Operator

operator
#1

Good morning, everyone, and thank you for joining Champion's conference call on our Q1 results for the 2026 financial year. <<operator_script>> Today is Wednesday, July 30, 2025, and this call is being recorded. At this point I'll hand things over to Michael Marcotte. Michael, please go ahead.

Michael Marcotte

executive
#2

Thanks, operator, and thanks to all of you for being with us to go over our results today. Before I hand things to David, our CEO, for the presentation, I want to remind you that we'll be making forward-looking statements throughout this presentation. For more detail on our forward-looking statements, risk and assumptions, you can look at our MD&A, which is available on our website at championiron.com. I'd also like to remind people that the presentation we'll be using on the webcast is also available on our website under the Investor tab. With me here today is David Cataford, our CEO, who's going to do the formal presentation; our COO, Alexandre Belleau; and our CFO, Donald Tremblay. With that, I'll turn it over to David.

David Cataford

executive
#3

Thanks, Michael. And thanks to all of you for joining us today. I'm really glad to be here to walk you through our results for the first quarter of fiscal year 2026. Now, looking at this quarter, I'd say two of the standout items were, first, the fact that we were able to rail and haul roughly 3.8 million tonnes dry — that's close to 4 million tonnes wet — of material on our rail. That was a really big positive for us this quarter. And on top of that, despite a more challenging quarter, we still managed to deliver an EPS of $0.05 per share. Turning to community governance and sustainability, we continue working with our First Nations partners and the local communities, primarily in Quebec. I'm also very pleased that we received a prize from the Quebec Mining Association for one of the projects we've been running with the First Nations community — an immersion project where some of our employees went to visit a First Nations community and were fully immersed in that community itself. As for our operational financial results, one of the elements that was somewhat underwhelming this quarter was definitely our production — around 3.5 million tonnes produced during the quarter.

David Cataford

executive
#4

The main factors that affected us were ore hardness. We saw that in the prior quarter, and it's showing up again. The encouraging part is that we believe we've pinpointed the element responsible. But when you put ore hardness together with the lower head grade in the quarter, that clearly cut our concentrate throughput. And hard ore also tends to generate more fines inside the mill, and those fines are harder to recover. So we get a double hit on throughput and on iron ore recovery. Those are the primary factors that affected us. Beyond that, we also had a Hydro-Quebec shutdown of roughly 2 days, which hit our production too. Combining ore hardness with the Hydro-Quebec shutdown, we're talking approximately 300,000 tonnes in the quarter. That would have taken our production closer to 3.8 million. One highlight of the quarter is that we did move roughly 440,000 tonnes out of the stockpile, reducing it to about 2.1 million tonnes in the quarter. On the rail side, as we said, we ran at a rate of approximately 4 million tonnes in the quarter.

David Cataford

executive
#5

So that's a net positive overall. Clearly, there will be a minor effect in the coming quarter. As you probably recall, each September the rail operator carries out a substantial shutdown of the rail line — typically somewhere around 10 to 12 days — closing it down for summer maintenance work on the rail facilities. Turning to ore hardness, if we examine our mining sequence and where the impact came from, looking at the map here, you can see the southern part of what we refer to as Pignac, or the center pit. There's an extension, a small zone we brought into our reserves a few years back when we updated the mine plan. We believed this material would actually work in our favor and let us bring operating costs down, since, as the map shows, it sits much nearer to our waste dumps. So we did sense a possible benefit, given how short the haul was for the strip material out of that zone. Unfortunately, what we found is that the material in that zone is considerably harder. And looking at the last quarter, we were mining approximately 12% of our blend from that area.

David Cataford

executive
#6

So taking into account that this material has behaved in a tougher manner, what usually occurs at our site is the mill becomes plugged and jammed with that kind of material, and no grinding media we have is hard enough to clear it out. So our aim in the back half of this year -- the financial year -- is to bring down the tonnage coming out of that zone and move closer, step by step over time, to roughly 4% of the ore blend, which represents the average for this material across the life of mine. So we were mining that zone somewhat more aggressively since we believed it would be beneficial. But given that we've observed this material being tougher, well, we will certainly scale it back in the back half of this year. Regarding our mining operations, I really believe there are quite a few positives. If you look at how the mine has performed, we set a record for combined ore and waste mined and hauled during the period. So all the new mining equipment and the efforts we're making at the mine to optimize our operations have been delivering results.

David Cataford

executive
#7

Unfortunately, that hasn't shown up in the results, given the ore hardness and how difficult it is to process that material. That said, realistically, I'd say the mine is quite healthy, and we demonstrated that over the last quarter. Looking at the industry, iron ore, or the P65 material, fell during the past quarter. Since then, we've observed a recovery. So we are seeing some encouraging signals when it comes to iron ore pricing. The spread between high grade and low grade has shifted as well. The spread, then, has moved from roughly $9 to $14 per tonne. That indicates high grade is returning as a sought-after material. And with steel mills — with steel margins improving in China — hopefully we can expect that to keep getting better in the near future. On freight, freight also worked in our favor, since the C3 index came down slightly and our shipping costs were lower during the quarter. As for the iron ore price, well, that clearly is what hit us on the provisional price adjustment. So we recorded a negative of roughly USD 20 million per tonne, or about USD 5 per tonne.

David Cataford

executive
#8

The main reason for that is at the close of last quarter, on March 31, we had anticipated a settlement price of roughly USD 111 per tonne, yet we ended up realizing around USD 103. That hurt us. It could flip the other way next quarter, since at the end of June, we expected our 2.5 million tonnes on the water to settle at approximately USD 100 per tonne. And from then on, we've watched iron ore prices climb. So we may see a positive provisional price adjustment. On realized price, after accounting for freight, provisional price adjustments and FX conversion, our net realized price came in at about CAD 102 per tonne. Turning to cash costs — clearly a somewhat disappointing item this quarter. Realistically, of the CAD 82 per tonne delivered in the vessel, the two chief factors that hit us were the use of stockpiled material and ore hardness. With ore hardness cutting our throughput and lowering our iron ore recovery, the overall volume impact this quarter was approximately $4 per tonne.

David Cataford

executive
#9

If we had been able to achieve a steadier output level, that would have let us lower those costs by cutting the fixed cost component by roughly $4 per tonne. A further effect came from our use of stockpiled material. As you're aware, when stockpile material is used, we must take into account that it had been transported to the stockpiles, along with the fact that we are likewise moving material out of the stockpiles to the load-out area. That gets captured in the cost of those tonnes. And considering the benefit of drawing such a large quantity, 440,000 tonnes, from the stockpile, it is clearly favorable for our cash, yet unfavorable for our operating cost in the quarter. So when you factor in the volume impact and the inventory impact, together they come to approximately $8 per tonne. That would have brought our operating cost down to the mid-70s. Turning to financial highlights, as noted on the first slide, revenues of approximately $390 million, EBITDA a little under $60 million, and EPS of roughly $0.05 per share. Regarding the change in cash for the quarter, we had several positives, one of which was that the case exercised their warrants, generating approximately $37 million.

David Cataford

executive
#10

They acted on that before the expiry date, which reflects their constructive outlook on the business right now. And when we turn to our cash movement, it climbed from $117 million to a bit above $176 million over the quarter. On the balance sheet side, that leaves us in a very strong position, letting us wrap up the <<inaudible>> while still drawing benefit from approximately 2.1 million tonnes of stockpile material that we expect to keep working down over the quarters ahead. One item we completed after the quarter closed was the high-yield bond we now have in place. It was our first-ever issue of that kind, it went well, and we're very pleased with how it turned out. <<inaudible>>, as you're aware, beginning next year we have to start repaying principal on the term loans we already carry. So we clearly wanted a structure with more permanence behind it. We had also drawn on the revolving facility, largely to fund construction of a flotation plant. So we wanted the ability to pay back that revolving facility. Taking everything together, we had roughly USD 335 million to repay, and we raised a note of approximately USD 500 million, which lets us boost liquidity while also clearing all of our other debt.

David Cataford

executive
#11

Now moving on to the flotation plant. As you're likely aware, we're currently in the construction holiday period here in Quebec. The teams will return next week to carry out the final steps so we can hand over the plant before this calendar year ends. The key objectives at this point are completing all piping on site, finishing the hookup of the different pieces of equipment, and doing the electrical work. There's still a substantial amount of work left to wrap up the plant, but we remain at ease stating that we can deliver the project by year-end and bring it in within the $470 million budget. If you recall, during the Phase 2 build, piping was among the more complicated elements in this region. There are quite a few projects underway here in Quebec right now involving piping, chiefly the battery factories being constructed in the southern part of Quebec, yet we still feel confident that we can hit our December target this year and complete the various remaining portions of the project. Regarding negotiations with our different clients.

David Cataford

executive
#12

We are therefore pressing ahead with those talks. Our view remains unchanged: the initial shipments will go to North Africa and the Middle East. We genuinely believe that region is where we can first unlock the strongest returns for our product. Down the road, we also aim to move tonnes into Europe. We have observed a range of European firms pressing on with their shift to steel with lower CO2 intensity. Although steel-related news coming out of Europe shows a fair amount of negative output, we still see multiple companies, chiefly in Germany, carrying on their move toward electric arc furnaces and DRI facilities. So while we do anticipate beginning to sell tonnes into the Middle East and North Africa, I believe that in the near future we will likewise be able to sell tonnes into Europe. We anticipate signing our initial contract by the close of this calendar year or the start of the next calendar year, so that we can be set for, say, April or May of next year, when we will be in a position to begin selling full cargoes of this DRPF material. Another major highlight we have just announced is our entry into a definitive framework agreement with Nippon Steel and Sojitz.

David Cataford

executive
#13

That signing ceremony last week was really encouraging. Executives from Nippon Steel and Sojitz came to our site, and they also flew to Kami. Having 2 solid partners who can help us move the Kami next steps forward is a very good thing. As a reminder of those next steps: what we're doing right now is completing the feasibility study, which will confirm the figures from our pre-feasibility study and possibly enhance certain areas, and we're also handling the permit for the modified Kami project. As you'll recall, in the Kami project we raised the volume versus earlier feasibility studies, and we also made a significant improvement to the grade of our material, which lets us counter what we largely observe elsewhere, where quality is falling — we in fact see our material and our niche as capable of producing the highest grade type material anywhere in the world. Now on ore quality: one of the key points many of our clients have raised with us is that the quality from the Australian majors has fallen over the past decade. Contaminants are up by roughly 12%.

David Cataford

executive
#14

We therefore view our kind of material as something capable of offsetting those grade reductions and of letting us gain, or helping us gain, from better premiums before long. That said, I'd now like to move into the Q&A part of the call so we can address whatever questions you may have.

Operator

operator
#15

<<operator_script>> Our initial question is from Alexander Pearce of BMO.

Alexander Pearce

analyst
#16

It's really encouraging to see shipment volumes rise substantially in the quarter. As you noted, though, costs stepped up on a sequential basis. You also mentioned in your remarks that you anticipate working through the tougher ore by this year's second half, which presumably ought to be a help on costs. But does that likewise suggest the strip ratio will decline during the back half of the year? Or is continued higher stripping required as you seek access to that softer ore? And what effect does that stripping have on cash costs? Then, for a second question, could you remind us of the stockpile level you ultimately aim to reach at site?

David Cataford

executive
#17

Yes. Appreciate the question. If we turn to the second part, when we consider how Bloom Lake has always been run, the goal is zero inventory at site. We've never managed to reach that zero level, since we always hold some stockpile material in case of train problems, because we don't want to halt production. But we've watched levels sit between roughly 75,000 tonnes and about 250,000 tonnes. That's a range where we're comfortable. We usually prefer to destock, or push as hard as we can, just ahead of winter so that our stockpiling facilities next to the site, or next to the loadout, are clear for that stretch. But I wouldn't expect that in the future, once we've cleared the stockpile material we've had to keep away from the loadout area — well, I expect us to return to that in the future. Now, looking at stripping going forward, the strip ratio is in the range where we ought to be for the life of mine. So the main cost reduction will really come from the higher throughput, because it dilutes our fixed costs down.

David Cataford

executive
#18

Therefore, a stripping portion isn't automatically what will benefit us. What really matters is that the ore is considerably harder at present, which has cut our throughput and lowered our recovery. Looking ahead, though, the thing that will assist us in bringing costs down will be, I would say, ore that is more typical, or like what we saw previously, rather than what we're encountering in that small zone located in the south of the center pit.

Alexander Pearce

analyst
#19

I just want to confirm, then — you don't actually require any specific shift in strip to reach the softer material or to get past this tougher ore section?

David Cataford

executive
#20

Right, that's accurate. What I view it as, more than anything, is the usual ore we've been working with over the last 7 years, plus this tougher ore located in that particular spot—the southern part of the center pit. Even so, reaching other ore doesn't require additional stripping. In all honesty, we genuinely saw a chance to bring costs down, since, once more, on the map it sits right beside the waste dumps. Our expectation was that it would cut our costs, yet the opposite happened, given how hard this material is.

Operator

operator
#21

Orest Wowkodaw from Scotiabank has the next question.

Orest Wowkodaw

analyst
#22

Sorry to press on this, but I'm not entirely clear. That plan to cut back the contribution from the harder ore area — is it already underway? Or is it more that you're essentially still mining <<inaudible>> through the remainder of this year, so we shouldn't really expect the improvement until next year? I'm just not clear on when that switch is meant to take place.

David Cataford

executive
#23

Yeah. So, as we said — if you turn to Slide 8, the key point is that during the second half of this financial year, we'll begin bringing that percentage down from that zone. So we do expect the next quarter to look similar to where we are right now. We're exploring ways we might be able to improve production even with this kind of ore, but the gradual reduction of this type of material will happen more in the second half of this year. I mean, we do get a benefit from the stockpile material that lets us counter on the sales side, but I expect that by the middle of this year we'll be able to start reducing the percentage from those zones.

Orest Wowkodaw

analyst
#24

All right, so we’re still looking at a couple of quarters here. Then, regarding costs, you mentioned that cash costs are being affected — I think by the stockpiles — because they make up a larger share of the contribution. Could you put a number on that for us? For instance, out of the $81.90 per tonne cost, how much would you say comes from, I guess, rehandling costs and what I believe is disclosed as higher inventory costs for that material?

David Cataford

executive
#25

Yeah. So the way we see it, there's roughly — if you look at the quarter, about $4 per tonne tied to higher inventory costs. That's mainly because of the material hauled to those stockpiles, so it was accounted for at a higher price. And then when we bring the material down, well, it's kind of a double cost increase. So that's where you see roughly about $4 per tonne linked to inventory cost. Then when you look at ore hardness, the total volume effect has been roughly about $4 per tonne as well. If we account only for, let's say, the harder ore, what the impact from that has been and the lower recovery, well, that is mainly due to — or associated with about $3 per tonne. So ore hardness zone of the — about $3 per tonne, $4 for the total volume portion. So that includes that $3. And then when you look at inventory effect, about $4.

Orest Wowkodaw

analyst
#26

All right, so would it be reasonable to think that, because of those two factors combined, expenses will probably stay elevated over the coming couple of quarters?

David Cataford

executive
#27

Sure — as long as we're pulling material down from the stockpile, that will certainly have an effect on us where cash cost is concerned. What I mean is, on a cash basis there's a net positive, since most of the operating costs tied to that material have already been paid. But when it comes to the actual cash cost, we'll see it run a little more elevated as we draw tonnes down from that stockpile. On the volume effect, what we'd expect is that starting in the second half of this year, we begin to see that portion decline, so far as cost impact goes. So we do see the volume effect getting better in the near future.

Operator

operator
#28

The next person to ask something is Fedor Shabalin with B. Riley Securities.

Fedor Shabalin

analyst
#29

David, you cut the amounts of iron ore concentrate sold through long-term sales contracts so that you could keep a larger share of your ore concentrate for the short-term and spot markets. So would it be fair to think this pattern will persist going forward if iron ore pricing stays at its current level?

David Cataford

executive
#30

So at the moment, if we look at how we're approaching sales, the bulk of the Phase 1 tonnes are committed under long-term contracts, and pretty much all of Phase 2 is more spot-based, because in just a few months we're going to deliver our plant — our flotation plant — and produce 69% material. So what we intend to do in the near future is allocate most of those tonnes from the flotation plant to longer-term contracts. That will leave only a very limited number of tonnes tied to the spot market.

Fedor Shabalin

analyst
#31

My second question concerns DRPF. Could you describe the current status of discussions about the future product from that project? And, to whatever extent you're able to disclose, which parties are taking part in those talks? Also, have there been any revisions to the anticipated premium versus the P65 index estimate? As I recall, that figure stood at approximately $20 per tonne.

David Cataford

executive
#32

Yes. What really matters to us is continuing negotiations with steel producers in North Africa and the Middle East. So our strategy remains unchanged on that front. We're pushing that part forward, devoting a significant amount of time in the region to make sure we understand which facilities are being delivered, which ones are the best where we can sell our material and benefit from Capesize vessels coming into those ports. And regarding potential premiums, our true aim is to link our contracts to the DR pellet. That has been our main focus over the past years, because we want to cut our exposure to the P65 index as we potentially see more volume arriving in the high-grade market with delivery of the Simandou project. So in how we structure our contracts, the goal really is tying our product to the DR pellet. So that is progressing well. We should be in a position to sign our first contracts either at the end of this calendar year or at the beginning of next calendar year.

Operator

operator
#33

<<operator_script>> Our following question is from Stefan Ioannou with Cormark Securities.

Stefan Ioannou

analyst
#34

I realize on earlier calls we discussed the rail's capacity in general terms. Now another quarter has gone by. And I understand it shifts from one quarter to the next because of weather and planned maintenance. Still, that 3,800 tonnes you moved by rail during the quarter just ended — do you think that's a sensible benchmark going forward for what you feel comfortable moving on that rail? Or do you believe it could go above that?

David Cataford

executive
#35

Absolutely, it could go higher than that. If we look at the prior quarter, sure, we had 3.8 million tonnes, but those are dry tonnes. And when we move tonnes, we need to measure on the wet side, since we're moving the water as well. So looking at the run rate for that quarter, we were nearer 4 million tonnes, which works out to a run rate of roughly 16 million tonnes. We still believe there's room for improvement. Again, the infrastructure itself isn't the problem. The operations are really what matters. And we certainly have the potential to keep raising that. Just to give one example, right now we're sharing railcars with the rail operator, which lets us have greater flexibility. So many of these small pieces we're adding in order to boost throughput, because we want to go past that 16 million tonne run rate going forward.

Stefan Ioannou

analyst
#36

All right. I don't want to be feeding you figures, but suppose we talked about something like 16 million dry tonnes per year — would that land somewhere in a sensible range, or...

David Cataford

executive
#37

So, I mean, our plan is to develop the Kami project down the road. That means the rail line will need capacity to handle an additional 9 million tonnes. I don't believe 16 million tonnes, whether dry or wet, represents the ceiling. We have to collaborate so we can boost the throughput on that rail. And again, looking back 30 years, that rail was moving close to double the tonnage we see today. So infrastructure isn't the problem. We simply need to return to the levels at which it operated previously.

Operator

operator
#38

That brings us to the end of the question-and-answer session. I'll hand things over now to David Cataford. Go ahead.

David Cataford

executive
#39

Yes, and thanks to all of you for joining the call. If you look back over the past few quarters, we certainly faced certain difficulties regarding production and costs, and that is absolutely an area the entire team is concentrating on so we can return to the output levels we have consistently achieved before. I mean, the 7 years behind us have been excellent. Phase 2 has proven somewhat tougher, both when you factor in logistics and a handful of external events, along with a few internal ones too. Even so, we continue to have a strong team capable of working around those factors over the coming quarters, and I believe we can restore the operational excellence we demonstrated previously. Looking ahead, I still feel your company occupies a strong position, because, I mean, we are shifting our product toward one of the few segments where demand is growing and where we genuinely expect higher premiums down the road, namely the DR grade. I realize there is considerable chatter around that, and at times some doubt about what level of premiums we can secure.

David Cataford

executive
#40

But the work we're doing is the right work, so we can align ourselves with the right partners — to gain from lower freight costs and also gain from the significant premiums that this type of material will bring, along with the scarcity of it. And once more, we're very proud to have delivered a project with 2 of the great companies of this world, Sojitz and Nippon Steel. And as you can imagine, being able to bring such good partners into our company on a greenfield project like Kami really demonstrates the strength of our team and the trust these various partners have, and we're very happy to be able to move forward with the next steps — so the permitting and the feasibility study — to be in a position in a few years to fully benefit from the DR premiums that we're going to see once this market starts getting more mature. So once again, thanks a lot for your support, and we look forward to being able to update you at the next quarter.

Operator

operator
#41

That wraps up our call for today, everyone. We appreciate you taking part. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Champion Iron Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Champion Iron Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Champion Iron Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.