Thanks, Sherry, and hello everyone. Our first-quarter numbers simply weren't good enough — EBITDA and cash flow each fell short of what we'd anticipated, driven mostly by non-core assets that didn't perform. Underneath those poor results sat the delayed effect of extremely depressed steel prices we had to contend with from the back half of 2024 through early 2025. When President Trump put sweeping tariffs on imported steel through Section 232 on March 12, that was the single most important and essential step toward removing competitors who don't price fairly. Everyone in the U.S. steel sector, and that includes Cleveland-Cliffs, is still dealing with hard times, though April and May brought signs of a steadier operating climate and better prices. Beyond pricing, three problems specific to our company have weighed heavily on what we've reported in recent quarters. All three have to be settled if we want profitability and free cash flow to return on a steady basis for the rest of 2025 and on into 2026. First on the list: our main automotive end markets are not performing as they should. Second: we run some operations that lose money and don't sit at the heart of our business. Third: we're locked into a slab supply agreement with ArcelorMittal Nippon Steel Calvert that works against us. Let's take these three one at a time. Starting with that first point: the statistics tell the story when it comes to U.S. auto manufacturing. During 2024, just half of all vehicles purchased in America were built here. To put it differently, foreign-made autos bought domestically accounted for roughly one-half of the market, matching the share held by vehicles manufactured at home. It's hard to imagine anyone claiming we don't require car production within the United States, or that bringing in vehicles from abroad rather than building them domestically is acceptable. So it follows that significant policy efforts aimed at bringing auto manufacturing back to America shouldn't catch anyone off guard. Both American steel and the American auto industry have received robust backing from the Trump administration. It helps that Cleveland-Cliffs sits at the intersection of two industries that matter enormously to America's national and economic security. Calling Cliffs merely a steelmaker that also turns out some automotive product misses the point. Cliffs is the U.S. steel company built specifically to provide American-made steel to America's car manufacturers. What the administration has done is targeted directly at expanding U.S. output of cars and trucks, made with steel from this country. The suppliers best positioned for these circumstances are those with long track records and top OEM ratings in quality, reliability, and delivery performance. Our automotive customers are moving quickly to bring their production back to the United States, so we're reaching out to them on our own initiative and coming up with near-term fixes. Right now there's a lot of unused room to ramp up vehicle manufacturing in America, and several of our biggest accounts have already begun moving work they'd been doing overseas into U.S.-built cars. When it comes to securing longer-horizon steel supply deals with auto OEMs, at home and overseas, we're landing genuine, meaningful business as those automakers push their existing American plants to run fuller and lay out new sites aimed at expanding domestic vehicle output. On top of that, we've recovered market share with our major automotive OEM accounts. Right now, our order book makes it abundantly clear — and so do the contracts we recently extended with long-standing customers — that significant transformation lies ahead. For Cliffs, automotive continues to be a high-margin segment, and we anticipate an annual EBITDA benefit somewhere between $250 million and $500 million, which will begin showing up incrementally during the back half of this year and will be fully reflected in our results in 2026; that takes us to issue number two. We have a lot of conviction that the Trump administration's push to bring manufacturing back to the U.S. is precisely the right one, and we understand that, over the long term, both the American steel industry and Cleveland-Cliffs stand to gain from it. That said, looking at the short term, staying cost-competitive means doing whatever is necessary. To get there and return to profitability, we're making aggressive moves to trim down our operating footprint. Several of these assets have been bleeding money for a long time, and we continued to eat those losses while holding out for new business linked to projects that received heavy promotion but never materialized, funded through the Infrastructure Bill, the CHIPS Act, and the IRA. Unfortunately, that outcome never materialized, and we're left with an issue that must be addressed. Decisions like this aren't made lightly, and we understand that about 2,000 employees felt the impact of these operational adjustments. Still, these moves are necessary, and here's what we've implemented across our operations. The first step: our Menominee mine was completely idled, while our Hibbing-Taconite mine was partially idled, with both being in Minnesota. Those shutdowns were required to restore balance to working capital needs and reduce the excess pellet inventory accumulated during 2024, which was a response to weak demand that plagued us through the final months of the Biden administration. The second step: the hot end in Dearborn, Michigan, is being idled. At Dearborn Works, the downstream equipment is quite advanced—there's a pickling line paired with a tandem cold mill (PLTCM), plus a galvanizing line that's extra wide and built for automotive-grade exposed parts. Operations at those assets won't pause at all. However, Dearborn is also home to a blast furnace, BOF, and caster that are stranded, since there's no hot strip mill to pair with them. To make up for the hot metal Dearborn currently produces, we'll bring back Cleveland's number six blast furnace, and it ought to be running before the Dearborn blast furnace is taken offline. Both the mine idling and the Dearborn blast furnace idle are meant to deliver efficiency improvements, and our ability to serve OEM and service center customers won't be compromised by any of this. Beyond all that, we still hold some legacy assets that simply can't compete and are losing money. These assets are going to be idled, and they're part of the three moves that come next. Action number three: Steelton, which is in Pennsylvania. Steelton operates mainly as an electric arc furnace rail mill. Sadly, the rail buyers we serve would rather have rail brought in from abroad at artificially low prices. In a single instance, one customer brings in half of what he requires from Nippon Steel, and that company keeps sending rail out of Japan even with the Section 232 tariffs in place. That puts a lot of pressure on pricing for the portion made here — the remaining 50% of the business — which we split with two other domestic suppliers, and both of those have more equipment than Steelton does. Action number four: Conshohocken, Pennsylvania. Conshohocken is a specialty plate finishing facility with high costs; the great bulk of the finishing work that happens at Conshohocken today can be handled at our EAF site in Coatesville, Pennsylvania. Action number five, the last one: Riverdale, Illinois. Riverdale relies on liquid pig iron that arrives by railroad, crossing the state line from Indiana, and that puts the plant at a meaningful cost disadvantage. For the Riverdale book of business, there are a number of competitors, and every one of them has a cost profile that's more competitive. This move creates operational efficiencies tied to logistics and fixed costs, while overall volume output stays the same.

Lourenco Goncalves

executive
#2

By idling Riverdale, we're able to keep the pig iron at Indiana Harbor, which is where it should be — that facility currently has spare capacity in steelmaking as well as rolling. Since we'll have more liquid pig iron tonnage for internal needs, we anticipate Indiana Harbor will be one of the largest beneficiaries of the automotive production reshoring expected to come into the U.S. Those three operational actions finalize our departure from three markets that have been unprofitable for us: rail, specialty plate, and high-carbon steel sheet. Circumstances can change, of course, but at this moment, this is the right path. Altogether, those moves will produce more than $300 million in yearly savings. On top of that, we'll also see lower associated overhead plus better efficiency at our remaining operations. Just as important, once all this old inefficiency is gone, everyone will see that Cliffs isn't a high-cost steel producer. At today's busheling scrap price, by feeding our steel plants pellets and HBI that are 100% made in the USA, our integrated mills produce hot-rolled coil at a cost that competes very well with any EAF flat-rolled mini mill. That's precisely why EAF mini mills are pushing so hard to win an exemption for pig iron from tariffs. They're looking to hold onto a hugely lopsided edge, continuing to purchase low-cost dumped pig iron brought in from Brazil, Ukraine, and South Africa — the same way steel importers would sooner acquire dumped foreign steel at bargain prices instead of what's made here at home. The fair competition principle should apply equally to the EAF mini mills as it does to everybody else, and we absolutely anticipate the Trump administration will handle the EAF mini mills the same way it handles every other importer of dumped goods. The third matter concerns the agreement with ArcelorMittal to provide slabs to their 50/50 joint venture with Nippon Steel located in Calvert, Alabama. As many of you are aware, when we bought ArcelorMittal USA back in 2020, one part of that deal was a five-year commitment to provide the Calvert hot strip mill with as much as 1.5 million tons of slabs annually, mostly sourced from Indiana Harbor. In today's market, that slab supply arrangement has turned into a tremendous burden. Pricing under the contract is tied to the Brazilian FOB index, which historically moved in line with U.S. flat-rolled steel prices. Our hot-rolled sensitivity guidance assumed this slab tonnage. But the link to HRC has broken down in a major way. Brazil now faces 25% tariffs, which is entirely justified, replacing the Section 232 slab quota that existed before. Because of that, the pool of American buyers for their slabs has gotten smaller, so the Brazilian slab producers needed to find customers in other regions, and that pushed them to sell off their slabs cheaply. So while domestic flat-rolled pricing has gone up, what we're actually paid under that Brazilian-linked pricing arrangement has gone down, leaving us with a substantial negative margin on this product, and that's reflected in our Q1 results. We've held discussions with ArcelorMittal about ways to address it, but no solution acceptable to both sides has emerged. Given where things stand now, as the slab contract's expiry draws closer, the best course for Cliffs is just to allow it to expire on December 9, 2025. Given where the slab and HRC markets stand right now, we anticipate a benefit of roughly $500 million in annualized EBITDA starting in 2026, purely from not having this burdensome contract anymore. Now let me turn to the Stelco acquisition, which has turned out to fit nicely with our well-established automotive commercial strategy. Stelco is Canada's steel company, and from the very first day, we've taken intentional steps to steer Stelco's sales back into the Canadian market, where they ought to be. Stelco's operations give us an excellent platform to serve its home market quickly and efficiently; thanks to Stelco's attractive cost structure, it can go after and capture any business in Canada. Looking back, Stelco used to be quite a disrupter in the American market, particularly across the Midwest region. While Stelco benefited by picking up legacy Cliffs accounts up in Canada—automotive being a notable example—refocusing Stelco's strategy toward serving Canadian customers with Canadian-made steel created additional opportunities for our mills south of the border, and that is what eventually allowed us to bring Cleveland-Cliffs' number six blast furnace back online. Turning to strategy, many of you have probably come across news reports regarding an uncertain outlook for the strategic projects we have at Middletown and Butler that receive DOE backing. What's evident is that the energy policy agenda under President Trump's administration looks quite different from what it was under the Biden administration. Even so, we are in direct discussions with the leaders at the Department of Energy regarding those awards, and the agency is eager to get a complete picture of both projects and the value each delivers. As for the larger effort in Middletown, we're collaborating with the government to examine adjustments to the scope that would align more closely with the energy goals of the current administration. Such a revision to the scope would result in a project whose cost is considerably lower, and which would not rely on vast quantities of hydrogen being on hand, but would instead run on readily accessible and more cost-effective fossil fuels. With any luck, we'll be able to say more about this project before long, though it's reasonable to expect that the Middletown project, in the form it was unveiled during 2024, is going to change considerably. Now regarding the Butler project — that induction reheat furnace initiative offers very strong returns and pays back quickly. With the Department of Energy grant sitting at $75 million, we don't see any danger there. And it's worth noting that Butler directly advances the energy dominance objectives set out by President Trump's administration. Butler Works happens to be the sole mill in the United States making grain-oriented electrical steel, so it plays a vital role in our nation's energy security. What this effort will do is raise production capacity and expand the site's capabilities, and that matters since the transformer industry continually shifts its requirements. Our enthusiasm for this project remains strong, given its economics, the modest amount of capital it requires, and the way it strengthens our highest-margin operation, which is grain-oriented electrical steel production. Now, on to the transformer facility in Wharton, West Virginia. Cliffs was looking for a partner capable of providing the technology and licensing needed for transformer manufacturing. Since that partner is presently reconsidering the Wharton site and is also weighing a facility smaller than what we initially had in mind, we have chosen to stop moving forward with this investment. At this point I'll hand things over to Celso for his comments.

Celso Goncalves

executive
#3

Hello, everyone. The first quarter largely showed the delayed effects of the tough pricing conditions from late 2024, along with the pre-Section 232 steel tariff situation in early 2025, plus the weak results from non-core assets that we are now shutting down. For Q1, our adjusted EBITDA loss came to $174 million. Shipments totaled 4.14 million tons in the first quarter, which matched our guidance of exceeding the 4 million-ton level, thanks to a full quarter of Stelco's contribution. Price realization in Q1 stood at $980 per net ton, just marginally better than Q4's $976, and it stayed pressured by weaker-than-anticipated realizations in plate and cold roll spreads. Bringing Stelco into our figures keeps helping us control our weighted average unit costs, yet the poor performance from non-core assets during Q1 mostly pushed our unit costs up by $15 per ton. Periods such as Q4 2024 and Q1 2025 are entirely unacceptable, and they don't represent what our normal run rate looks like. With better pricing and the three elements Lourenco described — recovery in automotive, shutting down assets that lose money, and the conclusion of the owner of slab contract — financial results ought to get better in the latter half of 2025 and then climb even higher in 2026 once all these elements are completely incorporated. The six distinct asset shutdowns are the main factor behind why we anticipate even larger cost cuts compared to last year. We had previously expected a $40 per ton reduction year over year in 2025 versus 2024, and at this point we're looking at a $50 per ton reduction year over year. Given the timing of the warrant notices, every one of these cuts will materialize in the back half of this year. During our prior call, I said that once Stelco is included, each $100 rise in the HRC price annually would boost our annual revenue by about $1 billion, assuming all else stays the same. Once you account for things such as profit sharing and past scrap correlations, that $1 billion effect would mostly go straight down to EBITDA; this relationship still holds, provided all else stays equal. That said, the present situation has created some odd dislocations that have tested the all-things-equal premise behind the equation. To illustrate, as I noted earlier, although HRC prices have recovered here in early 2025, slab prices haven't risen alongside them the way you'd normally anticipate. Keeping Stelco tons mostly within Canada, along with other elements such as weaker-than-expected plate and cold-rolled correlations to hot-rolled prices, has also dampened the effect of that billion-dollar relationship for the time being. That being said, even with the HRC curve sitting in the 800s right now, you should still anticipate significant EBITDA gains in performance during the second half of 2025 compared to the first half. One topic that frequently arises at times like this is selling off non-core assets, and this company is very rich in assets. We've lately gotten a number of unsolicited approaches from buyers keen on purchasing a variety of assets within our portfolio. We can’t promise that any of these possibilities will end up producing transactions, but we’re always ready to chase a deal when the value makes sense, when competitive dynamics aren’t upset, and when a sale wouldn’t undermine our main competitive strengths. We’re also continuing to scrutinize capital expenditures closely, and we’ve cut our 2025 CapEx guidance again, bringing it down from $700 million to $625 million, largely because of lower sustaining CapEx at idled assets and because we canceled capital deployment at Wharton. Looking past 2025, Lourenco described where our three strategic projects stand, and on that basis, it’s reasonable to anticipate sizable CapEx reductions in 2026 and later years too, although we won’t know precise figures until negotiations move further along. On the SG&A side, we’ve likewise examined things more carefully and acted to bring overhead costs down, and we’re reducing our expected SG&A expense for 2025 from $625 million to $600 million. From the balance sheet angle, even with our debt level elevated, we face no meaningful maturities before at least 2027 and have under $700 million of total bond maturities across the coming four years. After our recent well-timed capital raise, liquidity remains solid; we have roughly $3 billion available and an additional $3.3 billion of secured capacity. Our leverage metrics are still above target, but we’ll keep working to cut debt and leverage substantially as profitability returns, directing 100% of cash flow generation toward debt reduction. If our inbound inquiries result in successful divestitures, we’ll put cash proceeds from non-core asset sales toward debt reduction too. American steel companies are able to compete and prosper provided illegally dumped steel stays beyond our borders. President Trump’s Section 232 steel tariffs exist precisely for that purpose. Our immediate priority is getting back to profitability and the robust free cash flow generation we’ve produced before. We’re concentrated on serving customers, lowering costs, optimizing our operating footprint, generating free cash flow, and reducing debt. With that, I’ll hand things back to Lourenco for his closing comments.

Lourenco Goncalves

executive
#4

Appreciate that, Celso. We can see plainly that the recovery out of those soft quarters is driven mostly by the numerous things we're doing ourselves, and additionally by making sure U.S. trade law is actually enforced. Getting back to solid EBITDA and cash flow isn't some heavy mountain we have to scale — it's really about carrying out steps that, for the most part, are already underway. With that said, I'll hand things over to Sherry for the Q&A.

Nick Giles

analyst
#5

Thanks, Operator. Morning, everybody. My first question concerns that $300 million in savings. It's good to see. What's the timeline for getting to the complete run rate on those savings? I also wondered whether there might be further steps you could still take down the road to lift your three-cycle earnings. Many thanks.

Lourenco Goncalves

executive
#6

Morning, Nick. I'll hand that over to Celso to respond. Celso, please go ahead.

Celso Goncalves

executive
#7

Yeah, hi Nick. One reason we acted when we did is that, if you look at the warrant notices, those run for a 60-day window. Given the timing of our move, once 60 days pass, you're at the start of the back half of the year. That's the point when the complete effect of the $300 million of savings begins to show up. To add a bit more color, as we mentioned, we put a presentation up on our site too, and it breaks out additional specifics. Most of that $300 million ties to the Cleveland-Dearborn switch. That piece is roughly $125 million. Then $90 million — call it $90 million-$100 million — comes from the Riverdale fixed costs, $45 million from Conshohocken, and around $30 million from Steelton. The remainder, roughly $20 million, is the Minorca and Hibbing idles. All of that should be realized in the second half of 2025.

Nick Giles

analyst
#8

Celso, that's really useful, thanks so much. For my follow-up: you said we'd see it in the back half of the year, and with that plus the extra $10 per ton in cost savings you're adding, could you remind us how the cadence should look on the cost side? Clearly, there will also be some ASP improvement, which might start in 2Q. I'm just wondering how you'd put numbers on those two pieces. Thanks very much.

Celso Goncalves

executive
#9

Yeah. I mean, looking at it sequentially, Q1 into Q2, no material impact will show up. Costs ought to actually rise slightly, roughly $5 a ton going from Q1 to Q2, since those non-core assets will still sit in our portfolio. It's later in the year when a more meaningful impact begins to appear, driven by optimizing the footprint, cutting the fixed costs, and then bringing down the overhead; in the second half, versus Q1 and Q2, we'll see a significant benefit.

Nick Giles

analyst
#10

I’ll get back in line, but keep wishing you the best of luck.

Celso Goncalves

executive
#11

Thank you, Nick.

Lourenco Goncalves

executive
#12

Thanks, Nick. I appreciate that.

Albert Realini

analyst
#13

Good morning, Lourenco and Celso. Thanks for taking my question. I believe we're looking at slide 10, and it concerns how the steel tariffs are affecting Stelco. I was just wondering whether that would line up with any adjustments to the synergies you've planned, or perhaps even to how Stelco contributes on an annual basis?

Lourenco Goncalves

executive
#14

Albert, that's a really good question. When we discuss tariffs, we need to be specific about which ones we mean. Because when we made the acquisition of Stelco, we had already decided by design that we would remove Stelco from the American domestic market as a disruptor, the way they had been operating here, especially in Cleveland and Chicago, here in the Midwest. The Section 232 tariffs on steel simply consolidated what we were already doing, so our game plan didn't change. It affects other competitors from Canada that do the same thing. The Section 232 makes it entirely impossible for any other Canadian trying to sell into the domestic market. Our plan already accounts for not selling Canadian steel made at Stelco within the U.S. Nothing changes on that front except that it makes competing against other Canadians inside the U.S. easier. That said, the broader tariffs that hit Canada affected our clients. Our clients were harmed when it came to selling their product into the U.S. That wasn't part of our plan. Absolutely not. Nobody anticipated that. Otherwise, I wouldn't have been so eager to buy Stelco if I had known that Canada would not be treated like a friend. On the other hand, I do believe this situation is entirely temporary. I view the Carney-Trump meeting as a move in the right direction toward normalizing the relationship between the U.S. and Canada. There's no other way forward. We are tied by the hip, and neither of us can go without the other. We need each other, and we should keep working that way. Section 232 is a different animal. Tariffs in general will have to be reworked. It's clear that the USCA, the USCA treaty that I have always said what's needed will be worked, and it will be working in short order. Did I answer you? That's clear. Yeah, that's clear. Thank you, Lourenco. Thank you.

Lawson Winder

analyst
#15

Thanks, Operator. Morning, Lourenco and Celso. Good to hear from both of you, and I appreciate the update. May I ask about the assumptions you have regarding the rise in domestic auto production, and whether some part of that could be viewed as a drop in imports coming from Canada? My reason for asking is this: is there a risk that, if Canada were to become exempt again from an auto production standpoint, that outlook could be affected?

Lourenco Goncalves

executive
#16

Well, when I refer to normalization of trade between the U.S. and Canada, autos are part of that, since certain components made in Canada are required to put a car together in the U.S. In my view, that matter has already been fought over by the car manufacturers, and they have already received some relief. In fact, we are beginning to observe far more benign conduct from the auto OEMs when it comes to the chance to use components, especially components from Canada and likewise from Mexico, yet especially components from Canada; this is underway, and the car manufacturers are negotiating well with the Trump administration. We are witnessing the benefits. We are very excited about the new opportunities to deliver additional steel to the car manufacturers here in the U.S. Let's be honest, Lawson, even if the quantity of cars sold in the U.S., or in North America for that matter, is smaller soon because of the restrictions put in place by President Trump, the total quantity of cars built in the U.S. will go up; for us, that is the thing that counts. For us, as suppliers of steel, that is the thing that counts. Let's attach numbers to it. 16 million cars sold, let's say eight million cars made here and eight million cars brought in from somewhere. If that figure moves from eight to 12, then for the car manufacturers it is a decline from 16 to 12 in cars sold. For us, as suppliers of steel, especially Cliffs, it is a 50% rise from eight million cars to 12 million cars; that is what I am getting my company ready for. This is going to happen, and I am being very conservative with my numbers; we are getting Cleveland-Cliffs ready to be by far the biggest beneficiary of the growing production of cars in the U.S., because we are a well-established producer of steel for the automotive industry.

Lawson Winder

analyst
#17

All right. Great, that helps a lot. If I may ask a follow-up regarding the quarterly bridge, Celso, specifically about ASP and cost — you noted that cost might rise. I didn't hear whether you also said ASP would be higher. What I'm really after is a sense, whether by direction or by size, of how much EBITDA will improve in Q2 compared with Q1?

Celso Goncalves

executive
#18

Yes, absolutely. Hi, Lawson. Right. I said cost ought to climb roughly $5 per ton going from Q1 into Q2, yet ASP ought to climb far more than that — around $40 per ton between Q1 and Q2. Looking at it product by product, the quarterly lag contracts are significantly better. Say they rise by about $200 per ton in Q2 compared with Q1. The monthly lag contracts should increase by roughly $100 per ton. At present, spot pricing tends to be considerably higher for the U.S. business; those are more or less the main factors behind that $40 per ton ASP gain from Q1 to Q2.

Lawson Winder

analyst
#19

All right. Yeah, that's really helpful detail. Thanks a lot, Celso. Thanks, Lourenco.

Lourenco Goncalves

executive
#20

Thanks.

Alex Hacking

analyst
#21

Yeah, thanks. Good morning. Celso, you brought up the chance of selling some assets. I suppose I have a few questions about that. First, could you remind everyone what debt covenants you currently have? And second, regarding asset sales, if you're able to talk about it — I'm not certain you can — what sort of size are we discussing, and which potential assets are we discussing? Thank you very much.

Celso Goncalves

executive
#22

Yeah, sure. Good morning. Every one of our covenants is a springing covenant, so nothing there worries us much. When you're levered above four times, the leverage ratio on our borrowing base goes up by 25 basis points. That's what we're seeing right now. Beyond that, nothing concerns us. As for asset sales, as I said, we hold plenty of non-core assets. Ours is a company rich in assets. I won't get into which specific ones, but we've gotten unsolicited inbounds, and we're discussing assets that might deliver several billion dollars in potential value. If those come to fruition and we can sell them for cash, that cash will also go entirely toward paying down debt. While we're on this topic, our capital structure is, as you know, sort of pre-designed for deleveraging, correct? The ABL can be paid down easily, with no breakup fees. Each of our bonds is staggered. We have no meaningful maturities. A few of those bond tranches can even be called at par without any penalty. There are plenty of avenues we can deploy cash toward if we manage to sell those assets.

Alex Hacking

analyst
#23

All right, thank you. That makes sense. As a quick follow-up, could these deals be made public within the coming months, or does it take a longer period than that? Thanks.

Celso Goncalves

executive
#24

A number of them have progressed quite far. My sense is that a few might be announced before this year is over. Others will require more time. As I mentioned, there's no certainty, yet it's encouraging to observe such strong inbound interest.

Alex Hacking

analyst
#25

Okay. Thanks. Best of luck.

Celso Goncalves

executive
#26

Thank you.

Bill Peterson

analyst
#27

Right, hello there. Morning, Lourenco and Celso, and I appreciate you answering our questions. Perhaps to finish up on the second quarter guidance, what's the right way to view how shipments are shaped across that guidance?

Celso Goncalves

executive
#28

Right, so hi, Bill. Morning. Compared with Q1's 4.1 million tons, shipments ought to come in a bit higher. C6 is being brought back at the point Dearborn gets idled. From Q1 into Q2, auto volume is expected to rise. In Q2 versus Q1, I'd call it a modest increase. Mix is likely to look quite a lot like what we saw in Q1 as well.

Bill Peterson

analyst
#29

All right. Thank you for that, Celso. I suppose turning to Weirton, and perhaps a wider question about GOES as well, could you give us more specifics on what shifted, since earlier signals suggested equipment had already been purchased and the partnership was in place? Might this still return to the table and actually go ahead, or is it essentially dead? Regarding GOES itself, aside from what you said about Weirton, how should we view demand and shipment patterns there, given that lead times in the transformer segment still appear quite extended?

Lourenco Goncalves

executive
#30

Yes. GOES demand is going to stay extremely strong. That facility will get constructed somewhere, and by the partner on its own. What bothers me regarding joint ventures is that in such an arrangement, the partner gets a voice, especially when it is split 50/50. Building the plant by myself is not possible. The licensee is not mine, and the IP is not mine either. We are not Chinese. Taking IP from anybody is not what we do. The partner has to collaborate with me. Should the partner try to renegotiate terms, I walk away. For me, where it goes and how big it is matter greatly, since the location determines throughput, and the scale determines how many jobs we will bring to Weirton. To me, the Weirton site is sacred, because that is the place where my whole story began. With that said, my main drive is moving more grain-oriented electrical steels; that pledge stands. Whenever they move forward on their own with a project, I will supply them, ideally in Weirton. As far as I'm concerned, if Weirton is the spot, then I'm out. If Weirton is not the spot, then so be it. The plant will be built by them. Building a plant is something they are fully dedicated to. I will then supply them and sign a long-term supply contract, since importing dumped grain-oriented electrical steels from Japan, Korea, or China is no longer an option for them. Their only choice is to purchase from me, and I will be positioned right there to sell at market prices. Should they choose Weirton, the site remains open. We will deal with the partner in a very amicable manner and have them put the plant there. They claim they will build. They are merely reconsidering the location and scale. Size, I believe, is not a problem, because we begin small and expand afterward. The location, to me, is sacred; for me, it is Weirton, otherwise I'm out. I will simply serve as a grain-oriented electrical steels supplier, and they can rest easy about that. That works for me. I hope this call was useful, Bill.

Bill Peterson

analyst
#31

No, that really does clarify things. Appreciate both of you, Lourenco and Celso, for walking us through those observations, and best of luck dealing with the conditions we're facing right now.

Lourenco Goncalves

executive
#32

Thanks.

Celso Goncalves

executive
#33

Thank you, Bill.

Timna Tanners

analyst
#34

Hello, and good morning to everyone. I'd like to request that you take us through whatever exit expenses or severance charges might stem from the moves being made at the various sites at this point, possibly covering Weirton along with the remaining ones you mentioned.

Celso Goncalves

executive
#35

Alright, Timna. In the near term, the cash charges tied to those idles are quite small—roughly $15 million for Q2. We'll also see some non-cash accounting charges during Q2, and those should come in around $300 million. Those are primarily tied to impairment and certain employment accrual costs. After that, we'll have ongoing continued employment charges much like what we see with Weirton, but that's basically the way to think about it moving forward. As for ongoing idle costs, those should be minimal too—under $5 million annually across all the idle actions.

Timna Tanners

analyst
#36

That severance costs are not a big cost hit either then?

Celso Goncalves

executive
#37

That's right. Yes.

Timna Tanners

analyst
#38

All right. If I may, just one additional question. Regarding what you said about capital expenditures decreasing in upcoming years as well, could you refresh our memory on the status of any blast furnace relines that I think you've mentioned previously? Is there any new information about when those might occur, please?

Lourenco Goncalves

executive
#39

Right. We're going to keep depending on blast furnaces. They're essential. They aren't going anywhere. They'll remain in Japan, remain in Korea, remain in Europe, remain in Brazil. They're staying. We'll keep going head-to-head with the EAFs. As I mentioned, thanks to all the idled operations, all the non-contributors, the non-core assets we're closing, what it costs us to make hot bed is highly competitive against any EAF mini-mill; we're going to demonstrate that moving forward, now that the non-contributors are gone. This is going to show. You ought to anticipate that. We're in fact bolstering our standing as an automotive supplier. We'll keep providing the automotive sector the results we provided previously, particularly now that I've readied this company to compete on cost evenly by shedding those non-core assets — provided there's a level playing field. Naturally, I don't want my rivals bringing in dumped pig iron, since it's dumped the same way steel gets dumped. Pig iron gets dumped. If dumped steel isn't permitted, dumped pig iron shouldn't be permitted either. If not, there's no level playing field. Ours is 100% — our feedstock is 100% made in the USA. We've got an HBI plant made in USA producing HBI made in USA. In any case, that's the landscape. I love competition. I'm a competitor. I'll compete, and I'll win.

Timna Tanners

analyst
#40

All right, apologies. I had simply been inquiring about the expenses associated with blast furnace reline. I get where you're coming from.

Lourenco Goncalves

executive
#41

Yes. A reline is going to happen for our blast furnace. The blast furnace is going to get a reline. Now that the scope of the project has shifted, the Middletown blast furnace is going to be relined. A reline will take place at the Burns Harbor blast furnace. We recently completed a reline at one in Cleveland; relining blast furnaces is something we'll keep doing; this isn't something that's off the table; it's not something that's outside of consideration. It's simply part of normal, ongoing operations. If you're wondering when the following one is scheduled, it will happen in 2027, since we run things well. By running more conservatively and performing short creek and similar tasks that are standard practice for blast furnaces, we're able to extend how long our blast furnaces last. The following one comes in 2027; relines will keep happening. Reality has returned. La La Land is no more.

Timna Tanners

analyst
#42

Okay. Thank you.

Lourenco Goncalves

executive
#43

You're welcome.

Analyst

analyst
#44

Yes. Morning, Lourenco and Celso. I have a few things to ask. First, a follow-up regarding CapEx. As you look at and potentially rework your strategy for those 2 projects that got some backing from various government grants, is there anything new? Might you think about scrapping them, pushing them back, or at minimum carrying them out in a way that's more even so that CapEx stays intact? So that cash stays intact. My second thing relates to imports and Section 232. How do you view the upside of reducing every quota down to zero while simply holding the rate at 25%? The reason I ask is that we keep hearing about certain foreign nations that previously had no quotas and currently have none becoming fairly aggressive about shipping material into the U.S., something they couldn't do before. Thanks.

Celso Goncalves

executive
#45

Yes. Hey, Carlos. Celso speaking. I'll address CapEx first, then Lourenco can cover the tariffs. We touched on this somewhat during the prepared remarks, though perhaps it wasn't entirely clear or you missed it. The CapEx items tied to the DOE remain somewhat unsettled because of negotiations. What it comes down to is that it will change, and it will be considerably less than what we referenced previously. Just a few figures regarding CapEx for this year. Our guidance is coming down to $625 million in total, versus the $700 million we had before. That 2025 guidance includes the $30 million we are putting toward Butler. We are no longer proceeding with Weirton, which frees up $50 million of CapEx in 2025. Once you put together everything we covered in the prepared remarks about Middletown, you can reach the conclusion that 2026 CapEx and past that will be far lower than what we had anticipated earlier. As Lourenco said, the Burns Harbor reline, which we had originally scheduled for 2026, will now happen in 2027. Those represent the primary changes to how we expect CapEx to look.

Lourenco Goncalves

executive
#46

Right. So on Section 232 — you brought up quotas, and the way I took it, the message was that word on the street is quotas are on the way. Did I get that right, Carlos?

Carlos de Alba

analyst
#47

Right, my apologies, Lourenco. What I mean is this: now that those quotas are gone, plenty of overseas nations that previously faced a ceiling on the volume of steel they could ship into America have turned really aggressive, since that 25% was in place beforehand. There's still money to be made on the steel, but absent any restriction on how much they're able to bring in, they just keep ringing up traders to push material into the U.S.

Lourenco Goncalves

executive
#48

Right. The main issue we're facing with Section 232 right now involves those nations that keep moving product despite the tariffs. Consider Vietnam, for instance — they're offering hot rolls duty-paid at the port for $700 and change; that's insane. This is a nation that doesn't even merit a trade agreement, since they failed to grasp what the administration was really saying. What the administration was really saying is, "Stop dumping, because if you keep dumping, you won't be treated favorably." It's not, "25% is something I can live with. My government will give me subsidies so I can get past the 25%." That isn't the point being made. The point being made is, "Dumping must stop." My hope — my sincere hope — is that the Trump administration won't strike a very generous agreement with Vietnam, because Vietnam disrupts the market as they invariably do. Japan is the other case in point. Rail is being sold by Nippon Steel right through the tariffs. Actions like these carry consequences. It's unlike approaching the government and saying, "Look, Trump administration, we now need 50% or 100% tariffs on rail, because obviously Nippon Steel has no boundaries. They'll push all the way. Even at 100%, they'd still sell through the tariffs." How they manage that, I have no idea. Perhaps Morgan Stanley ought to know. How is Japan able to pull that off? How does Nippon Steel stay so profitable while selling at prices that low? What's the mystery there? These are capitalist markets, aren't they? When the banks never raise the question, I've yet to see a report asking how they turn a profit. Regardless, that isn't my concern. It's no longer my concern, because as I said, dumping carries consequences. Shutting down a mill that's been producing rail in the U.S. for a couple of centuries isn't something I do casually. I do what's necessary. We did it; it's finished. That's a direct result of Nippon Steel selling rail through the tariffs in spite of Section 232. Did that answer your question, Carlos?

Carlos de Alba

analyst
#49

Yeah. Thanks, Lourenco. Thank you, Celso, for the clarification.

Lourenco Goncalves

executive
#50

Okay.

Celso Goncalves

executive
#51

Carlos, thank you. That wraps up the Q&A portion, and with that, today's call comes to a close. You're free to hang up now, and we appreciate you joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Cleveland-Cliffs Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Cleveland-Cliffs Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Cleveland-Cliffs Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.