Cleveland-Cliffs Inc. (CLF) Earnings Call Transcript & Summary
February 20, 2020
Earnings Call Speaker Segments
Lourenco Goncalves
executiveThanks, Christina, and good morning to everybody. I'm grateful that you could all be here for what ought to be the final call before we stop operating as a stand-alone iron ore business. Once we complete the purchase of AK Steel, Cleveland-Cliffs is going to be a company involved in both steel and iron ore. This transaction is one of a kind, and the whole team is enthusiastic about it, eager for every advantage that comes from having control over the iron ore pellets and HBI feedstock in addition to steel products — flat rolled coils made of stainless and carbon steel among them — plus highly engineered manufactured parts serving the automotive industry. During the last few weeks, we've found ourselves captivated by the untapped potential that plainly sits within the AK Steel assets, and we've been extremely impressed by how good the people on the ground are. What lies ahead for us is in fact larger than our original vision. Before explaining why, let me begin by updating you on where things stand regarding our closing timeline. As you can likely tell, since this call was moved up by one week, we are making remarkable progress on every necessary checkpoint required to close the transaction, thanks to a tremendous combined effort from the transaction teams at both Cleveland-Cliffs and AK Steel, along with our outside counsel, Jones Day. Regulatory approval came through from the United States on January 22nd, from Canada on February 12th, and we anticipate Mexican approval by February 27th. Beyond that, our S-4 registration statement became effective on February 4th, which let us schedule our special shareholder meeting for March 10th, with the transaction closing shortly afterward on March 13th. Our interactions with AK Steel throughout the last several weeks convinced us that Cleveland-Cliffs and AK Steel share a great deal in common, and that both differ considerably from other companies and from the vast majority of companies out there. Much like Cliffs, AK Steel has never cut costs by neglecting required maintenance. Doing so would, over time, degrade equipment and products substantially. That isn't the situation at Cliffs, and it isn't the situation at AK Steel. Furthermore, both AK and Cliffs depend on the North American market and ought to prosper given the strong economy we have right now and will keep having here in the United States. Unlike the vast majority of companies these days, our businesses aren't reliant on China. With the acquisition of AK Steel, Cleveland-Cliffs turns into the most relevant steel supplier to the automotive industry in the United States, fully integrated from iron ore on the ground all the way to auto parts as a tier 1 supplier of finished parts used in the assembly line of the car manufacturers. The pro forma numbers demonstrate that even before we factor in synergies and cost-cutting actions, the new Cliffs holds the highest EBITDA margin among every steel company in North America. That covers all integrated mills and all EAF steel makers. Finally, on the first day, we are putting the AK Steel balance sheet matter to rest permanently; as a result, we will operate a company that has a 4-year period with no maturities coming due and run the business from a position of financial strength. AK Steel caters to high-end markets that favor price stability, and it holds the largest concentration of automotive share among every steel mill in our sector. That fairly steady revenue stream is not matched by its cost structure, which fluctuates considerably more, especially because of movements in the price of iron ore. By joining our two businesses together, we can reduce this intra-year volatility through a mix of stable costs and prices, while giving the new company a degree of margin predictability that is uncommon in the metals and mining world. Two other U.S. integrated steelmakers also control, either wholly or partly, their own iron ore supply, yet neither one has the same level of penetration in the automotive market, and both carry far more exposure to spot steel prices. The reasoning behind the deal was laid out in our announcement on December 3rd, 2019. Once our acquisition of AK Steel closes, the commodity indices investors treat as a proxy for Cliffs' performance will carry much less sway, since our revenues will be substantially more within our control. We recognize that EAF mills keep taking market share from the so-called high-cost blast furnace producers. That said, regarding every integrated steel producer as though they were identical is a poor oversimplification; in reality, there is enormous disparity among different integrated mills. Furthermore, when it comes to EAFs, significant technological constraints exist in the kinds of steel that each EAF mill can produce, or is willing to produce. Most of the sophisticated steel products AK Steel provides are not simply something any steel mill can make; that is one of the key reasons the steel industry in countries with substantial automotive manufacturing power, including Japan, Germany, France, and South Korea, is entirely dominated by blast furnaces. Those blast furnaces are run by a small number of well-managed and properly capitalized companies, including Nippon Steel, ArcelorMittal, and POSCO, among a few others. In the realm of highly sophisticated steels for the automotive industry, well-operated integrated mills win by a wide margin. Automotive and blast furnaces, good blast furnaces, I mean, go hand in hand. There is a small group of high-end steel producers worldwide that possess all 3 necessary strengths to belong to this select group. First, the technological capability. Second, the R&D resources; and third, the staying power of a strong balance sheet. While the legacy AK Steel has just 2 of the 3, the new Cleveland-Cliffs will possess all 3 strengths, and therefore, belongs in this very select group of the steelmakers. AK Steel's role as a longtime supplier to automakers matters even more right now, as we reach a fascinating turning point in the North American car and truck market. We are at the earliest stage of a sweeping shift away from combustion engines in passenger vehicles toward electric-powered cars and trucks. At present, EVs account for only a tiny share of vehicles on the road, and Tesla stands out as a star and an undeniable reality, the first company to demonstrate a presence in the EV market. Meanwhile, several other automakers are catching up and preparing to roll out new electric vehicle models across the coming few years, especially in our favorable American market, which is underpinned by low interest rates and full employment. A vertically integrated, downstream-oriented Cliffs AK Steel will gain from this trend. Thanks to AK Steel's distinctive technical expertise, we hold the strongest position to provide what this shift requires as the fleet moves from traditional combustion engines to EVs. AK Steel turns out the most sophisticated products, among them engineered parts for the automotive industry as a tier 1 supplier, made in highly automated facilities run by Precision Partners at several strategically located plants across the U.S., Canada, and Mexico.
Lourenco Goncalves
executiveLooking ahead, our downstream operations will be leveraged and expanded; AK Tube and Precision Partners are going to sit at the heart of both our business and our commercial strategy. Here at Cleveland-Cliffs, profit is what drives us, and our strong commercial execution has been demonstrated through highly successful renegotiations of contracts with our pellet customers—occasionally catching outside observers off guard with just how capable we are of getting those deals done. Through a more commercially oriented improvement in how we use our distinctive R&D assets, the new Cliffs AK is capable of providing, and will provide, the advanced steel solutions that automakers need in order to build electric vehicles for the mass market; these automakers are long-standing, well-established customers of AK Steel, and a number of them have reached out to us at Cleveland-Cliffs over the past several weeks to voice backing for our transaction and their readiness to engage with a stronger entity—which is what the combined Cliffs AK Steel will be. Thanks to the balance sheet relief that the standalone AK Steel will give us, this uncommon market opening in cars and trucks can be pursued, and will be pursued, to our advantage. Naturally, none of that would have come about if Cleveland-Cliffs and AK Steel had remained as 2 separate companies. This is merely one small illustration of what we intend to accomplish as a combined entity while attaining and preserving a robust financial profile for a well-capitalized Cliffs AK Steel. An exchange offer has already been completed successfully, one that removes the pertinent covenants from AK Steel bonds, which gives us a great deal of uniformity and flexibility in our capital structure. In addition, we have arranged and implemented a new $2 billion asset-based loan for the combined entity. Through our new ABL, we will have substantial liquidity along with a simple method for paying down debt rapidly, with no prepayment penalty. Finally, subject to market and other customary conditions, we will in the near term be refinancing AK's 2020 and 2023 bonds. Given all of this, when we close on March 13th, the newly combined company ought to carry a far stronger financial profile than the current AK Steel, among other things including the pleasant and comfortable low maturity window extending years into the future that we enjoy today as a standalone Cleveland-Cliffs. Once the deal has closed, I will be able to share far more detail, covering our operational plans, progress on synergy achievement, and footprint optimization initiatives. In the meantime, our combined teams will keep planning and preparing the ground for our takeover on day one; as of now, our mining and pelletizing business stays as steady and reliable as it has always been. Another advantage of the AK Steel transaction is that our pellet supply is now under our own control, and we have gained considerable optionality as a supplier of iron ore products. Through 2026, roughly 85% of our pellets order book is secured. When it comes to the other 15% of pellet output, a few paths are open to us: we could renew arrangements with outside parties, move DR-grade pellets, or use the AK Steel blast furnace setup to market merchant pig iron. That choice won't be made until a later point, and when we do make it, it will be structured so the profits we get from our distinctive standing in the iron ore pellet and HBI sectors are as large as possible. The main reason we have this room to maneuver with our pellets is that we built our HBI plant. In just a matter of months, hot-briquetted iron will be rolling out of our facility and into customers' hands. Let me state clearly at this moment: our HBI plant will come online in June 2020, and we look for solid EBITDA along with solid free cash flow out of our Toledo Operation during 2020 as well; beyond that, we look for reaching the 1.9 million metric tons nameplate capacity for HBI in 2021, which stands as the initial complete calendar year our Toledo plant will run. Ahead of commissioning, work on the technical and commercial fronts is progressing nicely alongside our new electric arc furnace customers. At a high 3% carbon content, Cliffs HBI stands as a distinctive premium item, well beyond the low-carbon HBI and DRI typically turned out; indeed, imported pig iron can be swapped out directly with our HBI. Of great importance, a single source, our Northshore Mining, provides our Toledo plant solely with consistent pellet feedstock, and that is a crucial element enabling steady output and an extremely uniform product; given this, I am glad to share that, drawing on genuine continuing commercial dealings, Cliffs HBI will find buyers not just in our customary market across the Great Lakes, Indiana, Ohio, Kentucky, Illinois, and other states, but additionally at electric arc furnace plants in states further south, for example Mississippi and Arkansas. Taken together, the Toledo HBI plant and the Northshore Mining upgrade for DR-grade pellet output mean Cleveland-Cliffs has invested over $1 billion to create a fresh application for taconite iron ore from the Minnesota Iron Range. This significant outlay has created over 150 new full-time, well-paying positions in Toledo, and delivered a highly meaningful economic gain to Minnesota and Ohio alike, encompassing roughly 1,650 construction positions across both states over the past couple of years; we could not be more thrilled that only a few months separate us from beginning to swap Russian and Ukrainian pig iron for our Made in USA HBI, which will benefit our new EAF clients, our employees, our shareholders, and the economy of Toledo and Northwest Ohio; with that said, I would like to bring in our CFO, Keith Koci, to go over our fourth quarter and full year 2019 results.
Keith Koci
executiveThank you, Lourenco, and good morning everyone who's joined the call. Cliffs closed out 2019 with adjusted EBITDA in the fourth quarter totaling $111 million, alongside full year adjusted EBITDA of $525 million. That worked out to a 28% EBITDA margin — the best in the industry — despite having to navigate steep declines in steel pricing as well as pellet premiums throughout the year. What stands out most is that cash flow from operations keeps climbing, now marking a positive six-year streak. Net cash provided by operating activities reached $563 million in 2019, up against $478 million the prior year, making it our strongest figure since 2013. Quarterly EBITDA for our mining and pelletizing segment came to $153 million, powered by 5.8 million long tons shipped, which included 400,000 tons of intercompany sales; that brought us to 19.4 million long tons sold across the full year, about what we had previously guided. Our pellet price realization landed at $90 per long ton in Q4, hurt by the swings in hot-rolled steel prices and pellet premiums experienced over the back half of the year. As a result, we booked an unfavorable revenue true-up adjustment in the fourth quarter. That true-up largely stemmed from revaluing the whole year's sales using full year averages for the HRC pellet premium and IODEX, which weighed on our Q4 rate. Taking all of that into account, our full year revenue rate came to $100 per long ton, landing at the midpoint of the spot price guiding range we gave last quarter. Cash costs in the fourth quarter were $64 per long ton, which likewise placed us squarely at the midpoint of our full year guidance range of $64.50 per long ton. Turning to CapEx, we've now passed our peak year spend of $656 million, and we anticipate roughly half that figure in 2020 as construction of the HBI plant in Toledo wraps up. On the finance side, we're thankful that after such a heavy spending year we kept a healthy liquidity position, with $350 million in cash plus an untapped revolver; as capital spend comes down, our cash needs in 2020 will be far lighter. Beyond lower HBI construction costs, we'll also be free of the $45 million minority interest payment we were contracted to make in each of the last three years. Lastly, our steady flow of tax refunds carries on, with another $60 million anticipated around the middle of this year, plus two refunds of $30 million in each of the next two years. For 2020, we expect to sell between 20 and 20.5 million long tons of pellets, including approximately 1.5 million long tons of DR-grade pellets delivered to our HBI plant. Because of the extra pellet tonnage produced last year that currently sits in inventory, we also retain the flexibility to exceed that sales figure in 2020 if demand justifies it. When we look at full-year guidance for Cliffs on a stand-alone basis, the expected 2020 adjusted EBITDA range we've given is $550 million-$575 million. To stay consistent, we've relied on approximately the same pricing and forecast assumptions that appear in other publicly filed documents, drawing on analysis put together last November. I'd also point out that because HRC prices have declined, our revenue rates are now somewhat less sensitive to iron ore price movements and pellet premiums, given how our pricing formulas work. Once we finish acquiring AK Steel, neither our revenue sensitivities nor our EBITDA guidance range will matter, so we'll be de-emphasizing them going forward. Even so, as long as we remain a stand-alone business, I should mention that we've reached a point where the Atlantic Pellet Premium is under the pellet conversion cost for most participants in this market. Supply has already started leaving the market; beyond that, right now the Chinese Pellet Premium is in fact above the Atlantic, which is fairly uncommon and frequently indicates the Atlantic premium has fallen too low and will probably increase. For the first quarter 2020, as usual, restricted shipping on the Great Lakes is underway, which means we must keep most deliveries to rail only. On a Cliffs stand-alone basis, Q1 ought to account for just 3%-5% of our full year revenues. If we close on our expected date of March 13th, next quarter's results would include AK's results only for the final 18 days of that month; a small prorated effect from AK's earnings could show up during Q1, but the complete benefit of their earnings wouldn't appear in our results until the second quarter. With that, I'll hand things over to Lourenco for his closing remarks.
Lourenco Goncalves
executiveAppreciate that, Keith. Between the AK Steel purchase wrapping up soon and the Toledo HBI facility starting operations, 2020 stands as the single most transformative year across our 173 years; it's a thrill to bring aboard new clients Nucor, Dave J. Joseph, Steel Dynamics, OmniSource, Big River Steel, North Star BlueScope, plus a number of others, since they'll be buying enormous tonnage of HBI to charge their electric arc furnaces. At the same time, bringing the Cleveland-Cliffs purchase of AK Steel across the finish line will require backing from those who own our shares. If you're a Cliffs shareholder listed as of January 31st and you're on today's call, the documents you need in order to cast a ballot for this deal ought to be in your hands already. That ballot matters, and I'm grateful for it. As you're aware, I personally hold a hefty stake in Cleveland-Cliffs — I've purchased several million dollars of CLF stock on the open market and have never parted with even one share, apart from offsetting taxes prior to those shares vesting to me. As an owner of shares, and speaking to every one of you who owns shares, my view is that acquiring AK Steel — done under my direction, with my management team leading the way, and with important people joining from AK Steel's management ranks — represents the best route toward maximizing what our CLF stock is worth. Should you have questions regarding why this deal makes sense or about casting your ballot, don't hesitate to get in touch with us via the contact details found in your materials or on our website. Once again, that ballot of yours matters, and I'm eager to have your yes vote in hand no later than March 10th. Having said that, I'll hand things back to Christina so we can move into Q&A.
Lucas Pipes
analystMorning, everyone, and congratulations to Lourenco and the team for the steady advances on HBI and for wrapping up the AKS purchase so fast. Lourenco, I'd like to open with a few bigger-picture questions. Number one, regarding AKS, you brought up the long-range strategy and the commercial possibilities there. Other parts of the AKS portfolio may matter less, and those could become candidates for monetization. I'd welcome any thinking on that. Going through the S-4, it looks like this union began with a date concerning Ashland. I don't believe you brought up Ashland in your prepared remarks. Could you perhaps give us an update on how you're thinking about that asset? Finally, I appreciate what you said in your prepared remarks about the EV revolution. People usually don't think about steel when it comes to EV. What's your view on that? Which products feed into that market and transition in particular, and what impact do you expect for AKS over the longer term? Thanks for all the detail on those three questions.
Lourenco Goncalves
executiveOkay, Lucas; that's quite a lot to digest, so let's try to get through it. To begin with, the thinking on assets. I need to tread very cautiously regarding the topics I'm permitted to address and those I'm not, because certain M&A rules exist — along with legal restrictions tied to gun-jumping — given that I haven't taken over leadership of the company at this point. We're in the process of getting a plan ready, and of course, plans are in place. At a high level, and without diving into any particulars, those assets that were never intended to sit within the core — and a number of them won't be in the core — are going to be monetized. That's exactly what we did when it came to the Cliffs. That was much harder, much messier, and much more tied to particular prospective purchasers. With AK, there are a couple of situations where people are approaching us on their own, without any outreach on our side. They initiate contact, phone us, and put forward ideas for this or that kind of transaction. We're giving a hearing to everybody, while also committing our own strategy to paper. The moment we begin, we'll move straight into carrying it out. You ought to anticipate that assets outside the core will be addressed and turned into cash as skillfully as we can manage — that comes first. Turning to Ashland: we had been developing a marketplace for HBI, and results have been very strong. That effort is now behind us. We feel our work on both the sales side and the engineering side paid off, and we're quite happy about that. I listed some customers who will purchase very large volumes of HBI from us. Incidentally, AK Steel wasn't among the names I brought up, since right now our focus is on selling HBI to buyers outside the company. At the outset, we don't intend to consume any of that HBI inside AK Steel at all. That should give you an idea of how sought-after the HBI product currently is in the marketplace. Now, back to Ashland. My interest in Ashland began because I was witnessing the tremendous appetite for our HBI; in my view, it would be a chance to build out an expansion within this metallics sector and grow Ashland into a supplier of pig iron to the market; but once I begin that process, market analysis becomes necessary. When we conduct that analysis, you come to see that the EAFs can only reach a certain point before hitting a ceiling they are unable to break through. Should they be unable to make particular product types, then you cannot, fairly, keep providing them with metallics, since they won't require it if other options exist that could prove more economically viable for these smart EAFs. They won't purchase pig iron merely because pig iron happens to be on offer. To put it differently, they — the EAFs — won't be manufacturing exposed parts for automotive when pig iron is on hand, since that isn't the limiting factor for making exposed parts; we truly came to see that we are reaching a stage with our HBI where we are essentially maximizing the market for EAFs. Will Ashland come to pass now? I have no idea. My belief is no, since our first and foremost priority will be to maximize AK Steel capabilities. Upon realizing the EAFs couldn't reach that point, I likewise recognized untapped potential in AK assets that I could cultivate. What's even more important is that a number of other integrated producers — ones with a long track record and deep history in supplying the automotive sector — are pulling back. They're going backwards. They're going from a car down to a bicycle. Let them do it. I'm fine with that. AK Steel R&D capability has the technical ability, the patents, the products, the customers; everything we need to do is make it better on the commercial side, together with the balance sheet that's going to be finished before we get there on March 13; that's where our strength lies; that's what we've done for a living for 39 years and six months in this business. Ashland, right now, is on the back burner. My view is the market doesn't need Ashland. There's no doubt that the market needs our HBI. What I can't say for sure is whether Ashland is something they need. My commitment is to do whatever I can to make sure Ashland isn't needed by the market, since growing AK Steel's business is our goal. You also mentioned the electric vehicle revolution. I agree with the way you put it — it truly is a revolution. Even more important, it's a revolution in steel. Remember that the Tesla S was made completely of aluminum. The Tesla 3, which is the next step for Tesla, and the Tesla you see driving around today, is made completely of steel. So steel has opportunity on its side as well. So, to close things out: the old-line car companies have figured out that Tesla isn't going anywhere, and neither are electric vehicles. Each of those manufacturers is charging hard into the electric space. And here's the thing — every single one of them buys from AK Steel. Down at our research and development site in Middletown, Ohio, we'll be building electric vehicles and the materials that go into them. Actually, we're starting right away — it's already underway. AK Steel stands to gain a great deal from this, and when a chief executive the likes of Volkswagen's informs his team, "Tesla is real. If you don't believe, you don't belong to Volkswagen at this point," that means something. General Motors is bringing out a whole slate of EVs. Ford is heading in that direction. There's a truck manufacturer named Rivian, building trucks in Illinois; they're a massive customer of AK Steel. We will keep supporting what they're developing. A great deal is coming in this area. Here in the United States, we're going to be essentially — I wouldn't say on our own, since we've got ArcelorMittal USA, which also competes in the market. My sense is they'll bring plenty of business our way, Cleveland-Cliffs, AK together, plus our major customer, ArcelorMittal USA. We're strong on both fronts, on the auto front and on the pellet front. Apologies if my response ran too long, you handed me three very fascinating and very thought-provoking points to address.
Lucas Pipes
analystI truly value all that detail, Lourenco. There's never enough of it. I'll be brief with my follow-up. Could you break down capex for 2020? Keith, perhaps you covered this in your prepared remarks, but if you would.
Keith Koci
executiveCertainly.
Lucas Pipes
analystIf I happened to miss that, I'd be grateful if you could say it again. Thanks.
Keith Koci
executiveSure thing, Lucas. For 2020, the guidance we gave, $350 million-$400 million, splits up like this. Finishing Toledo will take $270 million-$290 million. Essentially all of that spending occurs during the first six months. Cliffs' sustaining CapEx, $70 million-$90 million, around that area. About $20 million in capitalized interest over the course of the year. for getting the Toledo plant done. That's how it breaks down.
Lucas Pipes
analystAll right, that's really helpful. Wishing you ongoing success. Thanks so much.
Lourenco Goncalves
executiveThank you, Lucas.
Alex Hacking
analystHello, and good morning — I appreciate you making time for us. I'd like to ask a follow-up regarding the HBI. You mentioned that significant commercial progress has been achieved there, so congratulations on that success, and from what I understand, the offtake is fully secured, or at least a substantial portion of it has already been arranged. What I'm curious about is the pricing. If you can, could you share any detail about how the pricing will be structured — specifically, what kinds of contracts you'll sign? What about their length? Regarding the mechanism for setting HBI prices, will there be any linkage to indexes, and what frequency will be used for price resets? Whatever insight you can offer would be greatly appreciated. Thank you.
Lourenco Goncalves
executiveMorning, Alex. Our HBI is sold to customers who each have their own method of conducting business. That's something I've said repeatedly. Even before construction of the HBI facility, I've stated that the customers' way of doing business must be respected. Attempting to force a different business approach prior to gaining entry into a market is not something we can do. These buyers purchase on a short-term basis. Purchases happen order by order; tonnage for the quarter is agreed upon somewhat flexibly with such orders, while pricing gets determined each month. For us, pig iron pricing will serve as the primary benchmark, with adjustments made for the value in use that our HBI — I mean the pig iron as delivered to the customer, obviously, not pig iron FOB Tubarão, Brazil, nor FOB Ponta da Madeira, nor FOB any European port. Absolutely not. It's delivered within the United States, delivered to the site, then adjusted for value in use. Keep in mind, pig iron contains 4.5% carbon. Ours will contain 3% carbon; that's near, yet not equal; somewhat less heat will be generated by us. Since our silica is low but not at zero, we have somewhat more gangue. Conversely, our metallization is quite high. Many trade-offs exist that the value in use will determine, yet value in use can only be developed once the customer is genuinely utilizing the product; we'll have 6 months or 7 months, spanning June through December of 2020, to fine-tune these parameters. Broadly speaking, we're ready, we're pleased, and we'll keep growing this business in that manner. It's going to be extremely profitable for us. The payback and the IRR I pledged at the outset will be surpassed with ease.
Alex Hacking
analystAll right, I appreciate that; that clears things up nicely. Thanks for making room in your schedule, and best of luck.
Lourenco Goncalves
executiveThanks so much.
Seth Rosenfeld
analystGood morning, and thanks for taking my questions. May I address two topics — HBI first, then Ashland? Regarding HBI and the CapEx budget, your release mentioned CapEx being, I believe, fast-tracked, or development being fast-tracked in Q4, clearly on track for ramp-up before the end of H1. On CapEx, as I understood it, the 2020 CapEx budget was nearer $300 million, which suggests we're looking at $50 million-$100 million above that. What are the moving parts there, Keith? I appreciate the color earlier, but is HBI CapEx among those elements? Did the expected budget there actually increase? Second, please, on pig iron at Ashland, your remarks that market research indicates a metallics market well-supplied based on just your own HBI seem to contradict what you told us back in December when the deal was announced, when Ashland growth appeared to be one of the key incremental growth drivers for the story. Just to clarify, what has changed since then? Is this new market research you completed after the acquisition was announced, or was this always consistent with your expectations going back to December? Thank you.
Lourenco Goncalves
executiveFirst, let's set the record straight. You said that HBI throughout the world, particularly here in the United States, is a widow-maker. My wife is still married, so I'm still alive. Remember when you said HBI was a widow-maker because HBI generates budget overruns and people can't complete construction on time? Remember that, Seth?
Seth Rosenfeld
analystI do, and it's a relief that your wife still has you around.
Lourenco Goncalves
executiveI'm here with you now. When it comes to our HBI, we're meeting the timeline — in fact, we're running ahead of it — and we're spending exactly what we planned, so that piece is in good shape. As for the second point, those swings in the CapEx figures are simply leftover items from the prior year, expenses that, for various reasons, went unpaid back then, since whenever there's an option to settle a bill down the road, that's what we choose to do. Paying ahead of time isn't something we do. That's basically the standard approach whenever you're in the middle of a construction project. Assuming there's no schedule slip and nobody's pushing you to put the money to work sooner, then if you're able to wait, what's the argument for acting now? You're simply shifting it from one calendar year into the next. When it comes to Ashland, that's precisely the purpose of due diligence. Through that process, we're examining AK Steel very thoroughly. In terms of what's publicly available, AK didn't share much on their open earnings calls and similar forums, particularly regarding the automotive side of their business; the balance sheet got a great deal of attention. Their bonds that hadn't been refinanced also came up repeatedly. Pensions came up repeatedly, yet their actual business got very little attention. Once we began examining that business closely, it turned out to be phenomenal. Their technical capabilities are immense, and I would need to make pig iron in order to supply EAFs from Ashland. I'm going to supply EAFs from the HBI, so I'm not downplaying how important EAFs are, meaning there's no contradiction with anything I said before. It's simply that due diligence revealed genuine potential for the ongoing, for the existing AK business, especially in the automotive-related area. It's extremely impressive. AK Steel's inaugural investor day is going to take place at the company's research and development facility in Middletown, Ohio, and I have no doubt you'll be present for it, Seth. You, along with the other analysts covering research, are in for a surprise. There's nothing contentious here. This is simply due diligence. That's the very reason firms conduct due diligence before buying other companies — to genuinely understand what they're taking on. We came to see that what we're taking on is far larger, far more relevant, and far more significant when it comes to shareholder returns than merely making pig iron for the market from Ashland. I'm not claiming that won't happen down the road. All I'm pointing out is that, on the priority ladder, this now sits much further down.
Seth Rosenfeld
analystAlright, thanks a lot. Wishing you the best of health.
Lourenco Goncalves
executiveThank you.
Nick Jarmoszuk
analystHi, Lourenco. Good morning.
Lourenco Goncalves
executiveGood morning, Nick.
Nick Jarmoszuk
analystI've got a question about the EBITDA guidance. Is any contribution from the HBI plant during the year's second half baked into it?
Lourenco Goncalves
executiveWell, here's the situation. Bear in mind that the moment 2021 arrives, intercompany sales will total 9 million tons. Keep that in mind. Everything you're looking at in this EBITDA guidance will shift because of that. Keith Koci will walk you through the specifics of the figures tied to that guidance.
Keith Koci
executiveOkay, so when it comes to getting HBI up and running, our expectations for the back half are fairly conservative, and for 2020 we've included just $30 million of EBITDA from HBI; that's largely a result of the ramp-up, plus there are always some extra costs involved in starting up. In 2021 that figure rises dramatically, since we anticipate operating for a full year at our nameplate capacity. We're anticipating about $200 million of EBITDA generation in 2021, and that is what's reflected in our guidance.
Nick Jarmoszuk
analystAll right.
Lourenco Goncalves
executiveI'd like to add one point regarding that. When it comes to 2020, if we take $650 for hot band in the United States, that remains quite a modest figure, and it ought to be something simple to reach. As for $90 for IODEX, well, as of today it stands at $91.10 — that's the IODEX published this morning. The new normal continues unabated. Not even Vale could wreck the IODEX. The pellet premium, though, they certainly did destroy — there's no question about that. Once you reopen contracts that were carved in stone with customers, and you let customers cry wolf, pellet premiums fall. The largest issue is that Vale itself is the biggest casualty of this absurdity. Tonnage is being lost by them. Revenue is being handed away by them through giving away the pellet premium. Before long, they will have to face reality, and the pellet premium is going to rise. As Keith explained, for most pellet producers around the globe, the pellet premium as it stands doesn't cover their costs. They're in trouble. Vale may be fine, thanks to the manipulation of the Brazilian real, which is now trading at $1 for BRL 4.37, so that's quite absurd. That currency creates the impression that all their costs are under control, but that isn't the case. They will have to catch up on the pellet premium very soon. That's the reason we set a $50 figure as our expectation, since we think it will be higher.
Keith Koci
executiveNick, just a quick additional follow-up on what I said. That $30 million figure I mentioned leaves out the intercompany margin. We also then book the margin on the price we charge ourselves. There's another margin tied to the HBI product, and that will sit within the mining and pelletizing division.
Lourenco Goncalves
executiveGood point.
Keith Koci
executiveAdd another little bit.
Lourenco Goncalves
executiveThe profitability of the pellets division.
Keith Koci
executiveThat's right.
Lourenco Goncalves
executiveRight. It isn't the money we earn on pellets sold at market rates going from Northshore to our own facilities, meaning Northshore to Toledo. That's simply how we have to operate, since among other reasons, we owe royalties to Mesabi Trust tied to market price. We leave that alone.
Nick Jarmoszuk
analystAlright. Regarding those customers you brought up, is Toledo's nameplate capacity now completely locked up by contracts?
Lourenco Goncalves
executiveNo. What are you getting at? Do I hold orders amounting to 1.9 billion metric tons for 2021? Obviously not. That's not something anyone has. For no product does anybody have that. So why would that be the case for HBI? Pellets aren't any different for me. No steelmaker anywhere requests steel, so what's behind this question? Are you suggesting I lack orders for HBI? Is that the implication you're making?
Nick Jarmoszuk
analystNo, I was simply wondering what portion of the capacity has been locked up under contract.
Lourenco Goncalves
executiveAll of it, at least for the output we'll generate initially. After that, it's in our hands. Should the product perform well — which is what we believe, and what the customers believe — then we'll build a terrific business. Should our product resemble what other manufacturers offer, including one right here in the United States, in Texas, chances are we'd struggle. We aren't them. We're ourselves; our pellets come from a single source, Northshore; we understand iron ore. Our experience with iron ore spans 173 years, so we've picked up a thing or two, and we also know how to handle contractual arrangements for delivering feedstock to customers. Things will work out fine, Nick. The orders required to get started are in hand, and from that point we'll move forward.
Nick Jarmoszuk
analystAlright, so if we go back to what we were saying about pellets, any sense that Vale might try offering a certain kind of price break to buyers in Europe so they can keep blast furnace output steady, and after margins over there get better, they'd become a bit more forceful about the pellet premium? Does that strike you as a sensible frame for this?
Lourenco Goncalves
executiveMy view is that treating it that way means far too many folks are learning as they go, picking things up while doing the work. The moment they figure out how this business operates, they'll begin billing customers whatever amount they have to bill. That's something for Vale to sort out, for Vale's board members to sort out. This is a Vale matter. Right now Vale has other matters to sort out; several individuals from there are heading to jail; things are chaotic over there. I have no idea.
Nick Jarmoszuk
analystOkay.
Lourenco Goncalves
executiveYou got to ask them.
Nick Jarmoszuk
analystOkay, that covers everything I wanted to ask. Thanks.
Lourenco Goncalves
executiveThanks to you.
James Finnerty
analystHello, and thank you for fielding this. Regarding the AKS notes you're planning to refinance — the 2021s along with the 2023s — is it the case that the 2021s would come unsecured and guaranteed in the same way as the 2025s and 2027s?
Lourenco Goncalves
executiveWell, since you cover high-yield bonds for a living, you already understand I'm unable to address that at this moment. The right moment will come for us to reveal this deal. Our history shows we can execute transactions of this kind, and execute them properly. Take a look at that. Go back over the past 5.5 years. Right here inside Cleveland-Cliffs you've got no shortage of comparables, yet I'm not able to reveal my intentions at present, and disclosure won't happen now. We're ready; we're in good shape. Keep watching.
James Finnerty
analystAll right, so the schedule hasn't been settled yet. Might it take place alongside the deal's completion, or might it occur later on? Is that still not decided?
Lourenco Goncalves
executiveI told you we will be finished on day one — what I mean is, we will start immediately and operate from the very beginning. We will be finished. Keep in mind, the covenants on the AK bonds have already been removed. Box checked; the ABL has already been put in place. Box checked. The only remaining item is the bonds. We will handle that, and once we arrive, a 4-year window of opportunity will be available to us to work and bring AK Steel back to a commercial focus, back to a focus on developing steels, and above all else, charging customers a price appropriate for the kind of technology embedded in the steel we make.
James Finnerty
analystExcellent, I really appreciate that. It was quite useful.
Lourenco Goncalves
executiveThank you, James.
Tyler Kenyon
analystHi there, morning. Appreciate you fitting me into the schedule. You provided us with a few standalone EBITDA projections that rest on certain commodity price assumptions for Cliffs. I was hoping you might share a bit more granularity regarding the pellet volumes baked into that, the cash costs, and maybe the SG&A figures behind that $550 million-$575 million band.
Lourenco Goncalves
executiveGo ahead, would you like to field that?
Keith Koci
executiveOn a standalone basis, SG&A is roughly comparable to what we saw a year ago. There's about a 3% rise in the cash cost of production. The biggest driver there is product mix, since we're going to be turning out considerably more DR-grade pellet. Producing that DR-grade pellet carries a higher cost. On top of that, you'll see some extra maintenance expense during the year. There will also be some elevated costs at Tilden related to stripping, given that we've lengthened the mine's life, which you'll see as soon as it shows up in our 10-K. Then there's the usual yearly uptick in labor costs. You'll notice a modest increase in that area. What else was a factor?
Lourenco Goncalves
executiveIf we applied the rates we're seeing right now, the bump would likely come to about $1.50, roughly speaking. Under $2.
Tyler Kenyon
analystAll right, that's helpful. Just one more thing — what are you assuming when it comes to the volume of third-party pellet sales?
Lourenco Goncalves
executiveWe expect that volume to land somewhere between 20 million tons and 20.5 million tons.
Tyler Kenyon
analystCould you give us any indication of how much inventory will be headed to HBI?
Lourenco Goncalves
executiveThere's no additional inventory buildup — we've already completed it. In fact, for 2020, our expectation is that only 1.5 million tons to 1.8 million tons of pellets will be shipped, since that year is a ramp-up period. Come 2021, we'll be operating at steady state. To get 1.9 million metric tons of HBI, we'll require 2.8 million tons of pellets delivered to Toledo; that applies to 2021 and afterward.
Tyler Kenyon
analystOkay. Thank you.
Lourenco Goncalves
executiveThank you, Tyler. Christina?
Lourenco Goncalves
executiveWishing everyone a wonderful Thursday. Stay focused. Things are progressing quickly. Whatever needs to be done, we are doing it. The deal excites us, HBI excites us, and we're thrilled to have a transformational event that will reshape Cleveland-Cliffs from here onward, and will ensure this company's presence for the coming 50 to 100 years. What we've accomplished makes us happy. We're grateful for our shareholders' backing; thus far, the votes arriving overwhelmingly favor the transaction. We're thankful to every retail investor and institutional investor who keeps showing, day after day, their backing for our strategic moves; we stand together. I'm one of you. As a major shareholder in this company, my family will be part of it across two or three generations to come. That's the way we view this business. Nothing short-term exists here. We're putting in effort for us, the shareholders of this company. Many thanks, and enjoy your day.
Operator
operatorEveryone, that brings us to the end of today's call. We appreciate your participation. You're free to hang up now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Cleveland-Cliffs Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Cleveland-Cliffs Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Cleveland-Cliffs Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.