Champion Iron Limited (CIA) Earnings Call Transcript & Summary
May 31, 2024
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone, and thank you for joining us for Champion's conference call on fourth-quarter and full-year results for the 2024 financial year. <<operator_script>> Today is Friday, May 31, 2024, and this call is being recorded. At this point I'll hand things over to Michael Marcotte. Please go ahead.
Michael Marcotte
executiveThank you, operator, and thanks to all of you for being with us today as we go over the Q4 results. Before handing things over to our team so they can walk through these results, I want to briefly cover a few items, among them where this presentation we'll be referencing can be located, which is available on our website at championiron.com, in the Investors Section under Events and Presentation. I should also point out that forward-looking statements will be made by us throughout this presentation. Further detail on those forward-looking statements, along with the risks and assumptions and our MD&A, can be found as well on our website. I'd also like to remind everyone that unless otherwise stated, all figures we reference will be in Canadian dollars. With me on today's call is David Cataford, our CEO, who will handle the formal presentation, and we are also joined by Alexandre Belleau, our COO; Donald Tremblay, our CFO; and Michael O'Keeffe, our Executive Chairman, who will also deliver closing remarks. With that, I'll hand things back to David, our CEO, for the presentation.
David Cataford
executiveThanks, Michael. And thank you all for joining us. I'm really glad to have the chance to talk about the fourth quarter of fiscal year 2024, which just wrapped up our sixth year of operations at Bloom Lake, and you'll see that we've accomplished a great deal over those six years. On the quarter's highlights: we produced roughly 3.3 million tons and sold approximately 3 million tons in that period. Cash cost came in at about CAD77 per ton, with EBITDA of around CAD85 million. On sustainability, I'd say the key highlight this quarter is again the fact that no major environmental issues were reported at the site. So ever since recommissioning in 2018, no major environmental issues have been reported there. The investments we made have truly paid off, because our site is very sound from an environmental standpoint. Turning to community governance and sustainability, one major highlight this quarter is the five-year collective bargaining agreement signed with our unionized employees. That contract's impact is roughly CAD1 per ton on our operating cost. But realistically, we had some salary catch-up relative to our neighbors, and we want to remain competitive in the war for talent so we can attract the best employees and keep delivering results like we have over the past six years.
David Cataford
executiveWe've also brought Mr. Ronnie Beevor onto the Board of Directors, and he brings with him decades of valuable experience in mining. On ESG disclosure, you've seen that we have now published our 2023 Sustainability Report, and there are quite a few highlights in it that we can be very proud of as a Company. First, we held our position as the leading First Nations employer in the region, and we keep working very closely with our First Nations partners to make sure we can operate sustainably. We also have 100% compliance with our tailings monitoring program. So all the investments made in the past really help us stand out as having one of the safest tailings infrastructures in the world. We also have a very big highlight: a 99% water reusage rate at Bloom Lake. So again, we've invested so we can protect the environment, and we're also a leader when it comes to water reusage. And the final highlight is that we managed to cut our GHG emissions year-over-year by about 8.7%. On operations, and when we look at the iron ore price, you've seen that it's been pretty volatile in fiscal year 2024.
David Cataford
executiveBut if you consider the rough average across the year, the iron ore price has held up quite well. We did see a decline in Q4, though the price has bounced back over the last two weeks, if you look at it. On freight, the Red Sea situation and the Middle East conflicts have caused some disruption, yet the C3 index has also settled today at roughly $23 to $24 per ton. Regarding what's possible at Bloom Lake — as you're aware, a key difficulty for us is coordinating with the rail operator so that production can be aligned with logistics and we can begin reducing our stockpile. As of today, roughly 2.7 million tons sit at the site, and we keep working with the rail operator so we can both align with production and begin drawing those tons down. Glad to say the first train conductors will be joining the project starting June of this year. The second group arrives in August. So starting June, we ought to be able to align production with capacity, and starting August, we ought to be able to begin drawing tons down from the stockpile, just as we said at the January meeting.
David Cataford
executiveSo once more, the rail operator's performance has been a bit disappointing, but realistically, I believe we're headed in the right direction to resolve that problem and move past it. Regarding quarterly output, it came to roughly 3.3 million tons, and that gave us 14.2 million tons for the full year, which works out to approximately 95% of our nameplate capacity. Looking at the operations in a bit more detail, one highlight is that our strip ratio has gone up, so the mine is healthy, and we moved about 0.69 as our strip ratio in the year — sorry, in the quarter, and we moved roughly 6.5 million tons of waste in the quarter. So again, we're following the mine plan, and the mine sits in a very healthy position at present. Turning to financial highlights. For the quarter, revenues were about CAD330 million, and for the full year CAD1.5 billion, which gave us CAD85 million of EBITDA in the quarter and just over CAD550 million of EBITDA across the full year. On cash costs, you've seen a slight increase during the quarter.
David Cataford
executiveWe had been trending favorably, reducing operating costs while the project was ramping up. As you saw in the last quarter, the primary factors affecting our cash costs were, first, lower production. So the biggest opportunity for us to cut costs is having the right production level during the quarter. The second factor was the two major shutdowns. And if you recall Q3 of fiscal year 2024, we achieved a run rate of approximately 16 million tons per year, but we had a significant amount of equipment that we pushed to its maximum, which we had to repair during the fourth quarter. That was expected. To debottleneck the facilities, we need to understand which equipment requires work and when it fails, so we had a substantial run-to-fail approach for pumps, pipes, conveyors, and various elements at the plant. So this quarter, we had two major shutdowns, and we also experienced considerable unplanned downtime. But that enabled us to pinpoint the different elements we need to address in order to debottleneck the site.
David Cataford
executiveWe're actively addressing those issues at the moment, and over the next few quarters we ought to begin observing gains in our nameplate capacity. Ultimately, our goal is to debottleneck somewhere between 17 million tons and 18 million tons annually. Turning to the provisional price adjustment: going back to 31 December 2023, we had projected settling 1.8 million tons still on the water at approximately CAD150 per ton, and we ultimately settled that material at roughly CAD136. That gap of about $13 per ton across the 1.8 million tons on the water translated into a negative effect of roughly CAD24 million. Dividing that figure by the 3 million tons sold in the quarter gives an impact of approximately $8 per ton. Conversely, as of 31 March, we had projected settling the following 1.8 million tons still in transit at around CAD113 per ton. However, as you've observed in recent weeks, pricing has rebounded, and we expect a positive provisional price adjustment in the current quarter. Looking at net realized price, you can see that our gross realized price came in below the P65 index during the quarter.
David Cataford
executiveThat isn't because we're receiving discounts on our material — big discounts — or because our quality is lower. Our quality remains high, and we continue selling our tons at a premium. However, the 1.8 million tons still in transit that we were required to book at $113 at quarter end hurt our average for the quarter. As we said, though, that ought to flip around next quarter, since we potentially have a positive provisional price adjustment. On the cash side, we grew cash a bit during the quarter, by roughly CAD13 million, and we keep investing in our flotation plant, putting in about CAD35 million. Looking at our balance sheet, we remain in a very strong position to carry on with our flotation plant. Our net cash position stands at approximately CAD56 million. And looking at our balance sheet together with the projects we have lined up, it let us declare six consecutive semiannual dividends of CAD0.10 per share. Turning to our growth projects, the main focus for us at present is clearly the flotation plan we're working on, along with continuing talks with various groups so we can bring in a partner for the Kami project.
David Cataford
executiveWe've had a fair amount of interest coming from various strategic parties, so those conversations are ongoing, and we're also kicking off the permitting work for the Kami project up in Newfoundland. So we're very pleased to report that work on that project continues. There's no meaningful CapEx to be spent over the next two years as we move toward permitting. That said, we genuinely believe this ranks among the finest resources globally for future production of DR-grade material. Beyond the DR flotation plant we're currently building, the second project involves taking Bloom Lake past 15 million tons per year. As you're aware, during the past quarter we experienced some noise around reliability and repairs to various pieces of equipment. As we complete those repairs, we should be on a path in the quarters ahead to lift our nameplate capacity above 15 million tons per year. Turning to our flotation plant, we're pleased to say the project remains on track for on-time, on-budget delivery. We've spent roughly CAD95 million so far, and approximately CAD375 million of investment remains in order to deliver the project in the second half of 2025.
David Cataford
executiveThe second key point is that we're still in talks with a range of prospective customers so we can place that material with the right kind of buyers — ones that, as we've said before, are nearer to home, which cuts down on our shipping exposure. I believe the timing is quite good, because when we look at the market, we're beginning to map out globally all the various projects underway for new DRI facilities that would serve the electric arc furnaces. And we can see that more than 160 million tons of DR-quality iron ore will be needed to supply what's been announced so far in terms of DRI capacity. So we see the bulk of that demand landing in Europe and the Middle East, and that's where we're devoting most of our time to talks with various customers so we can position our material for the future. So we do believe that putting investment into this flotation plant is the right path for us. That's where we stand to gain, potentially, from the highest premiums for our kind of material. And what's interesting is, once again, when we look at the close of this quarter, well, we don't see any projects announced that could produce or fill in that gap of 160 million tons of DR quality iron ore.
David Cataford
executiveSo at Bloom Lake, where we stand really does put us in a strong spot to serve that demand and to capture those premiums fully going forward. With that said, I want to express appreciation to our team, since they made these results achievable in what was another excellent year, fiscal year 2024, and as we ramp up completely toward reaching our nameplate capacity and even exceeding it. With that said, I'll hand things over now to the Q&A part of the call.
Operator
operatorAnd Orest Wowkodaw from Scotiabank has the first question. Go right ahead.
Orest Wowkodaw
analystHello there, and good morning to you, David. I just wanted to get some clarity on something you mentioned earlier. Did I hear you right when you said that Bloom Lake continues to run under its nameplate capacity of roughly 3.7 million tons per quarter, since you're essentially still making repairs stemming from what took place a quarter ago?
David Cataford
executiveYes. Essentially, what I meant — and apologies if I didn't frame this clearly — is that it was more about the logistics side, where we sensed there remained a mismatch between how much they're able to bring down and how much we're able to deliver toward the port.
Orest Wowkodaw
analystAlright, so Bloom Lake is back up and running at its full rate — it's just that you aren't able to ship it out.
David Cataford
executiveYeah. In terms of order of magnitude, the gap between our production capability and actual shipments is fairly small at this point, though we're still not at the full level — right.
Orest Wowkodaw
analystAll right. And on what you said regarding shipping, did I understand that right that you aren't anticipating destocking before August?
David Cataford
executiveThat's right.
Orest Wowkodaw
analystOkay. Starting in August, how many quarters do you figure it will take, say, to work that 2.7 million tons of inventory down?
David Cataford
executiveYeah. There are a fair number of moving parts at the moment. So as you look at that rail today, you've got two players that are running or that are moving tons — IOC and ourselves — and across the summer months, TADA is in the mix as well. So based on how those other groups perform, that could work in our favor and let us move more tons quickly with the new rail operators arriving in June, and then come August, we genuinely believe we may be able to bring down even more tons than what's currently forecast. So overall, to get the full 2.7 million tons down, we previously indicated that roughly a year and a half would be the window needed to accomplish that, though there are some possible upside cases if we can deliver faster than forecast. But once again, that's a piece that sits beyond our control. We put as much effort and time as we can into collaborating with the rail operator, but as you're aware, dealing with that side of things has been a rather frustrating journey for us.
Orest Wowkodaw
analystAll right. But the base case covers roughly eighteen months, beginning in August.
David Cataford
executiveThat's right.
Orest Wowkodaw
analystAll right, thanks.
Operator
operatorThe next question is from Lucas Pipes at B. Riley, so please go ahead.
Lucas Pipes
analystMuch appreciated, operator. Morning, everybody. David, I want to make sure I heard you correctly during your prepared remarks — you mentioned capacity of 17 million tons, or 18 million tons, once the debottlenecking projects are complete.
David Cataford
executiveThat is right.
Lucas Pipes
analystIs that figure the nameplate capacity, or the level you'd expect to actually run at? And how fast do you think you'd reach it?
David Cataford
executiveYes. Sorry, Lucas, I’m not entirely certain whether the difference you’re asking about is nameplate capacity or what we actually expect to produce. But realistically, once those debottlenecking projects get underway, our average head grade at the mine is quite stable, so it won’t change. Our recovery should also be fairly stable going forward as we keep improving it. So when we look at the debottlenecking portion, that’s where we don’t yet have a fixed number, because we’re still in engineering to determine the exact elements that need modification and how they can be modified, but we do expect that in the future it will be between 17 million tons and 18 million tons, correct.
Lucas Pipes
analystAppreciate that. I have two quick follow-ups. How fast could you reach that level? And are there any cost-side effects—say, fixed cost absorption or similar items—that might lend a hand? Thanks.
David Cataford
executiveYeah. The rise will happen gradually. Some pieces are simpler to handle than others. Back in January, as we said, we already placed orders for a few pieces of mining equipment so the mine's capacity can go up, and those should arrive before this calendar year finishes. So once that equipment shows up, we ought to be able to lift part of the output target. After that, looking ahead across the next two to three years, that is the point where we think we will have completed the bulk of the changes needed to bring us into the range of 17 million tons to 18 million tons.
Lucas Pipes
analystThat's quite useful. And I'd take it you're confident the rail side will keep up with that too.
David Cataford
executiveAbsolutely. I have no doubt the rail can come through. We have to collaborate with the rail operator to ensure they truly reach that point. Still, the rail itself is capable of handling roughly 80 million tons annually, so nothing stands in the way of making it happen. That said, as you'd expect, we'll be tracking this far more carefully, since it hasn't been performing the way it ought to have previously.
Lucas Pipes
analystThanks, that's really useful, David. Moving on quickly to Kami — you said you're having productive talks with a few strategic groups. Could you give us a sense of what kinds of groups those are? My guess is they're still makers, but perhaps you could say more and indicate the particular region and the size of the prospective partners; I'd be grateful for anything you can flesh out there. Thank you.
David Cataford
executiveYeah. Thanks for that question, Lucas. So, in terms of potential partners, what makes the most sense for us is to align with a group either from Japan, the Middle East, or Europe. Those are the three markets we feel are the most logical for us. They're markets that need decarbonizing, that are looking to invest and are already putting money into DRI and electric arc furnaces. And Japan might be a little far, but there's potential there too, even with the Japanese, as you've seen in the various press releases over the past year showing they're also beginning to invest in the Middle East so they can carry out DRI production. So there's potential for alignment there. So it needs to be a large steelmaker operating in one of those regions.
Lucas Pipes
analystWould you anticipate just a single partner, or possibly more than one?
David Cataford
executiveGiven how large the partners are that we're in discussions with, it could potentially end up being just one partner.
Lucas Pipes
analystGreat, okay. We genuinely value all that detail. Keep it up and good luck.
David Cataford
executiveYes. Thanks. Appreciate it, Lucas.
Operator
operatorThanks. Our next question is from Gordon Lawson at Paradigm Capital. Go ahead, please.
Gordon Lawson
analystMorning, and thanks a lot. Could you give us some detail on the light premiums during the quarter, what you're seeing right now in the current quarter, and what your expectations are for fiscal '25?
David Cataford
executiveYes. Thanks for that question, Gordon. So, looking at the premiums you've observed — even with no environmental restrictions in China and Europe not having fully recovered, we still saw high-grade premiums rise over the past few weeks. So not at the historical level, which is sort of in the low 20s, but we have seen it in the high teens over the past few weeks, which is a slight improvement from where we were before. But when we look at it, forecasting what comes next is very tough. But what's interesting is that every time the iron ore price has dipped below CAD100 over the past two years, it has recovered pretty quickly. So we feel the iron ore price is well positioned right now, and we do see some potential upside scenario on the premium for the high grade.
Gordon Lawson
analystAlright, thanks a lot. And turning back to the stockpile — are there any things to weigh when it comes to growing your rail fleet, including the chance of bringing in one more locomotive?
David Cataford
executiveYeah. So IOC has ordered three locomotives, and those will be delivered over the next few months. We've also bought a good number of new railcars, which weren't strictly needed for current production, but they're going to add some flexibility as well. Delivery on those begins in October of this year, and it will also help us as we debottleneck the project. But as you'd expect with railcars, they don't arrive all at once, so delivery will be gradual across a few quarters, starting in October of this year.
Gordon Lawson
analystAll right, thanks so much. I really appreciate that.
David Cataford
executiveThanks, Gordon.
Operator
operatorCraig Hutchison from TD Securities has the next question. The line is yours.
Craig Hutchison
analystHi there, and good morning, everyone. I just wanted to follow up on the Kami project. I believe you said that you aren't expecting to spend any CapEx over the next couple of years. Is that the length of time you're anticipating for the updated permits, roughly a two-year process?
David Cataford
executiveYes. So I'd say — appreciate the question, Craig. Our estimate is roughly two years for the permitting work, and that ought to give us sufficient time as well to bring in the partner, get the agreements finalized on that front, and then we can look at what comes next once 2026 arrives. And I think that's a fairly good year in which to assess a project such as Kami. As you'll recall, the economics at present were perhaps somewhat underwhelming, but considering what could unfold over the coming two years — with the possible list of critical minerals on the federal side and the talks with the Newfoundland government as well, plus most of the DRI and EAFs being delivered within that same two-year window — we ought to have a clearer picture of the pricing mechanism for DR pellet feed, along with the various economic improvements available to us at both the federal and provincial levels.
Craig Hutchison
analystAlright, great. Just — I was going to — my follow-up was going to focus on price discovery, sort of, for DR pellet feed. Do you have any kind of indications regarding what that might be, over the discussions you've had during the last sort of year? I think the premium you assumed was somewhere in the range of an additional CAD30 a ton on top of the CAD65. Is that still sort of the case, or do you think it could be higher? Or any kind of color you could provide on that would be great.
David Cataford
executiveYes. Thank you for that question, Craig. So, as we've done previously, our aim is essentially to tie the right formulas to the pricing mechanisms, and what we're keen to ensure is that we connect those to the DR pellet premiums. We want to gradually step away from the P65. Once projects such as Simandou are delivered, we don't know what will become of that index. And we genuinely believe our material will sit in a subclass of its own. It's a unique product that will go into DRI for electric art furnaces when groups are looking to make high-quality steel. So for us, we're eager to ensure that we tie all of those pricing mechanisms to the DR pellet, and talks so far with a range of clients have proven very successful when it comes to getting that kind of mechanism in place.
Craig Hutchison
analystAppreciate it — thanks, everyone.
David Cataford
executiveAppreciate that, Craig.
Operator
operatorStefan Ioannou from Cormark Securities has the next question. Go right ahead.
Stefan Ioannou
analystYeah. Thanks a lot, guys. Just perhaps on Kami once more. I'm just wondering again, since you mentioned it's probably roughly a two-year-ish timeline to permits — when we think about moving forward with possible partnership talks, does that line up with getting the permits? Or do you figure we'll have a partner locked in well before then?
David Cataford
executiveSure, we’ve got parties that are highly engaged with this project. So I’d say — certainty is never possible. Still, as of now, assuming matters keep moving at the current pace, I’d feel confident we could secure a partnership ahead of permitting. That said, a fair number of variables remain in play, though again, interest is substantial. And if discussions continue at roughly today’s tempo, there’s a chance we might line up a partner before permits are in place.
Stefan Ioannou
analystAlright. Alright, that's excellent. Thank you so much, everyone.
Operator
operatorBrian MacArthur from Raymond James has the next question, so please proceed.
Brian MacArthur
analystMorning, and thanks for taking my question. I just want to return to what Lucas asked. So when you take Bloom Lake up to 17 million tons, then to 18 million tons, and you say you're confident the railway will be there — it's been uncertain so far. What actually — you mentioned 18 million tons of capacity, but what actually needs to happen to secure those additional 3 million tons? Does another party need to order locomotives? Do you control all the rolling stock required? What actually needs to be done to, in a sense, guarantee that you can move 18 million tons at that point?
David Cataford
executiveYes. Sadly — I appreciate the question, Brian. But sadly, the situation is out of our hands at the moment, as you're aware. Still, if you consider what needs to happen, it's largely a matter of track availability, plus some locomotives and train operators. Clearly we'll handle this in a different way as tonnage rises, because when we signed that contract with the operator, we assumed they could deliver what they promised, and that didn't happen, so we'll watch it very carefully once we sign a possible agreement for the additional tons. Then again, going back only a few years, we had signed for 7.5 million tons, and we were producing 8 million tons fairly consistently, and that rail never had any problems. So they could handle the additional tonnage. I believe this is the first occasion the rail operator has come under strain when it comes to the rail's actual operations. But what we really need to do is focus on efficiencies on that rail. We don't think there's a great deal of CapEx needed to double-track any sections in order to reach that full 18 million tons.
David Cataford
executiveOur view is simply that this delivers improved efficiency, along with somewhat more locomotives and additional train operators.
Brian MacArthur
analystExcellent — I appreciate that, and it's quite useful.
David Cataford
executiveThanks, Brian.
Operator
operatorAt this point, there are no more questions coming in. I'll hand things back over to Michael O'Keeffe for some closing remarks.
Michael O'Keeffe
executiveThank you, operator, and I appreciate all of you joining the call. Summaries have become trickier for me lately, since David handles such a great deal. Several years back, I could occasionally spot a few openings and offer remarks that contributed something useful to the discussion. Still, one thing struck me: if anybody has read that children's book about trains titled Tootle, the conductors weren't the ones trained to operate the trains a bit. The conductor wasn't doing that. And I observed that they invariably brought their conductors along. Perhaps that's the trouble. Anyway, on a serious note, we are training up — the operators are training up the train drivers, and our major challenge is that whenever we've handled infrastructure, problems have always arisen from areas beyond our control. That held true with the port, and we've gained greater control over the port now that we have the Quebec government. David sits on that board. And if anyone has seen the port when we took it over in 2017, and today it has gone from — a battered old car to a Rolls Royce so — and that's required an enormous effort.
Michael O'Keeffe
executiveBut if I look back at what's taken place in infrastructure from the point we took over the feasibility study and started Phase I in 2018, we've essentially been building nonstop. First Phase I was commissioned and operating, and now Phase II is commissioned and operating, plus all that enormous civil work on the tailings dam. Our COO, Alex, has spent so much time up there that I suspect he'd get restless without a new project to sink his teeth into. Fortunately, plenty are underway — the concentrator and the high grade — and that moves us into an entirely different category, with 69% FE coming out of that material, which obviously will serve as feed for the electric arc furnaces. Not long ago, Mr. Marcotte and I were in LA, and we also attended the Bank of America conference in Miami. At that conference, all the major players were seated up there — Jackson, Rio, et cetera, et cetera — and every one of them opened by discussing how the steel industry will be decarbonized through green steel. It was quite interesting to think about that, because everyone these days is talking about microwaves and how they'll be the solution for the business.
Michael O'Keeffe
executiveI heard a podcast about that, and it featured interviews with the folks at Rio, who are the biggest backers of this, plus the university over in the UK. And look, there are some really clever folks at Rio, and perhaps they ought to be on the rail. But regardless, the — what I'm getting at is that even they have managed to make an ingot of probably 2 grams out of this microwaving, 2 grams. So the following step is a pilot plant. They still haven't found a vessel you could use for that conversion process, and they even admit they're decades away from it. Yet you've got the CEOs of these companies standing up, saying that yes, it's imminent, and probably Fortescue is probably the furthest along, because a lot of people came to us in these one-on-one meetings saying the answer is there. And — well, let me tell you, the answer isn't there and it's decades away. So — and even the people working on it are saying the same thing. So if you take that, then put it simply, what we're doing here is taking the ore out of the ground at 30% iron content and upgrading it to 69%.
Michael O'Keeffe
executiveWhat's really interesting to me is David's point about moving away from the indexes. The only route to that is having a quality product that makes it possible, and that's what we'll have. And we're always making progress on that, because we don't want to be in a position where every time the 62% index falls, the 65% falls, and as a result the gap to the premium for the 69% narrows. So that process is underway, and it will change the game. But if you just look at today's numbers and say, okay, we're earning CAD0.5 billion — CAD600 million of EBITDA a year in a reasonable year, and it can be higher, obviously, when iron ore rates are higher. But if you simply take 69% today and say, well, there's a CAD27 premium over what we get for the 65%, and these tons will be moved into jurisdictions that aren't as far to ship as China — I mean, there's a CAD10 freight differential. So CAD37 on that, and then with the two lines up and running, you can do the EBITDA math yourself, and those are serious numbers.
Michael O'Keeffe
executiveSo — and this may sound far-fetched, but either way it's going to happen. We're recommissioning in the first stage of the 7.5 million tons Stage II in 2025 — second half of 2025, and we're shipping the tons out. So it's happening. It's unfolding right in front of us, and it's interesting talking to people. It hasn't sunk in. It hasn't resonated. But as David correctly points out, the people developing the electric arc furnaces know exactly what's happening, and that's why we're getting so many regular visits. But I have no doubt that green steel is the future. And remember, we also have energies from hydro, so it puts us in a very strong position. Now, just if you take that and look at Kami, and I know David has given you a good summary on Kami, but if I just sit back and look at it and say, okay, well, we are — people are coming in, people are interested in wanting to help us develop that because they need the feed. Now, if you start attributing some of these values that we're talking about for the end product back into Kami, I mean, it's a totally different project and people pay today at the numbers.
Michael O'Keeffe
executiveJust picture the situation if iron ore is classified as a critical mineral — what that would mean for us on taxes, and beyond that, what this material is actually worth. I have a lot of confidence that this represents our longer-term path, but the near term is coming fast, and by that I mean 2025. As shareholders, I believe you'll be glad to learn what is happening within the Company. We have brought in every single project on schedule and within budget. The sole source of trouble has been people operating beyond our control. We will therefore get a handle on that through persistence and talks with the relevant parties, and everyone stands to come out of it well. So thank you all for backing us, and I look forward to speaking with you again before long.
Operator
operatorThank you. And that brings us to the end of today's conference call, ladies and gentlemen. We appreciate everyone joining us. You're welcome to disconnect now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.