detail? For instance, should we expect any inventory destocking during this March quarter, since it's winter, or is that more likely to begin in the June quarter and then, I'm not sure, stretch across, I'd assume, a number of quarters?

David Cataford

executive
#28

I wouldn't say that — what I mean is, this quarter we've added 800,000 tonnes of material. My expectation isn't that we'll destock during this quarter. We would have to destock this quarter, but sadly I don't see that happening given the difficulties that exist over the winter period and the fact that we only succeeded in reducing 3.2 million tonnes in the prior quarter. So my expectation is that it will be nearer to the summer when we begin drawing down the stockpile.

Orest Wowkodaw

analyst
#29

And maybe there's a different way to think about this: as we move into the later portion of the year, what would you consider a realistic sales figure — both in terms of volume and in terms of what the rail can handle relative to your total volume? Is it 4 million tonnes, or is it a bit more than that? I'm simply trying to get a handle on the near-term constraints on sales volume.

David Cataford

executive
#30

So we're collaborating with the rail operator to secure that, since that's really the sole bottleneck we face at present for moving those tonnes to market. We know there's demand for them, and we know we're able to produce them. So that's the only piece still missing. I wish I could share more detail with you, Orest. But frankly, this represents the greatest risk for our company, and we're working — doing all we can to bring that rail service up to the level it ought to be.

Operator

operator
#31

Dalton Baretto with Canaccord has the next question.

Dalton Baretto

analyst
#32

I'd like to continue along that same line of inquiry. It really is such a pity that you're dealing with these logistics problems amid this pricing climate, especially with your operations performing so well. Just one follow-up on that point. You now hold 2.4 million tonnes of finished goods inventory. How much additional capacity do you have? In other words, if another rail disruption occurs, is there a situation in which we might see you needing to reduce production rates?

David Cataford

executive
#33

I mean, you've likely got one of the most inventive operations teams around, and we usually discover methods to get things working. So that same approach will keep going. It's hard to hand you a figure for what's available. Honestly, our stance is that at site we should never hold more than 100,000 to 200,000 tonnes of inventory. So this is an unusual situation. But as you've watched us over the past 10 years, we kind of always attempt to find a way, though it's costing us obviously and it's been very, very complicated. But I do expect that if we keep producing, we'll be able to work with the rail operator to bring those tonnes down and therefore not need to use additional stockpiling capacity at Bloom Lake. There is space, but the last thing we want is to keep increasing and seeing that stockpile at site.

Dalton Baretto

analyst
#34

And then perhaps pivoting to Kami, with a few questions on that. I'm just curious—now that the figures are available, how does that stack up against a possible Bloom Lake Phase 3 scenario?

David Cataford

executive
#35

That's hard to respond to directly, since our Phase 3 work at Bloom Lake isn't as far along. We're actively progressing it. For Bloom Lake, the debottlenecking project is really where our attention sits. Looking at the economics of debottlenecking Bloom Lake, they're clearly superior to those of a greenfield project such as Kami, so that will be our primary focus. Now that the CapEx figures for Kami are in hand, we will certainly keep advancing a possible Phase 3 at Bloom Lake. Still, the best near-term approach at Bloom Lake is, in my view, to bring the existing plants up to their full potential.

Dalton Baretto

analyst
#36

So from what you've said up to now, it seems that with these figures in hand, you aren't in much of a hurry to push Kami ahead. When you consider how the financing might be structured and the possibility of a JV, how quickly are you proceeding on that front, and what type of partner do you have in mind — what do you want them to bring to the table?

David Cataford

executive
#37

We’re after a strong partner. In our view, finding a strong partner means it has to be somebody who requires those tonnes. So realistically, we don’t need — well, it isn’t that a financial partner is unnecessary, but teaming up with a purely financial partner offers us no major benefit. What matters most to us is truly locating someone who required the tonnes. So it will be a big steelmaker that intends to make green steel, that regards making steel with low CO2 intensity as important, steel that originates from low CO2 intensity and in a top tier jurisdiction so it can supply either governments or the automotive sector so they can use this material. So that is the kind of partner we are seeking, and those are the kinds of groups that have come to us previously to explore whether they could partner on Kami. So those are the talks we will be able to keep pursuing. How soon will that occur? Well, we have already been talking with various groups about this for some time, and there are some interested parties.

David Cataford

executive
#38

So we'll see how long it might potentially take to firm something up with one of these partners. But the partner portion is definitely a priority for us, because even if we're not necessarily pressing go on the project, I think where we can create the most value for our shareholders is by derisking these projects as much as we can. So that way when we do potentially take a decision, we're much closer to the end goal when we actually pull the trigger. So for us, we want to keep monitoring where the DR premium is going, where all this sort of steel portion and steel premiums for green steel is going. And if we can advance permitting, we can derisk certain aspects of the project, definitely something that we'll be looking into, because we do feel that we should advance it to a certain level without spending too much shareholder money, but making sure that we can derisk the project and be closer to that decision time.

Operator

operator
#39

Our following question is from Lucas Pipes of B. Riley.

Lucas Pipes

analyst
#40

David, I'd like to begin by returning to the rail side, and I'd appreciate some added detail about what precisely is delaying the destocking right now. It feels as though several factors have shifted across the last 9 to 12 months, which has produced this buildup in inventory. But I'd really value hearing what the bottleneck has been and what the rail operator is telling you at present. That's where I'll start.

David Cataford

executive
#41

It's somewhat difficult to provide additional detail on this, Lucas. The situation is that they aren't delivering the contract, so it's essentially as straightforward as that, and we want to ensure they're capable of doing so. We provided them with substantial funds in advance so they could prepare, and delivery isn't happening, so we need to make sure we can bring that into line. At this point, that's essentially all the detail I'm able to share.

Lucas Pipes

analyst
#42

Is it a lack of locomotives, a lack of people, or track that isn't being maintained? What's driving this?

David Cataford

executive
#43

That's their business. In practical terms, we got everything set up so it ought to be delivering at this point, and it isn't delivering. So we're…

Lucas Pipes

analyst
#44

Are they putting money in—are they actually getting—I mean, for you to destock, those decisions have to be made by them right now. Are you seeing any action from them?

David Cataford

executive
#45

I mean, it's a little hard to respond to every one of your questions there, Lucas. I mean, one factor you've got to keep in mind is that this represents the largest exposure in our business, and we'll do whatever it takes to ensure we can bring those tonnes down. But when it comes to digging deeper into how they run things — how many locals they employ, that sort of thing — it's a bit difficult to go into that area. I think the key point is, once more, over the long term, that rail line's capacity stands at 80 million tonnes. And this marks the first occasion it must run at those levels, and they are currently ramping up. And we want to ensure we secure what we signed for when it comes to logistics.

Lucas Pipes

analyst
#46

So what legal options do you have? This is costing you significantly through higher inventory costs, capital is tied up, and you're missing out on a big market opportunity. What legal mechanisms exist to compel them to honor the terms of the contract?

David Cataford

executive
#47

The agreement is signed, and at this point we're collaborating with the rail operator to bring it into operation. That's about as much detail as I'm able to share with you, Lucas.

Lucas Pipes

analyst
#48

Let me give you one more in that vein, and I'll move to a different subject. I get that you've got storage capacity to build up reserves, but a substantial amount of capital is being tied up here. And does there come a level of inventories where you'd say, look, that's sufficient, there's no reason to stockpile iron ore for another 18 months or anything like that? At what stage do you get to the point of saying we need to reduce output?

David Cataford

executive
#49

Each ton we fail to generate is lost forever—there’s no way to get it back afterward. So at this point, when we compare what it costs us to stockpile against the liquidity we currently have available, stockpiling still makes sense. Our belief is that within a short span we’ll be capable of moving all the tonnage we’re producing down there, relative to the real rail capacity. How much additional tonnage might we stockpile before we’d essentially decide to stop pushing the machine? That’s somewhat difficult to answer, because once again, any time we skip producing a ton, that ton can never be produced again. So as things stand right now, pushing Bloom Lake still makes sense for us, and ensuring we produce everything we possibly can. And we’re hopeful that the logistics side will get sorted out before long, so we can move all those tons down there.

Lucas Pipes

analyst
#50

So I suppose those tonnes could be generated afterward, right—if they're lying on the ground or held in stock, that trade-off isn't quite clear to me…

David Cataford

executive
#51

What I mean is this: if you slow the pace at those plants, you won't later be able to push output beyond nameplate capacity. So each tonne you forgo by running slower is gone for good — there's no catching up afterward. Given that, from our standpoint it still adds up: considering how we see the iron ore price and our costs, the margins available to us, it still adds up to keep producing those tonnes now.

Lucas Pipes

analyst
#52

So to put it another way, you'd anticipate that rail bottleneck getting cleared up before long as well?

David Cataford

executive
#53

I figured it would be settled by now. So it's certainly a matter I anticipate being taken care of before long, yes.

Lucas Pipes

analyst
#54

David, I'd like to go up a level, if we could, on the supply-demand picture for high-grade iron ore. Looking ahead across the coming three years, what incremental demand are you seeing, roughly by region, and what additional supply do you expect to come online — whether from Eastern Canada or Brazil? I realize the regions that produce this great material are limited, but I'd value your perspective on that. Thank you.

David Cataford

executive
#55

The key point for us — and I believe we've brought this up over the last several years — is that servicing long-term blast furnaces isn't really what we're after. Our aim is to be the niche product serving the electric arc furnace market, and that's precisely where we perceive a fairly substantial gap between supply and demand. In a range of countries — the US, Canada, Europe, and particularly Germany and France — you're witnessing a great deal of investment going into building electric arc furnaces. Whenever we talk with various clients, they don't really have a clear answer as to where all those tonnes will originate from in order to supply that. We've just returned from the Middle East too, from a conference in Saudi. We're observing all the investments being made across the Middle East, all the investments and the money that's on hand for building green steel capacity. And once more, what we're observing is that they need to lock in tonnes in this DR market. So for us, moving away from what I'd describe as traditional high grade matters a great deal, because projects such as Simandou will potentially come online within a short timeframe.

David Cataford

executive
#56

There are additional projects of yours that might come online and could serve the upper end of blast furnace needs, yet those don't really qualify for DR grade — perhaps a few tonnes, but they fall short for the DR grade segment. So we want to be certain we're present in that market, which lets us stand apart and earn a better margin. And when you look at countries such as Canada and the US, and potentially Europe too, joining forces specifically to use green steel in infrastructure construction, that generates substantial demand that is far less sensitive to price regarding the premium that must be paid, since they simply require that material. It isn't as though they are weighing a trade-off, asking whether they can sell their car for X amount more against the premium they pay for green steel. If they are stating that green steel is needed to build their infrastructure, then that is what will be necessary. So we genuinely believe there is a considerable shortfall in supply of DR type grade material, and that is truly the market we wish to occupy.

Operator

operator
#57

Craig Hutchison with TD Securities has the next question.

Craig Hutchison

analyst
#58

I just have a question about costs. In your release, you mentioned that costs took a hit because contractors were used to cover open roles. Could you tell us which roles those contractors filled? And have you begun to change that in the first calendar quarter — are you starting to bring people in internally for those positions?

David Cataford

executive
#59

A lot of that is tied to maintenance, Craig. It's mainly the garage — largely making sure we can keep all our equipment up and running. So we had to boost how available our equipment is in order to reach those kinds of figures. That's really where we've got considerable resources behind it. I mean, it comes to roughly just over 60-odd cents per tonne. So that piece of the cost wasn't the primary focus, but it's still one where — had we achieved it, we'd have been nearer $72 per tonne. That's really where the biggest cost hit landed on the mine side.

Craig Hutchison

analyst
#60

And when you talk about aiming for that mid-60s cost figure, does hitting it really depend on everything going right over on the rail side?

David Cataford

executive
#61

That is right.

Craig Hutchison

analyst
#62

Perhaps one final question from me, and it concerns capex for the quarter. I believe you spent $18 million on third-party facilities, set up to manage the extra output from the Phase 2 expansion. Will that be a recurring expense, and I'm just curious why it was capitalized rather than, say, expensed?

David Cataford

executive
#63

So we're wrapping up the work and the payments tied to the SFPPN — specifically the port portion. When you look at that kind of investment, if you recall, we needed to construct that new reclaimer stack, build some new sitings, and handle all of that work at the port. That's where that portion has been invested. But we don't see it as recurring — the work that needs to be done at the port is pretty much finalized at this point.

Operator

operator
#64

Steven Ioannou of Cormark has the next question.

Stefan Ioannou

analyst
#65

I believe you've sort of covered what I asked, but maybe just to go over it again on Kami, you mentioned that you're still looking to further derisk the project as you move ahead. I'm just wondering whether there are any meaningful boots-on-the-ground costs needed for that, either before you really get into partnership talks or afterward — like, is basically the study you currently have in hand the key tool you'll use to push the project forward, or do you still need to do a bit more in terms of spending?

David Cataford

executive
#66

Looking at what comes next, our priority is really to get a partner locked in before we put more money — or any really substantial money — into the Kami project. I think we've now taken it to a point where, once that's finished, we stand a real chance of bringing a partner on board. There's still additional drilling required in order to pin down the geotechnical side, and some spending is needed on the environmental front to confirm that our tailings plan and so forth is right — but doing that would genuinely put us in a different position in the region, as the owner of one of the strongest tailings facilities in Labrador. So eventually the CapEx figure will be higher down the road, though we want to be certain we check every key box, environmental ones included, so that we can access that green steel market and those ESG-friendly type premiums. Still, if you look at what we'd be spending in the near term, those are fairly modest amounts until such time as we potentially secure a partner.

Operator

operator
#67

Brian MacArthur of Raymond James has the next question.

Brian MacArthur

analyst
#68

One item you pointed to for the quarter was securing power from the Quebec Government, since even there, I gather, it's constrained. With the electricity you currently have, I assume you can handle the DRFP's 8 million tonnes. But would that supply be sufficient for the bottlenecking work at Bloom Lake 3? At this stage, as you work through all your options, where does the power constraint actually show up in the whole process?

David Cataford

executive
#69

With debottlenecking projects, the positive side is that they don't usually consume all that much fixed power. More power is indeed needed at the mine, but most of that would come from the trucks. Looking at the capacity we currently have, could we run an additional shovel? That's not an issue. We do have certain buffers at the site, and the major power-consuming items in the plants are really the mills—and to achieve this, we wouldn't be adding further milling capacity. So for the debottlenecking projects, we don't believe additional power would be necessary to get there. The only extra power we'd need to secure is if we were to convert 100% of the Bloom Lake tonnes into DR grade, since modifying the first plant and adding a flotation plant there would potentially demand more power. Other than that, we believe we possess the power needed to debottleneck Bloom Lake.

Operator

operator
#70

We’ll take our next question from Lucas Pipes at B. Riley.

Lucas Pipes

analyst
#71

Let me return to the rail topic once more. Are the incentives truly aligned? To phrase it another way, does the rail operator face an economic problem, or do you believe they have the proper motivation to meet their contractual commitment? I just want to confirm that no party is upside down on this contract.

David Cataford

executive
#72

I really don't see a problem there. I mean, you can see every one of our costs involved in getting a tonne to the port. You can picture for yourself what the operating costs look like. The only thing they might struggle with is tallying up the profits they're earning on those tonnes. So as far as profitability on that rail goes, nothing stands in the way of them putting in the investment needed to deliver the contractual tonnes.

Operator

operator
#73

That brings us to the end of the Q&A session. I'll now hand things back to CEO David Cataford for some closing comments.

David Cataford

executive
#74

Thanks again, everybody, for joining the call. And thank you for standing with us through all the different phases. Honestly, I believe we have every reason to feel very proud of everything the team pulled off this quarter. There has been some noise, as you've noticed, on the logistics front, and we're working on getting that resolved. Still, I'd say the big highlights for us come down to this: getting output above our nameplate capacity in such a brief window is an amazing accomplishment for the teams. Through the FID for the flotation plant, we've put ourselves in a strong position to capture better premiums in the green steel market and to make one of the highest-grade, lowest-CO2-intensity DR materials anywhere in the world. On top of that, we're sitting in a good spot with the other growth initiatives, which are now options we can keep assessing going forward and thereby generate meaningful value for our shareholders. So once more, thank you all for attending, and I look forward to connecting with you next quarter.

Operator

operator
#75

That wraps up today's conference call, everyone. We appreciate your participation, and at this point you're free to hang up your lines. Thanks so much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.