Celso Goncalves
executiveHello, everyone. Just like I did during the previous conference call, I'll begin today with an update regarding capital allocation and M&A. During our February call, I said we would get far more aggressive about giving capital back to shareholders. I also made it crystal clear that repurchasing shares now sits as the top priority for capital allocation at Cleveland-Cliffs. In line with that commitment, throughout Q1 we repurchased over 30 million CLF shares, drawing down the remaining $608 million tied to our earlier $1 billion buyback plan first announced in 2022. Across the past couple of years, our diluted share count has come down by more than 100 million shares, equaling 17%, at an average open market repurchase price of $18.79 per share — well under where the stock trades right now. Looking ahead, because of our solid free cash flow projections and strong liquidity, we're rolling out a fresh $1.5 billion share repurchase program, which we intend to put to work right away and aggressively whenever windows are open. This new buyback plan also rests on the reality that we no longer need to hold back as much dry powder for M&A, since the range of possible outcomes for U.S. Steel has narrowed considerably. It's obvious now that their strategic alternatives review only appeared robust and competitive because the company, along with its financial advisers at Barclays and Goldman Sachs, brought in foreign buyers, creative consortiums, and companies lacking any USW backing. We told U.S. Steel, their advisers, and the whole market early last year during the process that selling U.S. Steel simply cannot be completed without the USW's agreement and complete support. We said publicly in August that the USW holds de facto veto power over how this process ends, yet U.S. Steel disputed that. At the time, Cliffs was correct while U.S. Steel was mistaken. We remain correct today, and they remain mistaken. Reality can't be denied any longer. From the outset, the USW stated they would back no buyer other than Cleveland-Cliffs. Union leaders don't break their promises; and now that President Biden has plainly and unequivocally stated his opposition to foreign ownership of U.S. Steel, the roster of genuine buyers for the company is plainly a party of one. Cliffs represents the sole union friendly American answer for U.S. Steel. The Nippon deal is finished, and no other buyers have any shot at completing a transaction involving U.S. Steel union assets. On value, the inflated bids produced by that blind auction process — which brought in unrealistic buyers — aren't a meaningful proxy for genuine valuation, and neither are the stand-alone price targets issued by research firms pandering to the arts. A company is worth only what an actual buyer or investor will pay, and anything beyond that amounts to nothing more than an opinion. The last instance when genuine steel industry investors owned U.S. Steel, the share price stood at $22.72. That lower valuation reset is nowhere near finished. Once we get the opportunity to dive back into M&A due diligence, we'll need to reevaluate everything, value included, since whatever we examined last year has gone stale. Naturally, there's no guarantee U.S. Steel would still be interested in selling itself to Cliffs. The business could simply remain independent, and the arbitrageurs who hold the shares could always offload them back to genuine investors in the 20s. Meanwhile, Cliffs will keep repurchasing our own CLF shares aggressively, just as we did in Q1. Returning capital to our Cliffs shareholders—who are genuine investors—through buybacks of our own stock is a far superior deployment of capital compared with any M&A possibilities at today's valuations. On the leverage front, we're adopting a target that treats shareholders more favorably: 2.5x net debt to trailing 12 months adjusted EBITDA, which grants us added flexibility for bold shareholder returns; our balance sheet has improved considerably over the past few years. At the close of 2023, we beat our earlier net debt goal of $3 billion, yet the rating agencies offered us nothing in return for last year's enormous debt paydown and left our ratings as they were. If the agencies intend to hold our ratings steady regardless, we may as well grant ourselves the room to repurchase additional stock. At 2.5x net debt to EBITDA, a ratings downgrade from our present position poses no risk either. We retain flexibility up to 3 or 3.5x before any downgrade becomes a threat. By imposing the 2.5x ceiling on ourselves, we're simply permitting greater flexibility while staying well inside the bounds of our current ratings category. This updated leverage target merely affords us the capacity to keep executing open market share buybacks. And should we spend the full $1.5 billion program across this year, our net leverage would remain comfortably beneath 2.5x; this updated leverage target likewise governs M&A scenarios. Any acquisition would be constrained to pro forma net leverage at that same self-imposed 2.5x target. Clearly, any M&A we pursue will bring meaningful EBITDA contribution, substantial synergy realization and greater scale, which rating agencies and bond investors will regard as a credit positive. To remove any doubt, we aren't currently conducting due diligence on any M&A opportunity that would stop us from buying back stock today. And should the U.S. Steel scenario emerge again at some future point, we would have to refresh our due diligence then and reset valuation expectations relative to current levels. Our balance sheet remains in excellent condition, with liquidity near record highs and no secured bonds in our capital structure for the first time since 2017. In the quarter, we completed the redemption of our last secured debt tranche, which happened to be the bond maturing soonest. Since nothing comes due before 2027, we're left with a 3-year maturity runway, adding still more confidence around our new target level; this marks the strongest state of our capital structure since Lourenco assumed leadership of the company 10 years ago. Thanks to stronger automotive sales in the quarter, our Q1 adjusted EBITDA reached $414 million, representing a profitability rebound from the most recent low point in Q4. With car, truck and SUV production and sales staying solid across the U.S. during Q1, our average sales pricing significantly beat expectations, driven by a larger automotive share of our Q1 steel sales mix. On the other side, during January and February, service centers engaged in a customary buyer strike, causing lower sales into the distribution sector. The combined effect of this pattern — more automotive sales alongside fewer tons shipped to service centers — produced a lower sales output of 3.9 million net tons. Now that distributors and service centers have stepped back in and steel pricing is trending upward, we anticipate surpassing the 4 million ton shipment level once again in the second quarter. Unit costs naturally felt the effect of the heavy automotive mix in Q1, along with the generally lower production volumes. Still, we're holding to our earlier guidance of roughly a $30 per net ton unit cost decrease in 2024 versus 2023. That starts in Q2, with costs expected to fall $20 per ton from one quarter to the next. Lower natural gas prices have offset both the reduced Q1 production volume and the unit cost impact from the heavier automotive mix. As usually happens in the first quarter, working capital was a use of cash, and we look for that to be recovered in the second quarter. Additionally in Q1, as the U.S. government widely publicized, we were chosen for award negotiations covering 2 decarbonization projects, totaling $575 million in DOE grants. These projects shouldn't affect our capital spend expectations for this year. And with the Middletown DRI EMF project, the new investment will substantially lessen future expenditures tied to the Middletown blast furnace and other infrastructure. Our investment expectation for the 2 projects is that net capital expenditures will stay near $1 billion from 2025 through 2028, ultimately producing $550 million in annual cost savings beginning in 2029, with essentially no production impact. With that, I'll hand things over to Lourenco for his remarks.
Lourenco Goncalves
executiveThanks, Celso, and good morning to all of you. At Cleveland-Cliffs, we go about business in corporate America in a manner that is quite straightforward, though it comes across as unique for some reason: we hold our workforce in high regard. Beyond that point, there's nothing remarkable or especially intricate. It's our employees who propel both how we perform and how we earn profits. The people who work here are the very reason this company exists, and we treat them that way. Naturally, throughout the 10 years I've spent leading Cliffs, this has never changed; yet what happened over the past year has clearly cast a brighter spotlight on it. The ties we maintain with every worker—and especially those represented by the union—stem from the long-term perspective we've adopted regarding our labor force, and that isn't something hollow pledges from outsiders, scribbled on pieces of paper with no value, can ever eclipse. Nippon Steel, which tried and failed to buy U.S. Steel, has never grasped this. Even now it stuns me that the clueless people speaking for Nippon Steel during this mortifying episode believed they could pull it off absent union backing. With a workforce represented by the USW, that simply cannot be done; this disastrous M&A saga came about directly because of the GOES—the U.S. Steel CEO—and the intentions his fellow board members held. Number one, to benefit stockholders alone while disregarding everybody else; and number two, to crush the USW. So for them, selling to Cleveland-Cliffs had to be avoided. To convey just how much prejudice existed toward Cliffs and toward the USW, in spite of everything we plainly showed them—they being steel directors along with their advisers from Milbank, Wachtel, Goldman Sachs and Barclays—it still points to a buyer incapable of completing the deal. We appreciate that the U.S. government holds the same opinion we've held all along regarding how vital union jobs are to a flourishing middle class in America. There are various avenues the Biden administration can use to put an end to the Nippon transaction, and we think that will happen before long rather than later. Prior to the President of the United States making his stance unmistakable, we tried to present Nippon Steel with a solution whereby we'd take over the union-represented assets of U.S. Steel while Nippon retained what they'd wanted from the start—the nonunion Big River steel facility. Nippon turned that down; and at this point, once President Biden has spoken, that possibility is off the table for them. Now Nippon claims they genuinely prize the blast furnaces since they can bring great technology to bear. Let me make this plain. This talking point about technology is utter hogwash. Japanese blast furnace technology has nothing special going for it. On every matter connected to blast furnaces, we're well ahead of them. On the iron ore pellet side and low sinter usage, direct reduction, putting HBI into blast furnaces, injecting natural gas plus hydrogen — every one of those things already exists in America at Cleveland-Cliffs, while none of it exists in Japan. What they call superior technology has no factual basis whatsoever. Still, there's one upside to Nippon Steel now being dead set on owning blast furnaces and BOFs here in America: the people who used to claim blast furnaces and BOFs were bad have nothing left to say. They've gone silent. So thank you, Nippon Steel, for confirming what I've been arguing. To simply validate my argument, you'll hand over a breakup fee of $565 million, and I'm grateful for it. That money will be put to good use. Here's another relevant point the U.S. Steel board chose to ignore. Nippon has remained a constant breaker of our trade laws. Over the last several decades, it's arguably been the worst player in global steel trade of anyone. In my view, Nippon Steel is in fact worse than the Chinese. On top of that, they hold major interests in China, something they prefer to minimize. Sadly for them, Nippon still can't conceal its deep Chinese connections, and that too has been fully brought to light. Nippon's presence in America is also harmful to customers. Incidentally, to win a price hike back home in Japan, Nippon Steel recently took the largest Japanese automaker, Toyota, to court. Cleveland-Cliffs has never done anything like that here in America. And for the record, Toyota in this country is our biggest automotive client. Once this whole matter concludes, we'll be living in an entirely different world. If U.S. Steel's directors have hurt feelings over what I've said or done, and they still refuse to sell to Cleveland-Cliffs, that's their right. Ultimately, nobody is forcing them to sell themselves to Cliffs. And there's no simple method to compel them. Yet after they take the breakup fee from Nippon, their sole remaining option is to keep going as <<inaudible>>. If that happens, then good luck operating the assets you despise alongside workers you don't respect. As for us, Cliffs has a number of other avenues whether or not M&A happens. The clearest current example is our share buybacks. We fell behind in Q1; and under our new reauthorization, we remain purchasers of our stock even at today's prices. We've also just shown we can expand earnings organically through the two projects we're launching with backing from the U.S. government. The $1.3 billion investment at Middletown Works, swapping our blast furnaces for a DRI facility and 2 electric melting furnaces, transforms our company and our industry. The $500 million co-investment coming our way makes this the biggest federally backed decarbonization effort in U.S. history. Officials recognized the direct reduction investment we made 7 years back, plus the 30% cut in CO2 emissions achieved across a 6-year span, along with our progress in hydrogen utilization technology. Our sustainability report, released not long ago, documented a further drop in integrated emissions intensity, now at 1.54 metric tons of CO2 per metric ton of steel, compared with 1.82 in 2020, and well under the present worldwide average of 2.15. Once Middletown reaches full operation, Middletown Works is going to rank as the lowest cost steelmaking site in the United States. As an illustration of the savings, producing pig iron at Middletown currently runs about $470 per net ton, while our DRI production cost today sits under $200 per net ton. Hot DRI gets charged into a melting furnace — an extremely straightforward method for turning solid DRI into liquid — yielding a pig iron equivalent suitable for feeding into our existing BOFs and further processing downstream. Given that scrap is going to become scarce, pricey and increasingly contaminated as time passes, we will prevent any growth in our scrap usage, preserving our capacity to supply the highest quality requirements in end markets such as automotive by relying on pure iron. That is technology — American technology, not Japanese hogwash PR. Over at Butler Works, the DOE granted us $75 million to swap out our natural gas fired slab reheat furnaces for electrified slab furnaces.
Lourenco Goncalves
executiveThis is going to lower emissions, boost efficiency, and strengthen our output of GOES — grain-oriented electrical steel — which is essential for the nation's power grid. Under the original draft of the DOE's new emissions rule put forward last year, the future of our GOES production was in jeopardy. Had it been adopted as first written, that rule would in practice have swapped out GOES for Japanese-made amorphous metal in every transformer operating across the United States. Thankfully, the DOE listened to what Cliffs and our American customers — the company builds transformers here in the United States — were telling them. And thanks in large part to elected officials such as Ohio Senator Sherrod Brown, Pennsylvania Senator Bob Casey, Pennsylvania Governor Josh Shapiro, plus Representative Mike Kelly from Butler County in Pennsylvania and Representative Chris Deluzio of Pittsburgh, Pennsylvania. To name just a handful, a far more sensible rule was put in place. Because of that, our customers stay in business, and they'll keep using GOES to build the transformers this country requires. Incidentally, demand for transformers has been extremely strong in the United States, and that presents a terrific chance to build more transformers and create additional jobs for American workers. We anticipate substantial investment from our customers in this vital infrastructure, and we need to build more transformers made in the U.S.A. That is entirely achievable, since Cliffs already holds sufficient extra steelmaking capacity for GOES to put to work in both Pennsylvania and Zanesville, Ohio. Our other big action this quarter was the announcement that our Weirton facility would be idled indefinitely, with production formally ending on April 11. Across the last 3 years, Weirton's typical yearly impact on our EBITDA came to a negative $100 million, mostly because of unfairly traded imports of tinplate products; in January, the Department of Commerce suggested antidumping and countervailing duties on certain of those imports, which would have softened this problem. Yet in February, the International Trade Commission, in a decision that caught everyone off guard, overturned the Department of Commerce recommendation, letting low-priced imports keep pouring into the United States. Consequently, we were left with no option but to leave the tinplate market, which put more than 900 Weirton employees out of work. A number of those employees chose to retire, and we managed to provide the affected workers jobs at other Cliffs sites. As of today, we have relocated over 100 employees to other Cliffs locations. Our GAAP loss in Q1 stems mainly from roughly $170 million in onetime charges recorded at Weirton, chiefly employee support costs together with asset impairments and other expenses. Plainly, it was a quarter full of developments for us. Our automotive business once again saved the day for us, as the U.S. automotive sector keeps getting stronger, expanding for the fourth consecutive year. Our customers rely on us for our best-in-class quality, delivery performance, customer service and technical expertise. When it comes to purchasing steel from other suppliers, every individual car manufacturer makes that call based purely on price. That said, not every automaker is ready to stake its performance on less capable suppliers merely to shave a few bucks per ton. There are some who are prepared to do that, and Cleveland-Cliffs will deal with those companies in kind. Point made. Turning to the other side, our service center business fell short on both volume and price over the last quarter, which weighed on our production volume. Demand has come back since then, and we've successfully put our recent price increase into effect; that ought to keep prices and shipments above the 4 million-ton mark in Q2. With that, I'll hand things over to Rob for Q&A.
Lucas Pipes
analystLourenco, you mentioned that the possibility where Nippon basically bought the nonunion properties and you buy the union ones is finished. I'm curious whether anything might bring that back and carve something out from it?
Lourenco Goncalves
executiveIncidentally, I stated that I put that possibility forward, yet my assumption is that Citibank together with the bank standing in for Nippon Steel and Ropes & Gray, the legal counsel standing in for Nippon Steel, managed at minimum to pass along the message to Nippon Steel, since Nippon Steel never bothered to respond to my proposal, to meet and talk it over. So I merely assume that they conveyed what — they carried out what they claimed they had carried out, getting the proposal over to Nippon Steel. With that said, indeed, that proposal no longer exists, since right now, at this juncture, the President of the United States has already stated his intended action. He isn't a dictator. He must allow the process to play out. After that he'll act exactly as he already vowed openly to the USW's workers, to USW President Dave McCall, and as he has echoed in public settings. So it's finished. I'm unable to defy what the President of the United States has said. Consequently, that possibility of mine is completely, 100% eliminated.
Lucas Pipes
analystUnderstood completely. In the prepared remarks, you brought up cost reductions for Q2 — could you walk us through those again? What effect would they have on margins given where steel stands right now, both in Q2 and across the remainder of the year? And when it comes to free cash flow, would any of it be directed at paying down debt from the elevated Q1 levels, or does all of it go toward the buyback?
Celso Goncalves
executiveYes, certainly, Lucas. On the cost side, we said that between 2023 and 2024, we'll deliver a $30 per ton reduction, equivalent to roughly $500 million in savings on an annualized basis. The main source of that will be cheaper coal. We struck our coal contracts on very favorable terms, plus reduced natural gas and reduced alloy costs. Those are the 3 main factors driving our costs lower. When it comes to Q2 in particular, costs will drop by $20 a ton, and the full advantage of those cheaper coal contracts will begin to show. Natural gas has come in below what we had anticipated, and the mix will be a bit less value-add in Q2, which also works in favor of costs. On your other question, I believe you were asking about free cash flow and deleveraging. We've been quite clear that buybacks of shares rank as our top priority. I stated that very plainly on the previous call. That said, should chances arise to repurchase bonds on the open market, we'll pursue those too. That chance didn't present itself in Q1, since our bonds were basically all trading above par, and we had already repaid the full ABL balance. We're allowing ourselves this flexibility to carry somewhat more leverage inside our current rating category, so we can repurchase additional stock. But if chances come up to repurchase bonds on the open market, we'll pursue those too.
Bill Peterson
analystI'd like to build on that point, and you touched on it somewhat when answering the earlier question, but what's the right way to think about our product mix? And then how does that shape where pricing goes as we move into Q2? And maybe tied to that, considering the talks you've been having around the auto contract negotiations, how do those unfold, particularly with the Japan headquarter companies given when their fiscal year falls?
Lourenco Goncalves
executiveThe auto negotiations for this period are the ones tied to customers whose renewal date is April 1. And those are essentially the Asians — Japanese, Korean — clear because April 1 marks the start of their fiscal year in their respective countries. And I'm pleased to say that these negotiations were entirely uneventful and everything moved very smoothly; and we got what we were asking for. And I'm certain they're pleased as well, because the tonnages shipped to every single one of these players keep increasing. So to sum up, for instance, one of the Asians purchased Stellantis as a bigger client for Cleveland-Cliffs. So this particular customer is now considerably bigger than Stellantis. Stellantis, from our standpoint, turned into just another member of the group; it's no longer a top priority for me or for Cleveland-Cliffs. They're now handled here as second-class citizens, and we'll keep doing that for those who are price driven like Stellantis; so April was great. It was fantastic. And remember, we keep growing tonnage for automotive. The sole distinction is that we're focusing more on the — a number of the customers and selling less to other customers; this will show up in the quality of the cars. It's only a matter of time. When all you're doing is chasing low cost, eventually you wind up building a car that sucks. And that's what I anticipate will happen, and we're going to help separate the good ones from the bad ones. I'd say that the April crowd was, in its entirety, part of the good one block.
Bill Peterson
analystYes. Celso, could you perhaps address how the product mix looks and where pricing is headed as we move into the second quarter?
Lourenco Goncalves
executiveI'll handle the product mix question too. Bill, the second quarter is going to look far more typical than what we saw in the first. If you remember, back in January and February, service centers essentially went on a buying freeze. Everyone anticipated prices dropping, so nobody purchased — there was uncertainty, people were waiting on the Fed, waiting on one thing or another, and with no buyers stepping up, nothing moved. That stretch was really difficult for us early in Q1. It's also the reason our concentration leaned so heavily toward automotive. Automotive, by contrast, was purchasing considerably more, since service centers were purchasing far less. Eventually, though, matters sorted themselves out once we came out with the first price hike, which landed quite successfully. After that we came out with the second price hike, and then a competitor of ours posted a price that sort of turned into a benchmark across the market, simply to offer a different viewpoint regarding what they intended. Ultimately, that is still unfolding in the market, and we continue dealing with the fallout from that situation; but on the whole, I expect Q2 to go back to a much more typical split across service center, distribution, and automotive. So automotive will stay strong. Service center plus distribution will grow larger, and that should push the mix back toward its usual level.
Celso Goncalves
executiveYes, Bill, to address what you asked about selling price, since I think that's the area you were zeroing in on. Clearly, in Q2, the mix is going to affect pricing, no doubt about that. And I'd say we've provided sufficient bread crumbs for you to roughly work out what that impact could look like. Still, let me bring everyone back up to speed on how the contract lags work for the agreements tied to our index. Roughly 40% to 45% is fixed with full year price. After that, 20% sits on CRU month lags, and about 10% of volumes are slab with a 2-month lag. Another 10% is CRU quarter lags, and the remaining portion, let's say 10% to 15%, is true spot. So as you consider Q2, the monthly lag has fallen relative to Q1, while the quarter lag has risen relative to Q1. Taking it all together, you can reasonably anticipate Q2 average selling price declining by roughly $40 a ton.
Bill Peterson
analystThat's really useful. The second item concerns CapEx. And I suppose, when you look at the business on a stand-alone basis, with net CapEx not counting awards and similar items. You mentioned roughly $1 billion normalized across the next 4 years following this year. Could you give us a bit more detail regarding 2025, especially if you've got clearer visibility, or perhaps even '26? A lot of the inquiries we've received are about how to think through your ability to generate free cash flow past this year.
Celso Goncalves
executiveYes. I believe it's somewhat too soon to dive into the specifics of 2025. I think the simplest way to consider it is to just remain with that $700 million for this year, which we have a lot of confidence in. When it comes to 2025, we probably won't even reach $1 billion, and then you're only going above $1 billion once you reach 2026. But as we get nearer, we'll be in a position to share additional details about '25 and '26.
Phil Gibbs
analystMy question concerns when the DOE grant will come through. Clearly, you have two quite large CapEx projects across the '25 to '28 period. As you put capital into the project, do those DOE awards arrive later? Or is it more like a single upfront payment received before you begin spending?
Lourenco Goncalves
executiveI'll have Celso address that.
Celso Goncalves
executiveCorrect, Phil — your understanding is on point. Those get distributed proportionally alongside the spending. That's really the simplest way to look at it.
Phil Gibbs
analystThen, regarding Middletown, since that project is so large in both schedule and reach, could you walk us through the timeline, or the chunks or stages the way you're viewing them? And what else remains to be finished when it comes to due diligence or design? You've noted this is fairly new technology, at least within the United States. I believe folks would simply like to hear about that.
Lourenco Goncalves
executiveYes. No. Look, it's new — that's a completely new facility there, but it isn't new technology by any means, since it combines a direct reduction plant that, rather than turning out DRI, we'll turn out — sorry, rather than turning out HBI the way our Toledo plant does, we'll turn out hot DRI, and that hot DRI will then be fed on-site into EMFs. And what does EMF mean? It's simply an electric arc furnace used to melt iron ore, to melt — at this particular facility — metallic iron ore, because it will be sponge iron, hot DRI coming from the direct reduction plant. So the setup is straightforward. Nothing is truly complicated about it. And these are 2 things we handle exceptionally well; we've got electric arc furnaces, so we're dominant in this operation; and as far as I know, our direct reduction plant is absolutely best-in-class worldwide. So we're going to be hydrogen ready, and in Toledo we already are hydrogen ready. Hydrogen is something we've been using. So hopefully, by 2029, once this plant begins operating, we can start with hydrogen, or begin just for the stock up, or with natural gas, and then move right away to sync gas, and within the short term reach 100% hydrogen by the early 30s. So this is real — a game changer when it comes to the technology for making steel, especially for making automotive grid steel. But it's a mix of many things that, one, we fully understand and have complete operational capability for; and second, we're operationally proven regarding how to use all of these things. So it's no big deal.
Phil Gibbs
analystAnd finally, about the mix. You said autos won the quarter in Q1 while service centers declined. Do we expect — or rather, do you expect — autos to hold roughly steady in Q2, with service centers then fueling the higher volume? Or is automotive also getting better?
Lourenco Goncalves
executivePhil, automotive keeps performing really strongly, especially now that they've stopped all chasing the next Tesla. They aren't as determined to go fully into EVs as they were even 6 months or 12 months back; now they're speaking plainly. What's selling is ICE, and these days hybrids; so those shifting quickest toward hybrids are coming out on top. And since we're so large in supplying virtually every one of them except a single company that only purchases inexpensive material, we're going to keep right on backing those that are expanding. And choosing winners and losers among the car manufacturers isn't an issue for us. For instance, yesterday, I said I will no longer sell steel to Volkswagen in Mexico, because there's no reason to sell steel from the United States to Mexico, only for Volkswagen to then ship cars back to the United States just to pay lower wages to Mexican workers. I won't back that. Especially now that the UAW managed to unionize Volkswagen's plant in Chattanooga, Tennessee. I'd prefer to sell to Chattanooga, Tennessee. So we'll become far more selective with our automotive customers; but don't misunderstand, automotive is a solid business for us. But the sole innovation the alliance for American innovation can produce is that we must sell at a lower price. So that's not something we'll do. And we'll keep playing the Cleveland-Cliffs' game. Growing our automotive size through M&A isn't necessary. We're large enough, yet we can be smaller, yet remain in this market; and that's what we'll do, and it will pay off for Cleveland-Cliffs down the road.
Phil Gibbs
analystAnd last, Lourenco and the team, on the grain oriented electrical steel side — I think what you said about the next several years sounds pretty bullish, particularly around grid investment and the timing of it. But how do you see the nearer term, maybe the next 6 to 12 months, in terms of volumes? And along those lines, you mentioned in your prepared remarks that you expected some reshoring possibly after this dispute, since for the prior 10 years there's been offshoring into Canada and Mexico on the transformer side. Could you shed some light on that as well?
Lourenco Goncalves
executiveSo the reason we're even talking about reshoring is that at one point we simply let that business move overseas. But ever since the Trump administration came in, we've put in a lot of hard work to stop the bleeding. You might recall that during the last two years of Trump's term, we pushed really hard to get a Section 232 applied to cores and laminations. The main problem was the way goods were being distributed through Mexico, which made that possible; we were able to fix it without the Section 232, which, by the way, President Trump never signed, even though Ambassador Bob Lighthizer at the USTR put in enormous effort; for whatever reason, President Trump never put his signature on it. That said, it's behind us now. We settled things with those customers. They've stopped doing that in Mexico, or at least they've scaled it way down. On the other hand, transformers are still being brought into the U.S. I spoke about that situation yesterday with the Secretary, Jennifer Granholm, about the exposure we face from importing transformers. For one thing, once you bring in a complete transformer, you have no idea what's inside it. So that has to end, and there are financial safety reasons for it. We'll keep working with the Biden administration. No matter which candidate wins the presidency, that effort will carry on; halting transformer imports is essential. We simply cannot let that continue. More transformer manufacturing needs to happen here in America. Fortunately, the conversations we're having with the companies that make transformers domestically have been terrific. A fix is in the works for Weirton, and it should clear up much of the transformer problem while letting us turn out additional GOES rehabs given our current capacity through modest capital outlays. Out at Butler, we could raise throughput by 50% to 70%, purely to expand output of GOES — grain oriented electrical steels used in transformers. Our plan is to establish a new manufacturing facility over in Weirton, West Virginia, and leverage the people we already employ in that area for building transformers. There are several ways we could structure this — we might put money in alongside a partner, or simply provide the steel as backing. Whatever approach proves necessary, we're willing to take it on. The key objective is getting more transformers produced and making them more readily obtainable throughout the supply chain, all manufactured domestically here in the United States. Transformers remain one of our key priorities, and it would be best if union labor is involved too. That represents the work we're dedicating ourselves to, and we feel strongly that the outcome will be a positive one for us.
Alex Hacking
analystLourenco and Celso. Going back to those DOE awards for a moment. From what you're saying, the talks seem like more of a formality, and you have a lot of confidence that the funds will come through — is that how I should read it? And if so, when do you expect those awards to be officially confirmed?
Lourenco Goncalves
executiveAlex, I wouldn't call it a formality, because they're raising plenty of solid questions, and we're giving them what we consider plenty of solid answers. As for how long the negotiation, the discussions, whatever you want to call it, will take — we'll spend the remainder of this year wrapping it up, though we're pretty confident things will go our way. It isn't a formality in my view. I think they're performing well. They're carrying out the due diligence they're supposed to carry out. Ultimately, they will hand us $575 million — $500 million of that for Middletown and $75 million for Butler — so that's a substantial sum. And in the end, it's tax payers money, and we treat it with a great deal of seriousness. But a formality it is not. We're putting in the work. And along the way, the biggest thing is that through this process, we get the chance to teach the government about what we do. Rather than them only reading trade press coverage or research analysts' reports, they're hearing it from the people who truly know the subject.
Alex Hacking
analystAll right.
Lourenco Goncalves
executiveYeah, that takes in you as well in the group that has no idea what they're discussing. On that point, you're correct. Still, that's only me, Alex. So yeah, what comes after this. What comes after this?
Alex Hacking
analystSuppose the funds were not granted. It sounds — for some reason, it sounds like the electric melt furnace's economics would be attractive even absent the award. But is that a project you would still proceed with under those conditions? Or is it impossible to really tell until you get to that stage?
Lourenco Goncalves
executiveAlex, I have a great deal of confidence that the funds will come to us. And naturally, we run the projections both ways; however, with the money coming from the DOE, there's no question about it. It's an extremely, extremely strong case for return on investment, it's capital put to excellent use. It's a genuine game changer. We are going to be cutting our costs to produce the same ton of liquid steel by over $250 per ton; that's incredibly significant. So that project is what we want. And yes, the ROI absent the grant is still acceptable, but the ROI with the grant is extraordinary; and I believe that up to now, given what Cleveland-Cliffs is doing in terms of, among other things, collaborating with the government and collaborating with our workforce, we are deserving of receiving the money.
Alex Hacking
analystAnd so, last thing from me, I suppose — you brought up that figure of $250 before. I mean, is that genuinely the amount saved directly by moving over to this technology? Because clearly that would deliver an enormous boost, wouldn't it, to EBITDA per ton.
Lourenco Goncalves
executiveThat's precisely correct.
Alex Hacking
analystComparing like for like.
Lourenco Goncalves
executivePrecisely. Since my background is in metallurgy, technology appeals to me; it would be all too simple to close blast furnaces and BOFs, install EAFs, and then find ourselves unable to make every variety of steel being produced right now, while throwing huge numbers of people out of work. That's the path Europe has taken. That's the path the U.K. has taken. During a discussion — when I spoke with Slovakia's minister of the economy at the time, he mentioned that GBP 600 million in grant money had been given to Kosice purely to close its blast furnace and swap in EAFs; and I asked him, are you aware that 2/3 of your workforce will be dismissed? So yes, regrettably, that is what decarbonizing brings. Mr. Minister, with all due respect, you have no idea what you're discussing; so we must look at the big picture; we must grasp where cost actually sits. If you think cost gets saved by trimming $20 per ton now and $30 per ton later, you wind up with the situation we brought about here in the United States; and next you wipe out a steel industry that, 4 years ago, was the world's envy, and you give rise to China. And then you come to see that China is a foe to be outbid. And yes, so you have to look at the big picture, and it requires a great deal of education plus a great deal of technology plus a great deal of engineering to operate the way we do here at Cleveland-Cliffs; we feel very glad that we discovered a willing counterparty among several cabinet members of the Biden administration, and that makes us happy.
Tristan Gresser
analystPerhaps one more thing about the decarbonization initiative. Could you break out the gross CapEx pieces for the Middletown project and provide a sense, not net CapEx, but gross, of what normalized CapEx would be in 2024, '25, '26, and '27? Would it be nearer to $1.2 billion? That is my first question.
Lourenco Goncalves
executiveI will hand that over to Celso. Celso, go ahead.
Celso Goncalves
executiveYeah, absolutely. Tristan, as I mentioned, none of the DOE projects affect CapEx in 2024 — to be completely clear on that, the start is 2025 for all of it. If you'd like the details, during 2025 the Cliffs share of Middletown spending comes to roughly $250 million. Altogether, CapEx tied to all of it lands at approximately $985 million; that's the reason I noted that in '25, we don't even get past the $1 billion mark. Then moving to '26, Middletown rises to around $400 million, with a gross total of roughly $1.2 billion. That's how it breaks down across the coming couple of years.
Tristan Gresser
analystOkay, that's useful. And that figure is net, isn't it? The $1.2 billion, meaning after taking out the reline and the grant.
Celso Goncalves
executiveThat's right. Yes.
Tristan Gresser
analystThen, for my second question: given the carbon advantages you brought up, which can be turned into premium sales, plus the cost advantages, should we view the Middletown project as the template for the remaining footprint? I believe you've said before that Burns Harbor has another reline coming in 2026. So, in essence, is it not logical to steadily transition your BF footprint toward these sorts of DRI melting unit configurations; and if so, would additional funding become available if you chose to pursue that path?
Lourenco Goncalves
executiveYes, that's an excellent question. However, let's take it one piece at a time regarding where my cost savings sit, the figures I just provided to you. Our biggest issue at Middletown is the extremely punitive contract we hold with SunCoke; that agreement is truly terrible. And our coke cost at Middletown ranks among the reasons we began examining this project to start with. So regardless, that circumstance will be altered. We will not allow SunCoke to keep penalizing us through that awful contract we have in place. So as far as Middletown goes, the figures are the figures I told you about. And we will move in that direction no matter what it takes. I will secure the grant; but the project there serves as our answer to the contract we have with SunCoke. When we turn to a company such as — to a facility such as, say, Burns Harbor, the changeover isn't that straightforward, since we have been greatly enhancing our capacity to make coke at a sensible cost. Burns Harbor is, for that reason, among other factors. But chiefly for that reason, it's our cheapest production facility across the whole footprint; so I don't foresee us moving on Burns Harbor that fast. Naturally, though, the new setup we are putting in place at Middletown will be the company's first, just as we did with our plant, our direct reduction plant in Toledo. And thanks to that, we could now readily proceed to Middletown with a new direct reduction plant since we know we have mastered the technology. So it's a first, I'm not sure whether we will keep following that path, but it's a possibility, and we do have priorities regarding who would come next and who will come next, should that happen.
Tristan Gresser
analystOkay, that's really clear. Perhaps one last thing. Could you talk a bit about what's happening at Calvert? You've got a slab supply agreement there. The facility is increasing its upstream, could continue into the second year. So my understanding is the contract comes up for renewal next year, but what's the answer, let's say, if Calvert chooses to go with upstream or another slab supplier? Are there alternatives available to you? Is this already being talked about or negotiated? If you could offer some perspective on that, it would be useful.
Lourenco Goncalves
executiveYeah. The negotiation has only just begun. And obviously, I won't provide — I'm unable to provide specifics about how it's progressing. But I'll tell you what the result is going to be. We'll wind up with a far superior contract for us, or we won't have one at all. Both outcomes are fine for Cleveland-Cliffs. Having no contract is fine. And an improved contract could be fine. The agreement we currently have was the final component needed for us to complete the deal and buy ArcelorMittal USA, and that happened in December of 2020, when we closed. So that negotiation took place in September 2020. So that was nearly 4 years back. I knew precisely what I was leading us into; and now the expiration moment has arrived and it's just like any circumstance with no contract. We got Cleveland-Cliffs ready to operate without that contract, we'll be fine. And should that contract get better, we can still collaborate with our friends at ArcelorMittal middle. If not, we remain friends, but they'll need to source slab elsewhere. That's the situation.
Lawson Winder
analystI'd like to ask about the NOES expansion at Zanesville. Has shipping to customers begun there? And what does that ramp-up look like?
Lourenco Goncalves
executiveThe NOES expansion at Zanesville is up and running, and the mission is accomplished. We've always believed we'd have greater use for non-oriented electrical steels, especially for electric vehicle motors. And we made a modest capacity increase by spending a comparatively small amount on CapEx. So we're in good shape. The project came in as planned. We are selling oriented electrical steels. We keep developing applications with our — mainly with our automotive clients, and we're fine with that, and we have no intention of expanding beyond what we already have for NOES.
Lawson Winder
analystAll right. Could I also inquire about the base price you established at $900 per short ton? What I'm getting at is that price reporters continue to show prices down in the lower 800s. Are you actually achieving pricing within that $900 per short ton range? And how are you thinking about pricing across the coming month or two?
Lourenco Goncalves
executivePrice forecasts are something I never make publicly. Our price increase was announced, and we're working to secure it. Alignment isn't there. Meanwhile, once we made that announcement, everything was moving in the proper direction; even so, we continue selling at $900, as a matter of fact we do. So yes is the answer to what you asked; however, other clients — pardon me, other clients, other competitors arrived with varying price points; and pricing competition is the world we inhabit, especially a world where every line from the trade press gets read by everyone. And you simply stated what you'd like to reach. So prices sit in the 800s and low 800s, yes, they'll treat that as their bible. Yet I'm telling you, at $900 is where we're selling; but is reaching that easy at this moment? No; it was easier prior to events that occurred late in the quarter. But these things are always — the environment never stops shifting. And ultimately, we'll see how it plays out; and we anticipate selling more, especially to service centers whose inventory is entirely depleted, since not buying appears to be the sole diet they can follow when they wish to shed weight on inventory. My suggestion would be Mounjaro or Ozempic, which would work far better. All right. With that, I believe we're finished, correct, Rob?
Lourenco Goncalves
executiveAlright, Mounjaro and Ozempic — take those, and you'll shed pounds, especially alongside working out. That said, when it comes to inventory, service centers are expected to hold stock. If you're running a service center and you aren't keeping inventory on hand, you're asking for humiliation. So go right ahead. Best of luck. Thanks to all of you. I'll be speaking with you again shortly. Goodbye for now.
Operator
operatorAppreciate all of you being here with us. That brings today's call to a close. At this point, feel free to drop off your lines. Thanks so much for taking part.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Cleveland-Cliffs Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Cleveland-Cliffs Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Cleveland-Cliffs Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.