Operator

operator
#1

Good morning, ladies and gentlemen, and welcome to Champion's First Quarter Results for the 2025 Financial Year. Right now, every line is in a listen-only mode. After the presentation, we'll hold a question-and-answer session. Should you need immediate assistance at any point during this call, please press star zero to reach the Operator. Today is Wednesday, July 31, 2024, and this call is being recorded. At this point I'd like to hand the conference over to Mr. Michael Marcotte, Senior Vice President, Corporate Development and Capital Markets. Please go ahead, sir.

Michael Marcotte

executive
#2

Thank you, Operator, and thanks to all of you for being with us today as we go over the quarterly results. For anyone who wants to view this presentation, you can find it on our website, championiron.com, under the Events and Presentation tab. I should also point out that throughout this call our team will be making forward-looking statements. If you want to read more about those forward-looking statements, along with the risks and assumptions, you can consult our MD&A, which is also posted on our website. With me today is our CEO, David Cataford, who will handle the formal portion of this presentation. Our Executive Chairman, Michael O'Keeffe, will give the closing remarks, and I'm also joined by other executives, including Alexandre Belleau, our COO, and Donald Tremblay, our CFO. With that, I'll hand things over to David for the formal portion of the presentation. David?

David Cataford

executive
#3

Thanks, Michael, and thanks to all of you for joining us today. I'm glad to have the chance to walk through our Q1 Fiscal Year 2025 Results. Looking at the highlights, one standout for the quarter is definitely the fact that we produced roughly about 3.9 million tons during the quarter, along with record sales of just over 3.4 million tons. So I'm very proud of what the team has achieved and of how we rebounded from the Q4 2024 fiscal year. On cash costs, they were relatively flat quarter-on-quarter — we'll get into that a little bit later — at just shy of $77 per ton. These results let us generate about $180 million of EBITDA during the quarter. We accomplished all of that with no significant workplace incidents and no major environmental issues. So again, clean tons coming out of Bloom Lake. On community governance and sustainability, I'm very proud that we hosted the Minister of Mines at our head office down in Montreal. The Minister came here to announce a new program aimed at helping local contractors step up their game so they can work in areas or in companies like Champion.

David Cataford

executive
#4

So there's a strong alignment for us in partnering with the government to support local suppliers and local contractors, helping them raise their companies to a level where they can come and work with us. That lets us deepen our ties with the local communities. On the operations side, as we said, quarterly production came in at roughly 3.9 million tons, which is an 18% rise compared with the prior quarter. We also picked up extra mining equipment and rail cars. The extra mining equipment lets us keep executing our current mine plan while at the same time getting ready to eventually push our nameplate capacity past 15 million tons per year. The extra rail cars serve the same purpose, and they give us some additional flexibility to bring down not only the stockpiled tons we currently have at Bloom, but potentially future tons as well, once we're able to increase beyond our nameplate capacity. On sales, roughly 3.4 million tons were sold during the quarter, which let us hit a record, though we're still short of matching our current production. So we'll keep working with IOC, but we are seeing positive results when it comes to the added capacity on the rail.

David Cataford

executive
#5

So, turning to something that happened after the quarter — all of you have seen it in recent press releases — a major forest fire burned near where Bloom Lake operates, and that forced us to evacuate the mining site. Our response had to be fast, and I think it speaks well of the preparation we had in place, since after the forest fires in that region last year, we put together fairly substantial contingency and emergency plans so that we could, first, get our people out, and second, safeguard our infrastructure. I'm glad to say that although the fires got near the operations, none of our infrastructure was affected. You can see that picture right there of someone hosing down some trees. We also had to cut down bands around the site, bands around some critical infrastructure that we have, but I'm very proud of how the teams responded and how fast we managed to evacuate a significant portion of our workforce while continuing to work to protect the site. The impact was roughly about one week's production when you look at the downtime and the ramp up, but I'm happy to say that right now we're back to pre sort of forest fire levels in terms of production.

David Cataford

executive
#6

When we take a look at the operations overview, we moved a substantial amount of tons in the quarter. Our iron recovery came in slightly below what we were targeting. During quarters with major shifts, and comparing Q4 to Q1, tonnage rose considerably. That's very positive, yet it's also harder to tune the recovery circuit under those conditions. Our best results come when things are fairly stable and fairly flat. So we ought to be able to lift that in upcoming quarters and return to our over 80% iron recovery. On the industry side, the P65 index fell roughly 7% in the quarter. We also observed somewhat elevated exports from Brazil and Australia, but all the iron ore produced was still being consumed. So we're very pleased that demand for our material remains high across our various customers. We also saw the premium for P62 rise, and the P65 over P62 premium increase during the quarter. It's still low versus historical figures, but that's a positive signal consistent with the correlation that when the iron ore price falls, the P65 to P62 spread typically widens.

David Cataford

executive
#7

Now, regarding provisional price adjustments, we saw a favorable effect this quarter. As you may recall, at the close of last quarter, on March 31, we had 1.8 million tons booked at $113 per ton. For those tons, we were able to realize roughly $124, giving a favorable impact of approximately $21 million in the quarter. Looking at June 30, once again we had about 1.8 million tons on the water at quarter-end, with an expected price of roughly $119 per ton for those tons. On the average realized selling price, there was a negative impact when you factor in the 1.8 million tons sitting on the water at below $120 per ton, versus the $126 average for the quarter. Yet even with that factor, we still realized near the P65 index during the quarter, which let us reach about $125 per ton, with a net realized price of roughly CAD 136 per ton. Turning to our costs, we did observe some improvements in costs tied to higher production and sales. So that was a favorable impact there.

David Cataford

executive
#8

Non-cash items skewed that somewhat — specifically the revaluation of the stockpile for cost accounting purposes. So we're spreading those costs across the 3 million tons we've got stockpiled, plus there's an effect from the shutdown carried out in Q4 fiscal year 2024. Keep in mind, two major shutdowns took place in that quarter, and since shutdowns usually run roughly six months, those costs get spread across two quarters. So looking at the quarter's impact, it's roughly about flat versus the prior quarter. Strip out the non-cash items, though, and we came in about $5 per ton better. On the financial highlights, as we said, roughly $180 million of EBITDA. And net income came in just over $80 million, which lets us keep funding our growth initiatives and reinvesting in the assets. Turning to our cash change — cash came in a bit lower than the market might have anticipated, largely because working capital moved by about $100 million. Most of that was vessels that departed the port at the end of June, and we got paid on those at the beginning of July.

David Cataford

executive
#9

It's really a matter of timing rather than any genuine long-term problem. So we ought to see that working capital shift reverse during the quarter we're in now. On the balance sheet side, when you factor in those receivables along with working capital, we sit at a net cash position of roughly $18 million. That gives us a very healthy balance sheet, which lets us keep pursuing our growth initiatives. Turning to growth initiatives, if we look at the DRPF project update — the primary project we're focused on at the moment — I'm glad to say we remain on schedule and on budget. The work is progressing as planned. Our chief priority at present is finishing all of the building so we're ready to operate indoors through the winter. That effort is moving along nicely. As the next slide shows, we have the majority of our long-lead items — the equipment our suppliers are currently building — and all of it is on track with respect to long-lead items. Overall, I'm quite confident we can deliver this project during the second half of the 2025 calendar year while staying inside the CAD 470 million budget we've set out.

David Cataford

executive
#10

So this project, once again, is essential for our growth as well as for how our product gets valued. The primary objective, then, is being able to sell our material to steel producers who will ultimately manufacture lower carbon steel. It's clear that a substantial number of these contracts are being signed, or already have been signed, for delivering tons of lower carbon steel beginning in 2025 and 2026. As we noted earlier, we've observed various governments — take Canada, Australia, the U.K., the U.S. — aiming to construct infrastructure using lower carbon steel. So all of that is beginning to materialize as of next year, in our view. That means our project will be timed very well for capturing that market down the road. So we're quite pleased with how the project is progressing, and likewise with how the various lower carbon steel contracts are moving forward. Another point, and a really big highlight for the quarter just past, is that high-grade iron ore now appears on Canada's critical minerals list. If you recall, last year high-grade iron ore was designated a critical mineral in Quebec and in Labrador, but now we've also succeeded in getting it added to the list at the federal level.

David Cataford

executive
#11

We're still assessing what kind of upside this could bring to our growth efforts — both the work currently underway on our projects and possible work down the road. That said, we view it as a real positive that Canada's government now classifies high-grade iron ore as critical to decarbonization, and includes it among the minerals it intends to back so a lower carbon economy can be reached. So again, that's a strong positive for our growth projects, and once we've settled all the various elements and all the different ways this could affect projects such as Kami or others, we'll be able to return to the market. I want to thank every member of our staff for delivering those results. The quarter's results, I'd call very positive, but the real standout is how we responded through the forest fires. I'm very proud of how everyone came together — not just our own people, but assisting local communities too, deepening our ties with them, with First Nations and with the Quebec government. It also shows our credibility in how we handle critical situations of different kinds. So I'm very proud of how the team navigated its way through all of that.

David Cataford

executive
#12

With that said, I'd like to hand things over to you for the question-and-answer part of the call.

Operator

operator
#13

Thank you. Ladies and gentlemen, we'll now start the question-and-answer portion. If you have a question, kindly press star then the number one on your touchtone phone. A three-tone prompt will sound to confirm your request. If you'd prefer to withdraw from the polling process, just press star then the number two. When on a speakerphone, please pick up your handset before pressing any keys. Once more, if you have a question, kindly press star then the number one on your touchtone phone. Please hold a moment for the first question. The first question is from the line of Lucas Pipes of B. Riley Securities. Please go ahead.

Lucas Pipes

analyst
#14

Thanks a lot, Operator. Morning or evening to all of you, depending on where you are. I'd like to start with a question about those extra rail cars — could you give us some idea of when every one of them will be in service? And then, on the destocking cadence, what's a reasonable run rate to assume going forward from here? Thanks so much.

David Cataford

executive
#15

Appreciate that question, Lucas. We felt quite lucky to lock in a production slot for those rail cars during calendar year 2024. As a result, construction on them is underway at this moment. Delivery of the initial rail cars can happen before this calendar year wraps up, and then during January and February we will also take receipt of the majority of our rail cars. That ought to let us keep pursuing the strategy of seeking out ways to destock the stockpile, while also giving us that added capacity once our production exceeds the 15 million ton capacity level. So, those units have been ordered, they are under construction and, once again, a small portion will arrive in 2024, but the bulk will come at the start of 2025.

Lucas Pipes

analyst
#16

Thanks for that. I really appreciate it. Regarding my second question, I was hoping to build on the news that high purity iron ore has been added to the critical minerals list. How much could a project such as Kami stand to gain from that? I understand there's attention on this and support for higher high purity iron ore, but if you could perhaps address Kami in particular and explain how this mineral designation might work in its favor, that would be great. Thank you.

David Cataford

executive
#17

Thanks for that question, Lucas. So being on a list is a good thing, but the real impact shows up because a lot of federal-level programs work in a fairly binary way — if you're on the list, you get access to them, and if you're not, you don't. There are dedicated funds at the Infrastructure Bank of Canada that can assist with infrastructure projects. And if you take a project like Kami, roughly about CAD 700 million of the CapEx tied to infrastructure could stand to benefit from a structure such as the Canadian Infrastructure Bank. So all of those are elements we're evaluating right now and holding discussions about to see how they might potentially help the Kami project. It's a bit preliminary to state what the actual impacts could potentially be, but it places us in a different position than where we were previously, since in the past we simply couldn't even hold those discussions with the various groups, because we weren't part of the critical list.

Lucas Pipes

analyst
#18

That is quite useful, and I genuinely appreciate it. To both you and the team, keep it up. Wishing you the best of luck, and thank you.

David Cataford

executive
#19

Appreciate that, Lucas.

Operator

operator
#20

Thanks. Craig Hutchison from TD Cowen has the next question on the line. Please proceed.

Craig Hutchison

analyst
#21

Morning, everyone. I'd like to return to the sales topic for a moment. During your previous conference call, I believe you said you were hoping that by June, sales would line up with production, and since we're now essentially in August, could you bring us up to date on that? Can you share a specific figure for the volume being moved each week or each month, or are sales at this point keeping pace with production? Also, when those cars show up — the 400 you're ordering — do you anticipate that on the downstream side they'll be matched with IOC, meaning the locomotives needed to actually move those volumes? Thanks.

David Cataford

executive
#22

Appreciate that question, Craig. So on the logistics side, we were fairly near to keeping pace with production. The forest fires, of course, caused a bit of a setback, since even though we managed to get operations going again relatively fast, rail capacity was constrained somewhat. As you'll recall, Labrador City was evacuated, and our rail line runs through that area. So it was very lucky that the local mayors and the Newfoundland province gave us the green light to keep running trains down while the forest fires were burning. Even so, there were limits on how much we could actually accomplish. And after the town was — I'm not sure what the right term is, de-evacuated, but once people went back to Labrador City after the emergency evacuation order was lifted — well, there was a ramp-up period to work through. But broadly speaking, I'd say operations are now quite close to aligning with logistics. The next step is being able to concentrate on destocking, and that's where the rail cars that are arriving, the new local operators are going to help, along with the new locomotives IOC has ordered. So IOC has ordered additional locos, and we do have some new train operators who've started, with more arriving in September and further ones coming before this calendar year ends.

David Cataford

executive
#23

It looked like all the pieces were coming together for us to begin removing some tons from the stockpile over the quarters ahead.

Craig Hutchison

analyst
#24

All right. And turning to costs, I realize you've finalized your labor agreement, and I know you're working to push recoveries above 80%, but given all of those factors, is the plan still to bring costs down over the long term into roughly the mid-60s range? Or should we instead assume that costs will probably drift nearer to, say, the $70 range, simply because of some of these items—labor and so on—that have affected your cost structure?

David Cataford

executive
#25

So for this quarter alone, without those non-cash items, we'd land nearer $71. So the trend is downward, heading toward the sub-$70 mark. Now, where exactly will we end up? As we mentioned, the union contract negotiation brought an increase of roughly about $1 a ton. But realistically, I do believe we can reach that sub-$70 number.

Craig Hutchison

analyst
#26

Okay, thank you, everyone. I'll hand things off to the next person.

David Cataford

executive
#27

Appreciate it, Craig.

Operator

operator
#28

Thanks. We'll take our next question from Julio Mondragon at BMO Capital. Please go ahead.

Julio Mondragon

analyst
#29

Thanks, Operator. Thank you. Good morning, David and Michael. I have a couple of questions. The first concerns production. You hit 3.9 million tons of concentrate output in the quarter, which is nearing the 16 million tons per annum capacity you've previously set as a target. So my question is whether this comes from debottlenecking your operations, or whether we should expect maintenance over the coming quarters. And on the same topic, do you have an approximate figure for the investment needed for debottlenecking the operations, or is that still being studied?

David Cataford

executive
#30

Right. The debottlenecking effort isn't a single straightforward project where you install one machine, so to speak, and output goes up. It's genuinely a synergy across a lot of different elements. That's the reason evaluating the complete picture is taking some time. Yet, as we've said before, it won't be one large project. It will be a collection of many smaller projects carried out quarter after quarter, and those will let us reach that level. Looking at output of 3.9 million tons in the last quarter — a very good achievement — we should keep in mind that this quarter had no major shutdowns. So in a quarter like that, if you place it on a six months basis with two major shutdowns, well, that brings the annual run rate down somewhat. So realistically, we aren't at the 16 million ton run rate yet. We do believe we've reached the nameplate capacity run rate, and we'll keep working so we can move toward that 16 million tons and beyond over the coming quarters.

Julio Mondragon

analyst
#31

Oh, thank you very much. So, returning to the concentrate shipments — you've already mentioned that you're anticipating, or expecting, stronger performance in the quarters ahead. But how do you see the pace, or the sales volumes, picking up, and what would your optimal level be next year for the stockpile, or the concentrate stockpile — going from 3 million tons to, say, 1 million within one year, or a year and a half? Do you have any sense of that? Any timelines or numbers?

David Cataford

executive
#32

Right now, we don’t have an official timeline for those figures. We’re collaborating with IOC to try to get as many tons out as possible. Of course, once those rail cars arrive, we have the new locals, and the train operators are in place, then we should be in a far stronger position to draw down the stockpiles. We’re also exploring other options with IOC to see whether there are additional synergies we can use to draw that down quickly. But at this point we don’t have an official kind of number for when that destocking will happen.

Julio Mondragon

analyst
#33

Oh, that's great. Thanks so much.

David Cataford

executive
#34

Appreciate that, sir.

Operator

operator
#35

Thanks. The next person in the queue is Brian MacArthur of Raymond James. Please go ahead.

Brian MacArthur

analyst
#36

Good morning, and thanks for taking my questions. Perhaps I could pose the last few questions in a different way, since you kind of indicated that your sales might have caught up with production if we hadn't had boats getting delayed and the forest fires, and we've discussed destocking. But when you speak about catching up to production levels, should I be thinking in terms of a 15 million ton annual rate to get past this issue of 3.9 versus 3.4? Is that what you mean, or will the rail in fact have the capacity, with these additional cars, to exceed the 15 million ton a year rate and, as you said, therefore assist with the destocking?

David Cataford

executive
#37

Appreciate that, Brian. We do have a contract covering 16, and getting to that full run rate of 16 is our primary objective. That is the key aim for us. We recognize there are going to be minor inefficiencies and the like, yet that is roughly the level we're aiming for whenever we discuss reaching the proper point. That ought to accommodate swings between quarters when shutdowns occur and quarters when they don't.

Brian MacArthur

analyst
#38

Thanks, that's really useful. My next question is about something else you brought up during the quarter — securing extra power, which I think is a pretty solid accomplishment. With all the power you can now access, could you perhaps explain what it will actually let you do when it comes to your growth initiatives?

David Cataford

executive
#39

Yeah, thanks for that question, Brian. So looking at what we achieved last quarter, we were among the only companies able to secure additional green hydroelectric power here in Quebec. I believe we're the sole company that actually received two blocks of energy. So we're quite proud to have accomplished that, and it's largely because the government recognizes the impact we have when it comes to decarbonization and the effect we have on the local economy. So we're very happy to have secured that access. As you know, last year we secured the power needed for the flotation project, to bring our material, or half of it, to 69%, and now we've accessed another block to keep advancing our various growth initiatives. Could that involve plant number one being converted to 69%, or other initiatives to keep decarbonizing? We're very proud to already have the lowest CO2 intensity, high-grade iron ore here in Canada, but I think we can keep doing better, and eventually that will show up in the price. So we have a few potential initiatives for using that power, but again, we're very proud to have secured it.

Brian MacArthur

analyst
#40

I really appreciate you taking the time to answer my questions.

David Cataford

executive
#41

Thanks, Brian.

Operator

operator
#42

Thank you. A quick reminder for everyone on the line: if you'd like to ask a question, press star and then the number one on your touchtone phone. We'll now take our next question, which comes from Dalton Barreto at Canaccord. Please go ahead.

Dalton Baretto

analyst
#43

Thank you. Morning, everyone. Appreciate you taking my questions. David, I'd like to remain on this broader logistics matter, and I want to pose something a bit different. In the period from now until you actually secure that incremental capacity, what occurs should additional disruptions arise, whether forest fires or something else? Really, two questions. First, what quantity of additional finished goods inventory are you able to stockpile at the site prior to having to cut back production? And second, in the event of a curtailment, how does the rail operator divide capacity among the various users? Thanks.

David Cataford

executive
#44

Appreciate the question. Generally speaking, a rail operator is obligated to fulfill its contractual commitments. Realistically, though, when you own the infrastructure yourself, that isn't always how things play out. That said, we've witnessed quite a few improvements on the rail side recently. So we're seeing plenty of encouraging signs, and we're aware that IOC is making efforts to meet its contract obligations. I'd say there isn't any kind of formal guideline governing how that capacity gets allocated, but realistically, I haven't come across a scenario — even last year, if you recall, when forest fires shut down the rail — once it came back online, when the rail was running at reduced capacity, we saw it divided among all the different clients. So it isn't the case that IOC was only hauling its own tonnage while leaving ours behind. So some arrangement exists to ensure everyone can bring down their tons. As for our actual stockpile capacity, it comes down to cost, because the more we stockpile, the farther we must go from the plant, and that raises the expense of moving the material around the mine.

David Cataford

executive
#45

So, the... There isn’t a set figure for what the maximum capacity is, but as the stockpile rises, the cost of managing it goes up too. So in theory there would be a point where we’d check whether it’s still worthwhile to produce and stockpile that far away from the plant. Right now, we’re still in a range where the costs are significant, but not impacting our profitability, so we’re still continuing to move those tons.

Dalton Baretto

analyst
#46

Appreciate the context, David. Maybe we can pivot a bit — I'd like to discuss your projects and get a clearer sense of what comes next for Kami and for the pellet plant, and also for upgrading your remaining capacity to DRPF product. Thank you.

David Cataford

executive
#47

Thanks for that question. So regarding Kami, what comes next for us — well, as you may have seen, we submitted our application to kick off the environmental process. The Newfoundland government gave it the green light, so we're now beginning the permitting stage for the Kami project. That will take us through to 2026 before we can secure a permit. So I don't expect any meaningful CapEx to go into Kami before that point, and that gives us the time needed to wrap up the work we're doing toward bringing a partner into this project. We are, in fact, having some fairly substantial conversations with a number of groups about forming a partnership for Kami. And I should also say that our inclusion on Canada's critical minerals list has certainly been helpful in that regard. So that project involves a great deal of work on the permitting side, but no significant dollars will be spent. When it comes to upgrading our material, I'd say our primary focus right now is delivering the flotation plant on schedule and within budget, and being able to achieve the price we think we can obtain for this type of material.

David Cataford

executive
#48

So that’s the effort we have underway at the moment. We’re assessing other possible upgrades, though the primary focus right now is really the DRPF, plant number two. And if we look at the pelletizing side, it isn’t necessarily the project gaining the most momentum on our end, so we’re finishing up the feasibility study on it. Yet when we consider pelletizing capacity and how pricing stands today, it’s hard to see that project making sense near term. We’re still glad we secured what is probably the best land in Canada for building a facility, but it isn’t something we’d put CapEx into over the short term. So as we look at our balance sheet, our main focus is really, first, to keep improving our actual operations and raise the nameplate capacity, because I believe that’s where we’ll create the most value for our shareholders. Getting the DRPF project up and running, and then carrying on the permitting process on Kami.

Dalton Baretto

analyst
#49

Thanks, David. That's really helpful context. Let me squeeze in just one quick follow-up. From the conversations you've had up to this point, could you give us a feel for the kind of pricing you're triangulating toward for the DRPF product?

David Cataford

executive
#50

Yes. At the moment, our primary aim is really to secure a formula that gives us exposure to the DR pellet. So the key conversations we're having are about gradually pulling ourselves out of that P62, P65 kind of environment and really moving closer to the DR pellet. I think that going forward, there ought to be a separation between typical iron ore and the iron ore that gets used in this DRI slash EAF process, and we want to make sure we aren't exposed to additional tons of P62 entering the market. So that's the primary approach we're taking in discussions with the various clients about pricing formulas, and we've been gaining quite a lot of traction in being able to do that.

Dalton Baretto

analyst
#51

Okay, great — so I just want to make sure I have this right. You'll be shifting from a discount relative to pellet pricing, rather than a premium, when compared with the current concentrate benchmark?

David Cataford

executive
#52

Right, on the DR pellet pricing — that's accurate. It could be a combination of the two, though the goal is ultimately to shift away from the P62 and P65 market.

Dalton Baretto

analyst
#53

That's really good to hear. Thanks so much, David.

David Cataford

executive
#54

Much appreciated, sir.

Operator

operator
#55

Thank you. It appears we have no more questions right now. At this point I would like to hand the call back to Mr. Michael O'Keeffe so he can offer any final closing remarks.

Michael O'Keeffe

executive
#56

Thank you very much, Operator. And look, I'm sitting here reflecting and listening to David talk and, you know, as a major shareholder, I try and put myself outside of the day-to-day goings-on with the company. I mean, David and I talk every couple of days, whether I'm in town or out of town, so I know intimately what's going on and obviously involved in the strategy of how we go forward. But as a major shareholder, I like to just sit back out and look back into the company and say: What are the elements that are facing us today? Well, first of all, it's the effect of China. When China coughs and everyone else gets a cold, especially, you know, no more evident than that in the iron ore business. So if I was sitting there thinking, you know, "What should I be doing? Should I be in iron ore, or should I be looking at other commodities, diversifying myself?" Well, we effectively are. And if I was sitting in Australia, in the Pilbara with, you know, low-grade iron ore, going to China all the time to their blast furnaces, I would be concerned. And as I discussed in the last quarterly report, it was, you know, how in the hell are they going to microwave the Pilbara?

Michael O'Keeffe

executive
#57

You know, it might happen at some point, but it's not... I doubt I'll witness it during my lifetime. And I hope I've got plenty of years ahead. So I examine the components within the company and ask myself, "What signals should I be watching?" Clearly, the signals are people. A near example of that would be the forest fires we recently experienced. The fact that we got the teams together, we made the area safe, we carried out evacuations of, I think, as many as 500 people. We had seven 737 airplanes on standby. We coordinated with the local community, and I believe 300 people were mobilized to battle those fires and be ready for them, and that was carried out efficiently. So one thing David didn't bring up — these small details I pay attention to — is that we've just finished a new workshop and a fairly substantial facility for the trucks and truck maintenance and maintenance, what we refer to as a shed, though it's really more of a huge building. It'll handle welding and all the rest. So that got finished on time and on budget just recently. It kind of goes unmentioned.

Michael O'Keeffe

executive
#58

I think that we, as operators, sometimes need to look back at ourselves, and one of our board directors asked, "Listen, did you have a path or anything for that?" I mean, our problem today is that we're treating that as the norm, where other people are quite surprised when they bring on an operation or bring on a project on time and on budget. For us, it's becoming the norm, and I think we probably have to stop and look back at ourselves and say, "Okay, start, you know, rewarding the people a bit more for what we're doing and what we're achieving as we go along." But what it highlights for me is the fact that if I'm sitting there as a shareholder, I'm very excited that people can deliver on these projects. And the fact that we've got the people delivering on the projects, and we're setting down the roadmap of the journey we want to go on, and that is not looking at other commodities, because, as David said, our pricing system for the product we're going to produce is going to be separated from the index, and it's not gonna be reliant on China. Now, we're talking about a pretty narrow timeframe, and we're talking about commissioning the high-grade plant in, you know, under 12 months or around about 12 months' time.

Michael O'Keeffe

executive
#59

So, you know, we're going to have to deal with a pricing system, but everybody else is in the same situation. However, we're lucky to have a high-grade 66.2 product, and you're now seeing the spread for it, because obviously steel makers want it — if they can buy high grade, they'll always want it, since it brings their unit cost down. It also helps them with their pollution issues. So let's take that as a given and then look at the roadmap. The fact that David and his team have been able to achieve this — Critical Minerals for iron ore — is bloody significant. I say that because it gives us access to government funding for growth and projects. Currently, what we're doing — the fact that we've got power ready for the next phase of this, all of that's done — and again, it seems to be taken as a given. Now, with that, we're able to look at growth opportunities, and we have the cash to do it, and, you know, we'll be a different company as we get into that process. So, you know, I'm very excited about where we're going.

Michael O'Keeffe

executive
#60

Our attention is completely fixed on the destination we must reach, and we have the right team in place to get us there. Beyond that, our shareholders have been extremely supportive, and I want to express my appreciation for that. We remain open to conversations at any time. We are always willing to bring people out to the site so they can observe what is taking place at the port, what is taking place with the rail cars, and what is taking place with the expansion of our development in that area. It can be tempting to chase after the lithium trend, or to chase after some other commodity, and that pulls your focus away from the work in front of you. Yet at the same time, the message I want to leave with you is this: we have complete conviction in the commodity, and our conviction is that it will serve a market that supports green steel. Because of that, a premium will come our way. Because of that, this is the basket where we are placing our eggs, and we will examine opportunities in other areas as they arise, and should they be low cost and sound opportunities, we will certainly look into them.

Michael O'Keeffe

executive
#61

But all in all, our whole focus is on getting to a place 12 months from now where we are selling into a completely different market. So, you know, all this emotion you're seeing today around China and iron ore prices is — we're going to be isolated from that. So exciting times for everyone, and we'll keep going over the next 12 months, and during that period, we've again been able to give dividends, and we'll keep doing that while, you know, while the iron ore price sits where it is, and we can keep bringing our cost structure down. So with that, thank you, everyone, and I'll sign off and wish you all a very nice evening or day, wherever you are. Thank you.

Operator

operator
#62

Thank you, sir. Ladies and gentlemen, that brings today's conference call to an end. We appreciate your participation and kindly ask you to disconnect your line. Have a lovely day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.